California Passenger Rail NETWORK SCHEMATICS April 2016

Total Page:16

File Type:pdf, Size:1020Kb

California Passenger Rail NETWORK SCHEMATICS April 2016 5 395 Redding 5 101 Coast California Starlight 99 Chico Passenger Rail 5 California Reno 70Zephyr NETWORK SCHEMATICS 1 101 99 Auburn April 2016 Capitol Santa Rosa Corridor 50 Sacramento 80 SMART 1 99 San Rafael 5 Oakland Stockton San Francisco 580 ACE Caltrain 395 101 San Jose 140 1 17 San Fresno PACIFIC Joaquin OCEAN Coast 5 1 Starlight Las Vegas 101 99 41 Bakersfield San Luis Obispo 15 395 Pacific 58 Barstow Southwest Surfliner Palmdale Chief 101 5 15 40 Santa Barbara Metrolink Ventura San Bernardino Los Angeles1 PACIFIC Riverside OCEAN Fullerton Palm Springs Perris 10 5 Sunset Oceanside 15 Limited Escondido Pacific Surfliner NCTD 8 San Diego sma-usa.com California Passenger Rail NETWORK SCHEMATICS April 2016 This booklet includes schematic drawings of California’s heavy rail corridors that are used for the operation of state intercity and commuter passenger rail service. The contents are con- ceptual only and were prepared for the convenience of reference. Drawings are not to scale and they should not be relied upon as representation express or implied, of the actual length, location or dimensions of any rail service or subdivision. Information included in this document is the intellectual property of the California Department of Transportation and cannot be modified without the express permission of the Department. Infrastructure represented within this document reflects the information and specifications available to the production team at the time of the book’s development. Any reference to future infrastructure improvements are subject to change. The California Department of Transportation would like to thank the partner entities listed below for their support and partic- ipation during the development of the booklet prepared for prepared by California Department of Transportation SMA Rail Consulting + IT, Corp. 1120 N Street www.sma-usa.com sma-usa.com P.O. Box 942874 Sacramento, CA 95814 with Jacobs www.jacobs.com In partnership with HAVE FEEDBACK? The production team strove to provide the most accurate information in this first release of the expanded and reformatted California Passenger Rail Network Schematics booklet. In the event that you discover any errors in the schematics, please let us know by using the enve- lope link that appears at the bottom of each page. This data will be used to update the sche- matics in order to maintain the integrity of future releases. You can also email us at [email protected]. HYPERLINK INSTRUCTIONS For convenience and ease of use, this PDF booklet includes hyperlinks. By clicking on the hyperlink a user’s view will jump to the corresponding linked location. Detailed below are the locations where you will find hyperlinks in this document and how to use them. LEGEND PAGE Legend Page linked to Bakersfield Subdivision (Sheet 11) Hyperlinks are embedded in the subdivision names on both the map and legend list Both links direct the user to the corresponding subdivision schematic sheet The home icon located on the bottom right of each schematic page links the user back to the legend page SERVICE ROUTE BOX River Subdivision (Sheet 16) linked to Los Angeles Subdivision (Sheet 20) Hyperlinks are embedded in service route continuation boxes These links direct the user to the subdivision where the service continues JUMP TO NEXT LINE OR PAGE Orange-Olive-San Diego Subdivisions (Sheet 25) link to next line Hyperlinks are embedded in the arrow symbols at the Example: Orange-Olive-San Diego