Splityard Creek Dam EMERGENCY ACTION PLAN – SPLITYARD CREEK DAM ISSUE: 13 Date: February 2020 Prepared by CS Energy/GHD Limited 1 Controlled Copy No: Gated: No Manned: Yes 2 Type: Earth and rock-fill embankment Project: Splityard Creek Dam EAP File no.: F/19/1991 Rural no.: 683 Wivenhoe Somerset Road (Power Station) o Location: Lat. -27.371944 (27°22'19"S) o Lon. 152.640833 (152°38'27"E) DISCLAIMER: This report has been produced by CleanCo to provide information for client use only. The information contained in this report is limited by the scope and the purpose of the study and should not be regarded as completely exhaustive. This report contains confidential information or information which may be commercially sensitive. If you wish to disclose this report to a third party, rely on any part of this report, use or quote information from this report in studies external to the Corporation, permission must first be obtained from the Chief Executive, CleanCo. 1 SunWater template 2 Monday to Friday Splityard Creek Dam - 2019/20 - i13 Emergency activation quick reference – Dam hazards The Emergency Action Plan (EAP) for Splityard Creek Dam covers three emergency conditions evaluated within CleanCo’s Dam Safety Management Program. Use Table 1 to select the relevant section of the EAP that deals with the emergency condition. Note: The Incident Coordinator (IC) is responsible for activating the EAP unless otherwise directed by the Dam Safety Technical Decision Maker (DSTDM). Should the IC be unavailable, the Dam Duty Officer (DDO) is responsible. Table 1: Emergency activation quick reference – Dam hazards Dam hazards and Activation levels for dam hazards section numbers Alert Lean Forward Stand Up Stand Down Piping: embankment, • Increasing leakage through dam • Increasing leakage through an 1. Piping condition has been established • Risk assessment has determined that foundation or embankment, foundations or abutments embankment, the foundations or 2. Failure in progress or likely due to piping, and sufficient piping risk has reduced abutments abutments with cloudy water water in storage to create a dam failure hazard See section 5 • EAP activated Earthquake • Earthquake reported or felt in the area • Earthquake reported or felt in the area 1. Earthquake reported or felt in the area, and a possible • No change detected or no damage found failure path has been identified during the inspections, or See section 6 • Intensity less than 5 MM (using Modified • Intensity greater than or equal to 5 MM, or Mercalli Scale in Appendix H Figure 13 2. Failure in progress or likely due to earthquake, and • Intensity less than 5 MM and change • Risk assessment has determined that sufficient water in storage to create a dam failure detected during surveillance inspection failure risk has reduced to an acceptable hazard • EAP activated level • Repairs completed as necessary Terrorist threat / activity • Alert/brief received from QPS Security and Counter-Terrorism Command relevant to dam 1. Possible terrorist activity or suspicious behaviour noticed • No damage found during the inspections, or or high energy impact at the dam, threat received relevant to dam safety, and safety • EAP activated Risk assessment has determined that See section 7 failure risk has reduced 2. Large explosion heard/observed at the dam (e.g. bomb • Repairs completed as necessary explosion, aircraft hit), and damage observed on the dam 3. Failure in progress or likely due to impact or explosion, and sufficient water in storage to create a dam failure hazard Splityard Creek Dam - EAP v13 Page ii Splityard Creek Dam - 2019/20 - i13 Table of Contents Emergency activation quick reference – Dam hazards ........................................................ ii Document control .......................................................................................................... viii Document revision history ................................................................................................ ix Controlled document distribution list ................................................................................ x 1. References, abbreviations and definitions ................................................................. 1 1.1 References/associated documents ................................................................................... 1 1.2 Abbreviations and acronyms ............................................................................................ 3 1.3 Business terms and definitions ......................................................................................... 2 2. Introduction ............................................................................................................. 5 2.1 Context .............................................................................................................................. 5 2.2 Purpose ............................................................................................................................. 6 2.3 Scope ................................................................................................................................. 6 2.4 CleanCo provides training ................................................................................................. 6 2.5 Dam emergency organisation within CleanCo .................................................................. 7 2.6 Community information ................................................................................................... 7 2.7 Lessons Learnt ................................................................................................................... 