PROGRAMMES at a GLANCE: MAY 2015 • 3 Added • 12 Updates • 3 Completed

Total Page:16

File Type:pdf, Size:1020Kb

PROGRAMMES at a GLANCE: MAY 2015 • 3 Added • 12 Updates • 3 Completed PROGRAMMES AT A GLANCE: MAY 2015 • 3 Added • 12 Updates • 3 Completed Sponsored by: www.soldiermod.com SoldierMod 27 PROGRAMMES AT A GLANCE MAY 2015 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity Australia Land 125 Phase 3 Phase 2 completed. Includes Elbit Craig International Ballistics Phase 3C, focus on Phase 3 being Systems, has secured a major long- “Lethality” continues. acquired; 3A C4I, Harris, Thales term contract under Land 125 3B Soldier Combat & Selex. Phase 3B to supply advanced This last phase is focused Ensemble and 3C is protective body armour to the on an upgrade of the UPDATED Enhanced Austeyr and Australian Defence Force. Austeyr F-88 bullpup STA. assault rifle to EF-88 The contract involves the specification overseen by manufacture of around Thales, which is now in 20,000 sets of body armour the process of selecting for the Australian Army at a suppliers for a range of value of approximately $49 accessories that must fit million. The contract is for the weapon’s STANAG four years with a three year 4694 rail system. extension option. Australia Land 125 To be managed TBC All personnel in Land 125-4 Strategy has not been fully Phase 4 (Army by Diggerworks. will already have L53-1BR scoped. Cost estimated at High Priority Equipping the - Night Fighting Equipment A$500m-$1500m although Capability Gaps soldier after 2020. technology re-fresh L125- expected to be towards - Next Soldier Programme likely to 3B – Survivability – the the lower end. $7.5 Enhancement) be renamed. Broad Soldier Combat Ensemble million of Phase 4 funding cuts to defence (Protection, Platform, allocated to new DMTC to budget have seen First Pouches, Packs) L125- develop new technology. Pass Delayed by a year 3C – Enhanced F88 with to 2015 and the whole ‘open architecture’ Army Phase 4 programme Minors, Force Protection due to complete in Review, Sustainment – 2023. F88SA2 and 3, 7.62mm MG, 7.62mm Marksman Rifle. In December 2013, Elbit Systems announced a $229 million pair of Australian contract modifications for Risk Reduction Activities, and additional Battle Management Systems. The exercised options and risk reduction survey and quote were separate items, but both fall within the existing contract. Work will be performed over the next 3 years. NO NEW INFO SINCE LAST UPDATE Australia Land 200 LAND 200 Tranche Elbit Systems LAND 200 Tranche 2 was LAND 200 will undergo 1 was endorsed endorsed by Government its greatest challenge LAND 200 by Government in in August 2013 and will between 2013 and 2018 nomenclature is November 2009. New continue with PMV and in delivering a holistic the combination NEW! radios and systems G-Wagon installations, as well Land Networking solution of the following commenced delivery as installation of radios and to two Army formations, projects/phases: across Defence in May systems into the M113AS4s, enabling Brigades, • LAND 75 Phase 2011. LAND 121 Medium Heavy training establishments, 3.2 & Phase Trucks, and PMV-Light. Special Forces and 3.3. Battlefield LAND 200 Tranche other Services. LAND Command 1 is due to reach full 200 Tranche 3, planned Support System operational capability for 2017 – 2021-22, will (BCSS) in 2014 with the complete deliveries to the • LAND 75 final delivery of all remainder of Defence and Phase 3.4. Battle equipment. Under provide technical refresh Management this Tranche, Army will of equipment previously System – Mounted receive digital Battle delivered in Tranche 1 (BMS-M) Management Systems and 2. • LAND 125 for the soldier, Phase 3. Battle Protected Mobility Management Vehicles, Unimog and System – G Wagon. Dismounted (BMS-D) 28 Volume 15 Spring/Summer 2015 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity Austria Soldat der Concept Phase TBC The Rheinmetall Group The new modular Gladius System, Zukunft concludes 