HRRP Bulletin Housing Recovery and Reconstruction Platform, Nepal

Total Page:16

File Type:pdf, Size:1020Kb

HRRP Bulletin Housing Recovery and Reconstruction Platform, Nepal Media Digest​ | ​FAQ​ | ​Briefing Pack​ | ​Meeting & Events​ | ​5W​ | ​Housing Progress​ | ​HousingTypologies ​ The fourth Asia Shelter Forum 2020 was held in Nepal on 29 November 2020. It was abridged and virtual due to COVID-19 Pandemic situation. The Asia Shelter Forum will be held face-to-face in April 2021 in Kathmandu if COVID-19 pandemic situation allows. The program was hosted by the Government of Nepal, led by Ministry of Urban Development with support from National Reconstruction Authority (NRA), Department of Urban Development and Building Construction (DUDBC), and Asia Shelter Forum Organizing Committee Members namely HRRP, CRS, IFRC, EU, IOM, Habitat for Humanity and NGO Federation Nepal. HRRP Bulletin Housing Recovery and Reconstruction Platform, Nepal HIGHLIGHTS ● The Fourth Asia Shelter Forum held in Nepal ● NRA organized a webinar to discuss NRA’s achievements and lessons through its compendium papers ● NRA has fixed a final deadline for grant disbursement ● Vulnerable Support Working Group Meeting update ● A webinar on “Promotion of Seismic Retrofitting in High Earthquake Risk Communities - Make safer now” ● The Urban Recovery Technical Working Group (UR-TWG) update ● COVID-19 live updates from Ministry of Health and Population (MoHP) FEATURED TECHNICAL STAFF STORY: Sanish Kumar Pandit, Focal Engineer Er. Sanish Kumar Pandit, Focal Engineer Bhimphedi Rural Municipality: Sanish is leading the Retrofit Task Force for the Bhimphedi Rural Municipality. He worked two and half years in the DLPIU Building and currently he is working as the focal Engineer in Bhimphedi Rural Municipality. The main challenge that they are currently facing is retrofitting. There are 964 beneficiaries eligible for the retrofitting in the rural municipality. However, a majority of the Sanish Kumar Pandit retrofitted beneficiaries want to convert into Focal Engineer, Bhimphedi Rural reconstruction, and they are having a tough Municipality, Makwanpur time convincing beneficiaries for the house retrofitting. 30 November 2020 Page 2 of 26 HRRP Bulletin Housing Recovery and Reconstruction Platform, Nepal NATIONAL UPDATES NRA, CLPIU GMaLI and Building, Grant Disbursement Data, as of 30 November 2020: *N/A indicates that the information source was not accessible at the time of reporting Progress with the disbursement of the GoN housing reconstruction and retrofit grants based on NRA, GMaLI CLPIU data as of 30 Nov 2020. 30 November 2020 Page 3 of 26 HRRP Bulletin Housing Recovery and Reconstruction Platform, Nepal The Fourth Asia Shelter Forum held in Nepal, 29 November 2020:​ Government of Nepal led by Ministry of Urban Development (MOUD), with support from National Reconstruction Authority (NRA), Department of Urban Development and Building Construction (DUDBC) and the Asia Shelter Forum Organizing Committee Members namely HRRP, CRS, IFRC, EU, IOM, Habitat for Humanity and NGO Federation Nepal organized an abridged virtual Asia Shelter Forum 2020 on 29 November 2020. ​The Asia Shelter Forum 2020 in Nepal is planned virtually due to the COVID-19 Pandemic with the expectation that the face to face Shelter Forum and shelter week will be held in April 2021 in Kathmandu if Covid-19 situation allows. This half-day virtual workshop discussed the lessons and experience of recent disasters as well as the wider experience of shelter response in the region. The workshop explored best practices and community driven shelter initiatives along with urban recovery and with active community engagement ensuring humanitarian assistance to support affected people to survive, recover and rebuild their lives with dignity. Detailed report to follow. NRA organized a webinar to discuss NRA’s achievements from 27-28 November 2020: NRA organized a two-day webinar session, with the objective to share, discuss and receive feedback on the compendium papers namely: private housing reconstruction; public building and infrastructure; cultural heritage; livelihood and economic development; rescue & relief; good governance & institutional arrangement as part of preparation for the International Conference on Nepal’s Reconstruction planned in April 2021. Experts in each of the thematic areas presented the findings of the documentation work highlighting on the background context, institutional and operational challenges, strategies