Page 1

Annexure-'A' GOVERNMENT OF FINANCE, PLANNING & INVESTMENT DEPARTMENT (PLANNTNG & TNVESTMENT DTVTSTON) A.P. CIVIL SECRETARIAT::

Annual Development Agenda, 2017 -18

Department: Publlic Works Department Rs. in lak Amount st. Particulars Roads & Public Remarks No. Housing Bridoes Works

1 2 3 4 5 6 I Normal Developmental Activities A. >re-Budqet surrender I Roads & Bridqes I l/o Subansiri Hotel-Panchali BSI road (5.20km) 280 00 lmprovement of Road from Arun Subansiri Hotel to Donyi 400.00 2 Polo School. a C/o Cement concrete road from CM bungalow to Division- 200.0t J lV PWD road (2.5 Km). )/o Retaining wall at Mowb-ll on way to CRPF camp 100.0c 4 'Senki view). ltanaoar. t l/o Protection Wall to protect VIP road at NlTl vihar near 100.0c :nerov oark. ltanaoar (9 m heioht). /o Storm water drainage & RCC wall at ltanagar, Mowb-ll. 1s0.00 6 C/o RCC protection wall and storm water drain and Mowb- '150 00 7 I ltanaoar near LJD Office C/o Link road from 5.00 Km point of Chowkham-Wakrc 66.79 road to Tivanq river via Coconut qarden. 9 lmorovement of Wakro Townshio road (5.00 Km) 95 00 C/o road from NH-52 to Krishi Vigyan Kendra at Momong 172 50 10 rrncler Chowkham circle Road from Rangali beel to Raja beel (5.00 Km) SH: EAI/ & 175.00 11 RCC Slab Culvert 1 mtr span-10 nos. C/o Village link road from NH-52 to Kongma Kham mode 202.74 1a village (9.00 Km) SH: Earth work and Culvert and WBM.

C/o Road from Lathao NH-52 to Lal Pahar Meditatior 127 45 I.t Centre (7.00 Km) SH:WBM-I and Culvert. C/o RCC Bridge over Namchik river to connect HetlonE 75 00 14 villaoe. Widening and improvement of Renuk circle HQ road, Rima 52.36 15 Putok CO HQ roads, Longtoi Lyngok CO HQ road.

Construction & widening of road with carpeting (approx. 250.00 lo 500 mtrs) from Pullong bridge point to Borduria CO HQ (5.5 Km). Sub-Total (l) 2596.84 0.00 0.0( il Public Works

1 l/o Circuit House in Bhalukoono. 479 63 2 l/o Gallerv at Bhalukoonq General Field 96 0C 3 l/o Priest Guest House at Sanglo Putung (Gophur Tinali, 92 5C fananar\ 4 Vlultiouroose communitv hall at Taliha HQ (Phase-l) 100 0c q C/o Communitv hall at Daqam villaqe, Taliha. 20.0c o 3/o Circuit House in . 496.0C 7 C/o and inspection Bunqalow 85.7e B Construction of Rehabilitation centre at in Anjavt 70 5C District. I C/o Dormitary for 10 persons at VIP suite, under Lohi' 51 71 district. 10 C/o water supplv scheme at Konqmukhan village. 100.0( 11 C/o Boundary wall at S.ports Complex at 74 85

12 Conference Hall at Circuit house Namsai. 60 0c f\ 13 C/o Multiourpose Cultural hall (Ph-ll) at Namsai. 272.03 f\ r\l . 14 nfrastructure development at 75.00 V ,\\-f,-

)ir"tooh(:jirP: Itanagar *{ rnffi" \Z in lakh

Clo lnspection Bungalow, Residential quarters and

Sub -Total {ll

Special renovation and maintenance of Govt. residential qtrs under PWD SH: Type-lV 2 nos., Type-lll 18 nos., T ll 42 nos and Type-l 34 Nos. and B/barracks 55 Units al

State lrrioation Develooment Fund

Approach Road to D.C. Bunglow at . A) RCC sla culvert 3.00 mtr. Span 1 mp. B) Retaining wall i) 8.00 height-12mtrs. Length ii) Retaining wall 6.00 mtr height mtr Length c) Brest Wall i) 6 mtrs ht. - 30 mtr.length d 6 mtr ht - 30 mtr. lenoth FSB and oorter track in Mechukha Sub-Division C/o all weather road from Nyorak PMGSY Road to Kodum-

C/o Road from Molom village to Yosing village (Ph-l) (

C/o Road from Parsinq to Construction of single lane steel Bridge at Sia & Sigul

C/O Helipad and lnfrastructure at Annini, Dibang Val

C/O Approach road to Helipad at , Dibang Val

C/o of FSB (Steel Deckino) at Naral Maintenance of Hawai Townshi

C/o Road (BT) from New Doidam To Soha C/o Road from Tutntyu Kolam Road to Nogna under Tira District C/o road & WBM from C.K Road point to Eklavya

Widening and improvement of road from Khonsa to Khasa

C/o Community hall at Craft Centre, Urgyelling Lebrang &

I centre at Teli, Surbi & Tsaiqhar vill C/o Communitv hall at Bomba & Bomdir. C/o lndoor Badminton Club at Parade Ground

C/o lndoor Badminton Club at Gvanqhkhar C/o Boundary wall, RCC retaining wall, Gate and solar fencing on boundary wall at A.P. Civil Secretariat, ltanagar.

C/o RCC Building double storied 50 boarders girls hostel

C/o Rostrum & qeneral qround at ADC HQ

C/o CHC Chonokham under Namsai District. C/o Primary Health Centre at Medo under Lohit Districl

C/o lnfrastructure for V.K.V School at Namsai. Up-gradation of infrastructure of Primary Middle Seconda and Higher Secondary Schools of Namsai, Lathao &

C/o Up-gradation of critical infrastructure with Med

\sr?t:J. ,"""3J$"1$i* ZOePar\. )V"\ \' r,'W-') J1 in lakh) Amount \ \:#l Particulars Roads & Public Remarks (onl" Housing Bridoes Works 1 2 3 4 5 6 16 3/o Communitv hall (Bera villaoe & CO Ho Dadam). '120.00 17 C/o EAC Office Buildinq (Lazu Block) 50 0c Total (bl 0.00 2273.54 0.00 Sub - Total (lVl 3688.91 2273.5( 0.00 Total (A) 6285.75 4497.48 200.00 B On-ooino (a) Roads & Bridqes

1 Road Safety (Sign boards etc).( to be under taken as per 50.00 action plan submitted to Committee constituted by Hon'ble Srrnreme Corrrt\ I C/o Arch Bridge over Kurung River connecting Sangram to 160.00 Parsi-Parlo (Ph-ll) Sub - Total (al 210.00 (b) )ublic Works

1 lonstruciion and creation of additional office space in the 15 00 :xistino Division Office for S.E. PWD at Tawano 2 Construction of boundary wall of General PWD Store at 10 00 Banderdewa - 300mtrs under Naharlaoun Division n '15.00 J Construction and creation of additional office space in the existing ADC/SDO/EAC office building to accommodate temporary D.C. office at Palin/Jamin (Plinth area 300.00 Snm annrnv \ 4 lonstruction and creation of additional office space in the 15.00 -.xistlno Division Office for S.E. PWD at Daooriio. E Construction and creation of additional office space in the 15.00 existing ADC/SDO/EAC office building to accommodate temporary D.C. office at . (Plinth area 300.00 Sqm annrov \ b 3onstruction of New Circuit House at Yinokiono. 90.00 7 C/o Polvtechnic Colleoe at Hawai. 307.75 B Construction and creation of additional office space in the 5.00 existino Division Office for S F PWD at Khonsa 9 Construction and creation of additional office space in the 5.00 existing ADC/SDO/EAC office building to accommodate temporary D.C. office at Longding (Plinth area 300.00 Sqn aoorox ) Sub - Total (bl 0.00 477.78 0.00

(c) Housinq C/o Residential Buildings at Newly Created District Heac 36.0C Quarter of . (SH:- (i) Bachelor banack-€ units, (ii) T-ll - 4 units, (iii) T-lll -4 units, (iv)T-lV-4 units & (v) T-V - 1 unit 2 C/o Residential Buildings at Newly Created District Heac 24.3t Quarter of Siang Districi. (SH:- (i) Bachelor barrack, I units, (ii) T-ll -4 units, (iii) T-lll -8 units, (iv) T-lV -4 units (v' T-V -1 unit ) 3 C/o Residential Buildings at Newly Created District Head 38.00 Quarter of . (SH:- ( i) Bachelor Barrack, 8 unit( ii) T-ll, 4 unit (iii) T-lll, 4 unit (iv) T-lV, 4 unit

