Factsheet Wivenhoe Pumped Storage Hydroelectric Power Station WIVENHOE PUMPED STORAGE HYDROELECTRIC POWER STATION About CleanCo CleanCo is Queensland’s publicly owned clean energy generator, with a current trading portfolio of 1, 120 MW in the National Energy Market (NEM). CleanCo has a target to support 1, 000 MW of new renewable energy generation by 2025 and will achieve this by building, owning and operating renewable energy projects and by supporting investment in other new renewable energy projects. CleanCo’s foundation assets include the Wivenhoe pumped storage hydroelectric power station, Swanbank E gas-fired power station, and three Location: Commissioned: hydroelectric power stations in Far North Queensland: Wivenhoe Pocket via 1984 Barron Gorge, Kareeya and Koombooloomba. Fernvale in South East Capacity: Queensland 570 megawatts (MW) OUR FOUNDATION ASSETS About Wivenhoe Power Station Barron Gorge Hydroelectric Commissioned in 1984, Wivenhoe Power Power Station 66 MW Station is the only pumped storage hydroelectric plant in Queensland and Kareeya Hydroelectric provides fast ramping capability to support Power Station 88 MW a stable electricity supply. Wivenhoe’s two 285 MW generators are the largest Cairns Koombooloomba hydromachines in Australia, weighing 1, 500 tonnes each. Hydroelectric Power Station Using electricity from the grid, Wivenhoe Power Station 7 MW pumps water uphill from Wivenhoe Dam, into Splityard Wivenhoe Creek Dam. Pumped Storage The water is stored at Splityard Creek Dam until it is Hydroelectric required for electricity generation, at which time the Power Station 570 MW water is released back downhill to the turbines at the power station to generate electricity. Brisbane The water then flows back into Wivenhoe Dam, where it can be pumped back uphill to Splityard Creek Dam to generate more electricity. In this way, Wivenhoe Power Swanbank E Station works like a giant rechargeable battery. Power Station 385 MW.
Recommended publications
  • Fact Sheet How Dams Work
    Fact sheet How dams work December 2015 In South East Queensland, our drinking water is predominantly Flood mitigation sourced from dams, which collect run-off rainwater from our catchments and store it. Our dams provide a safe, secure and At its most basic level, flood mitigation is capturing water and cost-effective water supply, as well as help to mitigate floods. then releasing it at a slower rate, with the aim of minimising river levels downstream of the dam. When dams fill, they are designed to pass the excess water into the creek or river system they are built on. What is Full Supply Level? Dam release notification service The Full Supply Level of a dam is the approved water storage level of the dam for drinking and/or irrigation purposes. Seqwater offers a free dam release notification service, which provides subscribers with notifications when gated dams For un-gated dams, if inflows result in the water level rising release water or un-gated dams are spilling. above the Full Supply Level, the water will spill out of the dam. This spilling cannot be controlled. Subscribers to Seqwater’s dam release notification service will also be notified when higher outflows are occurring from For our gated dams (Wivenhoe, Somerset and North Pine), if a spilling dam due to high inflows resulting from rainfall in the inflows result in the water level rising above the Full Supply catchment. Level, Seqwater will make controlled releases for either flood mitigation or to protect the safety of the dam. These notifications advise caution downstream due to potential hazards to people and property.
    [Show full text]
  • Where Water Comes From
    Year 6 Lesson 1 Where water comes from www.logan.qld.gov.au Learning objectives Students will be able to determine: The definition of a catchment. Basic principles of catchment management. Issues associated with balancing the needs of various catchment users. Learning outcomes Subject Strand & Content Descriptors Science Science Understanding Sudden geological changes or extreme weather conditions can affect Earth's surface (ACSSU095) Science as a Human Endeavour Scientific knowledge is used to inform personal and community decisions (ACSHE220) Geography Geographical Knowledge & Understanding Places are connected to each other locally, regionally and globally, through the movement of goods, people and ideas as well as human or environmental events. Geographical Skills & Understanding Pose geographical questions that range in complexity and guide deep inquiry then speculate on their answers Identify a variety of information sources that will be used for inquiry, considering their validity Identify and create appropriate materials, geographical tools or equipment to collect data or observations, using formal measurements and digital and spatial technologies as appropriate Important questions What is a catchment? How do well-managed catchments contribute to clean water supplies? What impacts can industrial, agricultural or other users have on the dam catchment? What mechanisms are used to manage competing demands on catchments? P 1 of 3 DM 7962814 www.logan.qld.gov.au Background information – the dam and its catchment A catchment is an area of land, bordered by hills or mountains, from which runoff flows to a low point – either a dam or the mouth of the river. Water running from a bath down the plughole is a simple representation of a catchment.
