GOVERNMENT OF FINANCE, PLANNING & INVESTMENT DEPARTMENT (PLANNtNG & TNVESTMENT DtVtStON) A P. ClVll- SECRETARIATE:: TTANAGAR

No PD(SPD)-02t2017-18 Dated, the 1't September 2017

To The Commissioner (PWD), Government of Arunachal pradesh, .

Sub. Finalization of SADA, 20,17-,18.

Sir, I am directed to refer to this department's letter of even number dated on 20th July' 2017 on the subject cited above and to convey the approval of the proposed modification on SADA proposals approved earlier sought vide letter No.CEAP(SlD&P)A//-1|DADAt2O17-1g1634^35 dated 0810812017 within BE allocation,2OlT-18. However, expenditure is subject to observance of all codal formalities as prevails.

2. This modified schematic distribution of fund approved under SADA 2017-18 of your department is enclosed as Appendix ,,A".

3. This is issued with approval of the Hon'ble Deputy Chief Minister (Finance, planning & lnvestment).

sd/- Enclo: As Stated above. (Dr. Joram Beda),lAS Secretary (Planning & lnvestment)

Memo No. PD(SPD)-0212017 -1 B Dated, the 1't September 2O17 Copy to. 1 PPS to Hon'ble Chief Minister, Arunachal Pradesh, ltanagar. 2 PS to Hon'ble Deputy Chief Minister, Arunachal pradesh, ltanagar. ? PS to Hon'ble Parliamentary secretary (Planning), Arunachar pradesh, Itanagar. 4. PS the Chief Secretary, Govt. of Arunachal pradesh, ltanagar. 5. PS to Development Commissioner (Finance, Planning & lnvestment) Govt. of Arunachal Pradesh, ltanagar. 6. The chief Engineer (PWD-StD&P), Govt. of Arunachal pradesh, ltanagar 7. The Deputy secretary (Budget), Govt. of Arunachal pradesh, rtanagar. 8. The Deputy Secretary (Finance), Govt. of Arunachal pradesh, ltanagar. 9 File No PD(SPD)-8112015-16 (Part) .P*^*L,- 'lPalab Dey/L "'",i,lJriili5try* Page 1

Annexure-'A' GOVERNMENT OF ARUNACHAL PRADESH FINANCE, PLANNING & INVESTMENT DEPARTMENT (PLANNtNG & TNVESTMENT DtVtStON) A.P. CIVIL SECRETARTAT:: ITANAGAR

Annual Development Agenda, 2O1T -19(Modified)

Department: Public Works Department

Pre-Budqet surrender

SuQanqLri Hotet-panchqlt eSt rojd (520km lmprovement of Road fi;m Arun Subansfi Hot"l io Dony Polo School C/oCementconcrete iffi lV PWD road (2.5 Km) Retaining wall at Mowb-ll on *ay to Cnef carnp

C/o Protection Wall to protect Vip ioad at Nlll ,rtfrar.

C/o Storm water drainage & RCC ,//all at ltr.agarj/o*b{

/o RCC protection wall and storm witeiOrain anO trltown I, ltanaqar near UD C/o Link road from 5.00 Km boini ot CtroW

of Wakro Township road (5.00 kmi. c/o road rrom NH-s2to t

C/o Road from Lathao NH-52 to- Lal pahar Meditah.o" 127.45 entlq (7,]J0 Km) SH:WBM-I and Culvert. C/o RCC Bridge over trlamctrik-nver to connect

Widening and improvemeni@ Putok CO HQ roads, Longtoi Lyngok CO He road C_onstruction & widening oi@ 500 mtrs) from Pullong bridge point to Borduria CO HC

ircuit House in Bhalu

C/o Priest Guest House at Sangio putung (Gophrr Tr1"I

community hall at Taliha He C/o Community hall at Daqam villaoe. Taf ifra Circuit House in C/o and inspection-Brnqalow Construction of Rehabilitation cenire at Hayuf iang tn

C/o Dormitary for 10 persons alVtp sr,rte,l ezu LjnOer f_ofuf

waler supply scheme at Konqmukhan /o Boundary wall at Sports CfiplexANam;-idistnct

Hall at Circuit house Namsai C/o Multrpurpoge Cultural halt (pfr-LD at fitamsai l!frastructure development at Khonsi c7'cn'rr \9 'qKL f { }+ Rs. in lakh

Clo* tnspection Aun*Low, Residentral quarters and aooroach road at CO

Sdcbl t€n""albn and maintenance of Govt residential oirs under PWD SH: Type-lV 2 nos, Type-lll 18 nos,-I'ype ll 42 nos and Type-l 34 Nos and B/banacks 55 Units al

noaO to O.C Bunglow at . A) RCC rt 3 00 mtr. Span '1 mp B) Retaining wall i) 8 00 mtr herght-12mtrs. Length ii) Retaining wall 6 00 mtr height -38 mti Length c) Brest Wall i) 6 mtrs ht. - 30 mtr'length d)

FSB and porter track in Cb all *ealher ioad from Nyorak PMGSY lload to Kodum-

C/o Ro"d f.rn lvlolot nittage to Yosing village (Ph-l) (10

/o Road from Parsing to Arolg,qlea ;tructicffi sinde-lane steel Bridge at Sia & Sigut

CIC Gfipad a.d k f*ilructure at Annini, Dibang Val @ it , Dibang Valley

Clo or rSA tSieel Deckins) at Nefe!e!g-4!Ey1Q191 D M a i nte n a n ca of H awa i Towqg! lp-Bqqq.A!,1-aq 19! ation of Namsai Towns 174 73 Road (Bl from New Doidam To Solla Clc R"rd frorn lilt.fiyu fotam-noiA to Nogna under Tirap

C/o ro"d & Vr/BM irom C.K Road point to Eklavy Residential Model Schoo!-(!e!s Wdenrlg and il"nprovement of road from to Khasa

elc Communty hatt jt Cratt Centre, L'lrgyelling Lebrang

cultural centre at Teli, Surbi &'T C/o Communitv hall at Bot@q-& Cl" l.do"t B"d*t'tton Club at Parade Ground

lndoor Badminton Club at C/. B"r.daty *rlf, nCf reiiining wall, Gate and sola fencing on boundary wall at A P Civil Secretariat, ltanagar

lo Rrc B*hmS douUe;loried 50 boarders girls hostel at Govt. Hiqher Secondary Schoo-l

C/" Ro;tr,,m & C,eneral grourld allQQ-LlQ Belbgk e/o CtlC Cho.qkham under Namsai Qis!!c! e/o Ptffiy H"dth c.ntie it ttlteoo under

K. q a mgs Ci o I nf t*trt, ct,"e f o r V. Vjiqlq !- !-Ng !. Ufgradatlon of infrastructure of Primary Middle Seconoary and'Higher Secondary Schools of Nambai, Lathao &

C;/i-Up-gradatbn of ciitical infrastructure with Medical l, Page 3 z*c cl (o\ Rs. in lakh t )(,^"^/q/l Amount Public Remarks g Padiculars Roads & I Housing sk Rridoes I Works b 2 3 4 5 1 120.0c to C/o C"m*rn,tv hali (Bera vlllqg-e&CQ Fl-S !-qde-rn) 50.0c 7 u/o tsAU (JTIlCe rJUllOIIlg \LazLr IIVlll .ro!el{0 0.001 2273.50 0.00 Sub -'total (lV' 3688.911 ZZ7Z.So 0.0c Total (A) - 6285.751 4497.48 200.0c B On-qoinq Ie) Roads & Bridqes taken as per 50 00 1 noaO Siiety (Sign boards etc).( to be under action plan submitted to Committee constituted by Hon'ble

to 160.00 2 C/o A.h Btdge Jver Kurung River connecting Sangram Parsi-Parlo (Ph-ll) Srrtr - Total (a 210.00 (b) Publrc worKs e"*ttrcti"n a"d cieation of additional office space in the 15.00 existinq Divisio1 lQllqejeIs E PWD at Tawelq at 10.00 2 Co*tr,.,"tCIt ;i boundary wall of General PWD Store aanna'lar,e - ?nnmtrc rrndcr Naharlaoun DiviSiOn ; Co..trrctio" cieiiion ot additional office space in ihe 15 00 existing ADC/SDO/EAC".d office building to accommodate tempoLry D C. office at Palin/Jamin (Plinth area 300 00 Qnm annroy \ in the 15 00 4 C"nsttrct.n;nd creation of additional office space .!,^^ c^- C E D\n ln cl f\annriin lrre 15.00 5 Construction and creation of addltlonal olllce space ln existing ADC/SDO/EAC office building to accommodate tempoiary D.C. office at . (Plinth area 300 00 Sqn annrnx ) 6 Constructton ot New ulrcull n!u!9 3I r llrgKru.rrg !q_0c - 307.74 7 C/o Polvtechnic Colleqe at Hawai rn tne 500 B lonstructron and creation of additional office space axistino Division office for S.E PWD at Khonsa -- 5.00 I construction anO #ition of additional office space in the existing ADC/SDO/EAC office building to accommodate tempoiary D.C. office at Longding (Plinth area 300 00 Sqm annrox ) Sub - Tqltaliq) o.0o l 477 .75 0.0c

Housinq {c} 36.00 t lClo Residential Buildings at Newly Created Drstrlct neao lQuarter of . (SH:- (i) Bachelor barrack-8 (iv)'T-lV-4 units lunits (ii) T-ll - 4 units, (iii)T-lll -4 units ' (v) '1 l& T-v - unit 24 38 z C/o Residential Buildings at Newly createo ulslrlcl neao Quarter of . (SH:- (i) Bachelor barrack' 8 units, (ii) T-ll -4 units, (iii) T-lll -8 units, (iv) T-lV -4 units (v) T-V -1 unit ) Head 38.00 3 :/. R"sd""t"reuildt''gs at Newly Created District Quarter of . (SH:- ( i) Bachelor Barrack' B unit( ii) T-ll, 4 unii (iii) T-lll, 4 unit (iv) T-lV, 4 unit - Sub -Total (c 0.00 0.00 98.38 210.00 477.75 98.38

c Maintenance Works '1 50.0c 10.00 5.0C 1 80 00 40 00 20.0c 2 Tawano 50.0c 15 00 20.00 3 50.0c 10.00 10.00 4 : . 50.00 15 0C 20.0c 5 (alaKtang 80 00 35.0c 20.00 6 Bomdila- 50.00 10 00 10.00 7 Chay 40 00 10 0c 10 00 B Bamelg 100.00 16 00 20 00 I ,- 40 00 10.00 10.0c n 10 Pakke-Kessanq -'-----''.-..-''-..-'-."_- '15.0C ? 50 00 10.0Q I baqalee ,*ffi;;;'"''' tiunugut -