2011. has been awarded an which provides soldiers with high- Acquisition €84 million (US$112 tech protective gear backed by a The system postponed to now million) contract to networked array of communication – originally begin from 2015. supply a further sixty and navigation equipment, is known as of its Gladius “future currently being used by German “Infanterist Der soldier” systems to the troops in Afghanistan. Zukunft” or German Federal Defense “Future Soldier” Force. NO NEW INFO – is now called SINCE LAST UPDATE “Gladius” (Latin for sword) Austria Soldat 2015 Near term TBC Madritsch delivered first Brigadier General Norbert procurement of batch of its AG77 A1/ HuberHead of Force Development radios, hearing ML40. Division, Austrian Army spoke at protection and The Infantry Weapons and Support head subsystem. Systems 2014 conference, held September 2014 in London, UK. He gave a brief on developments and progress of SOLDAT 2015 to this point, and discussed: • Austrian infantry support systems; shoulder launched munitions now and in the future • Austrian efforts to integrate non- lethal weapons and their potential benefits • The future direction of the Austrian infantry; modernization developments over in the next 5 years NO NEW INFO SINCE LAST UPDATE Belgium BEST R&D and market Sagem The commissioning of Smart vest is approaching final studies. the new modular combat phases, including integrated helmet has been delayed head gear and the E-lighter. The until 2016 and a three- commissioning of the new modular year contract with Fokker combat helmet has been delayed UPDATED Aerostructures for the until 2016 and a three-year contract further development of with Fokker Aerostructures for the the E-lighter was signed further development of the E-lighter in September 2011. was signed in September 2011. Brazil Combatente 2007 Army General TBC $14m award for Harris The contract involves the supply of Brasileiro Staff endorsement. Falcon II&III radios in radios to the Brazilian army’s center (COBRA) R&D and testing RF-7800V in Feb. 2011. for communications and electronic and evaluation First 86 VBTP-MR Guarani warfare. phase until 2013 6x6 IFVs delivered Both the RF-7800V and RF-7800S linked to AFV work. in December 2013, systems are essential to the COBRA requirement for 2130. modernization program, as they NO NEW INFO SINCE will provide secure voice and LAST UPDATE high-bandwidth data applications, including video combat chat. Canada Integrated Project restarted in Companies The successful bidder will By December of 2014, the Canadian Soldier System February 2013, with expressing receive two contracts. government expects to award Project (ISSP) a formal RFP for interest The first will cover a the first phase of a program to new bids reissued include: period of about four purchase a new integrated system in August of 2013. Elbit Systems years and will see the of computers, communications and UPDATED with L-3, delivery of Integrated sensors for individual soldiers. Thales Canada, Soldier Systems (ISS) Rheinmetall for qualification. If the Canada with systems pass review, Saab, General then the government Dynamics will purchase systems in Canada, batches, totalling 1,600 Sagem with in all. Raytheon, DRS Technologies and Selex. www.soldiermod.com SoldierMod 29 PROGRAMMES AT A GLANCE MAY 2015 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity Croatia ‘Future Soldier’ EDA/LCG/1 Procurement New uniform and load New sniper rifles demo-ed: Berta participation only for carriage procured. First 1000 Projekt BP 08 M in .338 Lapua on C4I. Afghanistan VHS 5.56mm assault rifle and .300 Win Mag and Agencija deployment delivered. NO NEW INFO Alan’s MACS M4 12.7mm. inc. Motorola SINCE LAST UPDATE Program is almost an end, should GP300, Kroko be fully implemented by the end ballistic vest, of 2015. Sestan Busch helmet. Czech Voják 21 ‘V21’ V21 2004-6 single VOP-026 New Ceska Zbrojovka assault Plans to acquire 10,000 CZ 805 Republic or Soldier 21 demonstrator led V21 and rifle postponed