HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1999-2000 Act of Nov. 24, 1999, P.L. 550, No. 53 Cl. 86 A SUPPLEMENT To the act of December 8, 1982 (P.L.848, No.235), entitled "An act providing for the adoption of capital projects related to the repair, rehabilitation or replacement of highway bridges to be financed from current revenue or by the incurring of debt and capital projects related to highway and safety improvement projects to be financed from current revenue of the Motor License Fund," itemizing additional local and State bridge projects. The General Assembly of the Commonwealth of hereby enacts as follows: Section 1. Short title. This act shall be known and may be cited as the Highway-Railroad and Highway Bridge Capital Budget Supplemental Act for 1999-2000. Section 2. Definitions. The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise: "Account." The Highway Bridge Improvement Restricted Account within the Motor License Fund. "Capital project." A capital project as defined in section 302 of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, and shall include a county or municipal bridge rehabilitation, replacement or improvement project as set forth in this act. "Department." The Department of Transportation of the Commonwealth. "Secretary." The Secretary of Transportation of the Commonwealth. Section 3. Total authorization for bridge projects. (a) Total projects.--The total authorization for the costs of the projects itemized pursuant to this act and to be financed from current revenue or by the incurring of debt shall be $3,720,280,000. (b) State projects.--The authorization for capital projects in the category of highway bridge projects and forestry and State park bridge projects to be constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt or from the account, itemized in this act under the category of State bridges, shall be $2,264,845,000. (c) Non-State projects.--The authorization for non-State highway bridge projects to be constructed by municipalities and to be financed in part with grants not exceeding 80% of the non-Federal share of the costs made to the local government municipalities by the department from revenues deposited in the account, itemized in this act under the category of local bridges, shall be $1,455,435,000. Section 4. Itemization of bridge projects. The individual capital projects in the category of highway projects to be constructed by the Department of Transportation, its successors or assigns, and to be financed from current revenue or by the incurring of debt are hereby itemized, together with their estimated financial costs, in the following sections. Section 5. Adams County. (a) Local Bridges (1) Cumberland Township, T-338, Herr's Ridge Road Bridge over Willoughby Run, Bridge Rehabilitation 170,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (2) Cumberland Township, T-402, Horner Road Bridge over Marsh Creek, County Bridge No.111, Bridge Replacement 1,075,000 (Base Construction Allocation - $725,000) (Land Allocation - $25,000) (Design and Contingencies - $325,000) (3) Cumberland Township, T-417, Goulden Road Bridge over Rock Creek, County Bridge No.123, Bridge Rehabilitation 330,000 (Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $75,000) (4) Cumberland and Freedom Townships, T-509, Sachs Mill Covered Bridge over Marsh Creek, Pedestrian Bridge, Bridge Rehabilitation 749,000 (Base Construction Allocation - $698,000) (Design and Contingencies - $51,000) (5) Butler Township, West Guernsey Road Bridge over Gettysburg Railroad, Pedestrian Bridge Rehabilitation 460,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (b) State Bridges (1) SR 3001, Bridge over Middle Creek, Freedom Township, Bridge Replacement 876,000 (Base Construction Allocation - $649,000) (Land Allocation - $65,000) (Design and Contingencies - $162,000) (2) PA 234, Bridge over , Arendtsville Borough, Bridge Replacement 1,089,000 (Base Construction Allocation - $806,000) (Land Allocation - $81,000) (Design and Contingencies - $202,000) (3) PA 116, Bridge over White Run, Arendtsville Borough, Bridge Replacement 602,000 (Base Construction Allocation - $445,000) (Land Allocation - $45,000) (Design and Contingencies - $112,000) (4) SR 3001, Bridge over , Huntington Township, Bridge Replacement 1,009,000 (Base Construction Allocation - $747,000) (Land Allocation - $75,000) (Design and Contingencies - $187,000) (5) PA 116, Bridge over Muddy Creek, Highland Township, Bridge Replacement 497,000 (Base Construction Allocation - $368,000) (Land Allocation - $37,000) (Design and Contingencies - $92,000) (6) PA 94, Bridge over Bermudian Creek, Latimore Township, Bridge Replacement 550,000 (Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) Section 6. Allegheny County. (a) Local Bridges (1) Plum Borough, Mary Street Bridge over Plum Creek, Bridge Replacement 630,000 (Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $180,000) (2) City of , , Phase II over , Three Railroads and Carson Street, Bridge Rehabilitation 4,180,000 (Base Construction Allocation - $3,905,000) (Design and Contingencies - $275,000) (3) Elizabeth Township, Patterson Road, Boyd Hollow Bridge, Bridge Replacement 225,000 (Base Construction Allocation - $180,000) (Land Allocation - $11,000) (Design and Contingencies - $34,000) (4) Elizabeth Township, Yates Street Bridge, Bridge Replacement 198,000 (Base Construction Allocation - $158,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (5) Shaler Township, South of Martha Avenue, Anderson Road over Wible Run, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Design and Contingencies - $100,000) (6) Baldwin Borough, Old Clairton Road over CSX Railroad, Bridge Rehabilitation 80,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $15,000) (7) Ben Avon Borough, Spruce Run Road over Spruce Run, Bridge Rehabilitation 265,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000) (8) City of Pittsburgh, Swinburne Street, Bridge Painting 1,530,000 (Base Construction Allocation - $1,500,000) (Design and Contingencies - $30,000) (9) City of Pittsburgh, Railroad Bridge () at Former LTV Steel Company over Monongahela River, Bridge Rehabilitation 25,000,000 (Base Construction Allocation - $22,500,000) (Design and Contingencies - $2,500,000) (10) Edgeworth Borough, Beaver Street over Little Sewickley Creek, Bridge Replacement 358,000 (Base Construction Allocation - $250,000) (Land Allocation - $8,000) (Design and Contingencies - $100,000) (11) Forward Township, Pangburn Hollow Road over Pangburn Run, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (12) Hampton Township, Duncan Avenue over Pine Creek, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (13) Harrison Township, Natrona Road over Small Branch of , Bridge Rehabilitation 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (14) Jefferson Borough, Coal Valley Road Bridge No.2 over McRoberts Run, Bridge Rehabilitation 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (15) Jefferson Borough, Coal Valley Road Bridge No.4 over McRoberts Run, Bridge Rehabilitation 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (16) Leetsdale Borough, Beaver Road over Big Sewickley Creek, Bridge Replacement 420,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $110,000) (17) Municipality of Penn Hills, Mt. Carmel Road over Sandy Creek, Bridge Replacement 230,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (18) Municipality of Penn Hills, Lincoln Road Bridge No.6 over Sandy Creek, Bridge Replacement 215,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000) (19) Municipality of Penn Hills, Lincoln Road Bridge No.12 over Sandy Creek, Bridge Replacement 215,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000) (20) Sewickley Heights Borough, Blackburn Road over Kilbuck Run, Bridge Rehabilitation 145,000 (Base Construction Allocation - $110,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) (21) South Park Township, Sleepy Hollow Road over Sleepy Hollow, Bridge Replacement 295,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $90,000) (22) South Park Township, Cochran's Mill Road over Licks Run, Bridge Replacement 215,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000) (23) Hampton Township, T-357, Bridge over Gourdhead Run, Bridge Rehabilitation 320,000 (Base Construction Allocation - $280,000) (Design and Contingencies - $40,000) (24) Hampton Township, T-984, South Pioneer Road Bridge No.1 over Crouse Run, Bridge Rehabilitation 250,000 (Base Construction Allocation - $210,000) (Design and Contingencies - $40,000) (25) Hampton Township, T-984, South Pioneer Road Bridge No.2 over Crouse Run, Bridge Rehabilitation 250,000 (Base Construction Allocation - $210,000) (Design and Contingencies - $40,000) (26) Marshall Township, T-482, Northgate Drive Bridge over Brush Creek, Bridge Replacement 320,000 (Base Construction Allocation - $280,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000) (27) Town of McCandless, Blazier Drive Bridge No.1 over Pine Creek, Bridge Rehabilitation 17,000 (Base Construction Allocation - $15,000) (Design and Contingencies - $2,000) (28) Town of McCandless, Blazier Drive Bridge No.2 over Pine Creek, Bridge Rehabilitation 28,000 (Base Construction Allocation - $26,000) (Design and Contingencies - $2,000) (29) Town of McCandless, Blazier Drive Bridge No.3 over Pine Creek, Bridge Rehabilitation 3,000 (Base Construction Allocation - $2,000) (Design and Contingencies - $1,000) (30) Town of McCandless, Oakridge Drive over Pine Creek, Bridge Rehabilitation 10,000 (Base Construction Allocation - $8,000) (Design and Contingencies - $2,000) (31) Town of McCandless, Meinert Road over Pine Creek, Bridge Rehabilitation 3,000 (Base Construction Allocation - $2,000) (Design and Contingencies - $1,000) (32) Collier Township, Thom's Run Road-Oakdale Road No.4 over Thom's Run, Bridge Replacement 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (33) Collier Township, Thom's Run Road-Oakdale Road No.5 over Thom's Run, Bridge Replacement 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (34) Collier Township, Thom's Run Road-Oakdale Road No.9 over Thom's Run, Bridge Replacement 180,000 (Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (35) Etna Borough, Dewey Street over , Bridge Rehabilitation 23,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $3,000) (36) Forward Township, Roberts Hollow Road over Fallen Timber Run, Bridge Replacement 200,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (37) Hampton Township, Duncan Avenue over Stillhouse Run, Bridge Replacement 230,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (38) Penn Hills Township, Lincoln Road over Ryans Run, Bridge Replacement 190,000 (Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (39) Penn Hills Township, Lincoln Road over Sandy Creek, Bridge Replacement 195,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000) (40) North Versailles Township, Crooked Run Road over Crooked Run, Bridge Replacement 170,000 (Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (41) O'Hara Township, Brownhill Road over Little Pine Creek, Bridge Replacement 275,000 (Base Construction Allocation - $231,000) (Design and Contingencies - $44,000) (42) Ross Township, Thompson Run Road over South Branch of Pine Creek, Bridge Replacement 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $8,000) (Design and Contingencies - $42,000) (43) Moon Township, T-114, Becks Run Road over Flaugherty Run, Bridge Replacement 420,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (44) Homestead Borough, High Level Bridge, Bridge Rehabilitation and Upgrade 250,000 (45) North Braddock Borough, Hawkins Avenue Bridge, Bridge Rehabilitation 300,000 (46) Penn Hills Borough, Beechtree Road Box Culvert Bridge, Bridge Rehabilitation 100,000 (47) Whitaker Borough, Rankin Bridge, Bridge Rehabilitation 100,000 (48) Swissvale Borough, Kenmaur Bridge connecting Swissvale and Rankin, Bridge Replacement 320,000 (Base Construction Allocation - $270,000) (Design and Contingencies - $50,000) (49) Wilkins Township, Brown Avenue Bridge over Brown Run, Bridge Replacement 475,000 (Base Construction Allocation - $380,000) (Design and Contingencies - $95,000) (50) Wilkins Township, Ivy Street Bridge over Brown Run, Bridge Replacement 268,000 (Base Construction Allocation - $214,000) (Design and Contingencies - $54,000) (51) Wilkins Township, Baker Street Bridge over Chalfant Run, Bridge Replacement 205,000 (Base Construction Allocation - $164,000) (Design and Contingencies - $41,000) (52) Upper St. Clair Township, Walther Lane Bridge, Bridge Replacement 700,000 (Base Construction Allocation - $650,000) (Design and Contingencies - $50,000) (53) Green Tree Borough, Trumball Drive Bridge over Wheeling and Lake Erie Railroad, Bridge Rehabilitation 575,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $75,000) (54) City of Pittsburgh, Fancourt Street Bridge, Bridge Replacement 625,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $125,000) (55) City of Pittsburgh, Fort Wayne Bridge over Allegheny River, Bridge Rehabilitation 100,000,000 (Base Construction Allocation - $90,000,000) (Land Allocation - $1,000,000) (Design and Contingencies - $9,000,000) (56) City of Pittsburgh, Wabash Bridge at Stanwix Street over Monongahela River, Bridge Construction 175,000,000 (Base Construction Allocation - $150,000,000) (Land Allocation - $10,000,000) (Design and Contingencies - $15,000,000) (57) City of Pittsburgh, Northshore/Central Business District Bridge over Allegheny River, Bridge Construction 65,000,000 (Base Construction Allocation - $50,000,000) (Land Allocation - $10,000,000) (Design and Contingencies - $5,000,000) (58) City of Pittsburgh, Airport Busway/HOV Bridge over (Brunot Island), Bridge Construction 185,000,000 (Base Construction Allocation - $150,000,000) (Land Allocation - $20,000,000) (Design and Contingencies - $15,000,000) (59) City of Pittsburgh, South Millvale Street Bridge over East Busway/Conrail, Bridge Rehabilitation 5,000,000 (Base Construction Allocation - $5,000,000) (60) Carnegie Borough, Carnegie Pedestrian Mall Bridge, Conversion from Pedestrian Bridge to Vehicular Bridge 850,000 (Base Construction Allocation - $850,000) (61) Jefferson Borough, State Street Bridge Reconstruction 100,000 (Base Construction Allocation - $100,000) (62) City of Pittsburgh, Fort Wayne Bridge Rehabilitation and Conversion for L.R.T. Vehicles 20,000,000 (Base Construction Allocation - $18,000,000) (Design and Contingencies - $2,000,000) (63) City of Pittsburgh, Fan Court Street Bridge, Bridge Reconstruction 650,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $150,000) (64) City of Pittsburgh, South Millvale Avenue Bridge, Bridge Reconstruction 5,500,000 (Base Construction Allocation - $5,000,000) (Design and Contingencies - $500,000) (65) City of Pittsburgh, West Ohio Street Bridge, Bridge Reconstruction 3,575,000 (Base Construction Allocation - $3,250,000) (Design and Contingencies - $325,000) (66) City of Pittsburgh, McArdle Viaduct No.1, Bridge Reconstruction 3,850,000 (Base Construction Allocation - $3,500,000) (Design and Contingencies - $350,000) (67) City of Pittsburgh, McArdle Viaduct No.2, Bridge Reconstruction 3,850,000 (Base Construction Allocation - $3,500,000) (Design and Contingencies - $350,000) (68) City of Pittsburgh, Carnahan Road Bridge, Bridge Reconstruction 428,000 (Base Construction Allocation - $345,000) (Design and Contingencies - $83,000) (69) City of Pittsburgh, Second Avenue Bridge, Bridge Reconstruction 322,000 (Base Construction Allocation - $322,000) (70) City of Pittsburgh, South Highland Avenue Bridge, Bridge Reconstruction 5,040,000 (Base Construction Allocation - $4,600,000) (Design and Contingencies - $440,000) (71) South Park Township, Catfish Run Bridge No.10, Bridge Replacement 210,000 (Base Construction Allocation - $175,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) (72) Jefferson Borough, McRoberts Run Bridge No.6, Bridge Replacement 297,000 (Base Construction Allocation - $200,000) (Land Allocation - $12,000) (Design and Contingencies - $85,000) (73) Indiana Township, Crawford Run Bridge No.2, Bridge Replacement 299,000 (Base Construction Allocation - $215,000) (Land Allocation - $9,000) (Design and Contingencies - $75,000) (74) Monroeville Borough, Dirty Camp Run Bridge No.9, Bridge Replacement 315,000 (Base Construction Allocation - $225,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (75) City of McKeesport, Long Run Bridge No.8, Bridge Replacement 285,000 (Base Construction Allocation - $190,000) (Land Allocation - $15,000) (Design and Contingencies - $80,000) (76) Ross Township, South Branch Pine Creek, Bridge No.10, Bridge Replacement 297,000 (Base Construction Allocation - $200,000) (Land Allocation - $12,000) (Design and Contingencies - $85,000) (77) Sewickley Hills Borough, Kilbuck Run Bridge No.13, Bridge Replacement 405,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $90,000) (78) Leetsdale Borough, Beaver Road Bridge No.1 over Big Sewickley Creek, Bridge Replacement 420,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $110,000) (79) Edgeworth Borough, Beaver Street Bridge No.1 over Little Sewickley Creek, Bridge Replacement 358,000 (Base Construction Allocation - $250,000) (Land Allocation - $8,000) (Design and Contingencies - $100,000) (80) South Park Township, Sleepy Hollow Road Bridge No.1, Bridge Replacement 295,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $90,000) (81) Penn Hills, Lincoln Road Bridge No.6 over Sandy Creek, Bridge Replacement 215,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000) (82) Penn Hills, Lincoln Road Bridge No.12 over Sandy Creek, Bridge Replacement 215,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000) (83) South Park Township, Cochran's Mill Road Bridge No.9 over Licks Run, Bridge Replacement 215,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $60,000) (84) Forward Township, Pangburn Hollow Road Bridge No.10 over Pangburn Run, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (85) Hampton Township, Duncan Avenue Bridge No.29 over Pine Creek, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (86) Ross Township, Thompson Run Road Bridge No.7 over Pine Creek, Bridge Replacement 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $8,000) (Design and Contingencies - $42,000) (87) Penn Hills, Lincoln Road Bridge No.5 over Ryan's Run, Bridge Replacement 190,000 (Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (88) Penn Hills, Lincoln Road Bridge No.7 over Sandy Creek, Bridge Replacement 195,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000) (89) Hampton Township, Duncan Avenue Bridge No.1 over Stillhouse Run, Bridge Replacement 230,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (90) Collier Township, Thom's Run Bridge No.4, Bridge Replacement 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (91) Collier Township, Thom's Run Bridge No.5, Bridge Replacement 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (92) Collier Township, Thom's Run Bridge No.9, Bridge Replacement 180,000 (Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (93) North Versailles Township, Crooked Run Bridge No.3, Bridge Replacement 170,000 (Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (94) Forward Township, Roberts Hollow Road Bridge No.5 over Fallen Timber Run, Bridge Replacement 200,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (95) Sewickley Heights Borough, Blackburn Road Bridge No.16 over Kilbuck Run, Bridge Replacement 145,000 (Base Construction Allocation - $110,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) (96) Jefferson Borough, Coal Valley Road Bridge No.2 over McRoberts Run, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (97) Jefferson Borough, Coal Valley Road Bridge No.4 over McRoberts Run, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (98) Penn Hills, Mt. Carmel Road Bridge No.14 over Sandy Creek, Bridge Replacement 230,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (99) Harrison Township, Natrona Road Bridge No.12 over Small Branch of Allegheny River, Bridge Replacement 210,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (100) Borough of Rankin and Borough of Whitaker, Rankin Hot Metal Bridge over the Monongahela River, Bridge Rehabilitation 2,550,000 (Base Construction Allocation - $2,050,000) (Design and Contingencies - $500,000) (101) South Fayette Township, Millers Run, W&LE Railroad Overpass, Bridge Rehabilitation 350,000 (Base Construction Allocation - $330,000) (Design and Contingencies - $20,000) (102) Jefferson Township, W&LE Railroad Bridge over Peter Creek Road, Rehabilitate and Rebuild W&LE, Clairton Branch Bridge 380,000 (Base Construction Allocation - $345,000) (Design and Contingencies - $35,000) (103) Robinson Township, Steubenville Pike Bridge over Chartiers Creek, Bridge Replacement 85,000 (104) North Fayette Township, Noblestown Road, Bridge over Robinson Run, Superstructure Replacement 75,000 (105) Findlay Township, Santiago Road Bridge over Montour Run, Replace Super and Repair Sub 50,000 (106) Findlay Township, Potato Garden Road Bridge over Potato Garden Road, Replace Structure and Widen 75,000 (107) North Fayette Township, North Branch Road Bridge No.1 over Robinson Run, Structure Replacement 93,000 (108) North Fayette Township, North Branch Road Bridge No.2 over Robinson Run, Replace Super and Repair Sub 94,000 (109) Economy Borough, Big Sewickley Creek Road Bridge over Big Sewickley Creek, Bridge Rehabilitation 19,000 (110) Sewickley Borough, Bridge over Ohio River, Bridge Painting 701,000 (111) City of Pittsburgh, Bridge over Ohio River, Bridge Painting 1,101,000 (112) Moon Township, Beaver Grade Road Bridge over Montour Run, Deck Replacement Super/Sub Repairs 457,000 (113) City of Pittsburgh, South Hills Connector, to Banksville Road and Parkway West over Saw Mill Run, Bridge Construction 90,000,000 (Base Construction Allocation - $50,000,000) (Land Allocation - $30,000,000) (Design and Contingencies - $10,000,000) (114) Fox Chapel Borough, Rockwood Drive Bridge over Dry Stream Bed, Bridge Repainting 40,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $5,000) (115) Shaler Township, Dravo Street Bridge over Girty's Run, Bridge Replacement 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (116) Hampton Township, South Pioneer's Road, Bridge No.1 over Crouse Creek, Bridge Replacement 85,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $10,000) (117) Hampton Township, South Pioneer's Road, Bridge No.2 over Crouse Creek, Bridge Replacement 85,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $10,000) (118) City of Pittsburgh, Ellsworth Avenue Bridge over Martin Luther King Busway and Rail, Bridge Replacement 3,300,000 (Base Construction Allocation - $3,000,000) (Design and Contingencies - $300,000) (b) State Bridges (1) SR 0028, Etna Bridge, Northbound Bridge No.4 to Existing SR 0028, Etna Borough, Shaler Township, Sharpsburg Borough and O'Hara Township, Bridge Rehabilitation 7,415,000 (Base Construction Allocation - $7,115,000) (Land Allocation - $300,000) (2) SR 0028, Etna Bridge to 62nd Street Bridge, Etna Borough, Shaler Township, Sharpsburg Borough and O'Hara Township, Bridge Rehabilitation 17,222,000 (Base Construction Allocation - $17,022,000) (Land Allocation - $200,000) (3) SR 0030, Ardmore Westbound Electric over SR 2112, Chalfant Borough, Bridge Replacement 3,100,000 (Base Construction Allocation - $3,000,000) (Design and Contingencies - $100,000) (4) SR 0030, Ardmore Eastbound Electric over SR 2112, Chalfant Borough, Bridge Replacement 2,500,000 (Base Construction Allocation - $2,400,000) (Design and Contingencies - $100,000) (5) SR 0030, Ardmore Boulevard Bridge No.1 over Falls Run, North of SR 8012 Interchange, Forest Hills Borough, Bridge Replacement 550,000 (Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (6) SR 0048, Boston Hollow Road Bridge over Unnamed Stream, North of Lincoln Borough, Elizabeth Borough, Bridge Replacement 340,000 (Base Construction Allocation - $200,000) (Land Allocation - $40,000) (Design and Contingencies - $100,000) (7) SR 0050, Bridge over Chartiers Creek, Northbound Lane, Heidelberg Borough, Scott Township, Bridge Rehabilitation 3,750,000 (Base Construction Allocation - $3,300,000) (Land Allocation - $50,000) (Design and Contingencies - $400,000) (8) SR 0060, South Main Street Bridge over Saw Mill Run, South of West End Circle, City of Pittsburgh, Bridge Painting 178,000 (Base Construction Allocation - $173,000) (Design and Contingencies - $5,000) (9) SR 0130, Tri-Borough Extended Bridge over Patton Street at SR 8076 Interchange, Wilmerding Borough, Bridge Rehabilitation 505,000 (Base Construction Allocation - $400,000) (Land Allocation - $30,000) (Design and Contingencies - $75,000) (10) SR 0148, Bridge over Crooked Run Creek near SR 2037, White Oak Borough, Bridge Replacement 350,000 (Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (11) SR 0791, Bridge over Chalfant Run at SR 2048, Wilkins Township, Bridge Replacement 450,000 (Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (12) SR 0837, Northbound Ramp A to SR 0885 Southbound, City of Pittsburgh, Bridge Rehabilitation 1,350,000 (Base Construction Allocation - $1,250,000) (Design and Contingencies - $100,000) (13) SR 0978, Miller's Run Road Bridge over Dolphin Run, South Fayette Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $100,000) (14) SR 1001, West 7th Avenue Bridge over Bull Creek, Tarentum Borough, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $100,000) (15) SR 1011, Guys Run Road Bridge over Guys Run, North of SR 0028, Harmar Township, Bridge Replacement 350,000 (Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (16) SR 2001, Glassport-Elizabeth Road Bridge over Burns Run, North of Elizabeth Township, Lincoln Borough, Bridge Replacement 350,000 (Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (17) SR 2081, Turtle Creek-Monroeville Road over US 22 Business, Monroeville Borough, Bridge Replacement 1,060,000 (Base Construction Allocation - $960,000) (Design and Contingencies - $100,000) (18) SR 2094, Jerome Street Bridge over SR 2027, , McKeesport Borough, Bridge Rehabilitation 4,600,000 (Base Construction Allocation - $4,500,000) (Design and Contingencies - $100,000) (19) SR 3066, Steubenville Pike Bridge over US 22, North Fayette Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (20) SR 3069, Airshaft between SR 0051 and Liberty Bridge, City of Pittsburgh, Airshaft Restoration 1,570,000 (Base Construction Allocation - $1,370,000) (Design and Contingencies - $200,000) (21) SR 3104, McKees Rocks Sidewalk over Harriet Street, McKees Rocks Borough, Bridge Rehabilitation 6,800,000 (Base Construction Allocation - $6,700,000) (Design and Contingencies - $100,000) (22) SR 4036, Big Sewickley Creek Road over Big Sewickley Creek at SR 2003, Bell Acres Borough, Bridge Rehabilitation 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (23) SR 8043, Southbound Ramp Bridge over SR 0019 and SR 0065, City of Pittsburgh, Bridge Rehabilitation 2,400,000 (Base Construction Allocation - $2,100,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (24) SR 8045, Ramp at Stadium over SR 0065 and Stadium Drive, City of Pittsburgh, Bridge Rehabilitation 600,000 (Base Construction Allocation - $600,000) (25) SR 8049, SR 0019 Bridge Ramp, Chateau Street to SR 0019, City of Pittsburgh, Bridge Rehabilitation 2,350,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (26) SR 8049, Bridge Ramp from SR 0065 Northbound to SR 0019, City of Pittsburgh, Bridge Rehabilitation 2,850,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (27) SR 8049, I-279 Bridge Ramp to SR 0065 Northbound, City of Pittsburgh, Bridge Rehabilitation 1,730,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (28) SR 0030, Ardmore Boulevard Bridge No.2 over Falls Run, North of SR 8012 Interchange, Forest Hills Borough, Bridge Replacement 550,000 (Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (29) SR 3004, McLaughlin Road Bridge over McLaughlin Run, Bridgeville Borough, Bridge Replacement 227,000 (Base Construction Allocation - $177,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (30) SR 0028, Northbound Bridge over Pennsylvania Turnpike, Harmar Township, Bridge Rehabilitation 344,000 (Base Construction Allocation - $314,000) (Design and Contingencies - $30,000) (31) SR 0028, Southbound Bridge over Pennsylvania Turnpike, Harmar Township, Bridge Rehabilitation 356,000 (Base Construction Allocation - $325,000) (Design and Contingencies - $31,000) (32) SR 0028, Northbound Bridge over SR 1028, Harrison Township, Bridge Rehabilitation 106,000 (Base Construction Allocation - $97,000) (Design and Contingencies - $9,000) (33) SR 0028, Southbound Bridge over SR 1028, Harrison Township, Bridge Rehabilitation 105,000 (Base Construction Allocation - $96,000) (Design and Contingencies - $9,000) (34) SR 0050, Washington Avenue Bridge over Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation 119,000 (Base Construction Allocation - $109,000) (Design and Contingencies - $10,000) (35) SR 0051, Clairton Boulevard Bridge over Lewis Run, Pleasant Hills Borough, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $100,000) (36) SR 0065, Ohio River Boulevard Bridge over Forest Avenue, Ben Avon Borough, Bridge Replacement 396,000 (Base Construction Allocation - $360,000) (Design and Contingencies - $36,000) (37) SR 0065, Bridge over Ramps, Railroad and Chateau Street, City of Pittsburgh, Bridge Rehabilitation 13,284,000 (Base Construction Allocation - $12,784,000) (Design and Contingencies - $500,000) (38) SR 0079, Neville Island Bridge over Ohio River, Neville Township, Bridge Rehabilitation 12,700,000 (Base Construction Allocation - $11,200,000) (Design and Contingencies - $1,500,000) (39) SR 0088, Library Road Bridge No.1 over Piney Fork Creek, Bethel Park Borough, Bridge Replacement 161,000 (Base Construction Allocation - $128,000) (Land Allocation - $20,000) (Design and Contingencies - $13,000) (40) SR 0088, Library Road Bridge No.2 over Branch of Piney Fork Creek, Bethel Park Borough, Bridge Replacement 161,000 (Base Construction Allocation - $128,000) (Land Allocation - $20,000) (Design and Contingencies - $13,000) (41) SR 0885, Mifflin Road Bridge over Branch of Streets Run, City of Pittsburgh, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $100,000) (42) SR 0910, Gibsonia Road Bridge over Rawlins Run, Indiana Township, Bridge Deck Replacement 132,000 (Base Construction Allocation - $120,000) (Design and Contingencies - $12,000) (43) SR 1027, Pleasantville Road Bridge over Little Bull Creek, Harrison Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $100,000) (44) SR 1032, Burtner Road Bridge over Little Bull Creek, Harrison Township, Bridge Deck Replacement 198,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $18,000) (45) SR 2008, Lovedale Road Bridge over Wylie Run Creek, Elizabeth Township, Bridge Replacement 430,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (46) SR 2017, Pineview Drive Bridge No.1 over Gillespie Run, Elizabeth Township, Bridge Deck Replacement 255,000 (Base Construction Allocation - $135,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (47) SR 2017, Pineview Drive Bridge No.2 over Gillespie Run, Elizabeth Township, Bridge Deck Replacement 243,000 (Base Construction Allocation - $123,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (48) SR 2018, West Smithfield Road Bridge over Unnamed Creek, Elizabeth Township, Bridge Deck Replacement 218,000 (Base Construction Allocation - $118,000) (Design and Contingencies - $100,000) (49) SR 2031, Lincoln Way Bridge over Long Run, White Oak Borough, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $100,000) (50) SR 2051, Brinton Road Bridge over I-376, Edgewood Borough, Bridge Rehabilitation 996,000 (Base Construction Allocation - $846,000) (Design and Contingencies - $150,000) (51) SR 4019, Mount Royal Boulevard Bridge over Pine Creek, Hampton Township, Bridge Rehabilitation 94,000 (Base Construction Allocation - $89,000) (Design and Contingencies - $5,000) (52) SR 4043, Big Sewickley Road Bridge over Branch of Big Sewickley Creek, Franklin Park Borough, Bridge Replacement 84,000 (Base Construction Allocation - $76,000) (Design and Contingencies - $8,000) (53) SR 8002, Crosstown Boulevard Bridge over Forbes and Diamond Street and Ramps, City of Pittsburgh, Bridge Painting 310,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $10,000) (54) SR 8002, Ramp L Road Bridge over Forbes and Diamond Streets, City of Pittsburgh, Bridge Painting 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (55) SR 8015, Ramp D Road Bridge over Ohio River Back Channel, Neville Township, Bridge Rehabilitation 800,000 (Base Construction Allocation - $700,000) (Design and Contingencies - $100,000) (56) SR 8015, Ramp E Road Bridge over PC&Y Railroad, Neville Township, Bridge Rehabilitation 670,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $170,000) (57) SR 8015, I-79 Ramp H Bridge over PC&Y Railroad, Neville Township, Bridge Rehabilitation 700,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $100,000) (58) SR 8015, Ramp J Road Bridge over Neville Road, Neville Township, Bridge Rehabilitation 220,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $20,000) (59) SR 8017, Ramp B2 Road Bridge over SR 4025 and SR 4033, Glenfield Borough, Bridge Rehabilitation 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (60) SR 8017, Ramp B Road Bridge over Ramp A and SR 4033, Glenfield Borough, Bridge Rehabilitation 120,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $10,000) (61) SR 8017, Ramp B1 Road Bridge over SR 0065 Ramps A1 and R, Glenfield Borough, Bridge Rehabilitation 165,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $15,000) (62) SR 8017, Ramp A Road Bridge over Ramp B3, Glenfield Borough, Bridge Rehabilitation 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (63) SR 0028, Etna Bridges, Phase III, Northbound Bridge No.4 to Existing SR 0028, Two Structures, Etna and Sharpsburg Boroughs, Bridge Rehabilitation 6,300,000 (Base Construction Allocation - $6,000,000) (Land Allocation - $300,000) (64) SR 0028, Etna Bridge, Phase II, Southbound Bridge No.3 and Northbound Bridge for SR 0008 Connection, Etna and Sharpsburg Boroughs and Shaler Township, Bridge Rehabilitation 13,200,000 (Base Construction Allocation - $12,200,000) (Land Allocation - $1,000,000) (65) SR 2013, Monessen-Elizabeth Road Bridge over Becketts Run, Forward Township, Bridge Replacement 450,000 (Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (66) SR 2016, Jefferson Heights Road Bridge over I-376, Wilkins Township, Bridge Reconstruction 1,600,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $400,000) (67) SR 0008, Bridge over Allegheny River and Conrail, City of Pittsburgh, Bridge Painting 333,000 (Base Construction Allocation - $333,000) (68) SR 0028, Allegheny Valley Expressway Bridge, Southbound over Burtner Road, Harrison Township, Bridge Rehabilitation 170,000 (Base Construction Allocation - $165,000) (Design and Contingencies - $5,000) (69) SR 0028, Allegheny Valley Expressway Bridge, Northbound over Burtner Road, Harrison Township, Bridge Rehabilitation 320,000 (Base Construction Allocation - $315,000) (Design and Contingencies - $5,000) (70) SR 0028, Allegheny Valley Expressway Bridge, Northbound over Bull Creek Road, Tarentum Borough, Bridge Rehabilitation 120,000 (Base Construction Allocation - $115,000) (Design and Contingencies - $5,000) (71) SR 0028, Allegheny Valley Expressway Bridge, Southbound over Bull Creek Road, Tarentum Borough, Bridge Rehabilitation 120,000 (Base Construction Allocation - $115,000) (Design and Contingencies - $5,000) (72) SR 0028, Allegheny Valley Expressway, Bridge over Scout Reservation Road, Sharpesburg Borough, Bridge Rehabilitation 1,000,000 (Base Construction Allocation - $850,000) (Design and Contingencies - $150,000) (73) SR 0079, Glenfield Bridge over Ramp A and SR 4033, Glenfield Borough, Bridge Rehabilitation 748,000 (Base Construction Allocation - $681,000) (Design and Contingencies - $67,000) (74) SR 0079, I-79 Bridge Northbound over Turnpike, Marshall Township, Bridge Painting 278,000 (Base Construction Allocation - $268,000) (Design and Contingencies - $10,000) (75) SR 0079, I-79 Bridge Southbound over Turnpike, Marshall Township, Bridge Painting 228,000 (Base Construction Allocation - $218,000) (Design and Contingencies - $10,000) (76) SR 0079, I-79 Neville Island Bridge over Ohio River, Neville Township, Bridge Rehabilitation 12,945,000 (Base Construction Allocation - $11,200,000) (Land Allocation - $200,000) (Design and Contingencies - $1,545,000) (77) SR 0121, Green Tree Road Bridge over I-279, Parkway West, Green Tree Borough, Bridge Painting 192,000 (Base Construction Allocation - $165,000) (Land Allocation - $10,000) (Design and Contingencies - $17,000) (78) SR 0376, I-376 Bridge Eastbound over Haymaker Road, Monroeville Borough, Bridge Painting 266,000 (Base Construction Allocation - $256,000) (Design and Contingencies - $10,000) (79) SR 0376, I-376 Bridge Westbound over Haymaker Road, Monroeville Borough, Bridge Painting 155,000 (Base Construction Allocation - $145,000) (Design and Contingencies - $10,000) (80) SR 0400, SR 0400, SR 4019 and SR 4042 Bridges, Structure Painting, Franklin Park Borough, Hampton Township and Pittsburgh, Bridge Painting 520,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $20,000) (81) SR 0366, Tarentum Bridge over Allegheny River, Tarentum Borough, Bridge Rehabilitation 4,105,000 (Base Construction Allocation - $3,665,000) (Design and Contingencies - $440,000) (82) SR 0837, Eighth Avenue Bridge over Baldwin Road, West Homestead Borough, Bridge Replacement 2,529,000 (Base Construction Allocation - $2,258,000) (Design and Contingencies - $271,000) (83) SR 3078, Burgettstown Road Bridge over Potato Garden Road, Findlay Township, Bridge Replacement 148,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $18,000) (84) SR 1010, Hart's Run Road Bridge over Branch of Hart's Run, Hampton Township, Bridge Replacement 520,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (85) SR 1040, Bakerstown Road Bridge over Route 28, Tarentum Borough, Bridge Rehabilitation 275,000 (Base Construction Allocation - $270,000) (Design and Contingencies - $5,000) (86) SR 2065, Thompson Run Road Bridge over Union Railroad, Monroeville Borough, Bridge Replacement 550,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $50,000) (87) SR 2074, Hulton Road Bridge over Caldwell Run, Penn Hills, Bridge Replacement 117,000 (Base Construction Allocation - $84,000) (Land Allocation - $20,000) (Design and Contingencies - $13,000) (88) SR 2080, Plum Avenue Bridge over Plum Creek, Oakmont Borough, Bridge Painting 109,000 (Base Construction Allocation - $99,000) (Design and Contingencies - $10,000) (89) SR 2082, Hulton Bridge over Conrail and Allegheny River, Oakmont Borough and Harmar Township, Bridge Rehabilitation 550,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $100,000) (90) SR 2084, Milltown Road Bridge over Plum Creek, Penn Hills, Bridge Painting 31,000 (Base Construction Allocation - $26,000) (Design and Contingencies - $5,000) (91) SR 2085, over Mon River, CSX Railroad, City of Pittsburgh, Bridge Rehabilitation 1,455,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $5,000) (Design and Contingencies - $250,000) (92) SR 2114, Bowman Avenue Bridge over SR 1066, RPS G & E, Cliff Street, City of McKeesport, Bridge Rehabilitation 300,000 (Base Construction Allocation - $260,000) (Design and Contingencies - $40,000) (93) SR 3005, Mayview Road Bridge over Branch Chartiers Creek, South Fayette Township, Bridge Replacement 400,000 (Base Construction Allocation - $320,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (94) SR 3007, Walton Road Bridge over Branch of Lobbs Run, Jefferson Borough, Bridge Replacement 93,000 (Base Construction Allocation - $63,000) (Land Allocation - $20,000) (Design and Contingencies - $10,000) (95) SR 3069, Liberty Bridge and Approach Ramps, Six Structures, City of Pittsburgh, Bridge Painting 1,000,000 (Base Construction Allocation - $900,000) (Design and Contingencies - $100,000) (96) SR 3104, Bridge over Ohio River, City of Pittsburgh, Bridge Painting 960,000 (Base Construction Allocation - $950,000) (Design and Contingencies - $10,000) (97) SR 4003, McKnight Road Bridge over Branch Pine Creek, Culvert Repair, McCandless Township, Bridge Replacement 978,000 (Base Construction Allocation - $850,000) (Design and Contingencies - $128,000) (98) SR 4025, Bridge over Ohio River, Sewickley Borough, Bridge Painting 610,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $10,000) (99) SR 8037, Bridge and Ramp over Saw Mill Run, City of Pittsburgh, Bridge Painting 584,000 (Base Construction Allocation - $564,000) (Design and Contingencies - $20,000) (100) SR 0279, over Monongahela River, City of Pittsburgh, Bridge Rehabilitation 1,800,000 (Base Project Allocation - $1,800,000) (101) SR 1015, Russellton Road Railroad Bridge, Indiana Township, Bridge Replacement 5,000,000 (Base Construction Allocation - $4,000,000) (Land Allocation - $500,000) (Design and Contingencies - $500,000) (102) SR 2058, Hulton Road Bridge over Allegheny River, Oakmont Borough and Harmar Township, Expand to Four Lanes, Bridge Replacement 125,000,000 (103) SR 0048, Lincoln Way Bridge over Unknown Stream, White Oak Borough, Bridge Reconstruction 250,000 (104) SR 0048, McKee Road Bridge over Unknown Stream, White Oak Borough, Bridge Reconstruction 300,000 (105) Various Bridges, Allegheny and Beaver Counties, Bridge Rehabilitation 8,000,000 (Base Construction Allocation - $7,200,000) (Design and Contingencies - $800,000) (106) SR 0079, I-79 Northbound over TR 51, Robinson Township, New Deck and Paint 890,000 (107) Birmingham Bridge and Ramps, City of Pittsburgh, Bridge Rehabilitation 1,904,000 (108) over Monongahela River and P&LE Railroad, City of Pittsburgh, Bridge Painting 140,000 (109) Ramp over Ramp D, City of Pittsburgh, Bridge Rehabilitation 185,000 (110) Fort Duquesne Bridge Ramp Southbound over Ramp D, Allegheny River, City of Pittsburgh, Bridge Rehabilitation 262,000 (111) SR 0022/0030, 22/30 Expressway, North Fayette Township, Bridge Preservation 1,000,000 Section 7. Armstrong County. (a) Local Bridges (1) Boggs Township, T-850, Scrubgrass Bridge over Scrubgrass Creek, Bridge Rehabilitation 230,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (2) Boggs Township, T-632, Scrubgrass Bridge No.2 over Scrubgrass Creek, Bridge Rehabilitation 185,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000) (3) Boggs Township, T-821, Pine Creek Bridge over North Fork of Pine Creek, Bridge Rehabilitation 140,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (4) North Buffalo Township, T-300, Blaine Bridge over Buffalo Creek, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (5) North Buffalo Township, T-414, Church Road Bridge over Stream, Bridge Replacement 150,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (6) West Kittanning Borough, T-759, Bridge over Stream, Bridge Replacement 325,000 (Base Construction Allocation - $265,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (7) Manorville Borough, Manorville Railroad Bridge along Former Conrail Right-of-Way, Bridge Removal 65,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $10,000) (8) Pine Township, Templeton Bridge along Former Conrail Right-of-Way, Bridge Removal 75,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $10,000) (9) Gilpin Township, T-413, Elder Run Bridge on Fire Hall Road, Bridge Replacement 460,000 (Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $110,000) (b) State Bridges (1) SR 0028, Buffalo Creek Bridge over Buffalo Creek and Conrail, South Buffalo Township, Bridge Painting 3,010,000 (Base Construction Allocation - $3,000,000) (Design and Contingencies - $10,000) (2) SR 3023, Iron Bridge Road, Pine Run Bridge Replacement, South Buffalo Township, Bridge Replacement 550,000 (Base Construction Allocation - $510,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000) (3) SR 0156, Long Run Bridge over Long Run, Kiskiminetas Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (4) SR 0422, US 422 Eastbound Overpass Bridge over SR 0028, East Franklin Township, Bridge Painting 190,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $15,000) (5) SR 0422, US 422 Westbound Overpass Bridge over SR 0028, East Franklin Township, Bridge Painting 190,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $15,000) (6) SR 1028, Oscar Bridge over Pine Creek, Boggs Township, Bridge Painting 95,000 (Base Construction Allocation - $80,000) (Design and Contingencies - $15,000) (7) SR 0028, Buffalo Creek Bridge over Buffalo Creek, South Buffalo Township, Bridge Painting 1,730,000 (Base Construction Allocation - $1,700,000) (Design and Contingencies - $30,000) (8) SR 0066, Guffy Run Bridge over Guffy Run, Parks Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (9) SR 0066, Garrett's Run Bridge over Garrett's Run and Old 66, Manor Township, Bridge Painting 1,230,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $30,000) (10) SR 0128, Cadogan Bridge over Tributary of Allegheny River, Cadogan Township, Bridge Painting 380,000 (Base Construction Allocation - $360,000) (Design and Contingencies - $20,000) (11) SR 0422, Judge Graff Bridge over Allegheny River, North Buffalo Township, Bridge Painting 2,930,000 (Base Construction Allocation - $2,900,000) (Design and Contingencies - $30,000) (12) SR 0422, Ramp C and F Bridge over End of Bypass, Manor Township, Bridge Painting 180,000 (Base Construction Allocation - $165,000) (Design and Contingencies - $15,000) (13) SR 0422, Ramp F Bridge over SR 0066, Manor Township, Bridge Painting 190,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $15,000) (14) SR 1021, Eddyville Bridge over Pine Run, Redbank Township, Bridge Painting 100,000 (Base Construction Allocation - $85,000) (Design and Contingencies - $15,000) (15) SR 1028, Bryan Bridge over Branch of Pine Creek, Cowanshannock Township, Bridge Painting 50,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $15,000) (16) SR 1034, Mosgrove Bridge over North Fork of Pine Creek, Boggs Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (17) SR 1037, Echo Bridge over Pine Creek, Wayne Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (18) SR 2001, Rural Valley Bridge over Cowanshannock Creek, Rural Valley Borough, Bridge Painting 130,000 (Base Construction Allocation - $115,000) (Design and Contingencies - $15,000) (19) SR 2005, Brick Church Bridge over Branch of , Burrell Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (20) SR 2005, Cherry Run Bridge over Cherry Run, Plumcreek Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (21) SR 2005, Elgin Cemetery Bridge over Cowanshannock Creek, Cowanshannock Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (22) SR 2010, Garrett's Run Bridge over Garrett's Run, Manor Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (23) SR 2023, Wheel-in-Campground Bridge over Plum Creek, Plumcreek Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (24) SR 2025, Garrett's Run Bridge No.1 over Garrett's Run, Manor Township, Bridge Painting 80,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $15,000) (25) SR 2025, Garrett's Run Bridge No.2 over Garrett's Run, Manor Township, Bridge Painting 80,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $15,000) (26) SR 2025, Garrett's Run Bridge No.3 over Garrett's Run, Manor Township, Bridge Painting 90,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $15,000) (27) SR 2027, Girty Bridge over Crooked Creek, South Bend Township, Bridge Painting 155,000 (Base Construction Allocation - $140,000) (Design and Contingencies - $15,000) (28) SR 2029, Kelly's Station Road Bridge over Taylor Run, Bethel Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (29) SR 2036, Stilt's Run Bridge over Stilt's Run, Parks Township, Bridge Painting 50,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $15,000) (30) SR 2036, Carnahan Run Bridge over Carnahan Run, Parks Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (31) SR 2050, Rattling Run Bridge over Rattling Run, Kiskiminetas Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (32) SR 2051, Flat Run Bridge over Flat Run, Kiskiminetas Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (33) SR 2051, Equitable Bridge over Rattling Run, Kiskiminetas Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (34) SR 2057, Parks Pump Station Bridge No.1 over Carnahan Run, Parks Township, Bridge Painting 80,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $15,000) (35) SR 2058, Parks Pump Station Bridge No.2 over Carnahan Run, Parks Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (36) SR 3005, Glade Run Bridge over Glade Run, North Buffalo Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (37) SR 3013, Little Buffalo Bridge over Little Buffalo Creek, West Franklin Township, Bridge Painting 100,000 (Base Construction Allocation - $85,000) (Design and Contingencies - $15,000) (38) SR 3013, Harrigan Run Bridge over Harrigan Run, West Franklin Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (39) SR 3017, West Penn Power Bridge over SR 0422 and SR 0028, East Franklin Township, Bridge Painting 375,000 (Base Construction Allocation - $360,000) (Design and Contingencies - $15,000) (40) SR 4007, Kaylor Bridge over Sugar Creek, Bradys Bend Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (41) SR 4013, Foster Mills Bridge over Branch of Patterson Run, Sugarcreek Township, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (42) SR 8008, Ford City Ramp from Judge Graff Bridge over a Ravine, Manor Township, Bridge Painting 555,000 (Base Construction Allocation - $540,000) (Design and Contingencies - $15,000) (43) SR 4035, Craigsville Bridge over Buffalo Creek, West Franklin Township, Bridge Painting 140,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $15,000) (44) SR 0068, Kaylor Overpass, Railroad over PA 68, Bradys Bend Township, Bridge Removal 560,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (45) SR 0068, B&LE Railroad Overpass, Bradys Bend Township, Bridge Removal 55,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $5,000) (46) SR 0028, Pine Creek Bridge over Pine Creek, Boggs Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (47) SR 0028, Big Glade Run Bridge over Big Glade Run, North Buffalo Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (48) SR 0028, Cowanshannock Creek Bridge over Cowanshannock Creek, Rayburn Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (49) SR 0028, Bridge over Branch of Cowanshannock Creek, Rayburn Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (50) SR 0028, Hays Run Bridge over Hays Run, Rayburn Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (51) SR 0028, Furnace Run Bridge over Furnace Run, South Buffalo Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (52) SR 0028, Pine Run Bridge over Pine Run, South Buffalo Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (53) SR 0028, Bostonia Run Bridge over Bostonia Run, South Buffalo Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (54) SR 0028, Scrubgrass Creek Bridge over Scrubgrass Creek, Wayne Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (55) SR 0210, South Bend Pump Station Bridge over Crooked Creek, South Bend Township, Bridge Rehabilitation 680,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $80,000) (56) SR 0268, B & P Railroad Overpass over Railroad at Cowan Station, East Franklin Township, Bridge Replacement 610,000 (Base Construction Allocation - $500,000) (Land Allocation - $40,000) (Design and Contingencies - $70,000) (57) SR 0268, Hovey Bridge over Small Stream, Hovey Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (58) SR 0268, Church Run Bridge over Church Run, Parker City, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (59) SR 0268, Allison Run Bridge over Allison Run, West Kittanning Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (60) SR 0422, Big Buffalo Creek Bridge over Big Buffalo Creek, West Franklin Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (61) SR 1013, Oak Ridge Bridge over Branch Redbank Creek, Redbank Township, Bridge Deck Replacement 260,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (62) SR 1012, Bridge over Nye Run Branch, Redbank Township, Bridge Replacement 195,000 (Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (63) SR 2001, Gastown North Bridge over Redbank Creek, Plumcreek Township, Bridge Replacement 195,000 (Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (64) SR 2003, Gastown Bridge over Cessna Run, Plumcreek Township, Bridge Replacement 185,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (65) SR 4007, Rest Home Road Bridge over Small Stream, Sugarcreek Township, Bridge Replacement 185,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (66) SR 4033, Lair's Crossing Road Bridge over Small Stream, West Franklin Township, Bridge Replacement 205,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) Section 8. Beaver County. (a) Local Bridges (1) Ambridge and Aliquippa Boroughs, Ambridge - Aliquippa Bridge over Ohio River, Bridge Construction 38,000,000 (Base Construction Allocation - $30,000,000) (Land Allocation - $4,000,000) (Design and Contingencies - $4,000,000) (2) Vanport Township, Vanport Bridge No.6 over Two Mile Run, Bridge Replacement 465,000 (Base Construction Allocation - $375,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (3) Vanport Township, Vanport Bridge No.7 over Two Mile Run, Bridge Replacement 470,000 (Base Construction Allocation - $380,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (4) Vanport Township, Vanport Bridge No.8 over Two Mile Run, Bridge Replacement 510,000 (Base Construction Allocation - $420,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (5) Vanport Township, Vanport Bridge No.9 over Two Mile Run, Bridge Replacement 440,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (6) Borough of New Galilee, Washington Street Bridge over Jordan Run, Bridge Replacement 1,000,000 (b) State Bridges (1) SR 0051, Bridge over Avenue, Ramp A, Rochester Borough, Bridge Deck Replacement 5,600,000 (Base Construction Allocation - $5,500,000) (Design and Contingencies - $100,000) (2) SR 0351, 5th Street, Koppel-Ellwood Bridge over Beaver River, Koppel Borough and North Sewickley Township, Bridge Replacement, Phase I 33,500,000 (Base Construction Allocation - $30,000,000) (Land Allocation - $1,000,000) (Design and Contingencies - $2,500,000) (3) SR 1014, Wise's Grove Road Bridge over Brush Creek, Marion Township, Bridge Rehabilitation 750,000 (Base Construction Allocation - $600,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (4) SR 1022, 13th Street Bridge over Blockhouse Run at Pulaski County Line, New Brighton Borough, Bridge Replacement 780,000 (Base Construction Allocation - $480,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (5) SR 4032, Engle Road Bridge over Six Mile Run Creek, Industry Borough, Bridge Replacement 350,000 (Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (6) SR 4033, Wildwood Road Bridge over Brady's Run, Patterson Township, Bridge Replacement 400,000 (Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (7) SR 8035, Ramp A at LR 641 over Slope, Rochester Borough, Bridge Rehabilitation 1,200,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (8) SR 8037, Ramp F over TR 51 and TR 65 Northbound, Rochester Borough, Bridge Replacement 550,000 (Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (9) SR 8039, Ramp AD, SR 0168 over TR 51, Bridgewater Borough, Bridge Rehabilitation 700,000 (Base Construction Allocation - $550,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (10) SR 3018, Culvert-Pipe Style Bridge over Moody's Run, Greene Township, Bridge Construction 385,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $35,000) (11) SR 0051, Pennsylvania Avenue Bridge over Brady's Run Creek, Fallston Borough, Bridge Replacement 757,000 (Base Construction Allocation - $637,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (12) SR 0060, Beaver Valley Extension Southbound Bridge over T-535, Brighton Township, Bridge Rehabilitation 167,000 (Base Construction Allocation - $153,000) (Design and Contingencies - $14,000) (13) SR 0060, Beaver Valley Extension Northbound Bridge over T-535, Brighton Township, Bridge Rehabilitation 178,000 (Base Construction Allocation - $163,000) (Design and Contingencies - $15,000) (14) SR 0060, Beaver Valley Expansion Bridge over SR 0151, Hopewell Township, Bridge Deck Replacement 1,125,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $125,000) (15) SR 0588, Riverview Road Bridge over Pine Run, Marion Township, Bridge Replacement 250,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $100,000) (16) SR 1009, Hartzel Road Bridge over , Marion Township, Bridge Replacement 1,150,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (17) SR 1016, Tatko Road Bridge over Brush Creek, New Sewickley Township, Bridge Replacement 420,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (18) SR 1032, New York Avenue Bridge over Conrail, SR 1032 and Local Street, Rochester Borough, Bridge Rehabilitation 3,100,000 (Base Construction Allocation - $3,000,000) (Design and Contingencies - $100,000) (19) SR 4035, Sebring Road Bridge over SR 0060, Brighton Township, Bridge Rehabilitation 394,000 (Base Construction Allocation - $361,000) (Design and Contingencies - $33,000) (20) SR 3032, Kendal Harshavile Road Bridge over Branch of Traverse Creek, Hanover Township, Bridge Replacement 250,000 (Base Construction Allocation - $100,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (21) SR 4012, Brady's Run Bridge over South Branch Brady's Run, Brighton Township, Bridge Painting 32,000 (Base Construction Allocation - $27,000) (Design and Contingencies - $5,000) (22) SR 4020, Dutch Ridge Road Bridge over PA 60, Brighton Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (23) SR 4032, Engle Road Bridge over Six Mile Run, Industry Borough, Bridge Painting 36,000 (Base Construction Allocation - $31,000) (Design and Contingencies - $5,000) (24) SR 0060, Vanport Bridge over Ohio River, Vanport Borough, Bridge Painting 965,000 (Base Construction Allocation - $950,000) (Design and Contingencies - $15,000) (25) SR 0018, Frankford Road Bridge over Traverse Creek, Hanover Township, Bridge Replacement 870,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (26) SR 0051, Pennsylvania Avenue Bridge over SR 4013, South Beaver Township, Bridge Rehabilitation 1,210,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000) (27) SR 3036, Gringo Independence Road Bridge over SR 0060, Hopewell Township, Bridge Replacement 2,455,000 (Base Construction Allocation - $2,200,000) (Land Allocation - $5,000) (Design and Contingencies - $250,000) (28) SR 0060, Beaver Valley Expressway Bridge over SR 4008, Chippewa Township, Bridge Rehabilitation 660,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (29) SR 0151, Bocktown Road Bridge over Raredon Run, Independence Township, Bridge Rehabilitation 820,000 (Base Construction Allocation - $550,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (30) SR 0168, Fairview Road Bridge over Upper Dry Run, Ohioville Borough, Bridge Rehabilitation 770,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (31) SR 0168, Tuscarwas Road Bridge over Brush Run, South Beaver Township, Bridge Replacement 870,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (32) SR 3022, Clearview Road Bridge over Service Creek, Independence Township, Bridge Painting 330,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (33) SR 3025, Bocktown Cork Road Bridge over Raredon Run, Independence Township, Bridge Rehabilitation 485,000 (Base Construction Allocation - $430,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (34) SR 3026, Tomlinson Road Bridge over Branch of Tomlinson Run, Hanover Township, Bridge Replacement 870,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (35) SR 3027, Georgetown Road Bridge over Branch of Mill Creek, Greene Township, Bridge Replacement 820,000 (Base Construction Allocation - $550,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (36) SR 3027, Georgetown Road Bridge over Mill Creek, Greene Township, Bridge Replacement 770,000 (Base Construction Allocation - $550,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (37) SR 4034, Westwood Road Bridge over Upper Dry Run, Ohioville Borough, Bridge Replacement 880,000 (Base Construction Allocation - $600,000) (Land Allocation - $30,000) (Design and Contingencies - $250,000) (38) SR 4053, Alpha Drive Bridge over SR 0051, South Beaver Township, Bridge Painting 435,000 (Base Construction Allocation - $400,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) Section 9. Bedford County. (a) Local Bridges (1) Broad Top Township, T-550, Mosquito Bridge over Six Mile Run, Bridge Replacement 505,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $95,000) (2) Broad Top Township, T-553, Langdondale Bridge over Sandy Run, Bridge Replacement 395,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (3) Broad Top Township, T-583, Longs Run Bridge over Longs Run, Bridge Replacement 395,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (4) Harrison Township, T-418, Turner Covered Bridge over , Bridge Rehabilitation 825,000 (Base Construction Allocation - $700,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (5) Monroe Township, T-354, Sideling Hill over East Branch Sideling Hill Creek, Bridge Replacement 335,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (6) South Woodbury Township, T-705 over Three Springs Run, Bridge Replacement 450,000 (Base Construction Allocation - $325,000) (Land Allocation - $50,000) (Design and Contingencies - $75,000) (7) West St. Clair Township, T-565 over , Bridge Replacement 1,250,000 (Base Construction Allocation - $935,000) (Land Allocation - $10,000) (Design and Contingencies - $305,000) (8) Londonderry Township, T-653 over Wills Creek, Bridge Replacement 945,000 (Base Construction Allocation - $850,000) (Land Allocation - $20,000) (Design and Contingencies - $75,000) (9) East Providence Township, T-419 over Brush Creek, Bridge Replacement 1,170,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (10) Broad Top Township, T-677, Riddlesburg Bridge, County Bridge No.35 over Six Mile Run, Bridge Replacement 190,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000) (11) Mann Township, T-319, County Bridge No.27 over Sideling Hill Creek, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,125,000) (Land Allocation - $10,000) (Design and Contingencies - $315,000) (12) Cumberland Valley Township, T-377 over Beaver's Run, Bridge Replacement 410,000 (Base Construction Allocation - $325,000) (Land Allocation - $5,000) (Design and Contingencies - $80,000) (13) Cumberland Valley Township, T-337 over Evitts Creek, Bridge Replacement 455,000 (Base Construction Allocation - $370,000) (Land Allocation - $5,000) (Design and Contingencies - $80,000) (14) Kimmell Township, County Bridge No.3 over Beaverdam Creek, Bridge