ग्रामामीण आध्रारभरभूत व विक्रास न निनध / Rural Infrastructur

ग्रामामीण आध्रारभरभूत व विक्रास न निनध / Rural Infrastructur

Ongoing proejcts ग्रामामीण आध्रारभरभूत व विक्रास ननिनध/ RURAL INFRASTRUCTURE DEVELOPMENT FUND च्रालरभू पररयोज नि्राओं क्रा वविविरण/ DETAILS OF ONGOING PROJECTS की स्锿नत/ POSITION AS ON : 30 June 2015 (` Lakh) क्राय्रा봾 निन वियनि परयोज नि्राओं के नि्राम ् विामीक啃नत परभूण봾 हो निे की संभ्राव वित ग्राँ वि/ त्रालुक्रा/ बल쥉क व विभ्राग/ आह्राररत र्रानि/ सं॰कं॰/ खेप / त锿्रा व वि विरण / ऋण / RIDF 餿न नि्रांक/ नतन锿 / सेकटर/ Sector सिल्रा/ District (//Village Taluka Bl वपक सं / PIC No. Implementin AMT. Sr.. No Tranche Project Name & LOAN DATE OF EXPECTED DATE ock) g DRAWN Details SANCTION OF COMPLETION Department सड़कᴂ / Roads ROADS Lower Dibang Valley Hunli XII R120900015 Hunli Desali road PWD(EZ) 1391.74 20 March 07 31-Dec-13 1391.74 1 By-pass Road from Papunallah to Itanagar ROADS Papumpare Doimukh XII R120900014 PWD(WZ) 388.57 20-Mar-07 31-Dec-13 93.00 via Donyi Polo Bhawan 2 road Improvement of ROADS Changlang Changlang XII R120900011 Nampong-Rima putak PWD(EZ) 533.25 07 Feb. 07 31-Dec-13 533.14 3 road PWD IB to Bali in ROADS East Kameng Seijosa XII R120900003 PWD(WZ) 1009.9 03 Aug.06 31-Dec-13 1009.90 4 Seijosa Ring road and Bridge at ROADS Tawang Zemithang XII R120900006 PWD(WZ) 821.63 03 Aug. 06 31-Dec-13 608.87 Zemithang 5 Road from Seppa- ROADS East Kameng Bameng XII R120900007 PWD(WZ) 203.55 03 Aug. 06 31-Dec-13 203.55 Chayangtajo to Bameng 6 Rural Road Shyaro- ROADS Tawang Tawang XIII R130900002 PWD(WZ) 761.34 4-Feb-08 31-Mar-13 605.00 7 Jangda Rural Road Yangte to ROADS Kurung Kumey Tali XIV R140900001 PWD(CZ) 1180.24 02 Dec.08 31-Mar-14 1128.80 8 Tali (Phase – II) Rural Road from 16km point on Bomdila-Dirang ROADS West Kameng Dirang XIV R140900002 PWD(WZ) 369.77 02 Dec. 09 31-Mar-14 369.77 to Salari-Nafra (Phase – II) 9 Road from Yattap to Yom 40 km ( Phase I, 0.00 km to 7.00 km) ROADS Lower Subansiri Yattap XIV R140900007 PWD(CZ) 360 02 Feb.09 31-Mar-14 357.71 SH : S & L Fc, Kutcha Side Drain& Slab culverts) 10 Page 1 Ongoing proejcts Rural Road Yazali to ROADS Lower Subansiri Ziro II XIV R140900008 Mengio (58.00 km) – PWD(CZ) 1158.89 02 Feb. 09 31-Mar-14 1158.62 11 Phase- II Pasighat-Pangin Road - Maintenance & Up- ROADS East Siang Pasighat-Pangin XV R150900001 PWD(EZ) 225 28 July 09 31-Mar-14 196.00 keeping (sector 28 to 76 km) 12 C/O Road from NH-52 BRO road to Bhekuliang Village, 16.187 km (SH: Raising of existing road ROADS Lohit Bhekuliang XV R150900002 formation, WBM-I, PWD(EZ) 590.49 28 Oct. 09 31-Mar-14 555.33 WBM-II, WBM-III Black topping and Culvert) under