Jadual Purata Kadar Harga 2014

Total Page:16

File Type:pdf, Size:1020Kb

Jadual Purata Kadar Harga 2014 JADUAL PURATA KADAR HARGA 2014 JABATAN PENGAIRAN DAN SALIRAN, MALAYSIA JADUAL PURATA KADAR HARGA 2014 ISI KANDUNGAN BAHAGIAN PERKARA MUKASURAT 1.0 Pendahuluan Dan Panduan Pengunaan 1 - 3 2.0 Kos Kerja-Kerja Am (General Items) 4 2.1 Tujuan Dan Definisi 2.2 Bentuk Maklumat Dan Pembahagian 2.2.1 Peratusan Kos Keseluruhan Kerja Am Daripada 5 Kos Kerja Pembina 2.2.2 Peratusan Kos Terperinci Kerja Am Daripada 6 - 7 Kos Kerja Pembina 3.0 Kos Item-Item Kerja 8 3.1 Tujuan 3.2 Bentuk Maklumat 3.3 Klasifikasi Kerja 3.3.1 Environmental Protection and Enhancement 9 - 11 Traffic Management And Control 3.3.2 12 3.3.3 Site Investigation Work 13 3.3.4 Demolition & Site Clearance 14 - 15 3.3.5 Earthworks 16 - 25 3.3.6 Geotechnical Work 26 - 33 3.3.7 Piling Work 34 - 42 3.3.8 Concrete Work 43 - 47 3.3.9 Brickwork, Blockwork & Masonry 48 3.3.10 Timber Work 49 3.3.11 Metal Work 50 - 51 3.3.12 Building Work 52 - 60 3.3.13 Painting Work 61 3.3.14 Pipeworks 62 - 63 3.3.15 Drainage Work 64 - 70 3.3.16 Roads And Pavings 71 - 75 3.3.17 Miscellaneous Works 76 - 79 4.0 Kos Upah Buruh 80 - 81 5.0 Kos Sewa Loji & Peralatan 82 - 84 PENDAHULUAN DAN PANDUAN PENGGUNA JABATAN PENGAIRAN DAN SALIRAN, MALAYSIA JADUAL PURATA KADAR HARGA 2014 1.0 PENDAHULUAN DAN PANDUAN PENGGUNAAN 1.1 TUJUAN 1.1.1 Tujuan buku ini dikeluarkan adalah untuk memberikan maklumat berkenaan dengan kos bagi melaksanakan kerja-kerja Jabatan Pengairan dan Saliran. Maklumat-maklumat kos ini boleh digunakan sebagi panduan untuk menyediakan anggaran kos, membuat pelarasan kadar harga atau untuk tujuan perundingan kadar harga. 1.2 KANDUNGAN 1.2.1 Maklumat-maklumat yang terkandung di dalam buku ini adalah berdasarkan kepada dokumen-dokumen tender bagi kerja-kerja Jabatan Pengairan dan Saliran yang pada amnya adalah terdiri dari: i) Kerja-kerja Saliran dan Tebatan Banjir ii) Kerja-kerja Kejuruteraan Pantai iii) Kerja-kerja Kejuruteraan Sungai 1.2.2 Maklumat-maklumat ini disusun dalam empat (4) bahagian utama iaitu; i) Kos Kerja-kerja Am (General Items) ii) Kos Item-item Kerja iii) Kos Upah Buruh iv) Kos Sewa Loji & Peralatan 1 JADUAL PURATA KADAR HARGA 2014 1.2.3 Maklumat-maklumat kos ini juga dibahagikan mengikut kategori kawasan di mana projek tersebut dilaksanakan iaitu seperti berikut: KATEGORI KAWASAN NEGERI Kawasan Utara - Perlis - Kedah - Pulau Pinang - Perak Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur - Selangor - Negeri Sembilan - Melaka - Johor Kawasan Timur - Pahang - Terengganu - Kelantan 1.3 SUMBER MAKLUMAT / PEMILIHAN SAMPEL 1.3.1 Data-data di dalam buku ini adalah diabstrak dari dokumen- dokumen tender secara konvensional bagi projek yang ditender dalam tahun 2014 dan ditutup di Ibu Pejabat Jabatan Pengairan Dan Saliran Malaysia. 1.3.2 Kadar harga diambil daripada dokumen tender yang disediakan berasaskan kepada senarai kuantiti. 1.4 ANALISA DAN SUSUNAN DATA 1.4.1 Data-data bagi item yang serupa dikumpulkan dan dijadikan dalam bentuk purata. Data-data yang terlalu tinggi atau rendah tidak diambilkira. 