and approaches adopted, lessons learned and conclusions with key messages. Prominent experts from various backgrounds provided feedback on the compendium papers. ​The Chief Executive Officer, Mr. Sushil Gyewali highlighted the future course of action for NRA highlighting on NRA’s disengagement plan, documentation of NRA’s achievements and lessons learned for future reference. A webinar on “Promotion of Seismic Retrofitting in High Earthquake Risk Communities - Make safer now”, 30 November, 2020: ​A webinar on " Promotion of Seismic Retrofitting in High Earthquake Risk Communities: Make Safer Now" was organized 30 November 2020 Page 4 of 26 HRRP Bulletin Housing Recovery and Reconstruction Platform, Nepal with t​he main objective of disseminating current knowledge and practice of improving seismic performance of existing buildings and other structures by discussing on the significance of seismic retrofitting as an essential intervention measure for earthquake risk reduction, elaborate on the research and development on retrofitting across the Asian region, interface the scientific advancements into practical applications in at-risk communities, and learn from the success and failures of past interventions to shape the way forward for future. There were more than 100 participants representing various sectors in earthquake risk management in Asia. NRA has fixed a final deadline for grant disbursement, 6 November ​The NRA Executive Committee Meeting held on 6 November 2020 has set a final deadline for tranche disbursement for private housing reconstruction. According to the new tranche deadline, those beneficiaries who are eligible for reconstruction and retrofit grant are requested to sign the partner agreement by 15 December 2020 (end of Mangsir 2077), and receive first tranche by 30 December 2020 (Poush 15, 2077). Similarly, beneficiaries who have received the first tranche must start their housing reconstruction and submit an application to the local government for verification process by 12 February 2021 (end of Magh 2077). All reconstruction and retrofitting beneficiaries must submit an application for verification process to the local level government by 14 May 2021 (end of Baisakh 2078) to access third and final tranche. Likewise, NRA has requested all eligible reconstruction beneficiaries that may have been left out of access to housing reconstruction grants to approach their respective local government, in order to sign a partner agreement at the earliest possible and access housing reconstruction grants. Similarly, retrofitting beneficiaries, who are willing to demolish their existing damaged house and go for new reconstruction are requested to submit an application to the District Level Project Implementation Unit (DLPIU) . Vulnerable Support Working Group Meeting, 6 November 2020: The virtual meeting of the Vulnerable Support Working Group was held on 06 November 2020 to discuss housing progress, issues and challenges surrounding the housing reconstruction of vulnerable beneficiaries. The overall objectives of the meeting were to discuss and provide necessary 30 November 2020 Page 5 of 26 HRRP Bulletin Housing Recovery and Reconstruction Platform, Nepal guidance to partners and the agents of change, particularly social mobilizers and mobile masons, who are deployed by CLPIU-Building in the 14 most earthquake-affected districts. The meeting also aimed at strengthening coordination and communication with partners, government entities and the field technical staff, to provide adequate socio-technical assistance (STA) to vulnerable beneficiaries struggling with their housing reconstruction.The meeting was attended by NRA, CLPIU-GMaLI, CLPIU-Building, POs and Donor representatives. For more information, contact HRRP National Coordination Officer, Ruplal Aidi. email: ​[email protected] The Urban Recovery Technical Working Group (UR-TWG) update: The UR-TWG held its 18th meeting on 25 November, 2020. The members discussed setting up a platform for sharing learnings from Nepal’s urban housing recovery. This will further be connected to Nepal’s longer-term urban development vision, in order to facilitate efficient, sustainable and inclusive urban settlement recovery. A concept proposed was starting with Urban Webinar Series. UR-TWG members brainstormed on making this a platform for national and international knowledge sharing on urban housing recovery issues, success stories and best practices. It would further explore linkages between urban