RIDF XV Phase I 13 Road from Koloriang to ROADS Kurung Kumey Koloriang XV R150900006 Damin via Parsi Parlo- PWD(CZ) 3111.12 28.01.2010 31-Mar-14 3040.15 (Part-II of Phase-I) 14 Const. of road from Langyar Hogu to Tali ROAD Kurung Kumey XIX PWD (CZ) 1350.00 1215.00 ADC HQ, (6.950 km) 15 Tali (Ph.III) 31. July 2013 31-Mar-16 Const. of road from ROAD Lower Subansiri XIX Pine-grove to Siro PWD (CZ) 900.00 432.00 (Outer Ring Road) Ziro 16 Siro 31. July 2013 31-Mar-16 Const. of road from ROAD East Kameng XIX Pakoti to Richa village PWD (WZ) 862.34 258.70 17 Richa (10.00km) 31. July 2013 31-Mar-16 Const. of road from 73 km point on Hunli - ROAD Dibang Valley XIX PWD (EZ) 900.00 300.00 Anini BRTF Road to 18 Hunli Anelieh 31. July 2013 31-Mar-16 Construction of Road ROAD Lohit XIX from Namsai to Jaipur PWD (EZ) 720.90 545.96 i/c RCC Bridge 19 Namsai 31. July 2013 31-Mar-16 Const. of road from ROAD West Siang XIX PWD (CZ) 1229.40 590.11 20 Riumgong Patum to Rumgong 31. July 2013 31-Mar-16 Const. of road from ROAD East Kameng XIX Chayangtajo at Sangchu- PWD(WZ) 686.21 30 Aug. 2013 489.60 Solung - Phase I 21 Chayangtajo 31-Mar-16 Const. of road from ROAD Papumpare XIX Balijan to Taraso - Phase RWD 1350.00 30 Aug. 2013 931.50 I (upto Ramghat 14 km) 22 Balijan 31-Mar-16 Const. of road (PWD ROAD . XIX road) 15th km road to RWD 1422.44 04 Sep.2013 981.49 23 Khayate Khayate village 31-Mar-16 Page 2 Ongoing proejcts Const. of road from ROAD Papumpare XIX PWD road (Pareng) to RWD 1877.68 04 Sep.2013 1295.60 Seema - Gangtung 24 Pareng 31-Mar-16 Infrastructure development of road ROAD Upper Subansiri XIX Koduka ADC PWD(CZ) 900.00 01 Oct. 2013 243.00 headquarters at Pgnato 25 Koduka Koduka 31-Mar-16 Const. of road from ROAD Lower Subansiri XIX Yaglu village to Pistana PWD(CZ) 449.10 01 Oct. 2013 215.57 26 Yaglu circle HQ 31-Mar-16 Const. of approach road ROAD West Kameng XIX to ADC HQ at PWD(WZ) 429.30 01 Oct. 2013 128.79 Kalaktang (Phase-I) 27 Kalaktang 31-Mar-16 Const. of road from ROAD West Kameng XIX PWD(WZ) 601.20 01 Oct. 2013 288.48 Subu to Tania village 28 Subu, Tania 31-Mar-16 Const. Of road from Yakshi village to Deku ROAD East Siang XIX PWD(CZ-B) 450.00 10/2/2014 135.00 & Dabuk village (Phase- 29 Dabuk Village I) 31-Mar-16 Const. Of Ring Road in ROAD Tawang XIX PWD(WZ) 900.00 10/2/2014 432.00 Tawang Dist. 30 Tawang 31-Mar-16 Extension & ROAD East Kameng XIX Improvement of Pangin PWD(CZ-B) 348.30 31/03/2014 104.49 Township Road 31 Pangin 31-Mar-16 C/O road from new ROAD Namsai XX Jenthu to Jona-III in PWD 27/03/2015 32 Namsai District 599.40 31-Mar-18 179.82 C/O road from Emphum to Ingo via ROAD XX PWD 