2 JADUAL PURATA KADAR HARGA 2014 1.4.2 Melalui penganalisaan tersebut adalah didapati wujudnya ketidakseragaman di dalam penyediaan dokumen tender/tawaran, samada dari segi pengukuran kuantiti dan keterangan kerja bagi beberapa item kerja. Sehubungan dengan itu, item-item yang serupa/hampir serupa telah dikumpulkan bersekali dan dikira dalam bentuk purata. Pertimbangan tidak diberikan sekiranya cara pengukuran berbeza walaupun ia adalah item kerja yang sama. 1.4.3 'Harga Purata' bagi sesuatu kawasan diperolehi berdasarkan kepada jumlah nilai data-data kos bagi sesuatu item kerja yang dibahagikan kepada bilangan sampel mengikut kawasan berkenaan. 1.4.4 Purata keseluruhan adalah berdasarkan kepada nilai purata bagi semua kawasan. 1.5 PEMAKAIAN DATA 1.5.1 Data-data di dalam buku ini hendaklah digunakan sebagai panduan sahaja. 1.5.2 Pengguna hendaklah menggunakan budibicara bagi memilih kos yang bersesuaian dengan berdasarkan kepada; i) Nilai kontrak ii) Keperluan spesifikasi iii) Cara pengukuran bagi projek yang akan dilaksanakan iv) Lokasi projek v) Keadaan pasaran semasa 3 KOS KERJA-KERJA AM (GENERAL ITEMS) JABATAN PENGAIRAN DAN SALIRAN, MALAYSIA JADUAL PURATA KADAR HARGA 2014 2.0 KOS KERJA-KERJA AM (GENERAL ITEMS) 2.1 TUJUAN DAN DEFINISI Bahagian ini mengandungi maklumat berhubung dengan kos bagi melaksanakan kerja-kerja di bawah kategori 'Kerja-kerja Am' (General Items). Terdapat sesetengah dokumen yang menamakan bahagian ini sebagai 'Preliminaries', 'Kerja Awalan' ataupun 'Kerja-kerja Pendahuluan'. 2.2 BENTUK MAKLUMAT DAN PEMBAHAGIAN Maklumat bagi bahagian ini diberikan dalam bentuk peratusan dan dibahagikan kepada dua bahagian seperti berikut:- 2.2.1 Peratusan Kos Keseluruhan Kerja Am Daripada Kos kerja Pembina Maklumat bagi kos keseluruhan adalah berdasarkan kepada penganalisaan ke atas kos keseluruhan bagi Kerja-kerja Am (General Items). Cara pengiraan peratusan: G.I X 100% T.S - (G.I. + P.S + P.C) 2.2.2 Peratusan Kos Terperinci Kerja Am Daripada Kos Kerja Pembina Maklumat bagi kos terperinci adalah berdasarkan kepada penganalisaan ke atas kos bagi setiap item Kerja-kerja Am (General Items). Cara pengiraan peratusan: Item in G.I. X 100% T.S - (G.I + P.S + P.C) Petunjuk: i) G.I = Kos Kerja Am (General Items) ii) T.S = Harga Tender (Tendered Sum) iii) P.S = Wang Peruntukan Sementara (Provisional Sum) iv) P.C = Wang Kos Prima (Prime Cost Sum) 4 JADUAL PURATA KADAR HARGA 2014 2.2.1 : PERATUSAN KOS KESELURUHAN KERJA AM DARIPADA KOS KERJA PEMBINA (TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA) UTARA TENGAH TIMUR KESELURUHAN BIL NILAI TENDER UNIT PURATA PURATA PURATA PURATA (%) (%) (%) (%) 1 Melebihi 5 juta tidak melebihi 10 juta - 11.75 - 11.75 2 Melebihi 10 juta tidak melebihi 20 juta - 4.75 - 4.75 3 Melebihi 20 juta 3.05 3.55 3.44 3.35 5 JADUAL PURATA KADAR HARGA 2014 2.2.2 : PERATUSAN KOS TERPERINCI KERJA AM (GENERAL ITEMS) DARIPADA KOS KERJA PEMBINA (TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA) UTARA TENGAH TIMUR KESELURUHAN BIL KETERANGAN KERJA UNIT PURATA PURATA PURATA PURATA (%) (%) (%) (%) A Contractual Requirement 1 Contractor's All Risk 0.31 0.30 0.19 0.27 - Insurance Of Works - Public Liability Insurance 2 Performance Bond 0.28 0.33 0.15 0.25 3 Perkeso / SOCSO 0.06 0.10 0.04 0.07 4 Compliance with laws, regulations