Provincial Transport Master Plan (PTMP) June, 2021

Total Page:16

File Type:pdf, Size:1020Kb

Provincial Transport Master Plan (PTMP) June, 2021 Province Government Bagamati Province Ministry of Physical Infrastructure Development Transport Infrastructure Directorate Hetauda, Makwanpur Provincial Transport Master Plan (PTMP) VOLUME I MAIN REPORT June, 2021 Provincial Transport Master Plan (PTMP) of Bagamati Province MESSAGE i Provincial Transport Master Plan (PTMP) of Bagamati Province MESSAGE ii Provincial Transport Master Plan (PTMP) of Bagamati Province FOREWORD It is my great pleasure to introduce the Provincial Transport Master Plan (PTMP) of Bagamati Province of Nepal. PTMP is a planned document for the development of the Provincial Roads to enhance the accessibility condition of transport infrastructure and services in the province to upgrade the road network and improve connectivity. The integrated road development approach has been envisaged to streamline the budget expenditure on priority investment on road infrastructure development. I believe this document will be helpful to materialize the Provincial Public Road and Vehicle Infrastructure Act, through planning, resource mobilization, implementation, and monitoring of road development. This document is very essential in lobbying the donor agencies through the central government to attract the fund gap. Furthermore, this document will be supportive in avoiding prevailing duplication in resource allocation in the road interventions by considering the basket fund approach on the overall transport infrastructure of the province. I would like to express my gratitude for the support of the Bagamati Province government for the financial support, especially Chief minister Mr. Dormani Paudyal, Minister(Ministry of Physical Infrastructure Development) Mr. Rameswar Phuyal, the secretaries Mr. Sanjeev Baral and Mr. Tejraj Bhatta, Senior Divisional Engineer Navin Kumar Singh, Engineer Punya Ram Sulu and Engineer Jyanendra Pun for the valuable input on finalization of the document. I would like to thank all six IDOs, Er. Hari Prasad Ojha and Road Expert Er. Aashish Khadka of the directorate for the valuable input and comments. I would like to thank Dr. Hare Ram Shrestha, Team Leader, and Raghab Bista, and team members from Project Research and Engineering Associates (PRENA) for their continuous dedication and technical input to prepare this document. Last but not least, I would like to express my heartfelt gratitude to the all engineers and staff of the Transport Infrastructure Directorateand Ministry of Physical Infrastructure Development, Bagamati Province for providing valuable contribution to produce this report. Any pioneering and constructive suggestions regarding the document will be highly appreciated. SahadevBahadur Bhandari, (PhD.) Acting Director Transport Infrastructure Directorate Bagamati Province, Hetauda May2021 iii Provincial Transport Master Plan (PTMP) of Bagamati Province TABLE OF CONTENTS List of Tables ........................................................................................................................... vi List of Figures ......................................................................................................................... vii Abbreviations ....................................................................................................................... viii CHAPTER 1: INTRODUCTION ........................................................................................... 1 1.1 Background .............................................................................................................. 1 1.2 Objective of PTMP Study ........................................................................................ 2 1.3 Scope of PTMP ........................................................................................................ 2 1.4 Limitation of Study .................................................................................................. 3 CHAPTER 2: METHODOLOGY OF PTMP ....................................................................... 4 2.1 Methodological Approach ................................................................................................ 4 2.2. Data Collection Methods ................................................................................................. 4 2.3. Data Analysis and Processing .................................................................................. 9 CHAPTER 3: PROVINCE SOCIO-ECONOMIC STATUS ............................................. 10 3.1. Socio Economic Characteristics ............................................................................ 11 3.2. Historical, Religious and Tourism Areas ............................................................... 15 3.3. Main Economic and Commerce Activities and Centers ........................................ 17 3.4. Future Development Potential Area ....................................................................... 19 CHAPTER 4: PROVINCIAL TRANSPORT REVIEW ................................................... 22 4.1. Transport Policy and Plan ...................................................................................... 22 4.2. Road Network of Province..................................................................................... 25 4.3. Air Transport .......................................................................................................... 30 4.4. Railway .................................................................................................................. 33 4.5. Ropeway ................................................................................................................ 34 4.6. Freight Transport ................................................................................................... 35 4.7. Other InfrastructureS ............................................................................................. 35 4.8. Urban Trasport ....................................................................................................... 36 4.9. Road Safety ............................................................................................................ 40 CHAPTER 5: PROVINCIAL TRANSPORT PERSPECTIVE PLAN ............................ 42 5.1. Background ............................................................................................................ 