Logan Airport, Sumner Tunnel Entrance - E/F

Total Page:16

File Type:pdf, Size:1020Kb

Logan Airport, Sumner Tunnel Entrance - E/F #1 EAST BOSTON - Logan Airport, Sumner Tunnel Entrance - E/F DESCRIPTION Unit #1 is a 19’6” x 48’ Spectacular head-on shot located at the entrance to the Sumner Tunnel toll booths and is seen by all traffic lining up to pay the toll leaving Logan International Airport heading into downtown Boston. Vehicles are slowed or stopped in 1 front of the unit as they merge from the airport roadway into the toll both lanes. Travelers from North Shore towns must pass directly by this board on their way into Boston. This unit was utilized by Anheuser Busch as its “Welcome to Boston” billboard for the Major League Baseball All-Star game. This Spectacular unit provides great visibility and excellent exposure for your message. SIZE: 19’6’’H X 48’W Spectacular WEEKLY A18+ IMPs: 302,319 LONGITUDE: -71.0359 LATITUDE: 42.3729 RSA MEDIA 10 Presidential Way, Suite 100, Woburn, MA 01801 P: 617.227.4858 F:781.926.4545 www.rsamedia.com #1 EAST BOSTON - Logan Airport, Sumner Tunnel Entrance - E/F Finished Area 49’W Live Area 48’W Finished Area 20’6”H Area Finished Live Area 19’6” Area Live MATERIAL: Standard Flex Face Vinyl LIVE AREA: 19’6”H X 48’W (registration line on top) FINISHED SIZE: 20’6”’H X 49’W ORIENTATION: West OTHER: N/A FILE PREPARATION: Finished artwork files should be supplied at 360 DPI at 1”=1’ scale or 720 DPI at ½”=1’ scale. All fonts and image files should be included with artwork. All files should be saved in CMYK format. PDF, PSD, AI, EPS, IND, and TIFF files are acceptable. Do not placed critical text or logos closer than 6” to the edge of the live area. FINISHING: 3” Pocket and 3” Bleed incorporated into the overall finished size. Bleed the pockets. Produce on standard vinyl. ARTWORK INQUIRIES, FILES, and SHIPPING INSTRUCTIONS: SHIPPING INQUIRIES: RSA Media c/o Reliable Services RSA Media c/o Susan Eastman 35 Hillman Street, unit #5 10 Presidential Way, Suite 100 Tewksbury, MA 01876 Woburn, MA 01801 Attn: Tony Losurdo 617.227.4858 [email protected] RSA MEDIA 10 Presidential Way, Suite 100, Woburn, MA 01801 P: 617.227.4858 F:781.926.4545 www.rsamedia.com.
Recommended publications
  • Tolling and Transponders in Massachusetts
    DRIVING INNOVATION: TOLLING AND TRANSPONDERS IN MASSACHUSETTS By Wendy Murphy and Scott Haller White Paper No. 150 July 2016 Pioneer Institute for Public Policy Research Pioneer’s Mission Pioneer Institute is an independent, non-partisan, privately funded research organization that seeks to improve the quality of life in Massachusetts through civic discourse and intellectually rigorous, data-driven public policy solutions based on free market principles, individual liberty and responsibility, and the ideal of effective, limited and accountable government. This paper is a publication of the Center for Better Government, which seeks limited, accountable government by promoting competitive delivery of public services, elimination of unnecessary regulation, and a focus on core government functions. Current initiatives promote reform of how the state builds, manages, repairs and finances its transportation assets as well as public employee benefit reform. The Center for School Reform seeks to increase the education options available to parents and students, drive system-wide reform, and ensure accountability in public education. The Center’s work builds on Pioneer’s legacy as a recognized leader in the charter public school movement, and as a champion of greater academic rigor in Massachusetts’ elementary and secondary schools. Current initiatives promote choice and competition, school-based man- agement, and enhanced academic performance in public schools. The Center for Economic Opportunity seeks to keep Massachusetts competitive by pro- moting a healthy business climate, transparent regulation, small business creation in urban areas and sound environmental and development policy. Current initiatives promote market reforms to increase the supply of affordable housing, reduce the cost of doing business, and revitalize urban areas.
