JR East-South Hokkaido Rail Pass JR Tohoku-South Hokkaido Rail Pass Morioka

Total Page:16

File Type:pdf, Size:1020Kb

JR East-South Hokkaido Rail Pass JR Tohoku-South Hokkaido Rail Pass Morioka 2021/04★ 英語 JR East-South Hokkaido Adults (age 12 and over) Children (age 6-11) 6 consecutive days 27,000 yen 13,500 yen Rail Pass https://www.jreast.co.jp/multi/en/pass/easthokkaido.html Sapporo Ōdōri Park Goryōkaku Park New Chitose Airport Shin-Hakodate-Hokuto Shin-Aomori Jōzankei Hot Springs Akita JR East-South Hokkaido Rail Pass JR Tohoku-South Hokkaido Rail Pass Morioka Sendai Hokkaido Shinkansen Yamagata Sendai Airport Karuizawa Shin-Shirakawa Ginzan Hot Springs Ōmiya Tōkyō Haneda Airport Narita Airport Matsushima Bay Hakkōda Mountains https://www.jreast.co.jp/multi/en/pass/tohokuhokkaido.html JR Tohoku-South Hokkaido Adults (age 12 and over) Children (age 6-11) 6 consecutive days 24,000 yen 12,000 yen Rail Pass JR East-South Hokkaido Rail Pass JR Tohoku-South Hokkaido Rail Pass Usage Area Usage Area Otaru * Asahikawa, Furano, and Biei are outside of the usage area. Sapporo * Asahikawa, Furano, and Biei are outside of the usage area. Otaru Kutchan Minami-Chitose Sapporo New Chitose Airport Kutchan Minami-Chitose Oshamambe Tōya Noboribetsu New Chitose Airport Muroran Sapporo Sapporo Oshamambe Ōnumakōen Tōya Noboribetsu Shin-Hakodate-Hokuto Goryōkaku Muroran Hakodate Ōnumakōen Sendai Shin-Hakodate-Hokuto Goryōkaku Tokyo Aomori Noheji Hakodate Hirosaki Shin-Aomori Hachinohe Higashi-Noshiro Akita Morioka Aomori Noheji Sakata Hirosaki Shinjō Shin-Aomori Hachinohe Higashi-Noshiro Sendai Akita Morioka Murakami Yamagata Sendai Airport Oguni Yonezawa Fukushima Tokusawa Sakata Aizu-Wakamatsu Kōriyama Shinjō Tadami Iwaki Kinugawa-onsen GALA Yuzawa Sendai Tōbu-nikkō Nasushiobara Echigo-Yuzawa Murakami Yamagata Nikkō Sendai Airport Jōmō-Kōgen Utsunomiya Mito Oguni Yonezawa Takasaki Tokusawa Fukushima Karuizawa Ōmiya Aizu-Wakamatsu Kōriyama Sakudaira Ueno Narita Ariport Tōkyō Tadami Ōtsuki Kobuchizawa Haneda Airport Shin-Shirakawa Iwaki Yokohama Kōfu Shirasaka Yamatsuriyama Kurihama Nakoso Atami Itō Izukyū-Shimoda This pass can be used for ordinary car reserved seats and non-reserved seats on all limited express This pass can be used for ordinary car reserved seats and non-reserved seats on all limited express trains (including the Shinkansen), express trains and local trains (including rapid trains) on Hokkaido trains (including the Shinkansen), express trains and local trains (including rapid trains) on Hokkaido Railway Company (JR Hokkaido) lines, East Japan Railway Company (JR East) lines (including BRT), the Railway Company (JR Hokkaido) lines, East Japan Railway Company (JR East) lines (including BRT),the Izu Kyuko Line, the Tokyo Monorail Line, the Aoimori Railway Line, the Iwate Galaxy Railway (IGR) Line Aoimori Railway Line, the Iwate Galaxy Railway (IGR) Line and the Sendai Airport Transit Line within the and the Sendai Airport Transit Line within the area shown on the map. area shown on the map. It can also be used for ordinary cars on limited express trains served by both JR East and Tobu Railway (Nikko, Kinugawa, SPACIA Kinugawa, etc.) and on local trains between Shimo-imaichi and Tobu-nikko/Kinugawa-onsen on Tobu Railway lines. Hokkaido Shinkansen Joetsu Shinkansen Aoimori Railway Sendai Airport Transit Tohoku Shinkansen Hokuriku Shinkansen IGR Iwate Galaxy Railway Tobu