Annex Franchised Bus Route Rationalisation Plan to Tie in With

Total Page:16

File Type:pdf, Size:1020Kb

Annex Franchised Bus Route Rationalisation Plan to Tie in With Annex Franchised Bus Route Rationalisation Plan to Tie in with Commissioning of Kowloon Southern Link Item Route Origin and Destination Proposed Plan No. No. Merging / Cancellation /Modification of Routes 1. K16 East Tsim Sha Tsui Station – Public Merging of Route K16 Transport Interchange at Nam with Route 12; increase in Cheong Station the frequency of Route 12 2. 12 Sham Shui Po (Tonkin Street) to and re-alignment of its Tsim Sha Tsui (Circular) route to run along Sham Mong Road and to cover Hoi Lai Estate 3. 63X Tin Tsz – Jordon Modification of route (Wui Cheung Road) 4. 257B Shan King Estate – Tsim Sha Tsui Cancellation of route (one special departure during morning peak hours only) 5. 267S Siu Hong Court – Tsim Sha Tsui Cancellation of route (one special departure during morning peak hours only) Adjustment of Frequency 6. 12A Public Transport Interchange at Adjustment of frequency Nam Cheong Station – Whampoa (1 bus less) Garden 7. 234X Bayview Garden –Tsim Sha Tsui Adjustment of frequency East (Mody Road) (1 bus less) 8. 238X Riviera Garden – China Ferry Adjustment of frequency Terminal (1 bus less) 9. 260X Po Tin – Hung Hom Station Adjustment of frequency (3 buses less) 10. 268B Long Ping Station – Hung Hom Adjustment of frequency Ferry Concourse (3 buses less) 11. 269B Tin Shui Wai Town Centre – Hung Adjustment of frequency Hom Ferry Concourse (3 buses less) 12. 2E Kowloon City Ferry Pier – Pak Tin Adjustment of frequency Estate (2 buses less) 13. 18 Public Transport Interchange at Adjustment of frequency Nam Cheong Station to Oi Man (1 bus less) (Circular) - 2 - 14. 41A Cheung On –Tsim Sha Tsui East Adjustment of frequency (2 buses less) 15. 44 Tsing Yi Estate – Mong Kok East Adjustment of frequency Station (2 buses less) 16. 60X Tuen Mun Central – Jordon Adjustment of frequency (Wui Cheung Road) (3 buses less) 17. 61X Tuen Mun Station – Kowloon City Adjustment of frequency Ferry Pier (2 buses less) 18. 68X Hung Shui Kiu – Jordon Adjustment of frequency (Wui Cheong Road) (2 buses less) 19. 212 Whampoa Garden – Sham Shui Po Adjustment of frequency (Tonkin Street) (1 bus less) 20. 43C Cheung Hong –Tai Kok Tsui Adjustment of frequency (Island Harbourview) (1 bus less) 21. 69X Tin Shui Estate – Jordon Adjustment of frequency (Wui Cheung Road) (1 bus less) .
Recommended publications
  • Railway Network
    Railway Network Railways play a vital role in serving the transport needs of COVID-19 pandemic. By end 2020, the AEL carries about Hong Kong. They account for about 39 per cent of domestic 8 400 passenger trips per day. public transport by end 2020. Light Rail: Light Rail is a local transportation network Existing Network: The existing railway network in Hong which started operation in 1988 to meet the transport needs of Kong has a total route length of about 263 kilometres. The the residents in the northwest New Territories. It now has a Legislative Council passed in June 2007 the Rail Merger route length of about 36 km with 68 stops. By end 2020, it Ordinance which provides the legal framework for the carries an average of about 305 600 passenger trips every post-merger corporation to operate both the Mass Transit day. It has four interchange stations in Yuen Long, Tin Shui Railway (MTR) system and Kowloon-Canton Railway (KCR) Wai, Siu Hong and Tuen Mun to facilitate passenger system. The post-merger Corporation, i.e. the MTR interchange between the Light Rail and West Rail Line Corporation Limited (MTRCL) has been granted a 50-year networks. franchise to operate the MTR and KCR systems with effect from December 2, 2007. Other fixed track systems include the Hong Kong Section of Guangzhou-Shenzhen-Hong Tramway and the Peak Tram. Kong Express Rail Link (XRL): The Hong Kong section of the XRL, commissioned in September 2018, is a 26-km long MTR: MTR is a heavily patronized railway network underground rail corridor connecting Hong Kong with the consisting of 10 heavy rail lines, Airport Express and the Hong national high-speed rail network.
