Upton & Mendon, Massachusetts

Total Page:16

File Type:pdf, Size:1020Kb

Upton & Mendon, Massachusetts PRSRT STD PRSRT PAID US POSTAGE #35 PERMIT MA UPTON, 01568 TOWN CRIER UPTON & MENDON, MASSACHUSETTS July 6, 2018 | Vol. 26 No. 12 | www.TownCrier.us The Town Crier POSTAL PATRON POSTAL CAR-RT-SORT WS MA 01568 UPTON, is closed for The Upton & Mendon Town Crier Town Mendon & Upton The Inc. Crier Publications, Town Street 48 Mechanic MA 01568 Upton, Est. 1993 • Mailed FREE to all 5,800 addresses in Upton and Mendon. Vacation from July 11 to July 25 Mendon 1773, Underpinnings Upton Selectmen Discusses for the American Revolution Changes to Meetings Editor’s note: As we celebrate July 4th, we decided to reprint this article written by By Michelle Sanford Mendon Historian Richard Grady about the Staff Reporter/Columnist Resolves approved at the town’s March 1, During a June 19 meeting, Selectmen Brett Simas led a discussion on possibly changing the 1773 Town Meeting, which provided some start times of Board meetings as well as adding a public comment section to each agenda. of the ideas included in the Declaration of Simas said during his recent campaign for the Selectmen’s seat he’d heard from residents Independence written Thomas Jefferson about two possible changes regarding meetings. “One was the time of the meetings and the 242 years ago. challenges that some folks have making the meetings because they’re working or having to feed children in the evenings,” he explained. “Having a later time would make it easier for Mendon’s town meeting on March 1, them to participate and engage in a meeting that might be interesting to them.” 1773, at the Fourth Meetinghouse, was The town’s Selectmen meetings begin at 6 p.m. Simas suggested changing the start time one of the most important meetings in to 7 p.m. to see if that might benefit interested residents. “Obviously, we’re not going to have the town’s history. The outcomes had a huge spike in participation but I think it’s worth making these meetings as accessible as significant impacts, not only on the town possible,” he said. but on the 13 colonies under British Selectman Chair Gary Daugherty proposed a trial period beginning in September with rule. A group of six scholarly residents one meeting starting at 6 p.m. and the following at 7 p.m. to see if there’s an increase in eloquently proposed a document and participation. Daugherty noted that several other towns begin their Selectmen executive supported it with fiery orations that shook sessions at 6 p.m. “So town employees aren’t here until 10, 11 o’clock at night.” Following the rafters of the wooden building. The executive session, the regular meeting would then begin. In March 1773, Mendon voters spirited voters gave approval, and the Selectman Stephan Matellian agreed. “If this is something that will help to draw people to approved 19 resolutions that were the document gained the attention of Boston’s the meetings I’m all for it,” he said, suggesting a start time at 6:30 p.m. possibly. basis for many of the freedoms listed Committee of Correspondence and The second half of the discussion regarded adding a public comment section to the agenda. in the Declaration of Independence Sons of Liberty. The document helped to Simas reviewed other agendas of Grafton, Hopkinton, and Mendon and each have a public and the Bill of Rights in the United define and focus on the issues of colonial comment at the beginning of the agenda. “That allows for citizens to give us input to what States Constitution. To view all discontent with Great Britain, and it might be on the agenda so we can incorporate any feedback Upton Selectmen 19 resolutions, visit Dan Malloy’s became an influence on the thinking in the p 17 website, Hope1842.com – Mendon early days of the American Revolution. menu. Jane Bigda photo The purpose of the meeting was to respond to a letter that the town had received at a February 10 meeting, three weeks earlier. It was from Boston’s New Mendon Police Station Design Committee of Correspondence in regards to the punitive Acts of Parliament that had shut down the Massachusetts state government and closed the port of Boston. Voters at the February meeting created a committee to propose a Needed Due to Increased Costs response and present it on March 1. The committee included Joseph Dorr Esq., Edward Rawson, James Sumner, John Tyler, Lt. Joseph Johnson, and William By Michelle Sanford Torrey. The presentation was orated by their chairman, Joseph Dorr. It was in the Staff Reporter/Columnist form of 19 resolves or resolutions. The following are a few examples. The Mendon Police Station Building Committee provided the Board of Selectmen an “1. Resolved, that all men have naturally an equal right to life, liberty, and update on the latest costs for the new police headquarters showing an increase of $1.2 million property. 