Railway Akita Shinkansen JR Line Izu Kyuko Line Tokyo Monorail Yamagata Shinkansen * These passes are unable to be used between Goryokaku Sta. and Kikonai Sta. on the “South Hokkaido Railway” line. * These passes cannot be used for the Tokaido Shinkansen or JR Bus. * When traveling on lines served by a company other than those mentioned above, fares and charges are required for the area served by that company. Notes These passes are only available to customers who are not Japanese citizens and have obtained landing permission with a short-term stay visa stamp. They may not be transferred or loaned to a third party, including ● family members. Present your original passport (photocopies not accepted) with the above stamp at designated locations in Japan to purchase or redeem your pass. These passes may not be exchanged for other passes. The period of validity cannot be changed after purchase. ● This information is current as of April 2021. Visit our website for the latest updates. ● How to Purchase 1 At a Travel Agency Outside Japan 2 Inside Japan 3 On the Website https://www.eki-net.com/en/jreast-train-reservation/Top/Index Purchase a voucher from a travel agency Passes are available for purchase at the Purchase passes by using the JR-EAST Train outside Japan before arrival, then redeem it at following locations. Reservation website. Seats may be reserved as well. the following locations. * Available starting June 27, 2021. JR EAST: JR-EAST Travel Service Centers, etc. Exchange and Sales Offices JR Hokkaido: JR Information Desks, JR Ticket Counters at major stations (Midori-no-madoguchi) * Exchanges and sales are only handled during business hours. Please see the website for more information on business hours, and exchange and sales office. JR East-South Hokkaido Rail Pass JR Tohoku-South Hokkaido Rail Pass https://www.jreast.co.jp/e/ticketwindow/?selectPass=eastSHokkaido https://www.jreast.co.jp/e/ticketwindow/?selectPass=tohokuSHokkaido.
Recommended publications
  • Shinkansen Bullet Train
    Jōetsu Shinkansen (333.9 km) Train Names: TOKI, TANIGAWA Max-TOKI, Max-TANIGAWA JAPAN RAIL PASS Can also be Used for Shinkansen Jōetsu Shinkansen "Max-TOKI"etc. “bullet train” Travel Akita Shinkansen "KOMACHI" Akita Shinkansen (662.6 km) Train Name: KOMACHI Akita Shin-Aomori Yamagata Shinkansen "TSUBASA" Hokuriku Shinkansen (450.5 km) Yamagata Shinkansen Train Names: KAGAYAKI, HAKUTAKA, (421.4 km) Shinjo¯ Morioka TSURUGI, ASAMA Train Name: TSUBASA Niigata Yamagata Sendai Kanazawa Toyama Nagano Hokuriku Shinkansen "KAGAYAKI"etc. Fukushima Takasaki Omiya¯ Sanyō & Kyūshū Shinkansen "SAKURA" Sanyō Shinkansen (622.3 km) Train Names: NOZOMI*, MIZUHO*, Tōhoku Shinkansen "HAYABUSA "etc. Tōkaidō & Sanyō Shinkansen "HIKARI" HIKARI (incl. HIKARI Rail Star), SAKURA, KODAMA Tōkaidō Shinkansen (552.6 km) (Tōkyō thru Hakata, 1,174.9km) Train Names: NOZOMI*, HIKARI, KODAMA Hakata Kokura Hiroshima Okayama Shin-Osaka¯ Kyōto Nagoya Shin-Yokohama Shinagawa Tokyo¯ ¯ * There are six types of train services, “NOZOMI,” “MIZUHO,” “HIKARI,” “SAKURA,” “KODAMA” and “TSUBAME” trains on the Tōkaidō, Sanyō and Kyūshū Shinkansen, and the stations at which trains stop vary with train types. The JAPAN RAIL PASS is only valid for “HIKARI,” “SAKURA,” “KODAMA” Tōhoku Shinkansen "HAYATE," "YAMABIKO,"etc. and “TSUBAME” trains, and not valid for any seats, reserved or non-reserved, on “NOZOMI” and “MIZUHO” trains. To travel on the Tōkaidō, Sanyō and Kyūshū Shinkansen, the pass holders must take Tōhoku Shinkansen (713.7 km) “HIKARI,” “SAKURA,” “KODAMA” or “TSUBAME” trains, or