Replacement 490,000 (Base Construction Allocation - $380,000) (Land Allocation - $20,000) (Design and Contingencies - $90,000) (15) Hopewell Township, County Bridge No.4 over Yellow Creek, Bridge Replacement 970,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (16) Colerain Township, Bridge No.2, Bridge Replacement 445,000 (Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $90,000) (17) Bedford Borough, Bridge No.1 over Shober's Run, Bridge Replacement 800,000 (Base Construction Allocation - $640,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (18) West St. Clair Township, Township Bridge No.8 over Branch of Dunning Creek, Bridge Replacement 480,000 (Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (19) Londonderry Township, T-669, Gladden Pike Bridge Over Gladden's Run, Bridge Replacement 430,000 (Base Construction Allocation - $335,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (20) Everett Borough, Bridge No.1 over Bloody Run, Bridge Replacement 571,000 (Base Construction Allocation - $400,000) (Land Allocation - $1,000) (Design and Contingencies - $170,000) (b) State Bridges (1) SR 0220, US 220, Northbound Bridge over Pennsylvania Turnpike, Bedford Township, Bridge Painting 180,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $30,000) (2) SR 0220, US 220, Southbound Bridge over Pennsylvania Turnpike, Bedford Township, Bridge Painting 170,000 (Base Construction Allocation - $140,000) (Design and Contingencies - $30,000) (3) SR 0869, Wallachs Bridge over Wallachs Branch, Pavia Township, Bridge Replacement 455,000 (Base Construction Allocation - $325,000) (Land Allocation - $25,000) (Design and Contingencies - $105,000) (4) SR 3019, Kegg Run Bridge over Kegg Run, Juniata Township, Bridge Replacement 655,000 (Base Construction Allocation - $495,000) (Land Allocation - $25,000) (Design and Contingencies - $135,000) (5) SR 2006, Sideling Hill Bridge over East Branch Sideling Hill Creek, Monroe Township, Bridge Replacement 750,000 (Base Construction Allocation - $580,000) (Land Allocation - $25,000) (Design and Contingencies - $145,000) (6) SR 3008, Bridge over Tributary of , Juniata Township, Bridge Rehabilitation 96,000 (Base Construction Allocation - $78,000) (Land Allocation - $2,000) (Design and Contingencies - $16,000) (7) SR 3017, Cove Run Bridge over Cove Run, Harrison Township, Bridge Rehabilitation 110,000 (Base Construction Allocation - $90,000) (Land Allocation - $2,000) (Design and Contingencies - $18,000) (8) SR 4034, Bridge over I-99/US 220, King Township, Bridge Painting 275,000 (Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) Section 10. Berks County. (a) Local Bridges (1) City of Reading, Fritz Island Bridge over Angelica Creek, Bridge Rehabilitation 23,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $3,000) (2) City of Reading, Bernadine Street over Angelica Creek, Bridge Rehabilitation 175,000 (Base Construction Allocation - $145,000) (Design and Contingencies - $30,000) (3) City of Reading, Tulpehocken Street Footbridge, Bridge Rehabilitation 6,000 (Base Construction Allocation - $5,000) (Design and Contingencies - $1,000) (4) West Reading Borough, Museum Road over Wyomissing Creek, Bridge Rehabilitation 15,000 (Base Construction Allocation - $12,000) (Design and Contingencies - $3,000) (5) Amity Township, Lake Drive over Tributary of Schuylkill River, Bridge Rehabilitation 86,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $11,000) (6) Amity Township, Browns Mill Road over Spring Creek, Bridge Rehabilitation 6,000 (Base Construction Allocation - $5,000) (Design and Contingencies - $1,000) (7) Amity Township, Valley Road over Spring Creek, Bridge Rehabilitation 10,000 (Base Construction Allocation - $8,000) (Design and Contingencies - $2,000) (8) Amity Township, Monocacy Road over Monocacy Creek, Bridge Rehabilitation 11,000 (Base Construction Allocation - $9,000) (Design and Contingencies - $2,000) (9) Bethel Township, T-492 over Little , Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (10) Bethel Township, T-682 over Crosskill Creek, Bridge Replacement 750,000 (Base Construction Allocation - $550,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (11) Lenhartsville Borough, Penn Avenue over Maiden Creek, Bridge Replacement 960,000 (Base Construction Allocation - $750,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000) (12) Mohnton Borough, Main Street over Wyomissing Creek, Bridge Replacement 750,000 (Base Construction Allocation - $550,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (13) Muhlenberg Township, Hain Avenue over Laurel Run, Bridge Rehabilitation 100,000 (Base Construction Allocation - $80,000) (Design and Contingencies - $20,000) (14) Oley Township, T-500 over Furnace Creek, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (15) Robesonia Borough, Freeman Street over Furnace Creek, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (16) Washington Township, T-885, Heydt's School House Road Bridge over Swamp Creek, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (17) Upper Bern Township, Mill Hill Road, T-712 over Mill Creek, Bridge Replacement 70,000 (Base Construction Allocation - $40,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (18) North Heidelberg Township, T-501, Milestone Road Bridge over Tributary of Spring Creek, Bridge Replacement 94,000 (Base Construction Allocation - $82,000) (Land Allocation - $4,000) (Design and Contingencies - $8,000) (19) Robeson Township, T-366, Bridge over Allegheny Creek, Bridge Replacement 133,000 (Base Construction Allocation - $117,000) (Land Allocation - $5,000) (Design and Contingencies - $11,000) (20) Bern Township, Mitchell Road over Leitz's Bridge to Reading Regional Airport, Bridge Replacement 1,000,000 (21) South Heidelberg Township, T-388, Krick Lane over Conrail, New Bridge 2,750,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $250,000) (Design and Contingencies - $500,000) (22) Colebrookdale Township, T-621, Township Line Road over Swamp Creek, Bridge Replacement 300,000 (23) Bethel Township, T-977, Schubert Road over Mill Creek, Bridge Rehabilitation 7,000 (24) Bethel Township, T-965, Legion Drive over Tributary of , Bridge Rehabilitation 6,000 (25) Bethel Township, T-674, Airport Road over Swatara Creek, Bridge Rehabilitation 6,000 (26) Bethel Township, T-721, Old 22 over Stone Creek, Bridge Rehabilitation 6,000 (27) Bethel Township, T-957, Myer Drive over Crosskill Creek, Bridge Rehabilitation 11,000 (28) Bethel Township, T-682, Little Mountain Road over Crosskill Creek, Bridge Rehabilitation 16,000 (29) Bethel Township, T-721, Old 22 over Mill Creek, Bridge Rehabilitation 8,000 (30) Bethel Township, T-492, Airport Road over Swatara Creek, Bridge Rehabilitation 27,000 (31) Bethel Township, T-639, Bashore Street over Tributary of Crosskill Creek, Bridge Rehabilitation 10,000 (32) South Heidelberg Township, T-388, Krick Lane Bridge over Norfolk Southern Railway Company, Bridge Construction 1,300,000 (Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $1,000,000) (b) State Bridges (1) SR 0010, Reading Road over Tributary of Conestoga Creek, Caernarvon Township, Bridge Rehabilitation 775,000 (Base Construction Allocation - $490,000) (Land Allocation - $100,000) (Design and Contingencies - $185,000) (2) SR 0222, SR 0222 Northbound over SR 0737 Exit, Maxatawny Township, Bridge Painting 45,000 (Base Construction Allocation - $45,000) (3) SR 0222, North Elm Street over SR 0222, Kutztown Borough, Bridge Painting 45,000 (Base Construction Allocation - $45,000) (4) SR 0222, SR 0222 Northbound over SR 8015, Ramp G, Maxatawny Township, Bridge Painting 45,000 (Base Construction Allocation - $45,000) (5) SR 0222, SR 0222 Southbound over SR 8015, Ramp G, Maxatawny Township, Bridge Painting 45,000 (Base Construction Allocation - $45,000) (6) SR 2038, Grist Mill Road over Ironstone Creek, Douglass Township, Bridge Replacement 405,000 (Base Construction Allocation - $235,000) (Land Allocation - $70,000) (Design and Contingencies - $100,000) (7) SR 0073, Bridge over Railroad, Maiden Creek Township, Bridge Rehabilitation 14,000 (Base Construction Allocation - $12,000) (Design and Contingencies - $2,000) (8) SR 2014, Spring Street Subway, City of Reading, Bridge Rehabilitation 18,000 (Base Construction Allocation - $15,000) (Design and Contingencies - $3,000) (9) SR 0073, SR 0073 over Manatawny Creek, Oley Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (10) SR 0061, SR 0061 over Blue Mountain Railroad, Borough of Hamburg, Bridge Rehabilitation 200,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $25,000) (11) SR 0078, SR 0078 over SR 1024, Greenwich Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (12) SR 0078, SR 0078 over T-808, Windsor Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (13) SR 0078, SR 0078 over Fifth Street, Borough of Hamburg, Bridge Rehabilitation 200,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $25,000) (14) SR 0078, SR 0078 over T-688, Bethel Township, Bridge Rehabilitation 250,000 (Base Construction Allocation - $225,000) (Design and Contingencies - $25,000) (15) SR 0176, SR 0176 over T-568, Robeson Township, Bridge Rehabilitation 250,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $50,000) (16) SR 0176, SR 0176 2/10 mile south of SR 0422, Cumru Township, Bridge Rehabilitation 350,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $50,000) (17) SR 1083, SR 0183 over Little Northkill Creek, Jefferson Township, Bridge Replacement 1,000,000 (Base Construction Allocation - $750,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000) (18) SR 0222, SR 0222 over Abandoned Railroad, City of Reading, Bridge Rehabilitation 200,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $50,000) (19) SR 0422, SR 0422 over Tulpehocken Creek, Borough of Womelsdorf, Bridge Rehabilitation 200,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $50,000) (20) SR 0568, SR 0568 over Allegheny Creek, Robeson Township, Bridge Rehabilitation 100,000 (Base Construction Allocation - $80,000) (Design and Contingencies - $20,000) (21) SR 0737, SR 0737 2.63 Miles North of Kutztown, Greenwich Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (22) SR 0737, SR 0737 2.82 Miles North of Kutztown, Greenwich Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (23) SR 2025, SR 2025 1/2 Mile East of SR 0422, Amity Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $15,000) (Design and Contingencies - $85,000) (24) SR 2031, SR 2031 over Hay Creek, Robeson Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (25) SR 2032, SR 2032 over Tributary of Swamp Creek, Washington Township, Bridge Replacement 500,000 (Base Construction Allocation - $375,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (26) SR 2039, SR 2039 over SR 0422, Exeter Township, Bridge Replacement 2,750,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $250,000) (Design and Contingencies - $500,000) (27) SR 2041, SR 2041 2 Miles West of Weavertown, Amity Township, Bridge Replacement 200,000 (Base Construction Allocation - $125,000) (Land Allocation - $15,000) (Design and Contingencies - $60,000) (28) SR 2057, SR 2057 over Leaf Creek, Amity Township, Bridge Replacement 600,000 (Base Construction Allocation - $425,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (29) SR 3003, SR 3003 over Angelica Creek, Cumru Township, Bridge Replacement 200,000 (Base Construction Allocation - $125,000) (Land Allocation - $15,000) (Design and Contingencies - $60,000) (30) SR 4026, SR 4026 over Irish Creek, Borough of Centerport, Bridge Rehabilitation 250,000 (Base Construction Allocation - $225,000) (Design and Contingencies - $25,000) (31) SR 0073, Bridge over Maiden Creek, Ontelaunee Township, Bridge Replacement 2,120,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (32) SR 2021, Mineral Spring Road, Lindbergh Viaduct, City of Reading, Bridge Rehabilitation 4,000,000 (33) SR 0222, US 222 Bridge Painting, Seven Structures, Kutztown, West Reading and Maxatawny, Bridge Painting 1,000,000 (Base Construction Allocation - $1,000,000) (34) SR 0422, Reading Bypass Bridges over Schuylkill River and US 222, Six Bridge Rehabilitations with Latex, City of Reading, Bridge Deck Rehabilitation 5,050,000 (Base Construction Allocation - $5,000,000) (Design and Contingencies - $50,000) Section 11. Blair County. (a) Local Bridges (1) Antis Township, T-490, Becker Road Bridge over Tributary of , Bridge Replacement 310,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (2) Taylor Township, T-332, Bridge over Halter Creek, Bridge Replacement 395,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (3) Greenfield Township, T-531 over South Poplar Run, Construct New Bridge 280,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (4) Greenfield Township, T-531 over Big Lick Branch of South Poplar Run, Bridge Replacement 565,000 (Base Construction Allocation - $465,000) (Land Allocation - $30,000) (Design and Contingencies - $70,000) (5) Greenfield Township, County Road 101 over Polecat Run, Bridge Replacement 520,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (6) Newry Borough, Allegheny Street over Tributary of Poplar Run, Bridge Rehabilitation 425,000 (Base Construction Allocation - $350,000) (Land Allocation - $25,000) (Design and Contingencies - $50,000) (7) Allegheny Township, Ellenberger Road, Quarry Bridge over Mill Run Creek, Bridge Replacement 319,000 (Base Construction Allocation - $277,000) (Design and Contingencies - $42,000) (8) City of Altoona, Beale Avenue, Bridge over Mill Run Creek, Bridge Replacement 380,000 (Base Construction Allocation - $330,000) (Design and Contingencies - $50,000) (9) City of Altoona, Broad Avenue, Bridge over Mill Run Creek, Bridge Replacement 317,000 (Base Construction Allocation - $275,000) (Design and Contingencies - $42,000) (10) City of Altoona, Hite Company Access, Bridge over Mill Run Creek, Bridge Replacement 127,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $17,000) (11) City of Altoona, 31st Street, Conrail No.1 Bridge over Mill Run Creek, Bridge Replacement 170,000 (Base Construction Allocation - $149,000) (Design and Contingencies - $21,000) (12) City of Altoona, West Chestnut Avenue, Bridge over Mill Run Creek, Bridge Replacement 285,000 (Base Construction Allocation - $248,000) (Design and Contingencies - $37,000) (13) City of Altoona, Spruce Avenue, Bridge over Mill Run Creek, Bridge Replacement 285,000 (Base Construction Allocation - $248,000) (Design and Contingencies - $37,000) (14) City of Altoona, Coleridge Avenue, Bridge over Mill Run Creek, Bridge Replacement 570,000 (Base Construction Allocation - $495,000) (Design and Contingencies - $75,000) (b) State Bridges (1) SR 0022, Canal Park Bridges over the Juniata River, Hollidaysburg Borough, Bridge Replacement 3,000,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $650,000) (Design and Contingencies - $350,000) (2) SR 4008, SR 4008 over Tributary of Glenwhite Run, Logan Township, Bridge Replacement 240,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000) (3) SR 4004, 58th Street Bridge over Mill Run Creek, City of Altoona, Bridge Replacement 758,000 (Base Construction Allocation - $658,000) (Design and Contingencies - $100,000) (4) SR 4003, Logan Boulevard Bridge over Mill Run Creek, City of Altoona, Bridge Replacement 1,438,000 (Base Construction Allocation - $1,250,000) (Design and Contingencies - $188,000) (5) SR 0036, Union Avenue Bridge over Mill Run Creek, City of Altoona, Bridge Replacement 770,000 (Base Construction Allocation - $670,000) (Design and Contingencies - $100,000) (6) SR 4029, Bridge over Schell Run, Tyrone Borough, Bridge Rehabilitation 120,000 (Base Construction Allocation - $90,000) (Land Allocation - $1,000) (Design and Contingencies - $29,000) (7) SR 0164, Bridge over Dry Run, Freedom Township, Bridge Replacement 1,030,000 (Base Construction Allocation - $900,000) (Land Allocation - $85,000) (Design and Contingencies - $45,000) (8) SR 4004, California Avenue Bridge over Burgoon Run, Allegheny Township 356,000 (Base Construction Allocation - $309,000) (Design and Contingencies - $47,000) (9) SR 1013, Sinking Valley, Blair County, Improve Three Drainage Structures on SR 1013, at Segment 270 (offset 0000), Segment 270 (offset 1920) and Segment 290 (offset 1774) 1,500,000 (Base Construction Allocation - $1,175,000) (Land Allocation - $25,000) (Design and Contingencies - $300,000) Section 12. Bradford County. (a) Local Bridges (1) Burlington Township, T-547 over Wallis Run, Bridge Replacement 395,000 (Base Construction Allocation - $310,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (2) Pike Township, T-790 over Gaylord Creek and South Creek, Bridge Replacement 495,000 (Base Construction Allocation - $410,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (3) Canton Township, T-889, County Bridge No.45 over , Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $55,000) (4) Tuscarora Township, T-874, County Bridge No.36 over Fargo Creek, Bridge Replacement 265,000 (Base Construction Allocation - $215,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000) (5) Franklin Township, T-358, County Bridge No.12 over Towanda Creek, Bridge Replacement 1,020,000 (Base Construction Allocation - $850,000) (Land Allocation - $50,000) (Design and Contingencies - $120,000) (6) Litchfield Township, T-900, Parks Creek Structure Bridge over Parks Creek, Bridge Replacement 390,000 (Base Construction Allocation - $220,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (7) Albany Township, T-377, Bridge over 390,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (8) Towanda Township, T-545, Bridge over Sugar Creek, Bridge Replacement 1,247,000 (Base Construction Allocation - $1,033,000) (Land Allocation - $65,000) (Design and Contingencies - $149,000) (9) Wells Township, T-763, Bridge over Seely Creek, Bridge Replacement 428,000 (Base Construction Allocation - $355,000) (Land Allocation - $22,000) (Design and Contingencies - $51,000) (10) Terry Township, T-420, Bridge over Foster Branch of Sugar Creek, Bridge Replacement 663,000 (Base Construction Allocation - $550,000) (Land Allocation - $33,000) (Design and Contingencies - $80,000) (11) Canton Township, T-889, County Bridge No.45 over Towanda Creek, Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $55,000) (12) Tuscarora Township, T-874, County Bridge No.36 over Fargo Creek, Bridge Replacement 265,000 (Base Construction Allocation - $215,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000) (13) Franklin Township, T-358, County Bridge No.12 over Towanda Creek, Bridge Replacement 1,020,000 (Base Construction Allocation - $850,000) (Land Allocation - $50,000) (Design and Contingencies - $120,000) (14) Litchfield Township, T-900 over Parks Creek, Parks Creek Structure Bridge, Bridge Replacement 390,000 (Base Construction Allocation - $220,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (15) Albany Township, T-381, County Bridge No.2 over South Branch of Towanda Creek, Bridge Replacement 550,000 (Base Construction Allocation - $495,000) (Design and Contingencies - $55,000) (16) Monroe Township, T-412, County Bridge No.20 over South Branch of Towanda Creek, Bridge Replacement 700,000 (Base Construction Allocation - $630,000) (Design and Contingencies - $70,000) (17) Granville Township, T-326, Bridge over North Branch Towanda Creek, Bridge Replacement 700,000 (Base Construction Allocation - $575,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (18) Monroe Township, T-402, South Bridge over Towanda Creek, Bridge Replacement 1,080,000 (Base Construction Allocation - $900,000) (Land Allocation - $30,000) (Design and Contingencies - $150,000) (19) North Towanda Township, T-545, Bridge over Sugar Creek, Bridge Replacement 1,140,000 (Base Construction Allocation - $960,000) (Land Allocation - $30,000) (Design and Contingencies - $150,000) (20) Granville Township, T-361, Bridge over North Branch of Towanda Creek, Bridge Replacement 400,000 (Base Construction Allocation - $280,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (21) North Towanda Township, T-892, Sugar Creek Bike/Pedestrian Bridge, Bridge Replacement 320,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (b) State Bridges (1) SR 0006, North Bridge over Sugar Creek, South of Longs Pond Road, Bridge Replacement 1,139,000 (Base Construction Allocation - $911,000) (Land Allocation - $57,000) (Design and Contingencies - $171,000) (2) SR 0409, Billing Creek Bridge, Village of Camptown, Bridge Replacement 318,000 (Base Construction Allocation - $254,000) (Land Allocation - $16,000) (Design and Contingencies - $48,000) (3) SR 3029, Towanda Creek Bridges between T-327 and T-326 on Gulf Road, Village of Granville Center, Bridge Replacement 593,000 (Base Construction Allocation - $474,000) (Land Allocation - $30,000) (Design and Contingencies - $89,000) (4) SR 4008, Bridge over Tributary of Sugar Creek, Columbia Township, Bridge Replacement 298,000 (Base Construction Allocation - $238,000) (Land Allocation - $15,000) (Design and Contingencies - $45,000) (5) SR 0414, Bridge over Towanda Creek, Bridge Painting 195,000 (Base Construction Allocation - $185,000) (Design and Contingencies - $10,000) (6) US 6, US 6 over Sugar Creek, Sylvania Borough, Bridge Replacement 633,000 (Base Construction Allocation - $506,000) (Land Allocation - $32,000) (Design and Contingencies - $95,000) (7) SR 0014, SR 0014 over Tributary of Sugar Creek, Troy Township, Bridge Replacement 410,000 (Base Construction Allocation - $280,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (8) SR 0187, SR 0187 over , Windham Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,600,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (9) SR 0414, SR 0414 over Tributary of Towanda Creek, Canton Township, Bridge Replacement 320,000 (Base Construction Allocation - $256,000) (Land Allocation - $16,000) (Design and Contingencies - $48,000) (10) SR 0467, SR 0467 over Johnsons Creek, Orwell Township, Bridge Replacement 751,000 (Base Construction Allocation - $601,000) (Land Allocation - $37,000) (Design and Contingencies - $113,000) (11) SR 0514, SR 0514 over North Branch of Towanda Creek, Granville Township, Bridge Replacement 638,000 (Base Construction Allocation - $510,000) (Land Allocation - $32,000) (Design and Contingencies - $96,000) (12) SR 1022, Ulster Bridge, Ulster Township, Bridge Painting 6,299,000 (Base Construction Allocation - $5,039,000) (Land Allocation - $315,000) (Design and Contingencies - $945,000) (13) SR 1026, SR 1026 over , Pike Township, Bridge Replacement 650,000 (Base Construction Allocation - $520,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (14) SR 1049, SR 1049 over Tributary of Pendleton Creek, Warren Township, Bridge Replacement 340,000 (Base Construction Allocation - $270,000) (Land Allocation - $15,000) (Design and Contingencies - $55,000) (15) SR 1055, SR 1055 over Parks Creek, Rome Township, Bridge Replacement 315,000 (Base Construction Allocation - $250,000) (Land Allocation - $15,000) (Design and Contingencies - $50,000) (16) SR 2018, SR 2018 over Tributary of , Asylum Township, Bridge Replacement 260,000 (Base Construction Allocation - $208,000) (Land Allocation - $39,000) (Design and Contingencies - $13,000) (17) SR 3005, SR 3005 over Towanda Creek, Canton Township, Bridge Replacement 666,000 (Base Construction Allocation - $533,000) (Land Allocation - $33,000) (Design and Contingencies - $100,000) (18) SR 3029, SR 3029 over Mud Creek, Troy Township, Bridge Replacement 457,000 (Base Construction Allocation - $366,000) (Land Allocation - $23,000) (Design and Contingencies - $68,000) (19) SR 4002, SR 4002 over Browns Creek, Burlington Township, Bridge Replacement 561,000 (Base Construction Allocation - $449,000) (Land Allocation - $28,000) (Design and Contingencies - $84,000) (20) SR 4013, SR 4013 over Justice Run, Ridgebury Township, Bridge Replacement 351,000 (Base Construction Allocation - $281,000) (Land Allocation - $18,000) (Design and Contingencies - $52,000) (21) SR 4014, SR 4014 over Branch of Tomjack Creek, Smithfield Township, Bridge Replacement 360,000 (Base Construction Allocation - $288,000) (Land Allocation - $18,000) (Design and Contingencies - $54,000) (22) SR 4015, SR 4015 over Mill Creek, Springfield Township, Bridge Replacement 390,000 (Base Construction Allocation - $312,000) (Land Allocation - $20,000) (Design and Contingencies - $58,000) (23) SR 4031, SR 4031 over Tributary of Beckwith Creek, Wells Township, Bridge Replacement 243,000 (Base Construction Allocation - $196,000) (Land Allocation - $10,000) (Design and Contingencies - $37,000) (24) SR 2024, Bridge over Towanda Creek, Towanda Township, Bridge Replacement 1,740,000 (Base Construction Allocation - $1,400,000) (Land Allocation - $40,000) (Design and Contingencies - $300,000) (25) SR 4015, Bridge over Mill Creek, Springfield Township, Bridge Replacement 740,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (26) PA 514, Bridge over North Branch of Towanda Creek, Granville Township, Bridge Replacement 630,000 (Base Construction Allocation - $500,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (27) US 6, Bridge over Sugar Creek, Sylvania Borough, Bridge Replacement 680,000 (Base Construction Allocation - $550,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (28) PA 549, Bridge over Daggett Creek, Wells Township, Bridge Replacement 1,180,000 (Base Construction Allocation - $950,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (29) SR 4002, Bridge over Browns Creek, Burlington Township, Bridge Replacement 560,000 (Base Construction Allocation - $450,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000) (30) SR 1026, Bridge over Wyalusing Creek, Pike Township, Bridge Replacement 650,000 (Base Construction Allocation - $520,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (31) PA 187, Bridge over Wappasening Creek, Windham Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,600,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (32) PA 199, Bridge over Overflow Channel, Athens Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,600,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (33) US 220, Bridge over Bridge Street, Towanda Borough, Bridge Rehabilitation 385,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $35,000) (34) US 220, Bridge over SR 3020, Towanda Township, Bridge Rehabilitation 495,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $45,000) (35) US 220, Bridge over SR 2036, North Towanda Township, Bridge Rehabilitation 715,000 (Base Construction Allocation - $650,000) (Design and Contingencies - $65,000) (36) US 220, Bridge over SR 3022, North Towanda Township, Bridge Rehabilitation 770,000 (Base Construction Allocation - $700,000) (Design and Contingencies - $70,000) (37) US 220, Bridge over US 6, North Towanda Township, Bridge Reconstruction 1,700,000 (Base Construction Allocation - $1,500,000) (Design and Contingencies - $200,000) (38) SR 0409, Camp Creek Box Culvert over Camp Creek, Wyalusing Township, Bridge Replacement 1,150,000 (Base Construction Allocation - $750,000) (Land Allocation - $200,000) (Design and Contingencies - $200,000) (39) SR 1022, Ulster River Bridge over Susquehanna River, Ulster Township and Sheshequin Township, Bridge Replacement 16,000,000 (Base Construction Allocation - $12,800,000) (Land Allocation - $800,000) (Design and Contingencies - $2,400,000) (40) SR 0014, Bridge over Sugar Creek, Troy Borough, Bridge Replacement 450,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $120,000) Section 13. Bucks County. (a) Local Bridges (1) Springfield Township, I-479, Bridge Street Bridge over Cooks Creek, Bridge Replacement 500,000 (Base Construction Allocation - $365,000) (Land Allocation - $35,000) (Design and Contingencies - $100,000) (2) Springfield Township, T-404, Hawks Mill County Bridge No.196, Shale Road over Cooks Creek, Bridge Rehabilitation 100,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $10,000) (3) Bristol Township, Randall Avenue over Conrail, Bridge Replacement 5,750,000 (Base Construction Allocation - $5,000,000) (Design and Contingencies - $750,000) (4) Bedminster Township, T-376, Bridge over East Branch Perkiomen Creek, Bridge Replacement 544,000 (Base Construction Allocation - $430,000) (Land Allocation - $4,000) (Design and Contingencies - $110,000) (5) Bristol Borough, Jefferson Avenue Bridge over Delaware Canal, Bridge Replacement 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (6) East Rockhill Township, T-362, Bridge over East Branch Perkiomen Creek, Bridge Replacement 539,000 (Base Construction Allocation - $425,000) (Land Allocation - $4,000) (Design and Contingencies - $110,000) (7) Falls Township, Wheatshef Road Bridge over Delaware Canal, Bridge Replacement 700,000 (8) Plumstead Township, T-340, Bridge over North Branch Neshaminy, Bridge Replacement 550,000 (Base Construction Allocation - $425,000) (Land Allocation - $4,000) (Design and Contingencies - $121,000) (9) Tinicum Township, T-439, Bridge over Beaver Creek, Bridge Replacement 560,000 (Base Construction Allocation - $435,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (10) Tinicum/Bedminster, T-427, Bridge over Tohickon Creek, Bridge Replacement 565,000 (Base Construction Allocation - $445,000) (Land Allocation - $5,000) (Design and Contingencies - $115,000) (11) Bensalem/Philadelphia, T-316, Bridge over Poquessing Creek, Bridge Replacement 840,000 (Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (b) State Bridges (1) SR 0032, River Road at Fleecydale over Paunacussing Creek, Solebury Township, Bridge Replacement 1,400,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $200,000) (2) SR 2002, Otter Street Bridge over Otter Creek, Bristol Borough, Bridge Replacement 1,150,000 (Base Construction Allocation - $900,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (3) SR 2025, Bristol Road Bridge over Little Neshaminy Creek, Warwick Township, Bridge Replacement 1,120,000 (Base Construction Allocation - $900,000) (Land Allocation - $80,000) (Design and Contingencies - $140,000) (4) SR 2047, Hulmeville Avenue Bridge over Conrail, Middletown Township, Bridge Replacement 5,600,000 (Base Construction Allocation - $4,000,000) (Land Allocation - $800,000) (Design and Contingencies - $800,000) (5) SR 4033, Upper Ridge Road Bridge over Unami Creek, Milford Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,600,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (6) SR 4091, Kellers Church Road Bridge over Deep Run, Bedminster Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $150,000) (Design and Contingencies - $350,000) (7) SR 0202, Doylestown Bypass (Five Bridges) over SR 0611, Doylestown Township, Bridge Rehabilitations 2,200,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (8) SR 0611, Easton Road (Two Bridges) over Tohickon and Deep Run Creeks, Bedminster Township, Bridge Replacements 1,650,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (9) SR 2089, Almshouse Road Bridge over Neshaminy Creek, Doylestown Township, Bridge Replacement 1,800,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $150,000) (Design and Contingencies - $150,000) (10) SR 0013, Bristol Pike over Otter Creek, Bristol Township, Bridge Replacement 1,600,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (11) SR 0413, Bridge over Mill Creek, Bristol Township, Bridge Replacement 600,000 (Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (12) SR 2002, State Road over Neshaminy Creek, Bristol Township, Bridge Replacement 3,700,000 (Base Construction Allocation - $3,000,000) (Land Allocation - $250,000) (Design and Contingencies - $450,000) (13) SR 0013, Bristol Pike over St. Francis Creek, Bensalem Township, Bridge Replacement 550,000 (Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (14) SR 0013, SR 0013 over Conrail and Newbold Road, Falls Township, Bridge Replacement 5,000,000 (Base Construction Allocation - $4,500,000) (Land Allocation - $150,000) (Design and Contingencies - $350,000) (15) SR 0032, West Bridge Street over Tributary of Delaware River, Morrisville Borough, Bridge Replacement 550,000 (Base Construction Allocation - $400,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (16) SR 0213, West Maple Avenue over Neshaminy Creek, Middletown Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,700,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000) (17) SR 1004, Cold Spring Creamery Road over Branch of Pine Run Creek, Buckingham Township, Bridge Replacement 450,000 (Base Construction Allocation - $380,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (18) SR 2005, Cornwells Avenue over Poquessing Creek, Bensalem Township, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (19) SR 2026, Trenton Avenue over Rock Run, Falls Township, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (20) SR 2037, Lincoln Highway Eastbound over Queen Anne Creek, Falls Township, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $75,000) (Design and Contingencies - $125,000) (21) SR 2037, Lincoln Highway over Branch of Queen Anne Creek, Falls Township, Bridge Replacement 500,000 (Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (22) SR 2047, Hulmeville Avenue over Conrail, Middletown Township, Bridge Replacement 1,200,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $75,000) (Design and Contingencies - $125,000) (23) SR 2065, Bustleton Pike/Ironworks over Ironworks Creek, Northampton Township, Bridge Rehabilitation 260,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (24) Green Lane Bridge over Delaware Canal, Bristol Borough, Bridge Replacement 200,000 (25) SR 0013, Bridge over Delaware Canal, Bristol Township, Bridge Replacement 2,500,000 (26) Haines Road Bridge over Delaware Canal, Bristol Township, Bridge Replacement 700,000 (27) SR 2033, Bridge over Delaware Canal, Bristol Township, Bridge Replacement 200,000 (28) Airport Road Bridge over Delaware Canal, Bristol Township, Bridge Replacement 500,000 (29) SR 0001, Bridge over Delaware Canal, Falls Township, Bridge Replacement 300,000 (30) SR 2020, Bridge over Delaware Canal, Falls Township, Bridge Replacement 3,000,000 (31) Mill Creek Road Bridge over Delaware Canal, Falls Township, Bridge Replacement 700,000 (32) SR 2031, Bridge over Delaware Canal, Falls Township, Bridge Replacement 800,000 (33) SR 2033, Bridge over Delaware Canal, Falls Township, Bridge Replacement 200,000 (34) SR 0013, Bridge over Delaware Canal, Falls Township, Bridge Replacement 2,500,000 (35) SR 0032, Bridge over Tributary of Delaware River, Morrisville Borough, Bridge Replacement 700,000 (36) SR 2095, Dark Hollow Road Bridge over Neshaminy Creek, Buckingham Township, Construction of a Pedestrian/Bicycle Bridge 1,010,000 (Base Construction Allocation - $815,000) (Land Allocation - $30,000) (Design and Contingencies - $165,000) Section 14. Butler County. (a) Local Bridges (1) Muddycreek and Worth Townships, T-348, Muddy Creek Bridge over Muddy Creek, Bridge Replacement 730,000 (Base Construction Allocation - $550,000) (Land Allocation - $15,000) (Design and Contingencies - $165,000) (2) Allegheny Township, T-542, Farrington Bridge, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (3) Concord Township, T-508, Greece City Bridge, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (4) Cranberry Township, T-326 over Brush Creek, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (5) Cranberry Township, T-300, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (6) Jackson Township, T-323, Senn Bridge, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (7) Jackson Township, T-325, Eidewau Bridge, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (8) Jefferson Township, T-844 over Thorn Creek, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (9) Mars Borough, Hook Street, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (10) Mars Borough, Church Street, Kocher Bridge, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (11) Middlesex Township, T-380 over Glade Run, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (12) Worth Township, T-318, Payne Bridge, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (13) Cranberry Township, T-326 over Tributary of Brush Creek, Bridge Replacement 167,000 (Base Construction Allocation - $135,000) (Land Allocation - $19,000) (Design and Contingencies - $13,000) (14) Adams Township, T-391, Brickey and Hill Bridge over Breakneck Creek, Bridge Replacement 600,000 (15) Butler City, T-319, Brady Street Bridge, Bridge Replacement 300,000 (16) Allegheny Township, T-538, County Bridge No.4, Squaw Valley Bridge No.1, Bridge Replacement 500,000 (17) Mercer Township, T-434, County Bridge No.7, Harrisville Bridge, Bridge Replacement 500,000 (18) Marion Township, T-434, County Bridge No.9, Wassum Bridge, Bridge Replacement 500,000 (19) Venango Township, T-649, County Bridge No.10, Lane Bridge, Bridge Replacement 500,000 (20) Parker Township, T-638, County Bridge No.12, Snake Bridge, Bridge Replacement 500,000 (21) Parker Township, T-632, County Bridge No.13, Old Iron Bridge, Bridge Replacement 500,000 (22) Slippery Rock Township, T-381, County Bridge No.25, Grossman Bridge, Bridge Replacement 600,000 (23) Cherry Township, T-428, County Bridge No.26, Duffy Bridge, Bridge Replacement 600,000 (24) Cherry Township, T-535, County Bridge No.28, Findley Bridge, Bridge Replacement 500,000 (25) Cherry Township, T-416, County Bridge No.29, Christy Bridge No.2, Bridge Replacement 500,000 (26) Cherry Township, T-560, County Bridge No.32, Bridge Replacement 700,000 (27) Washington Township, T-504, County Bridge No.35, Campbell Bridge, Bridge Replacement 500,000 (28) Washington Township, T-452, County Bridge No.36, Hilliard Bridge, Bridge Replacement 500,000 (29) Fairview Township, T-636, County Bridge No.39, Murtland Bridge, Bridge Replacement 600,000 (30) Fairview Township, T-676, County Bridge No.42, Burk Bridge, Bridge Replacement 600,000 (31) Clay Township, T-416, County Bridge No.48, R. C. Miller Bridge, Bridge Replacement 500,000 (32) Clay Township, T-414, County Bridge No.49, Muddy Creek Bridge, Bridge Replacement 600,000 (33) Brady Township, T-368, County Bridge No.52, McCracken Bridge, Bridge Replacement 600,000 (34) Brady Township, T-456, County Bridge No.53, Wigton Bridge, Bridge Replacement 500,000 (35) Brady Township, T-414, County Bridge No.54, Frank Hall Bridge, Bridge Replacement 500,000 (36) Muddycreek Township, T-348, County Bridge No.59, Book Bridge, Bridge Replacement 500,000 (37) Worth Township, T-318, County Bridge No.60, Payne Bridge No.2, Bridge Replacement 500,000 (38) Muddycreek Township, T-357, County Bridge No.62, Flinner Bridge, Bridge Replacement 500,000 (39) Summit Township, T-584, County Bridge No.70, Wadsworth Bridge, Bridge Replacement 600,000 (40) Clearfield Township, T-630, County Bridge No.77, McBride Bridge No.2, Bridge Replacement 600,000 (41) Clearfield Township, T-630, County Bridge No.78, McBride Bridge No.1, Bridge Replacement 600,000 (42) Clearfield Township, T-578, County Bridge No.79, Schuler Bridge, Bridge Replacement 600,000 (43) Clearfield Township, T-691, County Bridge No.80, Humes Bridge, Bridge Replacement 500,000 (44) Connoquenessing Township, T-431, County Bridge No.82, McGinnis Bridge, Bridge Replacement 700,000 (45) Connoquennessing Township, T-427, County Bridge No.84, Hays Bridge, Bridge Replacement 600,000 (46) Conoquennessing Township, T-340, County Bridge No.86, Kniess Bridge, Bridge Replacement 600,000 (47) Franklin Township, T-439, County Bridge No.87, Martin Bridge, Bridge Replacement 600,000 (48) Lancaster Township, T-338, County Bridge No.90, Drushel Bridge, Bridge Replacement 600,000 (49) Lancaster Township, T-339, County Bridge No.93, Eichenauer Bridge, Bridge Replacement 500,000 (50) Jackson Township, T-323, County Bridge No.97, Senn Bridge, Bridge Replacement 600,000 (51) Zelienople Borough, Market Street, County Bridge No.99, Iron City Bridge, Bridge Replacement 600,000 (52) Forward Township, T-407, County Bridge No.105, Martin Bridge, Bridge Replacement 600,000 (53) Forward Township, T-423, County Bridge No.106, Mardica Bridge, Bridge Replacement 600,000 (54) Clinton Township, T-570, County Bridge No.118, Hemphill Bridge, Bridge Replacement 600,000 (55) Clinton Township, T-572, County Bridge No.120, Cunningham Bridge, Bridge Replacement 600,000 (56) Clinton Township, T-554, County Bridge No.122, Brickyard Hill Bridge, Bridge Replacement 500,000 (57) Clinton Township, T-552, County Bridge No.123, Wiley Bridge, Bridge Replacement 500,000 (58) Mars Borough, T-396, County Bridge No.133, Mars Bridge, Bridge Replacement 600,000 (59) Adams Township, T-401, County Bridge No.137, Rosebaugh Bridge, Bridge Replacement 700,000 (60) Adams Township, T-403, County Bridge No.138, Hays Bridge, Bridge Replacement 600,000 (61) Middlesex Township, T-485, County Bridge No.141, Steiner Bridge, Bridge Replacement 500,000 (62) Middlesex Township, T-380, County Bridge No.142, Glade Run Bridge, Bridge Replacement 600,000 (63) Middlesex Township, T-384, County Bridge No.144, Rifley Bridge, Bridge Replacement 600,000 (64) Callery Borough, Main Street, County Bridge No.149, Ringeisen Bridge, Bridge Replacement 600,000 (65) Adams Township, Rosebaugh Bridge over South Branch Glade Run, Bridge Replacement 705,000 (Base Construction Allocation - $500,000) (Land Allocation - $75,000) (Design and Contingencies - $130,000) (66) Adams Township, Brickyard Hill Bridge over Breakneck Creek, Bridge Replacement 410,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000) (67) Adams Township, T-396, Bridge over Breakneck Creek, Bridge Replacement 500,000 (68) Allegheny Township, T-538, Bridge over Lowery Run, Bridge Replacement 500,000 (69) Buffalo Township, T-578, Bridge over Sarver Run, Bridge Replacement 500,000 (70) Buffalo Township, T-671, Bridge over Tributary of Buffalo Creek, Bridge Replacement 500,000 (71) Bull Creek, T-572, Bridge over Bull Creek, Bridge Replacement 500,000 (72) Center Township, T-500, Bridge over Connoquenessing Creek, Bridge Replacement 500,000 (73) Cherry Township, T-537, Bridge over South Branch Slippery Run, Bridge Replacement 500,000 (74) Cherry Township, T-428, Bridge over McMurray Run, Bridge Replacement 500,000 (75) Cherry Valley Borough, T-528, Bridge over Scrub Grass Creek, Bridge Replacement 500,000 (76) City of Butler, Mercer Street Bridge over Sullivan Run, Bridge Replacement 300,000 (77) City of Butler, Miller Street Bridge over Sullivan Run, Bridge Replacement 300,000 (78) City of Butler, South Monroe Street Bridge over Connoquenessing Creek, Bridge Rehabilitation 80,000 (79) City of Butler, North 6th Avenue Bridge over Sullivan Run, Bridge Rehabilitation 40,000 (80) Clay Township, T-458, Bridge over Muddy Creek, Bridge Replacement 500,000 (81) Clay Township, T-531, Bridge over Claytonia Run, Bridge Replacement 500,000 (82) Clearfield Township, T-595, Bridge over Buffalo Creek, Bridge Replacement 500,000 (83) Clearfield Township, T-627, Bridge over Little Buffalo Run, Bridge Replacement 500,000 (84) Clearfield Township, T-578, Bridge over Little Buffalo Run, Bridge Replacement 500,000 (85) Clinton Township, T-570, Bridge over Goldscheitter Creek, Bridge Replacement 500,000 (86) Concord Township, T-621, Bridge over Robinson Run, Bridge Replacement 500,000 (87) Concord Township, T-502, Bridge over Tributary of Connoquenessing Creek, Bridge Replacement 500,000 (88) Fairview Township, T-625, Bridge over Bear Creek, Bridge Replacement 500,000 (89) Fairview Township, T-676, Bridge over Hays Run, Bridge Replacement 500,000 (90) Fairview Township, T-636, Bridge over Bear Creek, Bridge Replacement 500,000 (91) Forward Township, T-407, Bridge over Glade Run, Bridge Replacement 500,000 (92) Frank Hall, T-414, Bridge over Hallston Run, Bridge Replacement 500,000 (93) Glade Run, T-423, Bridge over Glade Run, Bridge Replacement 500,000 (94) Lancaster Township, T-338, Bridge over Little Yellow Creek, Bridge Replacement 500,000 (95) Marion Township, T-476, Bridge over Tributary of , Bridge Replacement 500,000 (96) Mars Borough, Crowe Street Bridge over Breakneck Creek, Bridge Replacement 500,000 (97) Mercer Township, T-467, Bridge over McMurry Run, Bridge Replacement 500,000 (98) Muddycreek Township, T-416, Bridge over Muddy Creek, Bridge Replacement 500,000 (99) Oakland Township, T-620, Bridge over Bonnie Brook, Bridge Replacement 500,000 (100) Oakland Township, T-603, Bridge over Bonnie Brook, Bridge Replacement 500,000 (101) Parker Township, T-638, Bridge over Silver Creek, Bridge Replacement 500,000 (102) Parker Township, T-723, Bridge over Bear Creek, Bridge Replacement 500,000 (103) Penn Township, T-495, Bridge over Robinson Run, Bridge Replacement 500,000 (104) Slippery Rock Township, T-381, Bridge over Keifer Run, Bridge Replacement 500,000 (105) Venango Township, T-649, Bridge over Murrin Run, Bridge Replacement 500,000 (106) Washington Township, T-504, Bridge over Christy Run, Bridge Replacement 500,000 (107) Washington Township, T-506, Bridge over North Branch Slippery Run, Bridge Replacement 500,000 (108) Washington Township, T-504, Bridge over Christy Run, Bridge Replacement 500,000 (109) Winfield Township, T-626, Bridge over Rough Run, Bridge Replacement 500,000 (110) Worth Township, T-373, Bridge over Tributary of Muddy Creek, Bridge Replacement 500,000 (111) Worth Township, T-377, Bridge over Black Run, Bridge Replacement 500,000 (112) Marion Township, T-477, North Branch Bridge over North Branch of Slippery Rock, Bridge Replacement 250,000 (Base Construction Allocation - $190,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (b) State Bridges (1) SR 0228, Houseville Bridge over B&LE Railroad, Clinton Township, Bridge Deck Replacement 636,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $36,000) (2) SR 0019, Rose Point Bridge over SR 0422, Muddycreek Township, Bridge Painting 115,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $15,000) (3) SR 0058, Blocks Run Bridge No.1 over Blocks Run, Marion Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (4) SR 0058, Blocks Run Bridge No.2 over Blocks Run, Venango Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (5) SR 0058, Murrin Run Bridge over Murrin Run, Venango Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (6) SR 0068, Glade Run Bridge over Glade Run, Zelienople Borough, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (7) SR 0079, Muddy Creek Bridge Northbound over SR 0422 and Muddy Creek, Muddycreek Township, Bridge Painting 255,000 (Base Construction Allocation - $240,000) (Design and Contingencies - $15,000) (8) SR 0079, Muddy Creek Bridge Southbound over SR 0422 and Muddy Creek, Muddycreek Township, Bridge Painting 255,000 (Base Construction Allocation - $240,000) (Design and Contingencies - $15,000) (9) SR 0108, Slippery Rock Exit Bridge over I-79, Worth Township, Bridge Painting 225,000 (Base Construction Allocation - $210,000) (Design and Contingencies - $15,000) (10) SR 0138, Glades Wildlife Lake Bridge over South Branch of Slippery Rock Creek, Concord Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (11) SR 0258, Wolf Creek Bridge over Wolf Creek, Slippery Rock Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (12) SR 0308, Renick Bridge over Stoney Run and Railroad, Center Township, Bridge Painting 405,000 (Base Construction Allocation - $390,000) (Design and Contingencies - $15,000) (13) SR 0422, Mount Chestnut Bridge Eastbound over Little Connoquenessing Creek and SR 3007, Butler Township, Bridge Painting 355,000 (Base Construction Allocation - $340,000) (Design and Contingencies - $15,000) (14) SR 0422, Bonnie Brook Bridge over Bonnie Brook, Summit Township, Bridge Painting 90,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $15,000) (15) SR 1004, Bruin Bridge over Bear Creek, Bruin Borough, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (16) SR 1011, Rattigan Bridge No.1 over Buffalo Creek, Donegal Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (17) SR 1016, Eastland Drive Bridge over Connoquenessing Creek, Butler Township, Bridge Painting 80,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $15,000) (18) SR 1019, Rough Run Bridge over Rough Run, Winfield Township, Bridge Painting 95,000 (Base Construction Allocation - $80,000) (Design and Contingencies - $15,000) (19) SR 1019, Chicora Bridge over Buffalo Creek, Chicora Borough, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (20) SR 1021, Rattigan Bridge No.2 over Buffalo Creek, Donegal Township, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (21) SR 1025, Bonnie Brook Bridge No.1 over Bonnie Brook, Summit Township, Bridge Painting 90,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $15,000) (22) SR 2004, Connoquenessing Creek Bridge over Connoquenessing Creek, Butler City, Bridge Painting 135,000 (Base Construction Allocation - $120,000) (Design and Contingencies - $15,000) (23) SR 2004, Bonnie Brook Bridge No.2 over Bonnie Brook, East Butler Borough, Bridge Painting 90,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $15,000) (24) SR 2011, Lardintown Run Bridge No.1 over Lardintown Run, Clinton Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (25) SR 2011, Lardintown Run Bridge No.2 over Lardintown Run, Clinton Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (26) SR 2011, Lardintown Run Bridge No.3 over Lardintown Run, Clinton Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (27) SR 3004, McCalmont Bridge over Connoquenessing Creek, Butler Township, Bridge Painting 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) (28) SR 3007, Reinfrew Bridge over Connoquenessing Creek, Penn Township, Bridge Painting 115,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $15,000) (29) SR 3010, Zeno Bridge over Glade Run, Forward Township, Bridge Painting 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) (30) SR 3017, Kaufman Run Bridge over Kaufman Run, Adams Township, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (31) SR 3017, Breakneck Creek Bridge over Breakneck Creek, Adams Township, Bridge Painting 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) (32) SR 3025, Little Connoquenessing Creek Bridge over Little Connoquenessing Creek, Lancaster Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (33) SR 4006, Keister's Bridge over Slippery Rock Creek, Slippery Rock Township, Bridge Painting 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) (34) SR 4007, Lake Arthur Tributary Bridge over a Tributary of Lake Arthur, Worth Township, Bridge Painting 50,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $15,000) (35) SR 4007, I-79 North Bridge No.1 over I-79, Worth Township, Bridge Painting 245,000 (Base Construction Allocation - $230,000) (Design and Contingencies - $15,000) (36) SR 4007, I-79 North Bridge No.2 over I-79, Worth Township, Bridge Painting 215,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $15,000) (37) SR 4010, Bull Valley Bridge over Bull Valley Creek, Washington Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (38) SR 4012, Seaton Creek Bridge over Seaton Creek, Marion Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (39) SR 8002, North Shore Exit Bridge over Muddy Creek, Worth Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (40) SR 0422, Route 422 Overpass, Muddycreek Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (41) SR 0008, B&LE Railroad Overpass, Mercer Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (42) SR 0038, B&LE Railroad Overpass, Concord Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (43) SR 2002, Conrail Railroad Overpass, Summit Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (44) SR 2012, B&LE Railroad Overpass, Jefferson Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (45) SR 3004, B&LE Railroad Overpass, Butler Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (46) SR 0008, Bridge over Armco Private Drive, Butler Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (47) SR 0019, Scholars Run Bridge, Jackson Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (48) SR 0019, SR 0019 over SR 0422, Muddycreek Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (49) SR 0058, McMurray Run Bridge, Marion Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (50) SR 0068, Sullivan Run Bridge, Butler Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (51) SR 0080, I-80 over TR 540, Allegheny Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (52) SR 0138, Muddy Creek Bridge, Clay Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (53) SR 0173, Slippery Rock Creek Bridge, Slippery Rock Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (54) SR 0079, I-79 North Bridge over Ramp, Jackson Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (55) SR 0079, I-79 South Bridge over Ramp, Jackson Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (56) SR 0079, I-79 over SR 0068, Jackson Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (57) SR 0079, I-79 over TR 347, Lancaster Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (58) SR 0079, I-79 North Bridge over SR 0422, Worth Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (59) SR 0079, I-79 South Bridge over SR 0422, Worth Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (60) SR 0422, SR 0422 over SR 4005, Muddycreek Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (61) SR 0528, SR 0528 over SR 0422, Franklin Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (62) SR 1010, Bear Creek Bridge, Fairview Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (63) SR 1014, Bonnie Brook Bridge over Bonnie Brook, Summit Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (64) SR 1016, Connoquenessing Creek Bridge, Summit Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (65) SR 2006, SR 2006 over SR 0422, Summit Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (66) SR 2010, Bridge over Branch of Thorn Creek, Jefferson Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (67) SR 2010, Little Buffalo Creek Bridge, Winfield Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (68) SR 2011, Bridge over Branch of Bull Creek, Clinton Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (69) SR 2011, Little Bull Run Bridge No.4 over Bull Run, Clinton Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (70) SR 2018, Bridge No.1 over Branch of Buffalo Creek, Winfield Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (71) SR 2018, Bridge No.2 over Branch of Buffalo Creek, Winfield Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (72) SR 3025, Little Connoquenessing Creek Bridge, Lancaster Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (73) SR 4007, SR 4007 over SR 0422, Worth Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (74) SR 4007, Park Road Bridge, Worth Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (75) SR 4010, Long Run Bridge, Slippery Rock Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (76) SR 8005, SR 8005 over SR 0019, Jackson Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (77) SR 0008, William Flynn Bridge, Middlesex Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (78) SR 0008, Glade Run Bridge, Middlesex Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (79) SR 0008, Little Glade Run Bridge No.1, Middlesex Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (80) SR 0008, Little Glade Run Bridge No.2, Middlesex Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (81) SR 0008, Glade Run Bridge No.2, Middlesex Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (82) SR 0008, Bulcher Run Bridge, Butler Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (83) SR 0008, Bridge No.2 over Branch of Muddy Creek, Clay Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (84) SR 0008, Muddy Creek Bridge, Clay Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (85) SR 0008, Glade Run Bridge No.3, Brady Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (86) SR 0008, McDonalds Run Bridge, Mercer Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (87) SR 0008, McMurray Run Bridge, Mercer Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (88) SR 0019, Glade Run Bridge No.2, Jackson Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (89) SR 0019, Glade Run Bridge No.2, Jackson Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (90) SR 0038, Connoquenessing Creek Bridge, Center Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (91) SR 0038, Pine Run Bridge, Oakland Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (92) SR 0038, Concord Bridge, Concord Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (93) SR 0038, Little Connoquenessing Creek Bridge No.1, Concord Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (94) SR 0038, Little Connoquenessing Creek Bridge, Concord Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (95) SR 0038, Little Scrubgrass Creek Bridge, Allegheny Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (96) SR 0038, Bridge over Tributary of Scrubgrass Creek, Allegheny Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (97) SR 0058, Murrin Run Bridge, Venango Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (98) SR 0068, B&LE Railroad Bridge, Summit and Butler Townships, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (99) SR 0068, Connoquenessing Creek Bridge, Summit Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (100) SR 0068, Buffalo Creek Bridge, Chicora Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (101) SR 0068, Buffalo Run Bridge, Fairview Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (102) SR 0079, Bridge over Tributary of Glade Run, Jackson Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (103) SR 0079, Bridge No.1 over Branch of Yellow Creek, Lancaster Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (104) SR 0079, Bridge No.2 over Branch of Yellow Creek, Lancaster Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (105) SR 0079, Bridge No.3 over Branch of Yellow Creek, Lancaster Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (106) SR 0079, Little Yellow Creek Bridge, Lancaster Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (107) SR 0079, Bridge No.4 over Branch of Yellow Creek, Muddycreek Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (108) SR 0079, Bridge at Milepost 100, Worth Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (109) SR 0079, Black Run Bridge, Worth Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (110) SR 0268, Bridge over Branch of Bear Creek, Petrolia Borough, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (111) SR 0268, Lowrey Run Bridge, Allegheny Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (112) SR 0308, B&LE Railroad Bridge, Center Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (113) SR 0308, Bridge, Center Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (114) SR 0356, Little Buffalo Creek Bridge, Buffalo Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (115) SR 0356, Big Coal Run Bridge, Summit Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (116) SR 0422, Lake Arthur Bridge, Franklin Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (117) SR 0422, Big Run Bridge, Franklin Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (118) SR 0422, Mulligan Run Bridge, Franklin Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (119) SR 0422, Big Mulligan Run Bridge, Franklin Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (120) SR 0422, Big Sullivan Run Bridge, Butler Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (121) SR 0422, Connoquenessing Creek Bridge, Butler Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (122) SR 0422, Bridge No.1 over Tributary of Connoquenessing Creek, Summit Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (123) SR 0422, Bridge No.2 over Tributary of Bonnie Brook, Butler Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (124) SR 0422, Bonnie Brook Bridge No.1, Summit Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (125) SR 0422, Bridge No.3 over Tributary of Bonnie Brook, Summit Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (126) SR 0422, Bonnie Brook Bridge No.2, Summit Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (127) SR 0422, Bridge No.4 over Tributary of Bonnie Brook, Summit Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (128) SR 0422, Little Buffalo Creek Bridge, Clearfield Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (129) SR 0422, Buffalo Creek Bridge, Clearfield Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (130) SR 0528, Likens Run Bridge, Evans City Borough, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (131) SR 1010, Glade Run Bridge, Brady Township, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (132) SR 1010, Big Bear Creek Bridge, Fairview Township, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (133) SR 1011, Buffalo Creek Bridge, Fairview Township, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (134) SR 1019, Big Buffalo Run Bridge, Donegal Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (135) SR 1025, Bonnie Brook Bridge, Summit Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (136) SR 2002, Coal Run Bridge, City of Butler and Butler Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (137) SR 2004, Bonnie Brook Bridge, Summit Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (138) SR 2012, Thorn Creek Bridge No.1, Jefferson Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (139) SR 2012, Thorn Creek Bridge No.2, Jefferson Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (140) SR 3001, West Butler Creek Bridge, Butler Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (141) SR 3007, Thorn Creek Bridge, Butler Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (142) SR 3009, Cranberry Run Bridge, Penn Township, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (143) SR 3010, Saw Mill Run Bridge, Penn Township, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (144) SR 3015, Bridge No.2 over Tributary of Wolf Run, Forward Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (145) SR 3015, Bridge No.3 over Tributary of Wolf Run, Forward Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (146) SR 3025, Bridge over Branch of Yellow Creek, Lancaster Township, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (147) SR 3031, SR 3031 over US 422, Butler Township, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (148) SR 3034, Bridge over Branch of Semiconon, Prospect Borough, Bridge Rehabilitation 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (149) SR 4001, SR 4001 over US 422, Butler Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (150) SR 4002, Bridge over Branch of Muddy Creek, Clay Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (151) T-716, Old Plank Road Bridge, Penn Township, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (152) SR 3007, Crooked Run Bridge, Center Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (153) SR 3010, Glade Run Bridge, Forward Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (154) SR 3013, Big Connoquenessing Bridge, Forward Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (155) SR 0019, SR 0019 over Brush Creek, Cranberry Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $800,000) (Land Allocation - $75,000) (Design and Contingencies - $175,000) (156) SR 