in 2011 due Bren assault rifles, 7,000 CZ 75 Squad level ‘Sesedak’’ to funding. NO NEW INFO Phantom pistols and 500 CZ ‘Sesedak’ SINCE LAST UPDATE Scorpion SMGs from 2014-2020. experimentation in 2007-9. Denmark ‘Danish Army Work on integrated As Recent funding of Aimpoint Contracted with Harris for 3500 Network SMP ended equipment. laser light module, ballistic SPRs with INVISIO V60 ancillaries Enabled Soldier’ 2005 in favour eye protection, first aid kit, in October. (DANES) of incremental combat vest and Personal The Royal Danish Army acquisition. May Role Radio. NO NEW INFO announced in March 2014 it procure systems SINCE LAST UPDATE has selected the U.S. Ordnance from 2015-20. M60E6 as its new General Incremental Purpose Machine Gun. The procurement in M60E6 was chosen for the meantime for benefits it holds over the current Afghanistan. M/62 MG3 which has been in use Move to acquire with the Danish Army since 1962. dismounted BMS Additionally, the Danish Army is 2009-14. also in the process of obtaining an optics and sensor package for the new MG, including unspecified daylight optics, thermal optics, red dot optics, tactical lights, tactical lasers, and laser range finders. Finland Now known as Technology TP2010 Tactical Headgear for The ‘future soldier’ program Warrior 2020 Programme 2010 includes Operational Requirements for the Finnish Army known (TP2010) until 2014. Savox as (THOR) has been adopted by as ‘Warrior 2020′ is currently Fielding from 2017. integrator the Finnish Defense Forces conducted on a parallel and Millog, as the helmet component of path, under the Technology UPDATED Nethawk and their Soldier Modernization Programme 2010 (TP2010) Insta. Program: Warrior 2020. framework spanning four years A multi-year contract was of evaluation and development recently let by the Finnish of advanced soldier systems for Defense Forces Logistics the Finnish Army, scheduled to Command, with initial be fielded by 2017. deliveries being used for acceptance testing. Savox is the prime contractor of the consortium behind THOR, along with industry partners, Millog Oy (night vision) and Fy-Composites Oy (ballistic protection).
Recommended publications
  • ^`Nrfpfqflk=Obpb^O`E= `~Ëé=Ëíìçó= =
    NPS-AM-11-205 ^`nrfpfqflk=obpb^o`e= `~ëÉ=ëíìÇó= = The Nett Warrior System: A Case Study for the Acquisition of Soldier Systems 15 December 2011 by Maj. Joseph L. Rosen, U.S. Army, and Maj. Jason W. Walsh, U.S. Army Advisors: Michael W. Boudreau, Senior Lecturer, and Dr. Keith F. Snider, Associate Professor Graduate School of Business & Public Policy Naval Postgraduate School Approved for public release, distribution is unlimited. Prepared for: Naval Postgraduate School, Monterey, California 93943 = = ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= do^ar^qb=p`elli=lc=_rpfkbpp=C=mr_if`=mlif`v k^s^i=mlpqdo^ar^qb=p`elli The research presented in this report was supported by the Acquisition Chair of the Graduate School of Business & Public Policy at the Naval Postgraduate School. To request Defense Acquisition Research or to become a research sponsor, please contact: NPS Acquisition Research Program Attn: James B. Greene, RADM, USN, (Ret.) Acquisition Chair Graduate School of Business and Public Policy Naval Postgraduate School 555 Dyer Road, Room 332 Monterey, CA 93943-5103 Tel: (831) 656-2092 Fax: (831) 656-2253 E-mail: [email protected] Copies of the Acquisition Sponsored Research Reports may be printed from our website, www.acquisitionresearch.net = = ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= do^ar^qb=p`elli=lc=_rpfkbpp=C=mr_if`=mlif`v k^s^i=mlpqdo^ar^qb=p`elli THE NETT WARRIOR SYSTEM: A CASE STUDY FOR THE ACQUISITION OF SOLDIER SYSTEMS ABSTRACT This project provides an analysis of the Army’s acquisition of the Nett Warrior (NW) soldier system. Its objectives are to document the legacy of the system and provide an overview of how acquisition strategy has adapted with respect to key acquisition elements since its inception on September 8, 1993.
