OFFICE OF THE EXECUTIVE ENGINEER ELECTRICAL / ENERGY-I, WORKS & SERVICES DEPARTMENT GOVERNMENT OF , Barrack No. 17, Block 4-A, Sindh Secretariat /0 NO. XEN/EE-1//2016-17/ OD /Karachi Dated: •7

% To, The Manager (CB) Sindh Public Procurement Regulatory Authority, Government of Sindh. Karachi

SUBJECT:- NIT NO. XEN/EE-I/818 — DATED: 01-03-2017

Kindly refer as subject. in this context, it is submitted that above said tenders were opened on dated: 21/03/2017 at 3:00 p.m. in the presence of member of procurement committee and bidders / representatives of bidders. Bid evaluation Reports, Attendance Sheet, Minutes of the Meeting

of bid opening are attached herewith as desired.

I. Minutes of the Meeting 2. Attendance Sheet 3. Bid Evaluation Report 4. //11Z14.17 . 47e/44/ Execu we Engineer Electrical / Energy-I

ATTENDANCE SHEET

The Tender invited this office N.I.T. No: XEN/E.E-I/818 dated 01-03-2017 have been opened before us on 21-03-2017 at 3:00 p.m.

Sr. No. Name of Contractor's Signature of Contract r's 1 7-4 aioriW 5177 ev pg-t _?e f f 2

3 (1// 4Lf , 970 ' 4 151?,e-1ffrf11'4. (S, t .2.-- ‘' 5 L — Afk le..-z.( ---Asoc.6\1)62,3 —i-:i 6 A(\1 4/,),--i t--Ic,- E..5ii c, • _. 7 A4 d,A ..)( dp C/e4-6° i c- I ri.,F ' STV/ Lt;a:CAi c_ Co 8 C t< &hi

9 A /1--N Ana I( 10 ------_-___-- . 11 12 13 14 15 16

17 18

19

20

Member Member Chairman

1.(/#3.3(S01,7._

Abdul Ras eed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi

'el-MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 21-03- 2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017. NAME OF WORK: Strengthening and Improvement of Sindh Government Hospital City Karachi (Electric Work).(S.No-1)

A meeting of above subjected NIT on the basis of single stage-one envelope procedure held on 21-03-2017 at 3.00PM in the office of the Executive Engineer Electrical Energy-I Karachi under Chairmanship of Superintending Engineer Works & Service Department, Karachi. All the members of procurement committee were presets in the office of the undersign to discuss the Bid's invited vide under referred and subsequently hdsted on the web site of Sindh Public Procurement Regularity Authority and Published through information Technology Department, Government of Sindh in leading News papers. 1. Bidders / Representative , who were present , signed the attendance sheet. 2. The Sealed Tenders box was opened at 3.00PM and all the tenders were removed from box and placed on the table. 3. There was no enveloped marked " withdrawal" 4. There was no enveloped marked " modification" 5. After counting the tenders , each tender enveloped was identified by given it a serial No divided by total No of tenders received detailed below. 1/1 M/S Mehrab Electric 2/1 M/S Muhammad Ali Shujrah 3/1 M/S lqbal Enterprises 4/1 M/S R.K Construction & Co. 5/1 M//S Al-Maqbool Associates 6. Bid opening sheet was prepared containing the information relating to Bids announced at the opening 7. Relevant details i.e name of Bidder, total amount of each Bid, amount of call deposit, name of Bank, etc were read aloud against each serial No in the bid opening sheet. 8. • The procurement committee encircle the rate and total bid prices and then all the ember signed the bid opening sheet. •,/)- •

Member mber Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi 0 Bid Evaluation Report (S.No-I)

1. Name of ProcuringAgency: Executive Engineer Electrical/Energy-l. Karachi. : 2. Tender Reference No XEN.E.E-1/818 —Dated:- 01-03-2017

3. Tender Description/Name of work/item: Strengthening and Improvement of Sindh Government Hospital Gadap City Karachi (Electric Work)

4. Method of Procurement: NIL

5. Tender Published: S.PPRA ID No. 319342 .

6. Total Bid documents Sold; 10 Nos .

7. Total Bids Received: 5 Nos .

8. Technical Bid Opening date: (if applicable) 21-03-2017 (Provide details in separate form)

9. No. of Bid technically qualified (if applicable): NIL

10.Bid(s) Rejected: NIL

11.Financial Bid Opening date: 21-03-2017

12. Bid Evaluation Report:

Comparison Cost offered Ranking in Reasons for Name of Firm with S No by the Bidder terms of acceptance/ Remarks or Bidder Estimated cost rejection cost 0 1 2 3 4 5 6 M/S Mehrab I. Rs.4579172/- . Lowest - 1' Lowest Electric M/S 2. Muhammad Rs.7745724/- 2nd Highest - 2nd Highest Ali Shujrah M/S lqba I 3. Rs.8493845/- 3"1 Highest - 3rd Highest Enterprises M/S R.K 4. Construction Rs. I0478687/- 4th Highest - 4th Highest & Co M/S Al- 5. Maqbool Rs.I1270603/- 5th Highest - 5th Highest Assoc' tes

Member —.01°4rember Chairman - Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi COMPERATIVE STATEMENT

NAME OF WORK:- Strengthening and Improvement of Sindh Government Hospital Gadap City Karachi (Electric Work) (S.No-1)

ESTIMATED OF COST 11300000- EARNEST MONEY 2% DATE OF ISSUE 2/3/2017 DATE OF OPENING 21-03-2017

S.NO. NAME OF AGENCY RATE QUOTED BY THE CONTRACTOR AMOUNT REMARKS

1 M/S Mehrab Electric Schedule Items At par and Non Schedule Rs.6579172/- 1st Lowest Items 2 M/S Muhammad Ali Shujrah Schedule Items 32% Below and Non Rs.7745724/- Schedule Items 24.04% Below 3 M/S Iqbal Enterprises Schedule Items 5% Below and Non Rs.8493845/- Schedule Items 4 Schedule Items 25% Below and Non Rs.10478687/- M/S R.K Construction & Co Schedule Items 5 Schedule Items At par and Non Schedule Rs.11270603/- M/S AI-Maqbool Associates Items

Certified that the rates quoted by the M/S Mehrab Electric is found lowest, hence recommend for approval please

ABDUL RASHEED SHAIKH RIO RAFI KHAN SYEt4JHAMMAD FIDA HUSSAIN EXECUTIVE ENGINEER EXECUTIVE ENGINEER SUPERINTENDING ENGINEER ELECTRICAL/ENERGY-I HEALTH INSTITUATION WORKS & SERVICE DEPARTMENT KARACHI KARACHI METROPOLITAN CORPORATION GOVERNMENT OF SINDH KARACHI Bidder Eligibility / Qualification Report .1