0079, SR 0079 over Big Brush Creek, Cranberry Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $75,000) (Design and Contingencies - $275,000) (157) SR 0079, SR 0079 over Coal Run, Cranberry Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $75,000) (Design and Contingencies - $275,000) (158) SR 0228, SR 0228 over CSX Railroad, Adams Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $75,000) (Design and Contingencies - $275,000) (159) SR 3015, Breakneck Bridge, Adams Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (160) SR 3022, SR 3022 over Brush Creek, Cranberry Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $800,000) (Land Allocation - $75,000) (Design and Contingencies - $175,000) (161) SR 3024, SR 3024 over Big Brush Creek, Cranberry Township, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (162) SR 0008, Bridge over US 422, Butler Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (163) SR 0028, Bridge over SR 2017, Buffalo Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (164) SR 0068, Chicora South Bridge No.2 over Buffalo Creek, Chicora Borough, Bridge Replacement 610,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (165) SR 0068, Chicora South Bridge No.1 over Tributary of Buffalo Creek, Chicora Borough, Bridge Replacement 610,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (166) SR 0228, Breakneck Creek Bridge over Breakneck Creek, Adams Township, Bridge Replacement 610,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (167) SR 1011, Bonnie Run Bridge over Branch Bonnie Run, East Butler Borough, Bridge Rehabilitation 590,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (168) SR 1019, Rough Run Bridge over Rough Run, Winfield Township, Bridge Replacement 440,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (169) SR 2006, Butler Interchange Bridge Eastbound over US 422, Summit Township, Bridge Replacement 2,500,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) (170) SR 4007, Muddy Creek Bridge over Muddy Creek, Worth Township, Bridge Replacement 820,000 (Base Construction Allocation - $700,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (171) SR 4007, Bridge over I-79, Worth Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (172) SR 4007, Bridge over I-79, Worth Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (173) SR 0528, Bridge (Northbound and Southbound) over I-79, Jackson Township, Bridge Rehabilitation 915,000 (Base Construction Allocation - $750,000) (Land Allocation - $25,000) (Design and Contingencies - $140,000) (174) PA 528, Bridge over I-79 Southbound, Jackson Township, Bridge Rehabilitation 183,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $28,000) (175) PA 528, Bridge over I-79 Northbound, Jackson Township, Bridge Rehabilitation 183,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $28,000) (176) SR 3024, Bridge over Branch Brush Creek, Cranberry Township, Bridge Replacement 515,000 (Base Construction Allocation - $425,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (177) SR 0019, Turnpike Ramp Overpass, Turnpike Connector, Cranberry Township, Bridge Replacement 1,400,000 (Base Construction Allocation - $800,000) (Land Allocation - $300,000) (Design and Contingencies - $300,000) (178) SR 0219, B&P Railroad Overpass, Johnsonburg Township, Bridge Rehabilitation 3,550,000 (Base Construction Allocation - $2,675,000) (Design and Contingencies - $875,000) (179) SR 0068, B&P Railroad Overpass, Chicora Township, Bridge Replacement 2,900,000 (Base Construction Allocation - $2,190,000) (Design and Contingencies - $710,000) (180) SR 4023, SR 1033, B&P Railroad Overpass, East Franklin Township and Rayburn Township, Bridge Rehabilitation 1,100,000 (Base Construction Allocation - $825,000) (Design and Contingencies - $275,000) (181) SR 0036, B&P Railroad Overpass, Punxsutawney Township, Bridge Rehabilitation 860,000 (Base Construction Allocation - $650,000) (Design and Contingencies - $210,000) (182) T-392, Bridge over B&P Railroad, West Mahoning Township, Bridge Replacement 600,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $150,000) (183) Monroe Street Bridge over B&P Railroad, Butler Township, Bridge Replacement 1,850,000 (Base Construction Allocation - $1,400,000) (Design and Contingencies - $450,000) (184) T-501, Bridge over B&P Railroad, East Franklin Township, Bridge Replacement 600,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $150,000) (185) SR 0268, Bridge over B&P Railroad, East Franklin Township, Bridge Replacement 2,050,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $1,550,000) Section 15. Cambria County. (a) Local Bridges (1) Summerhill Township, T-346, Bridge No.1, Howard Avenue over Beaverdam Run, Bridge Replacement 450,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $100,000) (2) West Carroll Township, T-505 over Blacklick Creek, Bridge Replacement 235,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000) (3) West Carroll Township, T-626 over Fox Run, Bridge Replacement 235,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000) (4) Barr Township, T-509, Bridge over North Branch of Blacklick Creek, Bridge Replacement 570,000 (Base Construction Allocation - $450,000) (Land Allocation - $30,000) (Design and Contingencies - $90,000) (5) Allegheny Township, T-453 over , Bridge Replacement 450,000 (Base Construction Allocation - $345,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (6) Susquehanna Township, Bridge No.2, T-550 over Moss Creek, Bridge Replacement 270,000 (Base Construction Allocation - $185,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (b) State Bridges (1) SR 1030, Carl Road over Slate Lick Creek, Clearfield Township, Bridge Replacement 240,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (2) SR 0271, Maple Avenue Bridge over Little Conemaugh River and Conrail, Phase II, City of Johnstown, Bridge Painting 500,000 (Base Construction Allocation - $500,000) (3) SR 3033, PA 56 Detour Bridge over Solomon Run, Richland Township, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $15,000) (Design and Contingencies - $85,000) (4) SR 0403, Stonycreek Bridge over Stonycreek River, City of Johnstown, Bridge Replacement 3,600,000 (Base Construction Allocation - $2,915,000) (Land Allocation - $195,000) (Design and Contingencies - $490,000) (5) SR 3006, Stonycreek Bridge over Tributary of Stonycreek River, Richland Township, Bridge Rehabilitation 56,000 (Base Construction Allocation - $41,000) (Land Allocation - $1,000) (Design and Contingencies - $14,000) (6) SR 4010, Brubaker Bridge over Brubaker Run, Hastings Borough, Bridge Rehabilitation 50,000 (Base Construction Allocation - $36,000) (Land Allocation - $1,000) (Design and Contingencies - $13,000) (7) SR 1001, Ebensburg Bridge over Howells Run, Ebensburg Borough, Bridge Rehabilitation 350,000 (Base Construction Allocation - $300,000) (Land Allocation - $1,000) (Design and Contingencies - $49,000) Section 16. Cameron County. (a) Local Bridges (1) Shippen Township, T-345, Hercules Hollow Bridge over West Creek, Bridge Replacement 760,000 (Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (2) Grove Township, T-355, Bridge over Upper Jerry Run, Bridge Replacement 224,000 (Base Construction Allocation - $160,000) (Land Allocation - $8,000) (Design and Contingencies - $56,000) (b) State Bridges (1) SR 0120, Bridge over Still House Run, Lumber Township, Bridge Replacement 400,000 (Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (2) SR 4004, Bridge over Driftwood Branch, Shippen Township, Bridge Painting 115,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $5,000) (3) SR 4004, Elk Fork Bridge over Driftwood Branch, Shippen Township, Bridge Replacement 130,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (4) SR 2001, Bridge over White Oak, Gibson Township, Bridge Replacement 540,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (5) SR 2001, Bridge over Laurel Branch, Gibson Township, Bridge Replacement 540,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) Section 17. Carbon County. (a) Local Bridges (1) Penn Forest Township, T-481, County Bridge No.21 over Panther Creek, Bridge Replacement 290,000 (Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (2) Mahoning Township, T-390, Bridge over Mahoning Creek, Bridge Replacement 92,000 (Base Construction Allocation - $80,000) (Land Allocation - $4,000) (Design and Contingencies - $8,000) (3) Lausanne Township, T-502, Bridge over Schaffers Run, Bridge Replacement 320,000 (Base Construction Allocation - $212,000) (Land Allocation - $8,000) (Design and Contingencies - $100,00) (4) Towamensing Township, T-435, Bridge over Wild Creek, Bridge Replacement 357,000 (Base Construction Allocation - $220,000) (Land Allocation - $9,000) (Design and Contingencies - $128,000) (5) Bowmanstown Borough, Ore Street Bridge over Fireline Creek, Bridge Replacement 360,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (6) Packer Township, T-463, Bridge over Wetzel Creek, Bridge Replacement 360,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (7) East Penn Township, T-354, County Bridge No.6 over Lizard Creek, Bridge Replacement 974,000 (Base Construction Allocation - $600,000) (Land Allocation - $300,000) (Design and Contingencies - $74,000) (8) Lehigh Township, Leslie Run Road over Leslie Run, Bridge Replacement 110,000 (b) State Bridges (1) SR 2002, Delaware Avenue over Palmer Creek, Palmerton Borough, Bridge Replacement 568,000 (Base Construction Allocation - $318,000) (Land Allocation - $150,000) (Design and Contingencies - $100,000) (2) SR 4010, SR 4010 over Quakake Creek, Packer Township, Bridge Replacement 412,000 (Base Construction Allocation - $202,000) (Land Allocation - $150,000) (Design and Contingencies - $60,000) (3) SR 0209, SR 0209 Turnpike Ramp, Mahoning Interchange, Franklin Township, Bridge Replacement 1,260,000 (Base Construction Allocation - $750,000) (Land Allocation - $300,000) (Design and Contingencies - $210,000) (4) SR 0248, SR 0248 over Pohopoco Creek, Parryville Borough Line, Lower Towamensing Township, Bridge Rehabilitation 415,000 (Base Construction Allocation - $315,000) (Design and Contingencies - $100,000) (5) SR 4010, SR 4010 over Hartz Creek, Packer Township, Bridge Replacement 615,000 (Base Construction Allocation - $370,000) (Land Allocation - $150,000) (Design and Contingencies - $95,000) (6) SR 0534, SR 0534 over Sand Spring Run, 2 Miles South of Lehigh Tannery, Kidder Township, Bridge Replacement 340,000 (Base Construction Allocation - $160,000) (Land Allocation - $125,000) (Design and Contingencies - $55,000) (7) SR 0209, SR 0209 over Pohopoco Creek, Village of Harrity, Franklin Township, Bridge Rehabilitation 885,000 (Base Construction Allocation - $680,000) (Design and Contingencies - $205,000) (8) SR 0534, Pa 534 over I-80, Kidder Township, Bridge Rehabilitation 540,000 (Base Construction Allocation - $440,000) (Design and Contingencies - $100,000) (9) SR 0248, Bridge over Aquashicola Creek, Lower Towamensing Township, Bridge Rehabilitation 310,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $10,000) (10) SR 0534, Bridge over Hickory Run, Kidder Township, Bridge Rehabilitation 830,000 (Base Construction Allocation - $700,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (11) SR 0903, Bridge over Lehigh River, Jim Thorpe Borough, Bridge Rehabilitation 1,250,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (12) SR 0940, Bridge over Black Creek, Kidder Township, Bridge Replacement 185,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $35,000) (13) SR 2006, Bridge over Buckwha Creek, Lower Towamensing Township, Bridge Replacement 1,240,000 (Base Construction Allocation - $700,000) (Land Allocation - $90,000) (Design and Contingencies - $450,000) (14) SR 2008, Bridge over Pohopoco Creek, Parryville Borough, Bridge Replacement 920,000 (Base Construction Allocation - $600,000) (Land Allocation - $90,000) (Design and Contingencies - $230,000) (15) SR 3005, Bridge over Mahoning Creek, Mahoning Township, Bridge Replacement 308,000 (Base Construction Allocation - $280,000) (Design and Contingencies - $28,000) (16) SR 4014, Bridge over Tributary of Indian Run, Lehigh Township, Bridge Replacement 153,000 (Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $13,000) (17) SR 4014, Bridge over Tributary of Indian Run, Lehigh Township, Bridge Replacement 88,000 (Base Construction Allocation - $80,000) (Design and Contingencies - $8,000) (18) SR 2002, Bridge over Chestnut Ridge Railroad, Palmerton Borough, Bridge Deck Rehabilitation 500,000 (Base Construction Allocation - $500,000) Section 18. Centre County. (a) Local Bridges (1) Greene Township, T-350, Stover Road Bridge, Bridge Replacement 230,000 (Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (2) Howard Township, T-398 over Bullit Run, Bridge Rehabilitation 11,000 (Base Construction Allocation - $9,000) (Design and Contingencies - $2,000) (3) Halfmoon Township, T-307 over Loveville Creek, Bridge Replacement 21,000 (Base Construction Allocation - $19,000) (Design and Contingencies - $2,000) (4) Penn Township, T-839 over Pine Creek, Bridge Rehabilitation 80,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $20,000) (5) Port Matilda Borough, Pedestrian Bridge over Bald Eagle Creek, Bridge Rehabilitation 200,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $25,000) (6) Spring Township, T-367, Hill Road Bridge, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (7) Taylor Township, T-308, McMonagle Road over Sparrow Run, Bridge Replacement 330,000 (Base Construction Allocation - $275,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (8) Rush Township, Six Mile Road Bridge over Six Mile Run, Bridge Replacement 155,000 (Base Construction Allocation - $137,000) (Land Allocation - $5,000) (Design and Contingencies - $13,000) (9) Taylor Township, T-300, Big Fill Run Bridge over Big Fill Run, Bridge Replacement 310,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (10) Taylor Township, T-305, Bald Eagle Creek Bridge over Bald Eagle Creek, Bridge Replacement 360,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (11) Ferguson Township, T-307, West Gatesburg Road Bridge, Bridge Replacement 100,000 (Base Construction Allocation - $89,000) (Design and Contingencies - $11,000) (12) Ferguson Township, T-703, Scott Road Bridge, Bridge Rehabilitation 90,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $15,000) (b) State Bridges (1) SR 0080, I-80 Viaduct over and Conrail, Rush Township, Bridge Rehabilitation 14,510,000 (Base Construction Allocation - $13,210,000) (Design and Contingencies - $1,300,000) (2) SR 1002, Marsh Creek Bridge over Marsh Creek, Boggs Township, Bridge Replacement 760,000 (Base Construction Allocation - $630,000) (Land Allocation - $20,000) (Design and Contingencies - $110,000) (3) SR 1002, Little Marsh Creek Bridge over Little Marsh Creek, Curtin Township, Bridge Replacement 700,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (4) SR 2012, Bridge Northwest of the Village of Spring Mills, Gregg Township, Bridge Replacement 470,000 (Base Construction Allocation - $360,000) (Land Allocation - $20,000) (Design and Contingencies - $90,000) (5) SR 0220, SR 0220 over Laurel Run, Port Matilda Borough, Bridge Rehabilitation 450,000 (Base Construction Allocation - $400,000) (Design and Contingencies - $50,000) (6) SR 0053, Moshannon Creek Bridge over Moshannon Creek, Philipsburg Borough, Bridge Replacement 2,250,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (7) SR 0144, Bald Eagle Creek Bridge over Bald Eagle Creek, Boggs Township, Bridge Replacement 1,210,000 (Base Construction Allocation - $950,000) (Land Allocation - $10,000) (Design and Contingencies - $250,000) (8) SR 0879, Susquehanna Bridge over West Branch of Susquehanna River, Burnside Township, Bridge Replacement 3,700,000 (Base Construction Allocation - $3,200,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) (9) SR 0970, Bridge over Moshannon Creek, Rush Township, Bridge Painting 310,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $10,000) (10) SR 1005, Nittany Creek Bridge over Nittany Creek, Marion Township, Bridge Replacement 260,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (11) SR 2007, Spruce Creek Bridge over Spruce Creek, Gregg Township, Bridge Replacement 260,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (12) SR 2011, Penns Creek Bridge over Penns Creek, Penn Township, Bridge Replacement 1,040,000 (Base Construction Allocation - $830,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000) (13) SR 2012, Spring Bridge over Penns Creek, Gregg Township, Bridge Replacement 670,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (14) SR 2018, Mill Race Bridge over Mill Race, Penn Township, Bridge Painting 8,000 (Base Construction Allocation - $7,000) (Design and Contingencies - $1,000) (15) SR 3027, Trout Run Bridge over Trout Run, Rush Township, Bridge Replacement 270,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (16) SR 3034, Cold Stream Run Bridge over Cold Stream Run, Rush Township, Bridge Replacement 746,000 (Base Construction Allocation - $576,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (17) SR 4004, Wallace Run Bridge over Wallace Run, Boggs Township, Bridge Replacement 455,000 (Base Construction Allocation - $345,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (18) SR 4005, Bridge over I-80, Snow Shoe Township, Bridge Replacement 2,400,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (19) SR 4006, Moshannon Creek Bridge over Moshannon Creek, Rush Township, Bridge Replacement 1,000,000 (Base Construction Allocation - $780,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (20) SR 0504, Bridge, Moshannon State Park, Rush Township, Bridge Rehabilitation 13,000 (Base Construction Allocation - $11,000) (Design and Contingencies - $2,000) (21) SR 0550, Bridge over Half Moon Creek, Halfmoon Township, Bridge Replacement 230,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (22) SR 0504, Black Moshannon Creek Bridge in Moshannon State Park, Rush Township, Bridge Replacement 540,000 (Base Construction Allocation - $410,000) (Land Allocation - $40,000) (Design and Contingencies - $90,000) (23) SR 0026, Bridge Overpass, over NBER Railroad, Spring Township, New Bridge Construction 1,150,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (24) SR 3026, Bridge on T-965, Tadpole Road, Ferguson Township, Bridge Replacement 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) (25) SR 3013, Bridge on T-966, Marengo Road, Ferguson Township, Bridge Replacement 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) Section 19. Chester County. (a) Local Bridges (1) Parkesburg Borough, State Street Pedestrian Bridge over Amtrak, Bridge Replacement 1,700,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $500,000) (Design and Contingencies - $200,000) (2) East Fallowfield Township, T-362, Timacuia Road under Penn Central Railroad, Bridge Removal 445,000 (Base Construction Allocation - $400,000) (Land Allocation - $30,000) (Design and Contingencies - $15,000) (3) East Marlborough Township, T-402, County Bridge No.65, Mill Road Bridge over West Branch of Red Clay Creek, Bridge Replacement 345,000 (Base Construction Allocation - $291,000) (Land Allocation - $25,000) (Design and Contingencies - $29,000) (4) Oxford Borough, Broad Street Bridge over SEPTA, Bridge Replacement 1,304,000 (Base Construction Allocation - $1,125,000) (Land Allocation - $20,000) (Design and Contingencies - $159,000) (5) Penn Township, County Bridge No.260, Posey Mill Road Bridge over Big Elk Creek, Bridge Replacement 425,000 (Base Construction Allocation - $300,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (6) Tredyffrin Township, Old Lancaster Pike Bridge over Amtrak, Bridge Rehabilitation 465,000 (Base Construction Allocation - $400,000) (Land Allocation - $30,000) (Design and Contingencies - $35,000) (7) Tredyffrin Township, T-807, Evans Road Bridge over Conrail, Bridge Replacement 195,000 (Base Construction Allocation - $150,000) (Land Allocation - $30,000) (Design and Contingencies - $15,000) (8) West Caln and West Brandywine Townships, County Bridge No.283, Reid Road Bridge over West Branch of Brandywine Creek, Bridge Replacement 790,000 (Base Construction Allocation - $600,000) (Land Allocation - $40,000) (Design and Contingencies - $150,000) (9) West Goshen Township, T-210, Old Eachus Mill Road Bridge over SEPTA, Bridge Replacement 615,000 (Base Construction Allocation - $500,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (10) West Goshen Township, T-328, Bridge over Penn Central Railroad, Bridge Removal 132,000 (Base Construction Allocation - $110,000) (Land Allocation - $5,000) (Design and Contingencies - $17,000) (11) West Marlborough Township, T-368, Creek Road Bridge under Penn Central Railroad, Bridge Removal 580,000 (Base Construction Allocation - $500,000) (Land Allocation - $5,000) (Design and Contingencies - $75,000) (12) West Marlborough Township, Bridge over Doe Run, Bridge Replacement 915,000 (Base Construction Allocation - $750,000) (Land Allocation - $25,000) (Design and Contingencies - $140,000) (13) East Coventry Township, Zeiber Road over Pigeon Creek, Bridge Replacement 375,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $60,000) (14) South Coventry Township, Young Road over Pigeon Creek, Bridge Rehabilitation 6,000 (Base Construction Allocation - $6,000) (15) Franklin Township, T-356, Mount Olivet Road Bridge over Unnamed Tributary of Big Elk Creek, Bridge Rehabilitation 9,000 (Base Construction Allocation - $7,000) (Design and Contingencies - $2,000) (16) North Coventry Township, South Keim Street, Bridge No.270 over Small Run, Bridge Replacement 690,000 (Base Construction Allocation - $500,000) (Land Allocation - $40,000) (Design and Contingencies - $150,000) (17) Atglen Borough, Old Newport Pike Bridge over Officer's Run Creek, Bridge Rehabilitation 1,500,000 (18) New London Township, T-321, Bridge over West Branch of White Clay Creek, Bridge Rehabilitation 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (19) West Chester Borough, Neild Street Bridge over Goose Creek, Bridge Replacement 111,000 (Base Construction Allocation - $103,000) (Design and Contingencies - $8,000) (20) West Chester Borough, Lacey Street Bridge over Goose Creek, Bridge Rehabilitation 111,000 (Base Construction Allocation - $103,000) (Design and Contingencies - $8,000) (21) West Nottingham Township, T-307 and T-311, Bridge over Roney's Run and North East Creek, Bridge Rehabilitation 135,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $10,000) (22) West Whiteland Township, Whiteford Road at Clover Mill, Drainage Improvement, Bridge Rehabilitation 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000) (23) West Nottingham Township, TR 307 and TR 311, Bridge over Roney's Run and North East Creek, Bridge Rehabilitation 135,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $10,000) (24) West Chester Borough, Lacey Street Bridge over Goose Creek, Bridge Replacement 111,000 (Base Construction Allocation - $103,000) (Design and Contingencies - $8,000) (25) Atglen Borough, Old Newport Pike Bridge over Officer's Run Creek, Bridge Rehabilitation 1,500,000 (Base Construction Allocation - $1,500,000) (26) Penn Township, A150 and SR 0796, Bridge over SEPTA (Delaware Valley Branch), Bridge Rehabilitation 385,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $35,000) (27) Penn Township, T-356, Bridge over Middle Creek, Bridge Rehabilitation 165,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $15,000) (28) Uwchlan Township, PA 113, Bridge over Pennsylvania Turnpike, Bridge Replacement 6,500,000 (Base Construction Allocation - $5,500,000) (Land Allocation - $500,000) (Design and Contingencies - $500,000) (29) Avondale Borough, PA 41, Bridge over White Clay Creek, Bridge Rehabilitation 220,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $20,000) (30) Atglen Borough, PA 41, Bridge over Valley Creek, Bridge Replacement 1,000,000 (Base Construction Allocation - $800,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000) (31) East Nantmeal and Warwick Townships, James Mill Road over French Creek 525,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (32) Atglen Township, Old Newport Pike Bridge over Valley Creek, Bridge Replacement 450,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (33) East Pikeland Township, Pickering Road Bridge over Pickering Creek, Bridge Replacement 795,000 (Base Construction Allocation - $700,000) (Land Allocation - $20,000) (Design and Contingencies - $75,000) (34) East and West Bradford Townships, Harmony Hill Road Bridge over East Branch Brandywine Creek, Bridge Rehabilitation 1,250,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $75,000) (Design and Contingencies - $175,000) (35) Highland and Londonderry Townships, T-310 and T-344, Bridge over Doe Run, Bridge Replacement 920,000 (Base Construction Allocation - $700,000) (Land Allocation - $40,000) (Design and Contingencies - $180,000) (36) Lower Oxford Township, Fairview Road Bridge over Tweeds Run, Bridge Replacement 920,000 (Base Construction Allocation - $700,000) (Land Allocation - $60,000) (Design and Contingencies - $160,000) (37) Avondale Borough, State Street Bridge over Indian Run, Bridge Replacement 560,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (38) East Goshen Township, Dutton Mill Road Bridge over Ridley Creek, Bridge Replacement 1,040,000 (b) State Bridges (1) SR 1010, Swedesford Road Bridge over US 422, Drummers Lane and Warner Road, Tredyffrin, Chester County, Upper Merion, Montgomery County, Bridge Replacement 6,795,000 (Base Construction Allocation - $6,210,000) (Land Allocation - $180,000) (Design and Contingencies - $405,000) (2) SR 1045, Hares Hill Road Bridge over French Creek, East Pikeland Township, Bridge Rehabilitation 1,000,000 (Base Construction Allocation - $740,000) (Land Allocation - $60,000) (Design and Contingencies - $200,000) (3) SR 3014, Lees Road Bridge over Black Run, West Nottingham Township, Bridge Replacement 1,125,000 (Base Construction Allocation - $850,000) (Land Allocation - $75,000) (Design and Contingencies - $200,000) (4) SR 3030, Street Road Bridge over , Upper Oxford Township, Bridge Replacement 1,875,000 (Base Construction Allocation - $1,600,000) (Land Allocation - $75,000) (Design and Contingencies - $200,000) (5) SR 0003, Gay Street Bridge over Abandoned Conrail, West Chester Borough, Bridge Removal 180,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (6) SR 0842, Shaws Bridges (Two Bridges) over Branch of Brandywine Creek, East Bradford and Pocopson Townships, Bridge Replacement 1,500,000 (Base Construction Allocation - $1,288,000) (Land Allocation - $100,000) (Design and Contingencies - $112,000) (7) SR 0842, Bridge Road Bridge over East Branch of Brandywine Creek, East Bradford Township, Bridge Painting 214,000 (Base Construction Allocation - $186,000) (Design and Contingencies - $28,000) (8) SR 1049, Rapp's Dam Covered Bridge, East Pikeland Township, Bridge Painting 47,000 (Base Construction Allocation - $41,000) (Design and Contingencies - $6,000) (9) SR 2011, Phoenixville Pike Bridge under Abandoned Penn Central Railroad, West Goshen Township, Bridge Removal 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000) (10) SR 2018, Green Hill Road Bridge under Abandoned Penn Central Railroad, West Goshen Township, Bridge Removal 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000) (11) SR 3045, Springdell Road Bridge under Abandoned Penn Central Railroad, West Marlborough Township, Bridge Removal 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000) (12) SR 3049, Hilltop View Road Bridge over Buck and Doe Run Creek, Newlin Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (13) SR 1012, Bridge over Trout Creek, Tredyffrin Township, Bridge Replacement 850,000 (Base Construction Allocation - $550,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (14) SR 0113, Gay Street Bridge over French Creek, Phoenixville Borough, Bridge Replacement 10,200,000 (Base Construction Allocation - $9,000,000) (Land Allocation - $200,000) (Design and Contingencies - $1,000,000) (15) SR 202, Bridge Decks at Section 200, Bridge Deck Rehabilitation 1,300,000 (16) Westtown Road, Falls Bridge over Chester Creek, Westtown Township, Bridge Rehabilitation 610,000 (17) Whitford Road Bridge under Amtrak, West Whiteland Township, Bridge Replacement 3,000,000 (18) Grove Road Bridge over , West Whiteland Township, Bridge Replacement 1,097,000 (19) SR 0029, French Creek Parkway, Bridge No.1 over French Creek, Phoenixville Borough, Bridge Construction 1,898,000 (Base Construction Allocation - $1,650,000) (Design and Contingencies - $248,000) (20) SR 0029, French Creek Parkway, Bridge No.2 over French Creek, Phoenixville Borough, Bridge Construction 1,898,000 (Base Construction Allocation - $1,650,000) (Design and Contingencies - $248,000) Section 20. Clarion County. (a) Local Bridges (1) Beaver Township, T-400, Canoe Creek Bridge over Canoe Creek, Bridge Replacement 380,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (2) Beaver Township, T-422, Bridge over Deer Creek, Bridge Replacement 540,000 (Base Construction Allocation - $450,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (3) Clarion and Millcreek Townships, T-490, Mill Creek Bridge over Mill Creek, Bridge Replacement 540,000 (Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (4) Elk Township, T-424, Deer Creek Bridge over Deer Creek, Bridge Replacement 620,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (5) Farmington Township, T-562, Walley Run Bridge over Walley Run, Bridge Replacement 375,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $70,000) (6) Knox Township, T-850, Toby Creek Bridge over Toby Creek, Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (7) Knox Township, T-600, Licking Creek Bridge over Licking Creek, Bridge Replacement 445,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $80,000) (8) Madison Township, T-460, Red Bank Creek Bridge over Tributary of Red Bank Creek, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (9) Porter Township, T-462, Fiddlers Run Bridge over Fiddlers Run, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (10) Porter Township, T-472, Leatherwood Creek Bridge over Leatherwood Creek, Bridge Replacement 455,000 (Base Construction Allocation - $375,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (11) Porter Township, T-750, Leisure Run Bridge over Leisure Run, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (12) Redbank Township, T-840, Beaver Creek Bridge over Beaver Creek, Bridge Replacement 420,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $55,000) (13) Redbank Township, T-508, County Bridge No.46, Pine Creek Bridge over Pine Creek, Bridge Replacement 378,000 (Base Construction Allocation - $300,000) (Land Allocation - $8,000) (Design and Contingencies - $70,000) (14) Richland Township, T-382, Turkey Run Bridge over Turkey Run, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (15) Richland Township, T-382, Turkey Run Bridge over Turkey Run, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (16) Sligo Borough, Madison Street Bridge over Little Licking Creek, Bridge Replacement 445,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $80,000) (17) Beaver Township, T-332, Bridge No.17 over Beaver Creek, Bridge Replacement 560,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (18) Beaver Township, T-385 over Canoe Creek, Bridge Replacement 490,000 (Base Construction Allocation - $320,000) (Land Allocation - $80,000) (Design and Contingencies - $90,000) (19) Highland Township, T-573 over Toby Creek, Bridge Replacement 920,000 (Base Construction Allocation - $700,000) (Land Allocation - $40,000) (Design and Contingencies - $180,000) (20) Knox Township, T-850 over Step Creek, Bridge Replacement 240,000 (Base Construction Allocation - $180,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (21) Perry Township, T-301, Bridge Replacement 200,000 (Base Construction Allocation - $130,000) (Land Allocation - $30,000) (Design and Contingencies - $40,000) (22) Millcreek Township, T-564 over Little Mill Creek, Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (23) Paint Township, T-578 over Step Creek, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (24) Monroe Township, T-486, County Bridge No.22 over Piney Creek, Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (25) Clarion Township, T-532 over Brush Run, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (26) Clarion Township, T-561 over Jones Run, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (27) Elk Township, T-582 over Mahles Run, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (28) Farmington Township, T-609 over Engle Run, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (29) Paint Township, T-577 over Toby Creek, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (30) Paint Township, T-576 over Toby Creek, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (31) Beaver Township, T-405 over Canoe Creek, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (32) Beaver Township, T-411 over Boyd Run, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (33) Elk Township, T-424 over Deer Creek, Bridge Replacement 250,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (34) Highland Township, T-577, Bridge over Toby Creek, Bridge Replacement 518,000 (Base Construction Allocation - $380,000) (Land Allocation - $8,000) (Design and Contingencies - $130,000) (35) Beaver Township, T-423, Bridge over Canoe Creek, Bridge Replacement 510,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (36) Elk Township, T-418, Bridge over Deer Creek, Bridge Replacement 380,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (37) Paint Township, T-582, Bridge over Little Paint Creek, Bridge Replacement 424,000 (Base Construction Allocation - $350,000) (Land Allocation - $9,000) (Design and Contingencies - $65,000) (38) Ashland Township, T-863, Bridge over Little Canoe Creek, Bridge Replacement 330,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000) (39) Beaver Township, T-325, Schettler Road Bridge over Canoe Creek, Bridge Replacement 395,000 (Base Construction Allocation - $250,000) (Land Allocation - $15,000) (Design and Contingencies - $130,000) (40) Madison Township, T-442, Bridge No.34 over Wildcat Run, Bridge Replacement 425,000 (Base Construction Allocation - $275,000) (Land Allocation - $10,000) (Design and Contingencies - $140,000) (41) Madison Township, T-689, Bridge No.33 over Wildcat Run, Bridge Replacement 460,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (42) Madison Township, T-880, Bridge No.2050 over Turkey Run, Bridge Replacement 330,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000) (43) Limestone Township, T-540, Little Piney Creek Bridge over Little Piney Creek, Bridge Replacement 145,000 (Base Construction Allocation - $112,000) (Land Allocation - $8,000) (Design and Contingencies - $25,000) (44) Clarion Township, T-561, Bridge Washout over Jones Run, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (45) Elk Township, T-424, Deer Creek Bridge over Deer Creek, Bridge Replacement 620,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (46) Elk Township, T-424, Culvert over Deer Creek, Bridge Replacement 250,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (47) Millcreek Township, T-564, Little Mill Creek Bridge over Little Mill Creek, Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (48) Paint Township, T-578, Step Creek Bridge over Step Creek, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (49) Paint Township, T-578, Steiner Road Bridge over Step Creek, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (50) Beaver Township, T-385, Bridge over Canoe Creek, Bridge Replacement 1,100,000 (Base Construction Allocation - $880,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (51) Beaver Township, T-391, Bridge over Beaver Creek, Bridge Replacement 740,000 (Base Construction Allocation - $550,000) (Land Allocation - $10,000) (Design and Contingencies - $180,000) (52) Limestone Township, T-682, Bridge over Piney Creek, Bridge Replacement 490,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (53) Limestone Township, T-439, Bridge over Piney Creek, Bridge Replacement 872,000 (Base Construction Allocation - $632,000) (Land Allocation - $10,000) (Design and Contingencies - $230,000) (54) Monroe Township, T-486, Bridge over Pine Creek, Bridge Replacement 740,000 (Base Construction Allocation - $550,000) (Land Allocation - $10,000) (Design and Contingencies - $180,000) (55) Redbank Township, T-513, Bridge over Piney Creek, Bridge Replacement 378,000 (Base Construction Allocation - $300,000) (Land Allocation - $8,000) (Design and Contingencies - $70,000) (56) Richland Township, T-382, Bridge over Turkey Run, Bridge Replacement 705,000 (Base Construction Allocation - $495,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000) (57) Toby and Perry Townships, T-301, Bridge over Black Fiddlers Run, Bridge Replacement 325,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $115,000) (58) Millcreek Township, T-490 over Mill Creek, Drainage Improvement 660,000 (Base Construction Allocation - $550,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (59) Beaver Township, T-332, County Bridge No.16 over Beaver Creek, Bridge Replacement 560,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (b) State Bridges (1) SR 0058, Callensburg Bridge over Clarion River, Licking Township, Bridge Painting 365,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $15,000) (2) SR 0080, Beaver Creek Eastbound Bridge over Beaver Creek, Beaver Township, Bridge Painting 390,000 (Base Construction Allocation - $375,000) (Design and Contingencies - $15,000) (3) SR 0080, Beaver Creek Westbound Bridge over Beaver Creek, Beaver Township, Bridge Painting 390,000 (Base Construction Allocation - $375,000) (Design and Contingencies - $15,000) (4) SR 0080, Canoe Creek Eastbound Bridge over Canoe Creek, Beaver Township, Bridge Painting 1,230,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $30,000) (5) SR 0080, Canoe Creek Westbound Bridge over Canoe Creek, Beaver Township, Bridge Painting 1,290,000 (Base Construction Allocation - $1,260,000) (Design and Contingencies - $30,000) (6) SR 0080, TR 558 Bridge over I-80, Clarion Township, Bridge Painting 195,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $15,000) (7) SR 0322, Exit 11 Bridge over I-80, Clarion Township, Clarion Bridge Painting 205,000 (Base Construction Allocation - $190,000) (Design and Contingencies - $15,000) (8) SR 0536, Mayport Bridge over Redbank Creek, Redbank Township, Bridge Painting 215,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $15,000) (9) SR 1009, Brush Creek Bridge over Brush Creek, Clarion Township, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (10) SR 2001, Piney Creek Bridge over Piney Creek, Limestone Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (11) SR 2001, Little Piney Creek Bridge over Little Piney Creek, Limestone Township, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (12) SR 2005, Glade Run Bridge over Glade Run, Limestone Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (13) SR 2007, Licking Creek Bridge over Licking Creek, Monroe Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (14) SR 2009, Lawsonham Bridge over Redbank Creek, Madison Township, Bridge Painting 195,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $15,000) (15) SR 2009, Wildcat Run Bridge over Wildcat Run, Madison Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (16) SR 2015, Little Piney Creek Bridge over Little Piney Creek, Limestone Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (17) SR 3020, Alum Rock Bridge over Turkey Run, Richland Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (18) SR 4003, Turkey Run Bridge over Turkey Run, Richland Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (19) SR 4005, Canoe Creek Bridge over Canoe Creek, Beaver Township, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (20) SR 0208, Conrail Overpass, Elk Township, Bridge Removal 120,000 (Base Construction Allocation - $80,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (21) SR 0322, Conrail Overpass, Elk Township, Bridge Removal 250,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (22) SR 1011, Lake Erie, Franklin and Clarion Railroad Overpass, Clarion Township, Bridge Removal 12,000 (Base Construction Allocation - $10,000) (Design and Contingencies - $2,000) (23) SR 0066, Bridge over Piney Creek, Limestone Township, Bridge Replacement 650,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (24) SR 0066, Bridge over Little Piney Creek, Limestone Township, Bridge Replacement 600,000 (Base Construction Allocation - $450,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (25) SR 0068, Bridge over Brush Run, Monroe Township, Bridge Replacement 650,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (26) SR 0208, Bridge over Canoe Creek, Beaver Township, Bridge Replacement 550,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (27) SR 2001, Bridge over Little Piney Creek, Limestone Township, Bridge Replacement 490,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (28) SR 0208, SR 0208 over Deer Creek, Elk Township, Bridge Replacement 505,000 (Base Construction Allocation - $450,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (29) SR 2007, SR 2007 over Deer Creek, Beaver Township, Bridge Replacement 455,000 (Base Construction Allocation - $400,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (30) SR 4005, SR 4005 over Canoe Creek, Beaver Township, Bridge Replacement 405,000 (Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (31) SR 4008, SR 4008 over Paint Creek, Knox Township, Bridge Replacement 505,000 (Base Construction Allocation - $450,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (32) SR 0028, Redbank Creek Bridge over Tributary of Redbank Creek, Redbank Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (33) SR 0028, Pine Creek Bridge over Pine Creek, Redbank Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (34) SR 0028, Leisure Run Bridge over Leisure Run, Redbank Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (35) SR 0028, Walker Run Bridge over Walker Run, Redbank Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (36) SR 0066, Little Piney Bridge over Little Piney Creek, Clarion Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (37) SR 0066, Leisure Run Bridge over Leisure Run, Redbank Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (38) SR 0068, Trout Run Bridge over Trout Run, Clarion Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (39) SR 0068, Craigs Run Bridge over Craigs Run, Monroe Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (40) SR 0068, Craigs Run Bridge over Craigs Run, Monroe Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (41) SR 0068, Reids Run Bridge over Reids Run, Monroe Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (42) SR 0068, Brush Run Bridge over Brush Run, Monroe Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (43) SR 0068, Licking Creek Bridge over Licking Creek, Sligo Borough, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (44) SR 0080, I-80 Bridge over Coal Run, Beaver Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (45) SR 0080, I-80 Bridge over Deer Creek, Beaver Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (46) SR 0080, I-80 Bridge over Tributary of Clarion River, Beaver Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (47) SR 0080, I-80 Bridge, Westbound over SR 2014, Clarion Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (48) SR 0080, I-80 Bridge, Eastbound over SR 2014, Clarion Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (49) SR 0080, I-80 Bridge over Boyd Run, Paint Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (50) SR 0080, I-80 Bridge over Branch of Clarion River, Paint Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (51) SR 0080, I-80 Bridge over Turkey Run, Richland Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (52) SR 2001, Piney Creek Bridge over Piney Creek, Limestone Township, Bridge Replacement 620,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (53) SR 4008, Bridge over Shelter Run, Knox Township, Bridge Replacement 265,000 (Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (54) SR 4005, I-80 Eastbound, Bridge over Canoe Creek, Beaver Township, Bridge Rehabilitation 210,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $30,000) (55) SR 4005, I-80 Westbound, Bridge over Canoe Creek, Beaver Township, Bridge Rehabilitation 210,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $30,000) (56) SR 2003, Bridge over Branch of Leather Run, Monroe Township, Bridge Rehabilitation 60,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $20,000) (57) SR 4027, Bridge over Deer Creek, Elk Township, Bridge Deck Replacement 60,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $20,000) Section 21. Clearfield County. (a) Local Bridges (1) Knox Township, T-565 Bridge over Potts Run, Bridge Replacement 1,145,000 (Base Construction Allocation - $900,000) (Land Allocation - $20,000) (Design and Contingencies - $225,000) (2) Houtzdale Borough, McAteer Street Bridge, Bridge Replacement 430,000 (Base Construction Allocation - $270,000) (Land Allocation - $20,000) (Design and Contingencies - $140,000) (3) Penn Township, T-461 over Bell Run, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (4) City of Dubois, Washington Avenue Bridge over Pentz Run, Bridge Replacement 510,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (5) Sandy Township, T-854, Narrows Creek Bridge over Narrows Creek, Bridge Replacement 320,000 (Base Construction Allocation - $240,000) (Land Allocation - $16,000) (Design and Contingencies - $64,000) (6) Brady Township, T-353, Bridge over East Branch of Mahoning Creek, Bridge Replacement 344,000 (Base Construction Allocation - $272,000) (Land Allocation - $8,000) (Design and Contingencies - $64,000) (7) Union Township, T-372, Conrail Bridge over Conrail, Bridge Removal 515,000 (Base Construction Allocation - $400,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (8) Sandy Township, T-584, Bridge over Narrows Creek, Bridge Replacement 620,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (9) Bradford Township, T-210, Bridge over Millstone Run, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (10) Knox Township, T-565, Bridge over Potts Run, Bridge Replacement 510,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (11) Bigler Township, T-564, Fourth Street Bridge over Japling Run, Bridge Replacement 210,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (12) Ferguson Township, T-426 over Gazzam Run, Bridge Replacement 420,000 (Base Construction Allocation - $315,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (13) Lawrence Township, T-519 over Moose Creek, Bridge Replacement 520,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (14) Greenwood Township, T-420 over Curry Run, Bridge Replacement 575,000 (Base Construction Allocation - $425,000) (Land Allocation - $10,000) (Design and Contingencies - $140,000) (b) State Bridges (1) SR 0879, Bridge over US 322 near Clearfield Mall, Lawrence Township, Bridge Painting 644,000 (Base Construction Allocation - $614,000) (Design and Contingencies - $30,000) (2) SR 0729, Bridge over Muddy Run, Beccaria Township, Bridge Replacement 570,000 (Base Construction Allocation - $400,000) (Design and Contingencies - $170,000) (3) SR 0879, Bridge over Susquehanna River, Lawrence Township, Bridge Painting 538,000 (Base Construction Allocation - $533,000) (Design and Contingencies - $5,000) (4) SR 0970, Bridge over Moshannon Creek, Osceola Mills, Bridge Painting 145,000 (Base Construction Allocation - $120,000) (Design and Contingencies - $25,000) (5) SR 0970, Bridge over Susquehanna River, Village of Shawville, Bridge Painting 163,000 (Base Construction Allocation - $143,000) (Design and Contingencies - $20,000) (6) SR 1009, Bridge over Alder Run, Morris Township, Bridge Replacement 265,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $65,000) (7) SR 1014, Bridge over Alder Run, Graham Township, Bridge Replacement 570,000 (Base Construction Allocation - $400,000) (Design and Contingencies - $170,000) (8) SR 2010, Bridge over Beaver Run, Woodward Township, Bridge Painting 18,000 (Base Construction Allocation - $15,000) (Design and Contingencies - $3,000) (9) SR 2024, Bridge over Conrail, Pike Township, Bridge Painting 50,000 (10) SR 3001, Bridge over , Mahaffey Borough, Bridge Replacement 1,750,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $150,000) (Design and Contingencies - $300,000) (11) SR 3012, Bridge over Matthews Run, Beccaria Township, Bridge Painting 18,000 (Base Construction Allocation - $15,000) (Design and Contingencies - $3,000) (12) SR 3012, Bridge over Clearfield Creek, Beccaria Township, Bridge Replacement 150,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $25,000) (13) SR 0219, SR 0219 over Bear Run, Bell Township, Bridge Replacement 505,000 (Base Construction Allocation - $450,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (14) SR 2014, Bridge over Coal Run, Decatur Township, Bridge Replacement 702,000 (Base Construction Allocation - $512,000) (Land Allocation - $30,000) (Design and Contingencies - $160,000) (15) SR 3012, Bridge over Clearfield Creek, Beccaria Township, Bridge Painting 18,000 (Base Construction Allocation - $15,000) (Design and Contingencies - $3,000) (16) SR 0255, Bridge over Tyler Run, Village of Hollywood, Huston Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (17) SR 3009, Bridge over Kuhns Run, Bell Township, Bridge Rehabilitation 105,000 (Base Construction Allocation - $80,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (18) SR 0219, Clear Run Bridge over Clear Run, City of Dubois, Bridge Replacement 760,000 (Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (19) SR 0219, Bear Creek Bridge over Bear Creek, McGees Mills, Bridge Replacement 825,000 (Base Construction Allocation - $700,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (20) SR 0322, Bridge over Clearfield Creek Lawrence Township, Bridge Rehabilitation 1,400,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (21) SR 0879, Corman Railroad Bridge over SR 0879, Widen and Flatten Slope, Curwensville Borough, Bridge Removal 1,050,000 (Base Construction Allocation - $800,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000) (22) SR 0879, Bridge over Railroad & Susquehanna River, Lawrence Township, Bridge Painting 260,000 (Base Construction Allocation - $250,000) (Design and Contingencies - $10,000) (23) SR 0879, Bridge over US 322, Lawrence Township, Bridge Rehabilitation 160,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $10,000) (24) SR 0970, Bridge over West Branch of Susquehanna River, Bradford Township and Goshen Township, Bridge Painting 820,000 (Base Construction Allocation - $800,000) (Design and Contingencies - $20,000) (25) SR 2024, Rails/Trails Bridge over Rails to Trails, Pike Township, Bridge Painting 141,000 (Base Construction Allocation - $136,000) (Design and Contingencies - $5,000) (26) I-80, Westbound Side of Bridge at Clearfield and Jefferson County Line, Bridge Rehabilitation 1,670,000 (Base Construction Allocation - $1,670,000) (27) SR 0879, Anderson Creek Bridge near Curwensville Borough, Bridge Replacement 1,325,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $25,000) (Design and Contingencies - $200,000) (28) SR 2011, Bridge over Morgan Run, Bigler Township, Bridge Replacement 520,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (29) SR 3019, Bridge over Clearfield Creek, Coalport Borough, Bridge Replacement 1,350,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (30) SR 4027, Bridge over Deer Creek, Elk Township, Bridge Deck Replacement 60,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $20,000) (31) SR 0053, Bridge over Big Run, Osceola Mills, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (32) SR 0153, Bridge over Clearfield Creek, Boggs and Lawrence Townships, Bridge Rehabilitation 3,250,000 (Base Construction Allocation - $3,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (33) SR 1001, Bridge over Montgomery Run, Lawrence Township, Bridge Replacement 570,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (34) SR 1014, Bridge over Adler Run, Graham Township at Kylertown, Bridge Replacement 265,000 (Base Construction Allocation - $60,000) (Land Allocation - $5,000) (Design and Contingencies - $200,000) (35) SR 2011, Bridge over Morgan Run, Bigler Township, Bridge Replacement 520,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (36) SR 3012, Bridge over Clearfield Creek, Coalport Borough, Bridge Replacement 1,240,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (37) SR 2007, Brisbin Bridge, Bridge Replacement 301,000 (Base Construction Allocation - $250,000) (Land Allocation - $1,000) (Design and Contingencies - $50,000) (38) Juniata Street Bridge over Clear Run, City of Dubois, Bridge Replacement 620,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (39) SR 4020, Bridge over Clear Run, Dubois City, Sandy Township, Bridge Replacement 360,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (40) SR 0153, Bridge over Clearfield Creek, Boggs and Lawrence Townships, Bridge Rehabilitation 1,350,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $150,000) (41) SR 0879, Bridge over US 322, Lawrence Township, Bridge Rehabilitation 644,000 (Base Construction Allocation - $614,000) (Design and Contingencies - $30,000) (42) SR 1014, Bridge over Adler Run, Graham Township, Bridge Replacement 570,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (43) SR 3019, Bridge over Clearfield Creek, Coalport Borough, Bridge Replacement 1,350,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (44) SR 0879, Anderson Creek Bridge, Pike Township, Bridge Replacement 1,400,000 (Base Construction Allocation - $1,100,000 (Land Allocation - $25,000) (Design and Contingencies - $275,000) (45) SR 0322, US 322 over Clearfield Creek, Lawrence Township, Bridge Painting 1,220,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $20,000) Section 22. Clinton County. (a) Local Bridges (1) Mill Hall Borough, Church Street over Fishing Creek, Bridge Rehabilitation 5,000 (Base Construction Allocation - $4,000) (Design and Contingencies - $1,000) (2) Lamar Township, T-352 over Duck Run, Bridge Replacement 440,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (3) Bald Eagle Township, T-381, Mill Race Bridge over Mill Race, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (4) Leidy Township, T-545, Hammersley Fork Bridge over Hammersley Fork, Bridge Replacement 510,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (b) State Bridges (1) SR 0044, Bridge over SR 0220, 1 Mile Northeast of Avis, Pine Creek Township, Bridge Painting 580,000 (Base Construction Allocation - $525,000) (Design and Contingencies - $55,000) (2) SR 0080, Lamar Interchange (Two Bridges) over PA 64 at Exit 25, Porter Township, Bridge Rehabilitation 4,100,000 (Base Construction Allocation - $3,400,000) (Design and Contingencies - $700,000) (3) SR 0144, Bridge over Kettle Creek, 1 Mile East of Hammersley Fork, Leidy Township, Bridge Painting 660,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $60,000) (4) SR 0044, Pine Creek Bridge over Pine Creek, Grugan Township, Bridge Replacement 2,850,000 (Base Construction Allocation - $2,400,000) (Land Allocation - $50,000) (Design and Contingencies - $400,000) (5) SR 0144, Bridge over Kettle Creek, Leidy Township, Bridge Painting 590,000 (Base Construction Allocation - $580,000) (Design and Contingencies - $10,000) (6) SR 0144, Hammersley Fork Bridge over Hammersley Fork, Leidy Township, Bridge Painting 130,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $5,000) (7) SR 0150, Laurel Run Bridge over Laurel Run, Bald Eagle Township, Bridge Replacement 285,000 (Base Construction Allocation - $175,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (8) SR 0150, Bald Eagle Creek Bridge over Bald Eagle Creek, Bald Eagle Township, Bridge Replacement 1,370,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (9) SR 0150, Masden Run Bridge over Masden Run, Beech Creek Township, Bridge Replacement 320,000 (Base Construction Allocation - $210,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (10) SR 1002, Chatham Run Bridge, Pine Creek Township, Bridge Replacement 475,000 (Base Construction Allocation - $345,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000) (11) SR 2004, Big Fishing Creek Bridge over Big Fishing Creek, Porter Township, Bridge Replacement 720,000 (Base Construction Allocation - $550,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (12) SR 2019, Laurel Run Bridge over Laurel Run, Bald Eagle Township, Bridge Painting 8,000 (Base Construction Allocation - $7,000) (Design and Contingencies - $1,000) (13) SR 0120, Bridge over Shintown Run, Noyes Township, Bridge Replacement 440,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) Section 23. Columbia County. (a) Local Bridges (1) Catawissa Township, T-422, Bridge over , Bridge Replacement 840,000 (Base Construction Allocation - $615,000) (Land Allocation - $10,000) (Design and Contingencies - $215,000) (2) Cleveland Township, T-373, Bridge over Roaring Creek, Bridge Replacement 820,000 (Base Construction Allocation - $630,000) (Land Allocation - $40,000) (Design and Contingencies - $150,000) (3) Greenwood Township, T-572, Bridge over Mud Run, Bridge Replacement 393,000 (Base Construction Allocation - $336,000) (Land Allocation - $10,000) (Design and Contingencies - $47,000) (4) Locust Township, T-361, Bridge over Roaring Creek, Bridge Replacement 465,000 (Base Construction Allocation - $335,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (5) Main Township, T-468, Bridge over Catawissa Creek, Bridge Replacement 1,992,000 (Base Construction Allocation - $1,662,000) (Land Allocation - $80,000) (Design and Contingencies - $250,000) (6) Bloomsburg and Montour Townships, Train Street, Bridge over Fishing Creek, Bridge Replacement 1,330,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $10,000) (Design and Contingencies - $220,000) (7) North Centre Township, T-481, Bridge over West Branch Briar Creek, Bridge Replacement 410,000 (Base Construction Allocation - $250,000) (Land Allocation - $30,000) (Design and Contingencies - $130,000) (8) North Centre Township, T-507, Bridge over North Branch Briar Creek, Bridge Replacement 405,000 (Base Construction Allocation - $265,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (9) North Centre Township, T-730, Bridge over West Branch Briar Creek, Bridge Replacement 405,000 (Base Construction Allocation - $265,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (10) Orange Township, T-575, Bridge over Mud Run, Bridge Replacement 665,000 (Base Construction Allocation - $532,000) (Land Allocation - $100,000) (Design and Contingencies - $33,000) (11) Pine and Greenwood Townships, T-548, Bridge over , Bridge Replacement 500,000 (Base Construction Allocation - $390,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (12) Scott Township, T-514, Bridge over Tributary of Fishing Creek, Bridge Replacement 480,000 (Base Construction Allocation - $320,000) (Land Allocation - $30,000) (Design and Contingencies - $130,000) (b) State Bridges (1) SR 0044, Bridge over Chillisquaque Creek, 3 Miles Northwest of Jerseytown, Bridge Replacement 477,000 (Base Construction Allocation - $382,000) (Land Allocation - $24,000) (Design and Contingencies - $71,000) (2) SR 0093, Bridge over North Branch of Briar Creek, Bridge Replacement 350,000 (Base Construction Allocation - $275,000) (Land Allocation - $15,000) (Design and Contingencies - $60,000) (3) SR 0093, Briar Creek Bridge over Briar Creek, 3 Miles West of Berwick, Bridge Replacement 392,000 (Base Construction Allocation - $315,000) (Land Allocation - $18,000) (Design and Contingencies - $59,000) (4) SR 0239, West Creek Bridge over West Creek, Southeast of Benton and Sugarloaf Townships, Bridge Replacement 670,000 (Base Construction Allocation - $536,000) (Land Allocation - $34,000) (Design and Contingencies - $100,000) (5) SR 0442, West Branch Run Bridge over West Branch Run, 1.5 Miles North of Iola, Bridge Replacement 206,000 (Base Construction Allocation - $165,000) (Land Allocation - $10,000) (Design and Contingencies - $31,000) (6) SR 1004, Erie-Lackawanna Railroad Bridge, Viaduct over Conrail, South Centre Township, Bridge Replacement 1,900,000 (Base Construction Allocation - $1,600,000) (Land Allocation - $110,000) (Design and Contingencies - $190,000) (7) SR 1019, Briar Creek Bridge over Briar Creek, Briar Creek Township, Bridge Replacement 404,000 (Base Construction Allocation - $323,000) (Land Allocation - $20,000) (Design and Contingencies - $61,000) (8) SR 4012, Little Hemlock Creek Bridge over Little Hemlock Creek, 10 Miles Southeast of Jerseytown, Bridge Replacement 284,000 (Base Construction Allocation - $227,000) (Land Allocation - $14,000) (Design and Contingencies - $43,000) (9) SR 4037, Mud Run Bridge over Mud Run, 5 Miles Northwest of Millville Borough, Bridge Replacement 307,000 (Base Construction Allocation - $246,000) (Land Allocation - $15,000) (Design and Contingencies - $46,000) (10) SR 0011, Bridge over Fishing Creek, Bridge Painting 530,000 (Base Construction Allocation - $520,000) (Design and Contingencies - $10,000) (11) SR 1022, Bridge over Fishing Creek, Bridge Painting 380,000 (Base Construction Allocation - $370,000) (Design and Contingencies - $10,000) (12) SR 1022, Bridge over Old Channel, Bridge Painting 125,000 (Base Construction Allocation - $115,000) (Design and Contingencies - $10,000) (13) SR 4009, Bridge over Fishing Creek, Bridge Painting 315,000 (Base Construction Allocation - $305,000) (Design and Contingencies - $10,000) (14) SR 0042, SR 0042 over Roaring Creek, Conyngham Township, Bridge Replacement 457,000 (Base Construction Allocation - $366,000) (Land Allocation - $23,000) (Design and Contingencies - $68,000) (15) SR 0239, SR 0239 over West Creek, Benton Township, Bridge Replacement 760,000 (Base Construction Allocation - $560,000) (Land Allocation - $35,000) (Design and Contingencies - $165,000) (16) SR 0254, SR 0254 over Little Fishing Creek, Millville Borough, Bridge Replacement 1,020,000 (Base Construction Allocation - $816,000) (Land Allocation - $51,000) (Design and Contingencies - $153,000) (17) SR 0339, SR 0339 over Beaver Run, Beaver Township, Bridge Replacement 320,000 (Base Construction Allocation - $256,000) (Land Allocation - $16,000) (Design and Contingencies - $48,000) (18) SR 0487, SR 0487 over Stony Brook, Orange Township, Bridge Replacement 380,000 (Base Construction Allocation - $304,000) (Land Allocation - $19,000) (Design and Contingencies - $57,000) (19) SR 1014, SR 1014 over Little Briar Creek, Briar Creek Township, Bridge Replacement 415,000 (Base Construction Allocation - $332,000) (Land Allocation - $21,000) (Design and Contingencies - $62,000) (20) SR 1023, SR 1023 over East Briar Creek, Briar