    [Show full text]
  • Programmes at a Glance: February 2014 • 27 Updates
    PROGRAMMES AT A GLANCE: FEBRUARY 2014 • 27 Updates Sponsored by: PROGRAMMES AT A GLANCE FEBRUARY 2014 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity Australia Land 125 Phase 2 Includes Elbit In December 2013, Under Phase 3C, Investigation Phase 3 completed. Systems, Thales Australia is underway to enhance the Phase 3 being Harris, Thales released an “Expressions in-service F88 Steyr rifle. acquired; & Selex. of Interest” for the The enhanced F88 will be UPDATED 3A C4I, 3B provision of small arms a modular rifle system to Soldier Combat accessories for Phase provide physical integration Ensemble and 3C. Thales intends to with improved performance 3C is Enhanced commence small arms and handling, including Austeyr and accessories product the integration of ancillary STA. analysis and testing in devices such as sights to the early 2014 under the weapons. These modifications Land 125 Ph3C Stage 2B will enhance the lethality of contract. the individual soldier, fire team and section. Australia Land 125 To be managed TBC All personnel in Land Strategy has not been fully Phase 4 (Army by Diggerworks. 125-4 will already have scoped. Cost estimated at High Priority Equipping L53-1BR - Night Fighting A$500m-$1500m although Capability the soldier Equipment technology expected to be towards the Gaps - Next after 2020. re-fresh lower end. $7.5 million of Soldier Programme L125-3B – Survivability Phase 4 funding allocated to Enhancement) likely to be – the Soldier Combat new DMTC to develop new renamed. Ensemble (Protection, technology. Broad cuts to Platform, Pouches, defence budget Packs) have seen First L125-3C – Enhanced F88 Pass Delayed with ‘open architecture’ by a year to Army Minors, Force 2015 and the Protection Review, whole Phase 4 Sustainment – F88SA2 programme due and 3, 7.62mm MG, to complete in 7.62mm Marksman 2023.
    [Show full text]
  • Nett Warrior
    1 Soldier Modernization Market Segment Report February 2021 Copyright © 2021 Jane's Group UK Limited. All Rights Reserved. 2 Introduction As part of Janes’ support of the New Hampshire Aerospace and Defense Export Consortium (NHADEC), Janes will provide a series of ten high-level market reports on subjects of NHADEC’s choosing as well as two in-depth market segment reports. This market segment market report focuses on the soldier modernization market and is comprised of the following elements: 1. Overview of the main aspects of soldier modernization 2. Ongoing programs 3. Market forecast 2021-2025 Copyright © 2021 Jane's Group UK Limited. All Rights Reserved. Soldier modernization evolution 3 1990s-2000 2000s-2010 2010s-2020 2030s • Future soldiers programs have been in the making for decades, although the concept only started reaching maturity in the 1990s with the advent of France’s FELIN or the US Land Warrior and Objective Force Warrior. In the 1990s, most projects were still heavily influenced by Cold War type engagement scenarios with a strong focus on mechanized infantry. Technological ambitions were huge and envisioned the use of airburst type combined weapons by “super soldiers” fully networked, heavily armed, capable of dissimulating through adaptive camouflage and holograms and able to live of the land thanks to genetically altered seeds able to turn into edible vegetables in hours. • Of the different programs launched in the 1990s, only FELIN reached maturity, albeit in a much different form than originally conceived. The system started to be fielded by the end of the 2000s and made its debut in operations in Afghanistan in 2011.