Subdivision, Sheet 25 end and start of the line and page breaks in a subdivision These links direct the user to the next or previous line or page EMAIL FEEDBACK Orange-Olive-San Diego Subdivisions (Sheet 25) link to email Hyperlinks are embed- ded in the envelope icon at the bottom right of each page These links launch a new message in the user's default email client for comments to be sent directly to the production team SUBDIVISION LEGEND NCTD SHEET BNSF SHEET UPRR Martinez Escondido 27 Bakersfield 11 CP Ferry CP Port San Diego 26 San Bernardino 22 - 23 Chicago BNSF Stockton Stockton 09 - 10 UPRR Tracy PCJPB CP 10th Street Peninsula 13 - 14 UPRR CP UP Crossing Coast 05 - 06 CP Hicks SCRRA Fresno 07 UPRR Niles Los Angeles 21 Montalvo 15 Martinez 03 Olive 25 Niles 04 UPRR Oakland Orange 25 - 26 Oakland 12 CP Niles Jct Perris Valley 24 CP Newark Roseville 02 River 18 San Francisco Area Santa Barbara 15 San Gabriel 19 - 20 Tracy 08 Shortway 23 Valley 17 Control Point or UPRR Roseville Ventura 16 CP Auburn TERMINAL STATION CP Washington CP Airport North UPRR Martinez SMART CP Elvas Mainline 01 0 25 50 75 mi SMART Mainline UPRR Fresno N 0 50 7525 100 km SAN RAFAEL SAN FRANCISCO 4th/KING PCJPB Peninusla See Inset BNSF Stockton CP Burbank Jct CP Coast CP Lick UPRR Los Angeles CP Taylor SCRRA San Gabriel CP San Bernardino CP Pasadena Jct CP Vernon CP Soto St. Jct CP Rana SAN CP Soto BERNARDINO CP 704 PACIFIC UPRR Coast SCRRA River CP Calwa BNSF San Bernardino OCEAN SCRRA CP Fullerton Jct CP 10th St. CP Atwood Shortway SCRRA Olive BNSF Bakersfield SCRRA Perris Valley CP Mapes CP Maple Los Angeles Area CP North San Luis Obispo CP Kern Jct UPRR Santa Barbara LANCASTER SCRRA Montalvo SCRRA Valley Bristol CP Montalvo See Inset SCRRA Ventura PACIFIC OCEAN SCRRA Orange CP Songs OCEANSIDE NCTD Escondido CP Avo NCTD San Diego CP Broadway 60.0 50.0 40.0 30.0 TO BRAZOS JCT SMART SMART BRAZOS JCT SUB Terminal Station SONOMA COUNTY AIRPORT* SANTA ROSA NORTH* SANTA ROSA DOWNTOWN* ROHNERT PARK* COTATI* PETALUMA DOWNTOWN* NOVATO SAN MARIN* 59.8 55.2 53.8 47.3 46.1 38.5 28.8 ye W OUT OF SERVICE | SMART MAINLINE SUB ioc a n 63.0 Ig 48" Platform Height 48" Platform Height HAYSTACK DRAWBRIDGE MAIN 2 15/15 15/25 300' 300' MAIN 1 48" Platform Height MAIN 2 48" Platform Height 48" Platform Height MAIN 2 MAIN 1 48" Platform Height MAIN 2 MAIN 1 48" Platform Height 50/40 MAIN 1 35/0 Rail Operations Center (ROC) 15/15 Fulton Yard - MOW 35/0 50/0 35/0 50/0 25/15 15/20 25/0 50/0 300' 300' 300' MAIN 1 Willowbrook Spur Park Siding 2,112' 300' MAIN 1 300' Windsor Siding 1,850' Maintenance Facility Equipment MAIN 1 Burdell Auxiliary Track 6,078' 9 3-car Train Storage 300' Dairymen's Spur ATC APPROACH CP RIVER CP SCHULZ NORTH CP SCHULZ SOUTH CP REDWOOD NORTH CP REDWOOD SOUTH CP HOPPER NORTH CP HOPPER SOUTH CP IGNACIO NORTH CP IGNACIO WYE CP IGNACIO SOUTH 60.5 58.7 55.6 53.5 46.6 45.8 38.2 37.2 26.8 25.8 24.5 CP AIRPORT NORTH CP AIRPORT SOUTH 59.7 59.9 Petaluma CP HAYSTACK CP HAYSTACK 62.85 62.45 59.5 58.5 42.1 39.7 39.2 38.7 38.1 Transshipment NORTH SOUTH 31.7 30.5 25.5 63.0 59.9 54.0 53.6 46.5 46.3 46.2 45.9 44.1 43.3 42.8 39.2 38.1 36.8 35.2 34.8 28.9 27.9 26.8 26.1 24.0 MAINLINE SUB 79 (M2), 79 (M1) Passenger 30 79 25 (M2), 20 (M1) 79 50 (M1) 50 79 (M2), 50 (M1) 79 45 70 79 45* 50 70 60 79 45 79 60 (M2) 60 Freight 25 45* 45* (M2) 25* (M2) 45* 45 (M2) 40 (M2) 45* (M2) 45 25 40 (M2) 40 45* 40 (M2) *15 MPH freight speed limit 55.6 *15 MPH freight speed limit *15 MPH freight speed limit *15 MPH freight speed limit *15 MPH freight speed limit *15 MPH passenger speed 37.2 *15 MPH freight speed limit 24.5 through station