Sub -Total (c 0.0c 0.00 98.38 Total (B) 210.0c 477.75 98.38

c Maintenance Works

1 Lumla 50.0c 10 0c 15.00 2 Tawano 80.0c 40.0c 20.00 J Janq 50.00 15.0C 20.00 4 Diranq 50 00 10.0c "- 10 00 5 Kalaktano 50 00 15 0C 20.00 b Bomdila 80.00 35.0C 20.00 7 Chavanoiaio 50.00 10 0c 10.00 8 Bameno 40.00 10.0c 10.00 o Seooa 100.00 16.0C 20.0c 10 Pakke-Kessanq 40.00 10.0c 10 00 11 Saoalee 50.0c 10 00 15 00 tl_ \P. o"S":n"of Page 4

s. in lakh s----] .iat. Amount , Particulars Roads & Public Remarks h,tr / Housing *6 Bridoes Works a 2 3 4 5 6 12 Caoital Division-A 50.00 140 0c 31 00 IJ Capital Division-B 50 00 5.0c 124.00 14 Naharlaoun 50.00 98.0C 15 0C 15 56.00 15 0C 10.00 16 Yazali 50.00 10 0c 10.00 17 80 00 20.0c 15 0C 18 Sanoram 80.0c 15 0C 10.00 19 Tali 40.00 8.0( '10.00 20 Jamin 40.00 8.00 10 00 21 Nacho 40 00 '10.00 10.00 22 Daporiio 90.00 15 00 15.00 23 lumooriio 60.00 15 00 15 00 24 3asar 50 00 15.00 15.00 25 llensi 50.00 15.00 15.00 26 Yomcha 50.00 10 0c 10 00 27 Vlechuka 50 00 10.00 10.00 28 Aalo 115.00 20.00 15.00 29 Rumqonq 50 0c 10 0c 10.00 JU Bolenq 70 00 10.00 '15.00 31 Yinokiono 60 00 20.00 15 00 32 M:rivano 50 00 10 00 10.00 e2 Pasiqhat 120.00 3s.00 20.00 34 Nari 50.00 20.0c 10 00 35 Anini 30 00 '10.00 15.00 36 Roino 90.00 20.00 15.00 3t Havuliano 50.00 '15 0c 10.00 38 Tezu 100 00 20.00 15.00 39 N amse i 140.00 80.00 50.00 40 Jaaramour 70.00 15 0C 15 00 41 Chanqlanq 70 00 27.00 15.00 42 Khonsa 100.00 15.00 15.00 43 Kanubari 50.00 10.00 10 0c 44 Lonqdinq 70 00 10 00 15.00 45 Hiohwav Arbitration. 10.00 46 Maintenance of lT assets under PWD. 126 0A 000 47 Printinn nf SADA hnnklot 5.00 0.00 48 Preoaration of DPR for Pilot oroiects 20.00 000 49 Road safetv Audit. 000 0.00 50 Litioation & Court decree 100.00 0.00 20.0c 51 Restoration of damages due to sudden natural calamities 500.00 0.00 like flood. cloudburst etc. q) Road safetv manual 0.00 0.00 EA Establishment of Centralised e-procurement centre a 30 00 0.00 Itanaqar for PWD. 54 Yearlv fees of lndian Road Conoress. 2.00 0.00 55 Yearlv fees of lndian National Group of IABSE 100 0.00 56 Preparation of APSR 11 00 0.00 57 Caoacitv buildino 15.82 58 Recruitment exoenses. 10 00 59 Renovation of Hiqhwav offices .20.00 60 Renovation of CE/SE offices 35.0C ot Renovation of Bunqlows 700.00 62 Annual membership fees 100 Total (C) 3616.0C 1017.82 1486.00 D New Schemes I Roads & Bridqes

1 C/o approach road to B.T.K Bridge( SH- Pavement and 75 00 Drain ). Completion of Jeepable Suspension Bridge at Gorsam ( 75 00 60.00 m SpanXSH- Approach Road, Protection work and narkino) lmprovement of road from Nehru Market to Tawang 30 00 Monasterv (Sh;- BM& BC). I 4 C/o Road from BRTF road to New Market at Tawang . SH- 30 00 ( BM& BC) 2.50 Km and WBM-Il and lll ('1 .50 Km). 0.f '' \59te ]irector 'ri*uq" Le Page 5 oY {A\o t1 l= * in lakh t, Amount t2t Particulars Roads & Public Remarks v Housing Bridoes Works

1 2 3 4 5 6 E C/o Retaining and Breast walls at various locations undet 28.00 Tawano Leoislative Assemblv Constituencv. 6 C/o road from Jangda to Rho Village 1.30 Km(Sh: WBM-Ill, 74.00 BT & Culvert 2 Mtr soan 3 Nos). 7 C/o approach road to Secondary School at Mukto 1.2( 10 00 Km/SH: Culvert 1 50 soan 1 No & B/wall 20 Mtr). 8 C/o Protection wall for Circuit House at Mukto(SH: 10 00 Retainino wall 30 Mtr ) q C/o Approach road to Circuit House Jang(SH- CC Drain 10.00 500 00 Mtr ). 10 C/o Road from Lamps to Foot Suspension at Nadi- 16.00 Paar. Dirano (SH: C.C Pavement & CC Drain). 11 C/o Slab Culvert 3.00 m Span at Jyotinagar school road. 10.00

12 )/o Approach road to C.O office at Mandalaphudung (300 5.00 Mtr) (SH: F/cuttino. WBM. BT & CC Drain). 13 lmprovement of Road from Helipad to Kharka Bridge point '1 5.00 at Dirang, (600 Mtr) (SH: Widening, WBM, BT & CC Drain)

14 lmprovement of Road from BRTF Road to Phudung 20.00 villaqe,1.00 Km (SH: . WBM. BT. Culvert & CC Drain). 15 lmprovemeni of Approach Road to Govt. Polytechnic 30.00 Namthung, Dirang ,'1 .50 Km (SH: , WBM, BT, Culvert & CC Drain) 16 C/o Approach Road to Krishi Vigyan Kendra, Sangti, 20.00 Dirang ,1.00 Km (SH: , WBM, BT, Culvert & CC Drain).

17 Providing of WBM and bituminous surfacing of approacl 40.00 road to ADC office at Kalaktanq. 18 C/o wino wall on Dekshi Bridoe. 20.00 19 C/o Rupa Township road (SH: Re-carpeting and Retaining 30.00 wall on approach road to Gompa from village side, widening, WBM and carpeting of road to PWD transil accomodation and CC pavement of village lnternal road al Ruoa). tn Consultancy Survey and preparation of DPR for Shergaon- 14.00 Doimara road (28.00 to 72.00 Km) 21 C/o CC Road from Wanghoo village to General Ground a 12.00 Wanohoo. ( Total Lenoth 0.700 km ). 22 C/o CC Road from Jamiri- Buragaon PMGSY Road ( Ch 900 3 00 km ) to CO Office ai Jamiri HQ( Total Length 0.50C km) 23 C/o lnternal Roads , Foot Paths and Storm water Drain at 10.0c Buraoaon 24 C/o Road from Jamiri Buragaon PMGSY road to 10 0c Hussioaon Prv School at Hussioaon (L-0.600 km). 25 l/o Porter track between Wanghoo village and Dikhiyang 9.0c villaqe ( L-35.00 km). 26 lmprovement and upgradation of Township 40.00 road(Ph-l) (SH: CC pavement, embankment, S/cul, P/work and road side drain). a1 lmorovement of Thrizino Township road. 20.00 28 C/o CC footpath from Kararamu village to football ground 4.00

al K araramr r 29 C/o RRM Breast Wall near the Residence of Sonam 6.00 Madam at Bomdila. ( SH:-RRM BANall - 6.00m Ht - 40.00 Mtr Lenqth). 30 C/o RRM RA//all on Road From Power House to Lower 6.00 Gompa.( SH :- RRM RANall 4.00m Ht - 80.00 m Length ).

a1 C/o RRM BAffall on Road From Trijunction to Uppet 600 Gompa.( SH :- RRM BA//all 4.00m Ht. - 80.00 m Length ). {?, 0(

,,,""sJ.,|::ilj tiu*uqd DeN

/(DI#'/

.).) lmprovement of Pedunq Gompa road at New Bomdila. 7.60 34 C/o Road from Fire Station to Durga Mandir at Bomdila. 11.60 Length - 0 150 Km)(SH:- WBM-I, ll, lll, BT,V-Shaped drain RRM BA//all - 4.00m ht - 50.00m Length & RRM RA//all 4.00m ht -50 00 m Lenoth) 35 C/o C C Pavement road from main road to Medical & foresl 24 00 colonv at Nafra 11 20 Km) 2A C/o approach road to Sera Village ( SH: 8T-1.06 km, 8.00 lmpvt. of Geometric, 1.50 mtr span S/cul-2 Nos). J/ C/o approach road from Division Office to various Govt. 39.60 Quarter at Veno under Bameno PWD Division. 3B C/o CC Drain at PWD Division office and Residential 15.00 complex at Veno under Bameno PWD Division. JV C/o CC Drain in various road under Bameno PWD 19.60 40 C/o Approach road to EE's residence at Chavanqtaio. '10 00 41 C/o By-Pass road from PWD main road to ADC Office 10.00 Colonv at Chavanotaio. C/o Approach Road to Sub-Divisional Office at Pipu (SH: 10.00 FC & WBM-I) 43 Expansion of RCC Bridge at Township near DC's 40.00 Bunolow. 44 3/o RCC Bridqe at LBSVN-Il over Macha river. 50 00 45 C/o Protection wall at Macha Nallah near Medical Colony. 9.00