    [Show full text]
  • 10Th Phd Conference Proceedings 10. Doktorandská Konference New
    UNIVERSITY OF DEFENCE / CZECH REPUBLIC UNIVERZITA OBRANY / ČESKÁ REPUBLIKA 10th PhD Conference Proceedings 10. doktorandská konference New Trends in National Security Nové přístupy k zajištění bezpečnosti státu Published by University of Defence in Brno Brno 2015 Conference Steering Committee / Programový výbor plk. Dr. habil. Ing. Pavel Foltin, Ph.D. prof. Ing. Ladislav Potužák, CSc. prof. PhDr. Miroslav Krč, CSc. prof. Ing. Petr Hajna, CSc. prof. Ing. Zdeněk Zemánek, CSc. Organization Committee / Organizační výbor por. Ing. Adéla Adámková Ing. Monika Cabicarová Ing. Magdaléna Náplavová Editor sborníku: Ing. Magdaléna Náplavová Ing. Kateřina Pochobradská Ing. Monika Cabicarová Ing. Michaela Vašková © Univerzita obrany © Autoři příspěvků Copyright © 2015 All rights reserved. No part of this publication may be reproduced without the prior permission of University of Defence in Brno University Press. ISBN 978-80-7231-994-7 2 ÚVODNÍ SLOVO VOJENSKÉ TECHNOLOGIE, MEZINÁRODNÍ POLITIKA A VÁLKA MILITARY TECHNOLOGY, INTERNATIONAL POLICY AND WAR prof. PhDr. Miroslav KRČ, CSc. Abstrakt Článek objasňuje vztah vojenských technologií a mezinárodní politiky, základní paradigmata formování zbrojního průmyslu a deskriptivně prověřuje tezi o růstu významu vojenských technologii po skončení studené války, což je reflektováno v trvale rostoucí globální úrovni vojenské síly. Pozornost je soustředěna na deskripci efektu vojenských technologií při ovlivňování mezinárodní situace. Řešení tohoto cíle staví právě na prolnutí logiky a integraci bezpečnostních studií
    [Show full text]
  • Pharmacological Supersoldiers in the US Military
    Chemical Heroes Pharmacological Supersoldiers in the US Military andrew bickford Chemical Heroes andrew bickford Chemical Heroes Pharmacological Supersoldiers in the US Military Duke University Press ​| Durham and London ​| ​2020 © 2020 Duke University Press All rights reserved Printed in the United States of Amer i ca on acid- free paper ∞ Designed by Matthew Tauch Typeset in Whitman and Helvetica Neue lt Std by Westchester Publishing Ser vices Library of Congress Cataloging- in- Publication Data Names: Bickford, Andrew, [date] author. Title: Chemical heroes : pharmacological supersoldiers in the US Military / Andrew Bickford. Other titles: Global insecurities. Description: Durham : Duke University Press, 2020. | Series: Global insecurities | Includes bibliographical references and index. Identifiers: lccn 2020018849 (print) | lccn 2020018850 (ebook) isbn 9781478009726 (hardcover) isbn 9781478011354 (paperback) isbn 9781478010302 (ebook) Subjects: lcsh: United States. Army— Safety mea sures. | United States. Army— Medical care. | Military art and science— Technological innovations. | Soldiers— Protection— United States. | Soldiers— Performance— United States. | Biological warfare— Research— United States. | Phar ma ceu ti cal industry— Military aspects. Classification: lcc u42.5 .b535 2020 (print) | lcc u42.5 (ebook) | ddc 355.3/45— dc23 lc rec ord available at https:// lccn . loc . gov / 2020018849 lc ebook rec ord available at https:// lccn . loc . gov / 2020018850 Cover art: Design and illustration by Matthew Tauch For Arwen Heroism is endurance for one moment more. » George F. Kennan, Letter to Henry Munroe Rogers, July 25, 1921 It is impossible to strive for the heroic life. The title of hero is bestowed by the survivors upon the fallen, who them- selves know nothing of heroism. » Johan Huizinga, The Spirit of the Netherlands, 1968 Death is but a moment; cowardice is a lifetime of affliction.