gauntlet through M2 station gauntlet through M2 station gauntlet through station gauntlet through M2 station gauntlet limit through station gauntlet through station gauntlet 20.0 FERRY CONNECTION 2-mile extension to Larkspur Ferry Terminal. SMART 3 3-car train storage south of Larkspur station. Terminal Station Estimated Completion: 2018 NOVATO HAMILTON MARIN CIVIC CENTER SAN RAFAEL LARKSPUR 23.6 19.6 17.0 14.9 C. Paul Bettini Transit Center - Bus Connection SMART MAINLINE SUB 48" Platform Height 14.9 285' 48" Platform Height MAIN 2 48" Platform Height 300' 300' 48" Platform Height 25/0 MAIN 1 Storage Track 300' 300' CP SAN RAFAEL NORTH CP SAN RAFAEL SOUTH 17.1 16.1 24.0 23.6 21.3 21.1 19.8 17.0 14.9 45 60 45 60 45 TBD LEGEND DISCLAIMER DATE: 20.0 Track segment Maximum turnout or crossover speed 45/40 AREMA speed used (passenger/freight mph) SMART MAINLINE SUBDIVISION Information included in this document is the intellectual property of the California July 26, 2016 60/40 Approximate mile marker Track segment included as reference (60 mph passenger / 40 mph freight) Department of Transportation and cannot be modified without the express permission of 79 Passenger speed (mph) Funded project description Control point with official milepost sma-usa.com SMART MAINLINE SUBDIVISION (Cloverdale [MP 63.0]- Larkspur [MP 14.9]) the Department. This drawing is conceptual only and for the convenience of reference. SHEET: Track segment proposed for removal CP HELEN 985’ Drawing is not to scale. It should not be relied upon as representation express or implied, Passenger platform with length (feet) 79 Freight speed (mph) Station hold-out rule in effect 10.5 Proposed track segment of the final length, location or dimensions of any rail subdivision.
Recommended publications
  • Consequences-Of-Rail
    Consequences of Rail Vulnerability Explore the assets, sectors and vulnerabili5es within the county most likely to impact economic ac5vity and goods movement, and consider if local solu5ons can reduce both local and regional consequences. Creeks Infrastructure Marine Oil Terminal Refinery Rail Lines ¸ Burlington Northern Santa Fe Rlwy Union Pacific RR 0 1 2 Miles Copyright: ©2013 Esri, DeLorme, NAVTEQ 6. Increased congestion impacts transit dependent commuters, GHG emissions and air quality 2. Goods movement affected (Society & Equity + Environmental (Economic Consequences) Consequences) 5. Increased truck traffic 3. Impacts on co-located assets and congestion 1. Railroad (Varied Consequences) (Economic + Society & Vulnerabilities Equity Consequences) 4. Disruption of seaport 7. Interstate operations at Port of Vulnerabilities Richmond and Oakland (Economic + Society & Equity Consequences) 1 Railroad Vulnerabilities Fourteen miles of rail line in the project area is within or passes over the current 100-year floodplain. Seven more miles (or a total of twenty-one miles) may be exposed to a 100-year coastal storm with as little as 6 inches of sea level rise, and a total of forty- one miles may be exposed to a 100-year coastal storm with 30 inches of sea level rise. Lack of information • There is insufficient information available on the UP and BNSF rail lines in the project area to thoroughly evaluate the vulnerability of the rail infrastructure. Governance challenges • Some segments of rail located on the shoreline serve as the first line of defense against flooding, while some are protected by lands owned by others or levees paid for by the public. Not built to withstand flooding • Rail lines are not constructed or maintained to withstand flooding, storm events, wave action or rising groundwater.