    [Show full text]
  • Transportation Impacts of the Massachusetts Turnpike Authority and the Central Artery/Third Harbor Tunnel Project
    Transportation Impacts of the Massachusetts Turnpike Authority and the Central Artery/Third Harbor Tunnel Project Volume I February 2006 After Before IFC Economic Impact of the Massachusetts Turnpike Authority & Related Projects Volume I: The Turnpike Authority as a Transportation Provider Prepared for: Massachusetts Turnpike Authority 10 Park Plaza, Suite 4160, Boston, MA 02116 Prepared by: Economic Development Research Group, Inc. 2 Oliver Street, 9th Floor, Boston, MA 02109 Table of Contents Table of Contents Preface.........................................................................................................................i Summary of Volume I Findings...................................................................................i Introduction ................................................................................................................1 1.1 Analysis Methodology............................................................................................1 1.4 Organization of the Report .....................................................................................2 Overview of Projects...................................................................................................3 2.1 I-93 Central Artery Projects ...................................................................................3 2.2 I-90 Turnpike Extension to Logan Airport.............................................................5 2.3 New Public Safety Services for Boston Area Highways........................................6
    [Show full text]
  • Civic Leadership and the Big Dig…………………………………………………………...1
    CCCIVICIVICIVIC LLLEADERSHIP ANDANDAND THETHETHE BBBIGIGIG DDDIGIGIG BBBYYY DDDAVAVIDIDAVID LLLUBEUBERROFFOFFUBEROFF WWWORORKIKINGORKINGNG PPPAPERAPERAPER 111111 MMMAYAYAY 3 3,3,, 200420 200404 RRRAPPAPORT IIINSTITUTE FOR GGGREREAATTEERREATERR BBBOSTOOSTOOSTONOSTONNN TTTAUBMAUBMANANAUBMAN CCCENTER FOR SSSTATE AND LLLOCAL GGGOVERNMENT JJJOHOHNOHNN FFF. KKKEENNENNEDDYYENNEDY SSSCHOOL OF GGGOVERNMENT HHHARARVVARARDDARVARD UUUNIVERSITY RRRAPPAPORT I NSTITUTE F OR GGGREATERREATERREATER B OSTONOSTONOSTON The Rappaport Institute for Greater Boston, based at Harvard University’s John F. Kennedy School of Govern- ment, works to improve the policy and governance in the Greater Boston area by contributing useful and aca- demically rigorous research to inform policy debates, engaging students in public service, strengthening net- works of academics and practitioners involved in public policy work, promoting dialogue on policy matters in forums and on the web, and providing training for municipal officials in the Greater Boston area. Contact the Rappaport Institute at: Rappaport Institute for Greater Boston John F. Kennedy School of Government 79 John F. Kennedy Street Cambridge, Massachusetts 02138 Telephone: (617) 495-5091 Fax:( 617) 496-1722 Email: [email protected] Web: www.ksg.harvard.edu/rappaport TTTAUBMANAUBMANAUBMAN C ENTERENTERENTER F OR SSSTATE AND LLLOCAL GGGOVERNMENT The Taubman Center for State and Local Government and its affiliated institutes and programs are the Kennedy School of Government's focal point for activities
    [Show full text]
  • Massachusetts Department of Transportation
    Massachusetts Department of Transportation - Highway Division Yearly Traffic & Revenue History Ted Williams Tunnel Ted Williams Tunnel Western Turnpike Boston Extension Sumner Tunnel Combines Tunnels Tobin Bridge Year AIRPORT I-90 McClellan Hwy 1A I-90 Traffic Revenue Traffic Revenue Traffic Revenue Traffic Revenue Traffic Revenue Traffic Revenue Traffic Revenue 1952 1953 1954 1955 1956 1957 7,421,458 $6,648,438 1958 10,922,532 $9,889,107 1959 12,217,215 $11,322,455 1960 13,488,205 $12,302,749 1961 14,603,327 $13,172,779 1962 15,072,291 $13,804,427 1963 15,833,809 $14,443,850 1964 17,740,555 $15,872,702 4,894,225 $281,986 16,331,652 $3,998,422 16,331,652 $3,998,422 1965 21,223,369 $17,643,942 25,438,363 $5,522,348 17,419,201 $4,275,726 17,419,201 $4,275,726 1966 23,461,833 $18,696,712 33,448,863 $7,415,206 18,529,535 $4,561,723 18,529,535 $4,561,723 1967 24,772,000 $19,481,062 37,350,541 $8,555,649 19,538,887 $4,819,274 19,538,887 $4,819,274 1968 26,274,329 $21,934,593 40,199,295 $9,993,242 20,948,054 $5,167,034 20,948,054 $5,167,034 1969 28,427,876 $23,576,095 42,739,219 $10,868,181 21,485,663 $5,305,139 21,485,663 $5,305,139 1970 29,956,985 $24,105,839 43,152,032 $11,611,928 22,328,440 $5,523,609 22,328,440 $5,523,609 1971 31,478,837 $24,835,825 44,628,449 $12,077,499 22,497,090 $5,584,754 22,497,090 $5,584,754 1972 33,294,919 $26,072,707 46,806,836 $12,726,213 23,236,310 $5,766,015 23,236,310 $5,766,015 1973 34,862,305 $27,094,780 48,067,041 $13,112,629 25,625,311 $6,377,143 25,625,311 $6,377,143 1974 32,658,641 $25,029,300 46,143,522
    [Show full text]
  • 1 Interview with Fred Salvucci, Former Massachusetts Secretary Of
    Interview with Fred Salvucci, former Massachusetts Secretary of Transportation, for Program Four: “The Big Dig” Note: This transcript is from a videotaped interview for “The Big Dig” segment of “Great Projects.” It has been edited lightly for readability. Interviewer (INT): What are the first three words that jump into your mind when you hear the word “Boston”? Fred Salvucci (FS): Great city. I like it. INT: What do you like about it? FS: Well, it's got all of these exciting assets within walking distance of each other. It's absolutely unique in the United States. We’ve got the capitol of the state, the finance center, essentially, of New England. We've got the North Station with the Bruins and the Celtics. You’ve got Fenway Park. You've got Harvard. You've got MIT. You've got Boston University. You've got the Mass General Hospital and all of these assets; you could walk from one to the other. I mean we have all of this intensity in a very concentrated area. Even other cities that that people compare to Boston sometimes don't, like San Francisco, which is a great city, [but] they don't have quite this concentration and residential neighborhoods the North End, the Back Bay, Beacon Hill, the South End really within walking distance. And I love where I live, out in Brighton -- it's accessible. Everything is inter-accessible. And you can get around. It's a nice place to walk, which is important. INT: How long have you been living in Boston? FS: Well, I was born in Boston, and the section of Boston I live in is in Brighton.
    [Show full text]
  • Draft NHMRR Federal Register Notice
    State: Massachusetts State Agency: MA DOT FMCSA: MA FMCSA Field Office POC: Eileen Fenton FMCSA POC: MA Motor Carrier Division Administrator Address: 3150 Ten Park Plaza Address: 50 Mall Road, Suite 212 Boston, MA 02116 Burlington, MA 01803 Phone: (617) 973-7760 Phone: (781) 425-3210 Fax: (617) 973-8037 Fax: (781) 425-3225 Web Address: www.massdot.state.ma.us/ highway/Main.aspx Massachussets – Restricted HM routes Desig- Restriction(s) Route nation Route Description City (0,1,2,3,4,5,6,7,8,9,i) Order Date 06/13/12 A City of Boston [City Streets in Downtown Area] Boston 0 [Use of City Streets in the Downtown Area for the through transportation of ALL NRHM in the City of Boston is prohibited between 6:00 a.m. and 8:00 p.m. where there is neither a point of origin nor destination (delivery point) within the City. For local deliveries within Boston, use of City Streets in the Downtown Area for the transportation of NRHM is further STRICTLY PROHIBITED during the hours of 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. daily, except on Saturdays, Sundays, and legal holidays. When city streets are to be used for local deliveries, the transporter must use Major Thoroughfares to a point as close as possible to the destination and comply with 49 CFR 397.67.] Downtown Area is defined as the area bounded by and including Massachusetts Avenue at the Mass. Ave. Entrance Ramp to the Southeast Expressway, the Southeast Expressway to the Kneeland Street Ramp, along Kneeland Street to Atlantic Avenue then along a line following the waterfront to the Charles River, along the Charles River to Massachusetts Avenue and along Massachusetts Avenue to the Mass.