8 2.8 Downstream notification lists ........................................................................................... 8 2.9 Comprehensive Risk Assessments .................................................................................... 8 3. Roles and responsibilities ......................................................................................... 9 4. Dam details ............................................................................................................ 13 4.1 General dam information ............................................................................................... 13 4.2 Population at risk ............................................................................................................ 14 4.3 Spillway adequacy and reservoir water releases ............................................................ 14 4.4 General arrangement ...................................................................................................... 14 4.5 Emergency inspections and monitoring ......................................................................... 15 5. Dam hazard – Piping: embankment, foundation or abutments ................................ 16 5.1 Overview ......................................................................................................................... 16 5.2 Emergency Actions .......................................................................................................... 16 6. Dam hazard – Earthquake ....................................................................................... 24 6.1 Overview ......................................................................................................................... 24 6.2 Emergency Actions .......................................................................................................... 24 7. Dam hazard – Terrorist threat/activity or high energy impact .................................. 32 7.1 Overview ......................................................................................................................... 32 Splityard Creek Dam - EAP v13 Page iv Splityard Creek Dam - 2019/20 - i13 7.2 Emergency Actions .......................................................................................................... 32 Notifications and communication lists ....................................................... 39 Flood impact downstream and inundation maps........................................ 54 Routine and emergency access routes ....................................................... 57 Machinery and equipment ......................................................................... 59 Technical information ................................................................................ 60 Summary of legal requirements ................................................................. 68 Notices from local government and district groups including responses ..... 69 Emergency action plan – Toolkit ................................................................ 72 Splityard Creek Dam - EAP v13 Page v Splityard Creek Dam - 2019/20 - i13 List of Tables Table 1: Emergency activation quick reference – Dam hazards Table 2: Splityard Creek Dam specifications Table 3: Piping: Embankment, foundation or abutments – DDO emergency action Table 4: Piping: Embankment, foundation or abutments – IC emergency action Table 5: Piping: Embankment, foundation or abutments – IC external communication plan Table 6: Piping: Embankment, foundation or abutments –DSTDM emergency action Table 7: Earthquake – DDO emergency action Table 8: Earthquake – IC emergency action Table 9: Earthquake – IC external communication plan Table 10: Earthquake –DSTDM emergency action Table 11: Terrorist threat/activity or high energy impact – DDO emergency action Table 12: Terrorist threat/activity or high energy impact – IC
Recommended publications
  • ATK2-1 Wivenhoe Power Station Geological Inspection Report by 19
    QUEENSLAND FLOODS COMMISSION OF INQUIRY STATEMENT OF ANDREW KROTEWICZ TABLE OF EXHIBITS ATK2-1 Wivenhoe Power Station Geological Inspection Report by 19 January 2011 SunWater On 3 November 20111, Andrew Krotewicz of ci Level 2, HQ North Tower, 540 Wickham Street, Fortitude Valley in the State of Queensland, say on oath: I am the former General Manager Generation Operations of Tarong Energy Corporation. I held this position between 1 September 2007 and 30 June 2011. 2. On 1 July 2011, I was appointed the Executive General Manager Asset Strategy of CS Energy at the same time as CS Energy became the successor in law to Tarong Energy Corporation of the Wivenhoe Business Unit as defined in the Government Owned Corporations Act 1993 (QId) (Generator Restructure) Regulation 2011 which includes the Wivenhoe Power Station and rights to move water in and out of Splityard Creek Dam. 3. This statement is supplementary to the two prior statements dated 13 September 2011. For the period 1 October 2010 to 31 March 2011: 4.0 1(a) a description of whether and how the communication requirements set out in the following documents were complied with and 1(b) to the extent that either of these documents were not complied with, and explanation as to why compliance did not occur: Deed of Practice between Seqwater and Tarong Energy Corporation (Tarong Energy) for Wiven hoe Dam and Wivenhoe Power Station. Wivenhoe Power Station Business Procedure for Wivenhoe - High Rainfall, High Dam Water Levels (WI V-OPS-1 5). Deed of Practice 4.1 On 4 October 2010 Seqwater requested under the terms of the Deed of Practice that a notification protocol be initiated to allow Seqwater to receive notice of impending water releases to/ extraction from Lake Wivenhoe by Wivenhoe Power Station.