46 C/o approach road from main road to Cherwa colony near 8.00 St. Joseoh at School New Seooa 47 C/o protection wall at Kamou Mlorano. 20 00 48 C/o CC Pavement & Retaining wall at Backside of DMO 20.00 office & Election office 49 l/o RCC Bridqe at Bana to Silla road (Soan-1Smtr). 20.00 50 3/o approach road from 3 km point of NH-229 Seppa to 20.0c Saqalee road to Resiooum. 51 C/o Ferom 12km point on PMGSY road Seba village to 10.0c Tourist Rafting Centre at Papu river stage-ll (span- 0.50km). 52 C/o WRSB over river Bichom in between old Sopung and 10.0c New Sopung village (Span-140mtr)- PH-ll (Sh: Super Structure). 53 lmprovement of Road from 8 km point of PMGSY road, 10.0c Nere village to proposed site of CO HQ and CD Block Debevar (2 Ookm\ 54 C/o Rinq road of Yanqsev villaoe at Bana (2.00km) 20 0c 55 lmprovement of road from Naria 2km point of Silla road tc 10.0c Kitchano vilaoe. 56 C/o road from Kampu Seba to Taqlanko (2.50km). 40.0c EA C/o Road from Seijosa to Namorah via Monai(15.00km) 30 00

58 C/o Link road between Dipik & Dikhalmuk(2.00km) '16,00 59 C/o RCC Slab culvert(10.0m) with protection wall over rive 800 Tarso Nallah between NH-229 & Primary School, Ngoleko.

bU C/o Wire rope Suspension bridge over river Papu at Mior 6.00 in between Deve Golo and Papu Hote(Span-30.m).

61 C/o Wire rope Suspension bridge at Passa to connec 6.00 Govt. Residential School at Passa camo(30m soan) 61 C/o CC road of Pakke Kessanq townshio road 20.00 63 Extension of road from Deputy Director UD office tc 8.00 Mobshi area at Senki View. ltanaoar l\ 64 C/o link road from PHE office to Lower Lobi Colony 10.00 Itanaoar. r[)

,-""3;f"::5,' Page 7 '\'/6v v\\2 a-I \o *\ ( in lakh KX 'tA'l4 Amount '/ particurars Roads & Public Remarks ffi Housing Bridoes Works 1 2 3 4 5 6 65 3/o Approach road from lG Park Middle School via Central 4.00 )ower House to Abotani Colonv ltanaoar 66 l/o road from Dree ground to Govt. Middle School Nyokum 8.00 -aoano via Revival Church Nvokrrm I anano 67 l/o Storm water drainage at Abotani Colony near Green 2.00 Mount School lfanaoar 68 C/o Retaining wall, Protection wall, Parapet wall and Side 6.00 drainage etc from 'O' Point Tinali to Panchali Lobi road, Itanaoar. 69 C/o Protection wall (30 mtrs) near WRD, Complex, 200 Chimou. 70 C/o Retaining Wall to protect bachelor barrack at Division- 2.00 lV. ltanaoar 71 C/o RCC drain 160 mtrs both side height 4 mtrs opposite 7.00 sides APEDA office to Mowb-l Nallah near residence ol Shri Tamuk Tadu /l Providinq retaininq wall at Panchali Switchvard. 50c 7a C/o Approach road from Tigdo Colony to Doyum Colony, (L 8.00 3 Km) 74 C/o RCC Retaining Wall at D-Sector near Postal colony, 2.00 Itanaoar. 1F C/o Road from Chandranagar Power House to Govt. 5.00 PrimarV School, Chandranaqar, 76 Road from Jomi Jote to Tani Putono. ltanaoar 10.00 77 C/o RCC Protection Wall at Donyi Polo Dariya Tinali Road, 10.00 Itanaoar. 78 C/o RCC Protection Wall near private residential area at 10.0c Kola Camo. Mowb-ll llanaoar 79 3/o Retaining wall at B-Sector, ltanagar near the resident 10 0c :f Kuli Manoam 80 l/o roads and drainage at Xl-Batt Ganga Anchal Segment 5.0c

81 C/o Road at DDK Colony-l to ll near Nipuchi School Hill 50c Top Colonv. ltanaoar. 82 C/o Link Road Lower ltafort D-Sector to C-Sector, ltanagar 5.0c

o2 Formation cutting from Kamko Primary School to 10.0c Haticamo. Chimou. (4.5 km) 84 C/o Approach Link Road from Highway to Dath Village, (2 15.00 km). 85 C/o drainage, CC Pavement , Culvert, Retaining Wall etc '15 00 including Widening of road from NH-415 to Directorate (Economics & Statistics) Colony , ltanagar at Ward No. 02

B6 C/o approach road from Directorate tourism to Upper Ring 10.00 road via Nerba Colonv. Ward no-12 ltanaoar 87 C/o Retaining Wall and widening of approach road tc s.00 NEFA Club at ESS- Sector, ltanaqar. 88 C/o Road from Chimou-l to Lutu-Lunia Villaoe (5 k.m). 30 00 89 C/o road connecting from Modirijo to Jomi Jote i.e., 1 km 10.00

90 C/o storm water drain at Dath at Dath Nallah under Daatl" 200 Villaoe Jollano ltanaoar 91 C/o road from ESS Sector to 4'h IRBN at Upper Jully, 20 00 Itanaqa(Sh:- FC-1.500km). 92 C/o New Road along with Retaining wall & CC Culvert from 10.00 Donyi Colony to Donyi-Dokum primary school, Itanaoar.(1.5-km). o2 C/o CC Drain for D-Sector Link Road(700 mtrs), ltanagar 2.00

94 C/o RCC wall & approach road from NH-415 to Sake '10.00 Colonv, Akash deep, ltanaqa(1 km). I oq C/o boulder retaining wall between privale quarter and 200 govt. bachelor barrak at C-Sector, Gandhi Market, Itanaoar a rl

-,""EJf":i5: \ Page 8 a\ \o Rs. in lakh) \ .:*uJ*/ Amount Particulars Roads & Public Remarks / Housing \;J Bridnes Works ,| 2 3 4 5 6 96 C/o CC footpath at A, B & P-Sector, ltanagar under Ward 2.00 no-18 around 2 km 97 l/o RCC retaininq wall at P-Sector. ltanaqar 5.00 9B l/o storm drainage from Multipurpose hall to NH-415 via 2.00 Singrik Kujo Colony, Ward No.- 2, ltanagar (100 mtr).

99 Road Maintenance/Retaining Wall from Ganga Market to 15.00 Ajing-ll Colony -via- Jama Masjid, ltanagar.(600-mtrs ).

'100 C/o link road 1km stretches from Ajing Colony'O' Point to 600 Lower belt Aiinq Colonv-1. ltanaqar. 101 C/o Protection wall to protect road near Tri-junction o1 2.OO Donvi to Dokum colonv road. ltanaoar. 102 C/o Retaining Wall at Dokum Road Sinking/Slipping Zone. 5.00

103 C/o Road from resident of Shri. Teli Raja to Covenenl 10 00 Nliccinn Snhnnl Ganna \/illana lfananar 104 C/o road at Sanqlo Putonq-lll. 10 00 105 C/o Retaining wall to protect sector road and Govt. Qtrs. a 10.00 B-Sector Rainivas. ltanaoar. 106 Protection wall at back side of Popu Baptish Church(3OC 2.00 mlrc \ 107 C/o link road from main road to Yoqin Villaqe. Niriuli. 8.00 108 C/o road connecting to Polo bridge to Down Polo Colony 10.00 Naharlaoun (2 km). 109 C/o Approach road from Jully road to Govt. Middle School 5.00 Yari Babar colonv. Paou Nallah. Naharlaoun. '1 10 C/o Road connecting from Dachi Hapa to Lutha village (10 40 00 km) 111 C/o Drain from A-sector to Rakao colonv. Naharlaqun 15 00 112 C/o approach road at Mara Hapa at Lekhi Villaqe. 10.0c 113 C/o approach road & drain from Bage Tinali to Upper 10.0c Manoio Colonv. Niriuli. 114 C/o Protection Wall of Suspension Bridge at Pachin 2.0c Colonv. Naharlaoun. 115 C/o Retaining wall (approx. 60-mtrs) at Govt. Sec. School, 40c Faehin '1 16 l/o CC Pavement, Drainage System and Culvert at VKV 20c Primarv School road at Niriuli-l 117 C/o boulder fencing wall at Borum Nallah, Borum, 2.00 Naharlaqun. 118 C/o Retaining wall and CC drain, culvert & road to protecl 2.00 Medical Sub-Centre and nearby buildings at Papu Village, Naharlaqun 119 C/o culvert & retainino wall at Jullv Nallah at Lekhi. 2.OA 120 C/o retaininq wall for protection of Anva villaqe. Niriuli. 2.00 121 C/o RCC Retaininq Wall at Ravo Villaqe, Niriuli. 2.00 122 C/o Protection wall at Nirubiuli villaoe-ll. Niriuli 50c 123 C/o RRM Wall at Sood Villaqe area. 20.00 124 C/o retarninq wall at 2 km Papu Nallah, Naharlaqun. 10.0c 125 C/o CC Pavement road at Upper-Nyorch Village along with 7.00 Drain (700 mtrs). 126 C/o Approach road to residential complex in the rear side 8.00 of State Guest House and High court(Sh:- Wid, CC oavement. CC drain). 127 l/o Protection Wall and Wing Wall at Kukurjan Nallah on 10.00 \ooroach Road to Govt Secondarv School Jote. 128 l/o Protection Wall and Wing Wall near forest colony 10.00 Qa lii: n 129 ilo 2 m Span Slab culvert on approach road to Govt Hr. 10 00 Sec School Baliian 130 C/o Bridge over river Magoni(80.0m)(Sh: Sub soil 10.00 investioation). A 141 tJ I C/o Bridge over river Balijan (60.0m)(Sh: Sub soi 10.00 investioation). It , r-*

