ग्रामामीण आध्रारभरभूत व विक्रास न निनध / Rural Infrastructur
Total Page:16
File Type:pdf, Size:1020Kb
Ongoing proejcts ग्रामामीण आध्रारभरभूत व विक्रास ननिनध/ RURAL INFRASTRUCTURE DEVELOPMENT FUND च्रालरभू पररयोज नि्राओं क्रा वविविरण/ DETAILS OF ONGOING PROJECTS की स्锿नत/ POSITION AS ON : 30 June 2015 (` Lakh) क्राय्रा봾 निन वियनि परयोज नि्राओं के नि्राम ् विामीक啃नत परभूण봾 हो निे की संभ्राव वित ग्राँ वि/ त्रालुक्रा/ बल쥉क व विभ्राग/ आह्राररत र्रानि/ सं॰कं॰/ खेप / त锿्रा व वि विरण / ऋण / RIDF 餿न नि्रांक/ नतन锿 / सेकटर/ Sector सिल्रा/ District (//Village Taluka Bl वपक सं / PIC No. Implementin AMT. Sr.. No Tranche Project Name & LOAN DATE OF EXPECTED DATE ock) g DRAWN Details SANCTION OF COMPLETION Department सड़कᴂ / Roads ROADS Lower Dibang Valley Hunli XII R120900015 Hunli Desali road PWD(EZ) 1391.74 20 March 07 31-Dec-13 1391.74 1 By-pass Road from Papunallah to Itanagar ROADS Papumpare Doimukh XII R120900014 PWD(WZ) 388.57 20-Mar-07 31-Dec-13 93.00 via Donyi Polo Bhawan 2 road Improvement of ROADS Changlang Changlang XII R120900011 Nampong-Rima putak PWD(EZ) 533.25 07 Feb. 07 31-Dec-13 533.14 3 road PWD IB to Bali in ROADS East Kameng Seijosa XII R120900003 PWD(WZ) 1009.9 03 Aug.06 31-Dec-13 1009.90 4 Seijosa Ring road and Bridge at ROADS Tawang Zemithang XII R120900006 PWD(WZ) 821.63 03 Aug. 06 31-Dec-13 608.87 Zemithang 5 Road from Seppa- ROADS East Kameng Bameng XII R120900007 PWD(WZ) 203.55 03 Aug. 06 31-Dec-13 203.55 Chayangtajo to Bameng 6 Rural Road Shyaro- ROADS Tawang Tawang XIII R130900002 PWD(WZ) 761.34 4-Feb-08 31-Mar-13 605.00 7 Jangda Rural Road Yangte to ROADS Kurung Kumey Tali XIV R140900001 PWD(CZ) 1180.24 02 Dec.08 31-Mar-14 1128.80 8 Tali (Phase – II) Rural Road from 16km point on Bomdila-Dirang ROADS West Kameng Dirang XIV R140900002 PWD(WZ) 369.77 02 Dec. 09 31-Mar-14 369.77 to Salari-Nafra (Phase – II) 9 Road from Yattap to Yom 40 km ( Phase I, 0.00 km to 7.00 km) ROADS Lower Subansiri Yattap XIV R140900007 PWD(CZ) 360 02 Feb.09 31-Mar-14 357.71 SH : S & L Fc, Kutcha Side Drain& Slab culverts) 10 Page 1 Ongoing proejcts Rural Road Yazali to ROADS Lower Subansiri Ziro II XIV R140900008 Mengio (58.00 km) – PWD(CZ) 1158.89 02 Feb. 09 31-Mar-14 1158.62 11 Phase- II Pasighat-Pangin Road - Maintenance & Up- ROADS East Siang Pasighat-Pangin XV R150900001 PWD(EZ) 225 28 July 09 31-Mar-14 196.00 keeping (sector 28 to 76 km) 12 C/O Road from NH-52 BRO road to Bhekuliang Village, 16.187 km (SH: Raising of existing road ROADS Lohit Bhekuliang XV R150900002 formation, WBM-I, PWD(EZ) 590.49 28 Oct. 09 31-Mar-14 555.33 WBM-II, WBM-III Black topping and Culvert) under