- Page 4

in lakh ---7d Amount SH{ Roads & Public Remarks Particurars Housing ${Md/q Bridoes Works 5 6 1 2 3 4 12 apital Division-A 50.00 140 0c 31.00 13 aoital Division-B 50 00 5.00 124.00 14 Naharlaqun 50.00 98.00 500 15 56.00 15 0C 0.00 '10.00 16 Yazali 50 00 000 17 80.00 20.0c 5.00 18 Sanqram 80 00 15.00 10.00 19 Tali 40 00 800 00c 20 Jamin 40 00 800 0.00 21 Nacho 40 0c 10 00 000 lz Daooriio 90 00 15 00 5.0c )1 Dumooriio 60.00 15 00 5.0c 24 Basar s0 0c 15.00 50c z3 Gensi 50 00 15 00 15 00 26 Yomcha 50 0c 10 00 10 00 27 50 0c 10.00 10 00 28 Aalo 115 0C 20.00 15 00 29 Rr 50 00 10.00 10 00 30 Bolenq 70 00 10.0c 15 00 0c 3'1 Yinokiono 60 00 20 15.00 10 0c JZ Marivano s0 0c 10 0c '120 20 00 JJ Pasiqhat 00 35.00 10.00 34 Nari 50 00 20 00 15 00 2A Anini 30.0c 10.00 15.00 36 Roino 90 00 20 00 37 Havuliano 50.00 15 00 10.00 15 00 38 100 00 20.00 ao Namsai 140 00 B0 0c 50.00 40 .l2ir 70.00 '1 5 00 15.00 15 00 41 Chanqlanq 70 00 27.00 42 Khonsa 100 00 15.00 15 00 43 Kanubari 50.00 10 00 10 0c 44 lonodino 70 00 10 00 15.0C 45 ^liohwav Arbitration 10 00 46 Maintenance of lT assets under PWD 126 00 0.00 47 Printinq of SADA booklet 50c 000 4B Preparation of DPR for Pilot proiects. 20.0c 0.00 49 Road safetv Audit 00c 000 50 Litiqation & Court decree 100.0c 0.00 20.0c 0.0c 5'1 Restoration of damages due to sudden natural calamities 500 00 like flood cloudburst etc. 52 Road safetv manual 00c 0.0c 53 Esiablishment of Centralised e-procurement centre a 30.00 000 Itanaoar for PWD. 54 Yearlv fees of lndian Road Congress 200 000 55 Yearlv fees of lndian National Group of IABSE 1.00 000 56 Preoaration of APSR. 1'1 0C 0.00 c1 )anacitv buildino 15 82 '10 00 58 Recruitment exDenses 59 Renovation of Hiohwav offices 20.0c 60 Renovation of CE/SE offices 35 00 bt Renovation of Bunolows 700 00 ol Annual membership fees 10c Total (C) 3616.00 1017.82 1486.0C D New Schemes Roads & Bridqes and 75 0C 1 C/o approach road to B.T K Bridge( SH- Pavement Drain ) 2 Combtetion of Jeepable Suspensron Bridge at Gorsam ( 75 00 60.00 m Span)(SH- Approach Road, Protection work and nark ino\ 3 improvement of road from Nehru Market to Tawang 30 00 f\/lnnesterv (Sh:- BM& BC). 4 /o Road from BRTF road to New Market at Tawang . SH- 3030 w BM& BC) 2 50 Km and WBM-ll and lll ('1 .50 Krd-- ptal'lr "-'f"IiIlI itanaQar L

Page 5 t{-rft:::larl ::i'k qi 'H,rr. Rs. in lakh cl(nl __: ffi Amount ,o,\ I Ill{'l' Public Remarks Particulars Roads & I Housing \}l 4 Rridoes I Works 4 5 6 I 2 3 28 00 5 Clo netJining and Breast walls at various locations undet Tawanq Leqislative Assembly ConstituencV-- WBM-lll, 74.00 Ct C/o rcad from Jangda to Rho Village 1 30 Km(Sh: BT & Culvert 2 Mtr sPan 3 Nos). '1 10.00 7 eb apprc,ach to Secondary School at Mukto 2C Km(SH: Culvert'oid 1.50 span 1 No & B/W!1L20jU!U.---_-_ 10.00 B C/o F\otecticn wall for Circuit l-louse at Mukto(SH: Retainins w4l 30 M!LL- o C/" Appto";h road to Circuit House Jang(SH- CC Drain 10.0c 500 00 Mtr.). 16.00 10 C/o R"ad ftot biiing Lamps to Foot Suspension at Nadi- Paar Dirano (SH: C.C Pavement & CC Drain)- 10.00 11 l/o Si;b Culvert 3.OO m Span at Jyotinagar school road 500 12 Clo Appro"ch road to C.O office at Mandalaphudung (300 Mtr) (SH: F/cuttino. WBM, BT & CC Dretq). _- IJ tnrpro"ement of Road from Helipad to Kharka Bridge poinl 15.00 at Dirang, (600 Mt$ (SH: Widening, WBM, BT & CC Drain)

20 00 14 l'"pr""ete.i of Road from BRTF Road to Phudung villaoe.'1.00 Km (SH: , WBM, BT, CulveI-&-CC.-QG]-!}_- 1E h-r.prot"n e.t of Approach Road to Govt. Polytechnic 30.00 Namthung, Dirang ,1.50 Km (SH: , WBM, BT, Culvert & CC Drain) to C/o Appro"ch Road to Krishi Vigyan Kendra' Sangti, 20.00 Dirang ,1.00 Km (SH: , WBM, BT' Culvert & CC Drain) 40.00 17 Pro"rdnS oi WAM and bituminous surfacing of approach road to ADC office at Kalaktanq. 20.00 1B C/o winq wall on Dekshi Bridge 30.00 19 TC/. R,la, iownship road (SH: Re-carpeting and Retaining lwall on approach road to Gompa from village side, lwidening, WBM and carpeting of road to PWD transit laccomodation and CC pavement of village lnternal road at l Rroat 14 00 20 fonsuGnay Survey and preparation of DPR for Shergaon' )oimara road (28.00 to 72.00 Km) a 12 00 21 lc CC Ro'rd from Wanghoo village to General Ground 900 22 3/o CC Road from Jamiri- Buragaon PMGSY Koao ( un 3.00 km ) to CO Office at Jamiri HQ( Total Length 0 500 km\ ffiooi patrs and storm water Drain a1 10 00 lR,,r"n"nn 24 lclo Road from Jamiri Buragaon PMGSY roao lo 10 00 lHussiqaon Prv. School at Hussiqaon (L-0 Q90 K!n)-- 25 IC/o Po 'ici between Wanghoo village and Dikhiyang 9.00 ( lvillaoe L-35.00-nd km) 26lh"pto*rn".t upgradation of Township 40.00 S/cul, P/work lroad(Ph-l) ( SH CC pavement, embankment, land road side drain). lt morovement of T'hrizino Township road 20 00 4.00 28 CbtC footpathTiom fararamu village to football ground

29 lclo RRM Breast Wall near the Residence ot sonam 600 lV"O.t at Bomdila ( SH:-RRM BA//all - 6 OOm Ht - 40 0C lMtr Lenoth). 600 30 C/,cfrRNn RA//ill on Road From Power House to Lowe Gompa ( SH :- RRM RA//all 4 00m Ht - 80.00 m Length )

Uppel 600 31 C/o RRM BA/y'all on Road From Trijunction to fl Gompa.( SH :- RRM BA//all 4 00m Ht - 80.0'0 m Length ) v, -;;;;.t':?XJP\ari l o"$;i'0"' Page 6 \ i(0 \ KfK,Rqi*6r* \t 'u I Rs. in lakh 3\ ds-"n- Amount Public Remarks Y Particulars Roads & Housing K} Bridoes Works 4 5 6 2 3 13 00 a,a C7o Approach Road to ICDS Office at Bomdrla ( s Shaped drain-220 00m length, RRM BA/Vall - 2 00m ht 150 00m Length & Culvert 3 OQmtr span - 1No )' lmProveW 760 Bomdila ( 11 60 34 e6'Ro"d ft". F* Staiion to Durga Mandir at Length - 0.150 Km)(SH:- WBM-I' ll, lll, BT,V-Shaped drain' RRti s^ruatt - 4 00m ht - 50.00m Length & RRM Rl/Vall - / h+ An nn m I annlh\ ^n". & foresl 24.00 35 Cb C C Pa"et"nt r-oad irom main road to Medical

uo 8.00 36 -/o approach road to Sera Village ( sH: tsl-1 lmovt. of Geometric, 1 50 mtrSpg! J&g!;? l''lo9)--- various Govt' 39.60 37 :6 ,pptoacffiad ftom bivision Office to Suarter at Veno under Bameng PWD Division 15.00 38 CL CC O'rn .t nlttO Division office and Residential comotex at Veno under Bameng PIVA qyf9lg!-- 19 60 39 10 0c 40 c/o Approacn roaq !o cE s Is:ruv"to-' road to ADC office 10.0c 41 @main 10 00 42 C/o Approach Road to Sub-Divisional Uttlce at HIpu (rn FC & WBM.I) DC 40.00 43 E-pa."o. of RCC B.dSe at Seppa Township near BLrnolow. 50.00 9.00 45 C/o Pilection wa Macha Nallah near Medical Colony'

near 8.00 46 C/o ioad from main road to Cherwa colony st Joseoh"pptoa;h at School New SePPa- 20 00 47 DMo 20 00 48 clc'Cc P""eme"t & R"liining watt at Backside of office & Election office. 20.0c 49 g Seppa tc 20 0c 50 Cfipp.ach roadjtom km point of NH-229 10 0( Sf IClo Ferom 12km point on PMGSY road seba vlllage r( river stage-ll (span lTourist Rafting Centre at Papu lo sot