    [Show full text]
  • Fact Sheet How Dams Work
    Fact sheet How dams work December 2015 In South East Queensland, our drinking water is predominantly Flood mitigation sourced from dams, which collect run-off rainwater from our catchments and store it. Our dams provide a safe, secure and At its most basic level, flood mitigation is capturing water and cost-effective water supply, as well as help to mitigate floods. then releasing it at a slower rate, with the aim of minimising river levels downstream of the dam. When dams fill, they are designed to pass the excess water into the creek or river system they are built on. What is Full Supply Level? Dam release notification service The Full Supply Level of a dam is the approved water storage level of the dam for drinking and/or irrigation purposes. Seqwater offers a free dam release notification service, which provides subscribers with notifications when gated dams For un-gated dams, if inflows result in the water level rising release water or un-gated dams are spilling. above the Full Supply Level, the water will spill out of the dam. This spilling cannot be controlled. Subscribers to Seqwater’s dam release notification service will also be notified when higher outflows are occurring from For our gated dams (Wivenhoe, Somerset and North Pine), if a spilling dam due to high inflows resulting from rainfall in the inflows result in the water level rising above the Full Supply catchment. Level, Seqwater will make controlled releases for either flood mitigation or to protect the safety of the dam. These notifications advise caution downstream due to potential hazards to people and property.
    [Show full text]
  • Where Water Comes From
    Year 6 Lesson 1 Where water comes from www.logan.qld.gov.au Learning objectives Students will be able to determine: The definition of a catchment. Basic principles of catchment management. Issues associated with balancing the needs of various catchment users. Learning outcomes Subject Strand & Content Descriptors Science Science Understanding Sudden geological changes or extreme weather conditions can affect Earth's surface (ACSSU095) Science as a Human Endeavour Scientific knowledge is used to inform personal and community decisions (ACSHE220) Geography Geographical Knowledge & Understanding Places are connected to each other locally, regionally and globally, through the movement of goods, people and ideas as well as human or environmental events. Geographical Skills & Understanding Pose geographical questions that range in complexity and guide deep inquiry then speculate on their answers Identify a variety of information sources that will be used for inquiry, considering their validity Identify and create appropriate materials, geographical tools or equipment to collect data or observations, using formal measurements and digital and spatial technologies as appropriate Important questions What is a catchment? How do well-managed catchments contribute to clean water supplies? What impacts can industrial, agricultural or other users have on the dam catchment? What mechanisms are used to manage competing demands on catchments? P 1 of 3 DM 7962814 www.logan.qld.gov.au Background information – the dam and its catchment A catchment is an area of land, bordered by hills or mountains, from which runoff flows to a low point – either a dam or the mouth of the river. Water running from a bath down the plughole is a simple representation of a catchment.
    [Show full text]
  • Wivenhoe Power Station Noise Control
    Wivenhoe Power Station Noise Control PROJECT: Wivenhoe Power Station INDUSTRY TYPE: Power Generation CLIENT: CS Energy LOCATION: Wivenhoe Initial project requirements: Wivenhoe Power Station, operated by CS Energy, is a hydropower generating system. Wivenhoe is approximately 50 km west of Brisbane and is the only pumped hydroelectric storage plant in Queensland. Not only is the power station the only pumped storage hydroelectric plant in Queensland, but it also has two of the largest hydro machines in Australia – 285 MW generators. The power station cycles water between Splityard Creek Dam and Wivenhoe Dam. The power station turbine room generates high noise levels, creating an uncomfortable working environment for the adjacent offices. Flexshield solution: Flexshield has an existing working relationship with CS Energy, having also worked with CS Energy at Kogan Creek Power Station. The Flexshield Group has a long experience working on Power Station noise control solutions across Australia - the full list is at the end of the case study. For our current project with CS Energy, our AcousTech senior acoustic project engineer visited the site to conduct an acoustic assessment and design the solution. The solution included treating the existing office with high-density V100 Sonic System modular acoustic panel facing the perforations into the room. We also replaced the current non-acoustic cold room doors with Flexshield high- performance Sonic Access Rw46 acoustic doors. Noise levels were further reduced by adding Calando Nude White panels to the ceiling. We sourced the Calando Panel from our Commercial Acoustics Company – Avenue Interior Systems. The solution Flexshield provided made a more comfortable working environment - allowing workers to communicate better and improve the number of sick days due to noise fatigue.