Creek Township, Bridge Replacement 520,000 (Base Construction Allocation - $466,000) (Land Allocation - $29,000) (Design and Contingencies - $25,000) (21) SR 2003, SR 2003 over Tributary of Roaring Creek, Roaring Creek Township, Bridge Replacement 171,000 (Base Construction Allocation - $136,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000) (22) SR 2003, SR 2003 over Tributary of Roaring Creek, Locust Township, Bridge Replacement 245,000 (Base Construction Allocation - $196,000) (Land Allocation - $12,000) (Design and Contingencies - $37,000) (23) SR 2009, SR 2009 over Catawissa Creek, Main Township, Bridge Replacement 436,000 (Base Construction Allocation - $349,000) (Land Allocation - $22,000) (Design and Contingencies - $65,000) (24) SR 4009, SR 4009 over Little Fishing Creek, Mt. Pleasant Township, Bridge Replacement 1,232,000 (Base Construction Allocation - $986,000) (Land Allocation - $61,000) (Design and Contingencies - $185,000) (25) SR 4033, SR 4033 over Wolfhouse Run, Pine Township, Bridge Replacement 252,000 (Base Construction Allocation - $202,000) (Land Allocation - $12,000) (Design and Contingencies - $38,000) (26) SR 4045, SR 4045 over Green Creek, Greenwood Township, Bridge Replacement 435,000 (Base Construction Allocation - $348,000) (Land Allocation - $22,000) (Design and Contingencies - $65,000) (27) SR 4049, SR 4049 over Coles Creek, Sugarloaf Township, Bridge Replacement 1,095,000 (Base Construction Allocation - $876,000) (Land Allocation - $55,000) (Design and Contingencies - $164,000) (28) SR 0080, I-80 Bridge over North Branch of Susquehanna River, Mifflin Township, Bridge Replacement 36,550,000 (Base Construction Allocation - $34,000,000) (Land Allocation - $50,000) (Design and Contingencies - $2,500,000) (29) SR 8006, SR 8006 Ramp W Bridge, Lime Ridge Interchange, South Centre Township, Bridge Deck Replacement 700,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $100,000) Section 24. Crawford County. (a) Local Bridges (1) Fairfield Township, T-636 over Branch of French Creek, Bridge Replacement 108,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $7,000) (2) Fairfield Township, T-321 Bridge No.1 over Branch of French Creek, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (3) Fairfield Township, T-321 Bridge No.2 over Branch of French Creek, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (4) Spring Township, T-747 over Branch of Conneaut Creek, Bridge Replacement 126,000 (Base Construction Allocation - $120,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (5) Wayne Township, T-347 over Branch of , Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (6) Wayne Township, T-457 over Tributary of , Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (7) Vernon Township, T-487, Sportsman's Road Bridge over Watson Run, Bridge Replacement 460,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (8) Woodcock Township, T-653, Morris Road Bridge over Conrail, Bridge Replacement 360,000 (9) City of Titusville, Walnut Street Bridge over Church Run, Bridge Replacement 360,000 (10) Rockdale Township, T-878, Swamp Bridge, Bridge Replacement 360,000 (11) Vernon Township, T-487, Middle Road Bridge over Watson Run, Bridge Replacement 400,000 (Base Construction Allocation - $360,000) (Design and Contingencies - $40,000) (b) State Bridges (1) SR 0006, SR 0006 over Padan Creek, Conneaut Township, Bridge Replacement 1,004,000 (Base Construction Allocation - $784,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (2) SR 0006, SR 0006 over French Creek, Woodcock Township, Bridge Replacement 2,325,000 (Base Construction Allocation - $1,840,000) (Land Allocation - $20,000) (Design and Contingencies - $465,000) (3) SR 0079, SR 0079 under Maple Drive, Hayfield Township, Bridge Replacement 2,401,000 (Base Construction Allocation - $1,901,000) (Land Allocation - $20,000) (Design and Contingencies - $480,000) (4) SR 0089, SR 0089 over Shirley Run, Rome Township, Bridge Replacement 510,000 (Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (5) SR 0098, SR 0098 over Van Horne Run, Vernon Township, Bridge Replacement 320,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (6) SR 0099, SR 0099 over Little Conneauttee Creek, Cambridge Township, Bridge Replacement 950,000 (Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (7) SR 0099, SR 0099 over Conneaut Creek, Cambridge Township, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $30,000) (Design and Contingencies - $70,000) (8) SR 0198, SR 0198 over Carr Run, Woodcock Township, Bridge Replacement 260,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (9) SR 0285, SR 0285 over Bennett Run, North Shenango Township, Bridge Replacement 750,000 (Base Construction Allocation - $650,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (10) SR 1002, SR 1002 over Acker Run, Venango Township, Bridge Replacement 370,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (11) SR 1024, SR 1024 over Britton Run, Sparta Township, Bridge Replacement 340,000 (Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (12) SR 2005, SR 2005 over French Creek, East Fairfield Township, Bridge Replacement 1,300,000 (Base Construction Allocation - $1,130,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (13) SR 2010, SR 2010 over Little Sugar Creek, Wayne Township, Bridge Replacement 260,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (14) SR 3016, SR 3016 over B&LE Railroad, Summit Township, Bridge Replacement 1,150,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $30,000) (Design and Contingencies - $120,000) (15) SR 0018, SR 0018 Bridge over Tributary of Conneaut Creek, Summit Township, Bridge Rehabilitation 115,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $15,000) (16) SR 0098, SR 0098 Bridge over Tributary of Cussewago Creek, Hayfield Township, Bridge Rehabilitation 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (17) SR 2003, Mercer Pike Bridge over Conneaut Creek Outlet, Union Township, Bridge Replacement 600,000 (Base Construction Allocation - $520,000) (Land Allocation - $30,000) (Design and Contingencies - $50,000) (18) SR 0006, Bridge over French Creek, Woodcock Township, Bridge Painting 590,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (19) SR 0408, Mohawk Run Bridge over Mohawk Run, Rockdale Township, Bridge Replacement 262,000 (Base Construction Allocation - $189,000) (Land Allocation - $20,000) (Design and Contingencies - $53,000) (20) SR 1020, Tryonville Road Bridge over Oil Creek, Steuben Township, Bridge Replacement 960,000 (Base Construction Allocation - $840,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (21) SR 1035, Brown Hill Road Bridge over Muddy Creek Tributary, Rockdale Township, Bridge Rehabilitation 194,000 (Base Construction Allocation - $135,000) (Land Allocation - $20,000) (Design and Contingencies - $39,000) (22) SR 4010, West Road Bridge over Cussewago Creek, Cussewago Township, Bridge Painting 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (23) SR 0198, Bridge over Dickson Street, Randolph Township, Bridge Rehabilitation 300,000 (Base Construction Allocation - $220,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (24) SR 1008, Bridge over Brush Creek, Cussewago Township, Bridge Rehabilitation 340,000 (Base Construction Allocation - $260,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (25) SR 1008, Bridge over Boles Run, Cussewago Township, Bridge Rehabilitation 340,000 (Base Construction Allocation - $260,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (26) SR 3008, Bridge over Johnson Run, South Shenango Township, Bridge Rehabilitation 440,000 (Base Construction Allocation - $360,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (27) SR 0008, Bridge over Franklin Street Mill Race, Titusville, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (28) SR 0027, Bridge No.2 over Oil Creek, Oil Creek Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (29) SR 0077, Bridge over Main Street, Spartansburg Borough, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (30) SR 0079, Bridge over T-528, Mercer Pike, Greenwood Township, Bridge Replacement 1,520,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (31) SR 0079, Bridge over Rock Creek, Greenwood Township, Bridge Replacement 570,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (32) SR 0079, Northbound Bridge over Conneaut Swamp, Greenwood Township, Bridge Replacement 4,050,000 (Base Construction Allocation - $3,500,000) (Land Allocation - $50,000) (Design and Contingencies - $500,000) (33) SR 0079, Southbound Bridge over Conneaut Swamp, Greenwood Township, Bridge Replacement 4,050,000 (Base Construction Allocation - $3,500,000) (Land Allocation - $50,000) (Design and Contingencies - $500,000) (34) SR 0079, Bridge over T-391 Rung Road, Union Township, Bridge Replacement 1,120,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (35) SR 0079, Bridge over T-433 and Conrail, Union Township, Bridge Replacement 2,120,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (36) SR 0079, Bridge over B&LE Railroad and Stream, Union Township, Bridge Replacement 3,220,000 (Base Construction Allocation - $3,100,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (37) SR 0079, Bridge over Van Horne Run, Vernon Township, Bridge Replacement 370,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (38) SR 0079, Bridge over US 6 and 322, Vernon Township, Bridge Replacement 3,630,000 (Base Construction Allocation - $3,400,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (39) SR 0079, Bridge over US 6 and 322, Vernon Township, Bridge Replacement 3,230,000 (Base Construction Allocation - $3,000,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (40) SR 0079, Bridge over Van Horne Run, Vernon Township, Bridge Rehabilitation 1,000,000 (Base Construction Allocation - $880,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (41) SR 0079, Bridge over SR 0102, Vernon Township, Bridge Replacement 1,120,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (42) SR 0079, Bridge over SR 4011, Cussewago Township, Bridge Replacement 920,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (43) SR 0089, Bridge over Hummer Creek, Oil Creek Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (44) SR 0173, Cochranton Truss Bridge, Fairfield Township, Bridge Replacement 3,100,000 (Base Construction Allocation - $2,750,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (45) SR 0198, Bridge over Wolf Run, Hayfield Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (46) SR 0285, Bridge over SR 0079 Northbound and Southbound, Greenwood Township, Bridge Replacement 7,920,000 (Base Construction Allocation - $7,100,000) (Land Allocation - $20,000) (Design and Contingencies - $800,000) (47) SR 0285, Bridge over Town House Run, Fairfield Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (48) SR 1010, Bridge over Woodcock Creek, Richmond Township, Bridge Replacement 700,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (49) SR 1013, Bridge over McLaughlin Creek, Oil Creek Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (50) SR 1015, Bridge over Hotchkiss Run, Cussewago Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (51) SR 1033, Bridge over Muddy Creek, Richmond Township, Bridge Replacement 1,360,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $20,000) (Design and Contingencies - $140,000) (52) SR 1035, Mackey Hill Road, Bridge over Mud Creek, Rockdale Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $420,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (53) SR 1037, Bridge over Little Federal Run, Athens Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (54) SR 1037, Bridge over Federal Run, Bloomfield Township, Bridge Replacement 200,000 (Base Construction Allocation - $120,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (55) SR 1039, Bridge over Mosey Run, Bloomfield Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (56) SR 2017, Bridge over Sugar Creek, Troy Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (57) SR 2018, Deckards Run Bridge No.1, Wayne Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (58) SR 2018, Deckards Run Bridge No.2, Wayne Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (59) SR 2019, Bridge over Sugar Creek East Branch, Troy Township, Bridge Replacement 120,000 (Base Construction Allocation - $50,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (60) SR 2028, Bridge over Caldwell Creek, Oil Creek Township, Bridge Replacement 1,700,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $20,000) (Design and Contingencies - $180,000) (61) SR 3004, Bridge over Crooked Creek, East Fallowfield Township, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (62) SR 3005, Bridge over Bennett Run, North Shenango Township, Bridge Replacement 700,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (63) SR 3011, Bridge over Pymatuning Reservoir, Pine Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (64) SR 4001, Bridge over Padan Creek Tributary, Conneaut Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (65) SR 4001, Beaver Center Road Bridge No.1, Beaver Township, Bridge Replacement 600,000 (Base Construction Allocation - $520,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (66) SR 4003, Bridge over Tributary of Conneaut Creek, Conneautville Borough, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (67) SR 4004, Center Road Bridge No.1, Conneaut Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (68) SR 4004, Center Road Bridge No.2, Conneaut Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (69) SR 4009, Bridge over I-79, Northbound and Southbound, Hayfield Township, Bridge Replacement 4,820,000 (Base Construction Allocation - $4,300,000) (Land Allocation - $20,000) (Design and Contingencies - $500,000) (70) SR 4010, Bridge over East Branch of Conneaut Creek, Beaver Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (71) SR 4011, Bridge over Tributary of Wolf Run, Hayfield Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (72) SR 4016, Bridge over Bill Mack Run, Summerhill Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (73) SR 0006, Bridge over French Creek, Cambridge Springs Borough, Bridge Replacement 1,620,000 (Base Construction Allocation - $1,400,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (74) SR 0006, Bridge over Cussewago Street, Cambridge Township, Bridge Replacement 590,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (75) SR 0008, Bridge over Franklin Street, Titusville City, Bridge Replacement 2,220,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (76) SR 0006, Bridge over Smock Street, West Mead Township, Bridge Replacement 33,600,000 (Base Construction Allocation - $30,000,000) (Land Allocation - $100,000) (Design and Contingencies - $3,500,000) (77) SR 0006, French Creek Bridge No.3, Woodcock Township, Bridge Replacement 3,120,000 (Base Construction Allocation - $2,800,000) (Land Allocation - $20,000) (Design and Contingencies - $300,000) (78) SR 0006, French Creek Bridge No.2, Woodcock Township, Bridge Rehabilitation 9,320,000 (Base Construction Allocation - $8,000,000) (Land Allocation - $20,000) (Design and Contingencies - $1,300,000) (79) SR 0006, French Creek Bridge No.1, Woodcock Township, Bridge Replacement 3,330,000 (Base Construction Allocation - $3,000,000) (Land Allocation - $20,000) (Design and Contingencies - $310,000) Section 25. Cumberland County. (a) Local Bridges (1) Camp Hill Borough, Pedestrian Tunnel under Bypass at 24th Street, Bridge Replacement 500,000 (2) Camp Hill Borough, Pedestrian Tunnel under Bypass at 27th Street, Bridge Replacement 500,000 (3) Cumberland County, Wolf Bridge over , Bridge Replacement 1,920,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $20,000) (Design and Contingencies - $400,000) (4) Cumberland and York Counties, Bridge over , Bridge Replacement 1,470,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $20,000) (Design and Contingencies - $350,000) (5) Cumberland and York Counties, Bridge over Yellow Breeches Creek, Bridge Replacement 1,310,000 (Base Construction Allocation - $950,000) (Land Allocation - $40,000) (Design and Contingencies - $320,000) (6) Dickinson Township, T-542, Bridge over Yellow Breeches Creek, Bridge Replacement 1,366,000 (Base Construction Allocation - $1,088,000) (Land Allocation - $55,000) (Design and Contingencies - $223,000) (7) Lower Frankford Township, T-459, Bridge over Locust Creek, Bridge Rehabilitation 30,000 (Base Construction Allocation - $25,000) (Design and Contingencies - $5,000) (8) Lower Frankford Township, T-459, Bridge over Tributary of Opossum Creek, Bridge Rehabilitation 10,000 (Base Construction Allocation - $10,000) (9) Lower Frankford Township, T-459, Bridge over Opossum Creek, Bridge Rehabilitation 2,000 (Base Construction Allocation - $2,000) (10) Lower Mifflin Township, T-414, Bridge over Doubling Gap Creek, Bridge Replacement 175,000 (Base Construction Allocation - $95,000) (Land Allocation - $5,000) (Design and Contingencies - $75,000) (11) Mechanicsburg Borough, Mulberry Street Bridge over Trindle Spring Run, Bridge Replacement 110,000 (12) Mechanicsburg Borough, T-591, Bridge over Trindle Spring Run, Bridge Replacement 80,000 (13) Mount Holly Springs Borough, East Pine Street Bridge over Mountain Creek, Bridge Replacement 5,225,000 (Base Construction Allocation - $5,000,000) (Land Allocation - $20,000) (Design and Contingencies - $205,000) (14) Penn Township, T-343, Bridge over Yellow Breeches Creek, Bridge Replacement 218,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $18,000) (15) East Pennsboro Township, Bridge M-8, Magaro Road over Conodoguinet Creek, Bridge Replacement 360,000 (b) State Bridges (1) SR 1001, Cavalry Road Bridge over Turnpike, North Middleton Township, Bridge Replacement 2,650,000 (Base Construction Allocation - $2,300,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (2) SR 0015, US 15 Bridges from Zimmerman Drive to PA 581, Lower Allen Township and East Pennsboro Township, New Bridge Construction 11,610,000 (Base Construction Allocation - $10,422,000) (Land Allocation - $100,000) (Design and Contingencies - $1,088,000) (3) PA 34, Bridge over Conodoguinet Creek, North Middleton Township, Bridge Replacement 2,030,000 (Base Construction Allocation - $1,504,000) (Land Allocation - $150,000) (Design and Contingencies - $376,000) (4) SR 4007, Bridge over Conodoguinet Creek, North Newton Township, Bridge Replacement 873,000 (Base Construction Allocation - $646,000) (Land Allocation - $162,000) (Design and Contingencies - $65,000) (5) SR 3007, Bridge over Big Spring Run, West Pennsboro Township, Bridge Replacement 476,000 (Base Construction Allocation - $353,000) (Land Allocation - $35,000) (Design and Contingencies - $88,000) (6) SR 3008, Bridge over Tagg Run, Dickinson Township, Bridge Replacement 462,000 (Base Construction Allocation - $343,000) (Land Allocation - $34,000) (Design and Contingencies - $85,000) (7) US 11, Bridge over Alexander Spring, Dickinson Township, Bridge Replacement 431,000 (Base Construction Allocation - $319,000) (Land Allocation - $32,000) (Design and Contingencies - $80,000) (8) PA 997, Bridge over Doubling Gap Run, Lower Mifflin Township, Bridge Replacement 784,000 (Base Construction Allocation - $581,000) (Land Allocation - $58,000) (Design and Contingencies - $145,000) (9) Various Bridges, Preventive Maintenance 382,000 Section 26. Dauphin County. (a) Local Bridges (1) City of Harrisburg, Mulberry Street Ramp to Cameron Street, Bridge Rehabilitation 108,000 (Base Construction Allocation - $73,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000) (2) City of Harrisburg, Maclay Street Bridge over Railroad, Bridge Rehabilitation 218,000 (Base Construction Allocation - $183,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000) (3) Mifflin Township, T-631, Reitz Road Bridge over Little , County Bridge No.24, Bridge Replacement 290,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (4) Mifflin Township, T-556, Kessler Road Bridge over Little Wiconisco Creek, Bridge Replacement 235,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (5) Washington Township, Bolts Road Bridge over Wiconisco Creek, Bridge Rehabilitation 469,000 (Base Construction Allocation - $374,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (6) Wayne Township, T-496, Lebo Road Bridge over Powell Creek, Bridge Rehabilitation 263,000 (Base Construction Allocation - $168,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (7) Conewago Township, T-602 and T-749 over Conewago Creek, Bridge Replacement 722,000 (Base Construction Allocation - $556,000) (Land Allocation - $10,000) (Design and Contingencies - $156,000) (8) Halifax Township, T-454 over Armstrong Creek, Bridge Replacement 480,000 (Base Construction Allocation - $367,000) (Land Allocation - $10,000) (Design and Contingencies - $103,000) (9) Jackson Township, T-544 over Armstrong Creek, Bridge Replacement 379,000 (Base Construction Allocation - $288,000) (Land Allocation - $10,000) (Design and Contingencies - $81,000) (10) Jefferson Township, T-534 over Powell Creek, Bridge Replacement 397,000 (Base Construction Allocation - $302,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (11) Upper Paxton Township, T-460 over Wiconisco Creek, Bridge Replacement 427,000 (Base Construction Allocation - $326,000) (Land Allocation - $10,000) (Design and Contingencies - $91,000) (12) Washington Township, T-595 over Wiconisco Creek, Bridge Replacement 669,000 (Base Construction Allocation - $515,000) (Land Allocation - $10,000) (Design and Contingencies - $144,000) (13) Washington Township, T-462 over Wiconisco Creek, Bridge Replacement 668,000 (Base Construction Allocation - $514,000) (Land Allocation - $10,000) (Design and Contingencies - $144,000) (14) Wayne Township, T-448 over Powell Creek, Bridge Replacement 438,000 (Base Construction Allocation - $334,000) (Land Allocation - $10,000) (Design and Contingencies - $94,000) (15) Susquehanna Township, Interstate Drive Bridge over , Bridge Replacement 1,118,000 (Base Construction Allocation - $818,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000) (16) Wayne Township, T-556, Union Church Road Bridge over Powells Creek, Bridge Replacement 360,000 (Base Construction Allocation - $360,000) (b) State Bridges (1) SR 0039, Bridge over I-81, West Hanover Township, Bridge Reconstruction 3,400,000 (Base Construction Allocation - $3,200,000) (Design and Contingencies - $200,000) (2) SR 0743, Spring Creek Bridge over Spring Creek, Derry Township, Bridge Replacement 1,760,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $10,000) (Design and Contingencies - $250,000) (3) SR 0743, Conrail Bridge over Conrail, Derry Township, Bridge Replacement 1,760,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $10,000) (Design and Contingencies - $250,000) (4) SR 3015, North Progress Avenue Bridge over Paxton Creek, Susquehanna Township, Bridge Rehabilitation 509,000 (Base Construction Allocation - $409,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (5) SR 3012, Market Street Bridge over Susquehanna River, City of Harrisburg, Lighting Improvements 120,000 (Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000) (6) SR 2019, Nyes Road Bridge over Tributary of Beaver Creek, Lower Paxton Township, Bridge Restoration 800,000 (Base Construction Allocation - $640,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (7) SR 2017, Bridge over , East Hanover Township, Bridge Replacement 1,115,000 (Base Construction Allocation - $825,000) (Land Allocation - $83,000) (Design and Contingencies - $207,000) (8) SR 2011, Bridge over Branch of Spring Run, Derry Township, Bridge Replacement 363,000 (Base Construction Allocation - $269,000) (Land Allocation - $27,000) (Design and Contingencies - $67,000) (9) PA 441, Bridge over Swatara Creek, Royalton Borough, Bridge Rehabilitation 3,520,000 (Base Construction Allocation - $2,718,000) (Land Allocation - $150,000) (Design and Contingencies - $652,000) (10) SR 3012, Bridge over Susquehanna River, City of Harrisburg, Bridge Rehabilitation 600,000 (Base Construction Allocation - $525,000) (Design and Contingencies - $75,000) (11) US 422 Bridge over US 322, Derry Township, Bridge Rehabilitation 3,400,000 (Base Construction Allocation - $2,956,000) (Design and Contingencies - $444,000) (12) T-390 over US 322, Derry Township, Bridge Rehabilitation 437,000 (Base Construction Allocation - $324,000) (Land Allocation - $32,000) (Design and Contingencies - $81,000) (13) SR 2017, Manada Bottom Bridge No.2 over Manada Creek, East Hanover Township, Bridge Replacement 220,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (14) SR 3034, Walnut Street Pedestrian Bridge over Susquehanna River, City of Harrisburg, West Portion, Bridge Replacement 10,205,000 (15) SR 4008, Little Wiconisco Creek Bridge over Little Wiconisco Creek, Upper Paxton Township, Bridge Replacement 191,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $61,000) (16) Various Bridges, Preventive Maintenance 382,000 Section 27. Delaware County. (a) Local Bridges (1) City of Chester, West 7th Street, County Bridge No.186 over Chester Creek, Bridge Replacement 1,630,000 (Base Construction Allocation - $1,470,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (2) Thornbury Township, Locksley Road Bridge over Chester Creek, Bridge Replacement 1,850,000 (Base Construction Allocation - $1,565,000) (Land Allocation - $20,000) (Design and Contingencies - $265,000) (3) Aston Township, New Road over Chester Creek, Bridge Rehabilitation 1,530,000 (Base Construction Allocation - $1,130,000) (Land Allocation - $30,000) (Design and Contingencies - $370,000) (4) Upper Providence Township, Third Street Dam Bridge over Broomalls Run, Bridge Replacement 885,000 (b) State Bridges (1) SR 0030, Pedestrian Tunnel under SR 0030 and Ithan Avenue at Villanova University, Radnor Township, Pedestrian Facilities 7,360,000 (Base Construction Allocation - $6,500,000) (Land Allocation - $650,000) (Design and Contingencies - $210,000) (2) SR 1015, Darby-Paoli Road Bridge over Branch of Little Darby Creek, Radnor Township, Bridge Replacement 1,000,000 (Base Construction Allocation - $760,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (3) SR 0291, 4th Street Bridge over Ridley Creek, Chester Township, Bridge Painting 291,000 (Base Construction Allocation - $253,000) (Design and Contingencies - $38,000) (4) SR 0291, Essington Avenue Bridge over Darby Creek, Ridley Township, Bridge Painting 546,000 (Base Construction Allocation - $487,000) (Design and Contingencies - $59,000) (5) SR 1019, Conestoga Road Bridge over PennDOT Railroad Right-of-Way, Radnor Township, Bridge Removal 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000) (6) SR 3019, Rosevally Road Bridge over SEPTA, Upper Providence Township, Bridge Replacement 875,000 (Base Construction Allocation - $700,000) (Land Allocation - $100,000) (Design and Contingencies - $75,000) (7) SR 0095, I-95 Bridge over Chester Creek, City of Chester, Bridge Replacement 5,100,000 (Base Construction Allocation - $5,000,000) (Design and Contingencies - $100,000) (8) SR 2037, Hanser Bridge on Crum Creek Road over Crum Creek, Marple Township and Upper Providence Township, Bridge Replacement 663,000 Section 28. Elk County. (a) Local Bridges (1) Village of Wilcox, T-631, Bridge over Clarion River, Bridge Replacement 1,100,000 (Base Construction Allocation - $850,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (2) Jones Township, T-671, Bridge over West Branch of Clarion River, Bridge Replacement 1,100,000 (Base Construction Allocation - $850,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (3) Jay Township, T-417, Spring Run Road Bridge over Spring Run, Bridge Replacement 210,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (b) State Bridges (1) SR 0555, Dixon Run Bridge, Village of Caledonia, Jay Township, Bridge Replacement 90,000 (Base Construction Allocation - $60,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (2) SR 0949, Conrail Bridge over Conrail, Spring Creek Township, Bridge Painting 340,000 (Base Construction Allocation - $330,000) (Design and Contingencies - $10,000) (3) SR 1004, Crooked Creek Bridge over Crooked Creek, Jones Township, Bridge Painting 50,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $5,000) (4) SR 3001, Belltown Bridge over Clarion River, Heath Township and Millstone Township, Bridge Painting 420,000 (Base Construction Allocation - $415,000) (Design and Contingencies - $5,000) (5) SR 3002, Spring Creek Bridge over Spring Creek, Spring Creek Township, Bridge Painting 160,000 (Base Construction Allocation - $155,000) (Design and Contingencies - $5,000) Section 29. Erie County. (a) Local Bridges (1) Girard Township, Beckman Bridge over I-90, Bridge Painting 200,000 (Base Construction Allocation - $200,000) (2) City of Erie, Norman Way, Bridge over Mill Creek, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (3) City of Erie, McBride Viaduct-East Avenue, Bridge over Railroad Lines, Bridge Rehabilitation 1,360,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (4) City of Erie, Kahkwa Avenue Bridge over Ravine Drive, Bridge Rehabilitation 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (5) Greenfield Township, T-974, Old Route 89 Bridge over Tributary of French Creek, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (6) Millcreek Township, T-707, Zimmerly Road Bridge over I-79, New Bridge Construction 4,550,000 (Base Construction Allocation - $3,500,000) (Land Allocation - $400,000) (Design and Contingencies - $650,000) (7) Waterford Township, T-455, Sedgwick Road Bridge over Tributary of Lake Le Boeuf, Bridge Replacement 350,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (8) City of Erie, Pittsburgh Avenue over Conrail and NS Lines, New Bridge 11,000,000 (Base Construction Allocation - $10,000,000) (Land Allocation - $250,000) (Design and Contingencies - $750,000) (9) City of Erie, Greengarden Boulevard over Conrail and NS Lines, New Construction 11,000,000 (Base Construction Allocation - $10,000,000) (Land Allocation - $250,000) (Design and Contingencies - $750,000) (10) Franklin Township, Falls Road over Falk Run Bridge No.2, Bridge Rehabilitation 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (11) Franklin Township, Falls Road over Falk Run Bridge No.1, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (12) McKean Township, Oliver Road over Tributary of Elk Creek, Bridge Replacement 150,000 (Base Construction Allocation - $125,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (13) Waterford Township, Sedgwick Road over Tributary of Lake Le Boeuf, Bridge Replacement 370,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (b) State Bridges (1) SR 0005, SR 0005 over Scott Run, Harborcreek Township, Bridge Replacement 140,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (2) SR 0006, SR 0006 over French Creek, Le Boeuf Township, Bridge Replacement 700,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (3) SR 0019, SR 0019 over Le Boeuf Creek, Waterford Township, Bridge Replacement 950,000 (Base Construction Allocation - $840,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000) (4) SR 0020, SR 0020 over I-79, City of Erie, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,770,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (5) SR 0089, SR 0089 over Sixteen Mile Creek, North East Township, Bridge Replacement 490,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (6) SR 0090, SR 0090 over Crooked Creek, Girard Township, Bridge Replacement 1,420,000 (Base Construction Allocation - $1,330,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (7) SR 0090, SR 0090 under Cherry Street, Summit Township, Bridge Replacement 1,600,000 (Base Construction Allocation - $1,410,000) (Land Allocation - $40,000) (Design and Contingencies - $150,000) (8) SR 0090, SR 0090 under Clark Road, Harborcreek Township, Bridge Replacement 2,100,000 (Base Construction Allocation - $1,880,000) (Land Allocation - $40,000) (Design and Contingencies - $180,000) (9) SR 0098, SR 0098 over Cussewago Creek, Elk Creek Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (10) SR 0474, SR 0474 over Dean Run, Venango Township, Bridge Replacement 200,000 (Base Construction Allocation - $160,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (11) SR 1001, SR 1001 over Conrail, Millcreek Township, Bridge Replacement 720,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (12) SR 1011, SR 1011 over Alder Brook, Venango Township, Bridge Replacement 470,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (13) SR 1013, SR 1013 over I-90, North East Township, Bridge Replacement 1,220,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (14) SR 3001, SR 3001 over Conneaut Creek, Conneaut Township, Bridge Replacement 1,020,000 (Base Construction Allocation - $900,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (15) SR 3003, SR 3003 over West Branch Conneaut Creek, Conneaut Township, Bridge Replacement 630,000 (Base Construction Allocation - $550,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (16) SR 3014, SR 3014 over Trout Run, Waterford Borough, Bridge Replacement 370,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (17) SR 4007, SR 4007 over I-90, Fairview Township, Bridge Replacement 1,920,000 (Base Construction Allocation - $1,800,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (18) SR 0020, Main Street Bridge over Elk Creek, Girard Township, Bridge Rehabilitation 5,450,000 (Base Construction Allocation - $5,000,000) (Land Allocation - $50,000) (Design and Contingencies - $400,000) (19) SR 0090, I-90 Bridge, Eastbound over Six Mile Creek, Harborcreek Township, Bridge Rehabilitation 6,350,000 (Base Construction Allocation - $6,000,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (20) SR 0090, I-90 Bridge Westbound over Six Mile Creek, Harborcreek Township, Bridge Rehabilitation 7,350,000 (Base Construction Allocation - $7,000,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (21) SR 0090, Remington Road Bridge over I-90, North East Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (22) SR 0505, Bridge over Mill Creek, City of Erie, Bridge Replacement 460,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (23) SR 0955, Bridge over Six Mile Creek, Harborcreek Township, Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (24) SR 1019, Gay Road Bridge over I-90 Eastbound and Westbound, North East Township, Bridge Replacement 2,630,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $20,000) (Design and Contingencies - $110,000) (25) SR 3002, Cherry Hill Road Bridge over Conneaut Creek, Conneaut Township, Bridge Replacement 620,000 (Base Construction Allocation - $540,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (26) SR 4014, Grandview Boulevard Bridge over I-79 Northbound and Southbound, City of Erie, Bridge Replacement 2,640,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $40,000) (Design and Contingencies - $100,000) (27) SR 4016, West 38th Street Bridge over I-79 Northbound and Southbound, City of Erie, Bridge Rehabilitation 1,730,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (28) SR 2008, West High Street Bridge over Horton Run, Union Township, Bridge Replacement 260,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (29) SR 0079, Bridges over Walnut Creek and West 32nd Street, Millcreek Township, Bridge Rehabilitation 2,800,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $10,000) (Design and Contingencies - $790,000) (30) SR 0090, Beckman Street Bridge over I-90, Girard Township, Bridge Rehabilitation 400,000 (Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (31) SR 0090, Crooked Creek Bridge over Crooked Creek, Girard Township, Bridge Replacement 700,000 (Base Construction Allocation - $640,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (32) SR 0090, Elk Creek Railroad Bridge over Elk Creek, Bridge Replacement 999,000 (Base Construction Allocation - $955,000) (Land Allocation - $4,000) (Design and Contingencies - $40,000) (33) SR 0005, Bridge over East Lake Road, Harborcreek Township, Bridge Rehabilitation 800,000 (Base Construction Allocation - $680,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (34) SR 0006, Bridge over Tributary of French Creek, Le Boeuf Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (35) SR 0006, Bridge over Beaver Run, Wayne Township, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (36) SR 0008, Bridge over Hubbel Run, Amity Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (37) SR 0018, Bridge over N&W Railroad, Girard Borough, Bridge Replacement 1,920,000 (Base Construction Allocation - $1,700,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (38) SR 0079, Bridge over SR 3006, Washington Township, Bridge Replacement 1,520,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (39) SR 0079, Bridge over SR 3008, Franklin Township, Bridge Replacement 920,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (40) SR 0079, Bridge over T-481, Stancliff Road, Franklin Township, Bridge Replacement 920,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (41) SR 0080, Bridge over Branch of French Creek, Greenfield Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (42) SR 0090, I-90 Bridge over T-666, Greenfield Township, Bridge Replacement 1,420,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (43) SR 0090, I-90 Bridge over T-666, Greenfield Township, Bridge Replacement 1,120,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (44) SR 0090, I-90 Eastbound Bridge over SR 0089, North East Township, Bridge Replacement 2,600,000 (Base Construction Allocation - $2,320,000) (Land Allocation - $20,000) (Design and Contingencies - $260,000) (45) SR 0090, I-90 Westbound Bridge over SR 0089, North East Township, Bridge Replacement 2,400,000 (Base Construction Allocation - $2,140,000) (Land Allocation - $20,000) (Design and Contingencies - $240,000) (46) SR 0090, Shadouck Road over I-90, North East Township, Bridge Rehabilitation 2,100,000 (Base Construction Allocation - $1,880,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (47) SR 0090, I-90 Bridge over Conrail, North East Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) (48) SR 0090, I-90 Eastbound Bridge over PA 20, North East Township, Bridge Rehabilitation 460,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (49) SR 0090, I-90 Westbound Bridge over PA 20, North East Township, Bridge Rehabilitation 460,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (50) SR 0090, I-90 Eastbound Bridge over 20 Mile Creek, North East Township, Bridge Rehabilitation 1,620,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (51) SR 0090, I-90 Westbound Bridge over 20 Mile Creek, North East Township, Bridge Rehabilitation 1,620,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (52) SR 0097, Bridge over Branch of French Creek, Union City Borough, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (53) SR 0426, Bridge over SR 0089, North East Borough, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (54) SR 1004, Bridge over West Branch of French Creek, Greenfield Township, Bridge Replacement 800,000 (Base Construction Allocation - $700,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (55) SR 1006, Moorheadville Road Bridge over I-90, North East Township, Bridge Replacement 2,600,000 (Base Construction Allocation - $2,330,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (56) SR 1017, Bridge over Averill Run, North East Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (57) SR 2008, Bridge over French Creek, Union Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (58) SR 2008, Bridge over French Creek, Union City Borough, Bridge Replacement 1,150,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (59) SR 2010, Bridge over Pine Run, Union Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (60) SR 2025, Bridge No.2 over Sciota Road, Wayne Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (61) SR 3001, Bridge No.2 over Ashtabula Creek, Conneaut Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (62) SR 0005, Bridge over Lincoln Avenue, City of Erie, Bridge Replacement 900,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (63) SR 0020, Westbound Bridge over I-79, City of Erie, Bridge Rehabilitation 4,330,000 (Base Construction Allocation - $4,000,000) (Land Allocation - $30,000) (Design and Contingencies - $300,000) (64) SR 0079, Southbound Bridge over West 32nd Street, City of Erie, Bridge Replacement 720,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (65) SR 3002, Bridge No.2 over Cherry Hill Road, Conneaut Township, Bridge Replacement 700,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (66) SR 3002, Bridge No.2 over Ashtabula Creek, Conneaut Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (67) SR 0005, Bridge over Walnut Creek, Fairview Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $410,000) (Land Allocation - $40,000) (Design and Contingencies - $50,000) (68) SR 0090, Eastbound Bridge over Franklin Road, T-404, Fairview Township, Bridge Replacement 1,200,000 (Base Construction Allocation - $1,080,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (69) SR 0020, Bridge over Walnut Creek, Fairview Township, Bridge Rehabilitation 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (70) SR 0098, Bridge over I-90, Fairview Township, Bridge Rehabilitation 860,000 (Base Construction Allocation - $800,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (71) SR 0090, Bridge over Platz Road, Fairview Township, Bridge Rehabilitation 350,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000) (72) SR 0090, Westbound Bridge over T-404, Fairview Township, Bridge Replacement 1,200,000 (Base Construction Allocation - $1,080,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (73) SR 0018, Bridge over Elk Creek, Girard Borough, Bridge Replacement 1,020,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (74) SR 3014, Bridge over Franklin Center Road Bridge, Girard Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (75) SR 0090, Eastbound Bridge over Elk Creek, Girard Township, Bridge Replacement 6,500,000 (Base Construction Allocation - $6,280,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (76) SR 0090, Westbound Bridge over Elk Creek and Railroad Tracks, Girard Township, Bridge Replacement 6,000,000 (Base Construction Allocation - $5,780,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (77) SR 0090, Westbound Bridge over Neiger Road, Girard Township, Bridge Replacement 1,200,000 (Base Construction Allocation - $1,080,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (78) SR 0020, Bridge over Elk Creek, Girard Township, Bridge Rehabilitation 8,500,000 (Base Construction Allocation - $7,600,000) (Land Allocation - $50,000) (Design and Contingencies - $850,000) (79) SR 0090, Eastbound Bridge over Neiger Road, Girard Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,880,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (80) SR 0090, Eastbound Bridge over Elk Creek and Railroad, Girard Township, Bridge Replacement 6,000,000 (Base Construction Allocation - $5,780,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (81) SR 0090, Westbound Bridge over Elk Creek, Girard Township, Bridge Replacement 6,500,000 (Base Construction Allocation - $6,280,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (82) SR 0090, Bridge over Four Mile Creek, Greene Township, Bridge Rehabilitation 800,000 (Base Construction Allocation - $700,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (83) SR 0090, Bridge over Moore Road, Greene Township, Bridge Rehabilitation 1,700,000 (Base Construction Allocation - $1,380,000) (Land Allocation - $20,000) (Design and Contingencies - $300,000) (84) SR 0090, Bridge over Clark Road, Harborcreek Township, Bridge Replacement 2,820,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $20,000) (Design and Contingencies - $300,000) (85) SR 0020, Bridge over Four Mile Creek, Harborcreek Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (86) SR 0090, Westbound Bridge over SR 0531, Harborcreek Township, Bridge Replacement 1,520,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (87) SR 0090, Bridge over Jordan Road, Harborcreek Township, Bridge Rehabilitation 2,800,000 (Base Construction Allocation - $2,480,000) (Land Allocation - $20,000) (Design and Contingencies - $300,000) (88) SR 0955, Bridge over Seven Mile Creek, Harborcreek Township, Bridge Replacement 830,000 (Base Construction Allocation - $700,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (89) SR 0090, Eastbound Bridge over SR 0531, Harborcreek Township, Bridge Replacement 1,520,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (90) SR 0005, Bridge over Elk Creek, Lake City Borough, Bridge Replacement 3,220,000 (Base Construction Allocation - $2,900,000) (Land Allocation - $20,000) (Design and Contingencies - $300,000) (91) SR 0006, Bridge over Mill Village Truss, Le Boeuf Township, Bridge Replacement 3,046,000 (Base Construction Allocation - $2,980,000) (Land Allocation - $26,000) (Design and Contingencies - $40,000) (92) SR 0832, Bridge over I-90, McKean Township, Bridge Rehabilitation 3,000,000 (Base Construction Allocation - $2,670,000) (Land Allocation - $30,000) (Design and Contingencies - $300,000) (93) SR 4013, Bridge over Elk Creek, McKean Township, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (94) SR 0099, Bridge over Stancliff Road, McKean Township, Bridge Replacement 1,620,000 (Base Construction Allocation - $1,400,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (95) SR 0090, Bridge over Millfair Road, McKean Township, Bridge Rehabilitation 1,820,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $20,000) (Design and Contingencies - $300,000) (96) SR 0090, Bridge over SR 0008, Northbound and Southbound, Millcreek Township, Bridge Replacement 1,720,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (97) SR 4012, Bridge over I-79, Millcreek Township, Bridge Replacement 5,020,000 (Base Construction Allocation - $4,500,000) (Land Allocation - $20,000) (Design and Contingencies - $500,000) (98) SR 0019, Bridge No.2 over Walnut Creek, Millcreek Township, Bridge Replacement 1,890,000 (Base Construction Allocation - $1,700,000) (Land Allocation - $20,000) (Design and Contingencies - $170,000) (99) SR 0079, Southbound Bridge over Walnut Creek, Millcreek Township, Bridge Replacement 420,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (100) SR 0090, Bridge over Pond Road, Springfield Township, Bridge Replacement 1,600,000 (Base Construction Allocation - $1,400,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (101) SR 0090, Bridge over McKees Road, Springfield Township, Bridge Replacement 1,550,000 (Base Construction Allocation - $1,380,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (102) SR 0090, Bridge over Huntley Road, Springfield Township, Bridge Replacement 1,700,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (103) SR 0020, Bridge over Crooked Creek, Springfield Township, Bridge Replacement 930,000 (Base Construction Allocation - $800,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (104) SR 0090, Bridge over Stanford Road, Springfield Township, Bridge Replacement 2,800,000 (Base Construction Allocation - $2,450,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (105) SR 0090, Bridge over Walnut Creek, Summit Township, Bridge Replacement 2,340,000 (Base Construction Allocation - $2,100,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (106) SR 0099, Bridge over I-90, Summit Township, Bridge Replacement 2,700,000 (Base Construction Allocation - $2,400,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (107) SR 0097, Bridge over Le Boeuf Creek, Summit Township, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (108) SR 2018, Railroad Bridge over Lovell Road, Concord Township, Bridge Rehabilitation 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (109) I-90 Bridge over Sixteen Mile Creek, North East Township, Bridge Rehabilitation 500,000 (Base Construction Allocation - $90,000) (Land Allocation - $10,000) (Design and Contingencies - $400,000) Section 30. Fayette County. (a) Local Bridges (1) Brownsville Township, Lynn Run Road Bridge over Redstone Creek, Bridge Replacement 200,000 (Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (2) Dunbar Township, Falls Avenue Bridge over Opossum Run, Bridge Replacement 800,000 (Base Construction Allocation - $550,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (3) Georges Township, County Bridge No.162 over Mountain Creek, Bridge Replacement 640,000 (Base Construction Allocation - $425,000) (Land Allocation - $40,000) (Design and Contingencies - $175,000) (4) German Township, Footedale Bridge No.66 over Dunlap Creek, Bridge Replacement 498,000 (Base Construction Allocation - $313,000) (Land Allocation - $35,000) (Design and Contingencies - $150,000) (5) German Township, County Bridge No.54 over Browns Run, Bridge Replacement 793,000 (Base Construction Allocation - $563,000) (Land Allocation - $50,000) (Design and Contingencies - $180,000) (6) German Township, Leckrone Bridge No.54 over Browns Run, Bridge Replacement 430,000 (Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $75,000) (7) Menallen Township, T-509, Bridge over Branch of Dunlap Creek, Bridge Replacement 165,000 (Base Construction Allocation - $110,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (8) Menallen Township, Fan Hallow Road Bridge over Fans Run, Bridge Replacement 145,000 (Base Construction Allocation - $90,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (9) Menallen and North Union Townships, Fan Hollow Bridge No.184 over Jennings Run, Bridge Replacement 440,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (10) Nicholson Township, County Bridge No.29 over York Run, Bridge Replacement 535,000 (Base Construction Allocation - $350,000) (Land Allocation - $35,000) (Design and Contingencies - $150,000) (11) Redstone Township, Merrittstown Bridge No.147 over Dunlap Creek, Bridge Replacement 435,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (12) South Union Township, T-479, Leith Bridge No.41 over Redstone Creek, Bridge Replacement 690,000 (Base Construction Allocation - $475,000) (Land Allocation - $40,000) (Design and Contingencies - $175,000) (13) Stewart Township, T-798, Meadow Run Bridge No.82 over Meadow Run, Bridge Replacement 825,000 (Base Construction Allocation - $575,000) (Land Allocation - $55,000) (Design and Contingencies - $195,000) (14) Springhill Township, T-335, County Bridge No.92 over York Run, Bridge Replacement 1,438,000 (Base Construction Allocation - $1,113,000) (Land Allocation - $75,000) (Design and Contingencies - $250,000) (15) Springfield Township, T-593, County Bridge No.111 over Mill Run, Bridge Replacement 320,000 (Base Construction Allocation - $225,000) (Land Allocation - $20,000) (Design and Contingencies - $75,000) (16) North Union Township, T-535, Township Bridge No.1 over Redstone Creek, Bridge Replacement 825,000 (Base Construction Allocation - $625,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (17) North Union Township, T-557, Township Bridge No.3 over Redstone Creek, Bridge Replacement 450,000 (Base Construction Allocation - $275,000) (Land Allocation - $50,000) (Design and Contingencies - $125,000) (18) Georges Township, T-387, County Bridge No.102 over York Run, Bridge Rehabilitation 320,000 (Base Construction Allocation - $225,000) (Land Allocation - $20,000) (Design and Contingencies - $75,000) (19) South Union Township, T-459, Township Bridge No.1 over Lick Run, Bridge Replacement 280,000 (Base Construction Allocation - $175,000) (Land Allocation - $25,000) (Design and Contingencies - $80,000) (20) Stewart Township, T-415, County Bridge No.63 over Meadow Run, Bridge Replacement 1,005,000 (Base Construction Allocation - $775,000) (Land Allocation - $50,000) (Design and Contingencies - $180,000) (21) German Township, County Bridge No.54 over Browns Run at Leith Community, Bridge Replacement 430,000 (Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $75,000) (22) Brownsville Township, T-655, Bridge over a Branch of Redstone Creek bordering Redstone Township, Bridge Replacement 305,000 (Base Construction Allocation - $175,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (23) Wharton Township, T-708, Cole Road Bridge over Stony Run, Bridge Replacement 375,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (24) Wharton Township, T-345, Quebec Road Bridge over Mill Run, Bridge Replacement 375,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (b) State Bridges (1) SR 0021, Masontown Bridge over Monongahela River, Railroad and Private Road, German Township, Bridge Painting 1,500,000 (Base Construction Allocation - $1,500,000) (2) SR 0031, Jacobs Creek Bridge over Branch of Jacobs Creek, Bullskin Township, Bridge Replacement 290,000 (Base Construction Allocation - $180,000) (Land Allocation - $35,000) (Design and Contingencies - $75,000) (3) SR 0119, Memorial Bridge over Youghiogheny River, Connellsville Borough, Bridge Painting 100,000 (Base Construction Allocation - $100,000) (4) SR 0201, Furnace Run Bridge over Furnace Run, Franklin Township, Bridge Replacement 445,000 (Base Construction Allocation - $245,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (5) SR 0711, Crawford Avenue Bridge over Youghiogheny River, Connellsville Borough, Bridge Painting 100,000 (Base Construction Allocation - $100,000) (6) SR 0982, Jacobs Creek Bridge over Branch of Jacobs Creek, Bullskin Township, Bridge Replacement 335,000 (Base Construction Allocation - $225,000) (Land Allocation - $35,000) (Design and Contingencies - $75,000) (7) SR 0982, Bridge over Mounts Creek, Bullskin Township, Bridge Painting 105,000 (Base Construction Allocation - $105,000) (8) SR 1051, Mounts Creek Bridge over Mounts Creek, Bullskin Township, Bridge Replacement 436,000 (Base Construction Allocation - $236,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (9) SR 3013, Browns Run Bridge over Browns Run, German Township, Bridge Replacement 631,000 (Base Construction Allocation - $431,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (10) SR 3015, Muddy Run Bridge over Muddy Run, Georges Township, Bridge Painting 33,000 (Base Construction Allocation - $33,000) (11) SR 4038, Washington Run Bridge over Washington Run, Perry Township, Bridge Replacement 640,000 (Base Construction Allocation - $440,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (12) SR 0381, SR 0381 over Stoney Run, Wharton Township, Bridge Replacement 663,000 (Base Construction Allocation - $463,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (13) SR 0819, SR 0819 over Branch of Jacobs Creek, Lower Tyrone Township, Bridge Replacement 240,000 (Base Construction Allocation - $125,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (14) SR 1021, SR 1021 over Breakneck Run, Bullskin Township, Bridge Replacement 650,000 (Base Construction Allocation - $475,000) (Land Allocation - $50,000) (Design and Contingencies - $125,000) (15) SR 1031, SR 1031 over Galley Run, Upper Tyrone Township, Bridge Replacement 475,000 (Base Construction Allocation - $325,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (16) SR 1031, SR 1031 over Branch of Galley Run, Upper Tyrone Township, Bridge Replacement 613,000 (Base Construction Allocation - $413,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (17) SR 1044, SR 1044 over Branch of Mounts Creek, Bullskin Township, Bridge Replacement 350,000 (Base Construction Allocation - $200,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (18) SR 2003, SR 2003 over Chaney Run, Wharton Township, Bridge Replacement 290,000 (Base Construction Allocation - $175,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (19) SR 3003, SR 3003 at Nicholson Township Border, Springhill Township, Bridge Replacement 1,400,000 (Base Construction Allocation - $1,125,000) (Land Allocation - $75,000) (Design and Contingencies - $200,000) (20) SR 3003, SR 3003 over Georges Creek, Springhill Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,150,000) (Land Allocation - $75,000) (Design and Contingencies - $225,000) (21) SR 3003, SR 3003 Nicholson Township over Georges Creek, Springhill Township, Bridge Replacement 1,200,000 (Base Construction Allocation - $975,000) (Land Allocation - $50,000) (Design and Contingencies - $175,000) (22) SR 3009, SR 3009 over Georges Creek, Springhill Township, Bridge Replacement 863,000 (Base Construction Allocation - $688,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (23) SR 3013, SR 3013 over Middle Run, German Township, Bridge Replacement 900,000 (Base Construction Allocation - $650,000) (Land Allocation - $75,000) (Design and Contingencies - $175,000) (24) SR 4027, SR 4027 over Little Redstone Creek, Jefferson Township, Bridge Replacement 538,000 (Base Construction Allocation - $338,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (25) SR 4044, SR 4044 over Downers Run, Washington Township, Bridge Replacement 800,000 (Base Construction Allocation - $575,000) (Land Allocation - $50,000) (Design and Contingencies - $175,000) (26) SR 4046, SR 4046 over Lutz Run and Abandoned Railroad, Washington Township, Bridge Replacement 1,400,000 (Base Construction Allocation - $1,075,000) (Land Allocation - $75,000) (Design and Contingencies - $250,000) (27) SR 1045, Bridge over Branch of Dickerson Run, Vanderbilt Borough, Bridge Replacement 330,000 (Base Construction Allocation - $225,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (28) SR 0201, Bridge over Virgin Run, Franklin Township, Bridge Replacement 330,000 (Base Construction Allocation - $225,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (29) SR 4016, Bridge over Redstone Creek, Redstone Township, Bridge Replacement 1,030,000 (Base Construction Allocation - $830,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (30) SR 1021, Bridge over Breakneck Run, Bullskin Township, Bridge Replacement 505,000 (Base Construction Allocation - $325,000) (Land Allocation - $5,000) (Design and Contingencies - $175,000) (31) SR 1031, Bridge over Branch of Galley Run, Upper Tyrone Township, Bridge Replacement 465,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $150,000) (32) SR 3003, Bridge over Georges Creek, Springhill/Nicholson Townships, Bridge Replacement 785,000 (Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $175,000) (33) SR 3003, Bridge over Georges Creek, Springhill/Nicholson Townships, Bridge Replacement 885,000 (Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $175,000) (34) SR 4027, Bridge over Little Redstone Creek, Jefferson Township, Bridge Replacement 355,000 (Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (35) SR 3007, Bridge over Georges Creek, Georges Township, Bridge Replacement 700,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (36) SR 0031, Jacobs Creek Bridge over Jacobs Creek, Bullskin Township, Fayette County, and Mt. Pleasant Township, Westmoreland County, Bridge Replacement 715,000 (Base Construction Allocation - $500,000) (Land Allocation - $40,000) (Design and Contingencies - $175,000) (37) SR 1037, Arch Street Bridge, City of Connellsville, Bridge Replacement 840,000 (Base Construction Allocation - $557,000) (Land Allocation - $35,000) (Design and Contingencies - $248,000) (38) SR 0021, Masontown Bridge over Monongahela River, German Township, Fayette County, Monongahela Township, Greene County, Bridge Replacement 36,000,000 (Base Construction Allocation - $31,000,000) (Land Allocation - $2,500,000) (Design and Contingencies - $2,500,000) (39) SR 1002, Bridge over Tributary of Youghiogheny River, Lower Tyrone Township, Bridge Replacement 155,000 (Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (40) SR 2031, Bridge over Coal Lick Run, South Union Township, Bridge Replacement 500,000 (Base Construction Allocation - $350,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (41) SR 0051, Bridge over Coal Lick Run, Uniontown, Bridge Replacement 663,000 (Base Construction Allocation - $463,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (42) SR 0166, Bridge over Dunlap Creek, Immediately South of the Intersection of SR 0166 and SR 4008, Redstone Township, Bridge Replacement 625,000 (Base Construction Allocation - $200,000) (Land Allocation - $400,000) (Design and Contingencies - $25,000) Section 31. Forest County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0227, SR 0227 over West Hickory Creek, Harmony Township, Bridge Replacement 480,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (2) SR 3001, SR 3001 over Little Tionesta Creek, Tionesta Township, Bridge Replacement 400,000 (Base Construction Allocation - $310,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (3) SR 3004, SR 3004 over Little Hickory Creek, Hickory Township, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (4) SR 3004, SR 3004 over , Green Township, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (5) SR 3001, Red Brush Road Bridge over Little Tionesta Creek, Tionesta Township, Bridge Rehabilitation 605,000 (Base Construction Allocation - $550,000) (Design and Contingencies - $55,000) (6) SR 1003, Bridge over Blue Jay Creek, Howe Township, Bridge Rehabilitation 340,000 (Base Construction Allocation - $250,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (7) SR 1003, Bridge over Slater Run, Howe Township, Bridge Rehabilitation 400,000 (Base Construction Allocation - $320,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (8) SR 1003, Bridge No.2 over Blue Jay Creek, Howe Township, Bridge Rehabilitation 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (9) SR 2005, Bridge over Millstone Creek, Jenks Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) Section 32. Franklin County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 3012, Social Island Road Bridge over , Hamilton Township, Bridge Replacement 786,000 (Base Construction Allocation - $636,000) (Land Allocation - $95,000) (Design and Contingencies - $55,000) (2) SR 4010, Edenville Road Bridge over Wilson Run, St. Thomas Township, Bridge Replacement 335,000 (Base Construction Allocation - $225,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (3) SR 4009, over Wilson Run, St. Thomas Township, Bridge Replacement 750,000 (Base Construction Allocation - $500,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (4) SR 4007, Tuscarora Creek Bridge over Tuscarora Creek, Fannett Township, Bridge Replacement 1,500,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) (5) PA 274, Bridge over Branch of Tuscarora Creek, Fannett Township, Bridge Replacement 523,000 (Base Construction Allocation - $387,000) (Land Allocation - $39,000) (Design and Contingencies - $97,000) (6) SR 4006, Bridge over West Branch of Conococheague Creek, Metal Township, Bridge Replacement 727,000 (Base Construction Allocation - $538,000) (Land Allocation - $54,000) (Design and Contingencies - $135,000) (7) SR 4018, Bridge over Tributary of Conodoguinet Creek, Lurgan Township, Bridge Replacement 473,000 (Base Construction Allocation - $350,000) (Land Allocation - $35,000) (Design and Contingencies - $88,000) (8) SR 4018, Bridge over Conodoguinet Creek, Southampton