ro ( 600 61 C/o Wire rope Suspension brldge al Hassa ^^-^/?nn c^rn\ 20 00 oz tjlo uu-lggq ergllglg!)drrs Lvvvrrrrrrv rvsv ' -beputy UD office tc 8.00 OJ EGnsd-of road from Director Lobl uolony 10 00 64 Clc lnk road from PHE office to Lower 7 Itanaqar. ffi';f;J'.'" **onaga( e K*, Pari Page 7 tiF'i"[jii:, rl$l \NtN- Rs. in lak o-\ e.* Amount rtJ- & Public Remarks isi-+ Particulars Roads Housing s?F6dt Y Rricloes Works 3 4 5 6 from lG Park l\4ddb Schooi Centratl 4 00 65 C/o Appr;chload "ia Power House to Abotani Colony, ltanagar. l 800 66 C/o ."d fto- Drei grounO to Govt Middle School Nyokum I 2nano via Revival Church Nvokum Lapang-. Green 2.00 61 Cd Siorm water dralnage at Abotani Colony near Mount School. ltanaqar. - and side 6.00 68 ffiion wall, ParaPet wall drainage etc from 'O' Point Tinali to Panchali Lobr road' Itanaoar. (30 mtrs) near WRD, Complex 2.OO 69 C/olfrG"ttc. "tail Chimou. Division- 200 70 Cb Retammg Wait to protect bachelor barrack at lV. ltanaoar '160 opposrte 700 71 Clo nCC Ooin mtrs both side height 4 mtrs sides APEDA office to Mowb-l Nallah near residence o1 Shri Tamuk Tadu. 5.00 800 t5 CL Appt"rch r.ord from tigOo Colony to Doyum Colony' (L 2.00 74 C/o RCC Retaining Wall at D-Sector near uostal corony Itanaqar. Govt' 5.00 75 C/o RoA ftom Chandranagar Power House to Prlmarvbcnool,ullalluldrrdgdr. - t6 10 00 10.00 v l/o RCC Protecilon Wait at nonyi Polo Dariya Tinali Road' ianaoer at 10.00 78 CbHCCFrotection Wdi near private residential area Kola CamP, Mowb-lLltel the resrdenl 10 00 79 ffior, ltanagar near of Kuli Manqam 5.00 80 /o roads dtanige at Xl-Batt Ganga Anchal Segment "nd -olony-l 5.00 81 IClc ffitrt DDK to ll near Nipuchi School Hill lToo Colonv, ltanaqar. ffiiort D-Sector to c-sector, ltanagar 5.00 - to 10 00 OJ =orfrT6n crtttg iro. Kamko Primary School -laticamo. (4.5 km). ChimPu. '15.00 to Dath Village' (2- 84 ]b/o Afi;ach Lnk Road from Higrrway Itmt 15.0c otr 3/o drarnage, CC Pavement , Culvert, Ketalnrng vvarr eru' ncluding Widening of road from NH-415 to Directorate tEconoriics & Statrstics) Colony , ltanagar at Ward No 02 10.00 86 C/o approach road from Directorate tourlsm to upper road via Nerba Colony, Ward no-12, ltanaqar' to 5.00 87 C/o Retatmg Wail a"d wiOening of approach road NhI-A UIUO AI EJD. 30 00 8B 1 km 10.00 B9 eio road connecmg from MoOirilo to Jomi Jote ie ,

Daat 2.00 90 C/o tto'-rfiat"r drai. at Dath at Dath Nallah under 20.00 91 Cio road from ESS Sector to 4tn IRBN at Upper Jully

Trorl 10.00 92 C/o New Road along with Retaining wall & UU uulver Donyi Colony t,t Donyi-Dokum primary school 200 93 Clo CC Drain for D-Sector Link Road(700 mtrs), ltanagar 10.00 94 C/o RCC wall & aPProach road trom N 2.00 oq C/o boulder retaining wall between prlvale quarrer arru govt bachelor barrak at C-Sector, Gandhi Market' u Itanaqar. ,,-19'$';;;;'"',' iiz.,na$ar Page 8 A /S/ l-\/ Rs. in lakh t--, _ ffi\ cll Amount (s\l Public Remarks hJJ Pa rticulars Roads & Housing wb !7rv/ Bridoes Works "z 2 3 4 5 6 96 C/o CC footpath at A, B & P-Sector, ltanagar under Ward 200 no-l8 around 2 km. 97 C/o RCC retainino wall at P-Sector, ltanaqar. 5.00 98 C/o storm drainage from Multipurpose hall to NH-4'15 via 2.O0 Singrik Kujo Colony, Ward No.- 2, ltanagar (100 mtfl.

99 Road Maintenance/Retaining Wall from Ganga Market to 15.00 Ajing-ll Colony -via- Jama Masjid, ltanagar.(600-mtrs )

100 C/o link road 1km stretches from Ajing Colony'O' Point to 6.00 lnruor hclt Aiino Colonv-1 ltanaoar. 101 l/o Protection wall to protect road near Tri-junction o 2.00 Donvi to Dokum colonv road, ltanaqar. 102 C/o Retaining Wall at Dokum Road Sinking/Slipping Zone 500

103 C/o Road from resident of Shri. Teli Raja to Covenent 10.00 Mission School. Ganqa Villaoe, ltanaqar. 104 C/o road at Sanqlo Putonq-lll. 10.00 105 C/o Retaining wall to protect sector road and Govt Qtrs a' 10 00 R-Sector Rainivas. ltanaoar. 106 Protection wall at back side of Popu Baptish Church(30C 200 mtrs.). 107 C/o link road from main road to Yogin Village, Niriuli " 8.0c 108 C/o road connecting to Polo bridge to Down Polo Colony,- 10 00 Naharlaqun (2 km). 109 -/o Approach road from Jully road to Govt. Middle School, 5.00 Yari Babar colonv. Papu Nallah, . 110 l/o Road connecting from Dachi Hapa to Lutha village ('10 40 00 < m). 111 C/o Drain from A-sector to Rakap colony, NaharlagUn. 15.00 112 Cio approach road at Mara Hapq at Lekhi Villagg. 10.00 113 C/o approach road & drain from Bage Tinali to Uppe 10.00 Manoio Colonv. Niriuli. 114 C/o Protection Wall of Suspension Bridge at Pachir 200 Colonv. Naharlaqun. 115 C/o Retaining wall (approx. 60-mtrs) at Govt. Sec. School 400

Pach i n. 116 Cb{,C Pa"etent Drainage System and Culvert at VKVI 200 at Primarv School road Nirlqli-|. " I 117 Clo boulder fencing wall at Borum Nallah, Borum, 20c Naharlaqun. '1 1B C/o Retaining wall and CC drain, culvert & road to protect 200 Medical Sub-Centre and nearby buildings at Papu Village' N aharl:o rtn 119 C/o culvert & retaininq wall at Jullv Nallah at Lekhi. 200 120 /o retaininq wall for protection of Anya village, Nirjuli 2.00 121 l/o RCC Retainino Wall at Ravo Villaqe, Niriuli 20c 122 l/o Protection wall at Nirubiuli villaqe-ll, Niriuli. 5.00 123 C/o RRM Wall at Sood Village area 20.00 10.00 124 C/o retaininq wall at 2 km Papu Nallah, Naharlagu! -. 125 Clo eC pjuement road at Upper-Nyorch Village along witl 7.00 Drain (700 mtrs). tto C/o Approach road to residential complex in the rear side 800 of State Guest House and lligh court(Sh:- Wid, CC no'amanl f'1- rlrain\ 10 0c 127 l7o Protection Wall and Wing Wall at Kukurjan Nallah on Aooroach Road to Govt Secondarv School Jote. 128 Clo protection Wall and Wing Wall near forest colony 10 00 Baliian. road to Govt Hr 10.00 129 Clo 2 n Span Slab culvert on approach - Sec School Baliian. 10.00 130 Clo Bridge over river Magoni(80.0m)(Sh: Sub soil investioation). (60.0mXSh: Sub soil 10 00 131 C/o BriOge over river Balijan hb investiqation).

ffiix.;'u*'o"S"aoa Page 9

ePari Rs. in lakh $ Amount /c ,nf \';4 ' "q{ Roads & Public Remarks tBl Particulars Housing NT Bridqes Works ; 6 3 4 5 + 1,,, 0Okm)(Sh:- 10 00 I -11 C/o Lfrk rcad from frrfeOnso trllage to Jullang(2 FC) in 20.00 IJJ Clo W* R"pe Su.pension Bridge over Panyor River between Kamrung to Bong Village (Span - 100 00 mtr')

por 10 00 134 C/o Approach road from TAH to Iahsl vlllage orloge with 3 nos. culvert soiling and metalling - 1 00 Km'

4aE C/o Mengio road to Nyokum Potu aI rararlg 10 00 villaoe. 10.00 tJo @ad to Rugo PrimarYschool 1.00 Km including 2 nos culverts soiling and metalling'

10 00 tJt @-in on wtengio TownshiP roac 1 50 Km. 10 00 138 Cb To*nshe .id at Sil-sango(SH: Soling, Metalling and Caroetino). 700 139 C/.'A.cor blo"k' ana Tower block at Nirpong river (Paga) 700 140 -lo Ancor block ino Tower block at Panior river (Sakiang- i:iino ) Havia 20 00 141 bE-1[RSB o"et Pare r'iuer. in between Mepsoro & with porter Track under Toru Circle' '

school 10.00 142 Clc fr". lnH to Govt residential Sarkahappa"pptoacJ.-oad at Nimte, Length- 200 Mtr (SH: CC Pavement' R/wall, B/wall, CC drain and Slab Culvert)' 20.00 143 Re€[g"dt of Tor" to Omputi road at Sudum Langfo' 6 800 to 7.600 Km under Toru. 12.0c 144 C/o road ftom TAtl pctrii to Halurangpa village (SH: Cross Drainage, CC side drain, R-wall & Solling)- '1 .00 Km'

18.0c 145 lClo lnternal/Sectoral roao ror Har - ffiwitt atRttu atGeka underPistana 20.0( lcircle. 20.0( 147 ffirStadium and General Ground at Talo (SH:- RCC, B/wall, site development & Galleries etc). 30.00 148 t6 R"adlrom B"b"seka io Kom, Happa via Taa Sepa' 10.00 149 ( 10 00 150 ffieC Pate."nt approach road from main road "f Kimin to Ziro Road ) near Petrol Pump , Yazali (400 mtrs)

via Job and 10 00 151 Clo road from PMGSV ioad to Kamcho l'aram Sikhe Villaqe 10.0c 4tr4 l/o road from BenYi HaPPa to Tag-o ' Village 10.00 153 C/o RoAfroil PNIC,SY ioad to Happa , Talo

via Pei 10.00 154 Cb Road f.t P'IMGSY .id to NomOum Nampin Baotist Church . Pei villaqe. Takho 10.00 '1 55 C/o roadjrom%ter Geka to Bentam Yorda via

10.00 156 uio rrolecllorl vvilll dt l\yurr esc qL rvrqr vrrrqvv' (400 Mtr) (Sh: 157 Cft CC Pa'rement m P'dr" Line at Hapoli 40 00 Preparation of Sub-Grade & WBM-|, WBM-Il' CC