2. Resolved, that all just and lawful government must necessarily over the approved $5 million project. The Committee, along with the project’s architects, also originate in the free consent of the people. 3. Resolved, that the good, safety, put forward another design option during the June 18 meeting that is expected to bring those and happiness of the people is the great end of civil government and must be costs down. considered as the only rational object in all original compacts and political Analysis of the $1.2 million overages, known as the Option C design, were broken down institutions. 10. Resolved, that introducing and quartering standing armies in a before the Selectmen and included the unexpected discovery of unsuitable soils which free country in times of peace, without the consent of the people, is a violation of added an additional $100,000 to the original $5 million price tag. According to a PowerPoint their rights as free men. 19. … voted that the foregoing Resolves be entered into presentation, overall, site work and demolition costs increased $424,000, certain additions the Town Book , that our children in years to come, may know the sentiments of totaled an extra $344,000, and the Fire Station renovations increased $320,000. A more their fathers in regard to their invaluable rights and liberties.” detailed breakdown of the increased costs can be found on the Police Station Building Dorr served in the General Court (Massachusetts Legislature) during the Committee’s Web page at mendonma.gov. 1760s, and Rawson served during the 1770s. With their Boston ties, they were While the Selectmen agreed the unsuitable soil and certain market increases could not have closely acquainted with Sam Adams, John Hancock, Paul Revere, Joseph Warren, been predicted, the other increases should have been accounted for. “It would seem to me that and other leaders of the revolutionary cause. Mendon had representation at all at least 75 percent of this was predictable and we should have had it in the original number,” meetings of the Committee of Correspondence and the Provincial Congress. said Selectman Rich Schofield. Clamors for freedom from tyranny from the radicals in Boston echoed off the The Selectmen were then presented with an Option E design which will bring down the walls of Mendon’s meetinghouse at the north end of Old Cemetery. Historian increased costs. The new drawings show a smaller footprint than Option C which means a William Cullen Bryant wrote that Mendon’s Resolves and Thomas Paine’s less impervious area to drain. In addition, the building’s basement will be built under the first “Common Sense” were the first writings that influenced Thomas Jefferson’s floor and the attic will not be built out but only constructed for future expansion or storage authorship of the Declaration of Independence. The town meeting on March 1, needs. No elevator will be needed but both levels will be ADA compliant. It also requires the 1773 was one of the most important in the town’s history. It not only influenced replacement of less unsuitable soil. Mendon Police Station Mendon, but to some extent, the early beginnings of the United States! Even though the $1.2 million increase is expected to lessen p 4 OVER 700 VEHICLES BRAND NEW WHOLESALE PRICING USED CAR OUTLET STORE ready for delivery. 2017 HYUNDAI Sonata SE MSRP: $22,785 SEDAN SPECIAL #H7346 BUY PURCHASE MERCEDES-BENZ FOR ONLY $47 9 CONVERTIBLES A WK. Must See! TO CHOOSE FROM STARTING AT: Bluetooth • 7” LCD From as low as: 16” Alloys • Back-Up Camera $ $ * SAVE $5,800 #HY0729 15,999 16,977 CLK 500 • CLK 430 • SL 600 “Drive like a king - for a little bling!” *PRICE INCLUDES $2,500 RETAIL BONUS CASH ON SE MODELS. NOW SERVICING ALL MAKES AND MODELS IMPERIAL HYUNDAI SALE ENDS 7/14/18. Cannot be combined with any other discount or promotion. Prices not valid with prior sales. Prices listed include all applicable 800-526-AUTO • IMPERIALHYUNDAI.COM manufacturer incentives (not everyone will qualify) and Imperial discounts including a $1,000 Imperial Trade Assistance Bonus for a qualifying 2007 our newer trade. See us for details. Advertised price does not include tax, title, registration, documentation, or our acquisition fees. Not re- sponsible for typographical errors. Photos are for illustration purposes only. Call 800-526-AUTO to see which incentives you qualify for. 154 E. MAIN ST | RTE. 16 | MILFORD, MA | OPEN DAILY 9-9, SAT 9-6, SUN 11-6 Mendon News Miscoe Springs Building Discussed with Selectmen By Michelle Sanford Staff Reporter/Columnist The fate of the Miscoe Springs Bottling Plant structure was discussed at the June 18 Board of Selectmen’s meeting with members of the Historical Commission and Planning Board in attendance.