and all relevant - - 0.27 0.27 authorities B Engineer / SO / PD's Requirement 1 Establishment & Removal Of SO's Site Office 0.22 0.11 - 0.17 2 Establishment, Maintenance & Removal Of SO's Site - - 0.15 0.15 Office 3 Maintenance Of SO's Site Office 0.01 - - 0.01 4 Laboratory Equipment - - - - 5 Pre & Post Survey - - - - 6 Preparation & Submission Of 'As Built Drawings' 0.08 0.08 0.07 0.08 7 Progress Photographs - - - - 8 Progress Report - 0.01 0.03 0.02 9 Project Signboard 0.04 0.06 0.01 0.04 10 Survey Works - 0.32 0.30 0.31 6 JADUAL PURATA KADAR HARGA 2014 2.2.2 : PERATUSAN KOS TERPERINCI KERJA AM (GENERAL ITEMS) DARIPADA KOS KERJA PEMBINA (TIDAK TERMASUK JUMLAH KOS KERJA AM, WANG PERUNTUKAN SEMENTARA & WANG KOS PRIMA) UTARA TENGAH TIMUR KESELURUHAN BIL KETERANGAN KERJA UNIT PURATA PURATA PURATA PURATA (%) (%) (%) (%) 11 Surveying Equipment 0.10 0.05 0.04 0.06 12 Testing & Sampling 0.03 - - 0.03 13 Work Programme 0.03 0.15 - 0.09 C Contractor's Requirement 1 Clearing & Cleaning Up Upon Completion - 0.07 - 0.07 2 Establishment, Maintenance & Removal Of - 0.22 - 0.22 Contractor's Site Office 3 Establishment, Maintenance & Removal Of - - - - Contractor's Office, Workmen Accommodation, Store etc 4 Establishment, Maintenance & Removal Of Workmen - - - - Accommodation 5 Moblization & Demobilization Of Construction Plant & - 0.20 0.44 0.32 Equipment 6 Site Agent 0.68 - - 0.68 7 Temporary works 1.24 1.28 0.44 0.99 7 KOS ITEM-ITEM KERJA JABATAN PENGAIRAN DAN SALIRAN, MALAYSIA JADUAL PURATA KADAR HARGA 2014 3.0 KOS ITEM-ITEM KERJA 3.1 TUJUAN Bahagian ini memberikan maklumat berhubung dengan data-data kos bagi item- item kerja yang dilaksanakan. 3.2 BENTUK MAKLUMAT Maklumat bagi bahagian ini diberikan di dalam bentuk kadar harga purata dan dibahagikan mengikut klasifikasi kerja sebagaimana ditetapkan di dalam MyCESMM (Malaysian Civil Engineering Standard Method Of Measurement). 3.3 KLASIFIKASI KERJA Klasifikasi kerja adalah seperti berikut:- 3.3.1 Environmental Protection and Enhancement (CLASS B) 3.3.2 Traffic Management And Control (CLASS C) 3.3.3 Site Investigation Work (CLASS D) 3.3.4 Demolition & Site Clearance (CLASS E) 3.3.5 Earthworks (CLASS F) 3.3.6 Geotechnical Work (CLASS G) 3.3.7 Piling Work (CLASS H) 3.3.8 Concrete Work (CLASS I) 3.3.9 Brickwork, Blockwork & Masonry (CLASS J) 3.3.10 Timber Work (CLASS K) 3.3.11 Metal Work (CLASS L) 3.3.12 Building Work (CLASS M) 3.3.13 Painting Work (CLASS N) 3.3.14 Pipeworks (CLASS O) 3.3.15 Drainage Work (CLASS P) 3.3.16 Roads and Pavings (CLASS Q) 3.3.17 Miscellaneous Works (CLASS T) 8 JADUAL PURATA KADAR HARGA 2014 3.3.1: ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B) PURATA KADAR HARGA 2014 (RM) BIL KETERANGAN KERJA UNIT KAWASAN KAWASAN KAWASAN KESELURUHAN UTARA TENGAH TIMUR ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1 Preparation of environmental management plan to Item 18,083.03 15,100.00 16,591.52 the approval of the S.O. which shall include erosion and sediment control plan (ESCP), noise, air and water quality monitoring and compliance with requirements of the local Authorities'. 2 Appointment of certified professional in ESCP mth 2,100.00 2,100.00 officer along the duration of the contract.