158 C/o Road from Tubyo village to Dura vlllage (bn 25.00 (rrr' 159 C/o Approach road to Sibeyaru colony (u JUUKm,' Preparation of Sub-Grade & WBM-l WBM-I,ll'lll' BT' RCC 20.00 Slab Culvert 1.00 mtr span=2 Nos. RA/Vall=80 00 mtrs' CC drain=300 00 mtrs. a 160 C/o RCC slab culvert in span over SlKna rrver 15 00 -) '{;";rxJn*' nunu*un Page 10

Rs. in lakh Amount Public Remarks Pa rtic u la rs Roads & Housing Bridqes Works b 3 4 5 (50 Mtr') 161 CdReta^ns *ail at Chabo Lower Subansiri Ziro 15 00

162 ffiPokhe length 2.5 km at Hong 25.04 villaoe. on 30.00 tr)J C/o Black ToPPing i/c CD o*i ano Pu"ci5ioe otain Road from BRTF Road to VIP Colony and DC Bungalow Palin. and Re 50.00 164 C/o Bla"k T" Works, Pucca Side Drain gradient on Road from Choba BRTF Road to Jamin'

scnoor 40 00 165 Cio Road from Talariang Yangte Road to Mloole Dari. 70.( too 240 to/ 7.0 68 50 0c 169 10.00 170 @mChainage43ooKmtc 45 00 Km. 8.00 171 l,/o Schooi Plat ground at Govt. M.E. School at Tungmar'

60 0c tz u/o Ko ?o iro m [9lllg_.!g_! ge e I v]: ------_=-. 20 00 t/J Cb 3 km Ltk Road ftom 'O' Point- Langdik village to Bere

rarar 174 C/o Wing Wall, Capping on Steel Balley LJrloge over 10 00 on Tamen-Tali Road. Nallah o 175 Cb WC Wail fot RCC Culverl over Yangmey 10.0c Yanote-Tali Road. nA lUo Wing Wall for RCC Culvert over Yangte l\arral 10 0( lonYanote-l-ali Road. 38 0C 177 C/o Rinq road under Kolorlqngle\vll - 17 0( 178 C/o Approa"h ioad to Circuit House via UD office' Kolorianq. 5.00 179 /o Slab culven aI YarKarl {oau '10 00 180 L;/O ApproaCn Koao al \,lrVur!-rrugPs rll4alil3 10.00 181 cl,o Part

- or 10 00 185 C/o slab culvert ( 2.0 m ) at lrr Junctlon PWD Road at Nacho. 4.00 186 road to Tarik Rava 10.00 187 ffi BRTF Bricloe ooint at Nacho. L Dcnoor orgd 40.00 1BB C/o Road from PWD link road to Govl r r t^^^' e' l-)ictt -- ^i-^t^ 'h^nciri 1ao Qina villane 60 00 village( 40 0c 190 ffim enrr road to Ligu Lenqth- 3KmX Phasq-l). , : (Lengtn- 1 Km) 20.00 191 clo t-int< Road from DFO Qtr to SIB Colony

Io 20.00 192 l/o CC Pavement road from Slgln uolony Length 6.00 1g3 rak ColonY( 1km) L-leK vrrrdgtr 4.00 194 Cio Foot Suspension bridge over snan rlver aI in . '------..------_--.--.-..------.'-- Top colony( Length 20.00 195 ffi to Hiil

tXm). _ . to' 10.00 196 c/o road from Trans nrffirto tourist Resort. t\ lufnperue 20.00 197 C/o road from - Mono roao 10 ' \ V WBM -l ,ll,& lll, S/culvert and CQ !lqld----".-"..'.."--_'"-.---- ,*"";ofir;1';f'"" \tanagar dge

Rs. in lakh n+./ Amount Public Remarks ffi;"/d/ Particulars Roads & I Housing $Ig1 Rrirloes I Works ;v 6 2 3 4 5 10.00 198 Clo road ftom pWO tint< road to Rija Pada at Hankar (SH:- village , Upper Subansiri District 5 of length 0.500 km

10.00 199 C/o road from BRTF road to PHC Puchl - GeKo at Hucnl CO HQ(L- 0.500km) (SH:- FC Geko ) '..------"-_-_-- '10.00 200 Clo t*O itot BRTF to General Ground at Laa villaoe( Lenqth-0.500km)(Sh :- Eq- to 40 00 201 ffi Roao near Godak village Beruk Nare old village via Durg-Pum old village length - 20.00 Km (Ph-l. 0.00 to 5 00 Km)- 40.00 202 Clc Road f.m l(cft village to Maga old village via Pip villaoe - 15 00 Km (Ph-| 0 00 to 5.00 Km) --..._' -.-'- 25 00 203 C/o road from BFiin road to Circle HQ office Maro (1 3km)

10.00 204 Clc RCC Brdge at Toraian Village under Kangku Circle(Soan 8.00 mtrs). 10.00 205 C/o Assam PMGSY RoaO to Sili Village( SH: Metalling)'

15.00 246 C/" R"ad f.t CO Hq kangku to Kangku Village via GSS Kangku(SH:- FF, Metalling and S/culvert 6.00 mtr)'

10.00 207 Re-Caroetino of Gensi Township lload 10 00 208 Cb RCC Slab Crtvert at Raate Village under Kangku Circle in West Siang Distt, AP(Span-l mtr-1 No' & Span 2 mtr-1 no.). 50c 209 C/o RCC culvert at Hime Villaqe (span-1 0!110 ,10 IC/o road from lMafinnempte Tri-junction to Malini village at 25.00 It itrr,^titSh,- WBM-Ill, BT). 10.00 211 :to CC Oiiin and Breast wall adjacent to Power House on he wav to Malini TemPle ('1 16 00 212 rprore*"nt ;f road from BRTF road to Moba Doke 5C (m) (Sh.- Widenning, Culvert, CC Drain & WBM-|, ll) 660 213 yo Nlyodr€rG-Siru NLCPR road to Siru Primary School 'FC-0.50 Km. Cul-2 Nos & WBM-|-0 50 Km) _- - B.0c 214 /" R"rd f.rn P-1o to fiOi RCC Bridge (Sh:- WBM-ll, BT 20 Km). 60c / t3 Cl, Eg*Da".gz-do Koyu Road (Taak Soi) (KiDrain-O 3C Km. S/Culvert-1 mtr-3 Nos. & 2 mtr-'l No) . zto C/o Batat PagfMGSV roaO to Upper Regi (S/Culvert-l- 3.00 Mtr-3 Nos) (Sh:- 500 217 Clr Appto"ch toad irom Pagl-tt village to Hide Rijo F/C-o 50 Km. S/Culvert-1 Mtr.-2 Nos) 600 218 Clo noiO irom BRTF road tq lJppgt Eygreql Vllqge 9:oo L;/o KOaO TrOm 21 600 - via 10.00 221 C/o RoadJ'om Po*"r House to Kidi Suspension Bridge To.io Little Flower, School (Sh:- Sol, CC Pavement, Culvert' Drain). - (Sh:- 14 00 222 C/o Road f'om N).gam t'lyoOu PMGSY road to Hiri Met BT CC Drain, Culvert) Jo- BRTF Road iocagi boke Village(Sh:- Sol, Met, CC 600 Jrain). 90c 224 Clc Approach d from PWD Nyigam Kamdak road I Nvioam Galin (Sh- F/C 1.00 Km,WBM-1 .00K). - in 7.00 225 e/. Apptoach road iiom BRTF road to Lower Nyobom old Market basar (Sh- CC drain 200 0mtr, Pavement 200 00mtr). 6.00 226 C/o t"ad ft"m Basar Sago Piri PMGSY road to Lipu Namchi Volley Ball Ground (Sh- Rl/Vall 30 00mtr, Slab Culver 1.00mtr span- '1 nos' WMB- l- 200 00mtr, CC drain

to 6.00 227 3/,. FSB o"et R*"r Sb to connect Bege prinrary school rnrrto/Yase & lite villaoe (120.00mtr span)- 10 00 A 228 10 00 229 lmorovement of LiromobaTownship Road [3 00 $d ,,fril,*t"r*tun' ;li-t.:'-:: Page 12

in la -w Amount Public Remarks -Sh"Y Particulars Roads & Housing rdpad Bridoes Works 3 4 5 6 aoc 230 ffimbu VillUPto Bridgel looo -f zJz r I 10.0C 12 00 233 at l-iromona [sl kml Dok" tol looo 234 I

10 00 235 11 00 l3b firomoba(SH:-l 0.800 Mtr.) .^ oTl o^r.^^^ \/irr rn,,rqnaJU [ml I 10.00 237 C/o Road lrom UaraK ro Dlllr r\aKsdP vrrr'tv ^"'l - | i::: Higher Secondary schooll lu uu 136 f n p.""ment of approach road to R cHc ai Yomcha [1 kml. I 24 00 239 C/o roadfrom Jkdn Trt,lnction to Tarsu Mobuk and to JNV School Aalo ( 8 5 Km) ( PH-l: Tarsu Mobuk to JNV Schoo'l - D^.,^m^^r. I nn l{m\ ^^ 27 00 240 Clo CC Pavement from Jirdin Tri-Junction to VKV School (2 00 Km) (PH- l: Jirdin Triiunction to Jirdin, CC Pavement: 1 20 Km Slb Culvert- 20 Nos, Embankement - 200 00 m)'

Bharti 30 00 241 )/o CC Pa"emeni road from Gumin Nagar to Bal School via Gaurhill and Hospital (2 15 Km) (PH-l: Bal

38 4C 242 l/o CC Pavement Road from to lJollce Statlon JUn 60c 243 C/o CC Pavement from Hospital to Porlce statlon ro BSNL Office ( 450 00 m). 15 0( 244 C/o Road from'ARf f RoaO to Yangko village(O 50Km) (SH: F/c- 0.50 Km). 15 0( 245 Ee fie*e.t of App6iCh noao to Lower Gumin Nagar at Aalo. 20.00 246 C/o .ad fto'" NH229 to Doyor village(1 30 Km)(Sl-l-

10 00 247 llo lnternal road of Darka village - 3 50 Km (5H: Ke 3aroettino). '10.00 248 C/oFoad ?tom BRTF RoaO to njnaghat - 1 200 Km (SH: GSB S/cul-4 m soan- 1 no). 10 00 249 Clo road from NH-i)i to CO Hq Bagra(O 600 KmXSH- Re-Caroettinq and CC DraiG 20 0c 250 C/o R"rd f'o'" NF:-z)s to Doji-Jeku Village(o 700 Km)(SH- GSB. CC Pavement). 10.00 1aI C/. App'oa;h .ad ft"t BRTF noad to Wak village- 0 450 800 252 )/o Retaining Wall to protect School playgrouno aI /n 1., AA nn nt Hl ? n t\il\ 10 00 tA2 C/o Retaining Wall to protect PWU' lu at Eagra uu nq Rine in Lipu Bagra village (R/w- 15.00 M' Ht-2 50 M)' 8.00 254 C/o General Playground at Paya Vrllage (un- trxca 600 255 C/o General Playground at Angu-l Vlllage (shl- trxcavar and Frllinq earth work and !|rygl--'-_ @ging village (sH: RCC slab culverl 10 00 la RR wattl ffibo (sH: RCC protection wall) 20.00 10 00 258 C/o approach road on Right bank ot RUU Drroge aI Nallah (SH: Back filling, RR Wall and Pavement)