42 5.2. PTPP Principles ..................................................................................................... 42 iv Provincial Transport Master Plan (PTMP) of Bagamati Province 5.3. PerspectIve Plan of PTPP ...................................................................................... 44 5.4. Provincial Transport Management Plan (PTMP) .................................................. 74 5.5. Provincial Road Safety Action Plan (PRSAP)....................................................... 76 5.6. Provincial Public Transport Master Plan (PPTMP) ............................................... 77 CHAPTER 6: PROVINCIAL TRANSPORT MASTER PLAN ....................................... 79 6.1. Provincial Transport Master Plan (PTMP) ............................................................ 79 6.2. Prioritizaton of Roads ............................................................................................ 79 6.3. Financial of PTMP ................................................................................................. 79 6.4. Expenditure on PTMP............................................................................................ 80 6.5. First Five Year PTMP ............................................................................................ 80 6.6. PTMP Outcomes .................................................................................................... 86 CHAPTER 7: CONCLUSION AND RECOMMENDATIONS ........................................ 89 REFERENCES ....................................................................................................................... 91 GLOSSARY............................................................................................................................ 93 v Provincial Transport Master Plan (PTMP) of Bagamati Province LIST OF TABLES Table 1: Population of the Bagamati Province ........................................................................ 11 Table 2: Economically Active Population of the Province ...................................................... 12 Table 3: Per Capital Income of District in Bagamati Province ............................................... 12 Table 4: Educational Status of the Province ............................................................................ 13 Table 5: Sub-basin System in the Province ............................................................................. 14 Table 6: Land Use Pattern of the Province .............................................................................. 15 Table 7: Historical, Religious and Touristic Place in Bagamati Province ............................... 15 Table 8: Trekking Places and spot in Bagamati Province ....................................................... 16 Table 9: Hiking spot of the Province ....................................................................................... 17 Table 10: Industrial Estate of the Bagamati Province ............................................................. 20 Table 11 Planning and Working Strategy of First Periodic Plan ............................................. 23 Table 12: List of Highway Road in Bagamati Province .........................................................
Recommended publications
  • Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020)
    Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020) Editor-In-Chief Shree Ram Bajagain Editor Aarya Adhikari Editorial Team Govinda Prasad Tripathee Ramesh Prasad Timalsina Data Analyst Anuj KC Cover/Graphic Designer Gita Mali For Human Rights and Social Justice Informal Sector Service Centre (INSEC) Nagarjun Municipality-10, Syuchatar, Kathmandu POBox : 2726, Kathmandu, Nepal Tel: +977-1-5218770 Fax:+977-1-5218251 E-mail: [email protected] Website: www.insec.org.np; www.inseconline.org All materials published in this book may be used with due acknowledgement. First Edition 1000 Copies February 19, 2021 © Informal Sector Service Centre (INSEC) ISBN: 978-9937-9239-5-8 Printed at Dream Graphic Press Kathmandu Contents Acknowledgement Acronyms and Abbreviations Foreword CHAPTERS Chapter 1 Situation of Human Rights in 2020: Overall Assessment Accountability Towards Commitment 1 Review of the Social and Political Issues Raised in the Last 29 Years of Nepal Human Rights Year Book 25 Chapter 2 State and Human Rights Chapter 2.1 Judiciary 37 Chapter 2.2 Executive 47 Chapter 2.3 Legislature 57 Chapter 3 Study Report 3.1 Status of Implementation of the Labor Act at Tea Gardens of Province 1 69 3.2 Witchcraft, an Evil Practice: Continuation of Violence against Women 73 3.3 Natural Disasters in Sindhupalchok and Their Effects on Economic and Social Rights 78 3.4 Problems and Challenges of Sugarcane Farmers 82 3.5 Child Marriage and Violations of Child Rights in Karnali Province 88 36 Socio-economic
    [Show full text]
  • Public Policy for Social and Solidarity Economy a Case Study from Nepal
    Public Policy for Social and Solidarity Economy A Case Study from Nepal Submitted By: Ripu M. Kunwar, Ram P. Acharya, Geeta Khadka, Bishnu H. Poudyal, Sita Shahi, Suman Dhakal, Sunil Pariyar and Bhola Bhattarai Practical Solution Consultancy Nepal Pvt. Ltd (PSPL) Min Bhawan, Kathmandu, Ph: 00977 1 4620373, Email: [email protected] www.psplnepal.org in association with Federation for Community Forestry Users Nepal (FECOFUN), Kathmandu Dalit Alliance for Natural Resources (DANAR), Kathmandu National Forum for Advocacy, Nepal (NAFAN), Kathmandu Submitted to: Center for International Studies and Cooperation (CECI) & UNITERRA, Kathmandu, Nepal February 2013 Public Policy for Social and Solidarity Economy: A Case Study from Nepal TABLE OF CONTENTS ACRONYMS & ABBREVIATIONS .................................................................................................................................... 4 ACKNOWLEDGEMENTS ..................................................................................................................................................... 6 EXECUTIVE SUMMARY ..................................................................................................................................................... 7 CHAPTER 1. INTRODUCTION .......................................................................................................................................... 10 1.1 BACKGROUND ........................................................................................................................................