Township, Bridge Replacement 913,000 (Base Construction Allocation - $689,000) (Land Allocation - $67,000) (Design and Contingencies - $157,000) (9) SR 2016, Bridge over I-81, Antrim Township, Bridge Rehabilitation 891,000 (Base Construction Allocation - $691,000) (Design and Contingencies - $200,000) (10) SR 0533, Bridge over West Branch of Conococheague Creek, Metal Township, Bridge Rehabilitation 1,200,000 Section 33. Fulton County. (a) Local Bridges (1) Thompson Township, T-312, Bridge over Licking Creek, New Bridge Construction 990,000 (Base Construction Allocation - $800,000) (Land Allocation - $15,000) (Design and Contingencies - $175,000) (2) Thompson Township, T-348, Bridge over Licking Creek, New Bridge Construction 740,000 (Base Construction Allocation - $575,000) (Land Allocation - $25,000) (Design and Contingencies - $140,000) (3) Thompson Township, T-325, Bridge over , New Bridge Construction 800,000 (Base Construction Allocation - $625,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (4) Thompson Township, T-343, Bridge over Tonoloway Creek, New Bridge Construction 890,000 (Base Construction Allocation - $700,000) (Land Allocation - $25,000) (Design and Contingencies - $165,000) (b) State Bridges (1) SR 4007, Wooden Bridge over Wooden Bridge Creek, Taylor Township, Bridge Replacement 550,000 (Base Construction Allocation - $405,000) (Land Allocation - $25,000) (Design and Contingencies - $120,000) (2) SR 2005, Bridge over Plum Run, Thompson Township, Bridge Rehabilitation 50,000 (Base Construction Allocation - $36,000) (Land Allocation - $1,000) (Design and Contingencies - $13,000) (3) SR 4010, Bridge over Roaring Run, Wells Township, Bridge Rehabilitation 88,000 (Base Construction Allocation - $72,000) (Land Allocation - $2,000) (Design and Contingencies - $14,000) Section 34. Greene County. (a) Local Bridges (1) Morgan Township, County Bridge No.89 over Browns Run, Bridge Replacement 286,000 (Base Construction Allocation - $166,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (2) Morgan Township, County Bridge No.90 over Browns Run, Bridge Replacement 282,000 (Base Construction Allocation - $162,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (3) Morgan Township, County Bridge No.91 over Browns Run, Bridge Replacement 273,000 (Base Construction Allocation - $153,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (4) Cumberland Township, T-517, County Bridge No.4, Ullery Road over Goose Run, Bridge Replacement 360,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (5) Cumberland Township, T-634, County Bridge No.15, Coal Hill Road over Muddy Creek, Bridge Replacement 805,000 (Base Construction Allocation - $625,000) (Land Allocation - $20,000) (Design and Contingencies - $160,000) (6) Greene Township, T-411, County Bridge No.20 over Whitely Creek, Bridge Replacement 1,075,000 (Base Construction Allocation - $900,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (7) Gray Township, T-392, County Bridge No.63 over Grays Creek, Bridge Replacement 380,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (8) Washington Township, T-550, County Bridge No.97 over Craynes Run, Bridge Replacement 465,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $150,000) (9) Morris Township, T-629, County Bridge No.73 over Bates Fork Creek, Bridge Replacement 490,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (10) Cumberland Township, T-660, County Bridge No.13 over Muddy Creek, Bridge Replacement 565,000 (Base Construction Allocation - $400,000) (Land Allocation - $15,000) (Design and Contingencies - $150,000) (11) Aleppo Township, T-304, County Bridge No.108 over Branch of Harts Run, Bridge Replacement 575,000 (Base Construction Allocation - $425,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (12) Franklin Township, T-511, Bridge No.30 over , Bridge Replacement 625,000 (Base Construction Allocation - $475,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (13) Morgan Township, T-659, Bridge No.87 over Ten Mile Creek, Bridge Replacement 1,275,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (14) Richhill Township, T-356, Bridge No.57 over North Fork of Wheeling Creek, Bridge Replacement 765,000 (Base Construction Allocation - $625,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (15) Jackson Township, T-381, Bridge No.109 over Job Creek, Bridge Replacement 465,000 (Base Construction Allocation - $325,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (16) Cumberland Township, T-517, County Bridge No.4 over Little Whitely Creek, Bridge Replacement 440,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (17) Aleppo and Richhill Townships at Township Line, T-417, County Bridge No.71 over Harts Run, Bridge Replacement 625,000 (Base Construction Allocation - $475,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (18) Aleppo and Richhill Townships at Township Line, T-417, County Bridge No.71 over Harts Run, Bridge Replacement 625,000 (Base Construction Allocation - $475,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (b) State Bridges (1) SR 0018, Bridge over South Fork of Ten Mile Creek, Franklin Township, Bridge Rehabilitation 320,000 (Base Construction Allocation - $280,000) (Design and Contingencies - $40,000) (2) SR 0018, Bates Creek Bridge over Bates Fork and Browns Creeks, Washington Township, Bridge Replacement 650,000 (Base Construction Allocation - $450,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (3) SR 0021, Grinnage Run Bridge over Grinnage Run, Gray Township, Bridge Replacement 453,000 (Base Construction Allocation - $253,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (4) SR 0079, I-79 Bridge over T-631, Washington Township, Bridge Replacement 980,000 (Base Construction Allocation - $740,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (5) SR 0079, I-79 Bridge over T-631, Washington Township, Bridge Rehabilitation 945,000 (Base Construction Allocation - $705,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (6) SR 0079, I-79 Bridge over PA 221, Washington Township, Bridge Replacement 2,074,000 (Base Construction Allocation - $1,784,000) (Land Allocation - $40,000) (Design and Contingencies - $250,000) (7) SR 0079, I-79 Bridge No.2 over PA 221, Washington Township, Bridge Replacement 2,074,000 (Base Construction Allocation - $1,784,000) (Land Allocation - $40,000) (Design and Contingencies - $250,000) (8) SR 0079, I-79 Bridge over T-512, Washington Township, Bridge Rehabilitation 980,000 (Base Construction Allocation - $740,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (9) SR 0079, I-79 Bridge No.2 over T-512, Washington Township, Bridge Replacement 1,020,000 (Base Construction Allocation - $780,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (10) SR 0088, Albert Gallatin Bridge over Monongahela River, Dunkard Township, Bridge Painting 1,500,000 (Base Construction Allocation - $1,500,000) (11) SR 0088, Point Marion Bridge over Monongahela River, Dunkard Township, Bridge Replacement 6,200,000 (Base Construction Allocation - $5,500,000) (Land Allocation - $200,000) (Design and Contingencies - $500,000) (12) SR 0218, Roberts Run Bridge No.2 over Roberts Run, Wayne Township, Bridge Replacement 768,000 (Base Construction Allocation - $568,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (13) SR 2003, Bridge over Branch of Dunkard Creek, Perry Township, Bridge Replacement 625,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $200,000) (14) SR 3007, Bridge over Branch of Wheeling Creek, Richhill Township, Bridge Replacement 375,000 (Base Construction Allocation - $175,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (15) SR 3006, Dunkard Bridge over Branch of Dunkard Creek, Gilmore Township, Bridge Replacement 99,000 (Base Construction Allocation - $80,000) (Land Allocation - $11,000) (Design and Contingencies - $8,000) (16) SR 3017, Bridge over Fork of Fish Creek, Freeport Township, Bridge Replacement 1,500,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) Section 35. Huntingdon County. (a) Local Bridges (1) Mill Creek Borough, Main Street Bridge over Mill Creek, Bridge Rehabilitation 30,000 (Base Construction Allocation - $30,000) (2) Juniata Township, T-428, Corbin Bridge over Raystown Branch of Juniata River, Bridge Replacement 920,000 (Base Construction Allocation - $920,000) (3) Springfield Township, T-313, Walnut Grove Bridge, County Bridge No.2 over Sideling Hill Creek, Bridge Replacement 975,000 (Base Construction Allocation - $800,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (4) Jackson Township, T-525, Bridge over Stone Creek, Bridge Rehabilitation 470,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $120,000) (5) Jackson Township, T-534, Bridge over Greenlee Run, Bridge Rehabilitation 250,000 (Base Construction Allocation - $170,000) (Design and Contingencies - $80,000) (6) Jackson Township, T-529, Bridge over Stone Creek, Bridge Replacement 469,000 (Base Construction Allocation - $355,000) (Design and Contingencies - $114,000) (7) Jackson Township, T-534, Bridge over Greenlee Run, Bridge Replacement 246,000 (Base Construction Allocation - $169,000) (Design and Contingencies - $77,000) (8) Jackson Township, T-534, Eckley Road Bridge over Croyle Run, Bridge Replacement 255,000 (Base Construction Allocation - $195,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (9) Shirley Township, T-373, Bridge over , Bridge Replacement 500,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $190,000) (10) Springfield Township, T-308, Bridge over Lick Run, Bridge Replacement 475,000 (Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (11) Springfield Township, T-330, Bridge over Elliot Run, Bridge Replacement 425,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (12) Springfield Township, T-332, Bridge over Elliot Run, Bridge Replacement 425,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (13) Todd Township, T-370, Bridge over , Bridge Replacement 565,000 (Base Construction Allocation - $450,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (14) Todd Township, T-368, Bridge over Great Trough Creek, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000) (15) Springfield Township, T-330, Bridge over Elliot Run, Bridge Replacement 425,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (16) Springfield Township, T-308, Bridge over Lick Run, Bridge Replacement 475,000 (Base Construction Allocation - $350,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (17) Springfield Township, T-332, Bridge over Elliot Run, Bridge Replacement 425,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (18) Spruce Creek Township, T-515, Bridge No.2 over Spruce Creek, Bridge Replacement 471,000 (Base Construction Allocation - $357,000) (Land Allocation - $11,000) (Design and Contingencies - $103,000) (b) State Bridges (1) SR 0522, Aughwick Bridge over Aughwick Creek, East Broad Top Railroad and T-396, Shirley Township, Bridge Replacement 825,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $75,000) (2) SR 1011, Murrays Run Bridge over Murrays Run, Oneida Township, Bridge Replacement 615,000 (Base Construction Allocation - $420,000) (Land Allocation - $75,000) (Design and Contingencies - $120,000) (3) SR 2011, Narrows Creek Bridge over Narrows Creek, Tell Township, Bridge Replacement 785,000 (Base Construction Allocation - $590,000) (Land Allocation - $50,000) (Design and Contingencies - $145,000) (4) SR 1005, Mill Creek Bridge over Mill Creek, Brady Township, Bridge Replacement 815,000 (Base Construction Allocation - $625,000) (Land Allocation - $40,000) (Design and Contingencies - $150,000) (5) SR 2019, Licking Creek Bridge over Licking Creek, Shirley Township, Bridge Replacement 505,000 (Base Construction Allocation - $365,000) (Land Allocation - $25,000) (Design and Contingencies - $115,000) (6) SR 0305, Bridge over Tributary of , Jackson Township, Bridge Rehabilitation 50,000 (Base Construction Allocation - $36,000) (Land Allocation - $1,000) (Design and Contingencies - $13,000) (7) SR 0522, Bridge over Tributary of North Branch of , Dublin Township, Bridge Rehabilitation 75,000 (Base Construction Allocation - $56,000) (Land Allocation - $1,000) (Design and Contingencies - $18,000) (8) SR 0655, Bridge over Tributary of Hares Valley Creek, Cass Township, Bridge Rehabilitation 50,000 (Base Construction Allocation - $36,000) (Land Allocation - $1,000) (Design and Contingencies - $13,000) (9) SR 0747, Bridge over Tributary of Three Springs Creek, Cromwell Township, Bridge Rehabilitation 50,000 (Base Construction Allocation - $36,000) (Land Allocation - $1,000) (Design and Contingencies - $13,000) (10) SR 0747, Bridge over Old Womens Run, Cromwell Township, Bridge Rehabilitation 45,000 (Base Construction Allocation - $33,000) (Land Allocation - $1,000) (Design and Contingencies - $11,000) (11) SR 0747, Bridge over Sugar Run, Cromwell Township, Bridge Rehabilitation 45,000 (Base Construction Allocation - $33,000) (Land Allocation - $1,000) (Design and Contingencies - $11,000) (12) SR 0994, Bridge over Haw Run, Todd Township, Bridge Rehabilitation 45,000 (Base Construction Allocation - $33,000) (Land Allocation - $1,000) (Design and Contingencies - $11,000) (13) SR 1005, Bridge over Tributary of Mill Creek, Brady Township, Bridge Rehabilitation 55,000 (Base Construction Allocation - $40,000) (Land Allocation - $1,000) (Design and Contingencies - $14,000) (14) SR 2005, Bridge over Elliot Run, Clay Township, Bridge Rehabilitation 52,000 (Base Construction Allocation - $38,000) (Land Allocation - $1,000) (Design and Contingencies - $13,000) (15) SR 2007, Bridge over Little Aughwick Creek, Dublin Township, Bridge Rehabilitation 152,000 (Base Construction Allocation - $125,000) (Land Allocation - $2,000) (Design and Contingencies - $25,000) Section 36. Indiana County. (a) Local Bridges (1) Banks Township, T-974, County Bridge No.13, Bear Run Bridge over Bear Run, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (2) Black Lick Township, T-574, Muddy Run Bridge over Muddy Run, Bridge Replacement 380,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (3) Cherryhill Township, T-686, County Bridge No.65, Grace Church Bridge over Two Lick Creek, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (4) Cherryhill Township, T-978, Allen Bridge over Two Lick Reservoir, Bridge Rehabilitation 264,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $54,000) (5) Rayne Township, T-760, County Bridge No.23-A, Chambersville Bridge over Crooked Creek, Bridge Rehabilitation 190,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (6) Grant Township, T-820 over Crooked Run, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (b) State Bridges (1) SR 0022, Chestnut Ridge Bridge over SR 0119, Burrell Township, Bridge Painting 90,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $15,000) (2) SR 0022, Armagh Bridge over SR 0056, West Wheatfield Township, Bridge Painting 145,000 (Base Construction Allocation - $130,000) (Design and Contingencies - $15,000) (3) SR 0119, Black Lick Bridge over Black Lick Creek, Burrell Township, Bridge Painting 280,000 (Base Construction Allocation - $265,000) (Design and Contingencies - $15,000) (4) SR 0119, Bypass Steel Bridge No.1 over Wayne Avenue Ramps, White Township, Bridge Painting 170,000 (Base Construction Allocation - $155,000) (Design and Contingencies - $15,000) (5) SR 0119, Bypass Steel Bridge No.2 over Wayne Avenue Ramps, White Township, Bridge Painting 170,000 (Base Construction Allocation - $155,000) (Design and Contingencies - $15,000) (6) SR 0119, Bypass Steel Bridge No.3 over SR 0422, White Township, Bridge Painting 240,000 (Base Construction Allocation - $225,000) (Design and Contingencies - $15,000) (7) SR 0119, Bypass Steel Bridge No.4 over SR 0422, White Township, Bridge Painting 240,000 (Base Construction Allocation - $225,000) (Design and Contingencies - $15,000) (8) SR 0119, Bypass Steel Bridge No.5 over SR 0954, White Township, Bridge Painting 195,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $15,000) (9) SR 0119, Bypass Steel Bridge No.6 over SR 0954, White Township, Bridge Painting 175,000 (Base Construction Allocation - $160,000) (Design and Contingencies - $15,000) (10) SR 0119, Bypass Steel Bridge No.7 over SR 0286, White Township, Bridge Painting 235,000 (Base Construction Allocation - $220,000) (Design and Contingencies - $15,000) (11) SR 0119, Bypass Steel Bridge No.8 over SR 0286, White Township, Bridge Painting 215,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $15,000) (12) SR 0119, Bypass Steel Bridge No.9 over SR 1003, White Township, Bridge Painting 200,000 (Base Construction Allocation - $185,000) (Design and Contingencies - $15,000) (13) SR 0119, Bypass Steel Bridge No.10 over SR 1003, White Township, Bridge Painting 175,000 (Base Construction Allocation - $160,000) (Design and Contingencies - $15,000) (14) SR 0119, Bypass Steel Bridge No.11 over SR 0110, White Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (15) SR 0119, Bypass Steel Bridge No.12 over SR 0110, White Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (16) SR 0217, Torrance Bridge over Conemaugh River, Burrell Township, Bridge Painting 435,000 (Base Construction Allocation - $420,000) (Design and Contingencies - $15,000) (17) SR 0217, Black Lick Creek Bridge over Black Lick Creek, Burrell Township, Bridge Painting 400,000 (Base Construction Allocation - $385,000) (Design and Contingencies - $15,000) (18) SR 0259, Heshbon Bridge over Black Lick Creek, West Wheatfield Township, Bridge Painting 200,000 (Base Construction Allocation - $185,000) (Design and Contingencies - $15,000) (19) SR 0286, Clymer Bridge over Two Lick Creek, Clymer Borough, Bridge Painting 175,000 (Base Construction Allocation - $160,000) (Design and Contingencies - $15,000) (20) SR 0422, Two Lick Eastbound Bridge over Two Lick Creek, White Township, Bridge Painting 360,000 (Base Construction Allocation - $345,000) (Design and Contingencies - $15,000) (21) SR 0422, Two Lick Westbound Bridge over Two Lick Creek, White Township, Bridge Painting 360,000 (Base Construction Allocation - $345,000) (Design and Contingencies - $15,000) (22) SR 0422, Penn Run Exit Bridge Eastbound over TR 840, White Township, Bridge Painting 190,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $15,000) (23) SR 0422, Penn Run Exit Bridge Westbound over TR 840, White Township, Bridge Painting 190,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $15,000) (24) SR 0580, Cush Cushion Creek Bridge over Cush Cushion Creek, Green Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (25) SR 0954, Yellow Creek Bridge over Yellow Creek, White Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (26) SR 0954, Creekside Bridge over Crooked Creek, White Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (27) SR 0954, South Branch Bridge over South Branch of Plum Creek, Washington Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (28) SR 1004, Philadelphia Street Exit Bridge over SR 0119, White Township, Bridge Painting 235,000 (Base Construction Allocation - $220,000) (Design and Contingencies - $15,000) (29) SR 1006, Jimmy Stewart Airport Bridge over SR 0119, White Township, Bridge Painting 245,000 (Base Construction Allocation - $230,000) (Design and Contingencies - $15,000) (30) SR 1007, Tanoma Bridge over Crooked Creek, Rayne Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (31) SR 1014, Diamondville Bridge over North Branch of Two Lick Creek, Green Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (32) SR 1017, Pine Flats Bridge over South Branch of Two Lick Creek, Green Township, Bridge Painting 95,000 (Base Construction Allocation - $80,000) (Design and Contingencies - $15,000) (33) SR 1033, Gypsy Bridge over Cush Creek, Montgomery Township, Bridge Painting 85,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $15,000) (34) SR 1034, Lower Wilgus Bridge over Branch of Cush Creek, Montgomery Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (35) SR 1038, Crooked Run Bridge over Crooked Run, East Mahoning Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (36) SR 1045, Broadhead Run Bridge over Broadhead Run, Canoe Township, Bridge Painting 70,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $15,000) (37) SR 1045, Juneau Bridge over Canoe Creek, Canoe Township, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (38) SR 1046, Straight Run Bridge over Straight Run, Banks Township, Bridge Painting 80,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $15,000) (39) SR 2019, Tearing Run Bridge No.1 over Tearing Run, Center Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (40) SR 2019, Tearing Run Bridge No.2 over Tearing Run, Center Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (41) SR 3003, Tunnelton Bridge over Conemaugh River, Conemaugh Township, Bridge Painting 525,000 (Base Construction Allocation - $510,000) (Design and Contingencies - $15,000) (42) SR 3007, Clarksburg Bridge over Blacklegs Creek, Conemaugh Township, Bridge Painting 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) (43) SR 3011, Black Lick Creek Bridge No.1 over Black Lick Creek, Brush Valley Township, Bridge Painting 405,000 (Base Construction Allocation - $390,000) (Design and Contingencies - $15,000) (44) SR 3011, Black Lick Creek Bridge No.2 over Black Lick Creek, Black Lick Township, Bridge Painting 405,000 (Base Construction Allocation - $390,000) (Design and Contingencies - $15,000) (45) SR 3013, Muddy Run Bridge over Muddy Run, Black Lick Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (46) SR 3016, Homer City Bridge over Two Lick Creek, Homer City Borough, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (47) SR 3031, Blacklegs Run Bridge over Blacklegs Run, Young Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (48) SR 3037, Walker Run Bridge over Walker Run, Armstrong Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (49) SR 3039, Anthony Run Bridge over Anthony Run, Armstrong Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (50) SR 4001, Fisher Siding Bridge over Crooked Creek, Armstrong Township, Bridge Painting 110,000 (Base Construction Allocation - $95,000) (Design and Contingencies - $15,000) (51) SR 4001, Five Points Bridge over South Branch of Plum Creek, Washington Township, Bridge Painting 100,000 (Base Construction Allocation - $85,000) (Design and Contingencies - $15,000) (52) SR 4006, Reddings Run Bridge over Reddings Run, Washington Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (53) SR 4008, Kimmel Station Bridge No.1 over Branch of Crooked Creek, Rayne Township, Bridge Painting 50,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $15,000) (54) SR 4008, Kimmel Station Bridge No.2 over Branch of Crooked Creek, Rayne Township, Bridge Painting 50,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $15,000) (55) SR 4035, Plumville Bridge over Plum Creek, Plumville Borough, Bridge Painting 75,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $15,000) (56) SR 0056, Seward Conrail Overpass, East Wheatfield Township, Bridge Replacement 2,570,000 (Base Construction Allocation - $2,080,000) (Land Allocation - $150,000) (Design and Contingencies - $340,000) (57) SR 0119, Two Lick Creek Bridge over Big Two Lick Creek, Center Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (58) SR 0119, Bridge over PA 840, Center Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (59) SR 0119, Yellow Creek Bridge over Yellow Creek, Center Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (60) SR 0119, Pickering Creek Bridge over Pickering Creek, East Mahoning Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (61) SR 0119, Northbound Bridge over PA 110, Rayne Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (62) SR 0119, Southbound Bridge over PA 110, Rayne Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (63) SR 0119, Pine Run Bridge No.1 over Pine Run, Rayne Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (64) SR 0119, Pine Run Bridge No.2 over Pine Run, Rayne Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (65) SR 0119, Northbound Bridge over US 422, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (66) SR 0119, Southbound Bridge over US 422, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (67) SR 0119, Southbound Bridge over PA 268, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (68) SR 0119, Northbound Bridge over SR 0268, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (69) SR 0119, Northbound Bridge over SR 1002, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (70) SR 0119, Southbound Bridge over SR 1002, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (71) SR 0119, Northbound Bridge over SR 1113 Ramp, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (72) SR 0119, Southbound Bridge over SR 1113 Ramp, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (73) SR 0286, Westbound Bridge over SR 1004, White Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (74) SR 0422, Cheese Run Bridge over Cheese Run, Armstrong Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (75) SR 0422, Crooked Creek Bridge over Crooked Creek, Armstrong Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (76) SR 0422, Crooked Creek Bridge No.2 over Branch Crooked Creek, Armstrong Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (77) SR 0422, Curry Run Bridge No.1 over Curry Run, Armstrong Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (78) SR 0422, Curry Run Bridge No.2 over Curry Run, Armstrong Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (79) SR 0422, Curry Run Bridge No.3 over Curry Run, Armstrong Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (80) SR 0422, Curry Run Bridge No.4 over Branch of Curry Run, Armstrong Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (81) SR 0422, Laurel Run Bridge over Laurel Run, Armstrong Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (82) SR 0422, Westbound Bridge over PA 840, Cherryhill Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (83) SR 0422, Eastbound Bridge over PA 840, Cherryhill Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (84) SR 0422, Little Yellow Creek Bridge over Little Yellow Creek, Pine Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (85) SR 0422, Bridge over Branch of Little Yellow Creek, Pine Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (86) SR 0422, Westbound Bridge over PA 954, White Township, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (87) SR 0422, Eastbound Bridge over PA 954, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (88) SR 1012, Diamondville Bridge over Two Lick Creek, Cherryhill Township, Bridge Replacement 1,250,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (89) SR 6422, McCarthy Run Bridge over Branch of McCarthy Run, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (90) SR 6422, Bridge over Tributary of McCarthy Run, White Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (91) SR 0119, Steel Railroad Bridge No.15 over PA 954, White Township, Bridge Painting 51,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $6,000) (92) SR 0422, Penn Run Exit Bridge Eastbound over TR 845, Cherryhill Township, Bridge Painting 61,000 (Base Construction Allocation - $55,000) (Design and Contingencies - $6,000) (93) SR 0422, Penn Run Exit Bridge Westbound over TR 845, Cherryhill Township, Bridge Painting 46,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $6,000) (94) SR 1044, Bridge over Big Canoe Creek, Canoe Township, Bridge Replacement 195,000 (Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (95) SR 1047, Bridge over Big Canoe Creek, Canoe Township, Bridge Replacement 205,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (96) SR 4006, Bridge over Plum Creek, South Mahoning Township, Bridge Replacement 205,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) Section 37. Jefferson County. (a) Local Bridges (1) Summerville Borough, County Bridge 40-A, Anderson Road Bridge over Runaway Run, Bridge Rehabilitation 415,000 (Base Construction Allocation - $345,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (2) Sykesville Borough, Station Street Bridge over Stump Creek, Bridge Replacement 570,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (3) Eldred Township, T-346 over Mill Creek, Bridge Replacement 420,000 (Base Construction Allocation - $330,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (4) Eldred Township, T-353 over Mill Run, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (5) Oliver Township, T-718 over Little Sandy Creek, Bridge Replacement 490,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (6) Union Township, T-320 over Little Mill Creek, Bridge Replacement 245,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (7) Union Township, T-321 over Runaway Run, Bridge Replacement 145,000 (Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000) (8) Young Township, T-632, Bridge No.JC-36 over Saw Mill Run, Bridge Replacement 330,000 (Base Construction Allocation - $270,000) (Design and Contingencies - $60,000) (9) Oliver Township, T-380, County Bridge No.22 over Hadden Run, Bridge Replacement 520,000 (10) Henderson Township, T-519, County Bridge No.7 over Big Run, Bridge Replacement 595,000 (11) Pine Creek Township, T-464, County Bridge No.17 over Little Mill Creek, Bridge Replacement 480,000 (12) Pine Creek Township, T-452, County Bridge No.16 over Little Mill Creek, Bridge Replacement 360,000 (13) Winslow Township, T-542, County Bridge No.10 over Sandy Lick Creek, Bridge Replacement 925,000 (14) Eldred Township, T-346, Mill Creek Bridge over Mill Creek, Bridge Replacement 420,000 (Base Construction Allocation - $330,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (15) Eldred Township, T-353, Culvert over Mill Creek, Bridge Replacement 195,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $35,000) (16) Oliver Township, T-718, Little Sandy Creek Bridge over Little Sandy Creek, Bridge Replacement 490,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (17) Reynoldsville Borough, Point View Avenue Bridge over Conrail, Bridge Replacement 580,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (18) Union Township and Eldred Township, T-342, Mill Creek Bridge over Mill Creek, Bridge Replacement 490,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (19) Young Township, T-632, Culvert over Saw Mill Run, Bridge Replacement 310,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (b) State Bridges (1) SR 3033, T-830, Knox No.1 Bridge over Swamp Run, Knox Township, Bridge Replacement 446,000 (Base Construction Allocation - $376,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (2) SR 0036, Sawmill Run Bridge over Sawmill Run, Punxsutawney Borough, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (3) SR 0119, Punxsutawney Bridge over Mahoning Creek, Punxsutawney Borough, Bridge Painting 250,000 (Base Construction Allocation - $235,000) (Design and Contingencies - $15,000) (4) SR 0410, Beaver Run Bridge over Beaver Run, Henderson Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (5) SR 0830, Falls Creek Bridge over Falls Creek, Falls Creek Township, Bridge Painting 80,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $15,000) (6) SR 0949, Corsica Exit Bridge over I-80, Union Township, Bridge Painting 205,000 (Base Construction Allocation - $190,000) (Design and Contingencies - $15,000) (7) SR 1009, Kyle's Run Bridge over Kyle's Run, Washington Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (8) SR 1027, Egypt Bridge over North Fork Creek, Polk Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (9) SR 2007, Clover Run Bridge over Clover Run, Gaskill Township, Bridge Painting 95,000 (Base Construction Allocation - $80,000) (Design and Contingencies - $15,000) (10) SR 2008, Stump Creek Bridge over Stump Creek, Henderson Township, Bridge Painting 100,000 (Base Construction Allocation - $85,000) (Design and Contingencies - $15,000) (11) SR 2023, Anita Bridge over Elk Run, McCalmont Township, Bridge Painting 60,000 (Base Construction Allocation - $45,000) (Design and Contingencies - $15,000) (12) SR 2023, Charcoal Plant Bridge over Sandy Lick Creek, Pine Creek Township, Bridge Painting 125,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $15,000) (13) SR 3003, Baxter Bridge over Redbank Creek, Clover Township, Bridge Painting 235,000 (Base Construction Allocation - $220,000) (Design and Contingencies - $15,000) (14) SR 4006, North Fork Creek Bridge over North Fork Creek, Warsaw Township, Bridge Painting 110,000 (Base Construction Allocation - $95,000) (Design and Contingencies - $15,000) (15) SR 0310, Bridge over Branch of Trout Run, Winslow Township, Bridge Replacement 490,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (16) SR 3018, Bridge over Little Sandy Creek, Oliver Township, Bridge Replacement 670,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (17) SR 0028, Knapp Run Bridge over Knapp Run, Clover Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (18) SR 0028, Coder Run Bridge over Coder Run, Rose Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (19) SR 0028, Mill Creek Bridge over Mill Creek, Snyder Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (20) SR 0028, Redbank Creek Bridge over Tributary of Redbank Creek, Summerville Borough, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (21) SR 0028, Seneca Run Bridge over Seneca Run, Warsaw Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (22) SR 0080, I-80 Bridge Westbound over PA 36, Brookville Borough, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (23) SR 0080, I-80 Bridge Eastbound over PA 36, Brookville Borough, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (24) SR 0080, I-80 Bridge over PA 28, Pine Creek Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (25) SR 0080, I-80 Bridge over Little Mill Creek, Pine Creek Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (26) SR 0080, I-80 Bridge over Mill Creek, Pine Creek Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (27) SR 0119, Rock Run Bridge over Rock Run, Bell Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (28) SR 0119, Stump Creek Bridge over Branch of Stump Creek, Henderson Township, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (29) SR 0119, Punxsutawney Bridge over Mahoning Creek, Punxsutawney Borough, Bridge Replacement 2,400,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $350,000) (30) SR 0119, Rock Run Bridge over Rock Run, Sykesville Borough, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (31) SR 0119, Sugar Camp Run Bridge over Sugar Camp Run, Sykesville Borough, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $100,000) (Design and Contingencies - $350,000) (32) SR 3003, Baxter Bridge over Redbank Creek, Clover Township, Bridge Rehabilitation 350,000 (Base Construction Allocation - $320,000) (Design and Contingencies - $30,000) (33) SR 3005, Worthville Bridge over Little Sandy Creek, Beaver Township, Bridge Painting 115,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $15,000) (34) SR 3007, Summerville Borough Bridge over Redbank Creek, Summerville Borough, Bridge Replacement 1,730,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $80,000) (Design and Contingencies - $150,000) (35) SR 3008, Perryville Run Bridge over Perryville Run, Perry Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (36) SR 3008, Horatio Bridge over Branch of Mahoning Creek, Perry Township, Bridge Painting 55,000 (Base Construction Allocation - $40,000) (Design and Contingencies - $15,000) (37) SR 3013, Valier Truss Bridge over Mahoning Creek, Perry Township, Bridge Painting 700,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $100,000) (38) SR 3014, Sprankle Mills Bridge over Big Run, Oliver Township, Bridge Painting 100,000 (Base Construction Allocation - $85,000) (Design and Contingencies - $15,000) (39) SR 3014, Worthville Bridge over Little Sandy Creek, Perry Township, Bridge Painting 105,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $15,000) (40) SR 3018, Coolspring Bridge over Little Sandy Creek, Oliver Township, Bridge Replacement 670,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (41) SR 3033, Fivemile Run Bridge over Fivemile Run, Brookville Borough, Bridge Replacement 595,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $175,000) (42) SR 3039, Brookville Bridge No.2 over Fivemile Run, Brookville Borough, Bridge Replacement 590,000 (Base Construction Allocation - $500,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (43) SR 4005, Richardsville Bridge over North Fork Creek, Warsaw Township, Bridge Replacement 490,000 (Base Construction Allocation - $400,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (44) SR 4005, Perkin Run Bridge over Perkin Run, Warsaw Township, Bridge Painting 65,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $15,000) (45) SR 4005, Richardsville Bridge over North Fork Creek, Warsaw Township, Bridge Painting 90,000 (Base Construction Allocation - $75,000) (Design and Contingencies - $15,000) (46) SR 1009, Bridge over Beaverdam Run, Washington Township, Bridge Replacement 205,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (47) SR 2019, Bridge over Saw Mill Run, Henderson Township, Bridge Replacement 205,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (48) SR 2019, Desire Bridge over Big Run, McCalmont Township, Bridge Replacement 205,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (49) SR 3014, Bridge over McCracken Run, Oliver Township, Bridge Rehabilitation 205,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) Section 38. Juniata County. (a) Local Bridges (1) Fayette Township, T-558 over West Branch of , Bridge Rehabilitation 21,000 (Base Construction Allocation - $18,000) (Design and Contingencies - $3,000) (2) Fayette Township, T-602 over Little Lost Creek, Bridge Rehabilitation 19,000 (Base Construction Allocation - $17,000) (Design and Contingencies - $2,000) (3) Delaware Township, T-471, Delaware Creek Bridge, Bridge Replacement 210,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (4) Fermanagh Township, T-410, Lost Creek Bridge, Bridge Replacement 640,000 (Base Construction Allocation - $510,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000) (5) Milford Township, T-360, Licking Creek Bridge over Licking Creek, Bridge Rehabilitation 350,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (6) Susquehanna Township, T-315, Mahatango Bridge over Mahatango Creek, Bridge Replacement 370,000 (Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (7) Tuscarora Township, Spectacle Gap Bridge over Spectacle Gap Run, Bridge Replacement 80,000 (Base Construction Allocation - $73,000) (Design and Contingencies - $7,000) (8) Tuscarora Township, T-309, Tuscarora Creek Bridge, Bridge Replacement 1,200,000 (Base Construction Allocation - $930,000) (Land Allocation - $20,000) (Design and Contingencies - $250,000) (9) Tuscarora Township, T-387, Willow Run Bridge, Bridge Replacement 370,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (b) State Bridges (1) SR 0850, Laurel Run Bridge over Laurel Run, Village of Honey Grove, Tuscarora Township, Bridge Replacement 670,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (2) SR 0850, Bridge over Tuscarora Creek, Tuscarora Township, Bridge Rehabilitation 155,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $5,000) (3) SR 0850, Bridge over Tuscarora Creek, Tuscarora Township, Bridge Replacement 1,420,000 (Base Construction Allocation - $1,280,000) (Land Allocation - $40,000) (Design and Contingencies - $100,000) (4) SR 0035, Lost Creek Bridge over Lost Creek, Fayette Township, Bridge Replacement 795,000 (Base Construction Allocation - $600,000) (Land Allocation - $10,000) (Design and Contingencies - $185,000) (5) SR 0035, Juniata River Bridge over Juniata River, Mifflintown Borough, Bridge Replacement 4,700,000 (Base Construction Allocation - $4,000,000) (Land Allocation - $200,000) (Design and Contingencies - $500,000) (6) SR 0075, Bridge over US 22, Walker Township, Bridge Painting 810,000 (Base Construction Allocation - $800,000) (Design and Contingencies - $10,000) (7) SR 0333, Delaware Creek Bridge, Thompsontown Borough, Bridge Replacement 560,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (8) SR 1002, Lost Creek Bridge over Lost Creek, Fermanagh Township, Bridge Replacement 920,000 (Base Construction Allocation - $730,000) (Land Allocation - $10,000) (Design and Contingencies - $180,000) (9) SR 1004, Little Lost Creek Bridge over Little Lost Creek, Fayette Township, Bridge Replacement 260,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (10) SR 2010, Stoney Run Bridge over Tributary of Stoney Run, Monroe Township, Bridge Replacement 290,000 (Base Construction Allocation - $180,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000) (11) SR 3025, Tuscarora Creek Bridge over Tuscarora Creek, Lack Township, Bridge Replacement 560,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) Section 39. Lackawanna County. (a) Local Bridges (1) Mayfield Borough, Poplar Street Bridge No.1 at Junction of South Washington Avenue, Bridge Rehabilitation 150,000 (Base Construction Allocation - $130,000) (Design and Contingencies - $20,000) (2) Benton Township, T-474 and T-470, Seamans Bridge, Bridge Rehabilitation 800,000 (3) South Abington Township, Leach Street Bridge, Bridge Replacement 500,000 (b) State Bridges (1) SR 1016, Hill Street Bridge over , Jessup and Blakely Boroughs, Bridge Deck Rehabilitation 890,000 (Base Construction Allocation - $800,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (2) SR 3011, Keyser Avenue Bridge over Lindy Creek, City of Scranton, Bridge Replacement 185,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (3) SR 0171, Bridge over Elk Creek at Junction of SR 1011, Fell Township, Bridge Replacement 660,000 (Base Construction Allocation - $520,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (4) SR 0247, Bridge over South Branch of Tunkhannock Creek, North of TR 438, Scott Township, Bridge Replacement 426,000 (Base Construction Allocation - $330,000) (Land Allocation - $10,000) (Design and Contingencies - $86,000) (5) SR 2003, Bridge over Wallenpaupack Creek, North of TR 348, Jefferson Township, Bridge Replacement 355,000 (Base Construction Allocation - $275,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (6) SR 3013, Main Street Bridge, Old Forge Borough, Bridge Painting 660,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $60,000) (7) State Bridges, Countywide Bridge Zone Painting, Bridge Painting 370,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000) (8) SR 1013, Bridge over Elm Brook, 0.7 Mile North of SR 1006, Scott Township, Bridge Replacement 240,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (9) SR 0524, Kennedy Creek Bridge, 0.5 Mile East of TR 407, North Abington Township, Bridge Replacement 330,000 (Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (10) SR 0011, Roaring Brook Retaining Wall, Spruce Street Complex, City of Scranton, Bridge Replacement 1,320,000 (Base Construction Allocation - $1,160,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (11) SR 3020, Linden Street Bridge over Lackawanna River, City of Scranton, Bridge Rehabilitation 480,000 (Base Construction Allocation - $380,000) (Design and Contingencies - $100,000) (12) SR 4007, Ackerly Creek Bridge over Ackerly Creek, Abington Township, Bridge Replacement 363,000 (Base Construction Allocation - $264,000) (Land Allocation - $11,000) (Design and Contingencies - $88,000) (13) SR 0011, Birney Avenue Bridge over SR 8001 Ramp H, Moosic Borough, Bridge Rehabilitation 320,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000) (14) SR 2011, Bridge over Lehigh River, Clifton Township, Bridge Rehabilitation 120,000 (Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000) Section 40. Lancaster County. (a) Local Bridges (1) Manor Township, T-599, West Roseville Road Bridge over , Bridge Replacement 446,000 (Base Construction Allocation - $286,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (2) Mt. Joy Township, T-350, Risser Mill Bridge over Tributary of Little Chickies Creek, Bridge Rehabilitation 550,000 (Base Construction Allocation - $400,000) (Design and Contingencies - $150,000) (3) Pequea Township, Silver Mine Road at Burnt Mills, Bridge Replacement 100,000 (Base Construction Allocation - $90,000) (Design and Contingencies - $10,000) (4) East Hempfield and Manheim Townships, Shreiner Station Road Bridge over Conestoga Creek, Bridge Replacement 477,000 (Base Construction Allocation - $377,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (5) City of Lancaster, Liberty Avenue Bridge over Conrail, New Bridge Construction 5,000,000 (Base Construction Allocation - $4,400,000) (Land Allocation - $100,000) (Design and Contingencies - $500,000) (6) Manheim Borough, East Stiegel Street Bridge over Chickies Creek, Bridge Replacement 423,000 (Base Construction Allocation - $378,000) (Design and Contingencies - $45,000) (7) Penn Township and Manheim Borough, Power Road and Fuller Drive Bridge over Chickies Creek, Bridge Rehabilitation 25,000 (8) Rapho Township, T-347, Eby Chickies Road Bridge over Chickies Creek, Bridge Replacement 745,000 (Base Construction Allocation - $550,000) (Land Allocation - $75,000) (Design and Contingencies - $120,000) (9) Rapho Township, T-344, Newcomer Road Bridge over Chickies Creek, Bridge Replacement 670,000 (Base Construction Allocation - $450,000) (Land Allocation - $100,000) (Design and Contingencies - $120,000) (10) Rapho Township, T-360, Garfield Road Bridge over Chickies Creek, Bridge Replacement 600,000 (Base Construction Allocation - $600,000) (b) State Bridges (1) SR 1024, Bridge over Little , East Cocalico Township, Bridge Replacement 675,000 (Base Construction Allocation - $550,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (2) PA 372, Bridge over Buck Run, Sadsbury Township, Bridge Replacement 172,000 (Base Construction Allocation - $127,000) (Land Allocation - $13,000) (Design and Contingencies - $32,000) (3) SR 0897, Bridge over Muddy Creek, Brecknock Township, Bridge Replacement 1,636,000 (Base Construction Allocation - $1,212,000) (Land Allocation - $121,000) (Design and Contingencies - $303,000) (4) SR 1011, Bridge over Tributary of Muddy Creek, Earl Township, Bridge Replacement 522,000 (Base Construction Allocation - $386,000) (Land Allocation - $39,000) (Design and Contingencies - $97,000) (5) SR 2019, Bridge over Beaver Creek, Manor Township, Bridge Replacement 771,000 (Base Construction Allocation - $571,000) (Land Allocation - $57,000) (Design and Contingencies - $143,000) (6) SR 1045, Bridge over Cocalico Creek, Denver Borough, Bridge Replacement 1,317,000 (Base Construction Allocation - $975,000) (Land Allocation - $98,000) (Design and Contingencies - $244,000) (7) SR 1053, Bridge over Cocalico Creek, West Earl Township, Bridge Replacement 629,000 (Base Construction Allocation - $465,000) (Land Allocation - $47,000) (Design and Contingencies - $117,000) (8) SR 1026, Bridge over Cocalico Creek, West Cocalico Township, Bridge Replacement 1,173,000 (Base Construction Allocation - $869,000) (Land Allocation - $87,000) (Design and Contingencies - $217,000) (9) SR 3032, Bridge over Little Conestoga Creek, Manor Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $777,000) (Land Allocation - $78,000) (Design and Contingencies - $195,000) (10) SR 3017, Bridge over West Branch of Conestoga Creek, Strasburg Township, Bridge Replacement 523,000 (Base Construction Allocation - $387,000) (Land Allocation - $39,000) (Design and Contingencies - $97,000) (11) SR 1035, Bridge over Middle Creek, Clay Township, Bridge Replacement 527,000 (Base Construction Allocation - $390,000) (Land Allocation - $39,000) (Design and Contingencies - $98,000) (12) SR 2036, Bridge over , West Lampeter Township, Bridge Rehabilitation 1,704,000 (Base Construction Allocation - $1,263,000) (Land Allocation - $126,000) (Design and Contingencies - $315,000) (13) PA 222, Bridge over , West Lampeter Township, Bridge Rehabilitation 1,421,000 (Base Construction Allocation - $1,053,000) (Land Allocation - $105,000) (Design and Contingencies - $263,000) (14) SR 0741, Bridge over Conestoga River, Lancaster Township, Bridge Rehabilitation 848,000 (Base Construction Allocation - $628,000) (Land Allocation - $63,000) (Design and Contingencies - $157,000) (15) PA 472, Bridge over Octoraro Creek, Colerain Township, Bridge Rehabilitation 1,806,000 (Base Construction Allocation - $1,337,000) (Land Allocation - $134,000) (Design and Contingencies - $335,000) (16) Mt. Joy Station Pedestrian Overpass over Amtrak and Keystone Main Line, Mt. Joy Borough, New Pedestrian Bridge 2,500,000 (Base Construction Allocation - $2,400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (17) Eby Chickies Road, Bridge over Amtrak, Rapho Township, New Bridge Construction 5,000,000 Section 41. Lawrence County. (a) Local Bridges (1) City of New Castle, Willard Avenue Bridge over Tributary of Shenango River, Bridge Replacement 210,000 (Base Construction Allocation - $150,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (2) Wampum Borough, Main Street Bridge over Eckles Run, Bridge Rehabilitation 190,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $40,000) (3) Hickory Township, T-478, Bridge over Hettenbaugh Run, Bridge Replacement 350,000 (4) Little Beaver Township, T-340, Bridge over Little Beaver Creek, Bridge Replacement 400,000 (5) Pulaski Township, T-382, Bridge over Buchanan Run, Bridge Replacement 400,000 (6) Scott Township, T-485, Bridge over Slippery Rock Creek, Bridge Replacement 350,000 (Base Construction Allocation - $350,000) (7) Slippery Rock Township, T-395, Bridge over Hell's Run, Bridge Replacement 16,000 (Base Construction Allocation - $16,000) (8) Union Township, T-420, Bridge over Tributary of Shenango River, Bridge Replacement 500,000 (9) Wilmington Township, T-476, Bridge over Neshannock Creek, Bridge Replacement 500,000 (10) Wilmington Township, T-464, Bridge over Neshannock Creek, Bridge Replacement 800,000 (11) City of New Castle, Grant Street Bridge over Shenango River, Bridge Replacement 2,500,000 (Base Construction Allocation - $1,800,000) (Land Allocation - $200,000) (Design and Contingencies - $500,000) (12) North Beaver Township, T-341, Burkey Road Bridge over Honey Creek, Bridge Replacement 523,000 (Base Construction Allocation - $400,000) (Land Allocation - $3,000) (Design and Contingencies - $120,000) (13) North Beaver Township, T-320, McClain Road Bridge over Tributary of Sugar Creek, Bridge Replacement 343,000 (Base Construction Allocation - $250,000) (Land Allocation - $3,000) (Design and Contingencies - $90,000) (14) North Beaver Township, T-368, Paden Road Bridge No.1 over Tributary of Hickory Run, Bridge Replacement 343,000 (Base Construction Allocation - $250,000) (Land Allocation - $3,000) (Design and Contingencies - $90,000) (15) North Beaver Township, T-368, Paden Road Bridge No.2 over , Bridge Replacement 343,000 (Base Construction Allocation - $250,000) (Land Allocation - $3,000) (Design and Contingencies - $90,000) (16) North Beaver Township, T-361, Moravia Road Bridge over Sugar Creek, Bridge Replacement 343,000 (Base Construction Allocation - $250,000) (Land Allocation - $3,000) (Design and Contingencies - $90,000) (17) North Beaver Township, T-368, Paden Road Bridge No.3 over Jenkins Run, Bridge Replacement 523,000 (Base Construction Allocation - $400,000) (Land Allocation - $3,000) (Design and Contingencies - $120,000) (18) North Beaver Township, T-700, Wampum Road Bridge No.1 over Jenkins Run, Bridge Replacement 523,000 (Base Construction Allocation - $400,000) (Land Allocation - $3,000) (Design and Contingencies - $120,000) (19) North Beaver Township, T-322, Hillsville Road Bridge over Tributary of Hickory Run, Bridge Replacement 343,000 (Base Construction Allocation - $250,000) (Land Allocation - $3,000) (Design and Contingencies - $90,000) (20) North Beaver Township, T-395, Wampum Road Bridge No.2 over Hickory Run, Bridge Replacement 853,000 (Base Construction Allocation - $700,000) (Land Allocation - $3,000) (Design and Contingencies - $150,000) (21) North Beaver Township, T-395, Wampum Road Bridge No.3 over Mahoning River, Bridge Replacement 2,203,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $3,000) (Design and Contingencies - $200,000) (b) State Bridges (1) SR 0018, Mahoning Avenue Viaduct over Shenango River and Railroad, City of New Castle, Bridge Replacement 9,320,000 (Base Construction Allocation - $9,000,000) (Land Allocation - $20,000) (Design and Contingencies - $300,000) (2) SR 0018, Liberty Street Bridge over Hickory Run, New Castle City, Bridge Rehabilitation 450,000 (Base Construction Allocation - $300,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (3) SR 0060, SR 0060 Southbound over SR 4004, Neshannock Township, Bridge Replacement 350,000 (Base Construction Allocation - $200,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (4) SR 0065, Ellwood Road Bridge over B & O Railroad, Shenango Township, Bridge Replacement 400,000 (Base Construction Allocation - $250,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (5) SR 0488, Portersville Road Bridge over Morrison Run, Perry Township, Bridge Replacement 250,000 (Base Construction Allocation - $100,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (6) SR 0488, Portersville Road Bridge over Morrison Run, Perry Township, Bridge Replacement 250,000 (Base Construction Allocation - $100,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (7) SR 3001, South Main Street Bridge over Bessemer Haul Road, Bessemer Borough, Bridge Rehabilitation 950,000 (Base Construction Allocation - $800,000) (Design and Contingencies - $150,000) (8) SR 4004, Union and Neshannock Townships, Bridge Rehabilitation 800,000 (Base Construction Allocation - $700,000) (Design and Contingencies - $100,000) (9) SR 0060, Beaver Valley Expansion Bridge over SR 4005, Neshannock Township, Bridge Rehabilitation 650,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $150,000) (10) SR 0060, Beaver Valley Extension Bridge over SR 4005, Neshannock Township, Bridge Rehabilitation 127,000 (Base Construction Allocation - $116,000) (Design and Contingencies - $11,000) (11) SR 0081, US 224 State Street Bridge over SR 0422 and Ramp K, Union Township, Bridge Rehabilitation 706,000 (Base Construction Allocation - $644,000) (Design and Contingencies - $62,000) (12) SR 0422, Westbound Bridge over Beaver River, Railroad and Local Street, Taylor Township, Bridge Rehabilitation 6,841,000 (Base Construction Allocation - $6,741,000) (Design and Contingencies - $100,000) (13) SR 0422, Eastbound Bridge over Beaver River, Railroad and Local Street, Taylor Township, Bridge Replacement 6,963,000 (Base Construction Allocation - $6,863,000) (Design and Contingencies - $100,000) (14) SR 0422, Bridge over Business US 422, Union Township, Bridge Rehabilitation 1,379,000 (Base Construction Allocation - $1,254,000) (Design and Contingencies - $125,000) (15) SR 0422, Ben Franklin Highway Bridge over Business US 422, Union Township, Bridge Rehabilitation 436,000 (Base Construction Allocation - $398,000) (Design and Contingencies - $38,000) (16) SR 0551, Main Street Bridge over Beaver Creek, Little Beaver Township, Bridge Replacement 624,000 (Base Construction Allocation - $524,000) (Design and Contingencies - $100,000) (17) SR 2020, Pleasant Road Bridge over Camp Run, Perry Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $100,000) (18) SR 3002, Beaver Dam Road Bridge over Honey Creek, Little Beaver Township, Bridge Painting 30,000 (Base Construction Allocation - $25,000) (Design and Contingencies - $5,000) (19) SR 3004, Wallace Road Bridge over Sugar Creek, North Beaver Township, Bridge Replacement 130,000 (Base Construction Allocation - $120,000) (Design and Contingencies - $10,000) (20) SR 3004, Wallace Road Bridge over Branch of Honey Creek, North Beaver Township, Bridge Painting 30,000 (Base Construction Allocation - $25,000) (Design and Contingencies - $5,000) (21) SR 3004, Wallace Road Bridge over Branch of Honey Creek, North Beaver Township, Bridge Painting 325,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $25,000) (22) SR 4006, Coffee Run Bridge over Coffee Run, Mahoning Township, Bridge Replacement 335,000 (Base Construction Allocation - $270,000) (Land Allocation - $15,000) (Design and Contingencies - $50,000) (23) SR 0224, Bridge over Conrail, Mahoning Township, Bridge Replacement 2,000,000 (Base Construction Allocation - $1,700,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000) (24) SR 2003, Wurtemburg Road Bridge over Branch of Duck Run, Mahoning Township, Bridge Replacement 135,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $15,000) (25) SR 0168, Moravia Street Bridge over US 422, Taylor Township, Bridge Rehabilitation 761,000 (Base Construction Allocation - $662,000) (Design and Contingencies - $99,000) (26) SR 0288, Main Street Bridge over Tributary of Beaver River, Wayne Township, Bridge Replacement 296,000 (Base Construction Allocation - $240,000) (Land Allocation - $20,000) (Design and Contingencies - $36,000) (27) SR 1001, High Street Bridge over Little Neshannock Creek, New Wilmington Borough, Bridge Replacement 89,000 (Base Construction Allocation - $60,000) (Land Allocation - $20,000) (Design and Contingencies - $9,000) (28) SR 2007, Armstrong Road Bridge over Branch of Slippery Rock Creek, Perry Township, Bridge Replacement 420,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (29) SR 3004, Honey Creek Bridge No.1 over Branch of Honey Creek, North Beaver Township, Bridge Rehabilitation 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (30) SR 3004, Honey Creek Bridge No.2 over Branch of Honey Creek, North Beaver Township, Bridge Painting 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (31) SR 3004, Honey Creek Bridge No.3 over Branch of Honey Creek, North Beaver Township, Bridge Painting 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (32) SR 4001, Villa Maria Road Bridge over Tributary of Coffee Run, Mahoning Township, Bridge Replacement 234,000 (Base Construction Allocation - $186,000) (Land Allocation - $20,000) (Design and Contingencies - $28,000) (33) SR 0488, Bridge over Connequessing Creek, Ellport Borough, Bridge Rehabilitation 3,010,000 (34) SR 4007, Bridge over Sankey Run, Union Township, Bridge Replacement 400,000 (Land Allocation - $50,000) (Design and Contingencies - $350,000) (35) SR 2005, Bridge over Slippery Rock Creek, Wayne and Perry Townships, Bridge Replacement 793,000 (Land Allocation - $150,000) (Design and Contingencies - $643,000) Section 42. Lebanon County. (a) Local Bridges (1) Union Township, T-617, Green Point School House Bridge over Trout Run, Bridge Replacement 255,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (2) Bethel Township, Market Drive, T-545 over Beach Run, Bridge Replacement 30,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $10,000) (3) South Londonderry Township, Patrick Road, T-331 over Tributary of Little Conewago Creek, Bridge Rehabilitation 5,000 (Base Construction Allocation - $4,000) (Design and Contingencies - $1,000) (4) South Londonderry Township, Eckert Road, T-304 over Little Conewago Creek, Bridge Rehabilitation 5,000 (Base Construction Allocation - $4,000) (Design and Contingencies - $1,000) (5) South Londonderry Township, Risser Road, T-300 over Conewago Creek, Bridge Rehabilitation 4,000 (Base Construction Allocation - $3,000) (Design and Contingencies - $1,000) (6) South Londonderry Township, Long Road, T-304 over Tributary of Conewago Creek, Bridge Rehabilitation 4,000 (Base Construction Allocation - $3,000) (Design and Contingencies - $1,000) (7) South Londonderry Township, Eckert Road, T-304 over Tributary of Little Conewago Creek, Bridge Rehabilitation 5,000 (Base Construction Allocation - $4,000) (Design and Contingencies - $1,000) (8) South Londonderry Township, Church Road, T-303 over Unnamed Creek, Bridge Rehabilitation 3,000 (Base Construction Allocation - $2,000) (Design and Contingencies - $1,000) (9) South Londonderry Township, Patrick Road, T-331 over Tributary of Little Conewago Creek, Bridge Rehabilitation 4,000 (Base Construction Allocation - $3,000) (Design and Contingencies - $1,000) (10) South Londonderry Township, Hinkle Road, T-433 over Killinger Creek, Bridge Rehabilitation 4,000 (Base Construction Allocation - $3,000) (Design and Contingencies - $1,000) (11) South Londonderry Township, Brandt Road, T-346 over Killinger Creek, Bridge Rehabilitation 3,000 (Base Construction Allocation - $2,000) (Design and Contingencies - $1,000) (12) Union Township, Green Point School House Road, T-617 over Trout Run, Bridge Replacement 90,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $20,000) (13) South Lebanon Township, Wilhelm Overpass, Reconstruct as Pedestrian Bridge 150,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $25,000) (b) State Bridges (1) PA 934, Bridge over Conrail, Annville Township, Bridge Replacement 981,000 (Base Construction Allocation - $726,000) (Land Allocation - $73,000) (Design and Contingencies - $182,000) (2) SR 2014, Bridge over Mill Creek, Millcreek Township, Bridge Replacement 691,000 (Base Construction Allocation - $512,000) (Land Allocation - $51,000) (Design and Contingencies - $128,000) Section 43. Lehigh County. (a) Local Bridges (1) Coplay and Northampton Boroughs, Chestnut Street Bridge over Lehigh River, Bridge Rehabilitation 2,000,000 (Base Construction Allocation - $1,900,000) (Design and Contingencies - $100,000) (2) Hokendauqua and North Catasauqua Boroughs, Lehigh Street Bridge over Lehigh River, Bridge Replacement 8,750,000 (Base Construction Allocation - $8,500,000) (Design and Contingencies - $250,000) (3) Allentown City, Linden Street Bridge over Jordan Creek, Bridge Rehabilitation 1,680,000 (Base Construction Allocation - $1,600,000) (Design and Contingencies - $80,000) (b) State Bridges (1) SR 4007, Schlicher's Bridge over Jordan Creek, North Whitehall Township, Bridge Replacement 875,000 (Base Construction Allocation - $560,000) (Land Allocation - $145,000) (Design and Contingencies - $170,000) (2) SR 3011, Farmington Road over Tributary of Schaffer Run, Upper Macungie Township, Bridge Rehabilitation 330,000 (Base Construction Allocation - $175,000) (Land Allocation - $55,000) (Design and Contingencies - $100,000) (3) SR 1027, Cold Springs Road over Spring Creek, Whitehall Township, Bridge Replacement 2,550,000 (Base Construction Allocation - $1,640,000) (Land Allocation - $420,000) (Design and Contingencies - $490,000) (4) SR 0378, Bridges over 14th, 8th and Eaton Avenue, Catasaqua and Broad Streets, Bridge Replacement 457,000 (Base Construction Allocation - $400,000) (Land Allocation - $12,000) (Design and Contingencies - $45,000) (5) American Parkway Bridge over Lehigh River, Allentown City, Bridge Replacement 17,000,000 (Base Construction Allocation - $15,000,000) (Land Allocation - $1,000,000) (Design and Contingencies - $1,000,000) Section 44. Luzerne County. (a) Local Bridges (1) Ashley Borough, Ashley Street Bridge, Bridge Removal 260,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $55,000) (2) Franklin Township, T-784, Bridge