    [Show full text]
  • The Bridge: the Belmont Street Bridge Carries Belmont Street (Route 9
    PRUDENTIAL TUNNEL CEILING REMOVAL PROJECT What to Expect: The Massachusetts Convention the Massachusetts Convention Center Authority (MCCA) and the Massachusetts Department of Transportation (MassDOT) will be conducting four significant weekend lane restrictions on the Massachusetts Turnpike (Interstate 90) to support the removal of the Prudential Tunnel ceiling, an asset owned and maintained by the MCCA. The restrictions will reduce the number of travel lanes in each direction on the Massachusetts Turnpike (I-90) through the Pru Tunnel on the following weekends beginning at 9 PM Friday through 5 AM Monday: March 21-23: I-90 Westbound March 28-30: I-90 Westbound April 4-6: I-90 Eastbound April 25-27: I-90 Eastbound Beginning at 9 PM on Friday night, lane restrictions will be implemented on both eastbound and westbound I-90 in Boston. By approximately 3 AM on Saturday, traffic in both directions will be reduced to a single travel lane until 5 AM on Monday. Due to the reduced number of travel lanes for both directions of I-90, most of the on- and off-ramps between the Alston/Brighton Tolls and I-93 in Boston will be closed for the duration of the weekend. Motorists should expect significant delays and congestion as a result of this necessary work on the ceiling of the Prudential Tunnel. What to Do: For those traveling locally in Boston, increased traffic will likely be present on surface streets in the Back Bay. Detours to access the Turnpike (I-90) westbound will be in place. For those traveling to Boston from the west, consider using an alternate route to downtown such as Storrow Drive from the Allston/Brighton Toll Interchange on I-90 or Interstate 95 (Route 128) to Interstate 93.
    [Show full text]
  • 700 Cmr: Massachusetts Department of Transportation
    700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION 700 CMR 7.00: USE OF THE MASSACHUSETTS TURNPIKE AND THE METROPOLITAN HIGHWAY SYSTEM Section 7.01: Scope and Effect 7.02: Definitions 7.03: Tolls 7.04: EZDriveMA Toll Collection 7.05: EZDriveMA Toll Enforcement 7.06: Limitations on Use of Ways 7.07: Special Limitations and Issuance of Special Permits 7.08: Limitations on Large Tandem Units 7.09: Traffic, Operation, and Safety 7.10: Motor Carrier Safety Act 7.11: Hazardous Materials 7.12: Repair or Removal of Vehicle 7.13: Penalties 7.14: Parking Violation Enforcement 7.01: Scope and Effect (1) Scope. 700 CMR 7.00 regulates activity, and establishes procedures, requirements, and penalties, with respect to the use of ways under the jurisdiction of the Massachusetts Department of Transportation. A provision of 700 CMR 7.00 applies equally to each such way, whether or not the provision refers explicitly to a way, unless the provision states otherwise. (2) Effect. The headings of 700 CMR 7.00 are provided for ease of reference only and should not be used to construe its provisions. A judicial determination that a provision of 700 CMR 7.00 is unenforceable does not affect another provision of 700 CMR 7.00 unless the provisions are integrally related and cannot be severed. 7.02: Definitions The following terms and their grammatical counterparts are used in 700 CMR 7.00 as described in 700 CMR 7.02: Abandoned Vehicle refers to a vehicle other than a disabled vehicle left on a way with neither the operator nor another responsible individual present.
    [Show full text]
  • All Electronic Tolling (AET): Frequently Asked Questions
    Charles D. Baker, Governor Karyn E. Polito, Lieutenant. Governor Stephanie Pollack, MassDOT Secretary & CEO 8/22/2016 All Electronic Tolling (AET): Frequently Asked Questions In 2012, MassDOT made the decision to transition to an All Electronic Tolling (AET) system for the Massachusetts Turnpike (I-90) as well as all of the Boston tunnels and the Tobin Memorial Bridge. MassDOT is currently testing the AET system and plans to activate it by the end of October. AET: Background Why is AET being implemented? The primary purpose of AET is to increase safety and convenience for the traveling public by eliminating the sometimes dramatic speed reductions and congestion that occur at toll plaza, which studies have shown to be a significant source of crashes. AET will improve safety since crashes occur more frequently both in the approaches to toll booths and as vehicles exit the toll booths and move into travel lanes. The crash rate for the Weston toll plaza, for example, is about 60 percent higher than it is on the adjacent mainline roadway. AET will also help improve air quality by reducing emissions from vehicles idling in toll lanes or accelerating and decelerating in manual collection toll lanes as well as in existing E-ZPass lanes, where drivers must now reduce their speed to 15 miles an hour. AET will save the motoring public more than 800 hours of time every day, or 280,000 hours a year. The system will also save drivers up to 875,000 gallons of gasoline a year. How does AET work? AET gantries have been installed and equipped with sensors that will electronically register toll charges as vehicles pass under them.