10.00 259 C/o approach road on Left bank ot RUU orloge aI Nallah (SH: Back filling, RR Wall and Pavement)

10 00 260 C/o approach road from BR IF road to Meolcal uorotry u K:vino-1 50 Km. (SH: CaPettinq). ,'*ffil"nTu"'"

116naQar ZSeParrN Page 13

in lakh \O -{ .- / Amount -ll \r. {'"/*V particutars Roads & Public Remarks Housing eh 7r,a\-/ Bridqes Works 1 2 3 4 5 6 261 lmprovement of road from BRTF road to Paksing bridge 10 00 ooint.-1.00 Km (SH: SMC. Drain and Culvert). 262 Re-decking of 2 Nos. of Wire Rope Foot Suspension 6.00 Bridoe over Sivom river under Kavino Sub-Division. 1r)3 C/o RCC bridge over lte River at Patum-Rumgong Road. 40.00 Soan-25 00 m. 264 Re-decking of 2 Nos. of Steel Balley Bridge at Patum 10.00 Rumoono road. 265 lmprovement of -Rumgong Road ( SH:- Retaining 30.00 Wall 3mt heioht=67.00 M) 266 C/o road from Karo to Pidi Administrative Circle under 20 00 (SH: Formation cutting - 8.00 Km)(Phase-|. F/C - 2.00 Km) 267 C/o link road from Tongkarla BRTF road to Mengang 20.00 village (Length 1.20 Km) (SFl: Widening RCC Slab crrlverts -: trtoJ& RA//all) 268 C/o Monigong Township road(CC Pavement - 0.400 Km). 20.00

269 C/o link road from BRTF road to Govt. Primary School, 34.00 Sorongdom (Length-1.20 Km)[SH: Embankment, GSB CC Pavement & RCC Culvert (Span-1.00 mtr)-3 Nosl.

ltu Clo link road from PMGSY (Galling) to Gause 20.00 village(Length-O 60 Km)[SH: GSB, CC Pavement , RCC Culvert (Span-4.00 mtr)-1 No. & RCC culvert - 1 00 mtr - 1 Nol. 271 Cio link road from PMGSY road to Gorjen Fush (Length- 10 00 1.55 Km)lSH: FC - 1.55 Kml. C/o link road from BRO road to Farge village (Length- 13.0C 0 500 Km)tSH: GSB & CC Pavement l ztJ Diversion/Realignment of road to avoid slip prone area in 12 0C between Likor and Pallinq (2.00 Km). 274 lmprovement of different colony roads ofYingkiong 30.0c townshio(SH C.C Drain. WBM-Il lll & caroettino). 275 lmprovement of Miqqinq township road 8.00 276 lmprovement of Jengging township road (SH: WBM-Il & 10.00 earnpltino\ l/o 4 Nos RCC Slab Culvert on Yeqlek road. 300 278 l/o C.C drain from -Mariyang road to Simong 800 ,,illaoe-200Km. l/v /o Aooroach road to Komsinq Bridqe (1.00km) 10.00 280 l/o RLR at Siri-Delenq at Yemsinq villaqe. 40 00 281 C/o Storm water drain including protection wall near 50.00 Medical at Panqin Town(Sh: CC drain & R/wall). 282 l/o Ouarrv road at Sanqam 25 00 283 C/o Drainage system at Pangin Town near Baptist Church 25 00

284 lmprovement of PLTK Road. Ph-l (Sll. lmprovement of 50.00 geometrics, WBM, Re-carpeting,bSide drains, etc.(CH- 40 00Km io 45 00 Km ) 285 Replacement of BB with RCC Bridge on PLTK road a' 30.00 Chainaoe 44.00(1 5.00M). 286 Clo approach road to Kakki Village(2.00 Km.)(SH: 40.00 Widenino. WBM. Drains. carpetinq. etc.). 287 C/o side drain on -Ledum-Tene road at Cl-l: 10.00 25 00 Km at Bilat 2BB C/o cross drainaqe Structures in Sille-Ovan Circle. 20 00 289 lmprovement of Pasighat-Ledum-Tene road (32.00 to 40 00 40 00 Km) 290 )/o road from Oyan Charali to Kemi Check post (4.50 Km) 32.OC SH WBM-Ill & Bituminous macadam). 291 C/o Approach Road from Paglek School to Komolighat and 12.00 ( - DC's Bunglow to PWD Explosive Godown (0.60 km). SH n, - ll,lll BT). RRL, Kutcha Side Drain, GSB, WBM and $ ,,*u;il;ffi'"''' itunugut An Page 14 lsYs, c/ fis cl €i <\o\ Rs. in lakh Amount \_ Particutars Roads & Public Remarks Housing @ W Bridoes Works I 2 3 4 5 6 292 Widening of approach road to DC office at Pasighat 3ZU (Length-261 00 Mtr) (SH: Widening, RRL, GSB, WBM-Il, WBM-lll, BT & C.C. Drain). 293 Double lanning of road from Siang Guest House to APST 30.00 Bus station (0.90km)( SH: RRL, GSB, WBM-ll, lll & B1).

294 C/o Road from NH-1 3 to Sille Hydel at Pasighat, East 60 00 Siang District (2.20 km) ( SH - Earthwork, GSB, WBM - ll, WBM- lll, Bituminous Concrete, CC Drain and RCC Box crrlvert- 1 50 mtr- 7 Nos ) 295 C/o Road from Pasighat-l-edum-Tene road to C.O's Office, 40 00 Yagrung (1.00 km) ( SH - Earthwork, GSB, WBM - ll, WBM- lll, Bituminous Concrete, RCC Box culvert -1.50 mtr- 2 Nos..). 296 C/o lnternal road at C.O. Head Quarter, Namsing (1.40 58.80 km). (SH- Sub - Grade - 1.40 km, WBM-ll - 1.40 km,WBM- lll - 1.40 km, BT - '1 .40 km, Cross drarn - 6 Nos, RCC Box culvert-1 .50mtr soan-1 No.) 297 Fabrication of Steel decking of Bailey Bridges under Mebo 18.00 Sub-Division, (SH - Fabrication of Steel decking 26.40 MT, Procurement of Transom Clamps - 400.00 Nos, Procurement of Panel pin, Rockers, Base Plate, Bearing post and Male & female etc, and Painting of Bridges).

298 l/o RCC Storm water drain under Mebo township (800 00 40 00 ntr\ 299 C/o drainage system at Namsing village (Sanggo segment 6.2C No 2) 300 C/o Road from BRTF Road to Jomoh village. (0.70 KM) 10.0c

301 Re-caroetino of Marivano Township Road (3 KM). 18 90 302 C/o Approach road for Steel Arch bridge over river Yamne 27 20 at Byasang. (3.50KM) (SH : Slab cul, R & B/wall, C C. l-)rain\ 303 Re-caroetinq of Geku Township Road ("1 .50 KM) 12 10 304 l/o Road from Marivano to New Millanq. (1.00 KM) 10 00 305 l/o Road from Trans Arunachal Highway to CHC & 10.00 nspection Bungalow at Geying (1.50 KMXSH: WBM & ?T) 306 C/o Road from near RWD A.E office to Govt.H.S.School 25.00 connecting and Lonka Village road neat back srde of Helipad at Anini (0 700Km)( SH: RCC slab culvert 1.50m span: 1No, Embanking: 70m WBM-|, ll & Ill: 200m).

307 C/o Approach road to Circuii House( (SH: 1.5m span slar 10 00 culvert, CC oavement: 30m, CC drain: 60m). 308 C/o two wheeler suspension bridge over river Dree neat 9.45 Etabe (Soan- '135 mtr). 309 C/o Approach road to District hospital at Anini( SH: 1 50n 400 slab culvert-1 No) 310 Cio Road via DFDO office and Girls Hostel to RWD road to 10.00 lanka village( 1.00Km)(SH Pot-hole repair, Kutcha drain).

311 l/o Road from Anini-Mipi BRTF road to Emuli-Sokhono 6.00 'oad( SH: 3m span Slab culvert: 1 No.). 312 C/o Approach road to helipad at Etalin (1.30 Km) (SH: 5.0c Kutcha drain). JIJ C/o Approach road to lB at Arzoo( SH: CC Pavement: 5.00 30M) 314 C/o Road from Parbuk-Kabang PMGSY road to Raj-Ali and 30.00 Mobang (SH:- E/W- 2KM, RCC Slab culvert - 4 Nos)

11E C/o RCC Bridge over Jia river along the road from NH-11 25.00 to Jemi villaqe under Bolunq (Span 10 mtr) J to lmprovement of Dambuk township road ( 7.80 Km) (SH:- 47.00 WBM & Caroettinq). ,,-'f*r:Jlx,r:n"' itunugut 26eParlN //" -\'a age 15 /.{ N *\ + (! 4ffi i )|? h-l Rs. in lakh \if Amount rs Roads & Public Remarks Particula Housing w Bridoes Works

1 2 3 4 5 6 317 Re-caroettrno of Road from Sisiri to Bizari (12.00 Km) 40.0c 3'1 B C/o Storm water drain at various location under 30.00 townshin /4 Km) 319 C/o Extension of Roing township road to Weya Village via 65.00 Cheta-ll at Roing (3.00 Km) (SH:- EA/V, GSB, WBM-Il, lll, BT & Slab culvert 1.50 mtr - 10 Nos). 320 R.e-caroetino of Roinq township road (5.00 Km). 45.00 JZt /o Protection wall at Thupani bridge in Hunli-Desali road 10.00