    [Show full text]
  • MTR Corporation
    Prospectus MTR Corporation Limited ࠰ಥ᚛༩Ϟࠢʮ̡ (a company incorporated on 26th April 2000 under the Companies Ordinance of Hong Kong with company number 714016) and MTR Corporation (C.I.) Limited (a company organised under the laws of the Cayman Islands on 30th October 2000) (Unconditionally and Irrevocably Guaranteed by MTR Corporation Limited) US$3,000,000,000 Debt Issuance Programme For the issue of Notes with maturities of between one month and 30 years On 22nd December 1993, Mass Transit Railway Corporation (“MTRC”) entered into a US$1,000,000,000 Debt Issuance Programme (the “Programme”). The maximum aggregate nominal amount of Notes (as defined below) which may be outstanding under the Programme was increased to US$2,000,000,000 with effect from 1st June 1999 and to US$3,000,000,000 with effect from 31st October 2006. On 30th June 2000 MTR Corporation Limited (“MTRCL” or “the Company”) replaced MTRC as the issuer of Notes under the Programme. All the assets and liabilities of MTRC vested in MTRCL and MTRCL has adopted all of the accounts of MTRC. MTR Corporation (C.I.) Limited (“MTR Cayman”) became an additional issuer of Notes under the Programme with effect from 9th April 2001 pursuant to an Amending and Restating Programme Agreement dated 9th April 2001 made between MTRCL, MTR Cayman and the Dealers named therein (MTRCL and MTR Cayman together being the “Issuers” and each an “Issuer”). This Prospectus supersedes any previous prospectus, listing particulars or offering circular describing the Programme. Any Notes issued under the Programme on or after the date of this Prospectus are issued subject to the provisions described herein.
    [Show full text]
  • Hoi Ying Estate & Hoi Lok Court)
    Proposed Comprehensive Residential Development at NKIL No. 6549, off Hing Wah Street West, Cheung Sha Wan 位於長沙灣興華街西對出(新九龍內地段第 6549 號)的擬議綜合住宅發展 16 May 2018 Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing SKY ASIA PROPERTIES LTD. Presentation Structure 1. Site & Planning Context 2. Urban Design Framework & Proposed Indicative Scheme 3. Concept Design of Waterfront Promenade and Public Open Space Part I Site & Planning Context Introduction • The tender for the Subject Site was awarded for private residential development with associated POS and waterfront promenade in Nov 2017 • Taking into account the requirements under the OZP as well as the Planning Brief, the Project Proponent proceeded to preliminary design of the private residential development, the associated POS as well as the waterfront promenade • Would like to seek Members’ views on the current proposal Subject Site The Subject Site is zoned “Comprehensive Development Area” on Approved South West Kowloon OZP No. S/K20/30, which is intended for comprehensive development for residential uses A waterfront site at Cheung Sha Wan facing Stonecutters Island Cheung Sha Wan Section of promenade & POS to be designed and constructed by Sham Shui Po the Project Proponent & adjacent hotel developer Nam Cheong Subject Site Cheung Sha Wan Wholesale Food Market Stonecutters Island Olympic One SilverSea Legend Existing Waterfront Promenade / Open Space New Yau Ma Tei Planned Waterfront Typhoon Shelter Promenade/Open Space Intended for private residential development
    [Show full text]