    [Show full text]
  • Union Station Conceptual Engineering Study
    Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks
    [Show full text]
  • TCRP Report 52: Joint Operation of Light Rail Transit Or Diesel Multiple
    APPENDIX A Key FRA Regulations (Affecting Joint Use) The following is a listing of key FRA specifications. This listing is intended as a regulations taken from the Code of Federal general identification of the operative code Regulations (49 CFR 200-299), Federal sections, along with a general description Railroad Administration, that may affect of the requirements. This identification joint operation of light rail transit or diesel code section should not imply or impute multiple unit vehicles with railroads. The that the code provision will need to be selected regulations concern operational modified to operate light rail transit or procedures, standards, and certain design DMU with railroads. Regulation Number and Section Comment §209: Railroad Safety Enforcement Policy procedures for assessing Procedures penalties and for appealing penalties. Also includes, fitness-for-duty and follow-up on FRA recommendations. §210: Railroad Noise Emission Covers total sound emitted by moving Compliance Regulations rail cars and locomotives. Does not apply to: • Steam engines; • Street, suburban, or interurban electric railways, unless operated as a part of the general railroad system of transportation; • Sound emitted by warning devices such as horns, whistles, or bells when operated for the purpose of safety; • Special-purpose equipment that may be located on or operated from rail cars. §211: Rules of Practice Subpart C - Rules of practice that apply to Waivers rulemaking and waiver proceedings, review of emergency orders issued §211.41: Processing of petitions for under 45 U.S.C. 432, and miscellaneous waiver of safety rules safety-related proceedings and informal safety inquiries. Page A-1 Regulation Number and Section Comment §212: State Safety Participation Establishes standards and procedures for Regulations State participation in investigative and surveillance activities under Federal railroad safety laws and regulations.
    [Show full text]
  • Hello. I'm Will Kempton, Chief Executive Officer of the Orange
    Hello. I’m Will Kempton, Chief Executive Officer of the Orange County Transportation Authority. I am pleased and honored to share the 2009 OCTA Annual Report with you. In an effort to reduce paper costs and "go green," this year’s annual report has moved to an online format. We think you’ll enjoy its interactivity. As you are aware, 2009 was a challenging year for transportation funding. We faced obstacles that we never had before, and hopefully, never will again. In spite of these obstacles, OCTA made great strides improving our transportation network. Due to our efforts in 2009, the I-5 Gateway Project through Buena Park is nearing completion. As a shovel-ready project, the SR-91 Eastbound Lane Addition Project received federal stimulus dollars in the spring of last year under the American Recovery and Reinvestment Act...and we broke ground in November. Our 34 cities and the county received a total of $78 million for local street and road improvements to reduce your commute time. As part of the Metrolink Service Expansion Program, design for track and infrastructure improvements was completed. We also finished final design for grade crossing safety enhancements, and construction began on projects in the cities of Orange and Anaheim. Conceptual design and environmental clearance are under way for ARTIC, Orange County’s premier transportation hub. Construction is scheduled to begin in 2011. With the loss of State Transit Assistance funding and declining sales tax revenues, it was an extremely challenging year for our bus system. In June, the OCTA Board of Directors declared a fiscal emergency resulting in significant bus service reductions that affected our customers and employees.