    [Show full text]
  • View Oirase’S Fresh Greenery in Spring and the Changing Colors of Tsutanuma in Autumn
    Aomori’s Nature Parks Majestic & Breathtaking Aomori Nature Parks Website http://www.shirakami-visitor.jp/aomoris-nature-parks The eternal colors of the four seasons continuing into future 01 The Milky Way at the Kayano Highlands Towada-Hachimantai National Park Aomori is an unexplored location in the north with flowers blossoming in spring and the blue ocean shining in summer. When the trees turn a burning red in autumn, it will soon be winter, a world of white and silver. The incredible scenery of mother nature will steal your heart. Be in awe of nature As one interacts with nature, slowly walking along a mountain road or shore, one begins to feel in awe of nature’s majesty. Enclosed by the ocean on three sides, Shimokita Hanto Aomori’s the climate differs between the Sea of Japan side and Quasi-National Park the Pacific Ocean side, allowing Aomori to boast of a wide variety of landscapes and plants. Nature Parks Aomori has 11 nature parks with outstanding scenery. Sanriku Fukko Towada-Hachimantai Tsugaru (Reconstruction) Quasi-National Park National Park National Park Asamushi-Natsudomari Ashino Chishogun Prefectural Natural Park Prefectural Natural Park National Park Iwaki Kogen Prefectural Natural Park Towada-Hachimantai National Park Shimokita Hanto Tsugaru Quasi-National Park Quasi-National Park Shirakami-Sanchi Natural World Heritage Site Kuroishi Onsenkyo Prefectural Natural Park Sanriku Fukko Tsugaru Shirakami (Reconstruction) Prefectural Natural Park Quasi-National Park National Park Owani Ikarigaseki Onsenkyo Nakuidake Prefectural
    [Show full text]
  • Hachinohe Martial Arts Center About 15 Min
    Access A Maeda Arena About 35 min. by car from Aomori Airport (New Aomori Prefecture Sports Park) About 25 min. by car from Shin-Aomori Station (JR Tohoku Shinkansen Line/Ou Line) B Michinokubank Dream Stadium About 30 min. by car from Aomori Airport (Aomori City Sports Complex) About 15 min. by car from Shin-Aomori Station (JR Tohoku Shinkansen Line/Ou Line) C Aomori Martial Arts Hall About 50 min. by car from Aomori Airport Hirosaki Athletic Park About 10 min. by car from Hirosaki Station (JR Ou Line/Konan Railway Konan Line) About 70 min. by car from Aomori Airport Mt. Iwakisan Synthesis Park About 40 min. by car from Hirosaki Station (JR Ou Line/Konan Railway Konan Line) D The right choice to train About 70 min. by car from Aomori Airport Iwaki Seishonen Sports Center About 45 min. by car from Hirosaki Station (JR Ou Line/Konan Railway Konan Line) AOMORI E About 70 min. by car from Aomori Airport Iwaki River Canoe Center About 30 min. by car from Hirosaki Station (JR Ou Line/Konan Railway Konan Line) About 55 min. by car from Misawa Airport Takamori Yama Sports Park About 30 min. by car from Shichinohe-Towada Station (JR Tohoku Shinkansen Line) F About 45 min. by car from Misawa Airport Towada City Wakaba Stadium About 25 min. by car from Shichinohe-Towada Station (JR Tohoku Shinkansen Line) About 40 min. by car from Misawa Airport Hachinohe Martial Arts Center About 15 min. by car from Hachinohe Station (JR Tohoku Shinkansen Line/Hachinohe Line/Aoimori Railway Line) G About 50 min.