Tender # XEN.E.E-I/818 —Dated:- 01-03-2017SPPRA ID 319342 Opening date : 21-03-2017 Strengthening and Improvement of 36 Bedded Hospital f7e Karachi (Electric Work)

S.No Eligibility /Qualification M/S Mehrab M/S M/S lqbal M/S R.K MIS AI-Maqbool Criteria Electric Muhammad Ali Enterprises Construction & Associates Shujrah Co I Bidder is a Company Yes Yes Yes Yes Yes 2 Local Presence in karachi Yes Yes Yes Yes Yes 3 Comply with specification Yes Yes Yes Yes Yes mentioned in bidding documents. 4 Bidder proposes all printing Yes Yes Yes Yes Yes strictly compliant with technical specification no optional item in accepted. 5 Bidders have completed 03 Yes Yes Yes Yes Yes projects of similar nature - satisfactory. 6 The bidders have 03 years of Yes Yes Yes Yes Yes experience in the supply. 7 Income Tax Certificate (NTN) Yes Yes Yes Yes Yes and Active Tax paver eA •

Member - - Member Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi OFFICE OF THE EXECUTIVE ENGINEER ELECTRICAL / ENERGY-I

KARACHI BARRACK NO 17, BLOCK 4-A, SINDH SECRETARIAT, KARACHI NO.XEN/ELECT:/ ENERGY-I/ ,g Karachi dated. .7..2 6 3 ,. 2.11,./7

To,

1 M/S Mehrab Electric 2 M/S Muhammad Ali Shujrah 3 M/S lqbal Enterprises 4 MiS R.K Construction & Co. S M/S AI-Maqbool Associates 6 M/S Jiya Enterprises 7 M/S Anwar Ahmed Construction Co,

SUBJECT: - Meeting

Reference: - NIT No XEN/E.E-I/81 8 dated 01-03-2017

The tender under referred N.I.T was opened in presence of procurement committee on 21 -03-2017, in the office of the

undersigned. It is inform that the some arithmetically correction observed

in your submitted / opened bids, in this connection a meeting of

procurement committee will be held in the office of the

undersigned on 25-03-2017 You are requested to please be present in the above said

meeting.

IA EXECUTIVE ENGINEER ELETRICAL/ENERGY-I frOkAHI

4 ATTENDANCE SHEET

• Opening of Tenders this office N.I.T. No: XEN/E.E-l/818 dated 01-03-2017 have been opened before us on 21-03-2017 after scrutiney of bid and meeting of procurement committee held on 25-03-2017

Sr. No. Name of Contractors Signature of Contractors — 1 Caw (%)"-- ctr (k) 2* P//‘ Alchnvnog.it LS/4d ____Z 3 ,..f.-i ,>71 /1/-( 19- 7-r 4 g 5 ir; iZ -. - - 4 / . .././ r - ilii'l 5 N‘_ - P-f.,,,,,- Acybc; 6 f))c_ k Yzo 8 Bice( n C_ ,-- A ja 7

8

9

10

ABDUL RASHEED SHAIKH TARIIIRAFI KHAN SYED MUHAMMAD FIDA HUSSAIN EXECUTIVE ENGINEER EXECUTIVE ENGINEER SUPERINTENDING ENGINEER ELECTRICAL/ENERGY-I HEALTH INSTITUATION WORKS & SERVICE DEPARTMENT KARACHI KARACHI A1ETROPOLITAN GOVERNMENT OF SINDH CORPORATION KARACHI

•sike MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 25-'03-2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

NAME OF WORK: STRENGTHENING AND IMPROVEMENT OF SINDH GOVERNMENT HOSPITAL GADAP CITY KARACHI (ELECTRIC WORK).(S.NO-1)

A meeting of procurement committee single stage-one Envelope procedure was held on 25-03-2017 in the office of the Executive Engineer Electrical Energy-I Karachi under the financial proposal / Bid after arithmetical correction of N.I.T. NO. XEN/EE- 1/818 DATED:- 01-03-2017.

The meeting is held to consider the corrected bid amounts.

As letters were issued to (1) M/S Mehrab Electric (2) M/s lqbal Enterprises (3) M/S R.K Construction & Co (4) M/S Al- Maqbool Associates vide letter No. XEN/Elect/ Energy-I/874 dated 22-03-2017 respectively.

Participant/ bidders signed the attendance sheet (attached).

Proprietor of M/S Mehrab Electric M/s lqbal Enterprises M/S R.K Construction & Co M/S Al- Maqbool Associates see the corrections and he himself calculated the figures and reached the conclusion that arithmetical correction are made as per rules and he agreed to the values which were read aloud and noted by the bidders.

In the result, M/S Mehrab Electric ranked as 1st lowest bidder, M/s Iqbal Enterprises ranked as 3rd lowest bidder, M/S R.K Construction & Co ranked as 4th lowest bidder and M/S Al- Maqbool Associates 5th lowest bidder and (Disqualify / non responsive). Accordingly bid Evaluation Report is prepared for hoisting in Web.

Finally all members of the Procurement committee signed the bid Evaluation Report.

Member TVlember Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi FINACIAL PROPOSALS AFTER CORRECTION

REFERENCE:- No XEN/E.E-I/818 Dated: 01-03-2017

Name of Work:- Strengthening and Improvement of Sindh Government Hospital Gadap City Karachi (Electric Work).(S.No-1)

Sr. No Firm Pay order No Quoted Bid Arithmetically Discount Corrected Remarks /Bidders Date, Amount & Cost corrected cost Amount Cost. Bank Name Percentage. (a) (b) (c) (d) (e) (f) (g) (h) 1 M/S Mehrab P.0-7174486 Rs.6504172/- Rs.6579172/- Rs.6579172/- Responsive Electric dt:20-03-17 Rs. 130100 Faysal Bank 2 M/S P.0-1061175 Rs.7745724/- Rs.7745724/- Rs.7745724/- Responsive Muhammad dt:21-03-17 Ali Shujrah Rs.180000 Bank Islami 3 M/S lqbal P.0-03126450 Rs.8143845/- Rs.8493845/- Rs.8493845/- Responsive Enterprises dt:20-03- 17 Rs.226014 Al- Habib 4 M/S R.K P.0-12065806 Rs.9479687/- Rs.10478687/- Rs.10478687/- Responsive Constructio dt:21-03-17 n & Co Rs.226014 ABL 5 M/S Al- P.0-00472435 Rs.9715853/- Rs.1 1270603/- Rs.1 1270603/- Responsive Maqbool dt:21-03-17 Associates Rs.226100 Sindh Bank