Recommended publications
  • Spotlight on Pile Integrity Test
    Piles & Deep Foundations A Spotlight on Low Strain Impact Integrity Test Concrete piles and drilled shafts are an important category of foundations. Despite their relatively high cost, they become necessary when we want to transfer the loads of a heavy superstructure (bridge, high rise building, etc.) to the lower layers of soil. Pile integrity test (PIT), or as ASTM D5882 refers to it as "a low strain impact integrity test," is a common non-destructive test method for the evaluation of pile integrity and/or pile length. A pile integrity test can be used for forensic evaluations on existing piles, or quality assurance in new construction. The Integrity test is applicable to driven concrete piles and cast-in- place piles. What is Pile Integrity Test (PIT) ? Low strain impact integrity testing provides acceleration or velocity and force (optional) data on slender structural elements (ASTM D5882). Sonic Echo (SE) and Impulse Response (IR) are employed for the integrity test on deep foundation and piles. The test results can be used for the evaluation of the pile cross-sectional area and length, the pile integrity and continuity, as well as consistency of the pile material. It is noted that this evaluation practice is approximate. 647-933-6633 Website: fprimec.com Email: [email protected] Use PIT Method To Evaluate : Integrity and consistency of pile material (concrete, timber); Unknown length of piles, or shafts; Pile cross-sectional area and length. Limitations of Use : Like all other non-destructive testing solutions, the low strain pile integrity test has certain limitations. These limitations must be understood and taken into consideration in making the final integrity evaluation.
    [Show full text]
  • Cen/Tc 250/Sc 7 N 1508
    CEN/TC 250/SC 7 N 1508 CEN/TC 250/SC 7 Eurocode 7 - Geotechnical design Email of secretary: [email protected] Secretariat: NEN (Netherlands) pr EN1997-3 MASTER v2021.40 Submission Document type: Other committee document Date of document: 2021-05-03 Expected action: INFO Background: Committee URL: https://cen.iso.org/livelink/livelink/open/centc250sc7 CEN/TC 250 Date: 2021-04 prEN 1997-3:202x CEN/TC 250 Secretariat: NEN Eurocode 7: Geotechnical design — Part 3: Geotechnical structures Eurocode 7 - Entwurf, Berechnung und Bemessung in der Geotechnik — Teil 3: Geotechnische Bauten Eurocode 7 - Calcul géotechnique — Partie 3: Constructions géotechniques ICS: Descriptors: Document type: European Standard Document subtype: Working Document Document stage: v4 31/10/2019 Document language: E prEN 1997-3:202x (E) Contents Page 0 Introduction ............................................................................................................................................ 9 0.1 Introduction to the Eurocodes ......................................................................................................... 9 0.2 Introduction to EN 1997 Eurocode 7 .............................................................................................. 9 0.3 Introduction to EN 1997-3 ................................................................................................................. 9 0.4 Verbal forms used in the Eurocodes ............................................................................................10 0.5 National
    [Show full text]
  • West Bank Bypass Main Report 1
    EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY (ERRA) No. THE ISLAMIC REPUBLIC OF PAKISTAN URGENT REHABILITATION PROJECT: WEST BANK BYPASS DESIGN UNDER THE URGENT DEVELOPMENT STUDY ON REHABILITATION AND RECONSTRUCTION IN MUZAFFARABAD CITY IN THE ISLAMIC REPUBLIC OF PAKISTAN FINAL REPORT MAIN TEXT MARCH 2008 JAPAN INTERNATIONAL COOPERATION AGENCY NIPPON KOEI CO., LTD. SD JR 08-014 Note: Following exchange rates are applied in the Study. 1 US$ = PKR60.800 = JPY119.410 (As of 1st August, 2007) PREFACE In response to the request from the Government of the Islamic Republic of Pakistan, the Government of Japan decided to conduct “The Urgent Development Study on Rehabilitation and Reconstruction in Muzaffarabad City in the Islamic Republic of Pakistan”, and entrusted the study to the Japan International Cooperation Agency (JICA). JICA selected and dispatched a study team headed by Mr. Tetsu NAKAGAWA of Nippon Koei Co., Ltd. to the Islamic Republic of Pakistan from February 2007 to November 2007. The team conducted Basic Design and Detailed Design for the “Urgent Rehabilitation Project: West Bank Bypass Design under the Urgent Development Study on Rehabilitation and Reconstruction in Muzaffarabad City in the Islamic Republic of Pakistan” based on field surveys, holding a series of discussions with and presentations to the officials concerned of the Government of the Islamic Republic of Pakistan. I hope that this report will contribute to the development of Pakistan and to the enhancement of friendly relationship between the two countries. Finally, I wish to express my sincere appreciation to the officials concerned of the Government of the Islamic Republic of Pakistan for their close cooperation and friendship extended to the Study.