    [Show full text]
  • Improving Efficiency Through Privatisation of Railways
    European Conference of Ministers Ministry of Land, Infrastructure and Transport of Transport Japanese Government 2-3 March 2005 Akasaka Prince Hotel, Tokyo Improving Efficiency Through Privatisation of Railways Masayuki SATOMI Corporate Planning Headquarters Management Administration Department East Japan Railway Company (JR East) Japan Split and Privatization of JNR (Japanese National Railways) Causes of JNR’s Failure 1 ○Unconsolidated long-term debts (In trillion yen) 6.00 25.00 5.00 20.00 l balance oflong-termdebts i long- term o b n debt s n income a c 4.00 income g l o t 15.00 a m cost e n ・ e r 3.00 c cost ・ m e c 10.00 o d o s 2.00 e f t b t 5.00 1.00 s 0.00 0.00 ‘63 ‘65 ‘70 ‘75 ‘80 ‘85 ‘86 (year) Causes of JNR’s Failure 2 Problems related to the public Problems related to the unified corporation system organization covering the entire nation (1) Interference from the government and (1) Beyond the scope of managerial control administrative bodies (2) Uniform operations (2) Loss of self-reliance in management (3) Unreasonable relationship of (3) Abnormal labor-management relations interdependence (4) Restrictions on the scope of operations (4) Lack of competitive spirit Incapable of accurately responding to changes in circumstances surrounding the corporation Managerial failure JNR Reform Scheme 1 JNR Passenger Railway Companies JR Hokkaido JR West Transformation in April 1987 JR East JR Shikoku JNR Settlement Corporation JR Central JR Kyushu ‘98.10 Japan Freight Railway Company Japan Railway Construction Public Corporation – Railway
    [Show full text]
  • Wine, Beer, Whisky, Etc
    Current as of January 1, 2021 Compiled by Sendai Regional Taxation Bureau Brewery Excludes breweries listed on the Aomori Wine, Beer, "Aomori Brewery MAP (SAKE)". MAP whisky, etc. However, breweries that produce continuously distilled shochu (New type or shochu group Ko), specialty shochu (Authentic type or shochu group Otsu), and beer are listed in duplicate. Legend ㉑ 279 Shinkansen Kazamaura JR Line Oma Private Railway Town Village Expressway Major National Highway City Boundary Sai Shinkansen Station JR and Private Railway Stations Village Higashidoori Mutsu City Village Ominato Station Shimokita Station 279 Ominato Line Imabetsu 338 ⑳ Town Sotogahama Town Nakadomari Okutsugaru-Imabetsu Station Town 338 Sotogahama Yokohama Goshogawara TsugaruTown Line Town City Kanita Station Yomogita Nakadomari Village Town Hokkaido Shinkansen Rokkasho 339 280 ①② Village 4 Noheji ⑲ Goshogawara Aomori Port Station Tsugaru City Hiranai Town City Shin-Aomori Aomori Station Noheji Town Tohoku Ajigasawa Station 101 Goshogawara Town Station Aoimori Railway394 Line Station Ou Misawa Main 103 4 Line Shichinohe-Towada City Tsuruta 338 Town ⑰ Aomori Airport Station Itayanagi Shichinohe Misawa Airport Itayanagi Town Namioka Station Aomori City Town Tohoku Shinkansen Station 394 Misawa Station Ajigasawa Town Fujisaki Kuroishi Kawabe Station Town Station 394 Oirase Town Fukaura Station Hirosaki Inakadate Hachinohe Port City ④ VillageKonan ③ Railway Kuroishi 102 Rokunohe 45 Gono Line Fukaura ⑤ City Hon- ⑯ ⑦ Hiraka 4 Town Town Towada City ⑱ Hachinohe Same Station ⑧ Station Station ⑪ ⑨ 454 Hachinohe Hirosaki Station Station ⑬ Mutsu-Minato Station Nishimeya Hirakawa Hachinohe Line Village Gonohe Town Owani⑫ City 454 ⑥⑩ Town ⑮ 7 282 Shingo Village ⑭ Hashikami Nanbu Hachinohe Town Town City Sannohe Town Name of City, Town, and Village No.