3tz lmprovement of road from BRO road to VKV School, 40.00 Tafragam (SH: Carpetting and pot hole repair) Ph- I (0.00 1n 6 OO Km\ 323 Tezu-Sunpura road to '19th Mile via Jeko village, length- 45 00 3 00 Km (SH: WBM-Il. lll and BT). 324 C/o Slab Culvert (1.50 Span) on Walla Road at Hawai. 700 325 C/o Retaininq Wall at Walla Road in Hawai 8.00 ,1/6 Cio CC Drain at Walla Road in Hawai. 900 327 C/o RCC slab culvert on Thawra Nallah at Changung 10.00 villaoe link road. 328 C/o RCC slab culvert on Tikrap Nallah at Changung village 10 00 link road 329 lmprovement of Chungung village Road (Sll: Storm water 24.00 drain) 330 lmprovement of Watong village Road (SH. Storm water 24.00 drain) 331 Co/ CC steps at Marbo villaqe 80c 332 C/o steel arch bridge over Lohit river to connect Manchal 50.0c (SH Completion of superstructures). 114 lmprovement of road from Kamlangnagar to Deban 25 00 (49 00Km). 334 Construciion of road from Chowkham-ll to Forest Colony 40.00 (1 50) (SH:-Earth work, SBC,WBM and Culvert)

Construction of Bypass road from BRTF road to Helipad a 50.00 Parasuramkund (2.50Km) ( SH:-FlC, SBC & Culvert)

JJO C/o road from BRTF to Kund (0.60 Km) (Sl-l: CC path with 35.00 railino) 337 C/o Approach road in Officefs residential complex at 40 00 Namsai 11 00Km) lSH:-Earth work. GSB. WBM ). JJO Cio Namsai-Diyun road (16.00Km) (SH Culvert 4mtr span- 10 00 1No and 2mtr span-1No). 339 C/o Manmow-Manfaiseng road (4.00Km) (SH:-RCC bridge 51.00 20m soan over Mannow river at Ch.1.30Km). 340 C/o RCC Slab Culvert at Lathao village road (6.00mtt 12.00 soan). 341 C/o RCC Culvert 6.00mtr span at Adi Ninoro village. 15 00 342 C/o link road in between Bhodrachuk to Kharia chuk (L- 20 00 0540Km) (SH: GSB & RCC Slab Culvert 1.00mir span- ?Nos) 343 Road from Govt. Primary School Waisali to Moran Chuk (L 25 00 1.50 Km) (SH: GSB & RCC Slab Culvert '1 m span -2 Nos).

344 C/o Colony road at Sitpani Miri (2.50Km) (SH: Earth work, 30 00 GSB & RCC slab Culvert 1.00mtr span-4Nos) 345 C/o road from Silatoo Khampti to Bokabeel via Christian 45 00 chuk (2.00Km) (SH: Earth work, GSB, RCC slab Culvert- 6 00mtr soan- 1No). 346 Trans- Arunachal Highway to Silatoo and New Silatoo 40.00 village (L-1 3OKm) (SH: Earth work, GSB & RCC Slab Culvert 1 .00mtr soan-7Nos). J4 t lmprovement of road from Diyun end to Namsai (SH Re- 35 00 WBM & BT- 3,OO Km) f 348 lmprovement of Bordumsa Township road (SH. WBM & BT 35 00 v 3.00 Km) / -.-P13{1,, -%J".uW iiunusut /1< Page 16 (c^ (EI -lo-\ Rs. in lakh \ Amount Roads & Public Remarks Particulars Housing w Bridoes Works b 1 2 3 4 5 349 lmprovement of road from Pisi village to Lama 60.0c Basti( Deban)(25.00km) 350 Re-carpettins of Kharsanq Township road (3.00km) 40.00 351 Extension of Miao township road (3 00 Km) (SH: EW & CD 50 00 works). 352 C/o RCC Bridge over Namchik river to connect l-leltong 60.00 villaoe (Ph-ll). C/o Bridge over Namchik river on PMGSY road to Sasum 40 00 village (SH.- Approach road & De- launching / Launching of Bailev bridoe). a,qa C/o road from Longvi-Tengman road to connect Sasum 50.00 and Hetman village (SH: FC- 1.50 Km & culverts).

355 Re-alignment of Sangkhuhavi road from Lungsang 75.00 onwards to Tara river (2.00 Km) (Sl'l: FC, widening &

356 C/o approach road to Kantang CO HQ (SH: RCC slab 75 00 culvert 1.50 m span- 6 Nos, GSB, WBM- ll & WBM- lll- 1 40 Km & CC drain- 1.40 Km). 357 /o CC road (Ph- lll) at Chanqlanq township 150.00 358 Cio Road from Notun Kheti to Old Lamlo, in , 40 00 AP. (SH Widening, WBM-I & RCC Slab Culverts) (3.00 Km) 2AO C/o Road from CO HQ to Soha Village, in Tirap District, AP 30 0c (1 500 Km) (SH: F/cutting, WBMI & RCC S/Culverts)

360 C/o Township Road, in Tirap District, AP (SH: 50 00 WBM lll & BT-5.00 Km) Jbt C/o approach road from CK road to Bari-Basip CO HQ. 40.00

JOZ l/o Road to Engineering Colony at Khonsa, in Tirap 20 00 -)istrici AP '10.00 363 l/o Protection wall near Fish Pond at Khonsa, in Tirap -)istrict AP 364 l/o RRM Wall to protect government quarter at Nokdong 10 00 :olonv at Khonsa. in Tirap Distict, AP. 365 C/o Retaining wall near Joy Guru Mandir at Khonsa, in 10 00 Tirao District. AP. 366 C/o CC Steps with railing from DC office to General 10.00 Hosoital at Khonsa. in Tirap District. AP. 367 C/o Road from Tupi-Dadam road to Dadam CO HQ, ir 40.00 Tirap District. AP (3 20 Km) (SH: FC & S/Culvertl.. 368 C/o Road from PHE Godown to Seva Kendra at Khonsa 16 00

369 C/o road from Thinsa village to Tethiam upto Khonsa-Lazu 40 00 road point in Khonsa Circle, Tirap Dist, AP (2 50 Km) (SH: FC & crrlvert\ 370 Cio Approach road to lB & staff quarters at CO. HQ 15 0C Borduria. in Tirap District. AP (0.300 Km). 371 C/o Foot bridge i/c protection wall and CC foot path from 20 00 Main road to PHC at Borduria, in Tirap District, AP

C/o CC Road to Telephone exchange at Borduria, in f irap 10.00 District. AP (0.300 Km) 373 Replacement of decking for 2 Nos. of Steel Bridges on 30 00 Booaoani - Nokfan Road. in Tirap District, AP. '10 374 lmprovement of Drainage system ai PHC Borduria, in Tirap 00 District. AP. aaE Clo CC footpath at CO HQ. Borduria, in Tirap District, AP. 10 00

376 lmprovement of Road from Kanubari to Ringpong (19 0C 90.00 Km) (CH: 2.40 Km to CH: 7 400 Km) (SH: CC Drain - 50C mtr WBM-Il. WBM-lll & BT - 5.00 Km). 3/ I lmprovement of Longding - Bimlapur Road under Kanubari 90 00 Division (43.80 Km) (SH: Box Culvert (2x2) - 2 Nos WBM- w g{i r lll & BT- 5.00 Km). GP\ '..rr;*:ff: Page t] //€/,+K) o/ q :l Rs in (\ Amount Particulars Roads & Public Remarks \G; Housing _T Rridnas Works 2 3 4 5 6 378 lmprovement of link road to Niaunu village at Longding 20 00 (SH: BT- 1 00 Km). 379 Protection work of CC road in Longding (SH: R/ Wall & B/ 30 00 Wall). 380 lmprovement of road to VKV Niausa (SH: WBM & Bf- 0.50 20.00 Km). 381 C/o Protection wall at Zero Point to Helipad ground, 30.00 Lonodino District 382 3/o Approach road to Community Hall at Longding (SH: 20.00 :A// & CC road (200 m). aoa JOJ lmprovement of Longding-Bimalapur road under Longding 50 00 Division (10.00 Km) (SH: WBM & BT- 7.00 Km)

384 Cio Link road from Middle School to Saint Thomas School, 40 00 Pangchau (2 50 Km) (SH: EA// & CC road (1.00 Km).

385 C/o Approach road to Armv Camo. Panochau. 20 0a 386 Approach road to PMC Via Middle School Wakka 20.00 387 lmprovement of approach road to llelipad at Wakka 30.00 388 C/o Slab culvert at Mailapa Votsum road at Pangchau 15 00 (soan 6 mtr) 389 C/o Kamuha-Noknu road (SH: B'f- 4.00 Km). 30 00 390 Consultancy Services for preparation of DPR for various 500.00 Roads and Bridges projects of State Roads under PWD.

391 C/o RA/i/all at lB road Dumooriio 5.5( 352 Maintenance of road & Drainage at Abotani Colony s0c Dumooriio 393 Maintenance of road & Drainage at Jilum Colony 5.5C Dumporiio. 354 Maintenance of road & Drainage & protection wall at Shanti 5.0c Colonv Dumooriio. 395 lmprovement of road & drainage at Tayek Colony 5.5t Dumooriio 396 C/o Protection wall at ADC HQ Road Dumooriio 55t 397 C/o Protection wall at Drainage at near residence of Sri 9.0c Tadam Ruoak. 398 C/o protection wall & drainage at near residence of Sri 8.0c Larpik Nalo Dumooriio. 399 /o Boundarv/ Fencino at Yatek Rioa 90c 400 C/o Approach road from BRTF road to Tourist Lodge at 6.OC Tabariio 401 Maintenance of PWD Colonv road at Maro. 3.0c 402 lmprovement of road from Mindi Putu to Lakbak Gongo 90c

403 lmprovement of road & Drainage from Tabarijo to Ronya 50c villaoe 404 Maintenance of Road & Drainage from Banyam Bridge 40c point to Haii villaqe. 405 Maintenance of Drainage from l-agbak Gongo to Depu 50c Gonoo villaoe. 406 C/o Approach road from Rumte village to Rumte primary 9.0c school 407 Maintenance of road from Baririio to Rumte villaoe. 5.0c 408 lmprovement of road at Kulo villaqe 4 0c, 409 C/o Culvert at Seoi-Gusar near Durde Lida 65C 410 maintenance of road at Segi-Gusar road near Riddi 6.00 J unction. 411 C/o Culvert at Segi-Gusar road near'O' Pont of Riddi 700 villaoe road. 412 C/o RA//all & Culvert near Bui village at Segi-Gusar Road. qqn

413 Maintenance of Approach road from lnspection Bunglow of 400 Seqi-Gusar. 414 Maintenance of WRSB at Siken Koro at Bui villaoe. 400 t\ 415 lmprovement of Approach road at Gusar C.O Office 4.00 .i HP' o"$""*at Page 18

Rs in lakh) st. Amount Roads & Public Remarks No, Housing \u*Vtarticurars Bridoes Works ,| 2 3 4 5 6 416 lmprovement of Road from Mepak Geko to Talinama. 5.00 Sub- Total (l 8124.25 0.00 0.00

il Public Works 1 Providing Hard Standing for Parking in Tawang Circuit 6.00 House. 2 l/o Sub Divisional Office buildinq for PWD Diranq 15 00 a Vlaior renovation of PWD Circle Office at Ruoa. 15 00 4 3/o Compound Wall around Circuit House at Buragaon. 500

5 l/o B/wall for Circuit House at Nafra ( L-300.00 mtr with 16.00 MS Gate) 6 C/o Staqqinq Hut at Pedunq( PH-lll). 16.00 7 C/o JE's office cum store at Khenewa under Bameng 8.00 PWD 8 C/o JE's office cum store at Lada under Bameng PWD 8.00

I Electricfication of PWD office and residential complex a 14.0C Veno under Bameno PWD. 10 C/o JE Office at Sawa under PWD Chayang Tajo Drvision. 10.0c

11 lio CO Office at Pipu 20.0c 12 Cio CO Office at Sawa. 20 00 11 C/o Compound wall for PWD Garaqe at Seppa 60c 14 l/o Protection wall and boundarv wall at Lumdunq l.B '10 00 15 lnfrastructure Development of the newly created Pakke 20 00 Kessano PWD. Division.(Phase-l) to C/o Circuit House at Pakke Kessanq. 20.00 17 C/o PWD Sub-Divisional office at Piierano. 20 0c 18 C/o New Office Building for Senior Architect of PWD at 20.00 Itanaoar 19 Cio Boys and Girls sanitation toilet at Borum Middle 5.00 school, Naharlaqun.