    [Show full text]
  • Fact Sheet Wivenhoe Dam
    Fact sheet Wivenhoe Dam Wivenhoe Dam Wivenhoe Dam’s primary function is to provide a safe drinking Key facts water supply to the people of Brisbane and surrounding areas. It also provides flood mitigation. Name Wivenhoe Dam (Lake Wivenhoe) Watercourse Brisbane River The water from Lake Wivenhoe, the reservoir formed by the dam, is stored before being treated to produce drinking water Location Upstream of Fernvale and follows the water journey of source, store and supply. Catchment area 7020.0 square kilometres Length of dam wall 2300.0 metres Source Year completed 1984 Wivenhoe Dam is located on the Brisbane River in the Somerset Type of construction Zoned earth and rock fill Regional Council area. embankment Spillway gates 5 Water supply Full supply capacity 1,165,238 megalitres Wivenhoe Dam provides a safe drinking water supply for Flood mitigation 1,967,000 megalitres Brisbane, Ipswich, Logan, Gold Coast, Beaudesert, Esk, Gatton, Laidley, Kilcoy, Nanango and surrounding areas. The construction of the dam involved the placement of around 4 million cubic metres of earth and rock fill, and around 140,000 Wivenhoe Dam was designed and built as a multifunctional cubic metres of concrete in the spillway section. Excavation facility. The dam was built upstream of the Brisbane River, of 2 million cubic metres of earth and rock was necessary to 80 kilometres from Brisbane City. At full supply level, the dam construct the spillway. holds approximately 2,000 times the daily water consumption needed for Brisbane. The Brisbane Valley Highway was relocated to pass over the dam wall, while 65 kilometres of roads and a number of new Wivenhoe Dam, along with the Somerset, Hinze and North Pine bridges were required following construction of the dam.
    [Show full text]
  • Somerset and Wivenhoe Dam Safety Upgrades – Business
    Somerset and Wivenhoe Dam Safety Upgrades – Business Case Stage APRIL 2019 Somerset Dam was built between 1937 and 1959. Wivenhoe Dam was completed in 1985. Both dams were designed to the engineering standards of their time. We now know more about the risks of extreme floods to the Somerset and Wivenhoe Dam walls. Both dams will be upgraded so that they can withstand much larger floods. What has changed since the dams were built? Some things have changed since the dams were built or last upgraded. These include: • significant population growth downstream • advances in dam design and the development of consistent risk assessment methods • improved estimates of extreme rainfall events • data from recent floods and updated flood modelling. An independent assessment has found the dams do not meet modern Queensland Government dam safety guidelines. We now know extreme floods could exceed the design capacity of the dams. Under the Water Supply (Safety and Reliability) Act 2008, we need to upgrade both dams to meet the guidelines. Lowering water levels in Somerset and Wivenhoe In January 2016, Seqwater changed the way it manages both Somerset and Wivenhoe Dams. These changes immediately improved the ability of both dams to withstand extreme floods and maintain flood mitigation. Changes include: • Changing the flood operations manual for both dams • Lowering the water supply storage volume of Somerset Dam to 80% of its normal volume • Lowering the water supply storage volume of Wivenhoe Dam to 90% of its normal volume. Lowering the water supply storage volume increased the flood storage volume in the dams. What to expect Get involved The water supply storage levels in both dams will remain Identifying the social, environmental and heritage impacts lowered during the design and construction of the of the shortlisted upgrade options for Somerset Dam is part Somerset Dam safety upgrade.