over Sutton Creek, Bridge Replacement 320,000 (Base Construction Allocation - $250,000) (Land Allocation - $15,000) (Design and Contingencies - $55,000) (3) Black Creek Township, T-309 over Falls Run Creek, Bridge Replacement 395,000 (Base Construction Allocation - $265,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (4) Black Creek Township, T-314 over Branch of Black Creek, Bridge Replacement 440,000 (Base Construction Allocation - $310,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (5) Butler Township, T-356 over , Bridge Replacement 405,000 (Base Construction Allocation - $275,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (6) City of Wilkes-Barre, Division Street over Solomon's Creek, Bridge Replacement 955,000 (Base Construction Allocation - $800,000) (Land Allocation - $5,000) (Design and Contingencies - $150,000) (7) Dallas Township, County Road No.12 over Toby's Creek, Bridge Replacement 405,000 (Base Construction Allocation - $275,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (8) Dennison Township, County Road No.41 over Nescopeck Creek, Bridge Replacement 405,000 (Base Construction Allocation - $275,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (9) Dorrance Township, County Road No.30 over Wapwallopen Creek, Bridge Replacement 405,000 (Base Construction Allocation - $275,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (10) Fairmount Township, T-563 over Maple Run Creek, Bridge Replacement 395,000 (Base Construction Allocation - $265,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (11) Franklin Township, T-782 over Sutton Creek, Bridge Replacement 405,000 (Base Construction Allocation - $275,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (12) Hunlock Township, T-534 over Hunlock Creek, Bridge Replacement 405,000 (Base Construction Allocation - $275,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (13) Jackson Township, County Road No.16 over Toby's Creek, Bridge Replacement 350,000 (Base Construction Allocation - $225,000) (Land Allocation - $5,000) (Design and Contingencies - $120,000) (14) Jackson Township, County Road No.16 over Toby's Creek, Bridge Replacement 370,000 (Base Construction Allocation - $240,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (15) Jackson Township, T-605 over Branch of Harvey's Creek, Bridge Replacement 395,000 (Base Construction Allocation - $265,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (16) Jackson Township, County Road No.13 over Toby's Creek, Bridge Replacement 395,000 (Base Construction Allocation - $265,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (17) Lake Township, T-796 over Beaver Run Creek, Bridge Replacement 410,000 (Base Construction Allocation - $280,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (18) Lake Township, T-779 over Bryant Pond Outlet, Bridge Replacement 430,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (19) Nescopeck Township, T-381 over Branch of Nescopeck Creek, Bridge Replacement 410,000 (Base Construction Allocation - $280,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (20) Ross Township, T-680 over Huntingdon Creek, Bridge Replacement 410,000 (Base Construction Allocation - $280,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (21) Ross Township, T-571 over Outlet North Pond, Bridge Replacement 420,000 (Base Construction Allocation - $290,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (22) Ross Township, T-575 over Huntingdon Creek, Bridge Replacement 455,000 (Base Construction Allocation - $325,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (23) Ross Township, County Road No.2 over Marsh Creek, Bridge Replacement 440,000 (Base Construction Allocation - $310,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (24) Sugarloaf Township, T-332 over Branch of Nescopeck Creek, Bridge Replacement 430,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (25) Plymouth Township, T-497 over Mud Pond Inlet, Bridge Replacement 405,000 (Base Construction Allocation - $275,000) (26) Slocum Township, T-454 over Black Creek, Bridge Replacement 395,000 (Base Construction Allocation - $265,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (27) Wright Township, County Road No.21 over Wapwallopen Creek, Bridge Replacement 395,000 (Base Construction Allocation - $265,000) (Land Allocation - $5,000) (Design and Contingencies - $125,000) (28) City of Wilkes-Barre, Stanton Street, Bowman Spring Run Bridge, Intersection of Empire Street, Bridge Replacement 170,000 (Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (29) Borough of Larksville, Nesbitt Street Bridge, Bridge Replacement 150,000 (Base Construction Allocation - $136,000) (Design and Contingencies - $14,000) (30) City of Wilkes-Barre, Stanton Street Bridge over Bowman Spring Run, Bridge Replacement 500,000 (31) Kingston Township, SR 0309, One-Tenth of a Mile South of SR 1036, Bridge over Toby Creek, Bridge Replacement 1,085,000 (Base Construction Allocation - $896,000) (Land Allocation - $10,000) (Design and Contingencies - $179,000) (32) Kingston Township, SR 0309, One Mile South of SR 1014, Bridge over Toby Creek, Bridge Replacement 1,868,000 (Base Construction Allocation - $1,548,000) (Land Allocation - $10,000) (Design and Contingencies - $310,000) (33) Kingston Township, SR 0309, Seven-Tenths of a Mile South of SR 1014, Bridge over Toby Creek, Bridge Replacement 1,392,000 (Base Construction Allocation - $1,152,000) (Land Allocation - $10,000) (Design and Contingencies - $230,000) (34) Kingston Township, SR 0309, Six-Tenths of a Mile South of SR 1014, Bridge over Toby Creek, Bridge Replacement 1,138,000 (Base Construction Allocation - $940,000) (Land Allocation - $10,000) (Design and Contingencies - $188,000) (35) Dallas Township, SR 0415, Three-Tenths of a Mile from SR 1018, Bridge over Huntsville Creek, Bridge Replacement 711,000 (Base Construction Allocation - $584,000) (Land Allocation - $10,000) (Design and Contingencies - $117,000) (36) Exeter Borough, SR 1010, Two-Tenths of a Mile West of SR 1025, Bridge over Hicks Creek, Bridge Replacement 426,000 (Base Construction Allocation - $347,000) (Land Allocation - $10,000) (Design and Contingencies - $69,000) (37) Dallas Township, SR 1014, Bridge over SR 0309, Bridge Replacement 882,000 (Base Construction Allocation - $727,000) (Land Allocation - $10,000) (Design and Contingencies - $145,000) (38) West Wyoming Borough, SR 1021, Five-Tenths of a Mile North of SR 1010, Bridge over Abrahams Creek, Bridge Replacement 651,000 (Base Construction Allocation - $534,000) (Land Allocation - $10,000) (Design and Contingencies - $107,000) (39) Dallas Township, SR 1044, One and Eight-Tenths of a Mile East of SR 1041, Bridge over Branch of Toby Creek, Bridge Replacement 398,000 (Base Construction Allocation - $323,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000) (40) Kingston Township, T-846, Center Street, One-Tenth of a Mile East of TR 309, Bridge over Toby Creek, Bridge Replacement 490,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (41) Exeter Township, SR 0092, 153 feet North of SR 1040, Bridge over Lewis Creek, Bridge Replacement 471,000 (Base Construction Allocation - $384,000) (Land Allocation - $10,000) (Design and Contingencies - $77,000) (42) Pringle Borough, SR 0309, 500 feet North of SR 1013, Bridge over Toby Creek, Bridge Replacement 860,000 (Base Construction Allocation - $708,000) (Land Allocation - $10,000) (Design and Contingencies - $142,000) (43) Kingston Township, SR 0309, 399 feet North of Center Street, Bridge over Tributary of Toby Creek, Bridge Replacement 590,000 (Base Construction Allocation - $483,000) (Land Allocation - $10,000) (Design and Contingencies - $97,000) (44) Luzerne Borough, SR 1054, Intersection of SR 1013, Bridge over Toby Creek, Bridge Replacement 750,000 (Base Construction Allocation - $600,000) (Land Allocation - $30,000) (Design and Contingencies - $120,000) (b) State Bridges (1) SR 0011, Erie-Lackawanna Railroad Bridge over Erie-Lackawanna Railroad, Plymouth Township, Bridge Removal 185,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $25,000) (2) SR 1030, Harvey's Lake Bridge at Junction of SR 1053, Lake Township, Bridge Replacement 460,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $90,000) (3) SR 3007, Bridge over Wapwallopen Creek, South of SR 3010, Dorrance Township, Bridge Replacement 530,000 (Base Construction Allocation - $420,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (4) State Bridges, Countywide Bridge Zone Painting, Bridge Painting 500,000 (Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (5) SR 3038, Black Creek Stone Arch Bridge, 0.1 Mile North of SR 3018, Black Creek Township, Bridge Replacement 240,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (6) SR 1034, Pikes Creek Bridge, 132 Feet East of TR 11, Lake Township, Bridge Replacement 180,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (7) SR 2041, Wright Creek Bridge, 2 Miles North of TR 940, Dennison Township, Bridge Replacement 400,000 (Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (8) SR 0309, Toby's Creek Bridge over Toby's Creek, Kingston Township, Bridge Replacement 1,276,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $11,000) (Design and Contingencies - $165,000) (9) SR 0309, North Cross Valley Dams over Susquehanna River, Plains Township, Bridge Rehabilitation 1,517,000 (Base Construction Allocation - $1,377,000) (Design and Contingencies - $140,000) (10) SR 0415, Harveys Lake Inlet Bridge No.2 over Harveys Lake Inlet, Harveys Lake Borough, Bridge Replacement 345,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (11) SR 2036, Bald Mountain Road Bridge over Bear Creek, Bear Creek Township, Bridge Rehabilitation 220,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000) (12) SR 1054, Toby's Creek, Intersection of SR 1013, Luzerne Borough, Bridge Replacement 750,000 (Base Construction Allocation - $600,000) (Land Allocation - $30,000) (Design and Contingencies - $120,000) (13) SR 6309, Coal Brook Bridge, 0.2 Miles South of SR 2020, City of Wilkes-Barre, Bridge Replacement 900,000 (Base Construction Allocation - $720,000) (Land Allocation - $30,000) (Design and Contingencies - $150,000) (14) SR 0080, Black Creek Bridge, 4.0 Miles West of TR 93, Black Creek Township, Bridge Deck Replacement 2,000,000 (Base Construction Allocation - $1,800,000) (Design and Contingencies - $200,000) Section 45. Lycoming County. (a) Local Bridges (1) Mifflin Township, T-651 over Larry's Creek, Bridge Replacement 528,000 (Base Construction Allocation - $438,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (2) McIntyre Township, T-667, Rolston Bridge over , Bridge Replacement 1,620,000 (Base Construction Allocation - $1,400,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (3) Franklin Township, T-710, Bridge over Beaver Run, Bridge Replacement 265,000 (Base Construction Allocation - $212,000) (Land Allocation - $40,000) (Design and Contingencies - $13,000) (4) Piatt Township, T-365, Bridge over Larry's Creek, Bridge Replacement 1,251,000 (Base Construction Allocation - $1,039,000) (Land Allocation - $30,000) (Design and Contingencies - $182,000) (5) McIntyre Township, T-673, Bridge over Lycoming Creek, Bridge Replacement 902,000 (Base Construction Allocation - $744,000) (Land Allocation - $23,000) (Design and Contingencies - $135,000) (6) Shrewsbury Township, T-686, Bridge over Rock Run, Bridge Replacement 288,000 (Base Construction Allocation - $238,000) (Land Allocation - $7,000) (Design and Contingencies - $43,000) (7) Piatt Township, T-343, Bridge over Pine Run, Bridge Replacement 353,000 (Base Construction Allocation - $291,000) (Land Allocation - $9,000) (Design and Contingencies - $53,000) (8) Washington Township, T-397, Bridge over Deer Hole Creek, Bridge Replacement 517,000 (Base Construction Allocation - $426,000) (Land Allocation - $13,000) (Design and Contingencies - $78,000) (9) South Williamsport Borough, East Central Avenue, Bridge over Hagermans Run, Bridge Replacement 519,000 (Base Construction Allocation - $428,000) (Land Allocation - $13,000) (Design and Contingencies - $78,000) (10) Moreland Township, T-443, Bridge over Little , Bridge Replacement 780,000 (Base Construction Allocation - $630,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (11) Muncy Creek Township, T-437, Bridge over Branch of Muncy Creek, Bridge Replacement 335,000 (Base Construction Allocation - $268,000) (Land Allocation - $17,000) (Design and Contingencies - $50,000) (12) Muncy Creek Township, T-811, Bridge over Wolf Run, Bridge Replacement 150,000 (Base Construction Allocation - $120,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (13) Pine Township, T-782, Lycoming County Bridge No.109 over Texas Creek, Bridge Replacement 537,000 (Base Construction Allocation - $426,000) (Land Allocation - $6,000) (Design and Contingencies - $105,000) (14) Lycoming Township, T-688, Horn Road Bridge over Little Gap Run, Bridge Replacement 310,000 (Base Construction Allocation - $185,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (15) Penn Township, T-521, Bridge over Sugar Run, Bridge Replacement 355,000 (Base Construction Allocation - $225,000) (Land Allocation - $50,000) (Design and Contingencies - $80,000) (16) Shrewsbury Township, T-650, Iron Bridge over Muncy Creek, Bridge Replacement 880,000 (Base Construction Allocation - $750,000) (Land Allocation - $20,000) (Design and Contingencies - $110,000) (17) Washington Township, T-424, Bridge over , Bridge Replacement 380,000 (18) Wolf Township, T-270, Bridge over Gregs Run, Bridge Replacement 500,000 (19) Woodward Township, T-367, Bridge over Quenshukeny Run, Bridge Replacement 480,000 (20) Woodward Township, T-369, Bridge over Quenshukeny Run, Bridge Replacement 500,000 (b) State Bridges (1) SR 0220, Quenshukeny Run Bridge over Quenshukeny Run, Village of Linden, Bridge Replacement 395,000 (Base Construction Allocation - $316,000) (Land Allocation - $20,000) (Design and Contingencies - $59,000) (2) SR 0973, Bridge over Hoagland Run, 3 Miles West of Cogan Station, Bridge Rehabilitation 195,000 (Base Construction Allocation - $156,000) (Land Allocation - $10,000) (Design and Contingencies - $29,000) (3) SR 1006, Wallis Run Bridge over Wallis Run, Cascade Township, Bridge Replacement 65,000 (Base Construction Allocation - $50,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000) (4) SR 2022, Mill Creek Bridge, North of Montoursville, Bridge Replacement 668,000 (Base Construction Allocation - $575,000) (Land Allocation - $43,000) (Design and Contingencies - $50,000) (5) SR 2051, Wolf Run Bridge over Wolf Run, South of SR 0220, Muncy Township, Bridge Replacement 638,000 (Base Construction Allocation - $510,000) (Land Allocation - $32,000) (Design and Contingencies - $96,000) (6) SR 3024, Jobs Run Road Bridge over Tributary of Larry's Creek, East of Salladasburg, Bridge Replacement 108,000 (Base Construction Allocation - $92,000) (Land Allocation - $8,000) (Design and Contingencies - $8,000) (7) SR 3028, West 4th Street, Lycoming Creek Bridge, City of Williamsport, Bridge Rehabilitation 216,000 (Base Construction Allocation - $185,000) (Land Allocation - $15,000) (Design and Contingencies - $16,000) (8) SR 0044, Bridge over Conrail, Bridge Painting 210,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $10,000) (9) SR 0180, I-180 Eastbound Bridge over , Bridge Painting 135,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $10,000) (10) SR 0180, I-180 Westbound Bridge over Loyalsock Creek, Bridge Painting 135,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $10,000) (11) SR 2014, Bridge over Lycoming Creek, Bridge Painting 780,000 (Base Construction Allocation - $770,000) (Design and Contingencies - $10,000) (12) SR 2061, Bridge over , Bridge Painting 80,000 (Base Construction Allocation - $70,000) (Design and Contingencies - $10,000) (13) SR 0014, SR 0014 over Trout Run, Lewis Township, Bridge Replacement 640,000 (Base Construction Allocation - $512,000) (Land Allocation - $32,000) (Design and Contingencies - $96,000) (14) SR 0044, SR 0044 over Ramsey Run, Cummings Township, Bridge Replacement 394,000 (Base Construction Allocation - $315,000) (Land Allocation - $20,000) (Design and Contingencies - $59,000) (15) SR 0044, SR 0044 over Pine Bottom Run, Cummings Township, Bridge Replacement 360,000 (Base Construction Allocation - $288,000) (Land Allocation - $18,000) (Design and Contingencies - $54,000) (16) SR 0118, SR 0118 over Big Run, Franklin Township, Bridge Replacement 382,000 (Base Construction Allocation - $307,000) (Land Allocation - $19,000) (Design and Contingencies - $56,000) (17) SR 0284, SR 0284 over Blacks Creek, Pine Township, Bridge Replacement 700,000 (Base Construction Allocation - $570,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (18) SR 0405, SR 0405 over West Branch of Susquehanna River, Muncy Creek Township, Bridge Replacement 24,924,000 (Base Construction Allocation - $19,939,000) (Land Allocation - $1,246,000) (Design and Contingencies - $3,739,000) (19) SR 0654, SR 0654 over Mosquito Creek, Anthony Township, Bridge Replacement 674,000 (Base Construction Allocation - $539,000) (Land Allocation - $34,000) (Design and Contingencies - $101,000) (20) SR 0973, SR 0973 over Mud Run, Mifflin Township, Bridge Replacement 294,000 (Base Construction Allocation - $252,000) (Land Allocation - $20,000) (Design and Contingencies - $22,000) (21) SR 1005, SR 1005 over Plunketts Creek, Plunketts Creek Township, Bridge Replacement 366,000 (Base Construction Allocation - $293,000) (Land Allocation - $18,000) (Design and Contingencies - $55,000) (22) SR 2061, SR 2061 over Sugar Run, Moreland Township, Bridge Replacement 443,000 (Base Construction Allocation - $354,000) (Land Allocation - $22,000) (Design and Contingencies - $67,000) (23) SR 2085, SR 2085 over Muncy Creek, Penn Township, Bridge Replacement 1,050,000 (Base Construction Allocation - $840,000) (Land Allocation - $53,000) (Design and Contingencies - $157,000) (24) SR 0405, East Water Street over Glade Run, Muncy Borough, Bridge Replacement 500,000 (Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (25) SR 1003, Bridge over Wallis Run, Gamble Township, Bridge Replacement 1,020,000 (Base Construction Allocation - $820,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (26) SR 1003, Bridge over Salt Run, Gamble Township, Bridge Replacement 390,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (27) US 15, Bridge over 2nd Avenue, South Williamsport Borough, Bridge Replacement 1,550,000 (Base Construction Allocation - $1,250,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (28) SR 44, Bridge over Conrail, Nippenose Township, Bridge Replacement 2,425,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $100,000) (Design and Contingencies - $325,000) (29) US 220, Southbound Bridge over SR 3005, Jersey Shore Borough, Deck Replacement 275,000 (Base Construction Allocation - $225,000) (Design and Contingencies - $50,000) (30) US 220, Northbound Bridge over Railroad, Porter Township, Bridge Replacement 900,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $150,000) (31) US 220, Southbound Bridge over Railroad, Porter Township, Bridge Rehabilitation 900,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $150,000) (32) US 220, Northbound Bridge over SR 3005, Jersey Shore Borough, Bridge Rehabilitation 275,000 (Base Construction Allocation - $225,000) (Design and Contingencies - $50,000) (33) US 220, Ramp on US 220, Jersey Shore Borough, Deck Replacement 1,500,000 (Base Construction Allocation - $1,250,000) (Design and Contingencies - $250,000) (34) US 220, Northbound Bridge over Ramp A, Woodward Township, Bridge Rehabilitation 550,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $50,000) (35) US 220, Northbound Bridge over T-331, Woodward Township, Bridge Rehabilitation 275,000 (Base Construction Allocation - $250,000) (Design and Contingencies - $25,000) (36) US 220, Northbound Bridge over Railroad, Woodward Township, Bridge Rehabilitation 825,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $75,000) (37) US 220, Southbound Bridge over Ramp, Woodward Township, Bridge Rehabilitation 550,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $50,000) (38) US 220, Southbound Bridge over T-331, Woodward Township, Bridge Rehabilitation 275,000 (Base Construction Allocation - $250,000) (Design and Contingencies - $25,000) (39) US 220, Southbound Bridge over Railroad, Woodward Township, Bridge Rehabilitation 825,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $75,000) (40) US 220, Reach Road over US 220, City of Williamsport, Deck Replacement 1,400,000 (Base Construction Allocation - $1,250,000) (Design and Contingencies - $150,000) (41) US 220, Northbound Bridge over Arch Street, City of Williamsport, Bridge Rehabilitation 385,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $35,000) (42) US 220, Southbound Bridge over Arch Street, City of Williamsport, Bridge Rehabilitation 385,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $35,000) (43) US 220, Northbound Bridge over Lycoming Creek, City of Williamsport, Bridge Rehabilitation 1,100,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $100,000) (44) I-180, Eastbound Bridge over Maynard Street, City of Williamsport, Bridge Widening and Deck Replacement 950,000 (Base Construction Allocation - $800,000) (Design and Contingencies - $150,000) (45) I-180, Westbound Bridge over Maynard Street, City of Williamsport, Bridge Widening and Deck Replacement 950,000 (Base Construction Allocation - $800,000) (Design and Contingencies - $150,000) (46) I-180, Eastbound and Westbound Bridges over Railroad, City of Williamsport, Bridge Widening and Deck Replacement 900,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $150,000) (47) I-180, Eastbound Bridge over Hepburn Street, City of Williamsport, Bridge Widening and Deck Replacement 1,200,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $200,000) (48) I-180, Westbound Bridge over Hepburn Street, City of Williamsport, Bridge Widening and Deck Replacement 1,200,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $200,000) (49) I-180, Eastbound Bridge over Basin Street, City of Williamsport, Bridge Rehabilitation 550,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $50,000) (50) I-180, Westbound Bridge over Basin Street, City of Williamsport, Bridge Rehabilitation 550,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $50,000) (51) I-180, Eastbound and Westbound Bridges over Muncy Creek, Muncy Creek Township, Bridge Rehabilitation 1,100,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $100,000) (52) I-180, Eastbound and Westbound Bridges over PA 405, Muncy Creek Township, Bridge Rehabilitation 1,100,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $100,000) (53) I-180, Eastbound Bridge over SR 4024, Muncy Creek Township, Bridge Rehabilitation 550,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $50,000) (54) I-180, Eastbound and Westbound Bridges over SR 2061, Muncy Creek Township, Bridge Rehabilitation 660,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $60,000) (55) I-180, Eastbound and Westbound Bridges over SR 2014, Muncy Creek Township, Bridge Rehabilitation 660,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $60,000) (56) SR 0180, I-180 Bridge over Loyalsock Creek, Loyalsock Township and Montoursville Borough, Bridge Rehabilitation 800,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $50,000) (57) SR 0973, Hoagland Run Bridge over Hoagland Run, Lycoming Township, Bridge Replacement 620,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (58) SR 2039, Mill Creek Bridge over Mill Creek, Loyalsock Township, Bridge Replacement 840,000 (Base Construction Allocation - $680,000) (Land Allocation - $30,000) (Design and Contingencies - $130,000) (59) SR 8028, Ramp Bridge over Ramp N, Piatt Township, Bridge Deck Replacement 1,500,000 (Base Construction Allocation - $1,400,000) (Design and Contingencies - $100,000) (60) I-180, Halls Station to Northumberland County Line, Muncy Creek Township, 11 Structures, Bridge Rehabilitation 3,400,000 (Base Construction Allocation - $3,200,000) (Design and Contingencies - $200,000) (61) SR 2049 over I-180, Bridge Rehabilitation 3,000,000 (Base Construction Allocation - $2,500,000) (Design and Contingencies - $500,000) (62) Various Bridges Rehabilitation 382,000 Section 46. McKean County. (a) Local Bridges (1) Foster Township, T-359, Garlock Hollow Bridge over Kendall Creek, Bridge Replacement 580,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $160,000) (b) State Bridges (1) SR 3009, Kinzua Creek Bridge over Kinzua Creek, Borough of Mt. Jewett, Bridge Replacement 880,000 (Base Construction Allocation - $700,000) (Land Allocation - $30,000) (Design and Contingencies - $150,000) (2) SR 4005, Kendall Creek Bridge over Kendall Creek, City of Bradford, Bridge Replacement 800,000 (Base Construction Allocation - $650,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (3) SR 9900, Kings Run Bridge over Kings Run, Ceres Township, Bridge Replacement 370,000 (Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (4) SR 1002, Annin Creek Bridge, Annin Township, Bridge Replacement 468,000 (Base Construction Allocation - $373,000) (Land Allocation - $15,000) (Design and Contingencies - $80,000) (5) SR 0006, Bridge over Potato Creek, Keating Township, Bridge Replacement 300,000 (Base Construction Allocation - $240,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (6) SR 0646, Pennbrook Run Bridge over Pennbrook Run, Village of Gilmore, Foster Township, Bridge Replacement 114,000 (Base Construction Allocation - $90,000) (Land Allocation - $4,000) (Design and Contingencies - $20,000) (7) SR 1002, Potato Creek Bridge over Potato Creek, Keating Township, Bridge Painting 410,000 (Base Construction Allocation - $400,000) (Design and Contingencies - $10,000) Section 47. Mercer County. (a) Local Bridges (1) City of Sharon, Service Avenue Bridge over Pine Run, Bridge Replacement 240,000 (Base Construction Allocation - $210,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (2) City of Sharon, Wengler Avenue Bridge over Pine Hollow Run, Bridge Replacement 218,000 (Base Construction Allocation - $193,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (3) Pine Township, T-355, Pinchlong Road Bridge over Swamp Run, Bridge Replacement 203,000 (Base Construction Allocation - $178,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (4) Pine Township, T-878, Diamond Road Bridge over Wolf Creek, Bridge Replacement 1,813,000 (Base Construction Allocation - $1,668,000) (Land Allocation - $60,000) (Design and Contingencies - $85,000) (5) Pine Township, T-413, Daugherty Road Bridge over Wolf Run, Bridge Replacement 407,000 (Base Construction Allocation - $352,000) (Land Allocation - $15,000) (Design and Contingencies - $40,000) (6) Shenango Township, T-955, Oak Hill Road Bridge over Turkey Run, Bridge Replacement 297,000 (Base Construction Allocation - $257,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (7) Shenango Township, Heasley Road Bridge over Tributary of Shenango River, Bridge Replacement 173,000 (Base Construction Allocation - $155,000) (Land Allocation - $3,000) (Design and Contingencies - $15,000) (8) Springfield Township, T-722, Spring Road Bridge over Mill Run, Bridge Replacement 230,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (9) Worth Township, T-912, Jack Atwell Road Bridge over Wolf Creek, Bridge Replacement 297,000 (Base Construction Allocation - $257,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (10) Springfield Township, North Spring Road Bridge, Bridge Replacement 245,000 (Base Construction Allocation - $210,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) (11) Delaware Township, T-634, Redfoot Road Bridge over Otter Creek, Bridge Replacement 220,000 (Base Construction Allocation - $185,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) (12) Fairview Township, T-623, Runkle Lane Bridge over Coolspring Creek, Bridge Replacement 220,000 (Base Construction Allocation - $185,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) (13) City of Hermitage, T-307, Lynnwood Drive Bridge over Bobby Run, Bridge Replacement 308,000 (Base Construction Allocation - $270,000) (Land Allocation - $3,000) (Design and Contingencies - $35,000) (14) Sharon City, Prindle Street Bridge over Pine Run, Bridge Replacement 485,000 (Base Construction Allocation - $405,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (b) State Bridges (1) SR 0058, SR 0058 over Sugar Creek, Greene Township, Bridge Replacement 270,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (2) SR 0058, SR 0058 over Tributary of Shenango River, Greenville Borough, Bridge Replacement 250,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $30,000) (3) SR 0058, SR 0058 over I-79, Findley Township, Bridge Replacement 1,630,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (4) SR 0062, SR 0062 over Shenango River/Riverside Drive, City of Sharon, Bridge Replacement 2,780,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $30,000) (Design and Contingencies - $250,000) (5) SR 0158, SR 0158 over Little Neshannock Creek, Wilmington Township, Bridge Replacement 770,000 (Base Construction Allocation - $650,000) (Land Allocation - $40,000) (Design and Contingencies - $80,000) (6) SR 0173, SR 0173 over Mill Creek, New Lebanon Borough, Bridge Replacement 430,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (7) SR 0208, SR 0208 over Wolf Creek, Grove City Borough, Bridge Replacement 1,000,000 (Base Construction Allocation - $870,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (8) SR 0258, SR 0258 over Daley Run, Jefferson Township, Bridge Replacement 430,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (9) SR 0318, SR 0318 over Shenango River/Street/Railroad, West Middlesex Borough, Bridge Replacement 4,400,000 (Base Construction Allocation - $3,700,000) (Land Allocation - $100,000) (Design and Contingencies - $600,000) (10) SR 0518, SR 0518 over Pine Hollow Run, City of Hermitage, Bridge Replacement 410,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000) (11) SR 0846, SR 0846 over Shenango Reservoir, South Pymatuning Township, Bridge Replacement 1,500,000 (Base Construction Allocation - $1,340,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (12) SR 2006, SR 2006 over I-79, Springfield Township, Bridge Replacement 1,100,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000) (13) SR 2014, SR 2014 over Mill Creek, Findley Township, Bridge Replacement 330,000 (Base Construction Allocation - $240,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (14) SR 2025, SR 2025 over Lake Barmore Outlet, Pine Township, Bridge Replacement 300,000 (Base Construction Allocation - $230,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (15) SR 3011, SR 3011 over I-80, Shenango Township, Bridge Replacement 810,000 (Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (16) SR 4014, SR 4014 over Shenango River, Delaware Township, Bridge Replacement 920,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (17) SR 0518, PA 518 (Walnut Street) Bridge over Pine Hollow Road, City of Hermitage, Bridge Replacement 550,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $50,000) (18) SR 4003, Wasser Bridge Road Bridge over Shenango River, West Salem Township, Bridge Replacement 1,620,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $40,000) (Design and Contingencies - $80,000) (19) SR 0080, Bridges over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation 2,120,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (20) SR 0080, Bridges over T-998, Wolf Creek Township, Bridge Rehabilitation 2,120,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (21) SR 0208, Bridge over I-79, Springfield Township, Bridge Replacement 4,000,000 (Base Construction Allocation - $3,600,000) (Land Allocation - $200,000) (Design and Contingencies - $200,000) (22) SR 2007, Bridge over Mill Creek, Findley Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (23) SR 2009, Bridge over Wolf Creek, Wolf Creek Township, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (24) SR 2009, Bridge over Centertown Run, Wolf Creek Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (25) SR 2013, Bridge over Munnel Run, Mercer Borough, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (26) SR 2016, Church Road Bridge, Findley Township, Bridge Replacement 400,000 (Base Construction Allocation - $320,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (27) SR 2024, Bridge over Wolf Creek, Worth Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (28) SR 2025, Bridge over Black Run, Liberty Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (29) SR 3008, Bridge over Small Stream, Hermitage Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (30) SR 3013, Bridge over Tributary of Little Neshannock Creek, Wilmington Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (31) SR 3018, Bridge over Shenango River, Sharpsville Borough, Bridge Replacement 4,920,000 (Base Construction Allocation - $4,400,000) (Land Allocation - $20,000) (Design and Contingencies - $500,000) (32) SR 3020, Bridge over Tributary of Shenango River, Jefferson Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (33) SR 3020, Bridge over Lackawannock Creek, Jefferson Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (34) SR 3030, Budd Street Bridge, Sharon Township, Bridge Rehabilitation 2,300,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (35) SR 4021, Bridge over Morrison Run, Perry Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (36) SR 0080, I-80 Bridge over Hog Back Run, Shenango Township, Bridge Rehabilitation 700,000 (Base Construction Allocation - $550,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (37) SR 0080, I-80 Eastbound Bridge over SR 0318, Shenango Township, Bridge Replacement 1,100,000 (Base Construction Allocation - $950,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (38) SR 0080, I-80 Westbound Bridge over SR 0318, Shenango Township, Bridge Replacement 1,100,000 (Base Construction Allocation - $950,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (39) SR 0173, Bridge over Black Run, Wolf Creek Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (40) SR 0173, Bridge over Sandy Creek, Sandy Lake Borough, Bridge Replacement 1,420,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (41) SR 0208, Bridge over I-79, Springfield Township, Bridge Replacement 2,920,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $20,000) (Design and Contingencies - $400,000) (42) SR 0258, Bridge over Tinkers Run, Liberty Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (43) SR 0318, Bridge over SR 0060, Shenango Township, Bridge Replacement 2,700,000 (Base Construction Allocation - $2,400,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (44) SR 0358, Bridge over Tributary of Little Shenango River, Otter Creek Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (45) SR 0358, Bridge over Tributary of Shenango River, Otter Creek Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (46) SR 0846, Bridge over Chestnut Run, Pymatuning Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (47) SR 1004, Bridge over Coolspring Creek, Fairview Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (48) SR 1011, Carpenters Corner Road, Bridge No.1, New Vernon Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (49) SR 1011, Carpenters Corner Road, Bridge No.2, Perry Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (50) SR 1028, Bridge over North Deer Creek, Deer Creek Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (51) SR 2001, Bridge over Indian Run, Wilmington Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (52) SR 2002, Bridge over Neshannock Creek, Springfield Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (53) SR 2006, Blacktown Road Bridge over SR 0080, Springfield Township, Bridge Rehabilitation 2,800,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (54) SR 0018, Thiel College Bridge over Little Shenango, Greenville Borough, Bridge Replacement 1,021,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $1,000) (55) SR 0058, Bridge over Wolf Creek, Grove City Borough, Bridge Replacement 1,420,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (56) SR 0060, Bridge over Hewitt Road, Shenango Township, Bridge Replacement 1,120,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (57) SR 0060, Bridge over Hog Back Run, Shenango Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (58) SR 0060, Northbound Bridge over I-80 Eastbound and Westbound, Shenango Township, Bridge Replacement 3,850,000 (Base Construction Allocation - $3,600,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (59) SR 0060, Southbound Bridge over I-80 Eastbound and Westbound, Shenango Township, Bridge Replacement 3,850,000 (Base Construction Allocation - $3,600,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (60) SR 0060, Bridge over SR 0018, Shenango Township, Bridge Replacement 1,800,000 (Base Construction Allocation - $1,600,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (61) SR 0062, Bridge over Pine Run, Sharon Township, Bridge Rehabilitation 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (62) SR 0062, Bridge over Pine Run, Sharon Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (63) SR 0062, Bridge over Pine Run, Sharon Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (64) SR 0062, Bridge over Pine Run, Hermitage Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (65) SR 0062, Bridge over Pine Run, Hermitage Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (66) SR 0062, Bridge over Pine Hollow Creek, Hermitage Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (67) SR 0062, Bridge over I-79 Northbound and Southbound, Jackson Township, Bridge Replacement 6,720,000 (Base Construction Allocation - $6,000,000) (Land Allocation - $20,000) (Design and Contingencies - $700,000) (68) SR 0079, I-79 Bridge over Pine Run, Findley Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (69) SR 0079, I-79 Northbound Bridge over Conrail and Yellow Creek, Jackson Township, Bridge Replacement 300,000 (Base Construction Allocation - $100,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (70) SR 0079, I-79 Southbound Bridge over Conrail and Yellow Creek, Jackson Township, Bridge Replacement 1,200,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (71) SR 0079, I-79 Bridge over Conrail, Lake Township, Bridge Replacement 3,720,000 (Base Construction Allocation - $3,300,000) (Land Allocation - $20,000) (Design and Contingencies - $400,000) (72) SR 0079, I-79 Southbound Bridge over Sandy Creek, New Vernon Township, Bridge Replacement 5,320,000 (Base Construction Allocation - $4,800,000) (Land Allocation - $20,000) (Design and Contingencies - $500,000) Section 48. Mifflin County. (a) Local Bridges (1) Oliver Township, T-803, Bridge over Musser Run, Bridge Replacement 492,000 (Base Construction Allocation - $390,000) (Land Allocation - $2,000) (Design and Contingencies - $100,000) (2) Decatur Township, T-379, Bridge over Meadow Creek, Bridge Replacement 370,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (3) Burnham Borough, T-782, Buck Run Bridge over Buck Run, Bridge Replacement 892,000 (Base Construction Allocation - $672,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (4) Menno Township, T-340, Kish Creek Bridge over Kish Creek, Bridge Replacement 262,000 (Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $72,000) (5) Oliver Township, T-702, Town Run Bridge over Town Run, Bridge Replacement 340,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (6) Wayne Township, T-357, Beaverdam Run Bridge over Beaverdam Run, Bridge Replacement 240,000 (Base Construction Allocation - $160,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (7) Wayne Township, T-343, Long Hollow Run Bridge over Long Hollow Run, Bridge Rehabilitation 240,000 (Base Construction Allocation - $140,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (8) Wayne Township, T-357, Bridge over Beaver Dam Run, Bridge Replacement 376,000 (b) State Bridges (1) SR 0022, Bridge over Kish Creek, Lewistown Borough, Bridge Painting 800,000 (Base Construction Allocation - $720,000) (Design and Contingencies - $80,000) (2) SR 3017, Bridge over Juniata River, Wayne Township, Bridge Painting 935,000 (Base Construction Allocation - $850,000) (Design and Contingencies - $85,000) (3) SR 0022, Strodes Run Bridge over Strodes Run, Granville Township, Bridge Replacement 665,000 (Base Construction Allocation - $445,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (4) SR 0022, Bridge over Kishacaquillas Creek, Lewistown Borough, Bridge Painting 610,000 (Base Construction Allocation - $600,000) (Design and Contingencies - $10,000) (5) SR 0305, Little Kish Creek Bridge over Little Kish Creek, Belleville, Bridge Replacement 980,000 (Base Construction Allocation - $800,000) (Land Allocation - $30,000) (Design and Contingencies - $150,000) (6) SR 0322, Bridge over Kish Creek and Conrail, Brown Township, Bridge Replacement 9,300,000 (Base Construction Allocation - $8,800,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) (7) SR 0322, Bridge over T-315 and Jacks Creek, Derry Township and Lewistown, Bridge Replacement 5,300,000 (Base Construction Allocation - $4,800,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) (8) SR 0655, Coffee Run Bridge over Coffee Run, Brown Township, Bridge Replacement 486,000 (Base Construction Allocation - $376,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (9) SR 0655, Little Kish Creek Bridge over Little Kish Creek, Union Township, Bridge Replacement 390,000 (Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (10) SR 1002, Honey Creek Bridge No.4 over Honey Creek, Armagh Township, Bridge Replacement 750,000 (Base Construction Allocation - $600,000) (Land Allocation - $75,000) (Design and Contingencies - $75,000) (11) SR 1005, Tea Creek Bridge over Tea Creek, Brown Township, Bridge Replacement 460,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (12) SR 1005, Bucks Run Bridge over Bucks Run, Burnham Borough, Bridge Replacement 820,000 (Base Construction Allocation -$600,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (13) SR 2004, Jacks Creek Bridge over Jacks Creek, Derry Township, Bridge Replacement 720,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (14) SR 3017, Juniata River Bridge over Juniata River, Wayne Township, Bridge Painting 815,000 (Base Construction Allocation - $800,000) (Design and Contingencies - $15,000) (15) SR 4007, Musser Run Bridge over Musser Run, Oliver Township, Bridge Replacement 240,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (16) SR 4013, Strodes Run Bridge over Strodes Run, Derry Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) Section 49. Monroe County. (a) Local Bridges (1) Hamilton Township, T-202, Bridge over Lake Creek, Bridge Replacement 320,000 (Base Construction Allocation - $270,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (2) Stroud Township, T-420, Bridge over Cherry Creek, Bridge Replacement 360,000 (Base Construction Allocation - $230,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000) (3) Smithfield Township, T-539, Bridge over Marshalls Creek, Bridge Rehabilitation 348,000 (Base Construction Allocation - $288,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (4) Smithfield Township, T-522, Bridge over Marshalls Creek, Bridge Replacement 134,000 (Base Construction Allocation - $116,000) (Land Allocation - $6,000) (Design and Contingencies - $12,000) (5) Barrett Township, T-612, Bridge over Broadhead Creek, Bridge Replacement 174,000 (Base Construction Allocation - $152,000) (Land Allocation - $7,000) (Design and Contingencies - $15,000) (6) Hamilton Township, T-414, County Bridge No.7 over McMichael Creek, Bridge Replacement 1,070,000 (Base Construction Allocation - $840,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (7) Tunkhannock Township, T-633, Bridge over Tunkhannock Creek, Bridge Replacement 139,000 (Base Construction Allocation - $121,000) (Land Allocation - $6,000) (Design and Contingencies - $12,000) (8) Hamilton Township, T-233, County Bridge No.9 over McMichael Creek, Bridge Replacement 665,000 (Base Construction Allocation - $515,000) (Land Allocation - $10,000) (Design and Contingencies - $140,000) (9) Jackson Township, T-486, Bridge over Trout Lake Spillway, Bridge Replacement 184,000 (Base Construction Allocation - $160,000) (Land Allocation - $8,000) (Design and Contingencies - $16,000) (10) Hamilton Township, T-231, County Bridge No.8 over Appenzell Creek, Bridge Replacement 565,000 (Base Construction Allocation - $415,000) (Land Allocation - $10,000) (Design and Contingencies - $140,000) (11) Coolbaugh Township, T-591, Steamtown Railroad Bridge, Bridge Replacement 1,031,000 (Base Construction Allocation - $937,000) (Design and Contingencies - $94,000) (12) Jackson Township, T-434, County Bridge No.13 over Appenzell Creek, Bridge Replacement 667,000 (Base Construction Allocation - $525,000) (Land Allocation - $12,000) (Design and Contingencies - $130,000) (13) Hamilton Township, T-237, County Bridge No.12 over Lake Creek, Bridge Replacement 430,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000) (b) State Bridges (1) SR 0447, SR 0447 over Broadhead Creek and Railroad, Stroud Township, Bridge Rehabilitation 1,395,000 (Base Construction Allocation - $1,071,000) (Design and Contingencies - $324,000) (2) SR 3003, Silver Spring Boulevard over Chapple Creek, Eldred Township, Bridge Replacement 280,000 (Base Construction Allocation - $130,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (3) SR 2012, SR 2012 over Broadhead Creek, East Stroudsburg Borough, Bridge Rehabilitation 1,500,000 (Base Construction Allocation - $1,150,000) (Design and Contingencies - $350,000) (4) SR 0080, I-80 Westbound over Tunkhannock Creek at County Line, Tobyhanna Township, Bridge Rehabilitation 935,000 (Base Construction Allocation - $720,000) (Design and Contingencies - $215,000) (5) SR 0080, I-80 Eastbound over Tunkhannock Creek at County Line, Tunkhannock Township, Bridge Rehabilitation 935,000 (Base Construction Allocation - $720,000) (Design and Contingencies - $215,000) (6) SR 4003, SR 4003 over Lehigh River at Lackawanna County Line, Coolbaugh Township, Bridge Rehabilitation 390,000 (Base Construction Allocation - $295,000) (Design and Contingencies - $95,000) (7) SR 0033, Northbound Bridge over US 209 Westbound, Hamilton Township, Bridge Rehabilitation 180,000 (Base Construction Allocation - $180,000) (8) SR 0191, Stites Bridge, Stroudsburg Township, Bridge Rehabilitation 600,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $100,000) (9) SR 0209, Bridge over I-80, Smithfield Township, Bridge Rehabilitation 434,000 (Base Construction Allocation - $334,000) (Design and Contingencies - $100,000) (10) SR 0402, Ressica Falls Bridge over Big Bushkill Creek, Middle Smithfield Township, Bridge Replacement 1,520,000 (Base Construction Allocation - $1,060,000) (Land Allocation - $60,000) (Design and Contingencies - $400,000) (11) SR 0423, Warnertown Bridge over Tobyhanna Creek, Coolbaugh Township, Bridge Rehabilitation 977,000 (Base Construction Allocation - $600,000) (Land Allocation - $27,000) (Design and Contingencies - $350,000) (12) SR 0940, Pocono Summit Bridge over Conrail, Tobyhanna Township, Bridge Rehabilitation 1,250,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (13) SR 1010, Bridge over Stony Creek, Price Township, Bridge Replacement 310,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (14) SR 2003, Bridge over Cherry Creek, Hamilton Township, Bridge Replacement 205,000 (Base Construction Allocation - $139,000) (Land Allocation - $13,000) (Design and Contingencies - $53,000) (15) SR 2004, Saylorsburg Bridge over SR 0033, Hamilton Township, Bridge Rehabilitation 335,000 (Base Construction Allocation - $304,000) (Design and Contingencies - $31,000) (16) SR 2017, Bridge over I-80 at Exit 51, East Stroudsburg Borough, Bridge Rehabilitation 689,000 (Base Construction Allocation - $625,000) (Design and Contingencies - $64,000) (17) SR 2030, Water Gap Bridge over US 209, Smithfield Township, Bridge Rehabilitation 1,390,000 (Base Construction Allocation - $1,158,000) (Design and Contingencies - $232,000) (18) SR 3011, Bridge over Sugar Hollow Creek, Chestnuthill Township, Bridge Replacement 129,000 (Base Construction Allocation - $117,000) (Design and Contingencies - $12,000) (19) SR 3016, Bridge over Pohopoco Creek, Chestnuthill Township, Bridge Replacement 139,000 (Base Construction Allocation - $121,000) (Land Allocation - $6,000) (Design and Contingencies - $12,000) (20) SR 3018, Bridge No.1 over Kettle Creek, Hamilton Township, Bridge Replacement 80,000 (Base Construction Allocation - $70,000) (Land Allocation - $3,000) (Design and Contingencies - $7,000) (21) SR 3018, Bridge No.2 over Kettle Creek, Hamilton Township, Bridge Replacement 68,000 (Base Construction Allocation - $59,000) (Land Allocation - $3,000) (Design and Contingencies - $6,000) (22) SR 3022, Bridge over McMichael Creek, Hamilton Township, Bridge Replacement 161,000 (Base Construction Allocation - $140,000) (Land Allocation - $7,000) (Design and Contingencies - $14,000) (23) SR 4001, Long Pond Bridge over Tunkhannock Creek, Tunkhannock Township, Bridge Replacement 1,454,000 (Base Construction Allocation - $904,000) (Land Allocation - $50,000) (Design and Contingencies - $500,000) (24) SR 4007, Pocono Manor Bridge over E L Railroad, Borough of Mt. Pocono, Bridge Replacement 1,185,000 (Base Construction Allocation - $935,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (25) SR 0080, Five Bridges over I-80, including SRs 0191, 0209, 2017, 2030 and 8026, Bridge Deck Rehabilitation 5,250,000 (Base Construction Allocation - $3,500,000) (Design and Contingencies - $1,750,000) (26) SR 2017, Bridge over I-80, East Stroudsburg Borough, Bridge Deck Rehabilitation 1,500,000 (Base Construction Allocation - $1,500,000) Section 50. Montgomery County. (a) Local Bridges (1) Norristown Borough, Hospital Bridge over Stony Creek, Bridge Replacement 412,000 (Base Construction Allocation - $365,000) (Land Allocation - $10,000) (Design and Contingencies - $37,000) (2) Trappe Borough, College Avenue Bridge over Tributary of Perkiomen Creek, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (3) Towamencin Township, Bustard Road Bridge over Towamencin Creek, Bridge Replacement 454,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $44,000) (4) Upper Hanover Township, T-444, Treichler Road Bridge under Reading Railroad, Bridge Removal 151,000 (Base Construction Allocation - $126,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (5) Upper Providence Township, T-400, Supio Road Bridge under Reading Railroad, Bridge Removal 187,000 (Base Construction Allocation - $157,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (6) Upper Salford Township, T-444, Bridge over Abandoned Railroad, Bridge Removal 1,175,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (7) Norristown Borough, Markley Street Bridge over Stoney Creek, Bridge Replacement 1,250,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (8) Norristown Borough, Markley Street Bridge over Stoney Creek, Bridge Rehabilitation 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000) (9) Horsham Township, Davis Grove Road over Park Creek, Bridge Replacement 300,000 (Base Construction Allocation - $230,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (10) Franconia Township, Keller Creamery Road over Indian Creek, Bridge Replacement 320,000 (Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (11) East Norriton Township, Germantown Pike over Five Mile Run Creek, Bridge Replacement 500,000 (Base Construction Allocation - $430,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (12) Upper Hanover Township, Eleventh Street over Macoby Creek, Bridge Replacement 400,000 (Base Construction Allocation - $340,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (13) Lower Merion Township, Black Rock Road over Mill Creek, Bridge Replacement 350,000 (Base Construction Allocation - $295,000) (Land Allocation - $20,000) (Design and Contingencies - $35,000) (14) Lower Merion Township, Morris Road over Mill Creek, Bridge Replacement 350,000 (Base Construction Allocation - $285,000) (Land Allocation - $20,000) (Design and Contingencies - $45,000) (15) Upper Merion Township, Conrail over South Gulph Road, Bridge Replacement 4,500,000 (Base Construction Allocation - $4,250,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (16) Trappe Borough, College Avenue over Buckwalter Tributary, Bridge Replacement 140,000 (Base Construction Allocation - $120,000) (Design and Contingencies - $20,000) (17) Upper Hanover Township, Knights Road Bridge No.237 over Green Lane Reservoir, Bridge Rehabilitation 1,450,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $250,000) (18) Plymouth Township, Ridge Pike Bridge over Conrail, Bridge Replacement 2,400,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (19) Whitemarsh Township, Manor Road Bridge over Manor Creek, Bridge Replacement 575,000 (Base Construction Allocation - $425,000) (Land Allocation - $100,000) (Design and Contingencies - $50,000) (b) State Bridges (1) SR 2009, Byberry Road Bridge over Southampton Creek, Upper Moreland Township and Bryn Athyn Borough, Historic Bridge Replacement 680,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $160,000) (2) SR 2018, Bethlehem Pike Bridge over Branch of Wissahickon Creek, Springfield Township, Bridge Rehabilitation 525,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (3) SR 4030, New Hanover Square Road Bridge over West Swamp Creek (Two Bridges), New Hanover Township, Bridge Replacement 1,150,000 (Base Construction Allocation - $900,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (4) SR 0100 Extended, Three Bridges, High Street to Farmington Road, Pottstown Borough and Upper Pottsgrove Township, Bridge Rehabilitation 1,650,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (5) SR 1017, Salfordville Road Bridge over East Branch of Perkiomen Creek, Lower Salford Township, Bridge Replacement 1,500,000 (Base Construction Allocation - $1,250,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (6) SR 1024, Salford Station, Two Bridges over Perkiomen Creek, Upper Salford and Lower Fredrick Townships, Bridge Replacement 1,200,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (7) SR 3020, Dannehower Bridge over River and New US 202, Upper Merion Township, Bridgeport and Norristown Boroughs, Bridge Painting 872,000 (Base Construction Allocation - $802,000) (Design and Contingencies - $70,000) (8) SR 3039, South Gulph Road Overpass under Conrail, Upper Merion Township, Bridge Replacement 1,500,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (9) SR 4003, Black Rock Road Bridge over Abandoned Reading , Upper Providence Township, Bridge Removal 205,000 (Base Construction Allocation - $175,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (10) SR 4012, Graterford Road Bridge over Perkiomen Creek, Skippack and Perkiomen Townships, Bridge Replacement 1,475,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $50,000) (Design and Contingencies - $125,000) (11) SR 4031, Ridge Pike Bridge over Manatawny Creek, Pottstown Borough, Bridge Replacement 2,053,000 (Base Construction Allocation - $1,935,000) (Land Allocation - $45,000) (Design and Contingencies - $73,000) (12) SR 0463, Horsham Road Bridge over Upper State Road, Montgomery Township, Bridge Replacement 1,100,000 (Base Construction Allocation - $950,000) (Land Allocation - $150,000) (13) SR 0422, Pottstown Expressway Bridge over Schuylkill River, Lower Pottsgrove Township, Bridge Deck Rehabilitation 310,000 (Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (14) SR 3020, Dannehower Bridge over Schuylkill River, Parkway and Railroad, Upper Merion Township, Bridge Deck Rehabilitation 1,420,000 (Base Construction Allocation - $1,165,000) (Land Allocation - $40,000) (Design and Contingencies - $215,000) (15) SR 0152, Susquehanna and Limekiln Pike Bridge over Conrail and Norfolk Southern Railroad, Upper Dublin Township, Bridge Replacement 7,000,000 Section 51. Montour County. (a) Local Bridges (1) Derry Township, T-407, County Bridge No.13 over West Branch of Chillisquaque Creek near Washingtonville Borough, Bridge Replacement 350,000 (Base Construction Allocation - $265,000) (Land Allocation - $35,000) (Design and Contingencies - $50,000) (2) Liberty Township, T-324, Bridge over Chillisquaque Creek, Bridge Replacement 824,000 (Base Construction Allocation - $634,000) (Design and Contingencies - $190,000) (3) Limestone Township, T-417, Bridge over Chillisquaque Creek, Bridge Replacement 559,000 (Base Construction Allocation - $399,000) (Design and Contingencies - $160,000) (b) State Bridges (1) SR 1004, Bridge over Chillisquaque Creek, North of Washingtonville Borough, Bridge Replacement 620,000 (Base Construction Allocation - $500,000) (Land Allocation - $40,000) (Design and Contingencies - $80,000) (2) SR 1006, Bridge over Branch of Chillisquaque Creek, 3 Miles Northwest of Washingtonville Borough, Bridge Replacement 510,000 (Base Construction Allocation - $410,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (3) SR 3004, Bridge over Beaver Run, 2 Miles West of Moresburg, Bridge Replacement 285,000 (Base Construction Allocation - $227,000) (Land Allocation - $14,000) (Design and Contingencies - $44,000) (4) SR 4001, Bridge over Chillisquaque Creek, Anthony Township, Bridge Replacement 458,000 (Base Construction Allocation - $366,000) (Land Allocation - $23,000) (Design and Contingencies - $69,000) (5) SR 0011, SR 0011 over Sechler Run, Mahoning Township, Bridge Replacement 582,000 (Base Construction Allocation - $466,000) (Land Allocation - $29,000) (Design and Contingencies - $87,000) (6) SR 0054, SR 0054 over Chillisquaque Creek, Anthony Township, Bridge Replacement 547,000 (Base Construction Allocation - $438,000) (Land Allocation - $27,000) (Design and Contingencies - $82,000) (7) SR 0642, SR 0642 over Mahoning Creek, West Hemlock Township, Bridge Replacement 213,000 (Base Construction Allocation - $170,000) (Land Allocation - $11,000) (Design and Contingencies - $32,000) (8) SR 1009, SR 1009 over Branch of Lowry Run, Anthony Township, Bridge Replacement 431,000 (Base Construction Allocation - $345,000) (Land Allocation - $21,000) (Design and Contingencies - $65,000) (9) SR 1011, SR 1011 over Tributary of Chillisquaque Creek, Anthony Township, Bridge Replacement 212,000 (Base Construction Allocation - $170,000) (Land Allocation - $11,000) (Design and Contingencies - $31,000) Section 52. Northampton County. (a) Local Bridges (1) Lehigh Township, Indiantrail Road Bridge over Indian Creek, Bridge Painting 16,000 (Base Construction Allocation - $14,000) (Design and Contingencies - $2,000) (2) Lehigh Township, T-548, Bridge over Bertsch Creek, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (3) Lehigh Township, Wood Drive Bridge, Bridge Replacement 65,000 (Base Construction Allocation - $41,000) (Land Allocation - $4,000) (Design and Contingencies - $20,000) (4) Freemansburg Borough, LVRR Bridge over Main Street, Bridge Removal 898,000 (Base Construction Allocation - $694,000) (Land Allocation - $100,000) (Design and Contingencies - $104,000) (5) City of Bethlehem, County Bridge No.88, Bridge over Monocacy Creek, Bridge Rehabilitation 275,000 (Base Construction Allocation - $250,000) (Design and Contingencies - $25,000) (6) City of Easton, Bushkill Street Bridge over Bushkill Creek, Bridge Rehabilitation 102,000 (7) City of Easton, Railroad Bridge over SR 2005, Bridge Rehabilitation 5,000,000 (8) City of Easton, Old Glendon Bridge over Lehigh River, Bridge Rehabilitation 1,381,000 (9) City of Easton, Railroad Bridge over SR 2005, Bridge Rehabilitation 5,000,000 (10) Lower Mt. Bethel Township, T-692, Bridge over Oughoughton Creek, Bridge Replacement 440,000 (11) Lower Saucon Township, T-371, Bridge over Saucon Creek, Bridge Rehabilitation 100,000 (12) Plainfield Township, T-629, Bridge over Wind Gap Creek, Bridge Replacement 210,000 (13) Stockertown Borough, Lefevre Road Bridge over Little Bushkill Creek, Bridge Replacement 380,000 (14) Upper Nazareth Township, T-511, Bridge over East Branch of Monocacy Creek, Bridge Replacement 186,000 (15) Chapman Borough, Monocacy Avenue, Culvert Replacement 207,000 (Base Construction Allocation - $172,000) (Land Allocation - $5,000) (Design and Contingencies - $30,000) (b) State Bridges (1) SR 2017, Tatamy Road over Tributary of Bushkill Creek, Palmer Township, Bridge Rehabilitation 240,000 (Base Construction Allocation - $100,000) (Land Allocation - $40,000) (Design and Contingencies - $100,000) (2) SR 4020, Maple Drive over Tributary of Bertsch Creek, Lehigh Township, Bridge Rehabilitation 465,000 (Base Construction Allocation - $275,000) (Land Allocation - $80,000) (Design and Contingencies - $110,000) (3) SR 0611, Railroad Bridge over SR 0611, Borough of Portland, Bridge Reconstruction 2,500,000 (Base Construction Allocation - $1,800,000) (Land Allocation - $170,000) (Design and Contingencies - $530,000) (4) SR 0033, Bridges over Van Buren Road and SR 1002, Palmer Township, Bridge Deck Rehabilitation 3,000,000 (Base Construction Allocation - $3,000,000) (5) SR 0378, Overhead Bridges on Broad, 14th and Eaton Avenue, City of Bethlehem, Bridge Rehabilitation 1,500,000 (Base Construction Allocation - $1,500,000) (6) SR 0611, Sandts Eddy Arch Bridge over Mud Run, Lower Mt. Bethel Township, Bridge Replacement 800,000 (Base Construction Allocation - $700,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (7) SR 0611, Sandts Eddy Arch Bridge over Mud Run, Lower Mt. Bethel Township, Bridge Replacement 1,325,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $275,000) Section 53. Northumberland County. (a) Local Bridges (1) Borough of Milton, Ridge Avenue over Limestone Run, Bridge Replacement 520,000 (Base Construction Allocation - $380,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (2) Lewis Township, T-631, Old State Road Bridge over Branch of Beaver Run, Bridge Replacement 220,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $20,000) (3) Ralpho Township, County Bridge No.183, Bridge Replacement 190,000 (b) State Bridges (1) SR 0642, Chillisquaque Creek Bridge over Chillisquaque Creek, 0.5 Mile East of Pottsgrove, Bridge Deck Replacement 1,190,000 (Base Construction Allocation - $950,000) (Land Allocation - $60,000) (Design and Contingencies - $180,000) (2) SR 1005, Bridge over Delaware Run, 3 Miles North of Watsontown Borough, Bridge Replacement 509,000 (Base Construction Allocation - $408,000) (Land Allocation - $25,000) (Design and Contingencies - $76,000) (3) SR 0045, Bridge over Chillisquaque Creek, East of SR 0147, Bridge Painting 260,000 (Base Construction Allocation - $250,000) (Design and Contingencies - $10,000) (4) SR 0054, SR 0054 over North Branch of , Mt. Carmel Township, Bridge Replacement 750,000 (Base Construction Allocation - $600,000) (Land Allocation - $35,000) (Design and