  • Designated 7-11 Convenience Stores
    Store # Area Region in Eng Address in Eng 0001 HK Happy Valley G/F., Winner House,15 Wong Nei Chung Road, Happy Valley, HK 0009 HK Quarry Bay Shop 12-13, G/F., Blk C, Model Housing Est., 774 King's Road, HK 0028 KLN Mongkok G/F., Comfort Court, 19 Playing Field Rd., Kln 0036 KLN Jordan Shop A, G/F, TAL Building, 45-53 Austin Road, Kln 0077 KLN Kowloon City Shop A-D, G/F., Leung Ling House, 96 Nga Tsin Wai Rd, Kowloon City, Kln 0084 HK Wan Chai G6, G/F, Harbour Centre, 25 Harbour Rd., Wanchai, HK 0085 HK Sheung Wan G/F., Blk B, Hiller Comm Bldg., 89-91 Wing Lok St., HK 0094 HK Causeway Bay Shop 3, G/F, Professional Bldg., 19-23 Tung Lo Wan Road, HK 0102 KLN Jordan G/F, 11 Nanking Street, Kln 0119 KLN Jordan G/F, 48-50 Bowring Street, Kln 0132 KLN Mongkok Shop 16, G/F., 60-104 Soy Street, Concord Bldg., Kln 0150 HK Sheung Wan G01 Shun Tak Centre, 200 Connaught Rd C, HK-Macau Ferry Terminal, HK 0151 HK Wan Chai Shop 2, 20 Luard Road, Wanchai, HK 0153 HK Sheung Wan G/F., 88 High Street, HK 0226 KLN Jordan Shop A, G/F, Cheung King Mansion, 144 Austin Road, Kln 0253 KLN Tsim Sha Tsui East Shop 1, Lower G/F, Hilton Tower, 96 Granville Road, Tsimshatsui East, Kln 0273 HK Central G/F, 89 Caine Road, HK 0281 HK Wan Chai Shop A, G/F, 151 Lockhart Road, Wanchai, HK 0308 KLN Tsim Sha Tsui Shop 1 & 2, G/F, Hart Avenue Plaza, 5-9A Hart Avenue, TST, Kln 0323 HK Wan Chai Portion of shop A, B & C, G/F Sun Tao Bldg, 12-18 Morrison Hill Rd, HK 0325 HK Causeway Bay Shop C, G/F Pak Shing Bldg, 168-174 Tung Lo Wan Rd, Causeway Bay, HK 0327 KLN Tsim Sha Tsui Shop 7, G/F Star House, 3 Salisbury Road, TST, Kln 0328 HK Wan Chai Shop C, G/F, Siu Fung Building, 9-17 Tin Lok Lane, Wanchai, HK 0339 KLN Kowloon Bay G/F, Shop No.205-207, Phase II Amoy Plaza, 77 Ngau Tau Kok Road, Kln 0351 KLN Kwun Tong Shop 22, 23 & 23A, G/F, Laguna Plaza, Cha Kwo Ling Rd., Kwun Tong, Kln.
    [Show full text]
  • Growth Momentum
    MTR Corporation Limited Annual Report 2010 Report Annual Limited Corporation MTR ANNUAL REPORT 2010 GROWTH MOMENTUM MTR Corporation Limited MTR Headquarters Building, Telford Plaza Kowloon Bay, Kowloon, Hong Kong GPO Box 9916, Hong Kong Telephone : (852) 2993 2111 Facsimile : (852) 2798 8822 www.mtr.com.hk Stock Code: 66 GROWTH MOMENTUM In 2010, the Company has ridden the economic recovery to post a strong set of results, with increases in revenue and profit. Looking ahead, our growth momentum continues, with our five major expansion projects in Hong Kong on track, and further progress in our growing portfolio of businesses in the Mainland of China and overseas. As a builder and operator of infrastructure assets, we try to ensure that our expansion plans benefit present and future generations, and our aim is to become a global leader in sustainable transportation. CONTENTS 2 MTR Corporation in Numbers – 2010 4 Hong Kong Operating Network with Future Extensions 6 MTR Corporation at a Glance 22 8 Chairman’s Letter Hong Kong Passenger 12 CEO’s Review of Operations Services and Outlook 19 Key Figures 20 Key Events in 2010 22 Executive Management’s Report 22 – Hong Kong Passenger Services 36 36 – Station Commercial and Station Commercial Rail Related Businesses and Rail Related 42 – Property and Other Businesses Businesses 54 – Hong Kong Network Expansion 60 – Mainland and Overseas Growth 66 – Human Resources 42 71 Financial Review Property 78 Ten-Year Statistics and Other Businesses 80 Investor Relations 82 Sustainability 83 Corporate Responsibility