    [Show full text]
  • Final Report
    Detail Study of Self-Reliant Industrial Goods in Nepal Final Report Submitted To: Government of Nepal Ministry of Industry, Commerce and Supplies Department of Industry Tripureswor, Kathmandu, Nepal Submitted By: Quality & Environmental Management Service Pvt. Ltd. Kathmandu, Nepal Telephone-01-5705455, E-mail- [email protected] June, 2021 ACKNOWLEDGEMENT Quality and Environmental Management Service Pvt. Ltd. takes an opportunity to express its’ gratitude to those Experts/stakeholders who contributed their valuable time and added precious value in this study. Particularly it extends sincere appreciation to Mr. Jiblal Bhusal, Director General, Mr. Krishna Prasad Kharel, Director; Mr. Pushpa Raj Shiwakoti, Statistical Officer, Mr. Santosh Koirala Mechanical Engineer and others staff of the Department of Industry for their kind inputs and guidance to bring this report to the final stage. We would also like to appreciate for the time and inputs of Mr. Jiblal Kharel Board member of Nepal Tea and Coffee Development Board (NTCDB), Mr. Naresh Katwal Chairperson of Federation of Nepalese Business Association, Mr. Dilli Baskota Member Sectary of HOTPA, Mr. Asish Sigdel Chairperson of NEEMA, Mr. Chandra khadgi member Sectary of NPMA, Mr Suresh Mittal Chairperson NTPA Jhapa and Mr. Rudra Prasad Neupane Board Member of FMAN. We would also like to thank for valuable input from Mr. Bikash Keyal Director of Narayani Strips Pvt. Ltd, Mr. A.K Jha GM of Hulas Steel Pvt. Ltd, Mr. Dibya Sapkota GM of Aarati Strip Pvt. Ltd., Mr Devendra Sahoo GM of Panchakanya Steel Pvt. Ltd, Mr. Laxman Aryal Chairperson of Jasmin Paints Pvt. Ltd. Mr.Buddhi Bahadur K.C chairperson of Applo Paints Pvt.