,_""8:i[":i5: @* *\ Page 9 \2jo /f in lakh

C/o Link road from Mebiaso village to Juilang(2.00km)(Sh:

C/o Wire Rope Suspension Bridge over Panyor River between Kamrung to Bong Village (Span - 100.00 mtr.)

C/o Approach road from TAH to Tahsi village bridge poi with 3 nos, culveri soiling and metalling - 1.00 Km.

C/o Mengio road to Nyokum Potu at p

C/o approach road from PWD road to Rugo primary school 1.00 Km including 2 nos. culverts soiling and metalling.

/o CC pavement and CC Drain on Mengio Township road

/o Township road at Sil-sango(SH: Soling, Metalling and

Ancor block and Tower block at Nirpong river (paga).

C/o Ancor block and Tower block at Panior river (

C/o WRSB over Pare river in between Mepsoro & Havia with porter Track under Toru Circle, .

C/o approach road from TAH to Govt. residential school Sarkahappa at Nimte, Length- 200 Mtr (SH: CC pavement, R/wall, B/wall, CC drain and Slab Culvert).

Re-alignment of Toru to Ompuli road at Sudum Langfo- to 7.600 Km under T road from TAH point to Hajurangpa village (SH: Cross Drainage, CC side drain, R-wall & Solling)- 1.00 Km.

C/o lnternal/Sectoral road for Paranq circle -2.00 Km. C/o Road with Retaining wall at Allu at Geka under pistana

Cio Protection wall to lndoor Stadium and General Ground at Talo (SH:- RCC, B/wall, site development & Galleries

C/o Road from Bobogeka to Komu Happa via Taa Sepa.

C/o link road from Serre Haooa to Rili Y C/o CC Pavement of approach road from main road ( Kimin to Ziro Road ) near Petrol Pump , Yazali (400 mtrs)

road from PMGSY road to Kamcho Taram via Job and

Road from PMGSY road to Happa , Talo Village

Road from PMGSY road to Nomdum Nampin via Pei

C/o road from Tater Geka to Bentam Yorda via Takho

C/o Protection Wall at Nvoli See at Mai C/o CC Pavement in Para Line at Hapoli (400 Mtr).(Sh: Preparation of Sub-Grade & WBM-|, WBM-Il, CC

C/o Road from Tubyo village to Dura village (Sh:- WBM -lll,

C/o Approach road to Sibeyaru colony (0.300Km) (Sh: Preparation of Sub-Grade & WBM-I WBM-I,ll,lll, BT, RCC Slab Culvert 1.00 mtr span=2 Nos. RA/y'all=60.00 mtrs, CC

RCC slab culvert in span over Sikha river at Panchu.

"."HJ*t::iIi,i*uqut 5a> Page 10 Io

* Rs. in lakh

C/o Retaining wall at Chabo Lower Subansiri Ziro (50 Mtr.).

C/o RLR Lutii to Moko via Pokhe length 2.5 km at Hong

C/o Black Topping i/c CD Works and pucca Side Drain on Road from BRTF Road to VIP Colony and DC Bung

Black Topping i/c CD Works, Pucca Side Drain and Re nt on Road from Choba BRTF Road to Jamin.

Road from Talariang Yangte Road to Middle

from Sango to Lunqsa(Ph-l). C/o approaach road to Circuit house road to SDO office Sanqram. C/o road from PMGSY road to idening on Tamen-Tali Road from Chainage 43.00 Km to

C/o School Play ground at Govt. M.E. School at Tungmar

C/o 3 km Link Road from '0' Point Langdik village to Bere

C/o Wing Wall, Capping on Steel Bailey Bridge over pala

C/o Wing Wall for RCC Culvert over Yangmey Nallah

C/o Wing Wall for RCC Culvert over yangte Nalla

at Yarkan road. /o Approach Road at Circuit House Koduk ircuit house. /o Approach road from PWD Road to police station at

Culvert ( 2.0 m C/o CC drain at Various Loaction under Nacho Township

C/o slab culvert ( 2.0 m ) at Tri Junction of BRTF and

C/o CC step from Tunq Muri to BRTF Road at Nacho. lmprovement of Road from BRTF road to Tarik Rava

C/o Road from PWD link road to Govt. L.P School Siga, under Chetam Circle Upper Subansiri Distt. Road from Lechinn to Upper Siqa vil C/o CC Pavement road from BRTF road to Ligu vil

C/o Link Road from DFO Qtr to SIB Colony (Length- 1 Km).

C/o CC Pavement road from Sigin Colony to ls

C/o Road from Nima RWD road to Morak Colony( Length-

C/o Foot Suspension bridge over Shah river at Dek village

Road from Nima RWD road to Hill Top Colony(

road from Trans Arunachal Highway to Bur-Yorlo for

road from - Mono road to Tun;perijo , (SH:-

',""8;rl::i[;oii*ust (N \o\\, RS in lakh

C/o road from PWD link road to Rija Pada at village , 5 of length 0.500 km (SH:-

C/o road from BRTF road to PHC Puchi - Geko at Puchi -

Clo road from BRTF to General Ground at

C/o Link road from BRTF Road near Godak village Beruk Nare old village via Durg-Pum old village length -

C/o Road from Kicho village to Maga old village via - '1 5.00 Km (Ph-|. 0.00 to 5.00 Km Construction and lmprovement of Road from Baririjo I Hakte-Rioa SDO HO. C/o road from BRTF road to Circle HQ office Maro (1.3km).

lnprovement of road from New lB Dumporijo to ADC H

Clo RCC Bridge at Torajan Village under Kangku

C/o Assam PMGSY Road to Sili Village( SH: Metalling).

C/o Road from CO Hq Kangku to Kangku Village via GSS Kangku(SH:- FF, Metalling and S/culvert 6.00 mtr).

inq of Gensi Townshio Road RCC Slab Culvert at Raate Village under Kangku ircle in West Siang Distt, AP(Span-1 mtr-1 No. & Span 2

/o RCC culvert at Hime Villaoe (soan-1 road from Malini Temple Tri-junction to Malini village at

/o CC drain and Breast wall adjacent to Power House on

lmprovement of road from BRTF road to Moba Doke ('1 .50 ) (Sh:- Widenning, Culvert, CC Drain & WBM-|, ll).

Nyodu-Sibe-Siru NLCPR road to Siru Primary School Nos. & WBM-|-O.50 Km C/o Road from Pajo to Kidi RCC Bridge (Sh:- WBM-Il, BT-

Ego-Daring-Zirdo Koyu Road (Taak Soi) (K/Drain-0.30 S/Culvert-1 mtr-3 Nos. & 2 mtr-1 No Basar Pagi PMGSY road to Upper Regi (S/Culvert-1

C/o Approach road from Pagi-ll village to Hide Rijo (Sh:

C/o Road from BRTF road to Uooer Everest vil C/o Road from PMGSY road to Yama riio at Tirbin C/o Road from PMGSY road to PWD road at Old Dari C/o Road from Power House to Kidi Suspension Bridge Tojo Little Flower, School (Sh:- Sol, CC Pavement, Culvert,

C/o Road from Nyigam Nyodu PMGSY road to Hiri (Sh:

C/o BRTF Road to Ragi Doke Village(Sh:- Sol, Met, CC

C/o Approach road from PWD Nyigam Kamdak road

C/o Approach road from BRTF road to Lower Nyobom in old Market basar (Sh- CC drain 200.0mtr, Pavemen

C/o road from Basar Sago Piri PMGSY, road to Lipu Namchi Volley Ball Ground (Sh- RAI/all 30.00mtr, Culver 1.00mtr span- 1 nos, WMB- l- 200.00mtr, CC drain in lakh)

C/o FSB over River Sie to connect Bege primary school

rovement of LiromobaTownshio Road. t3.00 km C/o Road from Darak to Benii-line via. Povom [7 C/o Road from DPGC Gate to Kambu Vill.Upto

rovement of Yomcha Township Road.[4

C/o Road from PMGSY road to Ligo Hydel at Liromoba. I

C/o Approach Road from Yomcha-Ragi Doke

Tai-Liromoba rcad.l 1 I -22 km C/o Approach Road to Helipad ground at Liromoba(SH:-

C/o Road from Darak to lmprovement of approach road to Higher Secondary school & CHC at Yomcha.fl km C/o road from Jirdin Trijunction to Tarsu Mobuk and to JNV School Aalo ( 8.5 Km) ( PH-l: Tarsu Mobuk to JNV Schoo,l CC Pavement: 1.00 Km C/o CC Pavement from Jirdin Tri-Junction to VKV School (2.00 Km) (PH- l: Jirdin Trijunction to Jirdin, CC Pavement: 1 .20 Km, Slb Culvert- 20 Nos, Embankement - 200.00 m).