    [Show full text]
  • Foundation Reuse for Highway Bridges
    Publication No. FHWA-HIF-18-055 Infrastructure Office of Bridges and Structures November 2018 Foundation Reuse for Highway Bridges Existing New Ground Improvement Turner-Fairbank Highway Research Center U.S. Department of Transportation 6300 Georgetown Pike Federal Highway Administration McLean, VA 22101-2296 FOREWORD Given the high percentage of deteriorated or obsolete bridges in the national bridge inventory, the reuse of bridge foundations may be a viable option that can present a significant cost savings in bridge replacement and rehabilitation efforts. The potential time savings associated with foundation reuse can, in turn, reduce mobility impacts and increase the economic viability and sustainability of a project. However, existing foundations may have uncertain material properties, geometry, or details that impact the risks associated with reuse. Unlike a new foundation, an existing foundation may have been damaged, may not have sufficient capacity, and may have limited remaining service life due to deterioration. Assessment of these issues as well as foundation strengthening and repair measures and innovative approaches to optimize loading are discussed in this report. To better demonstrate the engineering assessment of key integrity, durability and load carrying capacity issues, the report contains fifteen (15) case examples where foundation was reused by the owner agencies. On new construction, the report looks ahead and includes discussions on foundation design with consideration for reuse. Cheryl Allen Richter, P.E., Ph.D. Director, Office of Infrastructure Research and Development Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document.
    [Show full text]
  • Ask Vincent Chu (Common FAQ on Practical Civil Engineering Works)
    Ask Vincent Chu (Common FAQ on Practical Civil Engineering Works) Vincent T. H. CHU Ask Vincent Chu Vincent T. H. CHU CONTENTS Preface 3 1. Bridge Works 4 2. Concrete Works 13 3. Drainage and Tunneling Works 29 4. Marine Works 37 5. Piles and Foundation 51 6. Roadworks 61 7. Slopes 64 About the author 73 2 Ask Vincent Chu Vincent T. H. CHU Preface This is my third book since my first one in 2006. Following positive and encouraging response since the publication of “200 Questions and Answers on Practical Civil Engineering Works” and “Civil Engineering Practical Notes A-Z”, it provides great incentive for me to further write and discuss civil engineering practice to share my knowledge with fellow engineers around the world. Ever since the establishment of the free email service “Ask Vincent Chu” in 2008, a huge surge of email were received from time to time regarding civil engineering queries raised by engineers around the globe. It is my interest to publish some of these engineering queries in this book and hence the title of this book is called “Ask Vincent Chu”. Moreover, in this book I intend to write more on geotechnical aspects of civil engineering when compared with my previous two publications. Should you have any comments on the book, please feel free to send to my email askvincentchu @yahoo.com.hk and discuss. Vincent T. H. CHU June 2009 3 Ask Vincent Chu Vincent T. H. CHU Chapter 1. Bridge Works 1. What is the purpose of dowel bar in elastomeric bearing? Elastomeric bearing is normally classified into two types: fixed and free.