27/03/2015 Namsai Tingua and Insa in 33 Namsai District 1260.00 31-Mar-18 378.00 पुल / Bridges Steel bridge over river BRIDGES West Siang Basar XII R120900010 PWD(CZ) 376.65 07 Feb.07 31-Dec-13 376.65 Kidi Basar & Nyodu 1 RCC Bridge on Sisiri BRIDGES Lower Dibang Valley Dambuk XII R120900009 river at Dambuk-Paglam PWD(EZ) 2200.32 07 Feb.07 31-Dec-12 2200.32 Road 2 Pha bridge over River Kumey in between Dahill top to Gangte BRIDGES Kurung Kumey Gangte XIV R140900009 PWD(CZ) 1363.14 02 Feb. 09 31-Mar-12 1232.96 Circle (SH: Motorable Suspension Bridge - 160.00 mtr span) 3 Page 3 Ongoing proejcts Bailey Bridge over River Para at CH : 1 km on BRIDGES East Kameng Sana XIV R140900011 Para Holing to Sawa CO PWD(WZ) 444.01 02 Feb. 09 31-Mar-14 444.01 HQ Road (Span - 60 mtr) 4 Motorable Bailey Suspension Bridge over BRIDGES Upper Subansiri Nacho XV R150900005 PWD(CZ) 973.8 28 Oct. 09 31-Mar-14 957.19 River Subansiri at Nacho (Span – 126.00 mtr) 5 Bridge over River BRIDGES Kurung Kumey Yangte XVII R170900001 PWD(CZ) 898.46 04 Oct. 12 31.03.2014 367.42 6 Kamala BRIDGES Kurung Kumey Yangte XVII R170900002 Bridge over River Tus PWD(CZ) 87.99 04 Oct. 12 31.03.2014 87.99 7 C/o road from 7th km point of NH-52 to BRIDGE Lohit XIX Mimey village -SH:Steel PWD (EZ) 372.76 208.92 bridge over river Tiyang (60.00 m span) 8 Mimey 31. July 2013 31-Mar-16 Const. of steel arch bridge over river Yamne BRIDGE Upper Siang XIX at Parak on road from PWD(EZ) 581.40 30 Aug. 2013 279.07 Katan to Padu (Span - 90 mtr.) 9 Katan, Padu 31-Mar-16 Const. of steel bridge over Panyor river at BRIDGE Papumpare XIX RWD 630.00 30 Aug. 2013 434.70 Komasaki (span 80.00 10 Komasaki mtr) 31-Mar-16 Const. Of Bridge over River Kabung on Dosing-Pareng-Yibuk- BRIDGE East Siang XIX PWD(CZ-B) 540.00 31/03/2014 162.00 Ligging Road, (Span- 40.00 mtrs.) at Chainage 20.74 km 11 Dosing 31-Mar-16 Const. Of Steel Girder Bridge over river Panior BRIDGE Papumpare XIX PWD(WZ) 540.00 31/03/2014 162.00 on Sagalee-Sakiang Road (Span-75.00 mtr) 12 Sagalee 31-Mar-16 Const. Of Steel Girder BRIDGE Lower Subansiri XX composite Bridgeover PWD (CZ) 27/02/2015 river Dollung at Paro 13 1035.00 31-Mar-18 310.50 Const of Bridge/culverts on NH- 52 BRTF Road to BRIDGE Lohit XX Bhekuliang Tezu, SH: PWD 18/03/2015 Steel Composite Bridge over river Haju 14 in Lohit 668.01 31-Mar-18 200.40 Page 4 Ongoing proejcts क啃वि संबंधामी/ Agri- related 1 POWER Palin Choba XIII R130900001 Pagu Mini Hydel HPD 2160.3 04 Feb. 08 31-Mar-14 1880.36 Flood Management OTHERS Anjaw Hawai XIV R140900004 Scheme in and around WRD 1143.73 02 Feb.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us