Me ber firern—b-er Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 21-03- 2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017. NAME OF WORK: Strengthening and Improvement of Sindh Government Hospital Ibrahim Hvdri Karachi (Electric Work) (S.No-2)

A meeting of above subjected NIT on the basis of single stage-one envelope procedure held on 21-03-2017 at 3.00PM in the office of the Executive Engineer Electrical Energy-I Karachi under Chairmanship of Superintending Engineer Works & Service Department, Karachi. All the members of procurement committee were presets in the office of the undersign to discuss the Bid's invited vide under referred and subsequently hosted on the web site of Sindh Public Procurement Regularity Authority and Published through information Technology Department, Government of Sindh in leading News papers. 1. Bidders / Representative , who were present , signed the attendance sheet. 2. The Sealed Tenders box was opened at 3.00PM and all the tenders were removed from box and placed on the table. 3. There was no enveloped marked " withdrawal" 4. There was no enveloped marked " modification" 5. After counting the tenders , each tender enveloped was identified by given it a serial No divided by total No of tenders received detailed below. 1/2 M/S Anwar Ahmed Construction & Co 2/2 M//S Al-Maqbool Associates 3/2 M/S lqbal Enterprises 4/2 M/S Jiya Enterprises . 6. Bid opening sheet was prepared containing the information relating to Bids announced at the opening 7. Relevant details i.e name of Bidder, total amount of each Bid, amount of call deposit, name of Bank, etc were read aloud against each serial No in the bid opening sheet. 8. The procurement committee encircle the rate and total bid prices and then all the member signed the bid opening sheet. )\-

Member Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi r 4 Bid Evaluation Report(S.No-2) I. Name of Procuring Agency: Executive Engineer Electrical/Energy-I, Karachi. 2. Tender Reference No XEN.E.E-I/818 —Dated:- 01-03-2017 3. Tender Description/Name of work/item: Strengthening and Improvement of Sindh Government Hospital Ibrahim Hydri Karachi (Electric Work)

4. Method of Procurement: NIL

5. Tender Published: S.PPRA ID No. 319342 .

6. Total Bid documents Sold; 8 Nos

7. Total Bids Received: 4 Nos

8. Technical Bid Opening date: (if applicable) 21-03-2017 (Provide details in separate form) 9. No. of Bid technically qualified (if applicable): NIL

10. Bid(s) Rejected: NIL

11. Financial Bid Opening date: 21-03-2017

12. Bid Evaluation Report:

Comparison Cost offered Ranking in Reasons for Name of Firm with S No by the Bidder terms of acceptance/ Remarks or Bidder Estimated cost rejection cost 0 1 2 3 4 5 6 M/S Anwar I. Ahmed Constt Rs.5684392/- I s' Lowest - 1 s* Lowest A J Co. M/S Al- 2. Maqbool Rs.7227207/- 2.I'd Highest - 2nd Highest Associates M/S lqbal 3. Rs.7718384/- I'd Highest - 3rd Highest Enterprises

M/S Jiya 4. Rs.13357195/- 4'h Highest 4`h Highest Enterprises

Ors

Member Member Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi 4 COMPERATIVE STATEMENT

NAME OF WORK:- Strengthening and Improvement of Sindh Government Hospital Ibrahim Hydri Karachi (Electric Work) (S.No-2)

ESTIMATED OF COST 8300000 EARNEST MONEY 2% DATE OF ISSUE 2/3/2017 DATE OF OPENING 21-03-2017 S.NO. NAME OF AGENCY RATE QUOTED BY THE CONTRACTOR AMOUNT REMARKS

1 M/S Anwar Ahmed Constt: Schedule Items 18% Below on Part A and Rs.5684392/- 1st Lowest Co 15% Below on Part B and Non Schedule Items 2 M/S Al-Maqbool Associates Schedule Items 15% Below on Part A and Rs7227207/- 20% Below on Part B and Non Schedule Items 3 M/S lqbal Enterprises Schedule Items 5% Below on Part A and Rs.7718384/- 5% Below on Part B and Non Schedule 4 M/S Jiya Enterprises Schedule Items AT Part A and At Par and Rs 13357195/- Part B and Non Schedule Items

Certified that the rates quoted by the M/S Anwar Ahmed Constt: Co is found lowest, hence recommend for approval please

ABDUL RASHEED SHAIKH T IQ RAFT KHAN SYED MUHAMMAD FIDA HUSSAIN EXECUTIVE ENGINEER EXECUTIVE ENGINEER SUPERINTENDING ENGINEER ELECTRICAL/ENERGY-I HEALTH INSTITUATION WORKS & SERVICE DEPARTMENT KARACHI KARACHI METROPOLITAN CORPORATION GOVERNMENT OF SINDH KARACHI Bidder Eligibility / Qualification Report .2

Tender # XEN.E.E-I/818 —Dated:- 01-03-20175PPRA ID 319342 Opening date : 21-03-2017 Strengthening and Improvement of Sindh Government Hospital Ibrahim Hydri Karachi (Electric Work)

S.No Eligibility /Qualification M/S Anwar M/S Al- M/S lqbal M/S Jiya Criteria Ahmed Constt Maqbool Enterprises Enterprises Co. Associates 1 Bidder is a Pakistan Company Yes Yes Yes Yes 2 Local Presence in karachi Yes Yes Yes Yes 3 Comply with specification Yes Yes Yes Yes mentioned in bidding documents. 4 Bidder proposes all printing Yes Yes Yes Yes strictly compliant with technical specification no optional item in accepted. 5 Bidders have completed 03 Yes Yes Yes Yes projects of similar nature satisfactory. 6 The bidders have 03 years of Yes Yes Yes Yes experience in the supply. 7 Income Tax Certificate (NTN) Yes Yes Yes Yes and Active Tax paver

Member ember Chairman Ab • ul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi sib MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 25-03-2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

NAME OF WORK: STRENGTHENING AND IMPROVEMENT OF SINDH GOVERNMENT HOSPITAL IBRAHIM HYDRI KARACHI (ELECTRIC WORK) (S.N0-2)

A meeting of procurement committee single stage-one Envelope procedure was held on 25-03-2017 in the office of the Executive Engineer Electrical Energy-I Karachi under the financial proposal / Bid after arithmetical correction of N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017.

The meeting is held to consider the corrected bid amounts.

As letters were issued to (1) M/S Al- Maqbool Associates (2) M/s Iqbal Enterprises (3) M/s Jiya Enterprises vide letter No. XEN/Elect/ Energy-11874 dated 22-03-2017 respectively.

Participant/ bidders signed the attendance sheet (attached).

Proprietor of M/S Al- Maqbool Associates, M/s Iqbal Enterprises, M/s Jiya Enterprises see the corrections and he himself calculated the figures and reached the conclusion that arithmetical correction are made as per rules and he agreed to the values which were read aloud and noted by the bidders.

In the result, M/S Al- Maqbool Associates ranked as 2nd lowest bidder, M/s Iqbal Enterprises ranked as 3rd lowest bidder, M/S Jiya Enterprises ranked as 4th lowest bidder and M/S Al- Maqbool Associates 5th lowest bidder and (Disqualify / non responsive). Accordingly bid Evaluation Report is prepared for hoisting in Web.

Finally all members of the Procurement committee signed the bid Evaluation Report. ,

Me ber ~IVlember Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi FINACIAL PROPOSALS AFTER CORRECTION

REFERENCE:- No XEN/E.E-I/818 Dated: 01-03-2017

Name of Work:- Strengthening and Improvement of Sindh Government Hospital Ibrahim Hvdri Karachi (Electric Work).(S.No-2)

Sr.No Firm Pay order No Quoted Bid Arithmetically Discount Corrected Remarks /Bidders Date,Amount Cost corrected cost Amount Cost. & Bank Percentage. Name (a) (b) (c) (d) (e) (f) (g) (h) 1 M/S Anwar P.0- Rs.5684392/- Rs.5684392/- Rs.5684392/- Responsive Ahmed 00271345 Construction dt:17-03-17 & Co Rs.156000 Samba Bank 2 M//S Al- P.0- Rs.7554715/- Rs.7607587/- 380378 Rs.7227207/- Responsive Maqbool 00472436 5% Associates dt:21-03-17 Rs.166500 Sindh Bank 3 M/S Iqbal P.0- Rs.7044584/- Rs.7718384/- Rs.7718384/- Responsive Enterprises 03126449 dt:20-03-17 Rs.155724 Al-Habib 4 M/S Jiya P.0- Rs.8500000/- Rs.13357195/- Rs.13357195/- Responsive Enterprises . 03227869 dt:21-03-17 Rs.166386 Babk Al- Habib

Me •er —Member Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi •MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 21-03- 201'rUNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

N.I.T. NO. XEN/EE-l/818 DATED:- 01-03-2017. NAME OF WORK: Strengthening and Improvement of Sindh Government Hospital Goth Karachi (Electric Work) (S.No-3)

A meeting of above subjected NIT on the basis of single stage-one envelope procedure held on 21-03-2017 at 3.00PM in the office of the Executive Engineer Electrical Energy-I Karachi under Chairmanship of Superintending Engineer Works & Service Department, Karachi. All the members of procurement committee were presets in the office of the undersign to discuss the Bid's invited vide under referred and subsequently hosted on the web site of Sindh Public Procurement Regularity Authority and Published through information Technology Department, Government of Sindh in leading News papers. 1. Bidders / Representative , who were present , signed the attendance sheet. 2. The Sealed Tenders box was opened at 3.00PM and all the tenders were removed from box and placed on the table. 3. There was no enveloped marked " withdrawal" 4. There was no enveloped marked " modification" 5. After counting the tenders , each tender enveloped was identified by given it a serial No divided by total No of tenders received detailed below. 1/3 M/S Muhammad Ali Shujrah 2/3 M//S A1-Maqbool Associates

6. Bid opening sheet was prepared containing the information relating to Bids announced at the opening 7. Relevant details i.e name of Bidder, total amount of each Bid, amount of call deposit, name of Bank, etc were read aloud against each serial No in the bid opening sheet. 8. The procurement committee encircle the rate and total bid prices and then all the member signed the bid opening sheet.

Member ember Chairman Abdul Rasheed Shaikh Tariq Rail Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi Bid Evaluation Report(S.No-3) 1.Name of Procuring Agency: Executive Engineer Electrical/Energy-I, Karachi. 2. Tender Reference No XEN.E.E-1/8 I 8 —Dated:- 01-03-2017 3. Tender Description/Name of work/item: Strengthening and Improvement of Sindh Government Hospital Rehri Goth Karachi (Electric Work)

4. Method of Procurement: NIL

5. Tender Published: S.PPRA ID No. 319342 .

6. Total Bid documents Sold; 9 Nos

7. Total Bids Received: 4 Nos

8. Technical Bid Opening date: (if applicable) 21-03-2017 (Provide details in separate form) 9. No. of Bid technically qualified (if applicable): NIL

10.Bid(s) Rejected: 2 Nos

11.Financial Bid Opening date: 21-03-2017

12.Bid Evaluation Report:

Cost offered Comparison Ranking in Reasons for Name of Firm by the with S No terms of acceptance/ Remarks or Bidder Bidder Estimated cost rejection cost 0 1 2 3 4 5 6 M/S I . Muhammad Rs.5890329/- l' Lowest - l' Lowest Ali Shujrah i M/S Al- 2. Maqbool Rs.8305304/- 2"d Highest - 2"d Highest Associates

frd

Member Member Chairman A ul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi COMPERATIVE STATEMENT

NAME OF WORK:- Strengthening and Improvement of Sindh Government Hospital Rehri Goth Karachi (Electric Work) (S.No-3)

ESTIMATED OF COST 8580000 EARNEST MONEY 2% DATE OF ISSUE 2/3/2017 DATE OF OPENING 21-03-2017 S.NO. NAME OF AGENCY RATE QUOTED BY THE CONTRACTOR AMOUNT REMARKS 1 M/S Muhammad Ali Shujrah Schedule Items 32% Below on Part A and Rs 5890329/- and Non Schedule Items 30.90% Below. Schedule Items 32% Below on Part B Non Schedule Items 31 15% Below 2 M/S Al-Maqbool Associates Schedule Items and Non Schedule Items, Rs 8305304/- 30% Below on total bid Amount

Certified that the rates quoted by the M/S Muhammad AIi Shujrah is found lowest, hence recommend for approval please

ABDUL RASHEED SHAIKH -TARTQ RAFT KHAN SYED MUHAMMAD FIDA HUSSAIN EXECUTIVE ENGINEER EXECUTIVE ENGINEER SUPERINTENDING ENGINEER ELECTRICAL/ENERGY-I HEALTH INSTITUATION WORKS & SERVICE DEPARTMENT KARACHI KARACHI METROPOLITAN CORPORATION GOVERNMENT OF SINDH KARACHI 13idder / Qualification Report .3

Tender # XEN.E.E-11818 —Dated:- 01-03-2017SPPRA ID 319342 Opening date : 21-03-2017 Strengthening and Improvement of Sindh Government Hospital Rehri Goth Karachi (Electric Work)

S.No Eligibility /Qualification Criteria M/S Muhammad Ali M/S Al-Maqbool Shujrah Associates 1 Bidder is a Pakistan Company Yes Yes 2 Local Presence in karachi Yes Yes 3 Comply with specification mentioned Yes Yes in bidding documents. 4 Bidder proposes all printing strictly Yes Yes compliant with technical specification no optional item in accepted. 5 Bidders have completed 03 projects Yes Yes of similar nature satisfactory. 6 The bidders have 03 years of Yes Yes experience in the supply. 7 Income Tax Certificate (NTN) and Yes Yes Active Tax paver

ember - Member Chairman A. sul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 15-03-2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

NAME OF WORK STRENGTHENING AND IMPROVEMENT OF SINDH GOVERNMENT HOSPITAL REHRI GOTH KARACHI (ELECTRIC WORK) (S.NO-3)

A meeting of procurement committee single stage-one Envelope procedure was held on 25-03-2017 in the office of the Executive Engineer Electrical Energy-I Karachi under the financial proposal / Bid after arithmetical correction of N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017.

The meeting is held to consider the corrected bid amounts.

As letter was issued to M/S Muhammad Ali Shujrah vide letter No. XEN/Elect/ Energy-I/874 dated 22-03-2017 respectively.

Participant/ bidders signed the attendance sheet (attached).

Proprietor of M/S Muhammad Ali Shujrah, see the corrections and he himself calculated the figures and reached the conclusion that arithmetical correction are made as per rules and he agreed to the values which were read aloud and noted by the bidder.

In the result, M/S Muhammad Ali Shujrah ranked as 1st lowest bidder, and (Disqualify / non responsive). Accordingly bid Evaluation Report is prepared for hoisting in Web.

Finally all members of the Procurement committee signed the bid Evaluation Report.

Member ember Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi FINACIAL PROPOSALS AFTER CORRECTION • REFERENCE:- No XEN/E.E-l/818 Dated: 01-03-2017

Name of Work:- Strengthening and Improvement of Sindh Government Hospital Rehri Goth Karachi (Electric Work) (S.No-3)

Sr.No Firm Pay order No Quoted Bid Arithmetically Discount Corrected Remarks i/Bidders Date,Amount Cost corrected cost Amount Cost. & Bank Percentage. Name (a) (b) (c) (d) (e) (f) (g) (h) 1 M/S P.0-1061 174 Rs.5890103/- Rs.5890329 /- Rs.5890329 /- Responsive Muhammad dt:21 -03-17 Ali Rs.140000 Shujrah. Babk Islami 2 M//S Al- P.0- Rs.8305304/- Rs.8305304/- Rs.8305304/- Responsive Maqbool 00472437 Associates dt:21-03-17 Rs.171900 Sindh Bank 3 M//S P.0- Bid not filled Nil Nil Rejected Ammar 13298494 Enterprises dt:20-03-17 Rs.180000 ABL 4 M//S The P.0- Bid not tilled Nil Nil Rejected World 17121557 Enterprises dt:21-03-17 Rs.171612 HBL

Member --;.-Member Chairman Abdul Rasheed Shaikh Tariq Rail Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi • • MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 21-03- 2011 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017. NAME OF WORK: Strengthening and Improvement of 36 Bedded Hospital Dumba Goal Karachi (Electric Work) (S.No-4)

A meeting of above subjected NIT on the basis of single stage-one envelope procedure held on 21-03-2017 at 3.00PM in the office of the Executive Engineer Electrical Energy-I Karachi under Chairmanship of Superintending Engineer Works & Service Department, Karachi. All the members of procurement committee were presets in the office of the undersign to discuss the Bid's invited vide under referred and subsequently hosted on the web site of Sindh Public Procurement Regularity Authority and Published through information Technology Department, Government of Sindh in leading News papers. 1. Bidders / Representative , who were present , signed the attendance sheet. 2. The Sealed Tenders box was opened at 3.00PM and all the tenders were removed from box and placed on the table. 3. There was no enveloped marked " withdrawal" 4. There was no enveloped marked " modification" 5. After counting the tenders , each tender enveloped was identified by given it a serial No divided by total No of tenders received detailed below. 1/4 M/S Mehrab Electric 2/4 M/S Iqbal Enterprises 3/4 MIS R.K Construction & Co.

6. Bid opening sheet was prepared containing the information relating to Bids announced at the opening 7. Relevant details i.e name of Bidder, total amount of each Bid, amount of call deposit, name of Bank, etc were read aloud against each serial No in the bid opening sheet. 8. The procurement committee encircle the rate and total bid prices and then all the member signed the bid opening sheet.

Member ember Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi Bid Evaluation Report(S.No-4) 1. Name of Procuring Agency: Executive Engineer Electrical/Energy-I, Karachi. 2. Tender Reference No XEN.E.E-I/818 —Dated:- 01-03-2017 3. Tender Description/Name of work/item: Strengthening and Improvement of 36 Bedded Hospital Dumba Goth Karachi (Electric Work)

4. Method of Procurement: NIL

5. Tender Published: S.PPRA ID No. 319342 .

6. Total Bid documents Sold; 9 Nos

7. Total Bids Received: 3 Nos

8. Technical Bid Opening date: (if applicable) 21-03-2017 (Provide details in separate form) 9. No. of Bid technically qualified (if applicable): NIL

10. Bid(s) Rejected: Nil

11.Financial Bid Opening date: 21-03-2017

12. Bid Evaluation Report:

Cost offered Comparison Ranking in Reasons for Name of Firm by the with S No terms of acceptance/ Remarks or Bidder Bidder Estimated cost rejection cost 0 1 2 3 4 5 6 M/S Mehrab 1. Rs.3090961/- l' Lowest - l' Lowest Electric I

M/S lqbal 2. Rs.4163729/- 2"d Highest - 2"d Highest Enterprises M/S R.K 3rd 3. Construction Rs.5077661/- Highest - 3rd Highest & Co

frf

ember Chairman Ab•ul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi A COMPERATIVE STATEMENT

NAME OF WORK:- Strengthening and Improvement of 36 Bedded Hospital Dumba Goth Karachi (Electric Work) (S.No-4)

ESTIMATED OF COST 5200000 EARNEST MONEY 2% DATE OF ISSUE 2/3/2017 DATE OF OPENING 21-03-2017

S.NO. NAME OF AGENCY RATE QUOTED BY THE CONTRACTOR AMOUNT REMARKS

1 M/S Mehrab Electric Schedule Items At par and Non Schedule Rs.3090961/- 1st Lowest Items 2 M/S lqbal Enterprises Schedule Items At par and Non Schedule Rs.4163729/- Items 3 Schedule Items 25% Below and Non Rs.5077661/- M/S R.K Construction & Co Schedule Items

Certified that the rates quoted by the M/S Mehrab Electric is found lowest, hence recommend for approval please

ABDUL RA HEED SHAIKH TAR1Q RAFI KHAN SYED MUHAMMAD FIDA HUSSAIN EXECUTIVE ENGINEER EXECUTIVE ENGINEER SUPERINTENDING ENGINEER ELECTRICAL/ENERGY-I HEALTH INSTITUATION WORKS & SERVICE DEPARTMENT KARACHI KARACHI METROPOLITAN CORPORATION GOVERNMENT OF SINDH KARACHI Bidder Eligibility / Qualification Report .4

Tender # XEN.E.E-I/818 —Dated:- 01-03-2017SPPRA ID 319342 Opening date : 21-03-2017 Strengthening and Improvement of 36 Bedded Hospital Dumba Goth Karachi (Electric Work)

S.No Eligibility /Qualification M/S Mehrab M/S lqbal Enterprises M/S R.K Construction & Co Criteria Electric I Bidder is a Pakistan Company Yes Yes Yes 2 Local Presence in karachi Yes Yes Yes 3 Comply with specification Yes Yes Yes mentioned in bidding documents. 4 Bidder proposes all printing Yes Yes Yes strictly compliant with technical specification no optional item in accepted. 5 Bidders have completed 03 Yes Yes Yes projects of similar nature satisfactory. 6 The bidders have 03 years of Yes Yes Yes experience in the supply. 7 Income Tax Certificate (NTN) Yes Yes Yes and Active Tax paver

Arg

ember Member Chairman Ab ul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON .25-03-2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

NAME OF WORK: STRENGTHENING AND IMPROVEMENT OF 36 BEDDED HOSPITAL DUMBA GOTH KARACHI (ELECTRIC WORK) (S.NO-4)

A meeting of procurement committee single stage-one Envelope procedure was held on 25-03-2017 in the office of the Executive Engineer Electrical Energy-I Karachi under the financial proposal / Bid after arithmetical correction of N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017.

The meeting is held to consider the corrected bid amounts.

As letters were issued to (1) M/S Mehrab Electric (2) M/s lqbal Enterprises (3) M/s R. K. Construction & Co. vide letter No. XEN/Elect/ Energy-I/874 dated 22-03-2017 respectively.

Participant/ bidders signed the attendance sheet (attached).

Proprietor of M/S Mehrab Electric, M/s lqbal Enterprises, M/s R. K. Construction & Co., see the corrections and he himself calculated the figures and reached the conclusion that arithmetical correction are made as per rules and he agreed to the values which were read aloud and noted by the bidders.

In the result, MIS Mehrab Electric ranked as 1 stud lowest bidder, M/s Iqbal Enterprises ranked as 2" lowest bidder, M/S M/s R. K. Construction & Co. ranked as 3rd lowest bidder and (Disqualify / non responsive). Accordingly bid Evaluation Report is prepared for hoisting in Web.

Finally all members of the Procurement committee signed the bid Evaluation Report.

P<4

mber Member Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi FINACI(L PROPOSALS AFTER CORRECTION

REFERENCE:- No XEN/E.E-11818 Dated: 01-03-2017

Name of Work Strengthening and Improvement of 36 Bedded Hospital Dumba Goth Karachi (Electric Work).(S.No-4)

Sr.No Firm Pay order No Quoted Bid Arithmetically Discount Corrected Remarks - /Bidders Date.Amount Cost corrected cost Amount Cost. & Bank Name Percentage. (a) (b) (c) (d) (e) (f) (g) (h) 1 M/S Mehrab P.0-7174485 Rs.2860201/- Rs.3020461/- Rs. 3020461/- Responsive Electric dt:20-03-17 Rs.57300/- Faysal Bank 2 M/S lqbal P.0-03126448 Rs.4092899/- Rs.4163729/- Rs.4163729/- Responsive Enterprises dt:20-03-17 Rs.103676/- Al-Habib 3 M/S R.K P.0-12065805 Rs.4632711/- Rs.5077662/- Rs. 5077662/- Responsive Construction dt:21-03-17 & Co Rs.103676/- ABL

M mber Member Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi

MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 21-03- 4 2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017. NAME OF WORK: Strengthening and Improvement of Government Hospital 2-A Corridor Karachi (Electric Work) (S.No-5)

A meeting of above subjected NIT on the basis of single stage-one envelope procedure held on 21-03-2017 at 3.00PM in the office of the Executive Engineer Electrical Energy-I Karachi under Chairmanship of Superintending Engineer Works & Service Department, Karachi. All the members of procurement committee were presets in the office of the undersign to discuss the Bid's invited vide under referred and subsequently hosted on the web site of Sindh Public Procurement Regularity Authority and Published through information Technology Department, Government of Sindh in leading News papers. 1. Bidders / Representative , who were present , signed the attendance sheet. 2. The Sealed Tenders box was opened at 3.00PM and all the tenders were removed from box and placed on the table. 3. There was no enveloped marked " withdrawal" 4. There was no enveloped marked " modification" 5. After counting the tenders , each tender enveloped was identified by given it a serial No divided by total No of tenders received detailed below. 1/5 M/S Iqbal Enterprises

6. Bid opening sheet was prepared containing the information relating to Bids announced at the opening 7. Relevant details i.e name of Bidder, total amount of each Bid, amount of call deposit, name of Bank, etc were read aloud against each serial No in the bid opening sheet. 8. The procurement committee encircle the rate and total bid prices and then all the member signed the bid opening sheet.

Member ember Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi Bid Evaluation Report(S.No-5) 1. Name of Procuring Agency: Executive Engineer Electrical/Energy-I. Karachi. 2. Tender Reference No XEN.E.E-I/818 —Dated:- 01-03-2017 3. Tender Description/Name of work/item: Strengthening and Improvement of Government Hospital 2-A Cooridor Landhi Karachi (Electric Work)

4. Method of Procurement: NIL

. 5. Tender Published: S.PPRA ID No. 319342 .

6. Total Bid documents Sold; 12 Nos

7. Total Bids Received: 4 Nos

8. Technical Bid Opening date: (if applicable) 21-03-2017 (Provide details in separate form) 9. No. of Bid technically qualified (if applicable): NIL

10. Bid(s) Rejected: 3 Nos

11. Financial Bid Opening date: 21-03-2017

12. Bid Evaluation Report:

Cost offered Comparison Ranking in Reasons for Name of Firm by the with S No terms of acceptance/ Remarks or Bidder Bidder Estimated cost rejection cost 0 1 2 3 4 5 6 MIS lqbal 1. Rs.7,020276/- I s' Lowest - Is' Lowest Enterprises

Member ember -'Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi COMPERATIVE STATEMENT

NAME OF WORK:- Strengthening and Improvement of Government Hospital 2-A Cooridor Landhi Karachi (Electric Work) (S.No-5)

ESTIMATED OF COST 7800000 EARNEST MONEY 2% DATE OF ISSUE 2/3/2017 DATE OF OPENING 21-03-2017

S.NO. NAME OF AGENCY RATE QUOTED BY THE CONTRACTOR AMOUNT REMARKS

1 M/S lqbal Enterprises Schedule Items At par and Non Schedule Rs 7020276/- Items

Certified that the rates quoted by the M/S lqbal Enterprises is found lowest, hence recommend for approval please

ABDUL RASHEED SHAIKH TARIQ RAFI KHAN SYED MUHAMMAD FIDA HUSSAIN EXECUTIVE ENGINEER EXECUTIVE ENGINEER SUPERINTENDING ENGINEER ELECTRICAL/ENERGY-I HEALTH INSTITUATION WORKS & SERVICE DEPARTMENT KARACHI KARACHI METROPOLITAN CORPORATION GOVERNMENT OF SINDH KARACHI EL Bidder Eligibility / Qualification Report .5

Tender # XEN.E.E-I/818 —Dated:- 01-03-2017SPPRA ID 319342 Opening date : 21-03-2017 Strengtheningand Improvement of Government Hos ital 2-A Cooridor Landhi Karachi (Electric Work) S.No Eligibility /Qualification M/S 1qbal Enterprises Criteria 1 Bidder is a Pakistan Company Yes 2 Local Presence in karachi Yes 3 Comply with specification Yes mentioned in bidding documents. 4 Bidder proposes all printing Yes strictly compliant with technical specification no optional item in accepted. 5 Bidders have completed 03 Yes projects of similar nature satisfactory. 6 The bidders have 03 years of Yes experience in the supply. 7 Income Tax Certificate (NTN) Yes and Active Tax paver

ember ember Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi

MINUTES OF THE MEETING OF PROCUREMENT COMMITTEE HELD ON 25-03-2017 UNDER THE CHAIRMANSHIP OF SUPERINTENDING ENGINEER WORKS & SERVICE DEPARTMENT GOVERNMENT OF SINDH KARACHI ( (LIST OF PARTICIPANT ATTACHED

NAME OF WORK STRENGTHENING AND IMPROVEMENT OF GOVERNMENT HOSPITAL 2-A CORRIDOR LANDHI KARACHI (ELECTRIC WORK) (S.NO-5)

A meeting of procurement committee single stage-one Envelope procedure was held on 25-03-2017 in the office of the Executive Engineer Electrical Energy-I Karachi under the financial proposal / Bid after arithmetical correction of N.I.T. NO. XEN/EE-I/818 DATED:- 01-03-2017.

The meeting is held to consider the corrected bid amounts.

As letter was issued to M/S Iqbal Enterprises vide letter No. XEN/Elect/ Energy-I/874 dated 22-03-2017 respectively.

Participant/ bidders signed the attendance sheet (attached).

Proprietor of M/S Iqbal Enterprises, see the corrections and he himself calculated the figures and reached the conclusion that arithmetical correction are made as per rules and he agreed to the values which were read aloud and noted by the bidder.

In the result, M/S Iqbal Enterprises ranked as 1st lowest bidder, and (Disqualify / non responsive). Accordingly bid Evaluation Report is prepared for hoisting in Web.

Finally all members of the Procurement committee signed the bid Evaluation Report.

Me ber Chairman Abdul Rasheed Shaikh Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi th. FINACIAL PROPOSALS AFTER CORRECTION

REFERENCE:- No XEN/E.F-1/818 Dated: 01-03-2017

Name of Work:- Strengthening and Improvement of Government Hospital 2-A Corridor Landhi Karachi (Electric urk) (S.No-5)

Sr.No Firm Pay order No Quoted Bid Arithmetically Discount Corrected Remarks /Bidders Date,Amount Cost corrected cost Amount Cost. & Bank Name Percentage. (a) (b) (c) (d) (e) (I) (g) (h) 1 M/S lqbal P.0-03126451 Rs.7452276/- Rs.7020276/- Rs. 7020276/- Responsive Enterprises dt:20-03-17 Rs.166386 Al-Habib 2 M/S Falcon P.0-17874219 Bid not filled Nil Nil Rejected Engineers dt:21-03-17 Rs.160000 HBL 3 M/S Electro P.0-17874220 Bid not filled Nil Nil Rejected line dt:21-03-17 Engineering Rs.160000 HBL 4 1%.4//S The P.0-17121556 Bid not filled Nil Nil Rejected World dt:21-03-17 Enterprises Rs.155724 HBL

A '17.igt __.- 5„.. -- '- Member -;*Member Chairman Abdul Rasheed Shaikh ----- Tariq Rafi Khan Syed Muhammad Fida Hussain Executive Engineer Executive Engineer Superintending Engineer Electrical / Energy-I Health Institution Works & Service Department Karachi Karachi Metropolitan Corporation Government of Sindh Karachi Karachi OFFICE OF THE EXECUTIVE ENGINEER ELECTRICAL / ENERGY-I KARACHI BARRACK NO 17, BLOCK 4-A, SINDH SECRETARIAT, KARACHI NO.XEN/ELECT:/ENERGY-I/ /e ei Karachi dated. /7 e 2e,/7

To,

The Assistant Director (Assessment) Government of Sindh Sindh Public Procurement Regularity Authority Karachi.

Subject: NIT:REF:NO.XEN/E.E-I/818/17 DATED 01-03-2017 (31932) Reference your office letter No AD (A)/SPPRA/W&S (6)/31932/16-17/1645 Karachi dated 07-04-2017

The Reply in term of Para wise herewith submitted for further acceptance please.

1. The clipping of News Paper published invidely circulation is allied for your ready reference. 2. Procurement Agency has already submitted Annual Procurement plan for current fiscal year is perversely submitted to your good office. 3. Compliant Redressal committee has already formed & Notification submitted to your office copy attached. 4. Procurement committee has already formed & Notification submitted to your office copy attached. 5. Procurement Agency has nor any Telephone No neither and facilities of Fax & Email.

The participant of N.I.T is already working in Different office so it is under stood able they have experience in the flied.

At time of the submission of bid Evolution to your office mistakely do not mention in the bid so if may please mentioned

So it requested top accept all replies against the observation Reased by your good office

J EXECUTIVE ENGINEER ELECTRICAL / ENERGY-I KARACHI Cr)

v--

COVERNIVIEHT OF & SERVICES DEPARTMEHT

Karachi, dated the 74-1/ 7/ 2C 1,: NOTIFICATION

No. E&A(W&S)3-9/91/2014: With the approval of competent authority. Procurement C-rnmittee in terms of Rule-7 of Sindh Public Procurement Rules-2010, is hereby constituted for procurement of "Goods / Works" in the office of Executive Engineer, Electrical I Energy-I, Karachi excludinn procurement involving foreigr exchange with the following composition:-

i) Superintending Engineer, Chairman Works & Services Departmeii:. Karachi.