housing recovery, UN SDG 9 and 11 (resilient infrastructure; sustainable cities & communities), New Urban Agenda, and national level urban development strategies and urban policies of the Government of Nepal. Currently the webinar agenda is being prepared in consultation with the working group and other relevant stakeholders. The first webinar of the series will be held in December 2020 (Save the Date to follow shortly). To know more or contribute your ideas, kindly contact Rupesh Shrestha: ​[email protected] COVID-19 live updates from Ministry of Health and Population (MoHP) According to the Ministry of Health & Population (MOHP) ​website data, as of 29 November 2020, total cumulative new cases are 231,978
Recommended publications
  • Kulekhani I Hydropower Station
    MESSAGE FROM THE MANAGING DIRECTOR I would like to express my sincere greetings to the Generation Directorate on the publication of its 12th edition of NEA “Generation Directorate Magazine” on the occasion of the 35th anniversary of Nepal Electricity Authority. I believe the precious data presented herein will be useful to the NEA stakeholders as well as the general public. The total installed capacity of the NEA owned power plants is 626.70 MW (20 hydro and 2 thermal) out of total 1332.86 MW in INPS. The annual generation from these power plants is 3011.43 GWh, which is 50.09% of the total energy generation in Nepal. Upper Trishuli 3A (60 MW) was inaugurated by Rt. Hon’ble Prime Minister KP Sharma Oli on 18 Nov, 2019. The long awaited cascade type Hydro power project, Kulekhani-III (14 MW) also started generation from 11 Oct, 2019. The taking over of this plant is still on hold due to the Covid-19 pandemic as well as a few other liabilities that need to be accomplished by the Contractor. Major rehabilitation or overhauling works were carried out in Kaligandaki A (including SCADA/ Control system upgradation), Middle Marsyangdi, Marsyangdi, Kulekhani- I & II, Sunkoshi, Modi, Trishuli, Devighat and Puwakhola HPS, even during the lockdown imposed by the government and the continued pandemic. This has ultimately resulted in minimizing generation outage due to breakdowns. These regular and timely maintenance has made Generation Directorate capable of supplying reliable and continuous energy to national grid. Finally, I’m thankful to all the employees working in the power plants, their plant managers and the entire team in Generation Directorate for putting in all the hard work to achieve the desired result.
    [Show full text]
  • Tracing the Mahabharat Thrust (MT) on the Basis of Lithology and Microstructures Around Bhainse-Manahari Area, Central Nepal
    Journal of Nepal Geological Society, 2016, Vol.Tracing 51, pp.the 39-48Mahabharat Thrust (MT) on the basis of lithology and microstructures Tracing the Mahabharat Thrust (MT) on the basis of lithology and microstructures around Bhainse-Manahari area, central Nepal *Laxman Subedi1 and Kamala Kant Acharya2 1Department of Geology, Tri Chandra Campus, Tribhuvan University, Kathmandu, Nepal 2Central Department of Geology, Tribhuvan University, Kathmandu, Nepal (*Email: [email protected]) ABSTRACT Lithological and microstructural study carried out in Bhainse –Manahari area, central Nepal reveals that the rock sequences of the Bhainse–Manahari area can be divided into two successions: the Nawakot Complex and the Kathmandu Complex. These two Complexes are separated by a distinct thrust boundary, the Mahabharat Thrust (MT). The Nawakot Complex consists of low-grade metamorphic rocks like slate, phyllite, quartzite and limestone while the Kathmandu Complex comprises medium grade (up to garnet grade) metamorphic rocks like garnet-schist, marble and mica-schist. The Mahabharat Thrust (MT) and the Manahari Thrust (MnT) are the two major thrusts in the study area. The MT separates the rocks of the Nawakot Complex (foot wall) in the south from the rocks of the Kathmandu Complex (hanging wall) in the north. The Manahari Thrust in the western part of the study area separates the Dunga Quartzite and the older Benighat Slates lying above it. The microstructure analysis reveals that the rocks in the thrust zone show higher deformation than in the neighboring rocks, and this gradually decreases away from the MT zone. The strain analysis of quartz grains reveals that the rock sequences of the hanging wall of the MT showed pure, simple and complex shear senses and the rocks of the footwall also showed the same pattern indicating MT as a stretching fault.