    [Show full text]
  • Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages—Overview of Series E5/E6 Shinichiro Tajima
    Expansion of High-Speed Rail Services Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages—Overview of Series E5/E6 Shinichiro Tajima Introduction FASTECH 360 Z were started in June 2010. These carriages will be coupled with Series E5 carriages in commercial In preparation for the December 2010 opening of the Tohoku operation to run at 320 km/h. Shinkansen extension to Shin Aomori, JR East worked steadily from 2002 on technologies to increase speed, Path to Speed Increase finally settling on a commercial operating speed of 320 km/h after various considerations, including running tests using The Tohoku Shinkansen started operation in 1982 at a the FASTECH 360 test train. Furthermore, Series E5 pre- maximum speed of 210 km/h. Today, the commercial production models were built to determine the specifications operation speed is 275 km/h but 20 years have passed since of carriages used for commercial operations; running tests the first 275 km/h operation with Series 200 carriages on the confirmed the final specifications ahead of introduction of the Joetsu Shinkansen in 1990. Full-scale operation at 275 km/h Series E5 in spring 2011. Moreover, Series E6 pre-production started with the introduction of the E3 and E2 at the opening models reflecting development successes using the of the Akita Shinkansen and Nagano Shinkansen in 1997. Figure 1 Path to Speed Increase km/h 450 JNR JR 425 km/h (STAR21, 1993) Max. test speed 400 345.8 km/h (400 series, 1991) 350 319 km/h 320 km/h (961 series, 1979) 300 km/h (2013) (2011) 300 275 km/h (1990) Max.
    [Show full text]
  • How the Punctuality of the Shinkansen Has Been Achieved
    Computers in Railways XII 111 How the punctuality of the Shinkansen has been achieved N. Tomii Chiba Institute of Technology, Japan Abstract The high speed railway line in Japan began operation in 1964. The high speed railway is called the Shinkansen and is known for its safety and reliability. In addition, the Shinkansen is well known for punctuality. As a matter of fact, the average delay of trains is less than one minutes every year. The Shinkansen runs along dedicated lines, which seem to be advantageous in keeping punctuality. However, there are lots of disadvantages as well. For example, although traffic is very dense, resources are not abundant. In some Shinkansen lines, trains go directly through conventional railway lines and the Shinkansen is easily influenced by the disruption of those lines. Punctuality of the Shinkansen is supported by hardware, software and humanware. In this paper, we first introduce a brief history of the Shinkansen and then focus on humanware, which makes the punctuality possible. Keywords: high speed trains, punctuality, rescheduling, Shinkansen. 1 Introduction In 1964, a high speed railway line opened in Japan. The new line connects Tokyo, the capitol, and Osaka, the second largest city located 600 km away. The maximum speed of trains was 210km/h, which was almost twice that of other trains in those days and the travelling time between these two cities was halved to only three hours and ten minutes. The new high-speed line was called the Shinkansen and it had a great impact not only on railways in Japan, but also on railways worldwide.