    [Show full text]
  • Bagmati Province Emergency Response Preparedness
    VULNERABILITY INDICATORS BAGMATI PROVINCE EMERGENCY RESPONSE PREPAREDNESS as of June 2021 Water and Sanitation Human Development Indicators Source of Drinking Water Improved Source of Drinking water 30,636.40 Gross Domestic Product 97.3% NPR million ie n t Infant Mortality Rate (MICS) Unimproved Source of Drinking water 16 per thousand 2.7% Human Development Index (HDI) 0.66 Type of Toilet Used 72.01 Life expectancy (HDI) Improved Sanitation facilities 97.8 % Unimproved Sanitation facilities Note* : 2.2 % This is a living document. We will be continuously editing and updating with revisions. 76.7 % of household population with E. coli in source water Early Childhood Development Attitude towards Domestic Violence Index score of children age 3-4 years are developmentally on 29.5% of women age 15-49 years believes a husband is justi�ied in 73.9% beating his wife in various circumstances track in literacy- numeracy, physical, social-emotional, and learning domains 56.5 % of women age 15-49 years believes a mother-in-law is justi�ied in verbally abusing and threatening her daughter-in-law 6.9% of children age 0-17 living with neither in various circumstance biological parent Icons : https://thenounproject.com/ Source : Multiple Indicator Cluster Surveys 2019 and HDI 2019 report VULNERABILITY INDICATORS BAGMATI PROVINCE EMERGENCY RESPONSE PREPAREDNESS as of June 2021 Adult / Child Disfunctioning Shelter Natural floor Other Rudimentary wall Functional dif�iculties in at least one domain: Other Seeing, Hearing, Walking, Communication ie n t 2.4 % Mud bonded bricks/stone Age 18 - 49 1.3 % Finished floor Finished wall Age 02 - 04 1.0 % Type of House Foundation Type of Outer Wall Health Insurance covergae Finished roof It is one protection scheme that present the percentage of men and women covered by health insurance Age 15 - 49 5.2 % 6.3% Type of Roof Age 05 - 17 5.9% Rural Urban The Nepal Multiple Indicator Cluster Survey (MICS) is an international % of women using appropriate multi-purpose household survey.
    [Show full text]
  • Nepal Electricity Authority
    NEPAL ELECTRICITY AUTHORITY ENVIRONMENTAL AND SOCIALMANAGEMENT PLAN OF SUPPLY AND INSTALLATION OF DISTRIBUTION PROJECTS (33KV TRANSMISSION LINE) UNDER THE GRID SOLAR AND ENERGY EFFICIECY PROJECT VOLUME II Prepared and Submitted by: Environment and Social Studies Department Kharipati, Bhaktapur Phone No.: 01-6611580, Fax: 01-6611590 Email: [email protected] September, 2018 SIDP Abbreviations and Acronyms ABBREVIATIONS AND ACRONYMS BS : Bikram Sambat (Nepali Era) DADO : District Agriculture Development Office DCC : District Coordination Committee DFO : District Forest Office DoED : Department of Electricity Development ESMF : Environment and Social Management Framework ESMP : Environment and Social Management Plan EPR : Environment Protection Rules, 1997 ESSD : Environment and Social Studies Department GoN : Government of Nepal GSEEP : Grid Tied and Solar Energy Efficiency Project GRC : Grievance Redress Cell GRM : Grievance Redress Mechanism HHs : Households IEE : Initial Environmental Examination MoEWRI : Ministry of Energy, Water Resource and Irrigation MoFE : Ministry of Forest and Environment NEA : Nepal Electricity Authority PAS : Project Affected Settlement PMO : Project Management Office SIDP : Supply and Installation of Distribution Project WB : World Bank Units ha : Hectare km : Kilometer kV : Kilo Volt m2 : Square meter ESMP Report i NEA-ESSD SIDP Table of Contents Table of Contents ABBREVIATIONS AND ACRONYMS ........................................................................................ I 1 INTRODUCTION ............................................................................................................
    [Show full text]
  • Tables Table 1.3.2 Typical Geological Sections