    [Show full text]
  • 016 Adopt Res 20-03 Approve NCTD PTASP[Icon]
    ATTACHMENT 16A RESOLUTION NO. 20-03 RESOLUTION OF THE BOARD OF DIRECTORS OF THE NORTH COUNTY TRANSIT DISTRICT APPROVING THE PUBLIC TRANSPORTATION AGENCY SAFETY PLAN (PTASP) WHEREAS, the North County Transit District (“NCTD”) has safety as a core value of the agency; and WHEREAS, Title 49, Subtitle B, Chapter VI, Part 673 – Public Transportation Agency Safety Plan (“PTASP”) requires that an agency PTASP must be approved by its governing Board; and WHEREAS, Title 49, Subtitle B, Chapter VI, Part 674 – State Safety Oversight, requires the California Public Utilities Commission (“CPUC”), which is the State Safety Oversight Agency, ensure the transit agency has a PTASP compliant with 49 CFR Part 673 that has been approved by the governing Board; and WHEREAS, NCTD’s PTASP sets forth a sufficiently explicit process for safety risk management, with adequate means of risk mitigation for the rail fixed guideway public transportation system; which: • includes a process and timeline for annually reviewing and updating the safety plan; • includes a comprehensive staff training program for the operations personnel directly responsible for the safety of NCTD; • identifies an adequately trained safety officer who reports directly to the general manager, president, or equivalent officer of the Rail Transit Agency (RTA); • includes adequate methods to support the execution of the Public Transportation Agency Safety Plan by all employees, agents, and contractors for the rail fixed guideway public transportation system; and • sufficiently addresses other requirements under the regulations 49 CFR Part 673. NOW, THEREFORE, BE IT RESOLVED that the Board of Directors of the North County Transit District hereby approves the NCTD Public Transportation Agency Safety Plan (“PTASP”) as set forth in full in Exhibit A to this Resolution.
    [Show full text]
  • Verbatim Comments
    2011 CALTRAIN RIDER SURVEY On-Board Survey VERBATIM COMMENTS Prepared by COREY, CANAPARY & GALANIS RESEARCH 447 Sutter Street – Penthouse North San Francisco, CA 94108 2011 CALTRAIN ONBOARD RIDER SURVEY . VERBATIM COMMENTS CONTENTS VERBATIM COMMENTS BY CATEGORY Coding of respondent comments was done to provide a department specific or subject specific listing of comments. These department/subject specific categories are listed below. 1. Schedules/Frequency .................................................................... 4 – 11 2. Routes/Stops .................................................................................... 12 3. On-time Performance/Reliability................................................... 13 – 19 4. Delay Information/Service Announcements/Updates .................... 20 – 29 5. Transit Connections/Transfers ...................................................... 30 – 31 6. Crowding/Seat Availability.................................................................... 32 7. Fares/Fare Policy/Ticket Validation Procedure .............................. 33 – 39 8. Personnel ..................................................................................... 40 – 46 9. Enforcement/Security................................................................... 47 – 50 10. Safety Issues ........................................................................................ 51 11. Bikes/Bike Cars ............................................................................ 52 – 54 12. Train Cleanliness-Exterior/Interior................................................
    [Show full text]
  • Keeping Southern California's Future on Track
    Keeping Southern California’s 25Future on Track CONTENTS Message from the Board Chair .........................1 CEO’s Message .....................................................3 A Quarter Century of Moving People: The Metrolink Story .............................................5 How It All Began ................................................19 Metrolink’s Top Priority: Safety .......................27 WHO WE ARE Environment ........................................................31 Metrolink is Southern California’s regional commuter rail service in its Metrolink Relieves Driving Stress ...................35 25th year of operation. Metrolink is governed by The Southern California Regional Rail Authority (SCRRA), Board Members Past and Present ..................40 a joint powers authority made up of an 11-member board representing