Contingencies - $115,000) (5) SR 2001, SR 2001 over Little Roaring Creek, Rush Township, Bridge Replacement 415,000 (Base Construction Allocation - $335,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (6) SR 2023, SR 2023 over Conrail, Mt. Carmel Township, Bridge Replacement 1,275,000 (Base Construction Allocation - $1,025,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (7) SR 4013, SR 4013 over Plum Creek, Rockefeller Township, Bridge Replacement 361,000 (Base Construction Allocation - $289,000) (Land Allocation - $18,000) (Design and Contingencies - $54,000) (8) SR 0011, Railroad Overpass Bridge over Water Street, Northumberland Borough, Bridge Rehabilitation 3,500,000 (Base Construction Allocation - $3,200,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000) (9) SR 1025, Chillisquaque Creek Bridge over Chillisquaque Creek, East Chillisquaque Township, Bridge Painting 135,000 (Base Construction Allocation - $125,000) (Design and Contingencies - $10,000) (10) SR 3006, Bridge over Mahanoy Creek, Jackson Township, Bridge Painting 360,000 (Base Construction Allocation - $350,000) (Design and Contingencies - $10,000) (11) SR 0180, I-180 Bridge, 6 Structures, Lycoming County to Delaware Township, Bridge Rehabilitation 2,450,000 (Base Construction Allocation - $2,300,000) (Design and Contingencies - $150,000) (12) SR 2015, Hospital Road Bridge over Shamokin Creek, Coal Township, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Design and Contingencies - $30,000) (13) SR 0011, Bridge over Tributary of Susquehanna River, Point Township, Bridge Replacement 700,000 (Base Construction Allocation - $400,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000) (14) SR 0044, Bridge over Beaver Run, Lewis Township, Bridge Replacement 390,000 (Base Construction Allocation - $240,000) (Land Allocation - $30,000) (Design and Contingencies - $120,000) (15) SR 0054, Bridge over Delaware Run, Delaware Township, Bridge Replacement 680,000 (Base Construction Allocation - $450,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (16) SR 0054, Bridge over Deibler Creek, Ralpho Township, Bridge Replacement 580,000 (Base Construction Allocation - $350,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (17) SR 0225, Bridge over Tributary of , Lower Mahanoy Township, Bridge Replacement 420,000 (Base Construction Allocation - $270,000) (Land Allocation - $30,000) (Design and Contingencies - $120,000) (18) SR 1014, Bridge over West Branch of Susquehanna River, Watsontown Borough, Bridge Rehabilitation 6,950,000 (Base Construction Allocation - $5,900,000) (Land Allocation - $250,000) (Design and Contingencies - $800,000) (19) SR 2015, Bridge over Shamokin Creek and Railroad, Coal Township, Bridge Rehabilitation 1,000,000 (Base Construction Allocation - $850,000) (Design and Contingencies - $150,000) (20) SR 2027, Bridge over Tributary of , Upper Mahanoy Township, Bridge Replacement 530,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) Section 54. Perry County. (a) Local Bridges (1) Tyrone Township, County Bridge No.4, Rices Bridge over Shermans Creek, Covered Bridge Replacement 768,000 (Base Construction Allocation - $552,000) (Land Allocation - $77,000) (Design and Contingencies - $139,000) (2) Northeast Madison Township, T-403 over Bixler Run, Bridge Replacement 585,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $175,000) (3) Tyrone Township, Rices Bridge (County Bridge No.4) over Shermans Creek, Bridge Replacement 768,000 (Base Construction Allocation - $552,000) (Land Allocation - $77,000) (Design and Contingencies - $139,000) (4) Jackson Township, T-312, Bridge over Shermans Creek, Bridge Replacement 1,000,000 (5) Marysville Borough, South Main Street Bridge over Fishing Creek, Bridge Replacement 600,000 (6) Northeast Madison Township, T-403, Bridge over Bixler Run, Bridge Replacement 600,000 (7) Rye Township, T-506, Bridge over Fishing Creek, Bridge Replacement 50,000 (Base Construction Allocation - $37,000) (Design and Contingencies - $13,000) (8) Rye Township, T-305, Bridge over Fishing Creek Run, Bridge Replacement 85,000 (Base Construction Allocation - $73,000) (Design and Contingencies - $12,000) (9) Saville Township, T-324, Bridge over Big Buffalo Creek, Bridge Replacement 550,000 (10) Southwest Madison Township, T-405 (SMT-3), Bridge over Laurel Run, Bridge Replacement 550,000 (11) Southwest Madison Township, T-405 (SMT-2), Bridge over Laurel Run, Bridge Replacement 575,000 (12) Southwest Madison Township, T-405 (SMT-1), Bridge over Laurel Run, Bridge Replacement 575,000 (13) Toboyne Township, T-300, Bridge over Shaeffer Run, Bridge Replacement 550,000 (14) Tyrone Township, T-381, Bridge over Montour Creek, Bridge Replacement 550,000 (15) Wheatfield Township, T-506, Bridge over Little Juniata Creek, Bridge Replacement 575,000 (16) Wheatfield Township, T-466, Bridge over Little Juniata Creek, Bridge Replacement 550,000 (b) State Bridges (1) SR 4006, Raccoon Creek Bridge over Raccoon Creek, Tuscarora Township, Bridge Replacement 466,000 (Base Construction Allocation - $288,000) (Land Allocation - $20,000) (Design and Contingencies - $158,000) (2) SR 3002, Horse Valley Road Bridges (Two Bridges) over Horse Valley Run, Toboyne Township, Bridge Replacement 725,000 (Base Construction Allocation - $700,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (3) SR 4008, Bridge over Big Buffalo Creek, Saville Township, Bridge Replacement 913,000 (Base Construction Allocation - $676,000) (Land Allocation - $67,000) (Design and Contingencies - $170,000) (4) PA 849, Bridge over Buffalo Creek, Tuscarora Township, Bridge Replacement 1,379,000 (Base Construction Allocation - $1,022,000) (Land Allocation - $102,000) (Design and Contingencies - $255,000) (5) PA 849, Bridge over Buffalo Creek, Juniata Township, Bridge Replacement 1,298,000 (Base Construction Allocation - $962,000) (Land Allocation - $96,000) (Design and Contingencies - $240,000) (6) PA 849, Bridge over Buffalo Creek, Juniata Township, Bridge Replacement 1,317,000 (Base Construction Allocation - $976,000) (Land Allocation - $97,000) (Design and Contingencies - $244,000) (7) PA 849, Bridge over Buffalo Creek, Juniata Township, Bridge Replacement 1,440,000 (Base Construction Allocation - $1,067,000) (Land Allocation - $106,000) (Design and Contingencies - $267,000) (8) SR 1011, Bridge over Little Buffalo Creek, Centre Township, Bridge Replacement 356,000 (Base Construction Allocation - $264,000) (Land Allocation - $26,000) (Design and Contingencies - $66,000) (9) SR 1010, Bridge over Bargers Run, Liverpool Borough, Bridge Replacement 535,000 (Base Construction Allocation - $396,000) (Land Allocation - $40,000) (Design and Contingencies - $99,000) (10) SR 2003, Bridge over Shermans Creek, Carroll Township, Bridge Replacement 308,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $128,000) (11) SR 3005, Bridge over Shermans Creek, Southwest Madison Township, Bridge Rehabilitation 239,000 (Base Construction Allocation - $99,000) (Land Allocation - $20,000) (Design and Contingencies - $120,000) (12) Various Bridges Preventive Maintenance 382,000 Section 55. Philadelphia County. (a) Local Bridges (1) City of Philadelphia, Byberry Road Bridge over Conrail, Temporary Bridge Construction 511,000 (Base Construction Allocation - $390,000) (Land Allocation - $51,000) (Design and Contingencies - $70,000) (2) City of Philadelphia, Wyoming Avenue Bridge over Former Course Frankford Creek, West of Castor Avenue, Bridge Replacement 1,300,000 (Base Construction Allocation - $1,200,000) (Design and Contingencies - $100,000) (3) City of Philadelphia, Chelten Avenue Bridge over SEPTA, West of Wayne Avenue, Bridge Replacement 2,300,000 (Base Construction Allocation - $2,100,000) (Design and Contingencies - $200,000) (4) City of Philadelphia, Fisher's Lane Bridge over Tacony Creek, West of Ramona Avenue, Bridge Replacement 1,625,000 (Base Construction Allocation - $1,400,000) (Design and Contingencies - $225,000) (5) City of Philadelphia, Kingsessing Avenue Bridge over SEPTA, Bridge Replacement 2,550,000 (Base Construction Allocation - $2,200,000) (Land Allocation - $100,000) (Design and Contingencies - $250,000) (6) City of Philadelphia, Montgomery Bridge over Amtrak, Bridge Replacement 5,275,000 (Base Construction Allocation - $4,750,000) (Land Allocation - $125,000) (Design and Contingencies - $400,000) (7) City of Philadelphia, Thomas Avenue Bridge over SEPTA, Bridge Replacement 3,150,000 (Base Construction Allocation - $2,750,000) (Land Allocation - $100,000) (Design and Contingencies - $300,000) (8) City of Philadelphia, Sedgley Avenue Bridge over Conrail, Bridge Replacement 1,000,000 (Base Construction Allocation - $800,000) (Land Allocation - $100,000) (Design and Contingencies - $100,000) (9) City of Philadelphia, Lexington Avenue Bridge over Conrail, Bridge Replacement 420,000 (Base Construction Allocation - $360,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (10) City of Philadelphia, Greenland Bridge over Conrail and I-76, Bridge Replacement 1,350,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000) (11) City of Philadelphia, Glenwood Drive Bridge over Conrail, Bridge Replacement 1,450,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000) (12) City of Philadelphia, Second Street Bridge over Conrail, Bridge Replacement 740,000 (Base Construction Allocation - $650,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (13) City of Philadelphia, Cambria Street Bridge over Conrail, Bridge Replacement 2,750,000 (Base Construction Allocation - $2,400,000) (Land Allocation - $100,000) (Design and Contingencies - $250,000) (14) City of Philadelphia, 42nd Street Bridge over AMTRAK, Bridge Replacement 5,625,000 (Base Construction Allocation - $3,500,000) (Design and Contingencies - $2,125,000) (15) City of Philadelphia, Germantown Avenue Bridge over Wissahickon Creek, Bridge Replacement 5,800,000 (Base Construction Allocation - $5,000,000) (Design and Contingencies - $800,000) (16) City of Philadelphia, Cayuga Street Bridge over Conrail, Bridge Removal 2,350,000 (Base Construction Allocation - $2,000,000) (Design and Contingencies - $350,000) (17) City of Philadelphia, 40th Street Bridge over AMTRAK, Bridge Replacement 8,385,000 (Base Construction Allocation - $5,900,000) (Design and Contingencies - $2,485,000) (18) City of Philadelphia, Krewstown Road, Bridge over Pennypack Creek, Bridge Rehabilitation 730,000 (Base Construction Allocation - $627,000) (Land Allocation - $28,000) (Design and Contingencies - $75,000) (19) City of Philadelphia, South Street Bridge over Schuylkill River, Bridge Replacement 48,050,000 (Base Construction Allocation - $40,000,000) (Design and Contingencies - $8,050,000) (20) City of Philadelphia, Hunting Park Avenue Bridge over Conrail at 5th Street, Bridge Removal 1,200,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $200,000) (21) City of Philadelphia, Willow Grove Avenue Bridge over SEPTA, Bridge Replacement 2,715,000 (Base Construction Allocation - $2,100,000) (Design and Contingencies - $615,000) (22) City of Philadelphia, Wharton Street Bridge over CSX, Bridge Replacement 3,850,000 (Base Construction Allocation - $3,000,000) (Design and Contingencies - $850,000) (23) City of Philadelphia, Rising Sun Avenue Bridge over Conrail at 2nd Street, Bridge Removal 1,200,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $200,000) (24) City of Philadelphia, Erie Avenue Bridge over Conrail at 4th Street, Bridge Removal 1,200,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $200,000) (25) City of Philadelphia, Ontario Street Bridge over Conrail, Bridge Removal 1,200,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $200,000) (26) City of Philadelphia, 41st Street Bridge over AMTRAK, Bridge Replacement 8,575,000 (Base Construction Allocation - $6,500,000) (Design and Contingencies - $2,075,000) (27) City of Philadelphia, Cemetery Lane Bridge over CSX, Bridge Replacement 2,600,000 (Base Construction Allocation - $2,000,000) (Design and Contingencies - $600,000) (28) City of Philadelphia, G Street Bridge over AMTRAK, Bridge Replacement 8,270,000 (Base Construction Allocation - $5,800,000) (Design and Contingencies - $2,470,000) (29) City of Philadelphia, 59th Street Bridge over AMTRAK, Bridge Replacement 8,500,000 (Base Construction Allocation - $6,000,000) (Design and Contingencies - $2,500,000) (30) City of Philadelphia, Tabor Avenue Bridge over Tacony Creek, Bridge Replacement 625,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $125,000) (31) City of Philadelphia, 61st Street Bridge over AHSL, Bridge Replacement 3,850,000 (Base Construction Allocation - $3,000,000) (Design and Contingencies - $850,000) (b) State Bridges (1) SR 4007, Germantown Avenue Bridge, Conrail Overpass, City of Philadelphia, Bridge Removal 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000) (2) SR 0076, Schuylkill Expressway Bridge over Schuylkill River, City of Philadelphia, Bridge Painting 2,580,000 (Base Construction Allocation - $2,390,000) (Design and Contingencies - $190,000) (3) SR 2003, 5th Street Bridge over Amtrak, City of Philadelphia, Bridge Replacement 2,400,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $200,000) (Design and Contingencies - $200,000) (4) SR 3008, Chestnut Street Bridge over Schuylkill River, City of Philadelphia, Bridge Painting 477,000 (Base Construction Allocation - $426,000) (Design and Contingencies - $51,000) (5) SR 3037, JFK Boulevard Bridge over Schuylkill River, City of Philadelphia, Bridge Painting 857,000 (Base Construction Allocation - $794,000) (Design and Contingencies - $63,000) (6) SR 0095, Delaware River Expressway over Westmoreland and Tioga Streets, City of Philadelphia, Bridge Rehabilitation 4,450,000 (Base Construction Allocation - $4,200,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (7) SR 0003, Chestnut Street Bridge over AMTRAK, Schuylkill Expressway and 30th Street, City of Philadelphia, Bridge Replacement 11,800,000 (Base Construction Allocation - $10,000,000) (Land Allocation - $1,000,000) (Design and Contingencies - $800,000) (8) SR 0013, Girard Avenue Bridge over Schuylkill Expressway, City of Philadelphia, Bridge Deck Replacement 1,733,000 (Base Construction Allocation - $1,533,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (9) SR 0073, Cottman Avenue Bridge over Conrail, City of Philadelphia, Bridge Replacement 2,100,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $300,000) (Design and Contingencies - $300,000) (10) SR 8045, Gustine Lake Interchange, Five Structures over Kelly Drive and Ridge Avenue and Kelly Drive over Ridge Avenue, City of Philadelphia, Bridge Replacements 11,550,000 (Base Construction Allocation - $10,000,000) (Land Allocation - $50,000) (Design and Contingencies - $1,500,000) Section 56. Pike County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0390, Kill Creek Bridge, North of SR 3002, Greene Township, Bridge Replacement 430,000 (Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (2) SR 2011, Bridge over Outlet to Sawkill Pond, South of TR 6, Dingman Township, Bridge Replacement 355,000 (Base Construction Allocation - $275,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (3) SR 0434, Shohola Bridge over Delaware River, Shohola Township and New York State Line, Bridge Painting 2,200,000 (Base Construction Allocation - $2,000,000) (Design and Contingencies - $200,000) (4) State Bridges, Countywide Bridge Zone Painting, Bridge Painting 370,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000) Section 57. Potter County. (a) Local Bridges (1) Harrison Township, T-487 over North Branch of Cowanesque Creek, Bridge Replacement 174,000 (Base Construction Allocation - $149,000) (Land Allocation - $10,000) (Design and Contingencies - $15,000) (b) State Bridges (1) SR 3015, Baker Hollow Bridge over Baker Run, Homer Township, Bridge Replacement 290,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (2) SR 0006, Bridge over Allegheny River, Coudersport Borough, Bridge Painting 325,000 (Base Construction Allocation - $320,000) (Design and Contingencies - $5,000) (3) SR 4003, Bradley Run Bridge over Bradley Run, Clara Township, Bridge Replacement 520,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (4) SR 4013, North Hollow Run Bridge over Branch of North Hollow Run, Coudersport Borough and Sweden Township, Bridge Replacement 350,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (5) SR 1003, Judson Run Bridge over Judson Run, Pike Township, Bridge Replacement 340,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (6) SR 1010, Genesee River Bridge over Genesee River, Genesee Township, Bridge Painting 68,000 (Base Construction Allocation - $58,000) (Design and Contingencies - $10,000) (7) SR 0044, Bridge over Oswayo Creek, Shinglehouse Borough, Bridge Replacement 2,016,000 (Base Construction Allocation - $1,800,000) (Land Allocation - $16,000) (Design and Contingencies - $200,000) Section 58. Schuylkill County. (a) Local Bridges (1) City of Pottsville, Washington Street Bridge No.2 over Conrail and PA 61, Bridge Replacement 2,225,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $25,000) (Design and Contingencies - $200,000) (2) Pine Grove Township, Penn Central Bridge over T-390, Bridge Removal 551,000 (Base Construction Allocation - $435,000) (Land Allocation - $50,000) (Design and Contingencies - $66,000) (3) Rush Township, T-862, Bridge No.42 over Pine Creek, Bridge Replacement 139,000 (Base Construction Allocation - $121,000) (Land Allocation - $6,000) (Design and Contingencies - $12,000) (4) St. Clair Borough, Russell Street Bridge over Mill Creek, Bridge Replacement 223,000 (Base Construction Allocation - $193,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (5) Upper Mahantongo Township, T-473, Bridge over Mahantongo Creek, Bridge Replacement 202,000 (Base Construction Allocation - $175,000) (Land Allocation - $9,000) (Design and Contingencies - $18,000) (6) East Brunswick Township, T-753, Bridge over Indian Run, Bridge Replacement 400,000 (Base Construction Allocation - $290,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (7) West Brunswick Township, County Bridge No.94 over Schuylkill River, Bridge Replacement 384,000 (Base Construction Allocation - $384,000) (8) Tremont Borough, Maple Street Bridge No.22 over Goodspring Creek, Bridge Replacement 214,000 (Base Construction Allocation - $178,000) (Design and Contingencies - $36,000) (9) Gilberton Borough, Bridge Street Bridge over Mahanoy Creek, Bridge Replacement 520,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (10) Porter Township, T-416, Bridge No.79 over Wiconisco Creek, Bridge Replacement 287,000 (Base Construction Allocation - $250,000) (Land Allocation - $12,000) (Design and Contingencies - $25,000) (11) Union Township, T-594, Bridge over Little Catawissa Creek, Bridge Replacement 296,000 (Base Construction Allocation - $230,000) (Land Allocation - $5,000) (Design and Contingencies - $61,000) (12) Deer Lake Borough, Drehersville Road Bridge over Pine Creek, Bridge Replacement 484,000 (Base Construction Allocation - $324,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (13) Port Carbon Borough, Mill Street Bridge No.106 over Schuylkill River, Bridge Replacement 1,050,000 (Base Construction Allocation - $750,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (14) Hegins Township, T-478, Broad Street Bridge over Pine Creek, Bridge Replacement 357,000 (Base Construction Allocation - $290,000) (Land Allocation - $5,000) (Design and Contingencies - $62,000) (15) Frackville Borough, Spring Street Reading Railroad Bridge, Bridge Removal 112,000 (Base Construction Allocation - $52,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (16) Eldred Township, T-383, Bridge over Mahantango Creek, Bridge Replacement 121,000 (Base Construction Allocation - $110,000) (Design and Contingencies - $11,000) (17) Port Clinton Borough, Broad Street, County Bridge No.123 over Schuylkill River, Bridge Replacement 828,000 (Base Construction Allocation - $692,000) (Land Allocation - $32,000) (Design and Contingencies - $104,000) (18) South Manheim Township, T-676, County Bridge No.112 over Bear Creek, Bridge Replacement 470,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (19) Port Carbon Borough, Washington Street Bridge over Mill Creek, Bridge Replacement 684,000 (Base Construction Allocation - $564,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (20) City of Pottsville, Washington Street over Conrail and SR 0061, Bridge Rehabilitation 803,000 (Base Construction Allocation - $669,000) (Design and Contingencies - $134,000) (21) St. Clair Borough, Russell Street Bridge over Mill Creek, Bridge Replacement 480,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $120,000) (22) North Union Township, T-455, Bridge over , Bridge Replacement 360,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (23) West Brunswick Township, T-723, Industrial Road over Pine Creek, Bridge Replacement 584,000 (Base Construction Allocation - $434,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (24) Landingville Borough, Canal Street Bridge over Schuylkill River, Bridge Replacement 810,000 (Base Construction Allocation - $640,000) (Land Allocation - $20,000) (Design and Contingencies - $150,000) (25) North Manheim Township, Memorial Drive Overpass, Bridge Removal 295,000 (Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $25,000) (26) Branch Township, T-564, Bridge over Muddy Creek, Bridge Replacement 360,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (27) Eldred Township, T-395, Bridge over Little Mahantango Creek, Bridge Replacement 362,000 (Base Construction Allocation - $250,000) (Land Allocation - $12,000) (Design and Contingencies - $100,000) (28) Orwigsburg Borough, Ridge Road Bridge, Bridge Replacement 154,000 (Base Construction Allocation - $122,000) (Design and Contingencies - $32,000) (29) West Penn Township, Kittatinny Bridge over Lizard Creek, Bridge Rehabilitation 170,000 (30) Mahanoy City Borough, Market Street Bridge over Mahanoy Creek, Bridge Replacement 450,000 (31) Pine Grove Township, T-649, Bridge over Little Swatara Creek, Bridge Replacement 202,000 (32) Tamaqua Borough, Spruce Street Bridge over Wabash Creek, Bridge Rehabilitation 115,000 (b) State Bridges (1) SR 0054, SR 0054 over Mahanoy Creek, Mahanoy Township, Bridge Replacement 1,005,000 (Base Construction Allocation - $770,000) (Design and Contingencies - $235,000) (2) SR 0054, SR 0054 over Reading Blue Mountain and Northern Railroad, Mahanoy Township, Bridge Rehabilitation 650,000 (Base Construction Allocation - $500,000) (Design and Contingencies - $150,000) (3) SR 0081, SR 0081 Southbound over Swatara Creek, Pine Grove Township, Bridge Rehabilitation 970,000 (Base Construction Allocation - $745,000) (Design and Contingencies - $225,000) (4) SR 0081, SR 0081 Northbound over Swatara Creek, Pine Grove Township, Bridge Rehabilitation 970,000 (Base Construction Allocation - $745,000) (Design and Contingencies - $225,000) (5) SR 0081, SR 0081 Southbound over SR 0443 and Exit Ramp 3, Pine Grove Township, Bridge Rehabilitation 715,000 (Base Construction Allocation - $550,000) (Design and Contingencies - $165,000) (6) SR 0081, SR 0081 Northbound over SR 0443 and Exit Ramp 31, Pine Grove Township, Bridge Rehabilitation 515,000 (Base Construction Allocation - $390,000) (Design and Contingencies - $125,000) (7) SR 0081, I-81 Southbound over T-886, Oak Grove Road, Pine Grove Township, Bridge Rehabilitation 300,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $100,000) (8) SR 0081, I-81 Northbound over T-886, Oak Grove Road, Pine Grove Township, Bridge Rehabilitation 300,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $100,000) (9) SR 0061, Bridge over Mahannon Creek at South Liberty Street, North Manheim Township, Bridge Rehabilitation 265,000 (Base Construction Allocation - $175,000) (Design and Contingencies - $90,000) (10) SR 0895, SR 0895 over Lizard Creek, Village of Snyders, West Penn Township, Bridge Rehabilitation 290,000 (Base Construction Allocation - $190,000) (Design and Contingencies - $100,000) (11) SR 0901, SR 0901 over Mahanoy Creek, Bridge Rehabilitation 680,000 (Base Construction Allocation - $520,000) (Design and Contingencies - $160,000) (12) SR 1011, SR 1011 over Big Creek, Village of Brockton, Schuylkill Township, Bridge Replacement 340,000 (Base Construction Allocation - $160,000) (Land Allocation - $55,000) (Design and Contingencies - $125,000) (13) SR 1011, SR 1011 over Locust Creek, Ryan Township, Bridge Rehabilitation 365,000 (Base Construction Allocation - $180,000) (Land Allocation - $60,000) (Design and Contingencies - $125,000) (14) SR 2018, SR 2018 over Little Schuylkill River, Drehersville, East Brunswick Township, Bridge Rehabilitation 385,000 (Base Construction Allocation - $285,000) (Design and Contingencies - $100,000) (15) SR 4013, SR 4013 over Rausch Creek, Hegins Township, Bridge Rehabilitation 280,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $100,000) (16) SR 4022, SR 4022 over Tributary of Mahantango Creek, Eldred Township, Bridge Replacement 310,000 (Base Construction Allocation - $150,000) (Land Allocation - $50,000) (Design and Contingencies - $110,000) (17) SR 0209, Broad Street over Little Schuylkill River, Tamaqua Borough, Bridge Replacement 600,000 (Base Construction Allocation - $360,000) (Land Allocation - $100,000) (Design and Contingencies - $140,000) (18) SR 4022, Broad Street Bridge over Panther Creek, Tamaqua Borough, Bridge Replacement 1,780,000 (Base Construction Allocation - $1,220,000) (Land Allocation - $195,000) (Design and Contingencies - $365,000) (19) SR 4022, SR 4022 over Mahanoy Creek, Village of Helfenstein, Eldred Township, Bridge Replacement 1,170,000 (Base Construction Allocation - $750,000) (Land Allocation - $195,000) (Design and Contingencies - $225,000) (20) SR 0339, SR 0339 over Catawissa Creek, North Union Township, Bridge Replacement 984,000 (Base Construction Allocation - $630,000) (Land Allocation - $165,000) (Design and Contingencies - $189,000) (21) SR 0443, Dock Street Bridge over Tributary of Schuylkill River, Borough of Schuylkill Haven, Bridge Replacement 325,000 (Base Construction Allocation - $150,000) (Land Allocation - $50,000) (Design and Contingencies - $125,000) (22) SR 0895, SR 0895 over Schuylkill River, Bridge Replacement 2,370,000 (Base Construction Allocation - $1,480,000) (Land Allocation - $390,000) (Design and Contingencies - $500,000) (23) SR 4011, SR 4011 over Pine Creek, Hegins Township, Bridge Replacement 720,000 (Base Construction Allocation - $450,000) (Land Allocation - $120,000) (Design and Contingencies - $150,000) (24) SR 0895, Auburn Arch over Schuylkill River, South Manheim Township, Bridge Replacement 550,000 (Base Construction Allocation - $350,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (25) SR 0061, Mady's Big Bridge over Conrail, City of Pottsville, Bridge Rehabilitation 1,323,000 (Base Construction Allocation - $1,202,000) (Design and Contingencies - $121,000) (26) SR 0061, Mady's Small Bridge over Schuylkill River, City of Pottsville, Bridge Rehabilitation 329,000 (Base Construction Allocation - $299,000) (Design and Contingencies - $30,000) (27) SR 0125, Pitman Bridge over Little Mahantango Creek, Eldred Township, Bridge Replacement 480,000 (Base Construction Allocation - $390,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (28) SR 0325, Bridge over Wiconisco Creek, Porter Township, Bridge Replacement 1,175,000 (Base Construction Allocation - $800,000) (Land Allocation - $40,000) (Design and Contingencies - $335,000) (29) SR 0501, Bridge over Little Swatara Creek, Pine Grove Township, Bridge Replacement 1,400,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $350,000) (30) SR 0501, Small Bridge over Little Swatara Creek, Pine Grove Township, Bridge Replacement 250,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000) (31) SR 1013, Tuscarora Park Bridge over Tributary of Locust Creek, Ryan Township, Bridge Deck Replacement 485,000 (Base Construction Allocation - $375,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (32) SR 1016, Lofty Bridge over Pocono NE Railroad, Delano Township, Bridge Replacement 715,000 (Base Construction Allocation - $500,000) (Land Allocation - $15,000) (Design and Contingencies - $200,000) (33) SR 2006, Bridge over Mahannon Creek, West Brunswick Township, Bridge Replacement 107,000 (Base Construction Allocation - $92,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000) (34) SR 3003, Bridge over West Branch Schuylkill River, North Manheim Township, Bridge Deck Replacement 224,000 (Base Construction Allocation - $195,000) (Design and Contingencies - $29,000) (35) SR 3015, Bridge over Wiconisco Creek, Porter Township, Bridge Replacement 200,000 (Base Construction Allocation - $175,000) (Land Allocation - $8,000) (Design and Contingencies - $17,000) (36) SR 4016, Bridge over Little Mahantango Creek, Upper Mahantongo Township, Bridge Replacement 165,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $15,000) (37) SR 4033, Bridge over Tomhicken Creek, North Union Township, Bridge Deck Replacement 350,000 (Base Construction Allocation - $250,000) (Design and Contingencies - $100,000) (38) SR 4036, Ringtown Bridge over Little Catawissa Creek, Union Township, Bridge Replacement 240,000 (Base Construction Allocation - $216,000) (Land Allocation - $3,000) (Design and Contingencies - $21,000) (39) SR 4039, Haas Bridge over Mahantango Creek, Upper Mahantongo Township, Bridge Replacement 153,000 (Base Construction Allocation - $130,000) (Land Allocation - $10,000) (Design and Contingencies - $13,000) (40) SR 0081, I-81 Bridges over SR 3013, Tremont Township, Bridge Deck Rehabilitation 1,900,000 (Base Construction Allocation - $1,850,000) (Design and Contingencies - $50,000) (41) SR 0081, I-81 Bridge Deck Rehabilitation, Lebanon County Line to Ravine Township, Pine Grove and Tremont Townships, 8 Bridge Decks, Bridge Rehabilitation 1,060,000 (Base Construction Allocation - $1,000,000) (Design and Contingencies - $60,000) Section 59. Snyder County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 1011, Pine Street Bridge over Penns Creek, Selinsgrove, Bridge Painting 1,150,000 (Base Construction Allocation - $940,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000) (2) SR 3002, Bridge over Mahantango Creek, 1.5 Miles South of Meiserville, Perry and Chapman Townships Line, Bridge Rehabilitation 1,425,000 (Base Construction Allocation - $1,211,000) (Design and Contingencies - $214,000) (3) SR 4007, Middle Creek Bridge over Middle Creek, North of SR 0522 and South 1,158,000 of SR 4012, Beaver Township, Bridge Replacement (Base Construction Allocation - $926,000) (Land Allocation - $58,000) (Design and Contingencies - $174,000) (4) SR 0522, Bridge over Middle Creek, Bridge Painting 180,000 (Base Construction Allocation - $170,000) (Design and Contingencies - $10,000) (5) SR 0035, SR 0035 over Tributary of Mahantango Creek, Perry Township, Bridge Replacement 815,000 (Base Construction Allocation - $652,000) (Land Allocation - $41,000) (Design and Contingencies - $122,000) (6) SR 0104, SR 0104 over Branch of Mahantango Creek, Perry Township, Bridge Replacement 430,000 (Base Construction Allocation - $345,000) (Land Allocation - $20,000) (Design and Contingencies - $65,000) (7) SR 0104, SR 0104 over Middle Creek, Franklin Township, Bridge Replacement 440,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $70,000) (8) SR 0522, SR 0522 over Tributary of Middle Creek, Spring Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (9) SR 0522, SR 0522 over Tributary of Middle Creek, Spring Township, Bridge Replacement 896,000 (Base Construction Allocation - $717,000) (Land Allocation - $45,000) (Design and Contingencies - $134,000) (10) SR 0522, SR 0522 over Tributary of Middle Creek, Beavertown Borough, Bridge Replacement 244,000 (Base Construction Allocation - $195,000) (Land Allocation - $12,000) (Design and Contingencies - $37,000) (11) SR 0522, SR 0522 over Tributary of Middle Creek, Beavertown Borough, Bridge Replacement 245,000 (Base Construction Allocation - $196,000) (Land Allocation - $12,000) (Design and Contingencies - $37,000) (12) SR 0522, SR 0522 over Kern Run, Beavertown Borough, Bridge Replacement 570,000 (Base Construction Allocation - $456,000) (Land Allocation - $29,000) (Design and Contingencies - $85,000) (13) SR 0522, SR 0522 over Penns Creek, Selinsgrove Borough, Bridge Replacement 3,167,000 (Base Construction Allocation - $2,534,000) (Land Allocation - $158,000) (Design and Contingencies - $475,000) (14) SR 1011, SR 1011 over Tributary of Penns Creek, Jackson Township, Bridge Replacement 300,000 (Base Construction Allocation - $190,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000) (15) SR 2013, SR 2013 over Tributary of Susquehanna River, Chapman Township, Bridge Replacement 300,000 (Base Construction Allocation - $190,000) (Land Allocation - $30,000) (Design and Contingencies - $80,000) (16) SR 3009, SR 3009 over Paxtonville Creek, Franklin Township, Bridge Replacement 1,512,000 (Base Construction Allocation - $1,209,000) (Land Allocation - $76,000) (Design and Contingencies - $227,000) (17) SR 1011, Pine Street Bridge over Penns Creek, Selinsgrove Borough, Bridge Replacement 3,100,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $160,000) (Design and Contingencies - $440,000) (18) SR 3009, Bridge over Middle Creek, Franklin Township, Bridge Painting 155,000 (Base Construction Allocation - $140,000) (Design and Contingencies - $15,000) (19) SR 0522, Middle Creek Bridge No.2, Beavertown Borough, Bridge Replacement 400,000 (Base Construction Allocation - $250,000) (Land Allocation - $50,00) (Design and Contingencies - $100,000) (20) SR 0104, Bridge over Mahantango Creek, Perry Township, Bridge Replacement 430,000 (Base Construction Allocation - $345,000) (Land Allocation - $20,000) (Design and Contingencies - $65,000) (21) SR 1013, Bridge over Penns Creek, Jackson Township, Bridge Rehabilitation 2,200,000 (Base Construction Allocation - $1,700,000) (Land Allocation - $100,000) (Design and Contingencies - $400,000) (22) SR 0235, Bridge over Tributary of Branch of Beaver Creek, Spring Township, Bridge Replacement 565,000 (Base Construction Allocation - $452,000) (Land Allocation - $28,000) (Design and Contingencies - $85,000) (23) SR 1016, Bridge over Penns Creek, Jackson Township, Bridge Replacement 1,700,000 (Base Construction Allocation - $1,400,000) (Land Allocation - $40,000) (Design and Contingencies - $260,000) Section 60. Somerset County. (a) Local Bridges (1) Middlecreek Township, T-338, Blue Hole Creek Bridge over Blue Hole Creek, Bridge Replacement 505,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $95,000) (2) Paint Borough, Pennsylvania Railroad Bridge over Bedford Street, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (3) Shade Township, T-712, Lipinski Road Bridge over Dark Shade Creek, Bridge Replacement 560,000 (Base Construction Allocation - $450,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (4) Somerset Borough, Church Street Bridge over Parsons Run, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (5) Windber Borough, South 22nd Street Bridge over Seese Run, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (6) Windber Borough, 24th Street Bridge over Seese Run, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (7) Windber Borough, Village Street Bridge over Seese Run, Bridge Replacement 350,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $75,000) (8) Summit Township, Keystone Viaduct over SR 2006, CSX Mainline and Flaugherty Creek, Bridge Rehabilitation 715,000 (Base Construction Allocation - $663,000) (Design and Contingencies - $52,000) (9) New Baltimore Borough, T-813, Bridge over Raystown Branch of Juniata River, Bridge Rehabilitation 943,000 (Base Construction Allocation - $893,000) (Design and Contingencies - $50,000) (10) Wellersburg Borough, T-842, Bridge over Unnamed Stream, Bridge Replacement 270,000 (Base Construction Allocation - $180,000) (Land Allocation - $30,000) (Design and Contingencies - $60,000) (11) Greenville Township, Keystone Viaduct Bridge over Flaugherty Creek, Bridge Replacement 1,469,000 (Base Construction Allocation - $1,296,000) (Design and Contingencies - $173,000) (12) Jefferson Township, T-583, Duck Pond Bridge No.28 over Laurel Hill Creek, Bridge Replacement 335,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000) (13) Somerset Township, T-480, Roberts Bridge No.60 over East Branch of Coxes Creek, Bridge Replacement 385,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (14) Somerset Township, T-494, Housefeldt Bridge No.61 over Coxes Creek, Bridge Replacement 285,000 (Base Construction Allocation - $215,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (15) Stonycreek Township, T-515, Brady Bridge No.64 over Stony Creek, Bridge Replacement 946,000 (Base Construction Allocation - $806,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (16) Somerset Township, T-480 over East Branch Coxes Creek, Roberts Bridge, Bridge Replacement 385,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (17) Jefferson Township, T-583 over Laurel Hill Creek, Duck Pond Bridge, Bridge Replacement 335,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000) (18) Somerset Township, T-494 over Coxes Creek, Housefeldt Bridge, Bridge Replacement 285,000 (Base Construction Allocation - $215,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (19) Stonycreek Township, T-515 over Stony Creek, Brady Bridge, Bridge Replacement 946,000 (Base Construction Allocation - $806,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (b) State Bridges (1) SR 0160, SR 0160 over Tributary of Boones Run, Stonycreek Township, Bridge Replacement 580,000 (Base Construction Allocation - $430,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (2) SR 0523, SR 0523 over Whites Creek, Addison Township, Bridge Replacement 690,000 (Base Construction Allocation - $510,000) (Land Allocation - $50,000) (Design and Contingencies - $130,000) (3) SR 1007, SR 1007 over Lambert Run, Stonycreek Township, Bridge Replacement 490,000 (Base Construction Allocation - $355,000) (Land Allocation - $25,000) (Design and Contingencies - $110,000) (4) SR 1017, SR 1017 over Breastwork Run, Allegheny Township, Bridge Replacement 650,000 (Base Construction Allocation - $490,000) (Land Allocation - $25,000) (Design and Contingencies - $135,000) (5) SR 1017, SR 1017 over Breastwork Run, Allegheny Township, Bridge Replacement 580,000 (Base Construction Allocation - $440,000) (Land Allocation - $25,000) (Design and Contingencies - $115,000) (6) SR 1018, SR 1018 over Beaverdam Run, Shade Township, Bridge Replacement 545,000 (Base Construction Allocation - $400,000) (Land Allocation - $25,000) (Design and Contingencies - $120,000) (7) SR 1018, SR 1018 over Beaverdam Run, Shade Township, Bridge Replacement 515,000 (Base Construction Allocation - $375,000) (Land Allocation - $25,000) (Design and Contingencies - $115,000) (8) SR 2005, SR 2005 over Elk Lick Creek, Elk Lick Township, Bridge Replacement 520,000 (Base Construction Allocation - $380,000) (Land Allocation - $25,000) (Design and Contingencies - $115,000) (9) SR 4013, SR 4013 over North Branch of Quemahoning Creek, Lincoln Township, Bridge Replacement 585,000 (Base Construction Allocation - $435,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (10) SR 4019, SR 4019 over Quemahoning Creek, Quemahoning Township, Bridge Replacement 800,000 (Base Construction Allocation - $625,000) (Land Allocation - $25,000) (Design and Contingencies - $150,000) (11) SR 3039, SR 3039 over Allen Creek, Middlecreek Township, Bridge Replacement 200,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $45,000) (12) SR 3039, SR 3039 over Allen Creek, Middlecreek Township, Bridge Replacement 220,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (13) SR 4001, SR 4001 over Clear Run, Jefferson Township, Bridge Replacement 295,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (14) SR 3039, Allen Creek Bridge No.3 over Allen Creek, Middlecreek Township, Bridge Replacement 425,000 (Base Construction Allocation - $300,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (15) SR 4006, Quemahoning Creek Bridge over Quemahoning Creek, Jenner Township, Bridge Replacement 625,000 (Base Construction Allocation - $425,000) (Land Allocation - $75,000) (Design and Contingencies - $125,000) (16) SR 4026, Coxes Creek Bridge over East Branch Coxes Creek, Somerset Borough, Bridge Replacement 835,000 (Base Construction Allocation - $610,000) (Land Allocation - $75,000) (Design and Contingencies - $150,000) (17) SR 4016, Bens Creek Bridge over South Fork Bens Creek, Conemaugh Township, Bridge Replacement 700,000 (Base Construction Allocation - $515,000) (Land Allocation - $50,000) (Design and Contingencies - $135,000) (18) SR 0030, Bridge over Calendar Run, Stonycreek Township, Bridge Rehabilitation 55,000 (Base Construction Allocation - $40,000) (Land Allocation - $1,000) (Design and Contingencies - $14,000) (19) SR 4029, Bridge over Riffle Run, Conemaugh Township, Bridge Rehabilitation 64,000 (Base Construction Allocation - $47,000) (Land Allocation - $1,000) (Design and Contingencies - $16,000) Section 61. Sullivan County. (a) Local Bridges (1) Forks Township, T-448, Old TR 87 Bridge, County Bridge No.55 over , Bridge Replacement 860,000 (Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (2) Forks and Laporte Townships, T-346 over Loyalsock Creek, Bridge Replacement 840,000 (Base Construction Allocation - $730,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (b) State Bridges (1) SR 0087, SR 0087 over Lick Run, Forks Township, Bridge Replacement 635,000 (Base Construction Allocation - $508,000) (Land Allocation - $32,000) (Design and Contingencies - $95,000) (2) SR 0087, SR 0087 over Little Loyalsock Creek, Cherry Township, Bridge Replacement 655,000 (Base Construction Allocation - $524,000) (Land Allocation - $33,000) (Design and Contingencies - $98,000) (3) SR 0154, SR 0154 over Black Water Run, Elkland Township, Bridge Replacement 194,000 (Base Construction Allocation - $166,000) (Design and Contingencies - $28,000) (4) SR 0154, SR 0154 over Kings Creek, Elkland Township, Bridge Replacement 404,000 (Base Construction Allocation - $323,000) (Land Allocation - $20,000) (Design and Contingencies - $61,000) (5) SR 1012, SR 1012 over Little Loyalsock Creek, Cherry Township, Bridge Replacement 260,000 (Base Construction Allocation - $208,000) (Land Allocation - $13,000) (Design and Contingencies - $39,000) (6) SR 0154, Lincoln Falls Bridge over Elk Creek, Elkland Township, Bridge Replacement 1,750,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $100,000) (Design and Contingencies - $150,000) (7) SR 0154, Hoagland Branch Bridge over Hoagland Branch, Fox Township, Bridge Replacement 539,000 (Base Construction Allocation - $300,000) (Land Allocation - $19,000) (Design and Contingencies - $220,000) Section 62. Susquehanna County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0167, Owego Street Bridge over Branch of Fall Brook, Bridgewater Township, Bridge Replacement 413,000 (Base Construction Allocation - $342,000) (Land Allocation - $10,000) (Design and Contingencies - $61,000) (2) SR 1016, Salt Lick Creek Bridge over Branch of Salt Lick Creek, New Milford Township, Bridge Replacement 100,000 (Base Construction Allocation - $86,000) (Land Allocation - $3,000) (Design and Contingencies - $11,000) (3) SR 0081, Bridge over Trowbridge Creek, 1 Mile South of the Pennsylvania and New York State Line, Great Bend Township, Bridge Replacement 890,000 (Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $180,000) (4) SR 1017, Gulf Street Bridge, 0.5 Mile North of SR 1015, Lanesboro Borough, Bridge Replacement 305,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (5) SR 3003, Bridge over Transue Creek, 1.5 Miles South of SR 3005, Auburn Township, Bridge Painting 60,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $10,000) (6) SR 3006, Bridge over White Creek, 1.5 Miles West of SR 3004, Springville Township, Bridge Painting 70,000 (Base Construction Allocation - $60,000) (Design and Contingencies - $10,000) (7) SR 0011, Bridge over Salt Lick Creek, 0.6 Mile North of TR 492, New Milford Borough, Bridge Replacement 660,000 (Base Construction Allocation - $510,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (8) SR 0367, Bridge over Tuscarora Creek, North of SR 3005, Auburn Township, Bridge Replacement 335,000 (Base Construction Allocation - $265,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (9) SR 1010, Bridge over Bedbug Creek, West of SR 1021, Oakland Township, Bridge Replacement 325,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000) (10) SR 1010, Bridge over Tributary of Susquehanna River, 2 Miles West of SR 1021, Great Bend Township, Bridge Replacement 288,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $58,000) (11) SR 2046, Bridge over Branch of Tunkhannock Creek, East of TR 92, Gibson Township, Bridge Replacement 513,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $103,000) (12) SR 3017, Bridge over Thomas Creek, Southeast of TR 29, Springville Township, Bridge Replacement 280,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (13) State Bridges, Countywide Bridge Zone Painting, Bridge Painting 370,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000) (14) SR 0858, Branch of Apolacon Creek, 0.3 Mile North of SR 4013, Apolacon Township, Bridge Replacement 220,000 (Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (15) SR 1010, SR 1010 over Tributary of Susquehanna River, Great Bend Township, Bridge Replacement 230,000 (Base Construction Allocation - $190,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (16) SR 1010, SR 1010 over Bedbug Creek, Oakland Township, Bridge Replacement 270,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (17) SR 2046, SR 2046 over Tunkhannock Creek, Gibson Township, Bridge Replacement 440,000 (Base Construction Allocation - $370,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (18) SR 1011, Bridge over Hemlock Creek, 0.2 Mile North of SR 1009, Harmony Township, Bridge Replacement 330,000 (Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (19) SR 4002, Bridge over Choconut Creek, 0.1 Mile East of TR 267, Choconut Township, Bridge Replacement 290,000 (Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (20) SR 3009, Bridge over White Creek, 1.8 Miles North of County Line, Auburn Township, Bridge Replacement 240,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (21) SR 3023, Bridge over East Branch of Wyalusing Creek, 0.1 Mile South of TR 706, Rush Township, Bridge Replacement and Intersection Realignment 1,520,000 (Base Construction Allocation - $1,300,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (22) SR 4008, Bridge over Laurel Lake Creek, 1.7 Miles East of TR 167, Silver Lake Township, Bridge Replacement 430,000 (Base Construction Allocation - $360,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (23) SR 0000, Cemetery Road Bridge over Dewing Creek, Little Meadows Borough, Bridge Replacement 300,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (24) SR 1012, Bridge over Salt Lick Creek, New Milford Township, Bridge Rehabilitation 95,000 (Base Construction Allocation - $75,000) (Land Allocation - $5,000) (Design and Contingencies - $15,000) (25) SR 0011, Delaware and Hudson Railway Overpass, Concrete Repairs 150,000 (Base Construction Allocation - $128,000) (Design and Contingencies - $22,000) (26) SR 2032, Bridge over Delaware and Hudson Railway, Harford Township, Repair Concrete Parapets 75,000 (Base Construction Allocation - $64,000) (Design and Contingencies - $11,000) (27) SR 2024, Delaware and Hudson Railway Overpass, Brooklyn Township, Repair Masonry and Install Drain 31,000 (Base Construction Allocation - $26,000) (Design and Contingencies - $5,000) Section 63. Tioga County. (a) Local Bridges (1) Elkland Borough, North Buffalo Street over Camp Brook Creek, Bridge Replacement 510,000 (Base Construction Allocation - $360,000) (Land Allocation - $20,000) (Design and Contingencies - $130,000) (2) Middlebury Township, T-658 (Monkey Run Road), Bridge over Tributary of Losey Creek, Bridge Replacement 390,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (3) Farmington Township, T-758 (Short Hole Road), Bridge over Thorn Bottom Creek, Bridge Replacement 390,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $130,000) (4) Tioga Township, T-726, Upper Bear Creek Road Bridge over Crooked Creek, Bridge Replacement 1,550,000 (Base Construction Allocation - $1,250,000) (Design and Contingencies - $300,000) (5) Farmington Township, T-657, Bridge No.6 over Elkhorn Creek, Bridge Replacement 430,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (6) Farmington Township, T-657, Bridge over Elkhorn Creek, Bridge Replacement 430,000 (Base Construction Allocation - $300,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (7) Jackson Township, T-952, Bridge over Hammond Creek, Bridge Replacement 610,000 (Base Construction Allocation - $480,000) (Land Allocation - $30,000) (Design and Contingencies - $100,000) (8) Sullivan Township, T-469, Bridge over Cory Creek, Bridge Replacement 225,000 (Base Construction Allocation - $125,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (9) Richmond Township, Bridge on Mill Road, Bridge Replacement 500,000 (10) Osceola Township, T-743, Red House Bridge over Holden Creek, Bridge Replacement 350,000 (b) State Bridges (1) SR 0249, Losey Creek Bridge, South of SR 4017 in Village of Keeneyville, Middlebury Township, Bridge Rehabilitation 250,000 (Base Construction Allocation - $210,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000) (2) SR 1002, Corey Creek Bridge over Corey Creek, Northeast of Mansfield, Bridge Replacement 346,000 (Base Construction Allocation - $277,000) (Land Allocation - $17,000) (Design and Contingencies - $52,000) (3) SR 3001, Kettle Creek Bridge, 11 Miles South of Watrous, Bridge Replacement 366,000 (Base Construction Allocation - $293,000) (Land Allocation - $18,000) (Design and Contingencies - $55,000) (4) SR 3023, Heise Run North Bridge, West of Wellsboro, Bridge Replacement 240,000 (Base Construction Allocation - $192,000) (Land Allocation - $12,000) (Design and Contingencies - $36,000) (5) SR 4017, Holden Creek Bridge No.1, Bridge Replacement 584,000 (Base Construction Allocation - $467,000) (Land Allocation - $29,000) (Design and Contingencies - $88,000) (6) SR 4024, Elkhorn Creek Bridge, West of Tioga Borough, Bridge Replacement 451,000 (Base Construction Allocation - $401,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000) (7) SR 3007, Bridge over Stoney Fork Creek, Bridge Painting 160,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $10,000) (8) SR 4017, Bridge over , Bridge Painting 475,000 (Base Construction Allocation - $465,000) (Design and Contingencies - $10,000) (9) SR 0049, SR 0049 over Cowanesque River, Westfield Township, Bridge Replacement 1,802,000 (Base Construction Allocation - $1,442,000) (Land Allocation - $90,000) (Design and Contingencies - $270,000) (10) SR 0287, SR 0287 over Wellsboro Street - Conrail, Tioga Township, Bridge Replacement 1,709,000 (Base Construction Allocation - $1,367,000) (Land Allocation - $86,000) (Design and Contingencies - $256,000) (11) SR 0328, SR 0328 over Hammond Creek, Jackson Township, Bridge Replacement 256,000 (Base Construction Allocation - $205,000) (Land Allocation - $13,000) (Design and Contingencies - $38,000) (12) SR 0349, SR 0349 over Mill Creek, Clymer Township, Bridge Replacement 1,000,000 (Base Construction Allocation - $800,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (13) SR 1030, SR 1030 over Conrail, Tioga Township, Bridge Replacement 561,000 (Base Construction Allocation - $449,000) (Land Allocation - $28,000) (Design and Contingencies - $84,000) (14) SR 2017, SR 2017 over Mill Creek, Union Township, Bridge Replacement 584,000 (Base Construction Allocation - $469,000) (Land Allocation - $27,000) (Design and Contingencies - $88,000) (15) SR 4017, SR 4017 Bridge No.2 over Holden Creek, Osceola Township, Bridge Replacement 542,000 (Base Construction Allocation - $434,000) (Land Allocation - $27,000) (Design and Contingencies - $81,000) (16) SR 0015, Mill Creek Bridge Spanning Tioga Dam Impoundment at Confluence, Two-Lane Bridge Construction 6,875,000 (Base Construction Allocation - $6,250,000) (Design and Contingencies - $625,000) (17) PA 249, Bridge over Crooked Creek, Village of Little Marsh, Chatham Township, Bridge Replacement 1,250,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (18) SR 1032, Crooked Creek Bridge over Crooked Creek, Tioga Township, Bridge Replacement 1,550,000 (Base Construction Allocation - $1,250,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) Section 64. Union County. (a) Local Bridges (1) Hartley Township, T-320, Old Red Covered Bridge over Penn's Creek, Covered Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $850,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (2) White Deer Township, T-516, Factory Road Covered Bridge over , Covered Bridge Replacement 726,000 (Base Construction Allocation - $556,000) (Land Allocation - $50,000) (Design and Contingencies - $120,000) (3) White Deer Township, T-404, Bridge over Little Buffalo Creek, Bridge Replacement 320,000 (Base Construction Allocation - $320,000) (b) State Bridges (1) SR 0192, Rapid Run Bridge II over Rapid Run, Lewis Township, Bridge Rehabilitation 250,000 (Base Construction Allocation - $200,000) (Land Allocation - $13,000) (Design and Contingencies - $37,000) (2) SR 0192, Rapid Run Bridge I over Rapid Run, Lewis Township, Bridge Rehabilitation 205,000 (Base Construction Allocation - $164,000) (Land Allocation - $10,000) (Design and Contingencies - $31,000) (3) SR 0044, Bridge over Spring Creek, Gregg Township, Bridge Painting 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (4) SR 1004, Bridge over Little Buffalo Creek, Kelly Township, Bridge Painting 75,000 (Base Construction Allocation - $65,000) (Design and Contingencies - $10,000) (5) SR 1012, Bridge over White Deer Hole Creek, Gregg Township, Bridge Painting 160,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $10,000) (6) SR 0235, SR 0235 over Laurel Run, Hartley Township, Bridge Replacement 1,118,000 (Base Construction Allocation - $894,000) (Land Allocation - $56,000) (Design and Contingencies - $168,000) (7) SR 0235, SR 0235 over Buffalo Creek, Lewis Township, Bridge Replacement 395,000 (Base Construction Allocation - $316,000) (Land Allocation - $20,000) (Design and Contingencies - $59,000) (8) US 15, Bridge over White Deer Hole Creek, Village of Allenwood, Gregg Township, Deck Replacement 1,850,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $50,000) (Design and Contingencies - $300,000) (9) US 15, Bridge over SR 1004, Village of West Milton, Kelly Township, Superstructure Replacement 2,450,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $50,000) (Design and Contingencies - $400,000) (10) US 15, Bridge over White Deer Creek, White Deer Township, Deck Replacement 2,430,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $30,000) (Design and Contingencies - $400,000) (11) US 15, Bridge over SR 1010, White Deer Township, Deck Replacement 1,230,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (12) SR 3003, Bridge over Buffalo Creek, Lewis Township, Bridge Replacement 450,000 (Base Construction Allocation - $350,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (13) SR 3004, Bridge over Laurel Run, Hartley Township, Bridge Replacement 723,000 (Base Construction Allocation - $578,000) (Land Allocation - $36,000) (Design and Contingencies - $109,000) (14) SR 3004, Bridge over Cedar Run, Limestone Township, Bridge Replacement 380,000 (Base Construction Allocation - $280,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (15) SR 3003, Eighth Street Bridge, Mifflinburg Borough, Bridge Replacement 630,000 (Base Construction Allocation - $504,000) (Land Allocation - $32,000) (Design and Contingencies - $94,000) (16) SR 0192, Rapid Run Bridge III over Rapid Run, Hartley Township, Bridge Replacement 660,000 (Base Construction Allocation - $528,000) (Land Allocation - $33,000) (Design and Contingencies - $99,000) Section 65. Venango County. (a) Local Bridges (1) Richland Township, T-552 over Mill Creek, Bridge Replacement 475,000 (Base Construction Allocation - $355,000) (Land Allocation - $10,000) (Design and Contingencies - $110,000) (2) Richland Township, T-361 over Unnamed Tributary of Mill Creek, Bridge Replacement 360,000 (Base Construction Allocation - $265,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (3) Richland Township, T-377 over Sage Run, Bridge Replacement 385,000 (Base Construction Allocation - $290,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (4) Pinegrove Township, T-628 over , Bridge Replacement 363,000 (Base Construction Allocation - $307,000) (Land Allocation - $6,000) (Design and Contingencies - $50,000) (5) Cranberry Township, T-679 over Branch of Sage Run, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (6) Oakland Township, T-567 over Branch of Two Mile Run, Bridge Replacement 106,000 (Base Construction Allocation - $100,000) (Land Allocation - $1,000) (Design and Contingencies - $5,000) (7) Rockland Township, T-512 over East Sandy Creek, Bridge Replacement 360,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (8) Pinegrove Township, T-628 over East Sandy Creek, Bridge Replacement 510,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (9) Cherrytree Township, T-520, Baker Road Bridge over Prather Creek, Bridge Replacement 360,000 (10) Cherrytree Township, T-649, Fairview Road Bridge over Branch of Prather Creek, Bridge Replacement 360,000 (11) Canal Township, T-323, Bridge over Tributary of McCune Run, Bridge Replacement 150,000 (12) Canal Township, T-323, Bridge over McCune Run, Bridge Replacement 150,000 (13) Canal Township, T-323, Bridge over Tributary of McCune Run, Bridge Replacement 150,000 (14) Canal Township, T-354, Bridge over Tributary of Warden Run, Bridge Replacement 150,000 (15) Canal Township, T-354, Bridge over Warden Run, Bridge Replacement 150,000 (16) Cornplanter Township, T-569, Bridge over Cherry Run, Bridge Replacement 242,000 (17) Cherrytree Township, T-649, Bridge over Prather Creek, Bridge Replacement 200,000 (18) Cherrytree Township, T-520, Bridge over Prather Creek, Bridge Replacement 200,000 (19) Cooperstown Borough, T-372, Bridge over Lake Creek, Bridge Replacement 370,000 (20) Cornplanter Township, T-564, Bridge over Wykle Run, Bridge Replacement 417,000 (21) Cranberry Township, T-494, Bridge over Sage Run, Bridge Replacement 240,000 (22) Frenchcreek Township, T-318, Bridge over Little Sandy Creek, Bridge Replacement 300,000 (23) Frenchcreek Township, T-346, Bridge over Little Sandy Creek, Bridge Replacement 285,000 (24) Frenchcreek Township, T-304, Bridge over Little Sandy Creek, Bridge Replacement 302,000 (25) Frenchcreek Township, T-334, Bridge over Little Sandy Creek, Bridge Replacement 275,000 (26) Mineral Township, T-308, Bridge over Big Sandy Creek, Bridge Replacement 505,000 (27) Oilcreek Township, T-635, Bridge over Oil Creek, Bridge Replacement 840,000 (28) Polk Borough, Church Avenue Bridge over Sandy Creek, Bridge Replacement 600,000 (29) Rockland Township, T-522, Bridge over Mill Creek, Bridge Replacement 300,000 (30) Sugarcreek Borough, T-529, Bridge over Two Mile Run, Bridge Replacement 117,000 (31) Sugarcreek Borough, Sleepy Hollow Road Bridge over Tributary of Sugar Creek, Bridge Replacement 135,000 (32) Sugarcreek Borough, T-529, Bridge over Sugar Creek, Bridge Rehabilitation 9,360,000 (b) State Bridges (1) SR 4001, SR 4001 over Two Mile Run West Branch, Sugarcreek Borough, Bridge Replacement 205,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (2) SR 0227, SR 0227 over Cherry Run, Cornplanter Township, Bridge Replacement 280,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (3) SR 0322, SR 0322 over Halls Run, Cranberry Township, Bridge Replacement 2,600,000 (Base Construction Allocation - $2,000,000) (Land Allocation - $100,000) (Design and Contingencies - $500,000) (4) SR 3009, SR 3009 over I-80, Scrubgrass Township, Bridge Replacement 810,000 (Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (5) SR 3017, SR 3017 over Warden Run, Canal Township, Bridge Replacement 920,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (6) SR 0038, SR 0038 over Pine Run, Richland Township, Bridge Rehabilitation 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (7) SR 3025, SR 3025 over Hays Run, City of Oil City, Bridge Replacement 340,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $35,000) (8) SR 0062, Washington Crossing Bridge over French Creek and Conrail, City of Franklin, Bridge Painting 920,000 (Base Construction Allocation - $800,000) (Land Allocation - $40,000) (Design and Contingencies - $80,000) (9) SR 0062, Sage Run Bridge No.4 over Sage Run, Cranberry Township, Bridge Replacement 660,000 (Base Construction Allocation - $560,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (10) SR 0062, Sage Run Bridge No.7 over Sage Run, Cranberry Township, Bridge Replacement 330,000 (Base Construction Allocation - $250,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (11) SR 0322, 13th Street Bridge over French Creek, City of Franklin, Bridge Rehabilitation 1,620,000 (Base Construction Allocation - $1,500,000) (Land Allocation - $40,000) (Design and Contingencies - $80,000) (12) SR 1004, Pithole Stone Arch Bridge over Pithole Creek, Cornplanter Township, Bridge Rehabilitation 400,000 (Base Construction Allocation - $280,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (13) SR 4010, Twin Bridge over Sugar Creek, Sugarcreek Borough, Bridge Replacement 1,050,000 (Base Construction Allocation - $900,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (14) SR 1006, Pithole Creek Bridge No.4, Allegheny Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (15) SR 4022, Bridge over Porter Run, Plum Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (16) SR 1006, Bridge over Pithole Creek, Allegheny Township, Bridge Replacement 300,000 (17) SR 4008, Bridge over McCune Run, Canal Township, Bridge Replacement 450,000 (18) SR 3017, Utica Road Bridge over Warden Run, Canal Township, Bridge Replacement 420,000 (19) SR 3005, Bridge over Scrubgrass Creek, Clinton Township, Bridge Replacement 1,250,000 (20) SR 0208, Bridge over I-80, Clinton Township, Bridge Replacement 5,000,000 (21) SR 0080, I-80 Bridge over Tributary of Scrubgrass Creek, Clintonville Borough, Bridge Replacement 300,000 (22) SR 0008, Bridge over Oil Creek, Cornplanter Township, Bridge Rehabilitation 746,000 (23) SR 1004, Bridge over Oil Creek, Cornplanter Township, Bridge Replacement 2,500,000 (24) SR 1004, Bridge over Pithole Creek, Cornplanter Township, Bridge Rehabilitation 600,000 (25) SR 1006, 27th Street Bridge over Pithole Creek, Cornplanter Township, Bridge Replacement 200,000 (26) SR 0227, Bridge No.3 over Cherry