    [Show full text]
  • Shinkansen - Wikipedia 7/3/20, 1048 AM
    Shinkansen - Wikipedia 7/3/20, 10)48 AM Shinkansen The Shinkansen (Japanese: 新幹線, pronounced [ɕiŋkaꜜɰ̃ seɴ], lit. ''new trunk line''), colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, in order to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network.[1][2] It is operated by five Japan Railways Group companies. A lineup of JR East Shinkansen trains in October Over the Shinkansen's 50-plus year history, carrying 2012 over 10 billion passengers, there has been not a single passenger fatality or injury due to train accidents.[3] Starting with the Tōkaidō Shinkansen (515.4 km, 320.3 mi) in 1964,[4] the network has expanded to currently consist of 2,764.6 km (1,717.8 mi) of lines with maximum speeds of 240–320 km/h (150– 200 mph), 283.5 km (176.2 mi) of Mini-Shinkansen lines with a maximum speed of 130 km/h (80 mph), and 10.3 km (6.4 mi) of spur lines with Shinkansen services.[5] The network presently links most major A lineup of JR West Shinkansen trains in October cities on the islands of Honshu and Kyushu, and 2008 Hakodate on northern island of Hokkaido, with an extension to Sapporo under construction and scheduled to commence in March 2031.[6] The maximum operating speed is 320 km/h (200 mph) (on a 387.5 km section of the Tōhoku Shinkansen).[7] Test runs have reached 443 km/h (275 mph) for conventional rail in 1996, and up to a world record 603 km/h (375 mph) for SCMaglev trains in April 2015.[8] The original Tōkaidō Shinkansen, connecting Tokyo, Nagoya and Osaka, three of Japan's largest cities, is one of the world's busiest high-speed rail lines.
    [Show full text]
  • JR East High-Speed Rolling Stock Development Koji Asano Director of the Advanced Railway System Development Center, Research and Development Center of JR East Group
    Special feature article JR East High-speed Rolling Stock Development Koji Asano Director of the Advanced Railway System Development Center, Research and Development Center of JR East Group 1 Introduction The history of Shinkansen rolling stock for JR East started with the series 200 Shinkansen, which debuted at the opening of the Tohoku/Joetsu Shinkansen in 1982 in the Japanese National Railway era. It was initially a 12-car all motor car train with a maximum operating speed for 210 km/h. The Shinkansen network spreading out in five directions later came to have a variety of forms of operation (Fig. 1); and even after the series 200, Shinkansen rolling stock conforming to those forms of operation and with increased speeds was developed. In addition to the standard type of Shinkansen dedicated rolling stock, others appeared such as rolling stock for through service between Shinkansen and conventional lines to Akita and Shinjo and double deck rolling stock for large-volume short-distance transport. A variety of services came to be provided as well, such as GranClass providing a higher level of service and fun-to-ride Looking at high-speed railway trends around the world, we “Toreiyu” and “Genbi Shinkansen” (Fig. 2). see that many countries have achieved commercial operation The Shinkansen, handling long-distance transport, has been in excess of 300 km/h, and Italy has announced further speed forced to compete with airlines and others with the expansion of increases with a goal of 360 km/h commercial operation. And the Shinkansen network. In order to have customers choose the for JR East to transfer high-speed railway technologies abroad, Shinkansen, we need to think up how to make it more attractive we need to accumulate technologies for high-speed running in and amenity-rich.