20 C/o PWD Enquirv Office at Kimin . '10.00 21 C/o Boundary Wall around PWD Store at Hapoli (250 00 20 00 Mtrs ). C/o Securitv fencino at Nvaoin lB 900 aa C/o Security fencing for PWD complex Sanqram '10 00 24 C/o Securitv fencinq at PWD lB Sanqram 7.00 25 C/o CO Office buildinq at Parsi Parlo 40 00 26 lio CO Office buildinq at Sarli 40.00 27 C/o PWD Sub-Division Office and Boundary wall Koduka. 10 00

28 l/o lnfrastructure buildinq at Paveno Circle 40.00 29 lnfrastructure Development of PWD Sub-Division Office 16.00 and Residential Quarters at Dollunomrrkh 30 lnfrastructure Development (Office Building) of CO Head 10.00 Quarter at Geoen CO Head C)rrarter JI l/o Rostrum at Muri -Muqli General oround. 10.00 JZ /o Boundary Wall around PWD Circuit House at 10.00 aa )/o Boundary Wall around PWD Division Office at Gensi. 12 00

34 l/o Boundarv Wall around PWD lB at Gensi 10.00 AA C/o Boundary Wall around PWD Sub-Division Office at 500 Likabali 36 Extension of 4 [four room] LB at Darak (SH:-Drawing 300 Room 1 nos ) 37 C/o Overhead water tank for 4 room l.B. at Liromoba 10 00 2a C/o Compound Wall around EE's quarter at Yomcha.SH:- 10.00 Compound wall & Steel Gate. 39 C/o Boundary Wall around PWD Division office a 10 00 Yomcha. 40 C/o Protection Wall for PWD Store, Aalo ( 3.00 m Ht-85.00 30c m). \I 41 C/o Parkinq shed at Division Office PWD. Aalo. 5.0c Plan ,,'"%S::?Xi iian'aQa( Page 19

Rs. in lakh sl. \\*\ cD /+l Amount Roads & Public Remarks No. Housing \O"#/rtieurars Bridoas Works 1 2 3 4 5 b 42 l/o Over Head Water Tank and Bore Well for Division 10 00 fffice Aalo. 43 :xtension of lB at Kavino (SH: 2 Nos VIP Suits) 40c 44 Construction of boundary Wall of PWD Division Office at 700 Mechukha (Lenoth - 40.00 Mtr) 45 Construction of boundary wall of VIP Annex & lB a 16 00 Mechukha (Lenoth -160 00 Mtr) 46 Special repair & Renovation and furnrshing of Circuit house 18.00 at Jengging including protection works, Boundary wall etc.

47 C/o Multipurpose Hall at Dewkota. 20 0c 48 Construction of 4-Room l.B for C.O HQ at Sinqa. 10.0c 49 lonstrucjion of Boundary wall for PWD LB at Miqqinq. 30c 50 /o Dinninq cum Kitchen for Nari lB. 600 /o SPT PWD store at Ruksin 15.00 52 C/o Boundary wall around PWD section office at Ruksin 10.00

EA C/o Boundary wall around PWD seciion office at Bilat. 10 0c 54 C/o Boundary wall around PWD lB at Bilat. 10.00 55 C/o Garage for Light vehicles in PWD, Division office 10 00 complex (SH: Garraqe 10 Nos). 56 Co/ Compound wall for PWD Garage/store at Mebc 10.00 (120.00 mtr) 57 C/o of boundary wall for PWD Sub-division office at Geku 640

58 C/o Boundary wall around Mariyang PWD Division office & 12 60 Sub-Division office (42o mtr) 59 C/o Boundary wall for PWD complex and lB at Geying (60C 22 00 mtr). 60 Special repair & renovation of Anini PWD Division Office 25 00 ot Furnishinq of lB at Etalin and lB at Arzoo. 7.00 6l J/o security fencing around PWD Division office to protect 10.00 rublic encroachment. 63 C/o Boundary wall around PWD Sub-Divisional Store a 10.00 Dambuk. 64 C/o boundary wall including double leaf steel gate (3 Nos.) 25.00 around the EE's residences of PWD at Tezu (Length 305 Mtrs). 65 C/o Compound wall around I B. Yealianq. 20.0c bt) C/o Boundary wall around CO Office, Sunpura 20.0c 67 C/o Boundary Wall around PWD Division Office at Khupa 10 0c

6B 40.0c

69 C/o Generator room / Sub-station building at Circuit House 10 00 at Namsai. 7n Up-gradation of lnfrastructure of Community Hall at 10.00 Namsai Township. 71 C/o Communitv Hall at Namsai Circle. 10 00 72 C/o Community Hall at Piyonq Circle 10.00 C/o Communitv Hall at Lathao Circle. 10 00 74 Clo Boundary wall around PWD Sub-Division & Staf 20.00 quarter at Deomali, in Tirap District. AP. 75 Replacement of old timber structure & roofing for lB a 10 00 Soha, in Tirap District, AP. /6 C/o PWD lB at Katanq CO HQ Bari-Bisip Circle. 30 00 77 C/o Boundary wall, Approach road, Garage, etc., for SE's 20.00 quarter at Khonsa, in Tirap District. AP. 78 C/o Protection wall and Storm water Drain for Auditorium at 25.00 Borduria. in Tirap District. AP. Sub- Total {ll 0.00 1076.00 0.00 ilt Housinq n 1 lonstruction of Residential building for Tawang PWD 56.00 iY itfsle ( Sh -T-lV - 1 Nos ,T-lll- 4 Nos , T-il 4 Nos ) ,,u",o'.is;1;.rfl""' Page 20

trEffi (Rs. in lakh st. Amount Roads & Public Remarks No. Housing Q\@#'rticurars Bridoes Works 1 \

1B C/o B/wall around AE PWD Qtr at Nafra ( t-120.00 mtr) 10.00

19 C/o Bachelor Brrack 2 unjts ( for WC staff at Nafra). 12 00 20 C/o Semi RCC Building Type-V building for Executive 16 00 Enqineer Qtr i/c furnishinq. 21 C/o Type-ll 4 units for GA Department at Chayang Tijo 9.00

22 C/o Staff quarters for GA Department at pipu (Sh:- fype- 40.00 lV, 1 No; Type-lll,2 Nos; Type-il,3 Nos; 8 Men Bachelor Barrack- 1 unit). z3 quarters C/o Staff for GA Department at Sawa 1Sn:- fy@ 30.00 lV, 1 No; Type-lll,2 Nos; Type-il,3 Nos; B Men Bachetor Qarrack- 1 unit). 24 C/o Residential Qtrs for Pijerang pWD Sub Oivision(Sn:_ 20.00 Ty-lV-1 No, Tvpe-lll-1 No, Tvoe-ll-3Nos) )q C/o T-lV Qtr for PWD Executive Engineer ai pakke 10 00 Kessanq. 26 l/o T-lllglr for JE PWD at Taja Happa in passa vallev. 10.00 27 Clo Residential Qtrs for pWD Division at pakke 20.00 Kessanq(sh:- Tv-lV-1 No, Type-ll l-2Nos, Tvpe_ll_2Nos). 28 C/o Bqcholor Barrack at Baliian LB for Cook. 10.00 29 Clo Bacholor Barrack at Balijan Circuit House for 10 00 Chowkidar. 30 C/o Bacholor Barrack at Taraso l.B for Cook. 12 0C 31 C/o Bacholor Barrack at Sanqdupota l.B for Cook 12 00 -tl C/o Bacholor Barrack at Sangdupota LB for Chowkidar 12 00

JJ C/o Bacholor Barrack at Kakoi l.B for Cook 12.00 34 C/o Bacholor Barrack at Kakoi l.B for Chowkidar. 12.00 35 C/o Security Wall for EE residence at Sanqram 23 0C 36 C/o T-lV Qtr for PWD at Siqnyorianq, Kolorianq. 40 0c C/o Residential Buildinq at Koduka for pWD staff 10.0c 3B C/o PWD EE Residential Building T- lV and Boundary wal 16 0C at Nacho. 39 C/o Double Storied Bui;ding Type-lll etr for Junior 14.00 Enqineers at Gensi (4 units) 40 l/o Type-lll Qtr for Junior Enqineer at Kanqku 1 No 4.00 41 Jlo T1, 2 nos for Staff at PWD Sub-Division Darak 600 42 l/o Semi RCC T-V Quarter for EE Aalo. 800 43 lnfra-Structure Development of Kodum CO Hq ( SH- SpT- 8.40 T-ll- 1 No and 4- Men B/barrack- i No.).