Run, Cornplanter Township, Bridge Replacement 500,000 (27) SR 0062, Bridge No.7 over Sage Run, Cranberry Township, Bridge Replacement 900,000 (28) SR 0062, Bridge No.5 over Sage Run, Cranberry Township, Bridge Replacement 500,000 (29) SR 0062, Bridge No.4 over Sage Run, Cranberry Township, Bridge Replacement 310,000 (30) SR 0322, Bridge over Halls Run, Cranberry Township, Bridge Replacement 1,400,000 (31) SR 0062, Sage Run Bridge No.1, Cranberry Township, Bridge Replacement 400,000 (32) SR 0062, Sage Run Bridge No.6, Cranberry Township, Bridge Replacement 400,000 (33) SR 0322, Bridge over French Creek, Franklin City, Bridge Rehabilitation 9,900,000 (34) SR 0322, Bridge over Allegheny River, Franklin City, Bridge Rehabilitation 9,620,000 (35) SR 0062, Bridge over Conrail and French Creek, Franklin City, Bridge Painting 920,000 (36) SR 0008, Bridge over T-371, Irwin Township, Bridge Replacement 1,250,000 (37) SR 4003, Bridge over Wolf Run, Jackson Township, Bridge Replacement 200,000 (38) SR 3011, Bridge over South Sandy Creek, Mineral Township, Bridge Replacement 700,000 (39) SR 0428, Bridge over Prather Run, Oakland Township, Bridge Replacement 600,000 (40) SR 0428, Bridge over Sugar Creek, Oakland Township, Bridge Replacement 600,000 (41) SR 6008, Bridge over Oil Creek, Oil City, Bridge Replacement 1,000,000 (42) SR 0427, Bridge No.1 over Sugar Creek, Plum Township, Bridge Replacement 300,000 (43) SR 0427, Bridge No.2 over Sugar Creek, Plum Township, Bridge Replacement 800,000 (44) SR 4022, Bridge over Tributary of Sugar Creek, Plum Township, Bridge Replacement 600,000 (45) SR 4022, Bridge over Porter Run, Plum Township, Bridge Replacement 500,000 (46) SR 0080, I-80 Bridge over Little Scrubgrass Creek, Scrubgrass Township, Bridge Replacement 600,000 (47) SR 4006, Bridge over Patchell Run, Sugarcreek Borough, Bridge Replacement 300,000 (48) SR 4010, Bridge over Sugar Creek, Sugarcreek Borough, Bridge Replacement 1,300,000 (49) SR 0062, Bridge over Upper Two Mile Run, Sugarcreek Borough, Bridge Replacement 900,000 (50) SR 0322, Bridge over Sugar Creek, Sugarcreek Borough, Bridge Replacement 6,520,000 (51) SR 0427, Bridge over Sugar Creek, Sugarcreek Borough, Bridge Replacement 900,000 (52) SR 3023, Bridge over Mill Creek, Utica Borough, Bridge Replacement 400,000 (53) SR 0008, Bridge over T-380 and South Branch of Sandy Creek, Victory Township, Bridge Replacement 4,530,000 (54) SR 0008, Bridge over T-380 and North Branch of Sandy Creek, Victory Township, Bridge Replacement 4,530,000 (55) SR 1006, 17th Street Bridge over Allender Run, Cornplanter Township, Bridge Replacement 300,000 Section 66. Warren County. (a) Local Bridges (1) Pine Grove Township, Main Street Bridge over Johnny Run, Bridge Replacement 560,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (2) City of Warren, Hickory Street Bridge over Allegheny River, Bridge Replacement 7,300,000 (Base Construction Allocation - $6,650,000) (Design and Contingencies - $650,000) (3) City of Warren, Hickory Street River Walkway over Allegheny River, Pedestrian Bridge Construction 950,000 (Base Construction Allocation - $750,000) (Design and Contingencies - $200,000) (4) Sheffield Township, Center Street Bridge on T-540 over Two Mile Run, Bridge Replacement 255,000 (Base Construction Allocation - $250,000) (Design and Contingencies - $5,000) (5) Sheffield Township, Henry's Mill Road Bridge on T-526 over South Branch of Tionesta Creek, Bridge Replacement 1,025,000 (Base Construction Allocation - $850,000) (Land Allocation - $10,000) (Design and Contingencies - $165,000) (6) Sheffield Township, T-546, Bridge over , Bridge Replacement 315,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $55,000) (b) State Bridges (1) SR 0006, SR 0006 over Wintroth Run, Brokenstraw Township, Bridge Replacement 260,000 (Base Construction Allocation - $180,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (2) SR 0006, SR 0006 over Six Mile Run, Mead Township, Bridge Replacement 320,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (3) SR 0027, SR 0027 over Pine Creek, Southwest Township, Bridge Replacement 800,000 (Base Construction Allocation - $580,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (4) SR 0027, SR 0027 over Hazeltine Hollow Run, Brokenstraw Township, Bridge Replacement 310,000 (Base Construction Allocation - $210,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (5) SR 0062, SR 0062 over Bully Run, Watson Township, Bridge Replacement 300,000 (Base Construction Allocation - $230,000) (Land Allocation - $20,000) (Design and Contingencies - $50,000) (6) SR 0957, SR 0957 over Little Brokenstraw Creek, Freehold Township, Bridge Replacement 800,000 (Base Construction Allocation - $620,000) (Land Allocation - $20,000) (Design and Contingencies - $160,000) (7) SR 3009, SR 3009 over Tidioute Creek, Deerfield Township, Bridge Replacement 470,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (8) SR 4013, SR 4013 over Mathews Run, Youngsville Borough, Bridge Replacement 430,000 (Base Construction Allocation - $360,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (9) SR 4021, SR 4021 over Brands Run, Sugar Grove Borough, Bridge Replacement 240,000 (Base Construction Allocation - $180,000) (Land Allocation - $20,000) (Design and Contingencies - $40,000) (10) SR 0027, Bridge over Hazeltine Hollow Run, Brokenstraw Township, Bridge Replacement 500,000 (Base Construction Allocation - $450,000) (Design and Contingencies - $50,000) (11) SR 0062, US 62, Bridge over Bully Run, Watson Township, Bridge Replacement 410,000 (Base Construction Allocation - $370,000) (Design and Contingencies - $40,000) (12) SR 3009, Tidioute Creek Road Bridge No.5 over Tidioute Creek, Triumph Township, Bridge Replacement 290,000 (Base Construction Allocation - $270,000) (Design and Contingencies - $20,000) (13) SR 0027, Pittsfield Truss Bridge over Little Brokenstraw, Pittsfield Township, Bridge Replacement 1,040,000 (Base Construction Allocation - $900,000) (Land Allocation - $40,000) (Design and Contingencies - $100,000) (14) SR 3009, Tidioute Creek Road Bridge No.5 over Tidioute Creek, Triumph Township, Bridge Replacement 300,000 (Base Construction Allocation - $270,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (15) SR 0006, Bridge over Ludlow Street, Warren Township, Bridge Replacement 1,600,000 (Base Construction Allocation - $1,400,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (16) SR 0006, Bridge over Dutchmans Run, Mead Township, Bridge Replacement 700,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (17) SR 0006, Bridge over Dutchmans Run, Mead Township, Bridge Replacement 800,000 (Base Construction Allocation - $700,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (18) SR 0027, Bridge over Conrail, Pittsfield Township, Bridge Replacement 1,920,000 (Base Construction Allocation - $1,700,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (19) SR 0027, Bridge over Teelick Run, Brokenstraw Township, Bridge Replacement 200,000 (Base Construction Allocation - $100,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (20) SR 0027, Bridge over Mathews Run, Sugar Grove Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (21) SR 0059, Bridge over Morrison Run, Mead Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (22) SR 0059, Bridge over Brown Run, Mead Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (23) SR 0059, Bridge over Ward Run, Mead Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (24) SR 0059, Bridge over Kinzua Creek, Mead Township, Bridge Replacement 22,720,000 (Base Construction Allocation - $20,400,000) (Land Allocation - $20,000) (Design and Contingencies - $2,300,000) (25) SR 0948, Bridge over Tionesta Creek, South Bridge, Sheffield Township, Bridge Replacement 900,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (26) SR 0957, Bridge over Brokenstraw Creek, Columbus Township, Bridge Replacement 1,120,000 (Base Construction Allocation - $1,000,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (27) SR 0957, Bridge over Kanetone Creek, Farmington Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (28) SR 1011, Conewango Avenue Bridge, Glade Township, Bridge Rehabilitation 700,000 (Base Construction Allocation - $600,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (29) SR 1030, Bridge over Scotts Run, Conewango Township, Bridge Replacement 400,000 (Base Construction Allocation - $300,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (30) SR 2002, Bridge over Tionesta Creek, Sheffield Township, Bridge Replacement 900,000 (Base Construction Allocation - $800,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (31) SR 2004, Bridge over Two Mile Run, Sheffield Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (32) SR 3004, Bridge over Caldwell Creek, Southwest Township, Bridge Replacement 600,000 (Base Construction Allocation - $500,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (33) SR 3016, Bridge over Mead Run, Brokenstraw Township, Bridge Replacement 500,000 (Base Construction Allocation - $400,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (34) SR 4007, Bridge over Coffee Creek, Columbus Township, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $80,000) (35) SR 4023, Bridge over Brokenstraw Creek, Columbus Township, Bridge Replacement 1,220,000 (Base Construction Allocation - $1,100,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (36) SR 6006, Conewango Creek Bridge over Pennsylvania Avenue, Warren Township, Bridge Replacement 3,820,000 (Base Construction Allocation - $3,400,000) (Land Allocation - $20,000) (Design and Contingencies - $400,000) (37) Main Street Bridge over Johnny Run, Pine Grove Township, Bridge Replacement 560,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) Section 67. Washington County. (a) Local Bridges (1) Burgettstown Borough, Raccoon Bridge No.23 over Raccoon Creek, Bridge Rehabilitation 433,000 (Base Construction Allocation - $313,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (2) Chartiers Township, Allison Hollow Road, One-Lane Bridge, Bridge Replacement 195,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000) (3) Chartiers Township, Allison Hollow Road, One-Lane Bridge, Bridge Replacement 195,000 (Base Construction Allocation - $150,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000) (4) Chartiers Township, McGovern Road Bridge, Bridge Replacement 145,000 (Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $40,000) (5) North Strabane Township, T-643, Galley Road Bridge over Little Chartiers Creek, Bridge Replacement 570,000 (Base Construction Allocation - $450,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (6) Donegal Township, T-541, Lindsay Bridge over Buck Run, Bridge Replacement 285,000 (Base Construction Allocation - $255,000) (Design and Contingencies - $30,000) (7) Donegal Township, T-423, Mays Bridge over Middle Wheeling Creek, Bridge Replacement 245,000 (Base Construction Allocation - $215,000) (Design and Contingencies - $30,000) (8) Independence Township, T-649, Cummins Bridge over Sugar Camp Run, Bridge Replacement 330,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $30,000) (9) Mt. Pleasant Township, T-749, Sabo Road over Westland Run, Bridge Replacement 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (10) Mt. Pleasant Township, T-606, Primrose Road over Millers Run, Bridge Replacement 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (11) Mt. Pleasant Township, T-493, Meriage Street over Robinson Run Tributary, Bridge Replacement 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (12) North Bethlehem Township, T-445, Dague Bridge over Pigeon Creek, Bridge Replacement 250,000 (Base Construction Allocation - $220,000) (Design and Contingencies - $30,000) (13) North Franklin Township, T-526, Cario Drive over Unnamed Tributary of Catfish Creek, Bridge Replacement 46,000 (Base Construction Allocation - $42,000) (Design and Contingencies - $4,000) (14) Nottingham Township, T-782, Sundust Road Culvert, 35 Feet North of Intersection with SR 1059, Bridge Replacement 101,000 (Base Construction Allocation - $91,000) (Design and Contingencies - $10,000) (15) Nottingham Township, T-828, Barr Bridge over Mingo Creek, Bridge Replacement 350,000 (Base Construction Allocation - $310,000) (Design and Contingencies - $40,000) (16) Robinson Township, T-500, Chamberlain Bridge over Chamberlain Run, Bridge Replacement 285,000 (Base Construction Allocation - $255,000) (Design and Contingencies - $30,000) (17) Smith Township, T-843, Dunbar Bridge over Raccoon Creek, Bridge Replacement 285,000 (Base Construction Allocation - $255,000) (Design and Contingencies - $30,000) (18) City of Washington, Hanna Street Bridge over Catfish Creek, Bridge Replacement 40,000 (Base Construction Allocation - $30,000) (Design and Contingencies - $10,000) (19) City of Washington, Rosewood Avenue Bridge over Catfish Creek, Bridge Replacement 40,000 (Base Construction Allocation - $30,000) (Design and Contingencies - $10,000) (20) West Pike Run Township, T-840, Suzy Lane over Pike Run Creek, Bridge Replacement 230,000 (Base Construction Allocation - $210,000) (Design and Contingencies - $20,000) (21) California Borough, Daisytown Bridge over Pike Run, Bridge Replacement 925,000 (Base Construction Allocation - $700,000) (Land Allocation - $50,000) (Design and Contingencies - $175,000) (22) Coal Center Borough, Water Street Bridge over Pike Run, Bridge Replacement 1,588,000 (Base Construction Allocation - $1,288,000) (Land Allocation - $50,000) (Design and Contingencies - $250,000) (23) West Pike Run Township, T-948 over Pike Run, Bridge Replacement 1,075,000 (Base Construction Allocation - $850,000) (Land Allocation - $50,0000) (Design and Contingencies - $175,000) (24) Midway Borough, North Avenue over Robinson Run Creek, Bridge Replacement 95,000 (Base Construction Allocation - $55,000) (Land Allocation - $20,000) (Design and Contingencies - $20,000) (25) Canonsburg Borough, Adams Street over Brush Run, Bridge Replacement 176,000 (Base Construction Allocation - $150,000) (Land Allocation - $1,000) (Design and Contingencies - $25,000) (26) East Finley Township, T-375, County Bridge No.32 over Templeton Fork, Bridge Replacement 355,000 (Base Construction Allocation - $300,000) (Land Allocation - $5,000) (Design and Contingencies - $50,000) (27) North Franklin Township, Construct New Bridges along New Local Road Connecting SR 3013 and SR 0018, New Bridge Construction 1,168,000 (Base Construction Allocation - $928,000) (Land Allocation - $100,000) (Design and Contingencies - $140,000) (28) Peters Township, Bebout Road Bridge, Bridge Rehabilitation 365,000 (Base Construction Allocation - $365,000) (29) Blaine Township, Bridge No.23 over Buffalo Creek, Bridge Replacement 315,000 (Base Construction Allocation - $210,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (30) Buffalo Township, Bridge No.38 over Buffalo Creek, Bridge Replacement 315,000 (Base Construction Allocation - $210,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (31) Donegal Township, Bridge No.4 over Middle Wheeling Creek, Bridge Replacement 315,000 (Base Construction Allocation - $210,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (32) Marianna Borough, Bridge No.3 over Patterson Run, Bridge Replacement 710,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $200,000) (33) Nottingham Township, Bridge No.11 over Mingo Creek, Bridge Replacement 325,000 (Base Construction Allocation - $220,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (34) West Bethlehem Township, Grable Road Culvert, Bridge Replacement 400,000 (Base Construction Allocation - $285,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (35) West Bethlehem Township, Dutch Glory Road Bridge, Bridge Replacement 350,000 (Base Construction Allocation - $245,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (36) West Pike Run Township, Bridge No.18 over Pike Run, Bridge Replacement 305,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (37) Marianna Borough, T-327, Bridge over Patterson Run, Bridge Replacement 355,000 (Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (38) Robinson and Cecil Townships, McDonald Trestle Bridge over Robinson Run, Bridge Replacement 392,000 (Base Construction Allocation - $275,000) (Design and Contingencies - $117,000) (39) Cecil Township, Muse-Bishop Road Bridge, Bridge Replacement 525,000 (Base Construction Allocation - $368,000) (Design and Contingencies - $157,000) (40) Fallowfield Township, T-892, Bridge on Fox Stop Road, Bridge Replacement 400,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (41) Fallowfield Township, T-882, Bridge on Cooper Road, Bridge Replacement 400,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (42) City of Monongahela, Chess Street Bridge No.1 over Dry Run, Bridge Replacement 415,000 (Base Construction Allocation - $250,000) (Land Allocation - $5,000) (Design and Contingencies - $160,000) (43) Cecil Township, Hendersonville Road Bridge over Montour Trail, New Bridge Construction 5,500,000 (Base Construction Allocation - $5,000,000) (Design and Contingencies - $500,000) (44) Cecil Township, TR 776, Creedmore Road Bridge, Bridge Replacement 65,000 (45) Chartiers Township, Paxton Bridge No.40 over Chartiers Creek, Bridge Replacement 400,000 (46) Cross Creek Township, Wilson-Lawton Bridge No.28 over Cross Creek, Bridge Replacement 280,000 (47) Hanover Township, King Bridge No.7 over Kings Creek, Bridge Replacement 280,000 (48) Cecil Township, Scott Bridge No.7 over Millers Run, Bridge Replacement 330,000 (49) Robinson Township, Elliot Bridge No.12 over Raccoon Creek, Bridge Replacement 280,000 (50) Smith Township, Keys Bridge No.28 over Raccoon Creek, Bridge Replacement 350,000 (51) Smith Township, Cherry Valley Bridge No.30 over Raccoon Creek, Bridge Replacement 350,000 (52) Independence Township, Apple Bridge No.1 over Sugar Camp Run, Bridge Replacement 280,000 (53) Amwell Township, Condit Bridge No.55 over Ten Mile Creek, Bridge Replacement 280,000 (54) Amwell Township, Craft Bridge No.66 over Ten Mile Creek, Bridge Replacement 280,000 (55) Centerville Borough, Two Mile Bridge No.4 over Two Mile Run, Bridge Replacement 200,000 (56) Fallowfield Township, T-892, Fox Stop Road Crossing Structure over the Wheeling and Lake Erie Railway Co., Bridge Replacement 715,000 (Base Construction Allocation - $650,000) (Design and Contingencies - $65,000) (b) State Bridges (1) SR 0018, Bridge over Abandoned Railroad, City of Washington, Bridge Replacement 650,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $125,000) (2) SR 0019, Bridge over Chartiers Creek, North Strabane and Peters Townships, Bridge Painting 161,000 (Base Construction Allocation - $156,000) (Design and Contingencies - $5,000) (3) SR 0070, I-70 Westbound Bridge over SR 3009, Buffalo Township, Bridge Painting 148,000 (Base Construction Allocation - $143,000) (Design and Contingencies - $5,000) (4) SR 0070, I-70 Eastbound Bridge over SR 3009, Buffalo Township, Bridge Painting 163,000 (Base Construction Allocation - $158,000) (Design and Contingencies - $5,000) (5) SR 0070, I-70 Bridge over 8th Street, Donegal Township, Bridge Replacement 2,486,000 (Base Construction Allocation - $2,211,000) (Land Allocation - $25,000) (Design and Contingencies - $250,000) (6) SR 0070, I-70 Bridge over Turnback Road, South Strabane Township, Bridge Rehabilitation 990,000 (Base Construction Allocation - $750,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (7) SR 0070, I-70 Bridge over SR 0519, Somerset Township, Bridge Rehabilitation 2,000,000 (Base Construction Allocation - $1,720,000) (Land Allocation - $40,000) (Design and Contingencies - $240,000) (8) SR 0070, I-70 Bridge over SR 2017, Somerset Township, Bridge Rehabilitation 1,105,000 (Base Construction Allocation - $865,000) (Land Allocation - $40,000) (Design and Contingencies - $200,000) (9) SR 0088, Charleroi Bridge over Maple Creek, Charleroi and Speers Boroughs, Bridge Replacement 725,000 (Base Construction Allocation - $500,000) (Land Allocation - $25,000) (Design and Contingencies - $200,000) (10) SR 0088, Bridge over Peters Creek, Finleyville Borough, Bridge Painting 65,000 (Base Construction Allocation - $65,000) (11) SR 0917, Pigeon Creek Bridge over Branch of Pigeon Creek, Bentleyville Borough, Bridge Replacement 570,000 (Base Construction Allocation - $370,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (12) SR 1005, Bridge over Millers Run, Cecil Township, Bridge Painting 75,000 (Base Construction Allocation - $75,000) (13) SR 1022, Donora-Webster Bridge over Monongahela River and Conrail, Donora Borough, Bridge Replacement 20,000,000 (Base Construction Allocation - $15,000,000) (Land Allocation - $3,000,000) (Design and Contingencies - $2,000,000) (14) SR 1077, Donora-Monessen Bridge over Monongahela River, PA 837 and 906 and Railroad, Donora Borough, Bridge Painting 1,000,000 (Base Construction Allocation - $1,000,000) (15) SR 2005, Sowers Run Bridge over Sowers Run, Amwell Township, Bridge Replacement 435,000 (Base Construction Allocation - $235,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (16) SR 2011, Bridge over Branch of Little , West Bethlehem Township, Bridge Replacement 460,000 (Base Construction Allocation - $260,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (17) SR 2030, Gorby's Bridge II over Gorby Run, California Borough, Bridge Rehabilitation 300,000 (Base Construction Allocation - $300,000) (18) SR 2037, Maple Creek Bridge over Branch of Maple Creek, Fallowfield Township, Bridge Replacement 486,000 (Base Construction Allocation - $286,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (19) SR 3009, Buffalo Arch Bridge over Branch of Buffalo Creek and Railroad, Buffalo Township, Bridge Replacement 535,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $225,000) (20) SR 4015, Bridge over Cherry Run, Mt. Pleasant Township, Bridge Painting 53,000 (Base Construction Allocation - $51,000) (Design and Contingencies - $2,000) (21) SR 4022, Chartiers Creek Bridge No.2 over Branch of Chartiers Creek, Canton Township, Bridge Replacement 415,000 (Base Construction Allocation - $215,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (22) SR 4022, Chartiers Creek Bridge No.1 over Branch of Chartiers Creek, Canton Township, Bridge Replacement 405,000 (Base Construction Allocation - $205,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (23) SR 2034, SR 2034 over Branch of Pike Run, West Pike Run Township, Bridge Replacement 438,000 (Base Construction Allocation - $313,000) (Land Allocation - $25,000) (Design and Contingencies - $100,000) (24) SR 2079, SR 2079 over Pike Run, West Pike Run Township, Bridge Replacement 988,000 (Base Construction Allocation - $788,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (25) SR 2030, Bridge No.1 over Gorby Run, California Borough, Bridge Replacement 430,000 (Base Construction Allocation - $330,000) (Design and Contingencies - $100,000) (26) SR 1077, Donora-Monessen Bridge over Monongahela River, Donora Borough, Bridge Rehabilitation 2,000,000 (Base Construction Allocation - $1,980,000) (Design and Contingencies - $20,000) (27) SR 0070, I-70 Bridge at SR 0481 Interchange, Mon City Exit, Fallowfield Township, Bridge Replacement 580,000 (Base Construction Allocation - $280,000) (Land Allocation - $100,000) (Design and Contingencies - $200,000) (28) SR 0018, John Brunner Memorial Bypass Bridge over Fork of Raccoon Creek, Bridge Replacement/Reconstruction 1,250,000 (29) SR 4018, Meadowcraft Village Bridge over Cross Creek, Bridge Replacement/Reconstruction 750,000 (30) SR 2011, Bridge at Intersection with Laurel Ridge Road, West Bethlehem Township, Bridge Replacement 575,000 (Base Construction Allocation - $350,000) (Land Allocation - $25,000) (Design and Contingencies - $200,000) Section 68. Wayne County. (a) Local Bridges (1) Honesdale Borough, Old Willow Avenue, Bridge over Corley Brook at Intersection of TR 6, Bridge Replacement 410,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (b) State Bridges (1) SR 0371, Cochecton Bridge No.6 over Delaware River, Damascus Township, Bridge Rehabilitation 1,050,000 (Base Construction Allocation - $950,000) (Design and Contingencies - $100,000) (2) SR 0380, I-380 Bridge over Lehigh River, Lehigh Township, Bridge Rehabilitation 284,000 (Base Construction Allocation - $244,000) (Design and Contingencies - $40,000) (3) SR 4009, Quarry Bridge over Dyberry Creek, Dyberry Township, Bridge Replacement 660,000 (Base Construction Allocation - $500,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (4) SR 0371, Bridge No.6, Damascus Township, Bridge Painting 2,200,000 (Base Construction Allocation - $2,000,000) (Design and Contingencies - $200,000) (5) SR 1020, Bridge No.7 over Delaware River, Damascus Township, Bridge Painting 3,300,000 (Base Construction Allocation - $3,000,000) (Design and Contingencies - $300,000) (6) SR 1004, Bridge over Outlet of Beach Lake, Intersection of SR 1011, Berlin Township, Bridge Replacement 345,000 (Base Construction Allocation - $265,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (7) SR 3028, Bridge over TR 191, East of SR 3031, Cherry Ridge Township, Bridge Replacement 450,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $90,000) (8) State Bridges, Countywide Bridge Zone Painting, Bridge Painting 370,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000) (9) SR 1004, SR 1004 over Outlet of Beach Lake, Berlin Township, Bridge Replacement 260,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (10) SR 3028, SR 3028 over TR 191, Cherry Ridge Township, Bridge Replacement 400,000 (Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (11) SR 0371, Bridge No.1 over Dyberry Creek at Junction of SR 1023, Lebanon Township, Bridge Replacement 400,000 (Base Construction Allocation - $340,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (12) SR 0371, Bridge No.5 over Beaver Dam Creek, 0.1 Mile West of SR 1031, Damascus Township, Bridge Replacement 470,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (13) SR 3006, Bridge No.3 over Ariel Creek, 0.6 Mile North of SR 3008, Salem Township, Bridge Replacement 470,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (14) SR 4014, Bridge No.4 over Balls Creek, 0.5 Mile East of SR 4037, Scott Township, Bridge Replacement 380,000 (Base Construction Allocation - $320,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (15) SR 0348, Bridge over Jones Creek, 0.1 Mile West of SR 3019, Salem Township, Bridge Replacement 470,000 (Base Construction Allocation - $400,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (16) SR 4043, Bridge over Branch of Oquaga Creek, 1.5 Miles West of SR 4037, Scott Township, Bridge Replacement 240,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (17) SR 1007, Bridge over Branch of Boyd's Creek, 0.5 Mile East of SR 1019, Damascus Township, Bridge Replacement 310,000 (Base Construction Allocation - $260,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (18) SR 0006, Lackawaxen River Bridge over Lackawaxen River, Honesdale Borough, Bridge Rehabilitation 260,000 (Base Construction Allocation - $180,000) (Design and Contingencies - $80,000) (19) SR 1008, Lassly's Road Bridge, Damascus Township, Bridge Replacement 406,000 (Base Construction Allocation - $330,000) (Land Allocation - $10,000) (Design and Contingencies - $66,000) Section 69. Westmoreland County. (a) Local Bridges (1) Hempfield Township, Airport Hill Road Bridge over Slate Creek, Bridge Replacement 350,000 (Base Construction Allocation - $280,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (2) Hempfield Township, Sweitzer Road Bridge over Sewickley Creek, Bridge Replacement 975,000 (Base Construction Allocation - $800,000) (Land Allocation - $15,000) (Design and Contingencies - $160,000) (3) Hempfield Township, Ladysmith Road Bridge over Little Sewickley Creek,Bridge Replacement 813,000 (Base Construction Allocation - $613,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (4) Hempfield Township, Old Route 30 Bridge over Slate Creek, Bridge Replacement 370,000 (Base Construction Allocation - $300,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (5) Hempfield Township, Old Route 119 Bridge over Tributary of Jacks Run, Bridge Replacement 428,000 (Base Construction Allocation - $288,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (6) Jeannette City, 6th Street Bridge over Brush Creek, Bridge Replacement 460,000 (Base Construction Allocation - $340,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (7) Ligonier Township, T-605, Bridge over Two Mile Run, Bridge Replacement 320,000 (Base Construction Allocation - $200,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (8) Ligonier Township, T-617, Bridge over Mill Run, Bridge Replacement 310,000 (Base Construction Allocation - $190,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (9) Hempfield Township, Possum Hollow Road Bridge over Tributary of Little Sewickley Creek, Bridge Replacement 428,000 (Base Construction Allocation - $288,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (10) South Huntingdon Township, T-390, Williams Road Bridge, Bridge Replacement 125,000 (Base Construction Allocation - $100,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (11) South Huntingdon Township, T-562, J.D. Smith Road Bridge, Bridge Replacement 155,000 (Base Construction Allocation - $125,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (12) South Huntingdon Township, T-386, Bridge No.1, Mount Etna Road Bridge, Bridge Replacement 145,000 (Base Construction Allocation - $115,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (13) South Huntingdon Township, T-386, Bridge No.2, Mount Etna Road at Remo Road, Bridge Replacement 135,000 (Base Construction Allocation - $110,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (14) South Huntingdon Township, T-385, Commer Road Bridge, Bridge Replacement 150,000 (Base Construction Allocation - $120,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (15) Washington Township, T-979, Pleasant View Road Bridge over Beaver Run, Bridge Replacement 385,000 (Base Construction Allocation - $265,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (16) Derry Township, T-924, Bridge over Union Run, Bridge Replacement 578,000 (Base Construction Allocation - $463,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (17) Derry Township, T-937, Bridge over Stony Run, Bridge Replacement 553,000 (Base Construction Allocation - $438,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (18) Derry Township, T-941, Bridge over Stony Run, Bridge Replacement 590,000 (Base Construction Allocation - $475,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (19) Donegal Township, T-916, Bridge over Indian Creek, Bridge Replacement 465,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (20) Donegal Township, T-880, Bridge over Four Mile Run, Bridge No.3, Bridge Replacement 415,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (21) Donegal Township, T-880, Bridge over Four Mile Run, Bridge No.5, Bridge Replacement 415,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (22) Fairfield Township, T-739, Berkey's Bridge over Unnamed Tributary, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (23) Fairfield Township, T-847, Bailey's Bridge over Hendricks Run, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (24) Fairfield Township, T-847, Toby Bridge over Unnamed Tributary, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (25) Fairfield Township, T-931, Patterson Bridge No.1 over Bear Pond Run, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (26) Fairfield Township, T-984, Love Hollow Bridge No.1 over Hendricks Run, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (27) Fairfield Township, T-984, Love Hollow Bridge No.2 over Hendricks Run, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (28) Fairfield Township, T-988, Yeager Hollow Bridge No.1 over Unnamed Tributary, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (29) Fairfield Township, T-988, Yeager Hollow Bridge No.2 over Unnamed Tributary, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (30) Fairfield Township, T-990, Patterson Bridge No.2 over Unnamed Tributary, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (31) Ligonier Township, T-505, Horner Hill Road over Laughlintown Run, Bridge Replacement 175,000 (Base Construction Allocation - $125,000) (Land Allocation - $15,000) (Design and Contingencies - $35,000) (32) Ligonier Township, T-607, Weller Road over Unnamed Stream, Bridge Replacement 10,000 (Base Construction Allocation - $8,000) (Design and Contingencies - $2,000) (33) Ligonier Township, T-617, Robb Road over Hannas Run, Bridge Replacement 310,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (34) Ligonier Township, T-719, Peoples Road over Unnamed Stream, Bridge Replacement 100,000 (Base Construction Allocation - $75,000) (Land Allocation - $5,000) (Design and Contingencies - $20,000) (35) Ligonier Township, T-721, Bridge over North Fork of Trout Run, Bridge Replacement 200,000 (Base Construction Allocation - $125,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000) (36) Ligonier Township, T-942, Zion Church Road over Unnamed Stream, Bridge Replacement 50,000 (Base Construction Allocation - $35,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000) (37) Ligonier Township, T-984, Mill Road over Mill Race, Bridge Replacement 50,000 (Base Construction Allocation - $35,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000) (38) Ligonier Township, T-950, Old Lincoln Highway East over Unnamed Stream, Bridge Rehabilitation 25,000 (Base Construction Allocation - $20,000) (Design and Contingencies - $5,000) (39) Ligonier Township, T-984, Harvey Road over Macks Run, Bridge Rehabilitation 5,000 (Base Construction Allocation - $4,000) (Design and Contingencies - $1,000) (40) St. Clair Township, T-994, Bridge over Tubmill Creek, Bridge Replacement 440,000 (Base Construction Allocation - $325,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (41) Sewickley Township, T-318, Bridge No.3 over Tributary of Youghiogheny River, Bridge Replacement 100,000 (Base Construction Allocation - $70,000) (Land Allocation - $5,000) (Design and Contingencies - $25,000) (42) Derry Township, Conrail Overpass over SR 0981, Bridge Replacement 1,600,000 (Base Construction Allocation - $1,200,000) (Land Allocation - $200,000) (Design and Contingencies - $200,000) (43) Hempfield Township, T-399 over Jacks Run, Bridge Replacement 428,000 (Base Construction Allocation - $288,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (44) Hempfield Township, T-550 over Tributary to Little Sewickley Creek, Bridge Replacement 428,000 (Base Construction Allocation - $288,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (45) Ligonier Township, T-984 over Mill Creek, Bridge Replacement 650,000 (Base Construction Allocation - $450,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) (46) Salem Township, T-881, Bridge over Loyalhanna Creek, Bridge Replacement 82,000 (Base Construction Allocation - $67,000) (Design and Contingencies - $15,000) (47) Sewickley Township, T-633, Green Hills Road Bridge over Little Sewickley Creek, Bridge Replacement 465,000 (Base Construction Allocation - $325,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (48) Donegal Township, T-309, Hunter Lane Bridge No.1 over Indian Creek, Bridge Replacement 465,000 (49) Donegal Township, T-880, Four Mile Run Road Bridge No.2 over Four Mile Run Creek, Bridge Replacement 415,000 (50) Donegal Township, T-880, Four Mile Run Road Bridge No.3 over Four Mile Run Creek, Bridge Replacement 415,000 (51) Donegal Township, T-314, Sky View Road Bridge No.4 over Indian Creek, Bridge Replacement 465,000 (52) Salem Township, T-628, Bridge over Beaver Run, Bridge Replacement 1,160,000 (Base Construction Allocation - $800,000) (Land Allocation - $40,000) (Design and Contingencies - $320,000) (b) State Bridges (1) SR 0030, Mill Creek Bridge over Mill Creek, Ligonier Township, Bridge Replacement 910,000 (Base Construction Allocation - $710,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (2) SR 0031, Jacobs Creek Bridge over Jacobs Creek, Mt. Pleasant and Bullskin Townships, Bridge Replacement 715,000 (Base Construction Allocation - $500,000) (Land Allocation - $40,000) (Design and Contingencies - $175,000) (3) SR 0056, Seward Bridge over Conrail and Local Road, St. Clair Township, Bridge Painting 600,000 (Base Construction Allocation - $600,000) (4) SR 0070, I-70 Bridge over N&W Railroad, Rostraver Township, Bridge Rehabilitation 1,565,000 (Base Construction Allocation - $1,305,000) (Land Allocation - $60,000) (Design and Contingencies - $200,000) (5) SR 0070, I-70 Bridge over Conrail, South Huntingdon Township, Bridge Rehabilitation 3,125,000 (Base Construction Allocation - $2,780,000) (Land Allocation - $45,000) (Design and Contingencies - $300,000) (6) SR 0119, Crabtree Creek Bridge No.2 over Crabtree Creek, Hempfield Township, Bridge Replacement 577,000 (Base Construction Allocation - $377,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (7) SR 0136, West Newton Bridge over Youghiogheny River, West Newton Borough, Bridge Painting 250,000 (Base Construction Allocation - $250,000) (8) SR 0259, Boliver Underpass, Conrail Railroad over SR 0259, Fairfield Township, Bridge Replacement 310,000 (Base Construction Allocation - $200,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (9) SR 0271, Bridge over Mill Creek, Ligonier Township, Bridge Painting 87,000 (Base Construction Allocation - $87,000) (10) SR 0711, Bridge over Mill Creek, Ligonier Township, Bridge Painting 125,000 (Base Construction Allocation - $125,000) (11) SR 0819, Bridge over Stauffer Bridge, Scottdale Borough, Bridge Painting 92,000 (Base Construction Allocation - $92,000) (12) SR 0981, Bridge over Branch of Barron Run, South Huntingdon Township, Bridge Replacement 250,000 (Base Construction Allocation - $250,000) (13) SR 0982, Bradenville Bridge over Saxman Run, Derry Township, Bridge Replacement 330,000 (Base Construction Allocation - $330,000) (14) SR 1027, Stoney Run Bridge over Stoney Run, Derry Township, Bridge Replacement 340,000 (Base Construction Allocation - $255,000) (Land Allocation - $10,000) (Design and Contingencies - $75,000) (15) SR 2008, Four Mile Run Bridge over Four Mile Run, Cook Township, Bridge Painting 83,000 (Base Construction Allocation - $83,000) (16) SR 2010, Bridge over Branch of Boyer Run, Mt. Pleasant Township, Bridge Replacement 450,000 (Base Construction Allocation - $250,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (17) SR 8036, New Stanton Ramp Bridge over SR 3091, New Stanton Borough, Bridge Rehabilitation 475,000 (Base Construction Allocation - $395,000) (Design and Contingencies - $80,000) (18) SR 0030, SR 0030 over Mill Creek, Ligonier Township, Bridge Rehabilitation 200,000 (Base Construction Allocation - $150,000) (Design and Contingencies - $50,000) (19) SR 0030, SR 0030 over Branch of Loyalhanna Creek, Unity Township, Bridge Replacement 245,000 (Base Construction Allocation - $125,000) (Land Allocation - $20,000) (Design and Contingencies - $100,000) (20) SR 0217, SR 0217 over Miller Run, Derry Township, Bridge Replacement 293,000 (Base Construction Allocation - $188,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (21) SR 0259, SR 0259 over Branch of Freeman Run, Fairfield Township, Bridge Replacement 218,000 (Base Construction Allocation - $113,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (22) SR 0381, SR 0381 over Branch of Loyalhanna Creek, Cook Township, Bridge Replacement 670,000 (Base Construction Allocation - $450,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (23) SR 0381, SR 0381 over Camp Run, Donegal Township, Bridge Replacement 608,000 (Base Construction Allocation - $388,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (24) SR 0711, SR 0711 over Mill Creek, Ligonier Township, Bridge Replacement 600,000 (Base Construction Allocation - $450,000) (Land Allocation - $50,000) (Design and Contingencies - $100,000) (25) SR 0982, SR 0982 over Jacobs Creek, Mt. Pleasant Township, Bridge Replacement 938,000 (Base Construction Allocation - $688,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (26) SR 0982, SR 0982 over Nine Mile Run, Unity Township, Bridge Replacement 348,000 (Base Construction Allocation - $238,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (27) SR 0982, SR 0982 over Indian Camp Run, Unity Township, Bridge Replacement 335,000 (Base Construction Allocation - $225,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (28) SR 1004, SR 1004 over Hendricks Creek, Fairfield Township, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (29) SR 1006, SR 1006 over Freeman Run, Fairfield Township, Bridge Replacement 833,000 (Base Construction Allocation - $613,000) (Land Allocation - $20,000) (Design and Contingencies - $200,000) (30) SR 1006, West Bolivar Bridge near Treasure Island, Fairfield Township, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (31) SR 1007, SR 1007 over Tubmill Run, Fairfield Township, Bridge Replacement 465,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (32) SR 1012, SR 1012 over Branch of Megee Run, Derry Township, Bridge Replacement 318,000 (Base Construction Allocation - $213,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (33) SR 1014, SR 1014 over Abandoned Railroad, Derry Township, Bridge Replacement 268,000 (Base Construction Allocation - $163,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (34) SR 1015, SR 1015 over Hypocrite Creek, Fairfield Township, Bridge Replacement 200,000 (Base Construction Allocation - $170,000) (Land Allocation - $10,000) (Design and Contingencies - $20,000) (35) SR 1027, SR 1027 over Branch of Stony Run, Derry Township, Bridge Replacement 305,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (36) SR 1031, SR 1031 over McCune Run, Derry Township, Bridge Replacement 293,000 (Base Construction Allocation - $188,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (37) SR 2006, SR 2006 over Branch of Jacobs Creek, Mt. Pleasant Township, Bridge Replacement 403,000 (Base Construction Allocation - $288,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (38) SR 2007, SR 2007 over Shupe Run, Mt. Pleasant Township, Bridge Replacement 218,000 (Base Construction Allocation - $113,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (39) SR 2012, SR 2012 over Brinker Run, Mt. Pleasant Township, Bridge Replacement 415,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (40) SR 2021, SR 2021 over Sewickley Creek, Mt. Pleasant Township, Bridge Replacement 1,463,000 (Base Construction Allocation - $1,213,000) (Land Allocation - $50,000) (Design and Contingencies - $200,000) (41) SR 2025, SR 2025 over Tributary of Jacobs Creek, Mt. Pleasant Township, Bridge Replacement 250,000 (Base Construction Allocation - $225,000) (Design and Contingencies - $25,000) (42) SR 4034, SR 4034 over Pine Run, Allegheny Township, Bridge Replacement 818,000 (Base Construction Allocation - $588,000) (Land Allocation - $30,000) (Design and Contingencies - $200,000) (43) SR 4071, SR 4071 over Branch of Pine Run, Allegheny Township, Bridge Replacement 305,000 (Base Construction Allocation - $200,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (44) SR 4089, SR 4089 over Branch of Chartiers Run, Allegheny Township, Bridge Replacement 348,000 (Base Construction Allocation - $238,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (45) T-987, (formerly SR 1071) over Hypocrite Creek, Fairfield Township, Four State Bridges, Bridge Replacement 800,000 (Base Construction Allocation - $680,000) (Land Allocation - $40,000) (Design and Contingencies - $80,000) (46) SR 0381, SR 0381 over Laughlintown Run, Ligonier Township, Bridge Replacement 465,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (47) SR 2043, SR 2043 over Two Mile Run, Ligonier Township, Bridge Replacement 465,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (48) SR 2045, SR 2045 over Two Mile Run, Ligonier Township, Bridge Replacement 465,000 (Base Construction Allocation - $350,000) (Land Allocation - $15,000) (Design and Contingencies - $100,000) (49) SR 2045, SR 2045 over Loyalhanna Creek, Ligonier Township, Bridge Replacement 1,588,000 (Base Construction Allocation - $1,313,000) (Land Allocation - $75,000) (Design and Contingencies - $200,000) (50) SR 0119, Bridge No.2 over Crabtree Creek, Hempfield Township, Bridge Replacement 577,000 (Base Construction Allocation - $377,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (51) SR 8036, New Stanton Ramp Bridge over SR 3091, Turnback Project, New Stanton Borough, Bridge Rehabilitation 475,000 (Base Construction Allocation - $395,000) (Design and Contingencies - $80,000) (52) SR 2045, Bridge over Loyalhanna Creek, Ligonier Township, Bridge Replacement 800,000 (Base Construction Allocation - $600,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (53) SR 3037, Bridge over Branch of Sewickley Creek, South Huntingdon Township, Bridge Replacement 425,000 (Base Construction Allocation - $225,000) (Land Allocation - $25,000) (Design and Contingencies - $175,000) (54) SR 3075, Bridge over Branch of Sewickley Creek, Hempfield Township, Bridge Replacement 319,000 (Base Construction Allocation - $94,000) (Land Allocation - $50,000) (Design and Contingencies - $175,000) (55) SR 0259, Bolivar Bridge over Conemaugh River, Bridge Replacement 6,750,000 (Base Construction Allocation - $5,500,000) (Land Allocation - $750,000) (Design and Contingencies - $500,000) (56) SR 0381, Bridge over Loyalhanna Creek, Ligonier Township, Bridge Replacement 1,138,000 (Base Construction Allocation - $913,000) (Land Allocation - $50,000) (Design and Contingencies - $175,000) (57) SR 0381, Bridge over Linn Run, Ligonier Township, Bridge Replacement 663,000 (Base Construction Allocation - $463,000) (Land Allocation - $50,000) (Design and Contingencies - $150,000) Section 70. Wyoming County. (a) Local Bridges (1) Exeter Township, T-336, Bridge No.1, 2 Miles Southwest of Falls, Bridge Replacement 280,000 (Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (2) Falls Township, T-336 over White Lock Stream, Bridge Replacement 280,000 (Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $30,000) (3) Exeter Township, T-336 over Mill Creek, Bridge Replacement 214,000 (Base Construction Allocation - $166,000) (Land Allocation - $20,000) (Design and Contingencies - $28,000) (4) Eaton Township, T-413, Pedestrian Bridge over Bowman's Creek at Eatonville, Bridge Rehabilitation 125,000 (Base Construction Allocation - $113,000) (Design and Contingencies - $12,000) (b) State Bridges (1) SR 3001, Bridge at Junction with SR 4004 over Branch of Susquehanna River, Windham Township, Bridge Painting 60,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $10,000) (2) State Bridges, Countywide Bridge Zone Painting, Bridge Painting 370,000 (Base Construction Allocation - $350,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000) (3) SR 0006, Bridge over Meshoppen Creek, Meshoppen Borough, Bridge Rehabilitation 340,000 (Base Construction Allocation - $300,000) (Design and Contingencies - $40,000) (4) SR 3003, Bowmans Creek Bridge over Bowmans Creek, Eaton Township, Bridge Replacement 260,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $60,000) (5) SR 2032, Bridge over Delaware and Hudson Railway, Nicholson Borough, Concrete Repairs 200,000 (Base Construction Allocation - $170,000) (Design and Contingencies - $30,000) Section 71. York County. (a) Local Bridges (1) Carroll Township, Gettysburg Road Bridge over Yellow Breeches Creek, Bridge Replacement 860,000 (Base Construction Allocation - $700,000) (Land Allocation - $10,000) (Design and Contingencies - $150,000) (2) Codorus Township, Seitzville Road over South Branch of , Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $15,000) (Design and Contingencies - $85,000) (3) Dover Township, Cardinal Lane over Fox Run, Bridge Replacement 115,000 (Base Construction Allocation - $70,000) (Land Allocation - $15,000) (Design and Contingencies - $30,000) (4) Dover Township, Conewago Road over Salem Run, Bridge Replacement 300,000 (Base Construction Allocation - $200,000) (Land Allocation - $15,000) (Design and Contingencies - $85,000) (5) East Hopewell Township, South Church Street Extended, Bridge No.1, Bridge Rehabilitation 9,000 (Base Construction Allocation - $8,000) (Design and Contingencies - $1,000) (6) East Hopewell Township, South Church Street Extended, Bridge No.2 over Rambo Run, Bridge Rehabilitation 60,000 (Base Construction Allocation - $50,000) (Design and Contingencies - $10,000) (7) East Hopewell Township, Manifold School Road Bridge, Bridge Rehabilitation 7,000 (Base Construction Allocation - $6,000) (Design and Contingencies - $1,000) (8) East Hopewell Township, Trout School Road Bridge, Bridge Replacement 45,000 (Base Construction Allocation - $30,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000) (9) Hellam Township, Valley Acres Road over Tributary of , Bridge Rehabilitation 40,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $5,000) (10) Hellam Township, Libhart Mill Road over Tributary of Kreutz Creek, Bridge Rehabilitation 40,000 (Base Construction Allocation - $35,000) (Design and Contingencies - $5,000) (11) Manchester Township, T-900, Woodland View Drive over Conrail, Bridge Replacement 395,000 (Base Construction Allocation - $275,000) (Land Allocation - $30,000) (Design and Contingencies - $90,000) (12) Manchester Township, T-940, Bear Road 2,000 Feet North of Susquehanna Trail, Bridge Replacement 40,000 (Base Construction Allocation - $25,000) (Land Allocation - $5,000) (Design and Contingencies - $10,000) (13) Manheim Township, T-320 over Unnamed Tributary of Gunpowder Falls Creek, Bridge Replacement 150,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (14) Manheim Township, T-346 over West Branch of Codorus Creek, Bridge Replacement 250,000 (Base Construction Allocation - $190,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (15) Manheim Township, T-357 over Unnamed Tributary of West Branch of Codorus Creek, Bridge Replacement 160,000 (Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (16) Manheim Township, T-370 over West Branch of Codorus Creek, Bridge Replacement 200,000 (Base Construction Allocation - $140,000) (Land Allocation - $10,000) (Design and Contingencies - $50,000) (17) Manheim Township, T-413 over West Branch of Codorus Creek, Bridge Replacement 150,000 (Base Construction Allocation - $100,000) (Land Allocation - $10,000) (Design and Contingencies - $40,000) (18) Manheim Township, Tannery Road over West Branch of Codorus Creek, Bridge Replacement 250,000 (Base Construction Allocation - $180,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (19) Paradise Township, Shady Dell Road, Bridge Replacement 190,000 (Base Construction Allocation - $110,000) (Land Allocation - $10,000) (Design and Contingencies - $70,000) (20) Paradise Township, Beaver Creek Road over Beaver Creek, Bridge Replacement 370,000 (Base Construction Allocation - $265,000) (Land Allocation - $5,000) (Design and Contingencies - $100,000) (21) Penn Township, Center Street over Tributary of Oil Creek, Bridge Replacement 183,000 (Base Construction Allocation - $163,000) (Land Allocation - $10,000) (Design and Contingencies - $10,000) (22) Penn Township, Westminster Avenue over Plum Creek, Bridge Replacement 230,000 (Base Construction Allocation - $207,000) (Land Allocation - $8,000) (Design and Contingencies - $15,000) (23) Penn Township, Park Heights over Tributary of Plum Creek, Bridge Replacement 244,000 (Base Construction Allocation - $234,000) (Design and Contingencies - $10,000) (24) Red Lion Borough, North Charles Street over Former and Pennsylvania Railroad, Bridge Replacement 395,000 (Base Construction Allocation - $275,000) (Land Allocation - $30,000) (Design and Contingencies - $90,000) (25) Spring Garden Township, Tri Hill Road over Tyler Run, Bridge Replacement 200,000 (Base Construction Allocation - $120,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (26) Windsor Borough, West Gay Street over Fishing Creek, Bridge Replacement 200,000 (Base Construction Allocation - $120,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (27) York Township, School Street over Branch of Mill Creek, Bridge Replacement 250,000 (Base Construction Allocation - $200,000) (Design and Contingencies - $50,000) (28) Conewago Township, T-956 over Billion Run, Bridge Replacement 290,000 (Base Construction Allocation - $220,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (29) Conewago Township, T-956 over Poplar Run, Bridge Replacement 310,000 (Base Construction Allocation - $240,000) (Land Allocation - $10,000) (Design and Contingencies - $60,000) (30) Newberry Township, Intersection of SR 1009 and SR 0262, Bridge over Fishing Creek, Bridge Replacement 750,000 (31) Newberry Township and Goldsboro Borough, SR 0262 and SR 1009, Bridge over Fishing Creek, Bridge Replacement 800,000 (32) Jackson Township, Pine Road Bridge over Tributary of Paradise Creek, Bridge Replacement 188,000 (Base Construction Allocation - $140,000) (Land Allocation - $5,000) (Design and Contingencies - $43,000) (33) Lower Windsor Township, Willow Creek Road Bridge over Cabin Creek, Bridge Replacement 110,000 (Base Construction Allocation - $100,000) (Design and Contingencies - $10,000) (34) West Manchester Township and Dover Township, Baker Road Bridge over Little Conewago Creek, Bridge Replacement 530,000 (Base Construction Allocation - $390,000) (Land Allocation - $15,000) (Design and Contingencies - $125,000) (35) Heidelberg Township, Gitts Run Road Bridge over Oil Creek, Bridge Rehabilitation 106,000 (Base Construction Allocation - $78,000) (Land Allocation - $10,000) (Design and Contingencies - $18,000) (b) State Bridges (1) SR 0194, Broadway Street Bridge over Red Run, Washington Township, Bridge Replacement 245,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $85,000) (2) SR 0234, East Berlin Road Bridge over Paradise Creek, Jackson Township, Bridge Replacement 325,000 (Base Construction Allocation - $250,000) (Land Allocation - $10,000) (Design and Contingencies - $65,000) (3) SR 3074, Smoketown Road Bridge over Cod Creek, Manheim Township, Bridge Replacement 325,000 (Base Construction Allocation - $215,000) (Land Allocation - $10,000) (Design and Contingencies - $100,000) (4) SR 0116, York Street over Tributary of Oil Creek, Penn Township, Bridge Replacement 275,000 (Base Construction Allocation - $240,000) (Land Allocation - $15,000) (Design and Contingencies - $20,000) (5) SR 0116, SR 0116 over Codorus Creek, Spring Grove Borough, Bridge Replacement 300,000 (Base Construction Allocation - $240,000) (Land Allocation - $15,000) (Design and Contingencies - $45,000) (6) SR 0194, Frederick Street over Plum Creek, Penn Township, Bridge Replacement 262,000 (Base Construction Allocation - $234,000) (Land Allocation - $8,000) (Design and Contingencies - $20,000) (7) SR 1012, Emig Road over Conrail, Manchester Township, Bridge Replacement 395,000 (Base Construction Allocation - $275,000) (Land Allocation - $30,000) (Design and Contingencies - $90,000) (8) SR 2031, Penn Street over Fishing Creek, Windsor Borough, Bridge Replacement 200,000 (Base Construction Allocation - $120,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (9) SR 3001, South George Street over Tyler Run, Spring Garden Township, Bridge Replacement 200,000 (Base Construction Allocation - $120,000) (Land Allocation - $20,000) (Design and Contingencies - $60,000) (10) SR 3074, Smoketown Road Bridge over Codorus Creek, Manheim Township, Bridge Replacement 240,000 (Base Construction Allocation - $150,000) (Land Allocation - $10,000) (Design and Contingencies - $80,000) (11) SR 3074, Bridge over Tributary of Codorus Creek, Manheim Township, Bridge Replacement 750,000 (Base Construction Allocation - $555,000) (Land Allocation - $56,000) (Design and Contingencies - $139,000) (12) SR 3015, Bridge over Centerville Creek, Codorus Township, Bridge Replacement 477,000 (Base Construction Allocation - $354,000) (Land Allocation - $35,000) (Design and Contingencies - $88,000) (13) SR 1009, Bridge over Fishing Creek, Newberry Township, Bridge Replacement 815,000 (Base Construction Allocation - $604,000) (Land Allocation - $60,000) (Design and Contingencies - $151,000) (14) PA 216, Bridge over Centerville Creek, Codorus Township, Bridge Replacement 604,000 (Base Construction Allocation - $447,000) (Land Allocation - $45,000) (Design and Contingencies - $112,000) (15) SR 2038, Bridge over Little Muddy Creek, East Hopewell Township, Bridge Replacement 366,000 (Base Construction Allocation - $271,000) (Land Allocation - $27,000) (Design and Contingencies - $68,000) (16) SR 2069, New Park Road Bridge over Tributary of Alum Creek, Fawn Township, Bridge Replacement 365,000 (Base Construction Allocation - $300,000) (Land Allocation - $15,000) (Design and Contingencies - $50,000) (17) SR 2076, Stewartstown Road Bridge over Deer Creek, Hopewell Township, Bridge Replacement 227,000 (Base Construction Allocation - $185,000) (Land Allocation - $10,000) (Design and Contingencies - $32,000) (18) SR 2079, Red Lion Avenue over Muddy Creek, Felton Borough, Bridge Replacement 900,000 (Base Construction Allocation - $750,000) (Land Allocation - $15,000) (Design and Contingencies - $135,000) (19) SR 2002, Main Street over Mill Creek, Yoe Borough, Replace Retaining Wall 105,000 (Base Construction Allocation - $80,000) (Land Allocation - $1,000) (Design and Contingencies - $24,000) (20) SR 3041, Sinsheim Road Bridge over West Branch of Codorus Creek, Bridge Replacement 365,000 (Base Construction Allocation - $320,000) (Design and Contingencies - $45,000) Section 72. Statewide. Construction of advanced mitigation projects necessary to replace displaced by bridge projects authorized under the act of December 8, 1982 (P.L.848, No.235), known as the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983 3,100,000 (Base Construction Allocation - $2,500,000) (Land Allocation - $350,000) (Design and Contingencies - $250,000) Section 72.1. Statewide bicycle and pedestrian structures. Rehabilitation, construction and demolition of bridges and other crossing structures on bicycle and pedestrian ways to be identified by the Department of Conservation and Natural Resources 5,000,000 Section 73. Limitation on expenditure of funds. Any moneys derived from the incurring of debt shall be used solely for effecting the rehabilitation, replacement or removal of bridges located on State highways. All other bridge rehabilitation, replacement or removal shall be financed from current revenue. Section 74. Debt authorization. The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $2,264,845,000 as may be found necessary to carry out the acquisition and construction of the State projects specifically itemized in this act. Section 75. Issue of bonds. The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, Auditor General and State Treasurer shall determine, but the latest stated maturity date shall not exceed 30 years from the date of the bond first issued for each series. Section 76. Estimated useful life of projects. The General Assembly states the estimated useful life of the projects itemized in this act as 30 years. Section 77. Appropriation. The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the department in the maximum amount of $2,264,845,000 to be used by it exclusively to defray the financial costs of the State projects specifically itemized in this capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay out to the department the moneys as required and certified by it to be legally due and payable. Section 78. Federal funds. In addition to those funds appropriated in section 77, all moneys received from the Federal Government for the public improvement projects specifically itemized in this act are also hereby appropriated for those projects. Section 79. Allocation of funds. (a) General rule.--Whenever the department or the Department of Conservation and Natural Resources determines that the full estimated financial costs of the projects itemized in this act are not necessary for the proper design, acquisition or construction of such projects, the excess funds no longer required may be allocated by the department or the Department of Conservation and Natural Resources to increase the estimated costs of any one or more of the projects specifically itemized in a capital budget. (b) Reimbursement of municipal expenditures.--Moneys raised or expended by municipalities after the effective date of this act, in anticipation of receipt of funds authorized for projects itemized by this act, may be reimbursable to those municipalities. Section 80. Policy on jobs and materials. (a) Jobs.--It is the declared policy of the Commonwealth that the construction projects authorized in this act be used, to the greatest extent possible, to provide for the creation of jobs and the rehiring of the unemployed in this Commonwealth. In order to reach this goal, firms with Commonwealth-based facilities shall be actively solicited to make bids on contracts to furnish products and materials, including, but not limited to, steel and steel products, to be used in these projects. (b) Materials.--Every contract document entered into to undertake a project contained in this act shall provide that any steel or other products to be used or supplied in the performance of this contract shall be required to be manufactured by plants in the United States unless the secretary determines, on a contract by contract basis, that certain required products are not produced in the United States in sufficient quantities to meet the requirements of the contract. Such a determination and the reasons therefor shall be published in the Pennsylvania Bulletin. Decisions made under this subsection shall not be inconsistent with the general provisions of the act of March 3, 1978 (P.L.6, No.3), known as the Steel Products Procurement Act. (c) Minorities and women.--It is also the declared policy of the Commonwealth to require and encourage substantial participation by minorities and women in the construction projects authorized by this act. Section 81. Payment of capital debt service. The repayment of any debt incurred pursuant to this act shall be made from the account and such repayment shall have first claim on the revenues of the account. Section 82. Authorization and debt cumulation. The additional authorization and debt allowance provided for in this act shall be added to the total authorizations and debt incurred pursuant to the act of December 8, 1982 (P.L.848, No.235), known as the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983, as amended and supplemented. Section 83. Editorial changes. In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects. Section 84. Repeal. Section 3(50)(i)(Q) of the act of December 8, 1982 (P.L.848, No.235), known as the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983, is repealed. Section 85. Effective date. This act shall take effect immediately.