    [Show full text]
  • Shinkansen Before and After JNR Reform: Modification of Its
    Shinkansen Investment before and after JNR Reform Institute of Transportation Economics in Japan Fumio KUROSAKI, Ph.D. Outline of Presentation 1) Shinkansen Projects in JNR Era 2) Shinkansen Projects after JNR Reform 3) Through-Train Operation in Japan 4) Investment & Performance of Shinkansen Lines Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 Shinkansen Projects by JNR Niigata Joetsu Shinkansen Morioka Tohoku Shinkansen Okayama Omiya Ueno Tokyo Shin-Osaka Tokaido Shinkansen Hakata Sanyo Shinkansen Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 JNR Reform in April 1987 JR-Hokkaido Shinkansen operation was divided into JR East, JR Central and JR West JR-East JR-West JR-Central JR-Kyushu JR-Shikoku Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 Projects after JNR Reform (1) <Shinkansen Lines> Completed by JNR reform (1987) Completed since JNR reform Under construction Sapporo Planning stage Shin-Aomori Hokuriku Shinkansen Tohoku Shinkansen Nagano Morioka Tsuruga Takasaki Takeo-Onsen Ueno Tokyo (Shin-)Osaka Hakata Kyushu Shinkansen Nagasaki Kagoshima-Chuo Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December 2013 Projects after JNR Reform (2) <Conventional Line> Mini-Shinkansen (completed) Akita Shinjo Fukushima (Dedicated) High-speed train Mini-Shinkansen train Roundtable on the Economics of Investment in High Speed Rail New Delhi, India 18-19 December
    [Show full text]
  • 09 Development of New Shinkansen Lines(Hokuriku Shinkansen
    WEST JAPAN RAILWAY COMPANY CORPORATE OPERATING CONTENTS BUSINESS DATA OTHER Fact Sheets 2017 OVERVIEW ENVIRONMENT 9 Business Development of New Shinkansen Lines (Hokuriku Shinkansen Line) FIVE NEW SHINKANSEN LINES PROPOSED IN 1973 UNDER THE NATIONWIDE SHINKANSEN RAILWAY DEVELOPMENT LAW Line Lines in Operation Approved Zone for Construction Expense Burden TRAVEL TIME AND MARKET SHARE Implementation Plan JR 3 JR market share Morioka — Shin-Aomori Airlines* 4 Tohoku (Morioka–Aomori) Before opening*1 After opening*2 before opening* (opened in December 2010, 178km) Ishikawa — About 3h 50m 2h 28m About 2h 50m 38.3% Takasaki — Nagano Kanto region (opened in October 1997, 117km) Hokuriku (Tokyo–Osaka) Kanazawa — Tsuruga (125km) Nagano — Kanazawa • Central government (existing Shinkansen Toyama — transfer revenues, public utilities expenses) About 3h 10m 2h 08m About 2h 30m 61.5% (opened in March 2015, 228km) Kanto region • Local governments Shin-Aomori — Shin-Hakodate-Hokuto Shin-Hakodate-Hokuto — Sapporo Hokkaido (Aomori–Sapporo) (one-half of the central government) *1. Using the Joetsu Shinkansen and Hakutaka limited express train (opened in March 2016, 149km) (211km) • JR (usage fees with the upper limit to be *2. Time required for fastest “Kagayaki” Hakata — Kagoshima-Chuo determined by the range of expected benefits) *3. Includes airport access and egress time Kyushu (Fukuoka–Kagoshima) (opened in March 2011, 289km) *4. Source: Statistical survey of Ministry of Land, Infrastructure, Transport and Tourism (FY2014.3, preliminary) Kyushu (Fukuoka–Nagasaki)
    [Show full text]
  • Part 2: Speeding-Up Conventional Lines and Shinkansen Asahi Mochizuki
    Breakthrough in Japanese Railways 9 JRTR Speed-up Story 2 Part 2: Speeding-up Conventional Lines and Shinkansen Asahi Mochizuki Reducing Journey Times on is limited by factors such as curves, grades, and turnouts, so Conventional Lines scheduled speed can only be increased by focusing effort on increasing speed at these locations. Distribution of factors limiting speed Many of the intercity railways in Japan are lines in The maximum speed of any line is determined by emergency mountainous areas. So, objectives for increasing speeds braking distance. However, train speeds are also restricted by cannot be achieved by simply raising the maximum speed. various other factors, such as curves, grades, and turnouts. Acceleration and deceleration performance also impact Speed-up on curves journey time. The impact of each element depends on the The basic measures for increasing speeds on curves are terrain of the line. The following graphs show the distributions lowering the centre of gravity of rolling stock and canting the of these elements for the Joban Line, crossing relatively flat track. However, these measures have already been applied land, and for the eastern section of the Chuo Line, running fully; cant cannot be increased on lines serving slow freight through mountains. trains with a high centre of gravity. Conversely, increasing The graph for the Joban Line crossing the flat Kanto passenger train speed through curves to just below the limit Plain shows that it runs at the maximum speed of 120 km/h where the trains could overturn causes reduced ride comfort (M part) for about half the journey time.
    [Show full text]