    [Show full text]
  • 7-Eleven Store List – Return Service Store No
    7-Eleven Store List – Return Service Store No. Dist ADDRESS 0001 D03 G/F., Winner House,15 Wong Nei Chung Road, Happy Valley, HK 0008 D01 Shop C, G/F., Elle Bldg., 192-198 Shaukiwan Road, Shaukiwan, HK 0009 D01 Shop 12-13, G/F., Blk C, Model Housing Est., 774 King's Road, HK 0011 D07 Shop No. 6-11, G/F., Godfrey Ctr., 175-185 Lai Chi Kok Rd., Kln 0015 D12 Shop D., G/F., Win Cheung Hse, 131-137 Sha Tsui Road, Tsuen Wan, NT Shop B2A,B2B, 2-32 Man Tai St, Wing Wah Bldg & Wing Yuen Bldg, Blk F&G,Whampoa 0016 D06 Est, Kln 0022 D14 Shop No. 57, G/F., Hop Yick Ctr., 31 Hop Yick Rd., Yuen Long, NT 0030 D02 Shop Nos. 6-9, G/F., Ning Fung Mansion, Nos. 25-31 Main St., Apleichau, HK 0035 D04 Shop J G/F, San Po Kong Mansion, Nos. 2-32 Yin Hing St, Kowloon 0036 D06 Shop A, G/F, TAL Building, 45-53 Austin Road, Kln 0037 D04 G/F, 109 Geranum House, Ma Tau Wai Estate, Kln 0058 D05 Shop D, G/F & C/L, Lap Hing Bldg., 37-43 Ting On St., Ngau Tau Kok, Kln 0067 D13 G/F., Shops A & B, Golden Court, 42-58 Yan Oi Tong Circuit, Tuen Mun, NT 0069 D07 B2, G/F, Yuet Bor Building, 10-12 Shun Fong Street, Kwai Chung, NT 0070 D07 Shop 15-17, G/F, Block 9, Pak Tin Estate, Kln 0077 D08 Shop A-D, G/F., Leung Ling House, 96 Nga Tsin Wai Rd, Kowloon City, Kln 0083 D04 Shop D, G/F&C/L Yuk Wah Mansion, 1-11 Fong Wah Lane, Tsz Wan Shan, Kln 0084 D03 G6, G/F, Harbour Centre, 25 Harbour Rd., Wanchai, HK 0085 D02 G/F., Blk B, Hiller Comm Bldg., 89-91 Wing Lok St., HK 0086 D07 Shop 1, Mei Shan House, Block 42, Shekkipmei Estate, Kln 0093 D08 Shop 7, G/F, Hing Wong Mansion, 79 Tai Kok Tsui Road, Kln 0094 D03 Shop 3, G/F, Professional Bldg., 19-23 Tung Lo Wan Road, HK 0096 D01 62-74, Shaukiwan Main East Road, Shaukiwan, HK 0098 D13 8-9 Comm.
    [Show full text]
  • OFFICIAL RECORD of PROCEEDINGS Wednesday, 11
    LEGISLATIVE COUNCIL ─ 11 May 2011 10073 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 11 May 2011 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE ALBERT HO CHUN-YAN IR DR THE HONOURABLE RAYMOND HO CHUNG-TAI, S.B.S., S.B.ST.J., J.P. DR THE HONOURABLE DAVID LI KWOK-PO, G.B.M., G.B.S., J.P. THE HONOURABLE FRED LI WAH-MING, S.B.S., J.P. DR THE HONOURABLE MARGARET NG THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHEUNG MAN-KWONG THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. THE HONOURABLE MRS SOPHIE LEUNG LAU YAU-FUN, G.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG DR THE HONOURABLE PHILIP WONG YU-HONG, G.B.S. THE HONOURABLE WONG YUNG-KAN, S.B.S., J.P. 10074 LEGISLATIVE COUNCIL ─ 11 May 2011 THE HONOURABLE LAU KONG-WAH, J.P. THE HONOURABLE LAU WONG-FAT, G.B.M., G.B.S., J.P. THE HONOURABLE MIRIAM LAU KIN-YEE, G.B.S., J.P. THE HONOURABLE EMILY LAU WAI-HING, J.P. THE HONOURABLE ANDREW CHENG KAR-FOO THE HONOURABLE TAM YIU-CHUNG, G.B.S., J.P. THE HONOURABLE LI FUNG-YING, S.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, S.B.S., J.P. THE HONOURABLE FREDERICK FUNG KIN-KEE, S.B.S., J.P. THE HONOURABLE AUDREY EU YUET-MEE, S.C., J.P. THE HONOURABLE VINCENT FANG KANG, S.B.S., J.P.