CC Pavement road from Gumin Nagar to Bal Bharti School via Gaurhill and Hospital (2.15 Km) (PH-l: Bal

C/o CC Pavement Road from to Police Station Junction

/o CC Pavement from Hospital to Poilce Station Point via

C/o Road from BRTF Road to Yangko village(O.50Km) SH: F/c- 0.50 Km CC Pavement of Approach Road to Lower Gumin Nagar at Aalo. C/o road from NH-229 to Doyor village(1.30 Km)(SH- metallino- ll & lll BT C/o lnternal road of Darka village - 3.50 Km (SH: Re-

C/o Road from BRTF Road to Ranaghat - 1.200 Km (SH S/cul-4msoan-1no C/o road from NH-229 to CO Hq. Bagra(0.600 Km)(SH

C/o Road from NH-229 to Doji-Jeku Village(0.700 Km)( GSB. CC P C/o Approach road from BRTF Road to Wak village- 0

C/o Retaining Wall to protect School playground at Rine M Ht-3.0 M C/o Retaining Wall to protect PWD, lB at Bagra CO Hq. Rine in Lipu Bagra village (R/w- 15.00 M Ht-2 50 M).

C/o General Playground at Paya Village (SH- Exca

C/o General Playground at Angu-l Village (SH- and Fillino earth work and R/wall C/o PMGSY road to Beging village (SH: RCC slab culve & RR Wall) C/o Patum to Rumgong road (SH: RCC protection wall).

C/o approach road on Right bank of RCC bridge al Nallah (SH Back filling, RR Wall and Pavement). approach road on Left bank of RCC bridge at Patum Nallah (SH: Back filling, RR Wall and Pavement).

approach road from BRTF road to Medical Colony at lmprovement of road from BRTF road to Paksing bridge int.-1.00 Km (SH: SMC. Drain and Culvert). Re-decking of 2 Nos. of Wire Rope Foot Suspension river under Kavino Sub-Division. RCC bridge over lte River at Patum-Rumgong Road

ing of 2 Nos. of Steel Balley Bridge at Patum

mprovement of -Rumgong Road ( SH:- Retaining

road from Karo to Pidi Administrative Circle under (SH: Formation cutting

link road from Tongkarla BRTF road to village (Length 1.20 Km) (SH: Widening RCC culverts -2 Nos & R/Wall C/o Monigong Township road(CC Pavement - 0.400 Km)

C/o link road from BRTF road to Govt. Primary School, Sorongdom (Length-1.20 Km)[SH: Embankment, GSB CC Pavement & RCC Culvert (Span-1.00 mtr)-3 Nosl.

Clo link road from PMGSY (Galling) to Ga village(Length-0.60 Km)[SH: GSB, CC Pavement , RCC Culvert (Span-4 00 mtr)-'l No. & RCC culvert - 1.00 mtr - 1

C/o link road from PMGSY road to Gorjen Fush (Length- 1.55 Km)tSH: FC - '1 55 K C/o link road from BRO road to Farge village (Leng

Diversion/Realignment of road to avoid slip prone area in Pallinq (2.00 Km lmprovement of different colony roads ofYingkiong io(SH: C.C Drain. WBM-Il.lll lmprovement of Jengging township road (SH: WBM-Il &

4 Nos RCC Slab Culvert on Yeqlek road /o C.C drain from -Mariyang road to Simong

C/o RLR at Siri-Delenq at Yemsi C/o Storm water drain includrng protection wall near Medical at Panoin Town(Sh: CC cir

C/o Drainage system at Pangin Town near Baptist Church lmprovement of PLTK Road. Ph-l (SH. lmprovement geometrics, WBM, Re-carpeting,bSide drains, etc.(CH- 00Km to 45.00 Km.. Replacement of BB with RCC Bridge on PLTK road at

Clo approach road to Kakki Village(2.00 Km.)(SH:

C/o side drain on -Ledum-Tene road at CH:

C/o cross drainaqe Structures in Sille-Ovan Circle lmprovement of Pasighat-Ledum-Tene ropd (32.00 to

C/o road from Oyan Charali to Kemi Check post (4.50 Km) :WBM-Ill & Bituminous mac Page 1.4

,5t' Kiffit\t \o o-sf tffi Rs. in lakh T Amount Particulars Roads & Public Remarks 'Ky Housing Bridoes Works T- 2 3 4 5 6 293 C/o Approach Road from Paglek School to Komolighat and 12.0C DC's Bunglow to PWD Explosive Godown (0.60 km). ( SH - RRL, Kutcha Side Drain, GSB, WBM - ll,lll and BT).

294 Widening of approach road to DC office at Pasighal 5.20 (Length-261.00 Mtr) (SH: Widening, RRL, GSB, WBM-Il, WBM-lll. BT & C.C. Drain). 295 Double lanning of road from Siang Guest House to APST 30.00 Bus staiion (0.90kmX SH: RRL, GSB, WBM-Il, lll & BT).

296 C/o Road from NH-13 to Sille Hydel at Pasighat, East 60.00 Siang District (2.20 km). ( SH - Earthwork, GSB, WBM - ll, WBM- lll, Bituminous Concrete, CC Drain and RCC Box culvert - 1.50 mtr - 7 Nos.). 297 C/o Road from Pasighat-Ledum-Tene road to C.O's Office, 40.00 Yagrung (1.00 km) ( SH - Earthwork, GSB, WBM - ll, WBM- lll, Bituminous Concrete, RCC Box culvert -1.50 mtr- ? Nnc \ 298 C/o lnternal road at C.O. Head Quarter, Namsing (1.40 58.80 km) (SH- Sub - Grade - 1.40 km, WBM-Il - 1.40 km,WBM- lll - 1.40 km, BT - '1 .40 km, Cross drain - 6 Nos, RCC Box crrlvert-1 50mtr soan-1No ) 299 Fabrication of Steel decking of Bailey Bridges under Mebo 18.00 Sub-Division, (SH - Fabrication of Steel decking 26.40 MT, Procurement of Transom Clamps - 400.00 Nos, Procurement of Panel pin, Rockers, Base Plate, Bearing post and Male & female etc, and Painting of Bridges).

300 C/o RCC Storm water drain under Mebo township (800.00 40 00 mtr\ 301 C/o drainage system at Namsing village (Sanggo segment 6.2C No.2) 3Ut C/o Road from BRTF Road to Jomoh village. (0.70 KM) 10.0c

303 Re-caroetino of Marivano Townshio Road (3 KM) 18 9C 304 C/o Approach road for Steel Arch bridge over river Yamne 27.2C at Byasang. (3.50KM) (SH : Slab cul, R & B/wall, C.C. l-)ra in \ 305 Re-caroetinq of Geku Township Road (1.50 KM). 12 10 306 C/o Road from Marivanq to New Millanq. (1.00 KM) 10 00 307 C/o Road from Trans Arunachal Highway to CHC & 10.00 lnspection Bungalow at Geying. (1.50 KMXSH: WBM & BT). 308 C/o Road from near RWD A.E office to Govt.H.S.School 25.00 connecting and Lonka Village road neat back side ol Helipad at Anini (0.700Km)( SH: RCC slab culvert 1.50m span: 1No, Embanking: 70m WBM-|, ll & lll: 200m).

309 3/o Approach road to Circuit House( (SH: 1.5m span slab 10 00 :ulvert. CC oavement: 30m, CC drain: 60m). 310 C/o two wheeler suspension bridge over river Dree near 9.45 Etabe (Soan- 135 mtr). 311 C/o Approach road to District hospital at Anlni( SH: '1 .50m 400 slab culvert-'1 No). 312 C/o Road via DFDO office and Gids Hostel to RWD road tc 10.00 lanka village( 1 00Km)(SH: Pot-hole repair, Kutcha drain).

