Environmental Management Sub-Plans
Total Page:16
File Type:pdf, Size:1020Kb
Construction Environmental Management Plan Compliance Matrix CRRDA REQUIREMENT ADDRESSED IN SECTION REFERENCE Coordinator-General’s change report – whole of project refinements 2019 Appendix 1 – Part C. – Condition 4 Construction Environmental Management Plan (a) Prior to the commencement of Project Work, a Construction Environmental This Plan Management Plan for those works (Relevant Project Work) must be developed by the Proponent and endorsed by the Environmental Monitor as being consistent with the Outline EMP and these imposed conditions. (b) The endorsed Construction Environmental Management Plan must be submitted to This Plan the Coordinator General at least 20 business days prior to the commencement of Relevant Project Works. (c) The Construction Environmental Management Plan must: (i) describe the Relevant Project Work Section 2 (ii) be based on predictive studies and assessments of construction impacts Relevant sub-plans which have regard to the scale, intensity, location and duration of construction works, and location of Directly Affected Persons (iii) be generally consistent with the Outline EMP and incorporate its This Plan environmental outcomes and performance criteria (iv) incorporate and respond to the Imposed Conditions (Construction) This Plan and associated Sub-plans (v) demonstrate that the Imposed Conditions (Construction) will be complied This Plan and associated Sub-plans with during Relevant Project Work (vi) incorporate the community engagement plan, including the complaints Sections 4.3, 6 and 8 management process, in accordance with Condition 9 (vii) where predictive studies indicate impacts beyond those provided for in the Associated sub-plans performance criteria, incorporate mitigation measures to achieve the environmental outcomes (viii) establish specific mitigation measures and processes for consultation with This Plan and associated Sub-plans Directly Affected Persons for Project Works under Conditions 9(c), 11(c), and 11(e) (ix) contain a program and procedures for ongoing monitoring to identify the Section 7.2 and associated sub-plans effectiveness of mitigation measures in achieving the Imposed Conditions (Construction) and the environmental outcomes in (iii) (x) include a process for regular review and if required updating of the Section 8.3 and associated sub-plans Construction Environmental Management Plan, including a process to review and implement additional or different mitigation measures in response to monitoring results (xi) incorporate the EMP sub-plans required by the Imposed Conditions or as All associated sub-plans required by the approved Outline EMP. i Construction Environmental Management Plan CRRDA REQUIREMENT ADDRESSED IN SECTION REFERENCE (d) The Construction Environmental Management Plan must be implemented for the This Plan duration of Relevant Project Work. (e) Relevant Project Work is authorised if it is undertaken in accordance with the This Plan Construction Environmental Management Plan. (f) The Construction Environmental Management Plan must be publicly available on the Section 8.4 project website for the duration of the construction phase. (g) The Construction Environmental Management Plan may be updated. (i) updates to the Construction Environmental Management Plan that include Section 8.3 new or additional Relevant Project Work must be endorsed by the Environmental Monitor as being consistent with condition 2 before Relevant Project Work may proceed. (h) Updates to the Construction Environmental Management Plan that are limited to new Section 8.3 or different mitigation measures for Managed Work may be endorsed by the Environmental Monitor. ii Construction Environmental Management Plan Details of Revision Amendments Document Control The CBGU Project Director is responsible for ensuring that this Plan is reviewed and approved. The Project Environment & Sustainability Manager is responsible for updating this Plan to reflect changes to the Project, legal and other requirements, as required. Amendments Any revisions or amendments must be approved by the CBGU Project Director or delegate before being distributed / implemented. Table 1 Document schedule Time for Submission Period during which Project Co must Update Interval provide updates Prior to Relevant Project Works From initial submission until the 6-monthly commencement of Relevant Project Works Revision Details Table 2 Revision details Revision Details A Internal Review 0 Updated Revision - Endorsed by IEM (23/08/2019) & Submitted to CG (23/08/2019) 1 For Review 2 For Review 3 For Review Distribution and Authorisation The CBGU Project Director is responsible for the distribution of this Plan. The controlled master version of this document is available for distribution as appropriate and maintained on TeamBinder. All circulated hard copies of this document are deemed to be uncontrolled. All personnel employed on the Project will perform their duties in accordance with the requirements of this Plan, supporting management plans, and related procedures. Table 3 Distribution List Recipient Distribution Method Cross River Rail Delivery Authority (Delivery Authority) TeamBinder Project Independent Certifier (PIC) TeamBinder CBGU Project Personnel (including SA and FM) As per TeamBinder Distribution List Proof Engineer/Verification Engineer As per TeamBinder Distribution List iii Construction Environmental Management Plan Table of Contents 1 Introduction ......................................................................................................... 1 1.1 Background ............................................................................................................................................ 1 1.2 Purpose of the CEMP ............................................................................................................................. 1 2 Project Summary ................................................................................................. 3 2.1 Site Investigation Works ........................................................................................................................ 3 2.2 Site Establishment Works ...................................................................................................................... 3 2.2.1 Roma Street .................................................................................................................................................................. 3 2.2.2 Albert Street ................................................................................................................................................................. 4 2.2.3 Woolloongabba ............................................................................................................................................................ 5 2.2.4 Boggo Road .................................................................................................................................................................. 5 2.3 Construction Activities ........................................................................................................................... 6 2.3.1 Northern Portal ............................................................................................................................................................ 7 2.3.2 Roma Street .................................................................................................................................................................. 7 2.3.3 Albert Street ................................................................................................................................................................. 7 2.3.4 Boggo Road / Dutton Park / Southern Portal ............................................................................................................. 8 2.3.5 Woolloongabba ............................................................................................................................................................ 8 2.4 Construction Sequence ......................................................................................................................... 8 3 Legislative Requirements .................................................................................. 10 3.1 Coordinator-General Conditions ......................................................................................................... 10 3.2 Commonwealth Legislation ................................................................................................................. 11 3.3 State Legislation .................................................................................................................................. 11 3.4 Approvals, Permits and Licences ......................................................................................................... 11 3.5 Guidelines and Standards .................................................................................................................... 12 4 Implementation ................................................................................................. 13 4.1 Environmental Management System Overview .................................................................................. 13 4.1.1 Environmental Aspects and Impacts ......................................................................................................................... 13 4.2 Environmental Management Documentation ....................................................................................