2013 Twelve Year Transportation Program
Total Page:16
File Type:pdf, Size:1020Kb
2013 TWELVE YEAR TRANSPORTATION PROGRAM STATE TRANSPORTATION COMMISSION Adopted August 14, 2014 TWELVE YEAR TRANSPORTATION PROGRAM SINGLE-LINE LISTING DEFINITIONS The following is an explanation of the various codes used in the single-line computerized printout of the Twelve Year Transportation Program. The items in the heading are explained below. The column definitions proceed from left to right, top to bottom. SECTION HEADING This groups the projects by location under the regional metropolitan planning organizations or rural planning areas. Statewide and interstate projects are grouped at the end of the report. (See Table of Contents for order). COUNTY Groups the projects by county. MODE Identifies the project mode in the following order: Highways Bridges Airport Transit Rail PAGE HEADING and PROJECT DETAILS Consists of the following items: MPMS# The project identification number used in the current project inventory system. SR The State Route Number shows the route on which the project is located. The State Route System was implemented in late 1986, replacing the Legislative Route numbering system. Local roads are coded 9900 or 9911. TITLE /SPONSOR A brief name given to the project, often referred to as the project's "short title" or the Transit Entity sponsoring the project. The municipality where the project is located may be included. PERIOD Denotes the time period in which the project is to be implemented: 1 - First Four Years - October 2012 – September 2016 2 - Second Four Years - October 2016 – September 2020 3 - Third Four Years - October 2020 – September 2024 COSTS Consists of the following eight items: Study The cost associated with projects that are studies or research projects. PE The cost of the preliminary engineering of the project development. FD The cost of the final design of the project development. UTL The cost of the utility changes (electric, telecommunications, mechanical). ROW The cost of the right-of-way phase of the project. CON The cost of the construction phase of the project. PRA The costs of planning and research or administrative projects. TOTAL The total project cost. Table of Contents. Adams County MPO ---------------------------------------------------- 1 Scranton/Wilke-Barre MPO ------------------------------------- 151 Altoona MPO ------------------------------------------------------------- 4 SEDA-COG MPO --------------------------------------------------- 164 Centre County MPO ------------------------------------------------ 10 Shenango Valley MPO ------------------------------------------- 183 Delaware Valley Regional Planning Commission MPO 15 Southern Alleghenies Planning Commission RPO ---- 187 Erie Area MPO ------------------------------------------------------- 46 Southwestern Pennsylvania Commission MPO -------- 196 Franklin County MPO --------------------------------------------- 51 Wayne County ------------------------------------------------------ 242 Harrisburg MPO ----------------------------------------------------- 55 Williamsport MPO ------------------------------------------------- 245 Johnstown MPO ---------------------------------------------------- 65 York MPO ------------------------------------------------------------- 251 Lancaster County MPO ------------------------------------------- 71 Interstate ------------------------------------------------------------- 259 Lebanon County MPO --------------------------------------------- 81 Statewide Line Items --------------------------------------------- 269 Lehigh Valley MPO ------------------------------------------------- 86 North Central PA Regional Planning & Development Commission RPO --------------------------------------------------- 95 Northeastern Pennsylvania Alliance MPO ---------------- 109 Northern Tier Regional Planning & Development Commission RPO --------------------------------------------------------------------- 121 Northwestern PA Regional Planning & Development Commission RPO -------------------------------------------------- 136 Reading MPO-------------------------------------------------------- 144 2013 Twelve Year Program MPMS # SR Title Period STUDY PE FD UTL ROW CON PRA Total Partner: Adams County MPO County: Adams-Highway 18087 - 1 0 0 0 0 0 295,784 0 295,784 Belmont Rd Bridge(T-348)-Cumberland (Township) Bridge Replacement 82372 - 1 0 58,078 0 0 0 0 0 58,078 SRTP Rideshare Program-Abbottstown (Borough) Miscellaneous 87792 - 1 0 0 0 0 0 806,353 0 806,353 Bridge Reserve Miscellaneous 2 0 0 