313 C/o Road from Anini-Mipi BRTF road to Emuli-Sokhonc 600 road( SH: 3m span Slab culvert: 1 No.). 314 C/o Approach road to helipad at Etalin (1.30 Km) (SH 5.00 Kutcha drain). 315 C/o Approach road to lB at Arzoo( SH: CC Pavement: 5.0c 30tvl'l 316 C/o Road from Parbuk-Kabang PMGSY road to Raj-Ali and 30.0c Mobang (SH:- EA//- 2KM, RCC Slab culvert - 4 Nos) 0 ,.l,! rte \5t ;*-v"l[:l$; ?eP{ Page 15 &,c/ .itffiar N (El iriffiiv \, i\ _l: Rs. in lakh ffi /_' l Amount Particulars Roads & Public Remarks Housing \bWy Bridoes Works 1 2 3 4 5 5 317 C/o RCC Bridge over Jia river along the road from NH-115 25.00 to Jemi villaqe under Boluno (Soan 10 mtr) 318 lmprovement of Dambuk township road ( 7.80 Km) (SH:- 47.00 WBM & Caroettino). 319 -le-carpettinq of Road from Sisiri to Bizari ('12.00 Km) 40.00 320 l/o Storm water drain at various location under 30 00 :ownship (4 Km). 52l C/o Extension of Roing township road to Weya Village via 65.00 Cheta-ll at Roing (3.00 Km) (SH:- EA//, cSB, WBM-[, ilt, BT & Slab culvert 1 .50 mtr - 10 Nos). 322 Re-carpeting of Roinq township road (5.00 Km). 45.00 5ZJ C/o Protection wall at Thupani bridge in Hunli-Desali road 10.00

324 lmprovement of road from BRO road to VKV School, 40.00 Tafragam (SH: Carpetting and pot hole repair) Ph- I (0.00 to 5.00 Km). 325 Tezu-Sunpura road to 19th Mile via Jeko village, length- 45.00 3.00 Km (SH: WBM-Il lll and BT\ 326 C/o Slab Culvert (1.50 Span) on Walla Road at Hawai. 7.00 327 C/o Retaininq Wall at Walla Road in Hawai. 80c 328 3/o CC Drain at Walla Road in Hawai 9.0c 329 3/o RCC slab culvert on Thawra Nallah at Changung 10.0c rillaoe link road 330 C/o RCC slab culvert on Tikrap Nallah at Changung village 10.0c link road 331 lmprovement of Chungung village Road (SH: Storm water 24.0C drain) 1'7.) lmprovement of Watong village Road (SH: Storm water 24 00 drain) JJJ Co/ CC steos at Marbo villaoe 80c 334 C/o steel arch bridge over Lohit river to connect Manchal 50.00 (SH: Completion of suoerstructures). 335 lmprovement of road from Kamlangnagar to Debar 25 00 (49.00Km). 336 Construction of road from Chowkham-ll to Forest Colonl 40.00 (1.50) (SH:-Earth work, SBC,WBM and Culvert)

337 Construction of Bypass road from BRTF road to Helipad a1 50.00 Parasuramkund (2 50Km) ( SH:-FlC, SBC & Culvert)

338 3/o road from BRTF to Kund (0 60 Km) (SH: CC path with 35.00 'ailino). 339 C/o Approach road in Officer's residential complex at 40.00 Namsai (1 00Km) (SH:-Earth work. GSB. WBM ). 340 C/o Namsai-Diyun road (16.00Km) (SH: Culvert 4mtr span- 10.00 1 No and 2mtr soan-1 No) 341 C/o Manmow-Manfaiseng road (4.00Km) (SH:-RCC bridge 51.00 20m span over Mannow river at Ch.1.30Km). 342 C/o RCC Slab Culvert at Lathao village road (6.00mtr 12 00 soan). 343 C/o RCC Culvert 6.00mtr span at Adi Ninqro villaqe. 15 00 344 C/o link road in between Bhodrachuk to Kharia chuk (L- 20.00 0.540Km) (SH: GSB & RCC Slab Culvert 1.00mtr span- 2Nos). 345 Road from Govt. Primary School Waisali to Moran Chuk (t 25.00 1.50 Km) (SH: GSB & RCC Slab Culvert 1 m span -2 Nos).

346 C/o Colony road at Sitpani Miri (2.50Km) (SH: Earth work, 30.00 GSB & RCC slab Culvert '1 .00mtr soan-4Nos). 347 C/o road from Silatoo Khampti to Bokabeel via Christian 45.0C chuk (2.00Km) (SH: Earth work, GSB, RCC slab Culvert- 6.00mtr soan- 1No\ 348 Trans- Arunachal Highway to Silatoo and.New Silatoo 40 0c village (L-'l .30Km) (SH: Earth work, GSB & RCC Slab Culvert 1.00mtr span-7Nos). l) ,,rl

,;"8:$::[: Rs. in lakh

lmprovement of road from Diyun enO-o Narr,salSHne- WBM & BT- 3.00 Km)

I m provement of Bord umsa towns fr i p-oaOJS H : WAV &

lmprovement of road from pis,- io Lam" ",ilaSe

Extension of Miao township roaO (S.OO t(m) (SH: EW a CD

C/o RCC Bridge over Namchik river-to connect Heltong

C/o Bridge over Namchik river onFMGSVloId t,o SasL,m village (SH:- Approach road & De- launching / Launching

C/o road from Longvi{engman road to-onnecl Sasrrm and Hetman village (SH: FC- .1 .50 Km & culverts). Re-atignment of sangkn@ onwards to Tara river (2.00 Km) (SH: FC, widening &

approach road to Kantang CO He (SH: RCC slab lvert 1.50 m span- 6 Nos, GSB, WBM- il & WBM_ lll_ 1.40 Km & CC drain- 1 40 C/o CC road (Ph- ttt C/o Road from Notun Kheti to Otd GmloJ; T,rap Drstrrct (SH Widening, WBM-| & RCC Slab Culverts) (3.00

C/o Road from CO He to Soha Viliag;jn Tirap Distrjct. Ap (1.500 Km) (SH: F/cutting, WBM| & RCC S/Cutverts)

C/o Township Road, in ilrap Orstnct, np tSH

C/o approach road from Cf roaO io AaEnasip CO HO

/o Road to Engineering Colony ,l Khonsa, rn T,,"p istrict. AP. C/o Protection wall near fisfr eond at Xnonla, ln tri

C/o RRM Wall to protect governmenfquiGr atlokOong in Tirap Distict. AP.

C/oCCStepswithffi I at Khonsa, in Tirao District C/o Road from Tupi-Dadam road io Dadam CO HO, , AP (3.20 Km) (SH: FC & S/Crrtverr) C/o Road from PHE Godown to Seva K;ndra at Kl-,onsa

/o road from Thinsa village to Tethiam upto khonsa_Lazu road point in Khonsa Circle, Tirap Dist, Ap (2 50 Km) (SH: FC & culvert) C/o Approach road to lB & staff quallers at COjO Borduria, in Tirap District, Ap. (0.300 Km C/o Foot bridge i/c protection watt anO CCloot pitfr from road to PHC at Borduria, in Tirap District, Ap

C/o CC Road to Telephone exchange at Aorduria i,", Tir

Replacement of decking for 2 Nos. ot Steet AnOges ni - Nokfan Road, in Tirap District, Ap lmprovement of Drainage system at pHC gorOuria, in fi

CC footpath at CO HQ. Borduria, in firapDrstnct, ne

:-"t"'-tt:?t;'d ft' -\,3N ol

lmprovement of Road from Kanubari to Ringpong (19.00 Km) (CH: 2.40 Km to CH: 7.400 Km) (SH: CC Drain - 500

lmprovement of Longding - Bimlapur Road under Kanubari Division (43.80 Km) (SH: Box Culvert (2x2) - 2 Nos., WBM-

lmprovement of link road to Niaunu village at Longding

Protection work of CC road in Longding (SH: R/ Wall &

lmprovement of road to VKV Niausa (SH: WBM & BT- 0

C/o Protection wall at Zero Point to Helipad ground,

C/o Approach road to Community Hall at Longding (SH:

lmprovement of Longding-Bimalapur road under Division (10.00 Km) (SH; WBM & BT- 7.00 Km).

C/o Link road from Middle School to Saint Thomas School, Pangchau (2.50 Km) (SH: EAI/ & CC road (1.00 Km).

road to PMC via Middle School Wakka. of approach road to Helipad at Wakka C/o Slab culvert at Mailapa Votsum road at Pangchau

C/o Kamuha-Noknu road (SH: BT- 4.00 Km Consultancy Services for preparation of DPR for and Bridges projects of State Roads under PWD.

Providing Hard Standing for Parking in Tawang Circuit

C/o Sub Divisional Office buildinq for PWD Dira Maior renovation of PWD Circle Office at C/o Compound Wall around Circuit House at Buragaon.

C/o B/wall for Circuit House at Nafra ( L-300.00 mtr wi

Hut at Pedunq( PH-lll C/o JE's office cum store at Khenewa under Bameng

JE's office cum store at Lada under Bameng PWD.