    [Show full text]
  • View Souvenir Book
    DFI INDIA 2018 Souvenir With extended abstracts Sponsor / Exhibitor catalogue www.dfi -india.org Deep Foundations Institute USA, DFI of India Indian Institute of Technology Gandhinagar, Gujarat, India Indian Geotechnical Society, Ahmedabad Chapter, Ahmedabad, India 8th Annual Conference on Deep Foundation Technologies for Infrastructure Development in India IIT Gandhinagar, India, 15-17 November 2018 1 Deep Foundations Institute of India Advanced foundation technologies Good contracting and work practices Skill development Design, construction, and safety manuals Professionalism in Geotechnical Investigation Student outreach Women in deep foundation industry Join the DFI Family DFI India 2018 8th Annual Conference on Deep Foundation Technologies for Infrastructure Development in India IIT Gandhinagar, India, 15-17 November 2018 Souvenir With extended abstracts Sponsor / Exhibitor catalogue Deep Foundations Institute, DFI of India Indian Institute of Technology Gandhinagar, Gujarat, India Indian Geotechnical Society, Ahmedabad Chapter, Ahmedabad, India www.dfi -india.org 3 Deep Foundation Technologies for Infrastucture Development in India - DFI India 2018 IIT Gandhinagar, Gujarat, India, 15-17 November 2018 DFI India 2018, 8th Annual Conference on Deep Foundation Technologies for Infrastructure Development in India Advisory Committee Prof. Sudhir K. Jain, Director. IIT Gandhinagar Dr. Dan Brown, Dan Brown and Association and DFI President Mr. John R. Wolosick, Hayward Baker and DFI Past President Prof. G. L. Sivakumar Babu, IGS President Er. Arvind Shrivastava, Nuclear Power Corp of India and EC Member, DFI of India Prof. A. Boominathan, IIT Madras and EC Member, DFI of India Prof. S. R. Gandhi, NIT Surat and EC Member, DFI of India Gianfranco Di Cicco, GD Consulting LLC and DFI Trustee Prof.
    [Show full text]
  • Technical Specification Series 10000 Piling Works
    TECHNICAL SPECIFICATION SERIES 10000 PILING WORKS Series 10000 –Piling Works NRAP-MoPW TECHNICAL SPECIFICATION PART 10000 - PILING TABLE OF CONTENTS Item Number Page 10000 Board Cast in Place Piles 10-4 10001 Description 10-4 10100 Materials 10-4 10101 Steel Classing 10-4 10102 Concrete 10-5 10103 Reinforcement 10-5 10104 Drilling Fluid 10-5 10200 Construction Methods 10-5 10201 General 10-5 10202 Setting out Piles 10-6 10203 Diameter of Piles 10-7 10204 Tolerance 10-7 10205 Boring 10-7 10206 Placing Reinforcement 10-9 10207 Placing Concrete 10-9 10208 Extraction of Temporary Casing 10-10 10209 Temporary Support 10-10 10210 Records 10-12 10210 Measures in Case of Rejected Casing 10-12 10212 Measurement 10-12 10213 Payment 10-12 10300 Precast Concrete Units for River Training and Retaining Structures 10-13 10301 Description 10-13 10302 Materials 10-13 10303 Construction Methods 10-13 10304 King Post & Anchor Piles 10-14 10305 Precast Planks 10-14 10306 Tolerance 10-14 10307 Measurement 10-14 10308 Payment 10-14 10400 Pile Test Loading 10-15 10401 General 10-15 10402 Definitions 10-15 10403 Supervision 10-15 10500 Safety Precautions 10-16 10501 General 10-16 10502 Kentledge 10-16 10503 Tension Piles and Ground Anchors 10-16 10504 Testing Equipment 10-16 UNOPS-Afghanistan PART 10-1 Series 10000 –Piling Works NRAP-MoPW 10600 Construction of a Pilot Pile to be Test Loaded 10-17 10601 Notice of Construction 10-17 10602 Method of Constructions 10-17 10603 Boring or Driving Record 10-17 10604 Cut-Off Level 10-17 10605 Pile Head for Compression
    [Show full text]