0 0 0 7,264,000 0 7,264,000 3 0 0 0 0 0 14,148,000 0 14,148,000 87794 - 1 0 0 0 0 0 712,380 0 712,380 CMAQ Line Item Miscellaneous 2 0 0 0 0 0 3,772,000 0 3,772,000 3 0 0 0 0 0 3,770,000 0 3,770,000 87807 - 1 0 312,194 0 0 0 280,000 0 592,194 Delivery / Consult Assist Bridge Preservation Activities 87809 - 1 0 0 0 0 0 398,000 0 398,000 ENH Line Item Miscellaneous 2 0 0 0 0 0 796,000 0 796,000 3 0 0 0 0 0 796,000 0 796,000 87811 - 1 0 0 0 0 0 21,500 0 21,500 HSIP Line Item Safety Improvement 2 0 0 0 0 0 789,000 0 789,000 3 0 0 0 0 0 2,058,000 0 2,058,000 87812 - 1 0 0 0 0 0 88,000 0 88,000 RRX Line Item Safety Improvement 2 0 0 0 0 0 352,000 0 352,000 3 0 0 0 0 0 354,000 0 354,000 88019 - 1 0 0 0 0 0 3,683,410 0 3,683,410 Adams HRST Line Item Miscellaneous 2 0 0 0 0 0 13,600,114 0 13,600,114 3 0 0 0 0 0 17,781,000 0 17,781,000 88086 - 1 0 0 0 0 0 2,607,000 0 2,607,000 App 916 Reserve Miscellaneous 2 0 0 0 0 0 3,462,000 0 3,462,000 3 0 0 0 0 0 4,211,000 0 4,211,000 93722 - 1 0 0 0 0 0 1,522,000 0 1,522,000 Seminary Ridge Trail-Gettysburg (Borough) Bicycle Facilities/Services 94743 - 1 0 0 0 0 0 115,000 0 115,000 Pond Street RR Crossing-Menallen (Township) RR Warning Devices 2013 - 2024 Twelve Year Program Page 1 of 275 MPMS # SR Title Period STUDY PE FD UTL ROW CON PRA Total Adams-Highway Continued 94899 - 1 0 0 0 0 0 1,299,730 0 1,299,730 Adams MPO Park & Ride Park and Ride Lot 95736 - 1 0 0 0 0 0 360,000 0 360,000 Dist AWPM SFY 2012-13-Straban (Township) Reflective Pavement Markers 58136 15 1 0 0 0 0 0 0 0 0 US-15/US-30 Interchange-Straban (Township) Interchange Improvement 90201 15 1 0 25,000 0 0 0 13,958,762 0 13,983,762 US 15 Resurfacing South-Freedom (Township) Resurface 82983 30 1 0 0 175,000 55,000 75,000 1,700,000 0 2,005,000 East King Street Bridge-Abbottstown (Borough) Bridge Replacement 90860 30 1 0 100,000 0 20,000 20,000 2,500,000 0 2,640,000 US 30 Resurface #1-Franklin (Township) Resurface 90990 30 1 0 25,000 0 0 0 0 0 25,000 US-30 Resurfacing No.3-Franklin (Township) Resurface 96110 30 1 0 0 0 0 0 3,187,000 0 3,187,000 US 30 Resurface #2-Franklin (Township) Resurface 101095 30 1 0 0 0 0 0 5,000,000 0 5,000,000 Gettysburg Crossing-Straban (Township) Safety Improvement 87416 34 1 0 70,000 145,000 56,544 75,000 900,000 0 1,246,544 S Main St Bridge-Biglerville (Borough) Bridge Replacement 87417 34 1 0 300,000 200,000 20,000 20,000 800,000 0 1,340,000 Carlisle Road Bridge-Huntington (Township) Bridge Replacement 92391 34 1 0 0 0 0 0 149,000 0 149,000 Biglerville Road RR-Butler (Township) RR Warning Devices 59662 94 1 0 0 0 0 0 150,000 0 150,000 PA 94 North Widening-Berwick (Township) Reconstruct 94894 94 1 0 354,611 150,000 50,000 100,000 0 0 654,611 94 & 394 Intersection Imp-Reading (Township) Intersection Improvement 2 0 0 0 0 0 1,035,000 0 1,035,000 94897 94 1 0 400,000 150,000 30,000 50,000 920,000 0 1,550,000 94 & 234 Intersection Imp-Reading (Township) Intersection Improvement 18051 116 1 0 250,000 150,000 15,000 15,000 0 0 430,000 Fairfield Road Bridge 3-Highland (Township) Bridge Replacement 2 0 0 0 0 0 750,000 0 750,000 18147 116 1 0 333,300 200,000 15,000 15,000 0 0 563,300 Fairfield Road Bridge 2-Cumberland (Township) Bridge Replacement 2 0 0 0 0 0 3,000,000 0 3,000,000 68741 116 1 0 0 0 0 0 420,000 0 420,000 Hanover Road Bridge-Straban (Township) Bridge Replacement 68744 116 1 0 0 0 0 0 1,729,530 0 1,729,530 Hanover Road Bridge 2-Mount Pleasant (Township) Bridge Replacement 85652 116 1 0 125,000 100,000 50,000 50,000 1,000,000 0 1,325,000 PA 116 and Oxford Ave-Conewago (Township) Intersection Improvement 96244 116 1 0 25,000 0 0 0 1,452,500 0 1,477,500 Hanover Road Resurface-Bonneauville (Borough) Resurface 90861 134 1 0 0 0 0 0 1,723,000 0 1,723,000 PA 134 Resurfacing-Cumberland (Township) Resurface 2013 - 2024 Twelve Year Program Page 2 of 275 MPMS # SR Title Period STUDY PE FD UTL ROW CON PRA Total Adams-Highway Continued 73602 234 1 0 0 125,000 20,000 20,000 142,222 0 307,222 234 & 3001 Improvements-Tyrone (Township) Widen 2 0 0 0 0 0 257,778 0 257,778 90863 1015 1 0 0 0 0 0 164,088 0 164,088 New Oxford Overlay-New Oxford (Borough) Resurface 87418 2009 1 0 378,560 250,000 25,000 25,000 1,530,000 0 2,208,560 Black Lane Bridge-Conewago (Township) Bridge Replacement 18145 3001 1 0 0 200,000 25,000 30,000 2,100,000 0 2,355,000 Old Harrisburg Rd. Br. 1-Butler (Township) Bridge Replacement 58603 3001 1 0 0 235,000 25,000 30,000 600,000 0 890,000 Old Hbg Road Bridge 3-Huntington (Township) Bridge Replacement 2 0 0 0 0 0 1,400,000 0 1,400,000 66742 3001 1 0 0 0 0 0 230,000 0 230,000 N.