Electricfication of PWD office and residential complex at

C/o JE Office at Sawa under PWD Chayang Tajo Division

CO Office at Sawa

wall and boundarv wall at Lumdunq l.B. lnfrastructure Development of the newly created Pakke

Circuit House C/o PWD Sub-Divisional office at C/o New Office Building for Senior Architect of PWD at

C/o Boys and Girls sanitation toilet at Borum

Enouirv Office at Kimin . C/o Boundary Wall around PWD Store at Hapoli (250 Page 18 //:\ c/ gl Rs. in lakh

C/o Securitv fencinq at Nvapin lB.

C/o Securitv fencinq at PWD lB Sanqram. Office buildino at Parsi Parlo C/o CO Office buildinq at Sarli C/o PWD Sub-Division Office and Boundary wall Koduka

lnfrastructure buildinq at Pavenq Circle. lnfrastructure Development of PWD Sub-Division Office and Residential Quarters at Dollunqmukh. lnfrastructure Development (Office Building) of CO Head at Geoen CO Head Quarter C/o Rostrum at Muri -Muqli General C/o of New lnspection Bunglow at Sigi-Gusar Circle HQ.

C/o Boundary Wall around PWD Circuit House at .

Boundary Wall around PWD Division Office at Gensi.

/o Boundary Wall around PWD lB at Gensi. Boundary Wall around PWD Sub-Division Office at

Extension of 4 [four room] l.B at Darak (SH:-Drawing

/o Overhead water tank for 4 room l.B. at Liromoba. C/o Compound Wall around EE's quarter at Yomcha.SH: wall & Steel C/o Boundary Wall around PWD Division office Yomcha. C/o Protection Wall for PWD Store, Aalo ( 3.00 m Ht-85,

C/o Parkinq shed at Division Office, PWD, Aalo. C/o Over Head Water Tank and Bore Well for Division Office Aalo. Extension of lB at Kavinq (SH: 2 Nos VIP Suits). Construction of boundary Wall of PWD Division Office at

struction of boundary wall of VIP Annex & lB at

Special repair & Renovation and furnishing of Circuit house at Jengging including protection works, Boundary wall etc.

C/o Multipurpose Hall 4-Room l.B for C.O HQ at Sinqa. Consiruction of Boundarv wall for C/o Dinninq cum Kitchen for Nari lB. C/o SPT PWD store at Ruksin C/o Boundary wall around PWD section office at Ruksin

wall around PWD section office at Bilat. /o Boundarv wall around PWD lB at Bilat. Garage for Light vehicles in PWD, Division office :Garraqe 10 Nos Compound wall for PWD Garage/store at

C/o of boundary wall for PWD Sub-division office at Geku.

C/o Boundary wall around Mariyang PWD Division office &

C/o Boundary wall for PWD complex and lB at Geying

Special repair & renovation of Anini PWD Division Office.

Furnishino of lB at Etalin and lB al C/o security fencing around PWD Division office to protect 69 Page 19 olc/ 6\ \*\ Rs. in lakh

C/o Boundary wall around PWD Sub-Divisional Store

C/o boundary wall including double leaf steel gate (3 Nos.) around the EE's residences of PWD at Tezu (Length 305

C/o Compound wall around LB. Yeali wall around CO Office, Sunpura /o Boundary Wall around PWD Division Office at Khupa

C/o VIP suit with Conference hall at Circuit House, Khupa.

C/o Generator room / Sub-Station building at Circuit House at Namsai. Up-gradation of lnfrastructure of Community Hall a

Cio Communitv Hall at Pivonq Circle. C/o Community Hall at Lathao Circle Clo Boundary wall around PWD Sub-Division & Sta

Replacement of old timber structure & roofing for lB

C/o PWD lB at Katanq CO HQ Bari-Bisip Circle. C/o Boundary wall, Approach road, Garage, etc., for SE's at Khonsa. in Tirap District. AP. Protection wall and Storm water Drain for Auditorium at

Sub- Total

Construction of Residential building for Tawang pW ircle. ( Sh:-T-lV - 1 Nos .T-lll- 4 C/o 4 Nos Toilet for Divisional office and staff quarter a

C/o B/Barrack 2 Units for WC Staff al C/o B/Barrack 1 Units for WC Staff at Mukto. Clo Bl barrack 1 unit each for Chowkidar at Mukto and

RCC Tvoe-V. 1 No for EE RCC Residential buildings for Engineering Deptt at

C/o Tvpe-ll double unit (First Re-construction of Septic tank and Sewerage system for

C/o Boundary Wall Around AE, PWD Qtr ( T-lV-1 no ) at

C/o Boundary Wall Around JE, PWD Qtr ( T-lll-3no )

Clo T1-2 nos For Cook & Chaukidar at W C/o B/wall around Ty-lll-l No for J.E PWD at Jamiri. C/o PWD Residential Complex at Bomdila(PH-l )(Sh:- f - V-1No T-lV-1 C/o Type- l-2 Nos. for Cooks & Chowkidars near Circuit

T-lll- 1 No & T-l-1 Nos at Nafra for PWD B/wall around PWD Garrage at Nafra ( L-500.00 mtr)

/o B/wall around AE PWD Qtr at Nafra ( L-l20.00 mtr)

/o Bachelor Brrack 2 units ( for WC staff at Nafra Semi RCC Building Type-V building for Executive

Type-ll 4 units for GA Department at Chayang Tajo

\L - '\a$i \5lu*.i'9 ,."H:$;.:$;", : ,1,-"\ Page 20 /"* iJ{,)9"\ G/ iriAls#;:A \t l4 (Rs. in lakh) -l Amount + ffi Particutars Roads & Public Remarks tlo- g Housing ada(_T Bridoes Works 2 3 4 5 6 22 C/o Staff quarters for GA Department at Pipu (Sh:- Type- 40.00 lV, 1 No; Type-lll, 2 Nos; Type-ll, 3 Nos; 8 Men Bachelor Barrack- 1 unit). aa C/o Staff quarters for GA Department at Sawa (Sh:- Type. 30.00 lV, 1 No; Type-lll, 2 Nos; Type-ll, 3 Nos; 8 Men Bachelot Barrack- 1 unit). 24 C/o Residential Qtrs for Pijerang PWD Sub Division(Sh: 20 00 Tv-lV-1 No. Tvoe-lll-1 No. Tvoe-ll-3Nos). 25 C/o T-lV Qtr for PWD Executive Engineer at Pakk€ 10 0c Koccann 26 C/o T-lll qtr for JE PWD at Taia Happa in Passa valley. 10.0c 27 Clo Residential Qtrs for PWD Division at Pakke 20.0c Kessano(Sh:- Tv-lV-1 No. Tvoe-lll-2Nos, Tvpe-ll-2Nos). 28 C/o Bacholor Barrack at Baliian l.B for Cook 10 0c 29 C/o Bacholor Barrack at Balijan Circuit House for '10.0c Chowkidar 30 C/o Bacholor Barrack at Taraso l.B for Cook. 12 0C JI C/o Bacholor Barrack at Sanoduoota l.B for Cook 12.04 C/o Bacholor Barrack at Sangdupota l.B for Chowkidar. 12.00

JJ C/o Bacholor Barrack at Kakoi l.B for Cook 12.0Q a/ C/o Bacholor Barrack at Kakoi l.B for Chowkidar. 12 00 -i5 3/o Securitv Wall for EE residence at Sanqram. 23.00 Jb /o T-lV Qtr for PWD at Siqnvorianq, Kolorianq 40.0c 1'7 3/o Residential Buildino at Koduka for PWD staff 10.00 38 C/o PWD EE Residential Building T- lV and Boundary wall 16.00 at Nacho 39 C/o Double Storied Bui;ding Type-lll Qtr for Junior 14.00 Enqineers at Gensi (4 units) 40 3/o Tvoe-lll Otr for Junior Enoineer at Kanoku 1 No. 4.00 41 C/o T-1. 2 nos for Staff at PWD Sub-Division. Darak 6.00 42 C/o Semi RCC T-V Quarter for EE Aalo. 8.00 43 lnfra-Structure Development of Kodum CO Hq.( SH- SPT 8.40 T-ll- 1 No and 4- Men B/barrack- 1 No.). 44 C/o Tvpe-ll Qtr. for JE at Rumqonq 10.00 45 C/o Tvoe-lll Otr. for AE at Kavino. 400 46 C/o 4-men bachelor barrack at Kavinq 6.00 47 Completion of balance work of SPT-lll Qtr -1 No for JE at 10.00 Tato 48 C/o RCC double stroied Type-lll - 1 block (4 units) for GA 28.00 Dentt at Yinokiono 49 C/o Resdl.Bldg T-lll-1 No for Junior Engineer, PWD a '15.00 Kora. 50 l/o Bachelor Barrack for PWD Staff at Kora. 16.00 51 l/o SPT-IV Quarter for AE.PWD at Bilat. 5.00 52 l/o Comoound wall for AE.PWD Ouarter at Mebo. 10 00 EN /o Compound wall for JE.PWD Quarters at Mebo 10.00 54 lo T1-2 Nos for Enqq. Deptt. Ai Geku 6.40 55 3/o Bachelor barrack for PWD staff at Marivano 5 unit 800 56 3/o SPT 4 men Bachelor barrack for PWD staff at Geying 6.40

57 3/o T-lV-1No for Circle Officer at Anilieh(GA). 18.00 AQ Special Repair and renovation of 3 units Bachelor Barrack 15 00 at Anilieh. 59 C/o Barrack for Drivers at Circuit House at Namsai 12.00 60 C/o RCC residential buildings for Bordumsa ADC HQ (SH: 20.00 T- lll- 2 Nos). 61 C/o RCC residential buildings for Diyun EAC HQ (SH: T- lll 20.00 2 Nos). 62 C/o Residential Building for EAC at Lazu, in Tirap District, 20 0c AP lSH: Tvoe V - 1 No ) 63 C/o Residential Building for GA department at Borduria, in 20.0c Tiran District AP lSH Tvoe lll - 2 Nos ) . 64 C/o Residential building for JE, PWD at Borduria (SH: T- ll 10.0c 1 No). \ Sub-Total (llll 0.00 0.00 874.6C ;? ;*t":*:sta' Page 21

(Rs. in lakh

n of ATI

C/o Arunachal

Up-gradation ofArunachal House and Arunachal Bhawan

/o Guest House at Guwahati Survey and lnvestigation for East West lndustrial Corridor.