  • Uji Beban Fondasi
    HATTI MENGAJAR UJI BEBAN FONDASI (…… dari perspektif seorang) Aksan KAWANDA 2021.01.31 PENGUJIAN BEBAN STATIK Pengujian beban untuk verifikasi daya dukung dan pergerakan yang terjadi pada tiang uji. Pengujian ini dapat dilakukan dengan (3) metode : - Beban mati / Kentledge - Tiang reaksi - Pembebanan Cell 2 Arah Standar Pengujian D1143-07 (Re-13), Standard Test Method for Deep SNI 8460-2017, Foundations Under Static Axial Compression Load Persyaratan Perancangan Geoteknik D3689-07, Standard Test Method for Deep Foundations Under Static Axial Tensile Load D3966-07, Standard Test Method for Deep Foundations Under Lateral Load D8169-18, Standard Test Methods for Deep Foundation Under Bi-Directional Static Axial Compressive Load Standar Nasional Indonesia 8460:2017 Jumlah tiang uji A. Tiang Bor, 1 tes = 75 tiang B. Tiang Pancang, 1 tes = 100 tiang C. Jika N<75 bor / <100 pancang min 1 tes D. Ketentuan tambahan a . N<1000, 1%N b. 1000<N<3000, 0.8%N + item a c. 3000<N<6000, 0.5%N + item b d. 6000<N<8000, 0.4%N + item c E. 60% Sebelum konstruksi, 40% saat konstruksi Standar Nasional Indonesia 8460:2017 Tiang Bor Total 8600 a. 1% x 1000 = 10 b. 0.8% x 2000 = 16 c. 0.5% x 3000 = 15 d. 0.4% x 2600 = 10.4 ≈ 11 Total Tes = 52 tiang 60% Statik + 40% x 4 Dinamik (diperbolehkan) Standar Nasional Indonesia 8460:2017 Jumlah tiang uji ▪ Axial Tarik ▪ 1 tes = 100 tiang / min 1 (dimensi sama) ▪ Lateral ▪ 1 tes setiap dimensi tiang Standar Nasional Indonesia 8460:2017 Beban Uji (Tekan, Tarik, Lateral) ▪ Used Pile, 200% beban rencana Batasan Deformasi ▪ Axial
    [Show full text]
  • Project Experience of Alfa Geotech
    ALFA GEOTECH COMPANY PROFILE Alfa Geotech Co., Ltd. (formerly MAA Geotechnics Co., Ltd.) was established in 1997 as a local geotechnical consulting firm. Over the last decade, the company has become a well-established geotechnical consulting company. The company has involved in several major infrastructure projects in Thailand, including highway, airport, land reclamation, petrochemical and power plant projects etc. Today, the company has over twenty (20) geotechnical engineers with various testing equipment and facilities, becoming one of the most active geotechnical consulting firms in Thailand. Scope of Services Contact: Alfa Geotech Co., Ltd. provides the Address: following consulting services: 17,19 Soi Chokchai 4 Soi 69, Chokchai 4 1. Geotechnical Consultancy Road, Latphrao, Bangkok 10230, Thailand Ground Improvement :(+66) 2 931-0721-3 CO., LTD. CO., Fax: (+66) 2 931-0724 Foundation Design E-mail:[email protected] Slope Stability and Settlement Analysis Design and Construction Supervision 2. Geotechnical Investigation 3. In-Situ and Laboratory Tests 4. Topographical Survey 5. Geotechnical Field Tests Electric Piezocone Penetration Test (CPT) Dynamic Cone Penetration Test ALFA GEOTECH ALFA (DCPT) Soil Resistivity Test Pressuremeter Test Downhole Seismic Test 6. Pile Testing o Low Strain Integrity Test (Seismic Test) o Crosshole Sonic Logging Test (CSL) o Static Pile Load Test 7. Instrumentation and Monitoring Vibration monitoring Ground Movement Monitoring (Settlement plate, Inclinometer and Extensometer) Piezometer installation and monitoring of piezometric pressure. 8. Geosynthetics Testing ALFA GEOTECH Soil Investigation Soil Boring Rotary wash boring will be used in the soil drilling to advance the hole. A drilling bit is attached to the end of the drilling with constant injection of mud fluid to lift the cuttings from the borehole.