Metrolink Pioneering Staff the transportation commissions of Still on Board ......................................................47 Los Angeles, Orange, Riverside, San Bernardino and Ventura counties. Metrolink Employees Metrolink operates seven routes Put Customers First ...........................................48 through a six-county, 538-route-mile network with 60 stations. Facts at a Glance ...............................................50 For more information, including how to ride, go to www.metrolinktrains.com MISSION STATEMENT Our mission is to provide safe, efficient, dependable and on-time transportation service that offers outstanding customer experience and enhances quality of life. For
    [Show full text]
  • LOSSAN RAIL CORRIDOR AGENCY TECHNICAL ADVISORY COMMITTEE (TAC) the LOSSAN TAC May Take Action on Any Item Appearing on This Agenda
    MEETING NOTICE AND AGENDA LOSSAN RAIL CORRIDOR AGENCY TECHNICAL ADVISORY COMMITTEE (TAC) The LOSSAN TAC may take action on any item appearing on this agenda. Friday, November 1, 2013 12:30 to 2:30 p.m. Santa Barbara County Administration Building Large Supervisor’s Conference Room, 4th Floor 105 East Anapamu Street Santa Barbara, CA Staff Contact: Danny Veeh (619) 699-7317 [email protected] AGENDA HIGHLIGHTS • MANAGING AGENCY ADMINISTRATIVE SUPPORT AGREEMENT STATUS UPDATE • SANTA MARIA REFINERY EXPANSION • LOSSAN 2014 LEGISLATIVE PROGRAM • INFRASTRUCTURE DEVELOPMENT PLAN FOR THE LOSSAN RAIL CORRIDOR IN SAN DIEGO COUNTY To request this document or related reports in an alternative format, please call (619) 699-1900, (619) 699-1904 (TTY), or fax (619) 699-1905. MEETING LOCATION The meeting will be located at the County Administration Building 105 East Anapamu Street in Santa Barbara, California. Metropolitan Transit District operates a downtown electric shuttle along State Street connecting the Amtrak station to the meeting location. The downtown shuttle operates every 15 minutes with a fare of $0.50. 105 East Anapamu Several LOSSAN member agencies will be attending this meeting via teleconference from the following locations: Riverside County Transportation Commission, 4080 Lemon Street, Riverside, CA Amtrak, 530 Water Street, Oakland, CA Caltrans Division of Rail, 1120 N Street, Sacramento, CA The public is welcome to attend and testify at any of the LOSSAN member agency locations listed above, all of which are accessible to the public. For more information, please contact LOSSAN staff at (619) 699-7317 or email [email protected] for specific meeting room locations at least 72 hours in advance of the meeting.
    [Show full text]
  • Contra Costa County Department Of
    CONTRA COSTA COUNTY DEPARTMENT OF CONSERVATION & DEVELOPMENT 651 Pine Street, North Wing - 4th Floor Martinez, CA 94553-1229 Telephone: (925) 335-1201 Fax: (925) 335-1300 TO: Transportation, Water and Infrastructure Committee (Supervisor Gayle B. Uilkema, Chair; Supervisor Mary N. Piepho) FROM: John Greitzer, Transportation Planning Section DATE: September 29, 2008 SUBJECT: Potential reactivation of Mococo freight railroad line RECOMMENDATION: Review this report, discuss with Union Pacific officials at the Committee meeting, and consider providing a report to the full Board or other action as appropriate ATTACHMENTS: • Maps (2) provided by Union Pacific Railroad • Contra Costa Times article, August 18, 2008 • County maps (2) showing street crossings and schools along Union Pacific line The Transportation, Water and Infrastructure Committee has asked staff to provide a report on the potential reactivation of the “Mococo” freight railroad line in eastern Contra Costa County, as reported in recent newspaper articles, and the possible impacts of this action on communities along the route. This report responds to that request. Union Pacific Railroad staff will attend the meeting to discuss the issue with the Committee. Railroad representatives also are meeting with officials in the cities along the Mococo line. Background The Mococo line is the portion of the Union Pacific Railroad (UP) system between Martinez and Tracy in San Joaquin County. The name Mococo is short for Mountain Copper Company, a long- gone smelting operation just east of Martinez that used the railroad line in the early 1900s. From Martinez heading east, the tracks go through the Concord Naval Weapons Station, Bay Point, Pittsburg, Antioch, Oakley, Brentwood, and Byron, and continue southeast along Byron Highway to Tracy.