    [Show full text]
  • Hung Hom Station to Transform Into an Upgraded Interchange Hub New Interchange Arrangements for the East Rail Line and West Rail Line
    PR040/21 7 June 2021 Hung Hom Station to Transform into an Upgraded Interchange Hub New Interchange Arrangements for the East Rail Line and West Rail Line The new Tuen Ma Line (“TML”) platform at Hung Hom Station (“HUH”) will be opened on 20 June 2021 (Sunday), i.e. one week before the commissioning of TML, and new interchange arrangements for the West Rail Line (“WRL”) and the East Rail Line (“EAL”) will be in place on the same day. A series of upgrading works, including the construction of new platforms, have been implemented at HUH to cope with the full opening of the TML, as well as the commissioning of the Cross-Harbour Section of EAL. The new platforms will be put into service in phases according to the progress of the two projects. While the Cross-Harbour Section of EAL is still under construction, upon the opening of the new TML platform at HUH, passengers have to pass through the concourse to reach the existing EAL platform and the WRL (future TML) platform for changing between EAL and WRL (future TML) at HUH. (Please refer to annex for details). Passengers will have to follow the new interchange arrangements until the commissioning of the Cross-Harbour Section of EAL and the full launch of the new two-level platforms at HUH. By then passengers will be taking the EAL and TML at the new platforms. “Signage with colours corresponding to the relevant rail lines will be installed to direct passengers to the platforms they want to go to. We will also deploy additional staff, put up notices and make public announcements to assist and remind passengers of the new arrangements.
    [Show full text]
  • List of Appendices
    Reprovisioning of FEHD Sai Yee Street June 2013 Environmental Hygiene Offices-cum-vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area Appendix 8-1 Aerial Photograph of Landscape Resources URS LR 6-2 At Nam Cheong LR 6-10 To the southwest Estate of Sewage Screening Plant of DSD amid Fu Cheong Estate and Nam LR 1-2 Tung Chow Street Park Cheong Estate LR 6-10 Adjacent to Nam LR 1-3 Chui Yu Road Rest Cheong MTR Station, Garden which is currently occupied as MTR Express Rail Line (XRL) LR 1-1 Nam Cheong Park construction work site LR 2-1 Along Lin Cheong LR 4-3 Bounded by Sham Road Mong Road and Lin Cheung Road, inside Nam LR 6-12 Behind and Adjacent Cheong Park, as a current to Exit C of Nam Cheong construction site of MTR Station Express Rail Line (XRL) LR 2-1 Along Lin Cheong Road LR 5-1 Immediate in front of the exit of Nam Cheong Station to the north of the Site LR 4-2 Bounded by Sir Ellis Kadoorie Secondary School (West Kowloon) and Lin LR 5-3 At the northeastern Cheung Road periphery of the site bounded by the Site itself and CLP Tai Kok Tsui Substation LR 5-6 Bounded by Hoi Fan Road and Lin Cheong Road, adjacent to Tai Kok Tsui Catholic Primary School (Hoi Fan Road) LR 5-5 In between the vacant land to the northeastern of Sir LR 2-3 Along Hoi Fan Road Ellis Kadoorie Secondary School (West Kowloon) LR 6-6 At Island Harbourview LR 6-4 Between Hampton LR 3-1 Cargo Handling Basin Place and the Long Beach LR 6-11 Along the Waterfront Promenade adjacent to the LR 3-2 Waterfront Promenade Long Beach of the Long Beach LR 6-5 At the
    [Show full text]
  • LC Paper No. CB(4)1029/20-21(01)
    LC Paper No. CB(4)1029/20-21(01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Operating Arrangements for the Tuen Ma Line (Translation) Introduction The Tuen Ma Line (“TML”) under the Shatin to Central Link (“SCL”) project will be commissioned on 27 June 2021. This paper informs Members of the operating arrangements for the TML. Background 2. The SCL project consists of two Sections: (a) the Tai Wai to Hung Hom Section comprising the stations of Tai Wai, Hin Keng, expanded Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin and expanded Hung Hom. This section will join the original Ma On Shan Line and the existing West Rail Line to form the TML, while the TML Phase 1 (“TML1”), comprising the section between Tai Wai and Kai Tak, was commissioned in February 2020; and (b) the Hung Hom to Admiralty Section comprising the stations of expanded Hung Hom, Exhibition Centre and expanded Admiralty – this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. The alignment of the TML and updated MTRCL route map are at Annex 1. 3. The SCL is funded and owned by the Government under the concession approach. In preparation for the commissioning of the TML, the Government, the Kowloon-Canton Railway Corporation (“KCRC”) and the MTR Corporation Limited (“MTRCL”) make an arrangement similar to that of the commissioning of the TML1 in February 2020. Prior to the commissioning of the TML, the Government will vest the TML in KCRC which is wholly owned by the Government and then KCRC will grant the right to operate the TML to MTRCL under the service concession approach.