    [Show full text]
  • Non-Destructive Testing of Concrete Piles Using the Sonic Echo and Transient Shock Methods
    NON-DESTRUCTIVE TESTING OF CONCRETE PILES USING THE SONIC ECHO AND TRANSIENT SHOCK METHODS BY HON-FUNG CYRIL CHAN B.Sc. A thesis submitted for the Degree of Doctor of Philosophy UNIVERSITY OF EDINBURGH 1987 rM~k, 8'0 DECLARATION It is declared that this thesis has been composed by the author. The work and results reported in this thesis were carried out solely by him under the supervision of Dr. M.C. Forde, unless otherwise stated. Edinburgh, May 1987 H.F.C. CHAN To My Parents Acknowledgements The author would like to thank Professor A.W. Hendry, who is Head of Department of Civil Engineering and Building Science, has provided environment conducive to research. The author is particularly indebted to his supervisor, Dr. M.C. Forde, for inspiration and guidance throughout his years in the Department. The work outlined in this thesis would not have been possible without his dedicated support. Fellow colleagues, F.L.A. Wong and Alan Sibbald, helped enormously with the design and construction of the model piles used in this piece of work. The author is grateful for their unselfish contribution. The author is indebted to Miss A. Rudd for her contribution towards the model construction and undertaking some of the experimental work as part of her final year project. The assistance of members of the technical staff is also gratefully acknowledged. The author thanks Civiltech NDT Ltd. for providing a Case Award for this project. In additon, the author thanks its director, A.J. Batchelor, for many stimulating discussions. Stephen Lam, Bernard Cheng, and C.H.
    [Show full text]
  • Manuscript Preparation for International Conference On
    Proceedings of the 9th South African Young Geotechnical Engineers Conference, 13, 14 & 15 September 2017 – Salt Rock Hotel, Dolphin Coast, Durban, KwaZulu-Natal Upstream Raise Tailings Dams from a Low Risk Appetite Perspective: A Case Study R. van der Westhuizen1, G. Coetzer2 1Golder Associates Africa, Johannesburg, Gauteng, [email protected] 2Golder Associates Africa, Johannesburg, Gauteng, [email protected] Abstract This paper explores some controversy that was experienced when dealing with an international investor with an exceptionally risk averse paradigm on the design of an upstream raise tailings storage facility to be constructed in Limpopo, South Africa. The primary points of contention will be briefly discussed, with a single point regarding liquefaction under seismic loading being explored in more detail. Some of the proposed resolutions to the liquefaction concern will be presented and critically discussed, including the option that will most likely be the final resolution. Keywords: upstream raising; liquefaction; mine tailings 1 Introduction The design of a tailings storage facility (TSF) was undertaken for a greenfield development in the Limpopo region of South Africa. The design was conducted according to established norms and standard practice adopted in the South African mining environment, and the TSF was designed as a lined upstream raise facility, implementing a combination of established deposition methodologies consisting of daywall paddocking and spigotting. The foreign investor with a minority stake in the project voiced some concerns they had regarding the design. The investor originated from Japan, and their primary concern was based on the fact that design and implementation of upstream raise TSFs have been banned in Japan since 1982, due to failures of upstream dams in the 1970s (usually leading to liquefaction).
    [Show full text]
  • 3.3. Evaluation of Building Foundation Damage Basic Terminology
    3.3. Evaluation of Building Foundation Damage Basic Terminology: Damage: Destruction, deformation, inclination and settlement of a building foundation caused by an earthquake. Damage grade: Degree of danger of destruction, deformation, inclination and settlement of a building foundation caused due to earthquake. Retrofit: Secure a necessary aseismic capability reinforcing the aseismic capability of existing building foundations which decreases due to an earthquake, and assume an existing building to be reusable. Safety: Building foundation conditions which ensure the safety of human life even at a possible severe earthquake. Purpose: Methodology for evaluating safety of building foundations after earthquake or tsunami Important Points: Timing: Timing Evaluation Methodology Example Immediate · First announcement of · Reports of eye witness & building damage Feelings by local habitants · Broadcast Within few days · Quick inspection of · Evaluation into 3 ranks, building inspected, limited entry and no entry Within few · Damage survey in a · Judge the cause of settlement weeks typical area and inclination on building · Confirmation of building foundation After several · Damage Classification · Seismic capacity assessment months · Judge the retrofit method and design Grade: Grade Methodology Measures Minimum Reports of eye witness & Information to habitants Necessary Feelings by local habitants Better Instant evaluation Advice to habitants about Restoration Best Evaluation of safety of Advice to habitants about building foundation Retrofitting 198 3.3.1. Damage investigation flow chart The flow of building-foundation damage investigation is presented in Figure 3.3.1-1. Within two or three days after an earthquake, a quick inspection of the buildings is done to decide on the degree of danger from aftershocks and on whether it is necessary to restrict the use of the buildings (Step 1).
    [Show full text]