    Tables Table 1.3.2 Typical Geological Sections - T 1 - Table 2.3.3 Actual ID No. List of Municipal Wards and VDC Sr. No. ID-No. District Name Sr. No. ID-No. District Name Sr. No. ID-No. District Name 1 11011 Kathmandu Kathmandu Ward No.1 73 10191 Kathmandu Gagalphedi 145 20131 Lalitpur Harisiddhi 2 11021 Kathmandu Kathmandu Ward No.2 74 10201 Kathmandu Gokarneshwar 146 20141 Lalitpur Imadol 3 11031 Kathmandu Kathmandu Ward No.3 75 10211 Kathmandu Goldhunga 147 20151 Lalitpur Jharuwarasi 4 11041 Kathmandu Kathmandu Ward No.4 76 10221 Kathmandu Gongabu 148 20161 Lalitpur Khokana 5 11051 Kathmandu Kathmandu Ward No.5 77 10231 Kathmandu Gothatar 149 20171 Lalitpur Lamatar 6 11061 Kathmandu Kathmandu Ward No.6 78 10241 Kathmandu Ichankhu Narayan 150 20181 Lalitpur Lele 7 11071 Kathmandu Kathmandu Ward No.7 79 10251 Kathmandu Indrayani 151 20191 Lalitpur Lubhu 8 11081 Kathmandu Kathmandu Ward No.8 80 10261 Kathmandu Jhor Mahakal 152 20201 Lalitpur Nallu 9 11091 Kathmandu Kathmandu Ward No.9 81 10271 Kathmandu Jitpurphedi 153 20211 Lalitpur Sainbu 10 11101 Kathmandu Kathmandu Ward No.10 82 10281 Kathmandu Jorpati 154 20221 Lalitpur Siddhipur 11 11111 Kathmandu Kathmandu Ward No.11 83 10291 Kathmandu Kabresthali 155 20231 Lalitpur Sunakothi 12 11121 Kathmandu Kathmandu Ward No.12 84 10301 Kathmandu Kapan 156 20241 Lalitpur Thaiba 13 11131 Kathmandu Kathmandu Ward No.13 85 10311 Kathmandu Khadka Bhadrakali 157 20251 Lalitpur Thecho 14 11141 Kathmandu Kathmandu Ward No.14 86 10321 Kathmandu Lapsephedi 158 20261 Lalitpur Tikathali 15 11151 Kathmandu
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Education Is the Vita
    CM – 2016 Project Budget/ Plan Budget Budget in USD Year Account Code: Account Head 1 (For Grade 8) 2 (For Grade 9) 3 (For Grade 10) 4 (For Grade 11) 5 (For Grade 12) Per Total Per Total Per Total Per Total Per Total Head Children Budget Head Children Budget Head Children Budget Head Children Budget Head Children Budget CSEL: Program CSEL1: School Stationery 5 754 4,011 11 754 8,021 16 754 12,032 21 754 16,043 27 754 20,053 CSEL: Program Management CSEL2: Twelve Percentage of Program 1 754 481 1 754 963 2 754 1,444 3 754 1,925 3 754 2,406 Total: Monthly 4,492 8,984 13,476 17,968 22,460 Total: Annual 53,903 107,806 161,709 215,612 269,515 Total 5 Years Project Budget 808,545 Explanations: CSEL1: Beneficiaries for this project is based on the total population 1. Copies 57% of the total households. 1508 is the total household 2. Travel and Dress 43% population. For this proposal half of the total household is picked -up. Every household contains girls. Only small CSEL2: number about 7% only have male children. 1. Transportation 3% Copies: Regular items needed for children for educat ion 2. Human Resources 39% 3. Legality Management of Org. 6% Dress: once a year 4. Office running and rent tax (15%) 10% Travel: To purchase their needs the children needs to travel 5. Documentation and printing 42% to the nearby town centre. CSEL: Children Sustainable Education for Lalitpur Project: Strengthen the Education of Seven Hundred Fifty-Four outcast girls of Nepal Introduction: Education is the vital elements for the sustainable development for a least developed countries (LDCs) like Nepal where 23.9 million population survive (Population Monograph of Nepal, 2014, p.
    [Show full text]
  • Kathmandu - Bhaktapur 0 0 0 0 5 5
    85°22'0"E 85°24'0"E 85°26'0"E 85°28'0"E 85°30'0"E 340000 342500 345000 347500 350000 352500 GLIDE number: N/A Activation ID: EMSN012 Product N.: Reference - A2 NEPAL, v2 Kathmandu - Bhaktapur 0 0 0 0 5 5 7 7 Reference map 7 7 0 0 3 3 2014 - Detail 25k Sheet A2 Production Date: 18/07/2014 N " A1 !Gonggabu A2 A3 0 ' 8 !Jorpati 4 E N ° E " ! 7 Kathmandu E 0 ' 2 E E 8 4 ! ° Kirtipur Madh!yapur ! 7 Bhaktapur 2 B1 B2 0 ú 0 0 Budanilkantha 0 ! B 0 0 5 5 7 7 0 di n 0 3 Na Sundarijal 3 0 5 10 km /" ati um ! hn B Bis ! B ! B ú Cartographic Information 1:25000 Full color A1, high resolution (300 dpi) ! B ! B n ChapaliBhadrakali Meters ú nn n 0 10000 20000 30000 40000 50000 n n Grid: WGS 1984 UTM Zone 45N map coordinate system ! B ! B Tick Marks: WGS 84 geographical coordinate system n n ú ú n n WX Legend n n n n ! B Hydrography Transportation Urban Areas n ! B ! River Line (500>=m) Crossing Point (<500m) B d n Built Up Area a ú o ú R Intermittent Bridge Point Agricultural ! n in B ! B ! ! ú B a B ú n Perennial WX M ! Culvert Commercial r ú n B ú ta õö u River Area (>=1Ha) XY lf Ford Educational o n ! G n B n n Intermittent Crossing Line (>=500m) Industrial n ú Perennial Bridge 0 0 Institutional N n 0 n 0 " n ú 5 5 0 Reservoir Point (<1Ha) 2 2 Culvert ' Medical 7 7 6 ú 0 0 õö 4 3 3 E N Reservoir Point ° Ford E " Military 7 E 0 ' 2 E Reservoir Area (>=1Ha) 4 ú n Baluwa E 6 Ï Tunnel Point (<500m) Other 4 ! B IC ° ! B Intermittent ! B n n n 7 TunnelLine (>=500m) ú n 2 Recreational/Sports n Perennial n n Airfield Point (<1Ha) Religious ú n Ditch
    [Show full text]
  • Japan International Cooperation Agency (JICA)
    Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts.