    [Show full text]
  • Technical Investigation Report on Train Derailment Incident at Hung Hom Station on MTR East Rail Line on 17 September 2019
    港鐵東鐵綫 紅磡站列車出軌事故 技術調查報告 Technical Investigation Report on Train Derailment Incident at Hung Hom Station on MTR East Rail Line 事故日期︰2019 年 9 月 17 日 Date of Incident : 17 September 2019 英文版 English Version 出版日期︰2020 年 3 月 3 日 Date of Issue: 3 March 2020 CONTENTS Page Executive Summary 2 1 Objective 3 2 Background of Incident 3 3 Technical Details Relating to Incident 4 4 Incident Investigation 8 5 EMSD’s Findings 19 6 Conclusions 22 7 Measures Taken after Incident 22 Appendix I – Photos of Wheel Flange Marks, Broken Rails, Rail Cracks and Damaged Point Machines On-Site 23 1 Executive Summary On 17 September 2019, a passenger train derailed while it was entering Platform No. 1 of Hung Hom Station of the East Rail Line (EAL). This report presents the results of the Electrical and Mechanical Services Department’s (EMSD) technical investigation into the causes of the incident. The investigation of EMSD revealed that the cause of the derailment was track gauge widening1. The sleepers2 at the incident location were found to have various issues including rotting and screw hole elongation, which reduced the strength of the sleepers and their ability to retain the rails in the correct position. The track gauge under dynamic loading of trains would be even wider, and this excessive gauge widening caused the train to derail at the time of incident. After the incident, MTR Corporation Limited (MTRCL) have reviewed the timber sleeper condition across the entire EAL route and replaced the sleepers of dissatisfactory condition. MTRCL were requested to enhance the maintenance regime to closely monitor the track conditions with reference to relevant trade practices to ensure railway safety.
    [Show full text]
  • Hong Kong Housing Authority Public Housing Development at North West Kowloon Reclamation Site 1 (East) Report for Air Ventilation Assessment – Initial Study
    Hong Kong Housing Authority Public Housing Development at North West Kowloon Reclamation Site 1 (East) Report for Air Ventilation Assessment – Initial Study -- Rev A | 24 August 2018 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number -- Ove Arup & Partners Hong Kong Ltd Level 5 Festival Walk 80 Tat Chee Avenue Kowloon Tong Kowloon Hong Kong www.arup.com Hong Kong Housing Authority Public Housing Development at North West Kowloon Reclamation Site 1 (East) Report for Air Ventilation Assessment – Initial Study Contents Page Introduction 1 1.1 Background 1 1.2 Objective of AVA Initial Study 1 Location and Site Characteristics 2 Noise Barrier, Elevated Structure and Future Development 3 Wind Availability Data 6 Prevailing Wind Directions 7 Wind Profiles 8 Design Schemes for Initial Study 11 Approved Scheme 11 Intermediate Scheme 15 Methodology 19 Assessment and Surrounding Areas 19 Technical Details for CFD simulation 20 AVA Indicator 23 Locations of Test Points 24 Focus Areas 28 Results and Discussion 30 Annual Weighted Average 30 Summer Weighted Average 31 Directional Analysis 33 VR Results of Test Points 43 Focus Areas 44 Wind Enhancement Features 46 Proposed Scheme 47 Conclusion 48 Overview 48 Results 48 Reference 49 -- | Rev A | 24 August 2018 N:\PROJECT\209638 HKHA TERM CONSULTANCY 2009 (BATCH C1)\03&12 NWKR_SITE1_EAST\OUT\ISSUE\20180824_AVAIS_FOMAL_2ND_SUB_REVA\20180824_AVAIS_2ND_SUB_REVA.DOCX
    [Show full text]