RIDF XV Phase I 13 Road from Koloriang to ROADS Kurung Kumey Koloriang XV R150900006 Damin via Parsi Parlo- PWD(CZ) 3111.12 28.01.2010 31-Mar-14 3040.15 (Part-II of Phase-I) 14 Const. of road from Langyar Hogu to Tali ROAD Kurung Kumey XIX PWD (CZ) 1350.00 1215.00 ADC HQ, (6.950 km) 15 Tali (Ph.III) 31. July 2013 31-Mar-16 Const. of road from ROAD Lower Subansiri XIX Pine-grove to Siro PWD (CZ) 900.00 432.00 (Outer Ring Road) Ziro 16 Siro 31. July 2013 31-Mar-16 Const. of road from ROAD East Kameng XIX Pakoti to Richa village PWD (WZ) 862.34 258.70 17 Richa (10.00km) 31. July 2013 31-Mar-16 Const. of road from 73 km point on Hunli - ROAD Dibang Valley XIX PWD (EZ) 900.00 300.00 Anini BRTF Road to 18 Hunli Anelieh 31. July 2013 31-Mar-16 Construction of Road ROAD Lohit XIX from Namsai to Jaipur PWD (EZ) 720.90 545.96 i/c RCC Bridge 19 Namsai 31. July 2013 31-Mar-16 Const. of road from ROAD West Siang XIX PWD (CZ) 1229.40 590.11 20 Riumgong Patum to Rumgong 31. July 2013 31-Mar-16 Const. of road from ROAD East Kameng XIX Chayangtajo at Sangchu- PWD(WZ) 686.21 30 Aug. 2013 489.60 Solung - Phase I 21 Chayangtajo 31-Mar-16 Const. of road from ROAD Papumpare XIX Balijan to Taraso - Phase RWD 1350.00 30 Aug. 2013 931.50 I (upto Ramghat 14 km) 22 Balijan 31-Mar-16 Const. of road (PWD ROAD . XIX road) 15th km road to RWD 1422.44 04 Sep.2013 981.49 23 Khayate Khayate village 31-Mar-16 Page 2 Ongoing proejcts Const. of road from ROAD Papumpare XIX PWD road (Pareng) to RWD 1877.68 04 Sep.2013 1295.60 Seema - Gangtung 24 Pareng 31-Mar-16 Infrastructure development of road ROAD Upper Subansiri XIX Koduka ADC PWD(CZ) 900.00 01 Oct. 2013 243.00 headquarters at Pgnato 25 Koduka Koduka 31-Mar-16 Const. of road from ROAD Lower Subansiri XIX Yaglu village to Pistana PWD(CZ) 449.10 01 Oct. 2013 215.57 26 Yaglu circle HQ 31-Mar-16 Const. of approach road ROAD West Kameng XIX to ADC HQ at PWD(WZ) 429.30 01 Oct. 2013 128.79 Kalaktang (Phase-I) 27 Kalaktang 31-Mar-16 Const. of road from ROAD West Kameng XIX PWD(WZ) 601.20 01 Oct. 2013 288.48 Subu to Tania village 28 Subu, Tania 31-Mar-16 Const. Of road from Yakshi village to Deku ROAD East Siang XIX PWD(CZ-B) 450.00 10/2/2014 135.00 & Dabuk village (Phase- 29 Dabuk Village I) 31-Mar-16 Const. Of Ring Road in ROAD Tawang XIX PWD(WZ) 900.00 10/2/2014 432.00 Tawang Dist. 30 Tawang 31-Mar-16 Extension & ROAD East Kameng XIX Improvement of Pangin PWD(CZ-B) 348.30 31/03/2014 104.49 Township Road 31 Pangin 31-Mar-16 C/O road from new ROAD Namsai XX Jenthu to Jona-III in PWD 27/03/2015 32 Namsai District 599.40 31-Mar-18 179.82 C/O road from