    [Show full text]
  • Electrical Modeling of a Thermal Power Station
    Electrical Modeling of a Thermal Power Station Reinhard Kaisinger Degree project in Electric Power Systems Second Level Stockholm, Sweden 2011 XR-EE-ES 2011:010 ELECTRICAL MODELING OF A THERMAL POWER STATION Reinhard Kaisinger Masters’ Degree Project Kungliga Tekniska Högskolan (KTH) Stockholm, Sweden 2011 XR-EE-ES 2011:010 Table of Contents Page ABSTRACT V SAMMANFATTNING VI ACKNOWLEDGEMENT VII ORGANIZATION OF THE REPORT VIII 1 INTRODUCTION 1 2 BACKGROUND 3 2.1 Facilities in a Thermal Power Plant 3 2.2 Thermal Power Plant Operation 4 2.2.1 Fuel and Combustion 4 2.2.2 Rankine Cycle 4 2.3 Thermal Power Plant Control 6 2.3.1 Turbine Governor 7 2.4 Amagerværket Block 1 7 2.5 Frequency Control 9 2.5.1 Frequency Control in the ENTSO-E RG Continental Europe Power System 9 2.5.2 Frequency Control in the ENTSO-E RG Nordic Power System 10 2.5.3 Decentralized Frequency Control Action 11 2.5.4 Centralized Frequency Control Action 12 3 MODELING 14 3.1 Modeling and Simulation Software 14 3.1.1 Acausality 14 3.1.2 Differential-Algebraic Equations 15 3.1.3 The ObjectStab Library 15 3.1.4 The ThermoPower Library 16 3.2 Connectors 16 3.3 Synchronous Generator 17 3.4 Steam Turbine 22 3.5 Control Valves 23 3.6 Boiler, Re-heater and Condenser 23 3.7 Overall Steam Cycle 23 3.8 Excitation System and Power System Stabilizer 24 3.9 Turbine Governor 25 3.10 Turbine-Generator Shaft 26 3.11 Overall Model 26 3.12 Boundary Conditions 27 3.13 Simplifications within the Model 28 3.13.1 Steam Cycle 28 3.13.2 Governor 28 3.13.3 Valves and Valve Characteristics 29 3.13.4
    [Show full text]
  • DESIGN of a WATER TOWER ENERGY STORAGE SYSTEM a Thesis Presented to the Faculty of Graduate School University of Missouri
    DESIGN OF A WATER TOWER ENERGY STORAGE SYSTEM A Thesis Presented to The Faculty of Graduate School University of Missouri - Columbia In Partial Fulfillment of the Requirements for the Degree Master of Science by SAGAR KISHOR GIRI Dr. Noah Manring, Thesis Supervisor MAY 2013 The undersigned, appointed by the Dean of the Graduate School, have examined he thesis entitled DESIGN OF A WATER TOWER ENERGY STORAGE SYSTEM presented by SAGAR KISHOR GIRI a candidate for the degree of MASTER OF SCIENCE and hereby certify that in their opinion it is worthy of acceptance. Dr. Noah Manring Dr. Roger Fales Dr. Robert O`Connell ACKNOWLEDGEMENT I would like to express my appreciation to my thesis advisor, Dr. Noah Manring, for his constant guidance, advice and motivation to overcome any and all obstacles faced while conducting this research and support throughout my degree program without which I could not have completed my master’s degree. Furthermore, I extend my appreciation to Dr. Roger Fales and Dr. Robert O`Connell for serving on my thesis committee. I also would like to express my gratitude to all the students, professors and staff of Mechanical and Aerospace Engineering department for all the support and helping me to complete my master’s degree successfully and creating an exceptional environment in which to work and study. Finally, last, but of course not the least, I would like to thank my parents, my sister and my friends for their continuous support and encouragement to complete my program, research and thesis. ii TABLE OF CONTENTS ACKNOWLEDGEMENTS ............................................................................................ ii ABSTRACT .................................................................................................................... v LIST OF FIGURES .......................................................................................................
