Bristol and Bath Green Belt Report Land at Black Rock Aston & Co UK LTD 26/11/2018
[email protected] Version Control Date Author Status Notes 23.01.18 JCA Draft 1.02 19.11.18 JCA Draft 1.03 26.11.18 JCA FINAL 1.04 BBC GB Stats Drafted by: JCA Checked by: PJA Date: 25.11.18 Date: 26.11.18 Signed: Jeremy C Aston, BSc (Hons) FRICS Copyright © 2018 Aston and Co UK Ltd All rights reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopy, recording or otherwise, or quoted, or utilised in planning or development applications without the prior permission of Aston and Co UK Ltd. 1 | P a g e EXECUTIVE SUMMARY This report traces the history of the Bristol and Bath Green Belt (GB) from its origins (1957) to the present and identifies the purpose of the GB within North Somerset (NS) and specifically at Portishead. It discusses its initiation, modification and highlights the Examining Inspectors’ views during its development. The latest GB reviews undertaken by the West of England Joint Spatial Plan (JSP) in 2015 and 2016 and the further detailed site/area specific work undertaken on cell 74c by the Landmark Practice in 2017 are considered. Feedback is also provided by The Landmark Practice on the Landscape Sensitivity Assessment by Wardell Armstrong. The GB initially excluded any of the land being promoted, then included only the western half. During development of GB policy Examining Inspectors questioned the need for some areas at Portishead to be included.