State Share towards CSSs Release of state share is subject to actual release of fund from NABARD. Department shall furnish scheme- wise allocation of state share for approval of State Govt.

hanglang- Margherita (37.48 km) in the State o lmprovement of Road from Kamengbari to doimara(length=23.00Km) in the state of Arunachal lmprovement of Road from Tenga to Foot Hiil via length=20.500Km) in the state of Arunachal

C/o Nakhu to Ditchik Road including Bridge over Bichom rive(L=11.00Km) (span-50m) in AP under Bomdila Division under CRF. Job No. CRF/Ar.P/2O1 4-15162

C/o Road from Lechin to Dilrijo(7.00Km) in the state Arunachai Pradesh under CRF. CRF/Ar.P/2014-15167 C/o Basar-Sago PMGSY road to newly created Circle Head Quarter at Sago Piri in West Siang( length=S. under Basar Division in the State of Arunachal Pr under CRF.

C/o Approach road to Model Degree college, (Length=5.58Km) in the state of Arunachal Pradesh u CRF. No. CRF/Ar.P12014-15165 C/o Motorable Bridge over Siyom river at Bene (span- 120m) unde Aalo Division in the State of Arunachal Pradesh under CRF.

Development of lnfrastructure at ADC Hq.(10.00KmXSh:-CC Pavement) in the state of Arunachal

C/o Bridge over river Pare to connect Resing & Tabio village from Leporiang (100 mtrs) in Papury Pare District in Arunachal Pradesh. Page 22 ffffi+\ in lakh {"ll) Amount V Particulars Roads & Public Remarks w. Housing Bridoes Works 1 2 3 4 5 6 11 C/o Joru to Pachang Road in Kra-Daadi District (7.00km 250 00 under CRF in the State of Arunachal pradesh. Job No. CRF/Ar.P/201 5-16173

12 C/o of Tirbin Township road (0-7km)(Sh:- F/C, Soling 100.00 Metalling, Carpeting, R/wall, Culverts etc) under CRF in the State of Arunachal Pradesh.

Job No. CRF/Ar.P/201 5-16t7 1 1a C/o of road and drains in and around Township 200 00 under CRF in the State of Arunachal Pradesh. Job No. CRF/Ar.P/201 5-16177

14 Road infrastructure development of Rumgong ADC Hq 300.00 Town(7.0Okm) under CRF in the State of Arunachal Pradesh. Job No. CRF/Ar.P/20'l s-1Et72 15 C/o RCC Bridge over Sille river on Mirem-Mikong-Jonai 200 0c road under CRF in Arunachal Pradesh. Job No.CRF/A r.P 1201 5-'l 617 4 16 C/o Road from Jarkong to Gumin Nagar, pasighat under 300.0c Pasighat township road in (Sh:- Embankment, cross drainage and pavement) under CRF in the State ofArunachal Pradesh. Job No. CRF/Ar.P/201 5-16175

17 C/o Road from Old Lawang to Jagthung in Tirap Distric. 350 00 under CRF in the State of Arunachal pradesh. Job No. CRF/Ar.P/201 5-16176. 18 C/o Road from Pine Grove to Dilopolyang(Stage-ll) under 150.00 Ziro Sub-Division in in the State of Arunachal Pradesh. (Job No. CRF/Ar.P/2O15-'l 6/781 19 C/o Permanent Bridge over Nyamjang Chu at Namtsering 75.00 under Lumla Sub-Division of of Aruanchal Pradesh.

Job. No.CRF/A r.P I 20 1 6 -17 t90 ZU C/o Approach road to Bomja waterfall including steel 100.00 composite bridge in Tawang District in the State ol

Aru nachal Pradesh. Job. No.CRF/ Ar.P I 201 6-,17 t 8O 21 C/o Steel composite bridge over river Tawangchu on Lhou 75 00 Nallah to Mukto Road(Span 80m) in Tawang District ol Aru n achal Pradesh. Jo b. N o.CRF/A r.P I 201 6-17 t7 9

22 C/o Approach Road from Nafra-Bichom road to Orgyen 100.0c Guru North East Nallanda Monastary in West Kameng District of Arunachal Pradesh.

Job. No.CRF/A r.P I 2O 1 6 -17 t 94 23 C/o Road from Tuluhi to Dizamgania via Kayavalley in 50 00 West Kameng Dsistrict in the State of Arunachal Pradesh. Job. No.CRF/A r.P I 20 1 6 -17 I 86

24 C/o 3 Nos of RCC Bridges & improvement of road fron 100 00 Yingkiong to BRTF road near VKV Ramsing in in Arunachal Pradesh. Job.No. CRF/Ar.P/201 6-'17 182

25 lmprovement of Nari (length-3.50km)(Sh: Embankment, 191.65 pavement, S/culverts, and side drain) under CRF in East Siang Disirict in the Staie of Arunachal Pradesh. J ob.N o.CRF/A t.P I 20 1 6 -17 I 81 .A C/o Steel composite bridge over river Sissar At 14.00km in 50.00 Dambuk-Paglam Road in Lower in Aru nach a I Prades h. Job. No.CRF/A r.P I 201 6 -1 7 lg2 C,r] P. rJe"go$ ot iuga{ Page 23 trqffi\ Rs. in lakh Amount il-Vffi Roads & Public Remarks \.\ /.th.r:: Housing W^rticulars Bridqes Works 1 2 3 4 5 6 27 lmprovement of Hunli Township road in Lower Dibang 100.00 Valley District in Arunachal Pradesh. Jo b.N o.CRF/Ar.P I 201 6-17 I 87 28 C/o Various roads and bridges under Lekang Circle 200.0c Namsai in the State of Arunachal Pradesh.

Job. No.C R F/A r.P I 2O'l 6-'17 I 8E 29 C/o Road from Nongsaya to Mekang Miri in Namsai District 200.0c ofArunachal Pradesh.

Job.No.CRF/Ar.P I 201 6-17 I 88 30 lmprovement of Chongkham Township road (1Okm) in 200.0c Namsai District in the State of Arunachal Pradesh.

Job.No.CR F/Ar.P I 2O1 6-1 7 I 84 JIa1 C/o Double lane RCC Bridge over river Tirap at 50.0c Town in of Arunachal Pradesh.

Job. No.C RF/Ar.P I 201 6-'17 I 89

32 C/o Namsang-Khela Road(Ch 27.00-48 00=21.00km) in 100 0c Tirap District of Arunachal Pradesh. Job. No.C RF/A r.P I 2O1 6 -'17 I 91 JJ C/o 3 Nos RCC bridges in between the road of CO HQ 50.0c Dadam to Muktowa village in Tirap District of Arunachal Pradesh.

Job. No.CRF/A r.P I 2O1 6-'17 I 93 af, c/o RUU double lane bndge(span-45mtr) and road irom 50.0c BRTF road to Layang via SDO Headquarter Sangram(6.00km) in of Arunachal Pradesh.

Job. No.C RF/A r.P I 201 6 -17 196 35 l/o road from Yangte to Nyoing via Ringte(lengtl' 100.0c 3.00km)(Ph-ll) in the State of Arunachal Pradesh.

Job. No.C RF/A r.P I 201 6-'17 I 83 36 C/o Permanent(composite steel) bridge across river 50.0c Yargapchu to connect Singbir village (span-160 mtr) in of Arunachal Pradesh.

Job. No.CRF/A r.P I 2O1 6 -'17 I 95 37 Extension of Township road at Khonsa in Tirap Distt. HQ in 50.0c the State of Arunachal Pradesh. Job No.CRF/Ar P 12O17 -1 8198 Total (G 6500.0( 0.0c 0.00 \ Grand Total 26332.4i 14899.05 9458.98 50690.46 D {)

,tpte -."E:i[n$: