<<

Revision T February 2007 MISSIONS SUMMARY Page 155 - STS-113/11A LANDING SSME-TL CREW LAUNCH SITE, SITE/ NOM- SRB ORBIT PAYLOAD MISSION HIGHLIGHTS 7 UP/7 DOWN FLT ORBITER LIFTOFF RUNWAY, ABORT RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, TIME, CROSSRANGE EMERG NO. LANDING LANDING THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES SITES, TIMES PROFILE ET EXPERIMENT FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S ABORT TIMES FLT ENG. S.N. S DURATION, WINDS Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 255 - STS-113/11A STS- OV-105 CDR: KSC 39A KSC 33 (KSC 104/104/ BI-114 51. DIRECT OI- CARGO: KSC W/D: OPF 79, VAB 9, PAD 35 = 123 days 113/ (Flight 19) James D. Wetherbee 328:00:49:47Z 61) 109% 60 INSERTION 29 38393 LBS total. (Flt 6 - STS-32, STS- 7:49:47 PM EST 341:19:37:13Z RSRM (16) (4) ISS Atlantis 52, (P) 2:37:13 PM EST PREDICTED: 86 POST OMS- PAYLOAD LAUNCH POSTPONEMENTS: 11A STS-63, STS-86, 7:49:47 PM EST 100/104.5/1 2: CHARGEABLE: - Launch was postponed from July after Post-STS- STS-102) (A) Saturday 21 04.5/ ET-116 169.9 x 30217 LBS 110 visual inspections of OV-104 Inconel 12” SEQ MPS LH2 Flowliners revealed three cracks to FLT #112 OMS Saturday 5 12/7/02 (14) 72/104.5 125.7 NM PODS: P680/R108/V80/M198 11/23/02 (EST) SLWT- DEPLOYED: SSME 2. Subsequent inspections found cracks in LPO4-26 (14) DEORBIT ACTUAL: 21 29672 LBS other orbiter LH2 Flowliners: KSC-112 - OV-103 - three cracks (SSME 1) RPO1-33 PLT: BURN: 100/104.5/9 FRC5-19 LAUNCH 341:18:31:33Z 9/ NON- - OV-105 - one crack (SSME 1) and one PAD 39A- Paul S. Lockhart crack (SSME 2) (Flt 2 - STS-111) WINDOW: 72/104.5 ET DEPLOYED: - MPTA - one crack (SSME 1) 63 7M08S IN 2 XRANGE: 2.1 IMPACT 46 LBS NM - OV-102 three cracks (SSME 2). OV-102 P681/R279/V176/M24 PANES 1 = 2050 (4) flowliners are CRES. MLP-2 5 ISS ORBIT DIR: AL 2 = 2044 (8) 1:14:10 MIDDECK: After analyses, tests, etc., including PLANAR/PHASE 32 3 = 2045 (7) MET 288 LBS consideration of other repair techniques, the 16TH M/S 1/EV1: decision was made to use weld-repair technique AIM PT: LAT: SHUTTLE and polishing of Flowliner holes. SHUTTLE Michael E. Lopez- ° Alegria EOM PLS: KSC NOMINAL 36.54 S ACCUMULATE - As a result, STS-113 and STS-112 moved FLIGHT TAL: ZZA D ahead of STS-107. STS-113 launch date was set TO ISS (Flt 3 - STS-73, STS- MLGTD: 2846 92) TAL WX: MRN LONG: WEIGHTS: to November 6, 2002 EST. FT ° - At FRR, STS-113 Launch was postponed 1 341:19:37:13Z 158.67 DEPLOYED: SELECTED: W 1189722 LBS day to November 7, 2002 EST at 11:56 PM P682/R202/V163/M17 VEL: 194 KGS RTLS: KSC 197 KEAS NON- (311:04:56Z). 5 33/N/N HDOT: -2.8 FPS DEPLOYED: LAUNCH SCRUBS: TAL: ZZA 1559554 LBS - Scrubbed Monday, November 7 Launch at M/S 2/EV2: 30/N/SF TD NORM 195: CARGO TOTAL: John B. Herrington 3009 FT approximately L-3 hours due to an O2 leak in AOA: KSC 3547208 LBS PCS 2 between ECLSS Supply Valve and 576 P683/R287/M251 33/N/N NLGTD: 5814 Bulkhead. Leak was first noticed when Haz Gas PLS: EDW FT PERFORMANC Detection System indicated an O2 concentration M/S 3 UP/EXP 6 CDR: 22/N/N E MARGINS Kenneth D. 341:19:37:23Z of approximately 150 ppm in the Mid-Body. VEL: 163 KGS (LBS): Troubleshooting procedures isolated the leak to Bowersox TDEL: 159 FPR: 3065 PCS 2 outside the cabin between ECLSS O2 (Flt 5 - STS-50, STS- 0.04 -0.278/- KEAS FUEL BIAS: Supply valve and Crew Module 576 bulkhead. 61, 0.24 HDOT: -5.8 FPS 937 Launch date set to NET Monday, November 18. STS-73, STS-82) Inspection/troubleshooting found a blowing leak DRAG CHUTE FINAL TDDP: MAX Q NAV: 1736 in PCS 2 O2 flex hose near the 576 bulkhead. 763 765 DEPLOY: 155 Replaced PCS 2 O2 and N2 flex hoses. During P684/R146/V97/M130 KEAS RECON: 2486 341:19:37:25Z preparation to get access to PCS 2 O2 line under M/S 4 UP/EXP 6 Flt SRB STG: PLB liner, an Access Platform came in contact PAYLOADS: with the RMS damaging the TPS, Kevlar Eng 1: 2:04.8 2:04 BRK INIT: 65 PLB: KGS honeycomb with minor delamination to PERF: NOMINAL M 3 EOM: ISS 11A composite boom. Tests and analyses proved it (Russia) DRAG CHUTE (ITS P1 TRUSS) is OK to fly-as-is. On November 20, set launch P685/R288/M252 2 ENG TAL JETTISON: 57 WEIGHT: CETA CART B date to 11/22/02. Technical Scrub. (BEN): KGS 200993 LBS SRMS, ODS - Scrubbed 11/22/02 launch planned for M/S 5 UP/EXP 6 Flt 2:33 2:35 341:19:38:00Z 8:15:30 PM EST at L-8 minutes due to unstable Eng 2: X CG: DEORBIT: MIDDECK: weather at ZZA and MRN. Early forecasts were BRK DECEL Donald R. Pettit NEG RETURN: 2 1087.63 APOGEE: ISS 11A showers within 20 nm at Zaragoza and P686/R289/M253 3:52 3:55 FPS : 214 NM occasional overcast 1500 feet and showers at AVE 3.9 PK 5.1 PERIGEE: MRN. At L-1 hour, Moron weather had M/S 3 DN/EXP 5 Flt PTA (U/S 183): LANDING: 212 NM 5 CRYO TK improved and FD updated TAL to Moron. WHEELS STOP: However, both TAL sites were forecast and Eng 2: 5:01 5:01 341:19:38:28Z SETS 13420 FT WEIGHT: VELOCITY: 6 GN2 TANKS observed NO GO at the L-8 minute scrub time Sergei Y. Treschev and at TAL landing times. TAL Weather Scrub. (Russia) PTM (U/S 183): 200939 LBS 25907 FPS RMS 70 6:05 6:10 ROLLOUT: Ben Guerir was not available as a TAL site; (STS-111 Up) 10574 FT however, Ben Guerir was observed NO GO for P687/R283/M248 X CG: ENTRY RMS USED ceiling and showers. SE TAL (ZZA): 75 SEC 1089.52 RANGE: TO UNBERTH 6:00 6:01 M/S 4 DN/EXP 5 CDR: WINDS: 4351 NM P1 ITS AND LAUNCH WINDOW: Valery C. Korzun H3 R7 KTS HAND-OFF - ISS first Planar window opened at SE PTM (U/S OFFICIAL: TO SSRMS 328:00:44:48Z and closed at 328:0054:46Z with (Russia) 646): (STS-111 Up) 0308P13 FOR MATE TO PLT at 328:00:49:47Z (7:49:47 PM EST) for a 6:53 6:59 H4 R7 S0 TRUSS. 7M08S launch window. Second Planar window P688/R282/M247 opened at 328:00:47:56Z and closed at MECO CMD: DENS ALT: 580 328:00:57:55Z. M/S 5 DN/EXP 5 Flt 8:22.4 8:22.9 FT Eng 1: LAUNCH DELAYS: NONE Peggy A. Whitson VI: FLT DURATION: - Launch occurred On-Time at 328:00:49:47Z, (STS-111 Up) 25821 25823 13:18:47:26 7:49:47 PM EST on Saturday, November 23, P689/R281/F35 2002. Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 355 - STS-113/11A Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 156 - STS-113/11A LANDING SSME-TL CREW LAUNCH SITE, SITE/ NOM- SRB ORBIT PAYLOAD MISSION HIGHLIGHTS 7 UP/7 DOWN FLT ORBITER LIFTOFF RUNWAY, ABORT RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, TIME, CROSSRANGE EMERG NO. LANDING LANDING THROTTL AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES SITES, TIMES E ET EXPERIMENT FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S ABORT TIMES FLT PROFILE S DURATION, ENG. S.N. WINDS Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 156 - STS-113/11A STS- Continued… Continued… Continued… Continued… 113/ SS EVA 86 OMS-2: S/T: PERFORMANCE ENHANCEMENTS: ISS DOCKED QUEST EVA 38.12 37:49.2 1015:13:34:10 - Standard Set plus: (1) PE Operational High 11A 12 250 FPS256 FPS Q (WIN/DEC), (2) OMS Assist, (3) 52 NM EMU/TETHERED EVA 2:42 5:31 OV-105: MECO, (4) Del Psi Continued 79 206:14:12:06 … SCHEDULED EVA 80 FIRSTS/LASTS: DURATION 6:45 DISTANCE: - First flight with 3 Days Extension due to 5,735,600 sm weather wave-offs. SS EVA 87 - Record Minimum Crossrange of 2.1 nautical DOCKED QUEST EVA miles. 13 RENDEZVOUS #61: EMU/TETHERED EVA - Rendezvous and Dock with ISS (PMA2 Lab 80 Fwd Port). SCHEDULED EVA 81 DURATION 6:10 FLIGHT DURATION CHANGES: Extended flight 3 days total. SS EVA 88 - EOM - Planned landing at KSC on orbit 170 (Tig DOCKED QUEST EVA orbit 169) at 338:20:49Z, 3:49 PM EST on 14 Wednesday, December 4, 2002. Waved-off EMU/TETHERED EVA landing on orbit 170 (Tig orbit 169) at Tig-21 81 minutes due to NO GO forecast for ceiling SCHEDULED EVA 82 (broken 6000 feet). Weather reported that at DURATION 7:00 landing time ceiling was 8000 feet and showers at 30 nm (GO Observation). - Waved-off landing on orbit 171 (Tig orbit 170) at Tig –24 minutes due to NO GO Forecast of MCC WHITE FCR (42) ceiling 6500 feet. (One day extension) waveoff 1 day. Landing observations verified NO GO (BKN FLIGHT DIRECTORS: 6500 feet). ISS LD/O1 - A. F. - EOM+1 - Waved-off landing at KSC on orbit 185 Algate (Tig orbit 184) at 339:19:54Z, 2:54 PM EST on ISS O 2 - M. A. Thursday, December 5, 2002 at approximately Kirasich Tig-3H15M due to observed 18 knot crosswinds, ISS PLNG - A. P. moisture within 30 nm and broken 7000 feet. Hasbrook -Waved-off landing at KSC on orbit 186 (Tig orbit STS LD/O 1 - P. L. 185) a few minutes later for crosswind, moisture, Engelauf and ceiling violations. STS O 2 - C. A. (Second day Extension) waveoff 2 days. Koerner - EOM+2 - Waved-off landing at KSC on orbit 200 at 340:18:57Z, 1:57 PM EST on Friday, December STS O 3/PLNG - J. M. 6, 2002 at Tig-3H03M due to NO GO forecast and Curry observed drizzle at SLF and overcast 900 ft. A/E - J. P. Shannon - Decided to proceed with DeOrbit Prep for orbit MOD - R. E. Castle 201 landing but not fluid load. Closed the PLBD’s and gave GO for OPS 3 transition. Weather violations continued. Waved-off landing at Tig- 1H12M due to continued NO GO observed and forecast drizzle/fog, visibility 3 miles and overcast 600 feet. (Third Day Extension) waveoff 3 days. -EOM+3 - Landed at KSC Runway 33 on orbit 216 at 341:19:37:13Z, 2:37:13 PM EST, Saturday, December 7, 2002 (MET 13:18:47:26). Total extensions 3 Days (Record for three days extension due to weather, landed on EOM+4). STS-57 was extended 3 days; however, the first day extension was for science and the last 2 days were weather extensions. Record minimum crossrange of 2.1 miles. SHUTTLE NIGHT LAUNCH #28: EVENTS: - NC1 maneuver at 328:03:42:05Z (02:52:28 MET) resultant altitude of 170.2 by 186.7 nm. - MC4 maneuver at 329:20:27Z (01:19:37 MET) resultant altitude 203.3 by 215.5 nm. - ISS Capture (PMA 2 Lab Fwd Port) at 329:21:20:27Z (01:21:08:53 MET) Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 156 - STS-113/11A Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 157 - STS-113/11A LANDING SSME-TL CREW LAUNCH SITE, SITE/ NOM- SRB ORBIT PAYLOAD MISSION HIGHLIGHTS 7 UP/7 DOWN FLT ORBITER LIFTOFF RUNWAY, ABORT RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, TIME, CROSSRANGE EMERG NO. LANDING LANDING THROTTL AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES SITES, TIMES E ET EXPERIMENT FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S ABORT TIMES FLT PROFILE S DURATION, ENG. S.N. WINDS Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 157 - STS-113/11A STS- Continued… 113/ - IELK S/L Transfer (Official transfer of ISS from ISS Crew to Crew) at 11A 330:02:28Z (02:01:39:13 MET) - SRMS unberth of P1 ITS at 330:15:19:51Z Continued (02:14:30 MET) and positioned P1 over orbiter Port Wing for handoff to SSRMS. … (Thereafter SRMS camera was used only for video support of EVA activities.) - SSRMS used to mate P1 ITS to S0 truss at 330:18:50:14Z (02:18:00:27 MET) - EVA 1 Start at 330:19:48Z (02:18:57 МЕТ), ЕVA 1 End at 331:02:33Z (03:01:43 MET) on November 26, 2002, duration 6H45M. All three EVA’s used Pre-Breathe Protocol while exercising on Shuttle Ergometer located in mid-deck. Crew had to use Shuttle Ergometer as the CEVAS had a problem. Made connections between P1 and S0 Trusses. Released launch restraints on CETA Cart, DLA, and TARJ Stinger, installed Node 1 WETA. - Reboost 1 at 331:17:10:47Z (03:16:21 MET) delta V + 2.4 fps, altitude increase 2.4 nm, altitude 216 by 207 nm - EVA 2 Start at 332:18:36Z (04:17:46 MET), EVA 2 End at 333:00:47Z (04:23:57 MET) on November 28, 2002, duration 6H10M. Installed fluid jumpers between P1 & S0. Removed P1 Port & Stbd keel pins. Installed WVS TX Assy on P1. Relocated CETA Cart from P1 to S1. Released P1/P3 line clamps. Removed & stowed Radiator beam launch locks. - Reboost 2 at 333:16:50:59Z (05:16:01:12 MET), delta V = 2.56 fps, altitude increase 0.7 nm, altitude 216 by 209 nm. - EVA 3 Start at 334:19:24Z (06:18:34 MET) and End at 335:02:24Z (07:01:34 MET) on November 30, 2002, duration 7H00M. Installed Z1/P6/Lab, Lab HX, and P1 RBVM SPD’s. Reconfigured electrical harnesses, route power through Main Bus switching units. - Reboost 3 at 335:16:36:47Z (07:15:49 MET), delta V = 8.6 fps, altitude increase 2.4 nm, final orbit 216.6 by 211.4 nm. - Farewell 336:17:18Z (08:16:28 MET) - ODS Upper Hatch closed at 336:17:47:47Z (08:16:58 MET), Lab Fwd Hatch (all hatches closed) closed at 326:18:15:47Z (08:17:26 MET) - Undocking complete at 336:20:04:50Z (08:19:15:03 MET) - Transfers: Shuttle to ISS 2160 lbs plus P1 ITS of 27514 lbs, 690 lbs H2O (672 lbs in 7 CWC’s and 18 lbs in one PWR), 32 lbs O2 used during prebreathe for 3 EVA’s. Plus 6 LiOH cans. Transfer ISS to Shuttle 2250 lbs. - MEPSI deploy at approx. 336:22:25Z (08:21:36 MET) SIGNIFICANT ANOMALIES: - O2 concentration in Mid Body above expected baseline. Replaced secondary O2 line and secondary GN2 flex hoses (IFA STS- 113-V-01). - Right OMS Engine Bi-Propellant Valve 2 position indicator indicated 96 percent Open at start of OMS Assist Burn and continued to indicate 96 percent Open after burn (IFA STS-113-V-02). - S-Band Power Amplifier 2 power output low (IFA STS-113-V-04). - Hardware C&W pushbutton failures - APU 2 GG Bed Heater Cycles Abnormal - Wireless Video System video problems Revision T February 2007 SPACE SHUTTLE MISSIONS SUMMARY Page 157 - STS-113/11A