    [Show full text]
  • WASH Cluster Nepal 4W - May 12Th 2015
    WASH Cluster Nepal 4W - May 12th 2015 Please find following the analysis of the 4W data – May 12th Introduction (Round 2) This is the second round of the 4W analysis. As this is the second round and still early in the emergency response, many agencies are still planning their interventions and caseloads, hence much of the data is understandably incomplete. In the coming week/s we will receive far more comprehensive partner data and will be able to show realistic gaps. In addition, we are receiving better affected population data and there are many ongoing assessments, the results of which will help us to understand both the response data and the affected population data and enable us to deliver a far more profound analysis of the WASH response. Please assist us as we have a lot of information gaps in the data provided so far and hence the maps are not yet providing a true picture of the response. We would like to quickly move to VDC mapping including planned/reached beneficiaries. Since the first round of reporting, agencies have provided substantially more VDC‐level data – as of today, of 740 WASH activities identified, 546 of these (74%) are matched to an identified VDC ‐ this is a big improvement from last week (which had VDC data for 192 of 445 activities, or 43%) The Highlights ・ 47 Organisations – number of organisations that reported in Round 1 and/or Round 2 of the WASH 4W ・ 206 VDCs – where WASH interventions taking place/planned (in 15 districts) 4W – WASH May 12th 2015 Water0B Spread of water activities ‐ targeted Temporary
    [Show full text]
  • DAMS & DEVELOPMENT: Emerging Trendsinnepal's Hydropower Terrain
    Recognising Entitlements and Sharing Benefits: Emerging TrendsinNepal’s Hydropower Terrain Dialogue on DAMS & DEVELOPMENT:NEPAL Copyright: © 2005 IUCN-The World Conservation Union Nepal and Nepal Water Conservation Foundation Published in support of the Dams and Development Strategic Priorities Series for the National Steering Committee on Dams and Development by IUCN Nepal and Nepal Water Conservation Foundation The role of German Technical Cooperation (GTZ) in supporting the Dams and Development Strategic Priorities Series is gratefully acknowledged. The material in this publication may be reproduced in whole or in part and in any form for educational or non-profit uses, without prior written permission from the copyright holder, provided acknowledgement of the source is made. IUCN Nepal would appreciate receiving a copy of any publication which uses this publication as a source. DISCLAIMER No use of this publication may be made for resale or other commercial purposes without prior written permission of IUCN Nepal and NWCF. This Dams and Development Strategic Citation: Dixit, Ajay & Basnet, Shreshna (2005). Recognising Entitle- Priorities Series summaries the find- ments and Sharing Benefits: Emerging Trends in Nepal's Hydropower Terrain ings and serves as a platform for con- IUCN Nepal + 38 pp. tinuing the dialogue on the issues of water resources development and dams Technical Advice: Bhawani P. Kharel and Deependra Joshi in Nepal. This report can assist in the ISBN: 99933-860-9 evolution of the policy process, but it is not the policy document of any of the Printed by: Quality Printers Kathmandu, Nepal organizations involved in the specific priorities series consultative processes. ii Foreword t is five years since the report of the World Commission Priorities.
    [Show full text]