,nr""*'Js:i"X;tu*' Zo DeoN. PaPeage 21

*fi-,'wlQ in lakh \ llut t-lt Amount sl. Roads & Public Remarks No. Housing $@/T"rticurars Bridqes Works 'l -=*.Y' 2 3 4 5 6 44 l/o Tvoe-ll Otr for.iE at Rumoono 10.00 45 /o Tvoe-lll Qtr. for AE at Kavino. 4.00 46 /o 4-men bachelor barrack at Kavinq 6.00 47 Completion of balance work of SPT-lll Qtr -1 No for JE at 10 00 Tato. 4B C/o RCC double stroied Type-lll - 1 block (4 units) for GA 28.00 Deott at Yinokiono 49 C/o Resdl.Bldg T-lll-1 No for Junior Engineer, PWD al 15 00 Kora 50 C/o Bachelor Barrack for PWD Staff at Kora. 16.00 51 3/o SPT-IV Ouarter for AE PWD at Bilat 500 E' C/o Comoound wall for AE.PWD Quarter at Mebo. 10 0c 53 C/o Compound wall for JE,PWD Quarters at Mebo 10 00 54 CloT-l-2 Nos for Enoo. Deott. At Geku 6.40 EC C/o Bachelor barrack for PWD staff at Marivanq 5 unit 80c 56 C/o SPT 4 men Bachelor barrack for PWD staff at Geying. 6.40

57 C/o T-lV-1No for Circle Officer at Anilieh(GA) 18 00 5B Special Repair and renovation of 3 units Bachelor Barracl 15.00 at Anilieh. 59 C/o Barrack for Drivers at Circuit House at Namsai. 12 00 60 C/o RCC residential buildings for Bordumsa ADC HQ (SH 20.00 T- lll- 2 Nos). ot C/o RCC residential buildings for Diyun EAC HQ (SH: T- lll 20.00 2 Nos). oz C/o Residential Building for EAC alLazu, in Tirap District, 20 00 AP. (SH: Tvoe V - l No ) 63 C/o Residential Building for GA department at Borduria, in 20 00 Tirao District AP (SH: Tvoe lll - 2 Nos.) 64 C/o Residential building for JE, PWD at Borduria (SH: T- lll 10.00 1 No) Sub-Total (llll 0.00 0.00 874.60 Total (D) 8124.25 1076.00 874.60

E 3udqet Announcement

1 Jp-qradation of ATI buildinqs 00c 1000.00 2 )istrict Secretariat Buildinos 00c 000 5000 00 J l/o Arunachal Bhawan at New Delhi 0.0c 4800.0c 4 lemodilinq of APPSC 0.0c 500 00 5 Jp-gradation ofArunachal House and Arunachal Bhawan 0.00 500 00

6 l/o Guest House at Guwahati 00c 1000.00 7 Survey and lnvestigation for East West lndustrial Corridor. 000 000 1 800 00

Total (E) 0.0c 7800.00 6800"00

F State Share towards CSSs

1 RIDF 1626 43 Release of state share is subject to actual release of fund from NABARD. Department shall furnish scheme- wise allocation of state share for approval of State Govt.

Total (F) 1626.43 0_00 0.0c

G Central/Centrallv Sponsored Schemes(CSSs) CRF

1 - Margherita (37.48 km) in the State o' 835 Arunachal Pradesh. 2 lmprovement of Road from Kamengbari tc 400 00 r\\) doimara(length=23.00Km) in the state of Arunacha "* Pradesh under CRF. a p\a$ \a^*;.; ,,{"cE:i[r:$ Page 22

*d*ffi Rs. in lakh sl. \ (JDJJL[! l-Jl Amount r+\ / +Afticutars Roads & Public Remarks No. Housing VaYTi}4V Bridoes Works 'l XgeIY 2 3 4 5 6 J lmprovement of Road from Tenga to Foot Hill vie 400.00 Chackoo(length=20.500Km) in the state of Arunacha Pradesh under CRF. 4 C/o Nakhu to Ditchik Road including Bridge over Bichon 400.00 river(L='1 1.00Km) (span-50m) in AF under Bomdila Division under CRF. Job No. CRF/Ar.Pi201 4-1 5162

5 C/o Road from Lechin to Dilrijo(7.00Km) in the state ol 100 00 Arunachal Pradesh under CRF Job No. CRF/Ar.P/201 4-15167 6 C/o Basar-Sago PMGSY road to newly created Circle 300.00 Head Quarler at Sago Piri in West Siang( length=S.95Km) under Basar Division in the State of Arunachal Pradesh under CRF. Job No. CRF/Ar.P/20'l 4-1st64 7 J/o Approach road to Model Degree college, Basar 300.00 ,Length=S 58Km) in the state of Arunachal Pradesh under ]RF Job No. CRF/Ar.P/201 4-15165 8 C/o Motorable Bridge over Siyom river at Bene (span- 350 00 120m) unde Aalo Division in the State of Arunachal Pradesh under CRF. Job No. CRF/Ar.Pi201 4-15163 I Development of lnfrastructure at ADC 300.00 Hq.(10 00Km)(Sh:-CC Pavement) in the state of Arunachal Pradesh under CRF. 10 C/o Bridge over river Pare to connect Resing & Tabio 200 00 village from Leporiang (100 mtrs) in Papum Pare District in Arunachal Pradesh. Job No. CRF/Ar.P/201 5-1617 O 11 C/o Joru to Pachang Road in Kra-Daadi District (7 00km) 250.00 under CRF in the State of Arunachal Pradesh. Job No. CRF/Ar.P/2015-'t 6i73

12 C/o of Tirbin Township road (0-7km)(Sh:- F/C, Soting, 100.0c Metalling, Carpeting, R/wall, Culverts etc) under CRF in the State of Arunachal Pradesh. Job No. CRFiAT.P/201 5-1 617 1 13 C/o of road and drains in and around Mechuka Township 200.0c under CRF in the State of Arunachal Pradesh. Job No. CRF/Ar.Pi201 5-16177

14 Road infrastructure development of Rumgong ADC Hq 300 00 Town(7.OOkm) under CRF in the State of Arunachal Pradesh. Job No. CRFiAT.P/201 5-16172 15 C/o RCC Bridge over Sille river on Mirem-Mikong-Jonai 200 00 road under CRF in Arunachal Pradesh. Job No-CRF/A r.P I 201 5-1617 4 tb C/o Road from Jarkong to Gumin Nagar, Pasighat under 300 00 Pasighat township road in (Sh:- Embankment, cross drainage and pavement) under CRF in the State ofArunachal Pradesh. Job No. CRF/Ar.P/201 5-'1617 5

17 C/o Road from Old Lawang to Jagthung in Tirap Distric' 350.00 under CRF in the State of Arunachal Pradesh. Job No. CRFiAT.P/201 5-'t 6i76. 1B C/o Road from Pine Grove to Dilopolyang(Stage-ll) under 150.00 Ziro Sub-Division in in the State of Arunachal Pradesh. h 1;r (Job No. CRF/Ar.P/2015-16/78) -v

,,r"oto-"'i?X'Jtu*' oo$"laoar Page 23 Zo uepaN

69=,,tmX) s. rn lakh) sl. l{d{ lifilr l-}l Amount f llilarncutarc Roads & Public Remarks No. \.\ Cfr Housing \f*.""'/nJ/ Bridoes Works 1 N?aoar \DZ 2 3 4 5 b 19 C/o PermanEifBridge over Nyamjang Chu at Namtsering 75 00 under Lumla Sub-Division of of Aruanchal Pradesh.

Job. No.C RF/A r.P I 20 1 6 -17 I gO zlt C/o Approach road to Bomja waterfall including steel 100 00 composite bridge in Tawang District in the State of Arunachal Pradesh. Job.No.CRF/Ar.P 12016-17 I8O 21 C/o Steel composite bridge over river Tawangchu on Lhou 75.00 Nallah to Mukto Road(Span 80m) in Tawang District of Arunachal Pradesh Job.No.CRF/A r.P I 201 6-17 17 9

C/o Approach Road from Nafra-Bichom road to Orgyen 100.00 Guru North East Nallanda Monastary in West Kameng District of Arunachal Pradesh. Job.No.CRF/Ar.P I 2016-17 194 aa Cio Road from Tuluhi to Dizamgania via Kayavalley in 50 00 West Kameng Dsistrict in the State of Arunachal Pradesh.

Job. No.C RF/A r.P I 20 1 6 -17 I 86

24 C/o 3 Nos of RCC Bridges & improvement of road from 100 0c Yingkiong to BRTF road near VKV Ramsing in in Arunachal Pradesh. Job.No. CRF/Ar.P/201 6-17 182

lmprovement of Nari (length-3.50km)(Sh: Embankment, 19'1 65 pavement, S/culverts, and side drain) under CRF in East Siang District in the State of Arunachal Pradesh

Job. No.C R F/A r.P I 2O 1 6 -17 I 81 26 C/o Steel composite bridge over river Sissar at 14.O0km in 50 00 Dambuk-Paglam Road in Lower in

Arunachal Pradesh. Job.No.CRF/A r.P I 2O,l 6-17 192 z/ lmprovement of Hunli Township road in Lower Dibang 100 00 Valley District in Arunachal Pradesh. Job.No.CRF/A r.P I 2016-17 187 28 Cio Various roads and bridges under Lekang Circle, 200 00 Namsai in the State of Arunachal Pradesh.

Job. No.C RFiA r.P I 20'l 6 -'17 I 85 29 l/o Road from Nongsaya to Mekang Miri in Namsai District 200.00 rfArunachal Pradesh.

J ob. No.C R F/A r.P I 2O1 6 -17 I 88 30 lmprovement of Chongkham Township road (10km) in 200.00 Namsai District in the State of Arunachal Pradesh. Job.No.CRF/A r.P I 2O'l 6-17 184 31 C/o Double lane RCC Bridge over river Tirap at Changlang 50 00 Town in of Arunachal Pradesh.

Jo b.N o.CR F/A r.P I 201 6 -17 I 89

32 C/o Namsang-Khela Road(Ch 27.00-48.00=21.00km) in 100.00 Tirap District of Arunachal Pradesh. Job.No.CRF/Ar.P 12016-17 191 JJ C/o 3 Nos RCC bridges in between the road of CO HQ 50 00 Dadam to Muktowa village in Tirap District of Arunachal Pradesh.

Job. No.C RF/A r.P I 20 1 6 -17 I 93 34 C/o RCC double lane bridge(span-45mtr) and road from 50 00 BRTF road to Layang via SDO Headquarter Sangram(6.00km) in of Arunachal Pradesh Job.No.CRFiA r.P 12016-17 196 35 :i/o road from Yangte to Nyoing via Ringte(lengtl- 100.0c 5.00km)(Ph-ll) in the State of Arunachal Pradesll A

Jo b. No.C R F/Ar.P I 20 1 6-'17 I 83 v

,n""3Jf,,:j5;;'u*, Rs. in lakh

Yargapchu to connect Singbir village (span-160 mtr) in West Siang District of Arunachal Pradesh.

J o b. N o. C R F/A r.P I 20 I 6 -'l 7 I 9 5 Extension of Township road at Khonsa in Tirap Distt. HQ in State of Arunachal Pradesh.