    [Show full text]
  • Fact Sheet Wivenhoe Dam
    Fact sheet Wivenhoe Dam Wivenhoe Dam Wivenhoe Dam’s primary function is to provide a safe drinking Key facts water supply to the people of Brisbane and surrounding areas. It also provides flood mitigation. Name Wivenhoe Dam (Lake Wivenhoe) Watercourse Brisbane River The water from Lake Wivenhoe, the reservoir formed by the dam, is stored before being treated to produce drinking water Location Upstream of Fernvale and follows the water journey of source, store and supply. Catchment area 7020.0 square kilometres Length of dam wall 2300.0 metres Source Year completed 1984 Wivenhoe Dam is located on the Brisbane River in the Somerset Type of construction Zoned earth and rock fill Regional Council area. embankment Spillway gates 5 Water supply Full supply capacity 1,165,238 megalitres Wivenhoe Dam provides a safe drinking water supply for Flood mitigation 1,967,000 megalitres Brisbane, Ipswich, Logan, Gold Coast, Beaudesert, Esk, Gatton, Laidley, Kilcoy, Nanango and surrounding areas. The construction of the dam involved the placement of around 4 million cubic metres of earth and rock fill, and around 140,000 Wivenhoe Dam was designed and built as a multifunctional cubic metres of concrete in the spillway section. Excavation facility. The dam was built upstream of the Brisbane River, of 2 million cubic metres of earth and rock was necessary to 80 kilometres from Brisbane City. At full supply level, the dam construct the spillway. holds approximately 2,000 times the daily water consumption needed for Brisbane. The Brisbane Valley Highway was relocated to pass over the dam wall, while 65 kilometres of roads and a number of new Wivenhoe Dam, along with the Somerset, Hinze and North Pine bridges were required following construction of the dam.
    [Show full text]
  • Full-Scale Implementation of RES and Storage in an Island Energy System
    inventions Article Full-Scale Implementation of RES and Storage in an Island Energy System Konstantinos Fiorentzis , Yiannis Katsigiannis and Emmanuel Karapidakis * Department of Electrical and Computer Engineering, Hellenic Mediterranean University, GR-71004 Heraklion, Greece; kfi[email protected] (K.F.); [email protected] (Y.K.) * Correspondence: [email protected]; Tel.: +30-2810-379-889 Received: 10 September 2020; Accepted: 29 October 2020; Published: 30 October 2020 Abstract: The field of energy, specifically renewable energy sources (RES), is considered vital for a sustainable society, a fact that is clearly defined by the European Green Deal. It will convert the old, conventional economy into a new, sustainable economy that is environmentally sound, economically viable, and socially responsible. Therefore, there is a need for quick actions by everyone who wants to move toward energy-efficient development and new environmentally friendly behavior. This can be achieved by setting specific guidelines of how to proceed, where to start, and what knowledge is needed to implement such plans and initiatives. This paper seeks to contribute to this very important issue by appraising the ability of full-scale implementation of RES combined with energy storage in an island power system. The Greek island power system of Astypalaia is used as a case study where a battery energy storage system (BESS), along with wind turbines (WTs), is examined to be installed as part of a hybrid power plant (HPP). The simulation’s results showed that the utilization of HPP can significantly increase RES penetration in parallel with remarkable fuel cost savings. Finally, the fast response of BESS can enhance the stability of the system in the case of disturbances.