    [Show full text]
  • Provincial Summary Report Province 3 GOVERNMENT of NEPAL
    National Economic Census 2018 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 Provincial Summary Report Provincial National Planning Commission Province 3 Province Central Bureau of Statistics Kathmandu, Nepal August 2019 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 National Planning Commission Central Bureau of Statistics Kathmandu, Nepal August 2019 Published by: Central Bureau of Statistics Address: Ramshahpath, Thapathali, Kathmandu, Nepal. Phone: +977-1-4100524, 4245947 Fax: +977-1-4227720 P.O. Box No: 11031 E-mail: [email protected] ISBN: 978-9937-0-6360-9 Contents Page Map of Administrative Area in Nepal by Province and District……………….………1 Figures at a Glance......…………………………………….............................................3 Number of Establishments and Persons Engaged by Province and District....................5 Brief Outline of National Economic Census 2018 (NEC2018) of Nepal........................7 Concepts and Definitions of NEC2018...........................................................................11 Map of Administrative Area in Province 3 by District and Municipality…...................17 Table 1. Number of Establishments and Persons Engaged by Sex and Local Unit……19 Table 2. Number of Establishments by Size of Persons Engaged and Local Unit….….27 Table 3. Number of Establishments by Section of Industrial Classification and Local Unit………………………………………………………………...34 Table 4. Number of Person Engaged by Section of Industrial Classification and Local Unit………………………………………………………………...48 Table 5. Number of Establishments and Person Engaged by Whether Registered or not at any Ministries or Agencies and Local Unit……………..………..…62 Table 6. Number of establishments by Working Hours per Day and Local Unit……...69 Table 7. Number of Establishments by Year of Starting the Business and Local Unit………………………………………………………………...77 Table 8.
    [Show full text]
  • Makwanpur - Operational Presence Map (Completed and Ongoing) [As of 30 Sep 2015]
    NEPAL: Makwanpur - Operational Presence Map (completed and ongoing) [as of 30 Sep 2015] 44 Tistung Agra Partners working in Makwanpur Khairang Dandakharka Bajrabarahi Palung Chitlang Gomane Kangkada Phakhel 1-4 5-8 9-12 13-16 17-20 Bhartapunyadevi Daman Markhu Raksirang Kalikatar Kulekhani Namtar Sisneri Bhimphedi Sarikhetpalase Kagate Protection 17 Nibuwatar Manahari Bhainse Ipa Panchakanya Budhichaur Shelter and NFI Basamadi 12 Ambhanjyang Sukaura Health Manthali 8 Handikhola Hetauda Municipality Thingan Padampokhari Makawanpur Gadhi WASH Shikharpur 7 Beteni Churemai Hatiya Harnamadi Education 6 Phaparbari Shripur Chhatiwan Food Security 4 Early Recovery Dhiyal 2 Raigaun IMPLEMENTING PARTNERS BY CLUSTER Early Recovery Education Food Security 2 partners 6 partners 4 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 Health Protection Shelter and NFI 8 partners 17 partners 12 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 WASH 7 partners Want to find out the latest 3W products and other info on Nepal Earthquake response? visit the Humanitarian Response website at http:www.humanitarianresponse.info/en/op Nb of erations/nepal organisations Note: Implementing partners represent the organization on the ground, in the affected district doing operational work, such as send feedback to 1 >=5 distributing food, tents, water purification kits etc. [email protected] Creation date: 13 Oct 2015 Glide number: EQ-2015-000048-NPL Sources: Cluster reporting The
    [Show full text]
  • Redalyc.ANALYZING SEISMIC ACTIVITIES DURING 1900 TO
    Journal of Urban and Environmental Engineering E-ISSN: 1982-3932 [email protected] Universidade Federal da Paraíba Brasil Kumar, Amit; Chandra Pandey, Arvind ANALYZING SEISMIC ACTIVITIES DURING 1900 TO 2015 TO ASSESS URBAN RISK IN NEPAL HIMALAYAS USING GEOINFORMATICS Journal of Urban and Environmental Engineering, vol. 11, núm. 2, julio-diciembre, 2017, pp. 133-141 Universidade Federal da Paraíba Paraíba, Brasil Available in: http://www.redalyc.org/articulo.oa?id=283255970001 How to cite Complete issue Scientific Information System More information about this article Network of Scientific Journals from Latin America, the Caribbean, Spain and Portugal Journal's homepage in redalyc.org Non-profit academic project, developed under the open access initiative Kumar and Pandey 133 Journal of Urban and Environmental Journal of Urban and E Engineering, v.11, n.2, p.133-141 Environmental Engineering ISSN 1982-3932 J www.journal-uee.org E doi: 10.4090/juee.2017.v11n2.133141 U ANALYZING SEISMIC ACTIVITIES DURING 1900 TO 2015 TO ASSESS URBAN RISK IN NEPAL HIMALAYAS USING GEOINFORMATICS Amit Kumar and Arvind Chandra Pandey Centre for Land Resource Management, Central University of Jharkhand, Brambe, Ranchi-835205, INDIA Received 27 August 2016; received in revised form 02 May 2017; accepted 05 July 2017 Abstract: A high magnitude (Mw = 7.8) earthquake caused a geological disaster recently on April-May 2015 in Nepal Himalayas and resulted in severe devastation in Nepal as well as neighboring states in India. Looking into its recurrent occurrence with varied intensity, in the present study, the earthquake pattern in Nepal Himalayas was analyzed during the period 1900 to 2015 using United States Geological Survey (USGS) data sources in GIS environment.