    [Show full text]
  • Callahan Tunnel Capacity Management
    Transportation Research Record 1005 1 Callahan Tunnel Capacity Management HERBERT S. LEVINSON, MARVIN GOLENBERG, and JANE HOWARD ABSTRACT The Callahan Tunnel capacity management actions that were implemented beginning May 1983 in conjunction with one-way inbound toll collection are described. Traffic operations and capacities for both "before• and "after" conditions are analyzed. The analyses of existing Callahan peak-hour traffic volumes, flows through the parallel Sumner Tunnel, and volumes in the four New York City tun­ nels provided a basis for estimating tunnel and tunnel-system capacity. The analyses suggested a tunnel capacity of 1,600 to 1,650 vehicles per lane per hour compared with average peak-hour system volumes of 1,450 vehicles per lane. Channelization of the tunnel approach, elimination of outbound toll collection, and realignment of the tunnel exit lanes were estimated to increase system throughput by about 350 to 400 vehicles per hour--up to 200 vehicles per lane. "After• studies conducted during June 1983 indicated that flow rates of more than 1,600 vehicles per lane were achieved. The plan is significant in another respect--speed of implementation. Improvement concepts were formulated during March and April 1983, and their implementation began during May of that year. The opening of the Sumner Tunnel in 1934 as a two­ Tunnel) in coordination with similar one-way inbound lane, two-way facility created the first significant toll operations on the Tobin Bridge (Mystic River and direct automobile link between East Boston and Bridge) • Underlying objectives were to (a) increase North Shore communities and the city of Boston and tunnel throughput, (bl reduce the amount and dura­ conununities lying to the south of the Charles River tion of queueing at the tunnel approach, and (c) and Boston Harbor.
    [Show full text]
  • Best Practices for Roadway Tunnel Design, Construction, Maintenance, Inspection, and Operations
    NCHRP Project 20-68A Scan 09-05 Best Practices For Roadway Tunnel Design, Construction, Maintenance, Inspection, And Operations Supported by the National Cooperative Highway Research Program April 2011 The information contained in this report was prepared as part of NCHRP Project 20 68A U.S. Domestic Scan, National Cooperative Highway Research Program. SPECIAL NOTE: This report IS NOT an official publication of the National Cooperative Highway Research Program, Transportation Research Board, National Research Council, or The National Academies. Acknowledgments The work described in this document was conducted as part of NCHRP Project 20-68A, the U.S. Domestic Scan program. This program was requested by the American Association of State Highway and Transportation Officials (AASHTO), with funding provided through the National Cooperative Highway Research Program (NCHRP). The NCHRP is supported by annual voluntary contributions from the state departments of transportation. Additional support for selected scans is provided by the U.S. Federal Highway Administration and other agencies. The purpose of each scan and of Project 20-68A as a whole is to accelerate beneficial innovation by facilitating information sharing and technology exchange among the states and other transportation agencies, and identifying actionable items of common interest. Experience has shown that personal contact with new ideas and their application is a particularly valuable means for such sharing and exchange. A scan entails peer-to-peer discussions between practitioners who have implemented new practices and others who are able to disseminate knowledge of these new practices and their possible benefits to a broad audience of other users. Each scan addresses a single technical topic selected by AASHTO and the NCHRP 20-68A Project Panel.
    [Show full text]
  • Massdot Moves Forward on All Electronic Tolling
    For Immediate Release August 22, 2016 For Information Contact MassDOT Press Office: 857-368-8500 MassDOT Moves Forward on All Electronic Tolling Proposes Revenue Neutral Tolling Rates and Funds Contracts for Toll Plaza Removal in 2017 Discount for E-ZPassMA users extended statewide; end-to-end E-ZPassMA tolling rates on I- 90 reduced August 22, 2016, Boston - The Massachusetts Department of Transportation (MassDOT) Board acted today to move ahead with plans to completely demolish Interstate 90 toll plazas by the end of 2017 as a milestone in the state’s progress toward All Electronic Tolling (AET) along Interstate 90 (the Massachusetts Turnpike), the Tobin Bridge, and Boston tunnels. At today’s Board meeting, MassDOT announced that AET will “go live” on October 28. The Board approved toll demolition contracts, reviewed data security and retention proposals and instructed MassDOT to proceed with public hearings on proposed toll rates designed to be revenue neutral and minimize changes in toll charges for current commuters. “The AET system will improve driver convenience and safety and reduce greenhouse gas- causing vehicle emissions,” said MassDOT Highway Administrator Thomas J. Tinlin. “When toll booths have been removed, AET will allow drivers to maintain regular highway speed as they pass under AET gantries, eliminating the need for drivers to sharply reduce speed and idle in toll booth lines.” The Board-approved contracts provide that tolls booths will begin to be demolished as soon as AET goes live and all work to remove toll plazas and reconstruct roadways is to be completed by the end of 2017. Toll plaza removal and reconstruction, excluding the Sumner Tunnel, will cost about $133 million.
    [Show full text]