    [Show full text]
  • Operational Task Modeling
    IMPERFECT SITUATION ANALYSIS: REPRESENTING THE ROLE OF ERROR AND UNCERTAINTY IN MODELING, SIMULATION & ANALYSIS A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy By VICTOR E. MIDDLETON B.S., Michigan Technological University, 1973 M.S., Michigan Technological University, 1975 M.S., Michigan State University, 1978 ___________________________________________ 2014 Wright State University WRIGHT STATE UNIVERSITY GRADUATE SCHOOL May 2, 2014 I HEREBY RECOMMEND THAT THE DISSERTATION PREPARED UNDER MY SUPERVISION BY Victor E. Middleton ENTITLED Imperfect Situation Analysis: Representing Error and Uncertainty in Modeling, Simulation & Analysis BE ACCEPTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF Doctor of Philosophy. ____________________________ Frank W. Ciarallo, Ph.D., Dissertation Director ___________________________ Ramana Grandhi, Ph.D., Director of the Ph.D. in Engineering Program Committee on Final Examination __________________________ Robert E. W. Fyffe, Ph.D., Vice Frank W. Ciarallo, Ph.D. President for Research and Dean of the Graduate School _________________________ Raymond R. Hill, Ph.D. _________________________ Yan Liu, Ph.D. _________________________ Mateen M. Rizki, Ph.D. _________________________ Mary E. Fendley, Ph.D. _________________________ David Hudak, Ph.D. ABSTRACT Middleton, Victor Eaton. Ph.D., Engineering Ph.D. Program, Wright State University, 2014. Imperfect Situation Analysis: Representing Error and Uncertainty in Modeling, Simulation & Analysis. Much of traditional modeling, simulation and analysis (MS&A) is supported by engineering models - deterministic, Newtonian physics-based representations of closed systems. Such approaches are not well-suited to represent the intricacies of human behavior. This research advocates and seeks to articulate the concept of a more human- centric approach to MS& A, one that better represents decision-making and other cognitive aspects of human behavior as well as it does physical activity.
    [Show full text]
  • PROGRAMMES at a GLANCE: JANUARY 2020 • 5 Programmes Updated • 2 New Programmes
    PROGRAMMES AT A GLANCE: JANUARY 2020 • 5 Programmes updated • 2 New Programmes Sponsored by: www.soldiermod.com SoldierMod 1 PROGRAMMES AT A GLANCE JAN 2020 Country | Programme Name Schedule | Contractor Team Recent Procurement Activity | Notes Australia: Land 53 Procurement of night vision goggles, L-3 awarded a contract worth $208 million by the helmet mounts and other equipment Australian Defence Force under Phase 1BR of the approved. programme in mid-November 2016. It will provide | L-3 a range of systems, such as binocular night vision goggles and miniature laser rangefinders. The equipment is set to be delivered between 2017 and 2023, with the final materiel release set for March 2023 and final operational capability to be declared in September of that year. Australia: Land 125 Phase 3C Thales Australia is the prime This project is delivering a weapon system based contractor manufacturing the on the Enhanced F88 rifle comprising a Grenade Enhanced F88 rifle and supplying the Launcher Attachment (GLA) and a suite of surveillance Steyr Mannlicher-produced GLA. and target ancillaries, including an enhanced day sight and thermal and image-intensifier sights. UPDATED A contract for the production of 30,000 Enhanced F88 rifles, 2,277 GLAs, repair parts and training aids was signed in July 2015. Deliveries commenced in August 2015 and will continue through to 2021. Surveillance and target ancillaries have been fully delivered. Deliveries of weapon systems into Queensland have been completed. Deliveries to units of the readying brigade primarily located in South Australia and the Northern Territory have commenced and will be completed in April 2019.