    [Show full text]
  • Community Adaptation Strategies to Floods
    Community adaptation strategies to floods Investigating affected communities in the aftermath of the 2010–11 floods Understanding how floods impact communities provides insights on policies aimed at reducing the impact of future flood events. Climate change scenarios suggest an increase in extreme rainfall events, contributing to a greater frequency of riverine and flash floods. At the same time, Emergency Management Australia has shifted its policies for hazard mitigation towards building resilient communities. The experiences of psychological, financial and social stress within the communi- ties preparing for, dealing with, and recovering from the floods provides information to planners and emergency managers. This project looked at the factors inhibiting and enabling household adaptation strategies in the flood-affected communi- ties of Brisbane, Emerald and Donald in the aftermath of the 2010–11 flooding events. Researchers uncovered strengths and weaknesses in community resilience through surveys and face-to-face interviews with residents and local and State government agencies. Main factors affecting response, recovery and adaptation to floods » Memory of hardship from direct flood experience » Structural limits to adaptive housing redesign » Expectation of success from adaptation strategy » Financial constraints limiting capacity for change » Lack of support from insurance companies » Relocation resistance due to community identity » Negative physical and mental health impacts » Participation in community initiatives » Inadequate communication before and during » Perceived government protection through dam flooding events management, building regulations, and planning The Brisbane, Emerald and Donald case studies Study participants reported ample evidence of commu- Richardson River were the highest since 1909. The flood nity resilience through 39 face-to-face interviews and 210 caused extensive damage to agricultural land and public survey responses.
    [Show full text]
  • Purified Recycled Water in the Lockyer Valley
    Fact Sheet December 2012 Purified Recycled Water in the Lockyer Valley The water supply security of South East Queensland (SEQ) has recently been increased by the construction of the Western Corridor Recycled Water Scheme. The infrastructure of advanced wastewater treatment plants provides purified recycled water (PRW) to the SEQ Water Grid for indirect potable reuse of effluent from urban areas. With a maximum combined production capacity of 232 million litres of PRW a day, it is the third largest recycled water scheme in the world and the largest in the southern hemisphere. This additional water supply is critical during drought conditions but is underused in wet periods. The provision of recycled water in an environmentally Background sound and socially-equitable manner requires measured The Urban Water Security Research Alliance (the Alliance) understanding of the potential impacts on the region’s worked closely with the Queensland Water Commission, soils, groundwater system, environment (such as salinity the former Queensland Department of Environment and issues) and the economy. Therefore, a holistic framework Resource Management, WaterSecure (now Seqwater) and was required to inform an integrated water management the SEQ Water Grid Manager, as well as irrigators and the plan involving the use of PRW. This was achieved through farming community. a multi-tiered assessment incorporating environmental risk analysis, climate modelling, regulatory considerations and Together we explored the feasibility of providing agro-economics. approximately 20 million litres per year of PRW to supplement irrigation supplies in the Lockyer Valley, 80 km The environmental risks and benefits from the supply of PRW west of Brisbane. were the core subjects addressed by this research, using a combination of field research, water quality and quantity Alliance research explored whether the use of PRW can serve modelling , and unstructured stakeholder interviews.
    [Show full text]
  • Queensland Commission of Audit's Final
    Queensland Commission of Audit Final Report - February 2013 Volume 2 Queensland Commission of Audit Final Report February 2013 - Volume 2 Final Report February 2013 - Volume © Crown copyright All rights reserved Queensland Government 2013 Excerpts from this publication may be reproduced, with appropriate achnowledgement, as permitted under the Copyright Act Queensland Commission of Audit Final Report - February 2013 Volume 2 TABLE OF CONTENTS FINAL REPORT VOLUME 1 Transmittal Letter ...................................................................................................... i Acknowledgements .................................................................................................. iii Explanatory Notes .................................................................................................... iv Terms of Reference .................................................................................................. v Report Linkages to Terms of Reference .................................................................. vii Table of Contents ..................................................................................................... ix EXECUTIVE SUMMARY AND RECOMMENDATIONS Executive Summary .............................................................................................. 1-3 List of Recommendations .................................................................................... 1-27 Glossary .............................................................................................................