    [Show full text]
  • CHITWAN-ANNAPURNA LANDSCAPE: a RAPID ASSESSMENT Published in August 2013 by WWF Nepal
    Hariyo Ban Program CHITWAN-ANNAPURNA LANDSCAPE: A RAPID ASSESSMENT Published in August 2013 by WWF Nepal Any reproduction of this publication in full or in part must mention the title and credit the above-mentioned publisher as the copyright owner. Citation: WWF Nepal 2013. Chitwan Annapurna Landscape (CHAL): A Rapid Assessment, Nepal, August 2013 Cover photo: © Neyret & Benastar / WWF-Canon Gerald S. Cubitt / WWF-Canon Simon de TREY-WHITE / WWF-UK James W. Thorsell / WWF-Canon Michel Gunther / WWF-Canon WWF Nepal, Hariyo Ban Program / Pallavi Dhakal Disclaimer This report is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of Kathmandu Forestry College (KAFCOL) and do not necessarily reflect the views of WWF, USAID or the United States Government. © WWF Nepal. All rights reserved. WWF Nepal, PO Box: 7660 Baluwatar, Kathmandu, Nepal T: +977 1 4434820, F: +977 1 4438458 [email protected] www.wwfnepal.org/hariyobanprogram Hariyo Ban Program CHITWAN-ANNAPURNA LANDSCAPE: A RAPID ASSESSMENT Foreword With its diverse topographical, geographical and climatic variation, Nepal is rich in biodiversity and ecosystem services. It boasts a large diversity of flora and fauna at genetic, species and ecosystem levels. Nepal has several critical sites and wetlands including the fragile Churia ecosystem. These critical sites and biodiversity are subjected to various anthropogenic and climatic threats. Several bilateral partners and donors are working in partnership with the Government of Nepal to conserve Nepal’s rich natural heritage. USAID funded Hariyo Ban Program, implemented by a consortium of four partners with WWF Nepal leading alongside CARE Nepal, FECOFUN and NTNC, is working towards reducing the adverse impacts of climate change, threats to biodiversity and improving livelihoods of the people in Nepal.
    [Show full text]
  • District Level Fire Management Planning
    Government of Nepal Ministry of Forests and Soil Conservation Department of Forests Makawanpur District Forest Office Forest Fire Management Plan Makawanpur District January 2008 Prepared by: Sundar P. Sharma Krishna P. Acharya P. Daniel Kraus Ananta Ram Bhandari Kiran Timalsina Supported by: Ri lSth Government of Nepal Department of Forest Foreword Forest fire is considered as a problem in forest management systems in Nepal since we have not been able to use it as a management tool. The Fire Management Plan; the first of its kind in Nepal; is an important initiation to safeguard forest and biological resources by reducing fire damages through mobilizing government, non-government, private sector, civil society and local people. The Plan is prepared with the support of the Foreign Office, Federal Republic of Germany, Office for Humanitarian Assistance and the Global Fire Monitoring Center. The preparation of the Plan is based on the substantial efforts and assistance from numerous experts, professionals, organizations, and local communities who extensively shared their ideas and expertise. I would like to express sincere thanks to all those who contributed to this effort. I am thankful to the plan preparation team of Mr. Sundar Prasad Sharma, Mr. Krishna Prasad Acharya, Mr. P. Daniel Kraus, Mr. Ananta Ram Bhandari and Mr. Kiran Timilsina for their contributions. Moreover, I am greatful to Mr. Rishi Ram Tripathi, District Forest Officer of Makawanpur and his team, community forest user groups and local communities for their inputs. I believe that successful implementation of this plan will be instrumental in shaping future forest management strategies in Nepal.