Emphum to Ingo via ROAD XX PWD 27/03/2015 Namsai Tingua and Insa in 33 Namsai District 1260.00 31-Mar-18 378.00 पुल / Bridges Steel bridge over river BRIDGES West Siang Basar XII R120900010 PWD(CZ) 376.65 07 Feb.07 31-Dec-13 376.65 Kidi Basar & Nyodu 1 RCC Bridge on Sisiri BRIDGES Lower Dibang Valley Dambuk XII R120900009 river at Dambuk-Paglam PWD(EZ) 2200.32 07 Feb.07 31-Dec-12 2200.32 Road 2 Pha bridge over River Kumey in between Dahill top to Gangte BRIDGES Kurung Kumey Gangte XIV R140900009 PWD(CZ) 1363.14 02 Feb. 09 31-Mar-12 1232.96 Circle (SH: Motorable Suspension Bridge - 160.00 mtr span) 3 Page 3 Ongoing proejcts Bailey Bridge over River Para at CH : 1 km on BRIDGES East Kameng Sana XIV R140900011 Para Holing to Sawa CO PWD(WZ) 444.01 02 Feb. 09 31-Mar-14 444.01 HQ Road (Span - 60 mtr) 4 Motorable Bailey Suspension Bridge over BRIDGES Upper Subansiri Nacho XV R150900005 PWD(CZ) 973.8 28 Oct. 09 31-Mar-14 957.19 River Subansiri at Nacho (Span – 126.00 mtr) 5 Bridge over River BRIDGES Kurung Kumey Yangte XVII R170900001 PWD(CZ) 898.46 04 Oct. 12 31.03.2014 367.42 6 Kamala BRIDGES Kurung Kumey Yangte XVII R170900002 Bridge over River Tus PWD(CZ) 87.99 04 Oct. 12 31.03.2014 87.99 7 C/o road from 7th km point of NH-52 to BRIDGE Lohit XIX Mimey village -SH:Steel PWD (EZ) 372.76 208.92 bridge over river Tiyang (60.00 m span) 8 Mimey 31. July 2013 31-Mar-16 Const. of steel arch bridge over river Yamne BRIDGE Upper Siang XIX at Parak on road from PWD(EZ) 581.40 30 Aug. 2013 279.07 Katan to Padu (Span - 90 mtr.) 9 Katan, Padu 31-Mar-16 Const. of steel bridge over Panyor river at BRIDGE Papumpare XIX RWD 630.00 30 Aug. 2013 434.70 Komasaki (span 80.00 10 Komasaki mtr) 31-Mar-16 Const. Of Bridge over River Kabung on Dosing-Pareng-Yibuk- BRIDGE East Siang XIX PWD(CZ-B) 540.00 31/03/2014 162.00 Ligging Road, (Span- 40.00 mtrs.) at Chainage 20.74 km 11 Dosing 31-Mar-16 Const. Of Steel Girder Bridge over river Panior BRIDGE Papumpare XIX PWD(WZ) 540.00 31/03/2014 162.00 on Sagalee-Sakiang Road (Span-75.00 mtr) 12 Sagalee 31-Mar-16 Const. Of Steel Girder BRIDGE Lower Subansiri XX composite Bridgeover PWD (CZ) 27/02/2015 river Dollung at Paro 13 1035.00 31-Mar-18 310.50 Const of Bridge/culverts on NH- 52 BRTF Road to BRIDGE Lohit XX Bhekuliang Tezu, SH: PWD 18/03/2015 Steel Composite Bridge over river Haju 14 in Lohit 668.01 31-Mar-18 200.40 Page 4 Ongoing proejcts क啃वि संबंधामी/ Agri- related 1 POWER Palin Choba XIII R130900001 Pagu Mini Hydel HPD 2160.3 04 Feb. 08 31-Mar-14 1880.36 Flood Management OTHERS Anjaw Hawai XIV R140900004 Scheme in and around WRD 1143.73 02 Feb.