    [Show full text]
  • Somerset and Wivenhoe Dam Safety Upgrades – Business
    Somerset and Wivenhoe Dam Safety Upgrades – Business Case Stage APRIL 2019 Somerset Dam was built between 1937 and 1959. Wivenhoe Dam was completed in 1985. Both dams were designed to the engineering standards of their time. We now know more about the risks of extreme floods to the Somerset and Wivenhoe Dam walls. Both dams will be upgraded so that they can withstand much larger floods. What has changed since the dams were built? Some things have changed since the dams were built or last upgraded. These include: • significant population growth downstream • advances in dam design and the development of consistent risk assessment methods • improved estimates of extreme rainfall events • data from recent floods and updated flood modelling. An independent assessment has found the dams do not meet modern Queensland Government dam safety guidelines. We now know extreme floods could exceed the design capacity of the dams. Under the Water Supply (Safety and Reliability) Act 2008, we need to upgrade both dams to meet the guidelines. Lowering water levels in Somerset and Wivenhoe In January 2016, Seqwater changed the way it manages both Somerset and Wivenhoe Dams. These changes immediately improved the ability of both dams to withstand extreme floods and maintain flood mitigation. Changes include: • Changing the flood operations manual for both dams • Lowering the water supply storage volume of Somerset Dam to 80% of its normal volume • Lowering the water supply storage volume of Wivenhoe Dam to 90% of its normal volume. Lowering the water supply storage volume increased the flood storage volume in the dams. What to expect Get involved The water supply storage levels in both dams will remain Identifying the social, environmental and heritage impacts lowered during the design and construction of the of the shortlisted upgrade options for Somerset Dam is part Somerset Dam safety upgrade.
    [Show full text]
  • Community Adaptation Strategies to Floods
    Community adaptation strategies to floods Investigating affected communities in the aftermath of the 2010–11 floods Understanding how floods impact communities provides insights on policies aimed at reducing the impact of future flood events. Climate change scenarios suggest an increase in extreme rainfall events, contributing to a greater frequency of riverine and flash floods. At the same time, Emergency Management Australia has shifted its policies for hazard mitigation towards building resilient communities. The experiences of psychological, financial and social stress within the communi- ties preparing for, dealing with, and recovering from the floods provides information to planners and emergency managers. This project looked at the factors inhibiting and enabling household adaptation strategies in the flood-affected communi- ties of Brisbane, Emerald and Donald in the aftermath of the 2010–11 flooding events. Researchers uncovered strengths and weaknesses in community resilience through surveys and face-to-face interviews with residents and local and State government agencies. Main factors affecting response, recovery and adaptation to floods » Memory of hardship from direct flood experience » Structural limits to adaptive housing redesign » Expectation of success from adaptation strategy » Financial constraints limiting capacity for change » Lack of support from insurance companies » Relocation resistance due to community identity » Negative physical and mental health impacts » Participation in community initiatives » Inadequate communication before and during » Perceived government protection through dam flooding events management, building regulations, and planning The Brisbane, Emerald and Donald case studies Study participants reported ample evidence of commu- Richardson River were the highest since 1909. The flood nity resilience through 39 face-to-face interviews and 210 caused extensive damage to agricultural land and public survey responses.
    [Show full text]
  • Electric Power Generation and Distribution
    ATP 3-34.45 MCRP 3-40D.17 ELECTRIC POWER GENERATION AND DISTRIBUTION JULY 2018 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. This publication supersedes TM 3-34.45/MCRP 3-40D.17, 13 August 2013. Headquarters, Department of the Army Foreword This publication has been prepared under our direction for use by our respective commands and other commands as appropriate. ROBERT F. WHITTLE, JR. ROBERT S. WALSH Brigadier General, USA Lieutenant General, USMC Commandant Deputy Commandant for U.S. Army Engineer School Combat Development and Integration This publication is available at the Army Publishing Directorate site (https://armypubs.army.mil) and the Central Army Registry site (https://atiam.train.army.mil/catalog/dashboard). *ATP 3-34.45 MCRP 3-40D.17 Army Techniques Publication Headquarters No. 3-34.45 Department of the Army Washington, DC, 6 July 2018 Marine Corps Reference Publication Headquarters No. 3-40D.17 Marine Corps Combat Development Command Department of the Navy Headquarters, United States Marine Corps Washington, DC, 6 July 2018 Electric Power Generation and Distribution Contents Page PREFACE.................................................................................................................... iv INTRODUCTION .......................................................................................................... v Chapter 1 ELECTRICAL POWER ............................................................................................. 1-1 Electrical Power Support to Military Operations