    [Show full text]
  • Terms of Reference (TOR)
    Terms of Reference (TOR) Invitation for expression of interest (EOI) for partnership to implement Sponsorship Communication program in Makwanpur district Nepal 1. Introduction: Plan International is an independent development and humanitarian organization that advances children’s rights and equality for girls. We believe in the power and potential of every child. But this is often suppressed by poverty, violence, exclusion and discrimination. And it is the girls who are most affected. Working together with children, young people, our supporters and partners, we strive for a just world, tackling the root causes of the challenges facing girls and all vulnerable children. We support children’s rights from birth until they reach adulthood. And we enable children to prepare for – and respond to – crises and adversity. We drive changes in practice and policy at local, national and global levels using our reach, experience and knowledge. We have been building powerful partnerships for children for 80 years, and are now active in more than 70 countries. Plan International has been working in Nepal since 1978, helping marginalized children, their families and communities to access their rights to health, hygiene and sanitation, basic education, economic security of young people, protection and safety from disasters. Through partner NGOs, community based organizations and government agencies, Plan International Nepal reaches over 42 districts. The refreshed country strategy (2020 to 2023) of Plan International Nepal sets out a bold and clear vision of an inclusive, just and safe society where all girls and young women enjoy their rights and live in freedom. In line with Plan International’s global strategy “100 Million Reasons” and the regional ambition to reach 7% of all girls in the countries where Plan works, Plan International will reach 500,000 girls directly and 1 million girls indirectly in Nepal.
    [Show full text]
  • Assessment of Urban Forestry in Hetauda City, Makwanpur, Nepal
    ISSN 2664-4002 (Print) & ISSN 2664-6714 (Online) South Asian Research Journal of Humanities and Social Sciences Abbreviated Key Title: South Asian Res J Human Soc Sci | Volume-2 | Issue-1| Jan-Feb -2020 | DOI: 10.36346/sarjhss.2020.v02i01.002 Original Research Article Assessment of Urban Forestry in Hetauda City, Makwanpur, Nepal Samana Sapkota1, Garima Sharma1, Jharna Sharma1,2, Catherine Mhae B. Jandug2,3, Deepak Gautam1, 2* 1Institute of Forestry, Tribhuvan University, Nepal 2School of Forestry, Beijing Forestry University, Beijing 100083, China 3College of Forestry and Environmental Science, Caraga State University, Philippines *Corresponding Author Deepak Gautam Article History Received: 05.01.2020 Accepted: 12.01.2020 Published: 20.01.2020 Abstract: Trees have been an important part of human settlements throughout history. In the Nepalese context, the development of urban forestry is seen only in some cities to some extent. Questionnaire survey, key informant survey, and direct field observation techniques were used to access the information on urban forestry in Hetauda sub- metropolitan city which is in the phase of rapid urbanization with demanding the development of urban green infrastructure. The research aims to identify the present status of urban forestry by people's views regarding urban forestry. It also explores the list out of the preferred tree species, peoples' perception about urban forestry and new plantation site referred by people in Hetauda city. The perception of the local people towards UF was measured by the Likert scale scoring the statements on different issues. Documentation of present status and practices of urban forestry, list out of the most preferred species by the local people was recorded.