    [Show full text]
  • San Diego's North Shore
    San Diego’s North Shore The Classic California Beach Community Happenings Year-round Events, Festivals and Celebrations Surf & Sand Family Adventures on the Beach and in the Waves Rooms with a View The Best Vacation and Weekend Getaway Accommodations And Much More… Oceanside Convention and Visitors Bureau 2012 VISITORS GUIDE Save your money for the amusement parks. When you’re traveling with family, the costs add up. But on Amtrak CaliforniaSM trains, up to two kids, ages 2-15, can ride at 50% off for each adult rail fare purchased. On the Pacific Surfliner®, you can relax, skip the traffic and enjoy snacks and beverages in the Café Car. Also, surf online with our complimentary Wi-Fi®. Reserve your trip today and save at AmtrakCalifornia.com or call 1-800-USA-RAIL. Up to two children, ages 2-15, are eligible to receive a 50% discount on the lowest available adult rail fare purchased on most Amtrak trains. AmtrakConnectSM Wi-Fi® service may not be available in all areas at all times. Fares, routes, schedules and services are subject to change without notice. Other restrictions may apply. The term Wi-Fi® is a registered mark of the Wi-Fi Alliance®. Amtrak and Pacific Surfliner are service marks of the National Railroad Passenger Corporation. Amtrak California and AmtrakCalifornia.com are services of the California Department of Transportation. Experience Downtown Oceanside Shop, Play, Stay! Discover Downtown! 84 square blocks with over 200 shops, Located just one and a half blocks from 34 restaurants, 2 live theatres, 2 museums, the Oceanside Pier, Asylum Surf is a 16 screen Cineplex, and the longest wood high quality surf shop dedicated to out- pier on the West Coast.
    [Show full text]
  • ESCI Report Template Version C
    Pinole Fire Department Pinole, California REGIONAL FIRE SERVICE DELIVERY STUDY ADDENDUM March 2020 Regional Fire Service Delivery Study Addendum City of Pinole Fire Department TABLE OF CONTENTS Acknowledgments ............................................................................................................................ iii Executive Summary .......................................................................................................................... iv SECTION I: EVALUATION OF CURRENT CONDITIONS ...................................................................... 1 Current Conditions ............................................................................................................................ 2 Organizational Overview ............................................................................................................................ 2 Service Area & Infrastructure ...................................................................................................................... 5 Staffing Analysis ......................................................................................................................................... 6 Emergency Management ........................................................................................................................... 7 Fire Prevention ........................................................................................................................................... 8 Training ....................................................................................................................................................
    [Show full text]
  • The San Elijo Lagoon Double Track and Bridge Replacement Project
    THE SAN ELIJO LAGOON DOUBLE TRACK AND BRIDGE REPLACEMENT PROJECT John P. Eschenbach Sr. Project Manager Jacobs Engineering, Inc. 401 B Street, Suite 1560 San Diego, CA 92101 (619) 321-0009 [email protected] Irfan Kalhoro, PE Construction Manager AECOM 999 W. Town & Country Orange, CA 92868 [email protected] NUMBER OF WORDS: 2,966 ABSTRACT The San Elijo Lagoon Double Track and Bridge Replacement Project (SELDT) is located in Encinitas, CA between MP 238.0, CP Swami and MP 242.2, CP Valley on the North County Transit District (NCTD) railroad and is a part of the Los Angeles to San Diego rail corridor (LOSSAN). The LOSSAN corridor is the second busiest rail corridor within the Amtrak system. NCTD operates Coaster commuter trains and hosts Amtrak’s Intercity Pacific Surfliner trains, as well as BNSF freight operations. The SELDT project adds 1.5 miles of class 5 second mainline track on the LOSSAN rail corridor between the cities of Encinitas and Solana Beach. The new track extends between Cardiff-by-the Sea (CP Cardiff) and the southern border of the San Elijo Lagoon, resulting in 4.2 miles of continuous double track. The existing single track timber bridge, built in 1945, was replaced with a new double track concrete bridge. The new concrete bridge is an 8-span precast pre-stressed box girder bridge supported on concrete pile caps. The bridge foundation consists of cast-in-steel shell (CISS) piles that reach up to 110’ deep within the lagoon channel. The construction of the foundation utilized a pile driving analyzer (PDA) to measure the nominal resistance in real time during the pile driving operation.
    [Show full text]