    [Show full text]
  • A Brief Overview of Digital Military Systems Used in the Armies of NATO Member Countries
    NEMZETBIZTONSÁGI SZEMLE 9. évfolyam (2021) 1. szám 56–70. • doi: 10.32561/nsz.2021.1.4 Péter Török1 A Brief Overview of Digital Military Systems Used in the Armies of NATO Member Countries A NATO-tagországok által alkalmazott digitális katonai rendszerek rövid áttekintése Today’s wars have undergone significant change. These changed military operations have changed the way armies are deployed, including the role and responsibilities of soldiers. New tools are needed to overcome the new challenges. 21st century soldiers n1 e e d 2 st century equipment to perform their duties. A project is present in several NATO (North Atlantic Treaty Organisation) member states army to develop individual equipment systems for dismounted soldiers equipped with modern military equipment, which are in the pilot phase, under introduction or authorised. I present these briefly in my publication. Keywords: C4I, digital soldier, DSS, NATO, soldier modernisation program A ma háborúi jelentős változáson mentek át. Ezek a megváltozott katonai műveletek megváltoztatták a hadseregek alkalmazásának módját, ezen belül a katonák szerepét és feladatait. Az új kihívások leküzdéséhez új eszközökre van szükség. A ­21. század katonáinak 21. századi felszerelésre van szükségük feladataik végrehajtásához. Több NATO-tagország haderőiben van jelen kísérleti fázisban lévő, bevezetés alatt álló vagy rendszeresített, modern hadeszközökkel felszerelt gyalogos katonák egyéni eszközrendszereinek fejlesztésével foglalkozó projekt. Ezeket mutatom be röviden a publikációmban. Kulcsszavak: C4I, digitális katona, DSS, NATO, modernizációs program 1 Péter Török is a PhD student at the University of Public Service Doctoral School of Military Engineering – Török Péter a Nemzeti Közszolgálati Egyetem Katonai Műszaki Doktori Iskola doktori hallgatója. E-mail: torok. [email protected], ORCID: https://orcid.org/0000-0002-7960-8945 56 57 Péter Török: A Brief Overview of Digital Military Systems Used in the Armies… 1.
    [Show full text]
  • PROGRAMMES at a GLANCE: JANUARY 2019 • 7 Programmes Updated
    PROGRAMMES AT A GLANCE: JANUARY 2019 • 7 Programmes updated Sponsored by: www.soldiermod.com SoldierMod 1 PROGRAMMES AT A GLANCE JAN 2019 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity Australia Land 53 Procurement of L-3 L-3 awarded a contract worth night vision goggles, $208 million by the Australian helmet mounts and Defence Force under Phase other equipment 1BR of the programme in approved. mid-November 2016. It will provide a range of systems, such as binocular night vision goggles and miniature laser rangefinders. The equipment is set to be delivered between 2017 and 2023, with the final materiel release set for March 2023 and final operational capability to be declared in September of that year. Australia Land 125 Phase 2 completed. Includes Elbit Craig International Ballistics This phase is focused Phase 3 Phase 3 being Systems, has secured a major long- on an upgrade of the acquired; 3A C4I, Harris, Thales term contract under Land 125 Austeyr F-88 bullpup 3B Soldier Combat & Selex. Phase 3B to supply advanced assault rifle to EF-88 Ensemble and 3C is protective body armour to the specification overseen Enhanced Austeyr Australian Defence Force. by Thales, which is and STA. The contract involves the now in the process of manufacture of around 20,000 selecting suppliers for sets of body armour for the a range of accessories Australian Army at a value of that must fit the approximately $49 million. The weapon’s STANAG 4694 contract is for four years with a rail system. three year extension option. The delivery of rifles and ancillary devices to North Queensland under phase 3C has been completed, and deliveries were scheduled for South Queensland for the second half of 2017.
    [Show full text]
  • PROGRAMMES at a GLANCE | December 2020 | 10 Updates
    PROGRAMMES AT A GLANCE: DECEMBER 2020 • 10 Programmes updated • 2 New Programmes The full programme section is available online Sponsored by: www.soldiermod.com SoldierMod 1 PROGRAMMES AT A GLANCE DEC 2020 Country | Programme Name Schedule | Contractor Team Recent Procurement Activity | Notes Country | Programme Name Schedule | Contractor Team Recent Procurement Activity | Notes Australia: Land 53 Procurement of night vision goggles, L-3 awarded a contract worth $208 million by the Australia: Land 200 The Australian Federal Government The Department of Defence has sought to delay helmet mounts and other equipment Australian Defence Force under Phase 1BR of the LAND 200 is made up of phases announced that Eylex Pty Ltd has first pass approval for Battlefield Command approved. programme in mid-November 2016. It will provide from three projects: Land 125, Land been selected to supply critical Systems under Land 200 Phase 3. a range of systems, such as binocular night vision equipment to the $5.2 billion Land | L-3 75 and JP 2072. The pause is until ‘at least’ February 2022. The goggles and miniature laser rangefinders. 400 Phase 2 Commonwealth defence Department attributes the delay to ‘overall The equipment is set to be delivered between 2017 program, including Racal Acoustics movement in committee processes and Covid-19’. and 2023, with the final materiel release set for March RA4000 Magna and RA5001 Raptor headsets for Boxer 8×8 Combat The Land 200 program is designed to transition 2023 and final operational capability to be declared in Army command from paper to digital, providing September of that year. UPDATED Reconnaissance Vehicles (CRV) with deliveries later this year.