    [Show full text]
  • Bidding Document the Procurement Of
    BIDDING DOCUMENT for THE PROCUREMENT OF Upgrading of Bhimphedi-Kogate-Ipa-Deurali Road, 23.640 Km National Competitive Bidding (NCB) - Single-Stage: Two-Envelope Bidding Procedure - IFB No: NRA/CLPIU/GMaLI/MAK/W/PDRF/01 Contract ID: NRA/CLPIU/GMaLI/MAK/W/PDRF/01 District Level Project Implementation Unit (DLPIU/GMaLI), Makwanpur Issued on: 02-08-2018 06:00 Abbreviations BD ...............................................................Bidding Document BDF ......................................................... .. Bidding Forms BDS ......................................................... .. Bid Data Sheet BOQ .......................................................... Bill of Quantities CLPIU ....................................................... Central Level Project Implementation Unit COF .......................................................... Contract Forms DCC ......................................................... District Co-ordination Committee DLPIU ... .................................................. District Level Project Implementation Unit DP ... .......................................................... Development Partners DoLIDAR .................................................. Department of Local Infrastructure Development and Agricultural Roads DTO ... ................................................... ... District Technical Office EEAP………………………………… Earthquake Emergency Assistance Project ELI ... ..................................................... ... Eligibility EQC ... ....................................................
    [Show full text]
  • NEPAL: Makwanpur - Operational Presence Map [As of 14 July 2015]
    NEPAL: Makwanpur - Operational Presence Map [as of 14 July 2015] Tistung 30 Agra Partners working in Makwanpur Khairang Dandakharka Bajrabarahi Palung Chitlang Gomane Kangkada Phakhel Daman Bhartapunyadevi Markhu 1-10 11-15 16-20 21-25 26-35 Raksirang Kulekhani Kalikatar Namtar Sisneri Bhimphedi No. of implementing partners by cluster Sarikhetpalase Kagate Nibuwatar Manahari Bhainse BudhichaurIpa Panchakanya Basamadi Shelter and NFI 10 Ambhanjyang Sukaura Manthali Protection 9 Handikhola Thingan Hetauda Municipality Padampokhari Makawanpur Gadhi Shikharpur Health Beteni 8 Churemai Hatiya Harnamadi WASH 4 Phaparbari Shripur Chhatiwan Education 2 Dhiyal Nutrition 1 Raigaun Early Recovery IMPLEMENTING PARTNERS BY CLUSTER Early Recovery Education Health 0 partners 2 partners 8 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 Nutrition Protection Shelter and NFI 1 partners 9 partners 10 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 WASH 4 partners Want to find out the latest 3W products and other info on Nepal Earthquake response? visit the Humanitarian Response website at http:www.humanitarianresponse.info/en/op Nb of Note: erations/nepal organisations Implementing partners represent the organization on the ground, in the affected district doing operational work, such as send feedback to 1 >=5 distributing food, tents, water purification kits etc. [email protected] Creation date:23 July 2015 Glide number: EQ-2015-000048-NPL Sources: Cluster reporting
    [Show full text]
  • Identification of the Current Agricultural Situation in Bhimphedi (Nepal) and Proposals for Improvement
    Identification of the current agricultural situation in Bhimphedi (Nepal) and proposals for improvement Final project Agriculture engineering Author: Héctor Escudero Leiva Director: Núria Cañameras 18th September 2018 Resum El present treball de fi de grau pretén esdevenir una eina per entendre l’agricultura de Bhimphedi, Nepal; on l’Escola Superior d’Agricultura de Barcelona, junt amb l’ONG Amics del Nepal, liderarà un projecte de dos anys de durada a partir d’agost del 2017. Aquest treball es va realitzar durant la primera estada d’estudiants de l’ESAB, de l’agost de 2017 fins al Febrer de 2018. L’objectiu del Qual va ser descriure l’agricultura local i Factors socioeconòmics Que poguessin condicionar el desenvolupament del projecte, mitjançant entrevistes a 25 Famílies de la localitat triades a l’atzar amb l’ajut de Fins a 5 intèrprets. La majoria de Famílies practicaven alguna mena d’agricultura i ramaderia de manera similar als seus ancestres. Tot i això, noves tecnologies, com l’ús de Fertilitzants Químics i pesticides, medicines comercials pels animals o eines mecàniQues, estan esdevenint progressivament més accessible tant per pagesos proFessionals, com no proFessionals. A més a més, s’han descrit diverses alternatives, de diFerent durada i abast, als problemes detectats i manifestats per les Famílies, com problemes amb el control de plagues o el desherbatge. Amb aquest objecte, es van visitar diFerents iniciatives, tant públiques com privades, que pretenen impulsar el desenvolupament agrari al país. Es va determinar Que aQuestes iniciatives es poden adaptar al context i recursos de Bhimphedi, per tal de minvar els dèFicits descrits.
    [Show full text]