Executive Engineer, Electrical / Energy-I, Karachi.

iii) Mr. Tang Rafi Khan, Member Executive Engineer, Health Institutions Karachi Metropolitan Corporation.

2. The Functions & Responsibilities of the Committee. in term of Rule-7 & 8 ^f SPPR4- 2010, shall be as under.

a) Preparing of bidding documents b) Carrying out Technical as well as Financial Evaluatior of the bids. c) Preparing Evaluation report as provided in Rule-45: d) Making recommendation for the award of contract to the competent authority' and e) Perform any other function ancillary and incidental to the above.

QAZI SHAHID PERVEZ SECRETARY TO GOVT. OF SINDH

No. E&A(W&S)3-9/91-2014 Karachi, dated the 74' < 20

A copy is forwarded for information to:-

1 The Accountant General, Sindh, Karachi. 2. The Managing Director, SPPRA, Karachi. 3. The Chief Engineer (Buildings). riider:Itx-id ,4

(MUHAMMAD ZAKIR) SECTION OFFICER (GENERAL) FOR SECRETARY TO GOVT. OF SINDH

GOVERNMENT OF SINDH WORKS & SERVICES DEPARTMENT 3757 367equ? Karachi, dated the 27th January, 2017 NOTIFICATION

No. E&A(W&S)3-9/91-14: With the approval of competent authority, a Consultant of Redressal Committee, in terms of Rule-7 of Sindh Public Procurement Rules-2010 (Amended 2013) in the office of Executive Engineer, Buildings Division-I,11,111/ Electrical Energy- I &II I Road & Transport & Executive Engineer, Highways Division, Karachi:-

1. Director General (Design), Works & Services Department, Chairman Government of Sindh, Karachi. 2. Superintending Engineer, Provincial Buildings Circle, Karachi. Member

3. Representative of Accountant General, Sindh Member 1 1

2. The Functions & Responsibilities of the Committee will be same as specified in Rule-31(4) and (5) of Sindh Public Procurement Rule-2010.

SECRETARY TO GOVERNMENT OF SINDH

No. E&A(W&S)3-9/91-2014 Karachi, dated the 27th January, 2017.

A copy is forwarded for information to:-

1. The Accountant General, Sindh, Karachi. 2. The Managing Direct, SPPRA, Karachi. 3. The Chairman / Mt fibers of the Committee. 4. The Deputy Director (Monitoring) PM&E Cell, W&SD, Karachi. 5. P.S to Minister, Works & Services Sindh, Karachi. 6. P.S to Secretary, Works &Services Department, Karachi. 7. Notification file.

SECTION OFFICER (GENERAL) FOR SECRETARY TO GOVT. OF SINDH ANNUAL PROCUREMENT PLAN (WORKS, GOODS 8. SERVICES) WORKS & SERVICES DEPARTMENT, GOVERNMENT OF SINDH, ELECTRICAL/ENERGY-I, KARACHI.

ESTINMATED FUNDS QUANTITY UNIT COST ALLOCATED SOURCE OF FUNDS PROPOSED TIMINGS OF S.NO. DESCRIPTION OF PROCUREMENT. WHERE REMARKS. (WHERE (1000) (ADPS NON-ADPS) PROCUREMENT. PROCUREMENT APPLICABLE APPLICABLE) MILLIONS ist Ott 2nd Qtr 3rd Qtr 4th Qtr 'I strengthening and Improvement of 11.300 (M) 20000 ADP Singal stage-one < Sindh Government Hospital Gadap envelop City Karachi (Electric Work) 2 strengthening and Improvement of 8.300 (M) 37.500 ADP Singal stage--one < Sindh Government Hospital Ibrahim envelop Hydri Karachi (Electric Work)

3 strengthening and Improvement of 8.580 (M) 20 000 ADP Singal stage--one < Sindh Government Hospital Rehri envelop Goth Karachi (Electric Work) 4 strengthening and Improvement of 36 5.200 (M) 15 000 ADP Singal stage-one < Bedded Hospital Dumba Goth envelop Karachi (Electric Work) 5 strengthening and Improvement of 7.800 (M) 20 000 ADP Singal stage--one < Government Hospital 2-A Cooridor envelop Landhi Karachi (Electric Work)

---

EC TIVE ENGINEER b !... ELECTRICAL/ENERGY-( \ CHI

- - - •-•-• =••••• • -••••• '; art.:* .arik t-tyv rtral• 44/`,„er,;..le

Wed )467-7 iris "-r-r:4-c:•••••• •••14,-=47.14f="!‘

Itior, 4.• ;IA I Jl EIDZ dk 1 51744 •el;" dcietev

l'( f• 1r • ,1),ri erre: 54,4114. ;,+f* jic • r4,7`' - r.de•••:‘ ' e.ei" nee" elts ,„ 04:

III • 71" "4," „.• II) of I7 -7-'1' r!'"P ' 174: 5.4- its i M""'"'''r en•-7.7.;": 1>';‘% "Isirt-r." 41aif 11'es s' ;1'.. tf erevg, 511-ff r!,,,oe (woke' Yr rare" re ury • cl's • • r• • — ;1'04 r -0%4-4 i-rei •

*tr-ri are' cr-r.l 1'e-‘f,,,r( :-.."1" •-• r ,14-,;:t4 4 imof Ist :-.4.1"1"sm • .re- • e-r. -15-1 on. „cc fn.:. li r, ra.c ro.•••:-r: wt.?' • 1.17; 7-rc "'r 31( cr-. tr ' fir-A !Is 01 ( *'e.' (Pr?' ilf,‘ trIt-*; ri` z..z 1,0 gj r"-cs 7"-^" P:: KT' '''''&1""fr•I r ._s dpart c. ee.' .4.w-ors kr"rter fr:` 4` - eir ur• r • "" Vk "• --••••."." •••1^ c•-•-•,4:

fTet svrff er.rcr"" rirl re' 3 :4"af rfr' 4/1 co Er if' ers'rs' /13Z z oo 1^.-.1" .114" e 447 1130 IC le'43"rt '•.7‘4'.4-

i i>"'-'cr‘:‘1^•*":1 terfre rrzi vr ie rr-rAct e7-7., 1 ,06 ,

"41 I ste)4 .14 1 "Tar r4. 1 cis, ( 33cr`''"Ir•r‘r 51e' t's•r Cr

d ( r!-Trrir '71",""1-1. ' .'33d d' 19t -,$` -T e. 1st, • I3 c ;•• 33,d 1,41+r tieeti 440:row' JICZ-E0-10 '1);3gC3