    [Show full text]
  • Soldier Systems Technology Roadmap
    SOLDIER SYSTEMS TECHNOLOGY ROADMAP CAPSTONE REPORT AND ACTION PLAN SUPPORTING THE FUTURE SOLDIER SUPPORTING CANADIAN INDUSTRY SOLDIER SYSTEMS TECHNOLOGY ROADMAP CAPSTONE REPORT AND ACTION PLAN Abstract The Soldier Systems Technology Roadmap Capstone Report and Action Plan captures and summarizes the findings of the Development Phase of the Soldier Systems Technology Roadmap (2011–2025) (SSTRM) initiative. The SSTRM is a groundbreaking industry-government collaboration focused on enhancing the operational effectiveness of the future Canadian soldier and the competitiveness of Canadian industry through open innovation. Led by the Department of National Defence (DND)—with participation from Army and Materiel branches and Defence Research and Development Canada (DRDC)—and Industry Canada (IC), the initiative enjoys the strong support of the Canadian Association of Defence and Security Industries (CADSI) and of Technopôle Defence and Security (TDS). Applying roadmapping principles and processes to Canadian Forces soldier modernization efforts, the initiative involves industry and academia collaboratively in a comprehensive knowledge-sharing platform to articulate future needs and identify capability gaps, related challenges and potential technology solutions for the Canadian soldier of the future. The report includes an Action Plan that highlights the key R&D priorities identified by the soldier systems community of interest and makes recommendations for next steps in the initiative to encourage industry, academia and government collaboration
    [Show full text]
  • Technological Innovation and Defence: the Forza NEC Program in the Euro-Atlantic Framework
    IAI Research Papers Technological Innovation and Defence: The Forza NEC Program in the Euro-Atlantic Framework edited by Alessandro Marrone, Michele Nones and Alessandro R. Ungaro Edizioni Nuova Cultura Series Editor Natalino Ronzitti Acknowledgements The research team would like to thank the Italian Army General Staff, particularly the Land Transformation Department, as well as Finmeccanica-Selex ES. The authors bear the entire and exclusive responsibility for the content of this study. This research has been carried out with the support of Finmeccanica-Selex ES. Chapter 3 was translated with the support of Finmeccanica-Selex ES. Contributors Nick Brown, IHS Jane’s International Defence Review Tommaso De Zan, Junior Researcher, Istituto Affari Internazionali (IAI) Maren Leed, Senior Adviser, Center for Strategic and International Studies (CSIS) Alessandro Marrone, Senior Researcher, Istituto Affari Internazionali (IAI) Michele Nones, Head of the Security and Defence Program, Istituto Affari Internazionali (IAI) Alessandro R. Ungaro, Researcher, Istituto Affari Internazionali (IAI) _________________________ First published 2016 by Edizioni Nuova Cultura For Istituto Affari Internazionali (IAI) Via Angelo Brunetti 9 - I-00186 Roma www.iai.it Copyright © 2016 Edizioni Nuova Cultura - Roma ISBN: 9788868126513 Cover: by Luca Mozzicarelli Graphic Composition: by Luca Mozzicarelli The unauthorized reproduction of this book, even partial, carried out by any means, including photocopying, even for internal or didactic use, is prohibited by copyright.
    [Show full text]