    [Show full text]
  • Powerlink Queensland Revenue Proposal
    2023-27 POWERLINK QUEENSLAND REVENUE PROPOSAL Appendix 5.02 – PUBLIC 2020 Transmission Annual Planning Report © Copyright Powerlink Queensland 2021 Transmission Annual Planning Report 2020 Transmission Annual Planning Report Please direct Transmission Annual Planning Report (TAPR) enquiries to: Stewart Bell A/Executive General Manager Strategy and Business Development Division Powerlink Queensland Telephone: (07) 3860 2801 Email: [email protected] Disclaimer: While care is taken in the preparation of the information in this report, and it is provided in good faith, Powerlink Queensland accepts no responsibility or liability for any loss or damage that may be incurred by persons acting in reliance on this information or assumptions drawn from it. 2020 TRANSMISSION ANNUAL PLANNING REPORT Table of contents Executive summary __________________________________________________________________________________________________ 7 1. Introduction ________________________________________________________________________________________________ 15 1.1 Introduction ___________________________________________________________________________________________ 16 1.2 Context of the TAPR _________________________________________________________________________________ 16 1.3 Purpose of the TAPR _________________________________________________________________________________ 17 1.4 Role of Powerlink Queensland _______________________________________________________________________ 17 1.5 Meeting the challenges of a transitioning energy system ___________________________________________
    [Show full text]
  • Manual of Operational Procedures for Flood Mitigation at Wivenhoe Dam and Somerset Dam 1 the Controlled Version of This Document Is Registered
    Wivenhoe Dam and Somerset Dam Manual of Operational Procedures for Flood Mitigation Revision 15 | November 2019 15 Revision No. Date Amendment Details 0 27 October 1968 Original issue. 1 6 October 1992 Complete revision and re-issue. 2 13 November 1997 Complete revision and re-issue. 3 24 August 1998 Change to page 23. 4 6 September 2002 Complete revision and re-issue. 5 4 October 2004 Complete revision. 6 20 December 2004 Miscellaneous amendments and re-issue. 7 November 2009 (approved by Gazette notice Complete revision. 22 January 2010) 8 September 2011 Revision but no substantive alteration of objectives, strategies or operating practices. 9 November 2011 Insertion of Section 8 and consequential amendments. 10 October 2012 Revision but no substantive alteration of objectives, strategies or operating practices. 11 November 2013 Revision to take account of changes to the Act and improve clarity, but no substantive alteration of objectives or strategies. Operating practices amended to exclude consideration of Twin Bridges and Savages Crossing following stakeholder input. 12 November 2014 Significant revision including changes from WSDOS investigations, legislative changes and a number of general improvements. 13 November 2015 A number of minor updates to improve readability and application. 14 November 2016 Changes to account for the revised Maximum Flood Storage Level for Somerset Dam and a number of general improvements. 15 November 2019 Revision Revision No: 15 – November 2019 Seqwater Doc No: MAN-0051 Manual of Operational Procedures for Flood Mitigation at Wivenhoe Dam and Somerset Dam 1 The controlled version of this document is registered. All other versions including printed versions are uncontrolled.
    [Show full text]
  • WATER SECURITY STATUS REPORT December 2020
    WATER SECURITY STATUS REPORT December 2020 SEQ Water Grid capacity Average daily residential consumption Grid operations and overall water security position (L/Person) Despite receiving rainfall in parts of the northern and southern areas The Southern Regional Water Pipeline is still operating in a northerly 100% 250 2019 December average of South East Queensland (SEQ), the region continues to be in Drought direction. The Northern Pipeline Interconnectors (NPI 1 and 2) have been 90% 200 Response conditions with combined Water Grid storages at 57.8%. operating in a bidirectional mode, with NPI 1 flowing north while NPI 80% 150 2 flows south. The grid flow operations help to distribute water in SEQ Wivenhoe Dam remains below 50% capacity for the seventh 70% 100 where it is needed most. SEQ Drought Readiness 50 consecutive month. There was minimal rainfall in the catchment 60% average Drought Response 0 surrounding Lake Wivenhoe, our largest drinking water storage. The average residential water usage remains high at 172 litres per 50% person, per day (LPD). While this is less than the same period last year 40% 172 184 165 196 177 164 Although the December rain provided welcome relief for many of the (195 LPD), it is still 22 litres above the recommended 150 LPD average % region’s off-grid communities, Boonah-Kalbar and Dayboro are still under 57.8 30% *Data range is 03/12/2020 to 30/12/2020 and 05/12/2019 to 01/01/2020 according to the SEQ Drought Response Plan. drought response monitoring (see below for additional details). 20% See map below and legend at the bottom of the page for water service provider information The Bureau of Meteorology (BOM) outlook for January to March is likely 10% The Gold Coast Desalination Plant (GCDP) had been maximising to be wetter than average for much of Australia, particularly in the east.