    [Show full text]
  • Purified Recycled Water in the Lockyer Valley
    Fact Sheet December 2012 Purified Recycled Water in the Lockyer Valley The water supply security of South East Queensland (SEQ) has recently been increased by the construction of the Western Corridor Recycled Water Scheme. The infrastructure of advanced wastewater treatment plants provides purified recycled water (PRW) to the SEQ Water Grid for indirect potable reuse of effluent from urban areas. With a maximum combined production capacity of 232 million litres of PRW a day, it is the third largest recycled water scheme in the world and the largest in the southern hemisphere. This additional water supply is critical during drought conditions but is underused in wet periods. The provision of recycled water in an environmentally Background sound and socially-equitable manner requires measured The Urban Water Security Research Alliance (the Alliance) understanding of the potential impacts on the region’s worked closely with the Queensland Water Commission, soils, groundwater system, environment (such as salinity the former Queensland Department of Environment and issues) and the economy. Therefore, a holistic framework Resource Management, WaterSecure (now Seqwater) and was required to inform an integrated water management the SEQ Water Grid Manager, as well as irrigators and the plan involving the use of PRW. This was achieved through farming community. a multi-tiered assessment incorporating environmental risk analysis, climate modelling, regulatory considerations and Together we explored the feasibility of providing agro-economics. approximately 20 million litres per year of PRW to supplement irrigation supplies in the Lockyer Valley, 80 km The environmental risks and benefits from the supply of PRW west of Brisbane. were the core subjects addressed by this research, using a combination of field research, water quality and quantity Alliance research explored whether the use of PRW can serve modelling , and unstructured stakeholder interviews.
    [Show full text]
  • Queensland Commission of Audit's Final
    Queensland Commission of Audit Final Report - February 2013 Volume 2 Queensland Commission of Audit Final Report February 2013 - Volume 2 Final Report February 2013 - Volume © Crown copyright All rights reserved Queensland Government 2013 Excerpts from this publication may be reproduced, with appropriate achnowledgement, as permitted under the Copyright Act Queensland Commission of Audit Final Report - February 2013 Volume 2 TABLE OF CONTENTS FINAL REPORT VOLUME 1 Transmittal Letter ...................................................................................................... i Acknowledgements .................................................................................................. iii Explanatory Notes .................................................................................................... iv Terms of Reference .................................................................................................. v Report Linkages to Terms of Reference .................................................................. vii Table of Contents ..................................................................................................... ix EXECUTIVE SUMMARY AND RECOMMENDATIONS Executive Summary .............................................................................................. 1-3 List of Recommendations .................................................................................... 1-27 Glossary .............................................................................................................
    [Show full text]
  • Risky Biomass Business
    Risky Biomass Business The reputational and financial risks of investing in forest biomass energy Investors in electricity generated from n Biomass energy provides poor value for burning forest wood are facing increasing money compared to low-carbon forms reputational risks, as well as facing serious of renewable energy such as wind and financial risks. solar power - a trend that will only accel- Reputational risks stem from the growing erate as the cost of wind and solar power awareness and body of evidence showing continues to fall, unlike that of biomass that forest biomass is far from being a low energy; carbon or even carbon neutral energy n Bioenergy plants are highly dependent source. The climate impacts of forest of public renewable energy subsidies and biomass energy are in many cases as bad thus vulnerable to any changes in the as those of coal (for the same amount of opinion of policy makers and to reviews energy generated). Furthermore, biomass of legislation; energy is linked to accelerating forest and n biodiversity destruction, as well as to air Even with subsidies in place, several large pollution affecting public health. biomass power projects have resulted in substantial financial losses for energy Reputational risks can translate into finan- companies; cial risks given the high level of depend- ence of this form of energy on public n ‘State of the art’ or ‘advanced’, high- subsidies. Failure to fully disclose environ- efficiency biomass projects carry a mental, social and governance (ESG) risks higher risk of technical failure; in portfolios exposes financial institutions n Processing and burning woodchips and to regulatory risk.
    [Show full text]