Recommended publications
  • In the Woonasquatucket River Watershed
    Public Outreach & Education A Model Based on Rhode Island’s Woonasquatucket River “Do’s & Don’ts” Education Program Strategies and Programs Developed, Implemented and Compiled by Northern Rhode Island Conservation District, RI Urban Rivers Team—Health & Education Subcommittee, U.S. Environmental Protection Agency Table of Contents Section Title Page Why Use this project as a Model? / ii-iii Timeframe of Events for the Woonasquatucket River “Do’s & Don’ts” Background / iv-v Using this Tool Kit Step 1 Understand the Target Watershed 2-3 Step 2 Identify the Administrative Agency 4-5 Step 3 Develop a Steering Committee 6-7 Step 4 Identify Key Messages 8-9 Step 5 Identify Target Audiences 10-11 Steps Program Ideas for Various Audiences (12-15) 5A Step 5A: Signage & Brochures 12 5B Step 5B: Adult Audiences 13 5C Step 5C: Child Audiences 14 5D Step 5D: Facilitating Community Involvement 15 Step 6 Develop a Program for Implementation 16-17 Step 7 Finding Sustainable Funding Sources 18-19 Step 8 Program Evaluation 20-21 Appendices & Template Location 22-23 Evaluation of the Tool Kit Post- Appendices Acknowledgments: This publication was made possible by the efforts of dedicated individuals. We would like to thank them for all of their input, time, and expertise. ¨ US EPA—Urban Environmental Program ¨ Socio-Economic Development Center for ¨ Northern RI Conservation District Southeast Asians ¨ Audubon Society of RI ¨ Olneyville Housing Corporation ¨ RI Department of Health (HEALTH) ¨ The City of Providence ¨ RI Department of Environmental ¨ Narragansett Bay Commission Management (RIDEM) ¨ Save the Bay ¨ Woonasquatucket River Watershed Council ¨ Environmental Diversity Education Forum and the Greenway Project ¨ Urban League of RI ¨ Club Neopolsi Creations ¨ International Language Bank This publication was designed and compiled by Kate J.
    [Show full text]
  • Woonasquatucket: American Heritage River
    The Woonasquatucket: An American Heritage River Page 1 of 1 Superfund Records Center SITE: C__i__=la ie BREAK: OTHER­ no _ Donate Now! 4^04-0 3 WOONASQUATUCKET RIVER WATERSHED COUNCIL Home About UsD About the Watershed • Events Projects D Get Involved • Links Things to Buy The Woonasquatucket: An American Heritage More About Us: River • Who We Are & What We Do • In The News 'Tonight, I announce that this year I will designate 10 American Heritage An American Heritage River Rivers, to help communities alongside them revitalize their waterfronts and clean up pollution in the rivers, proving once again that we can grow • Our Staff the economy as we protect the environment." - President Clinton's 1997 • Our Funders State ofthe Union Address • Our Board • Employment Opportunities On July 30,1998 President Clinton designated the Woonasquatucket River as an American Heritage River. The Woonasquatucket is partnered • Way sto Contact Us with the Blackstone River for the purposes of this program. Senator John H. Chafee nominated the Woonasquatucket and Blackstone Rivers for this designation. The proposal received immediate and strong support from Senator Jack Reed, Representative Weygand, Representative Kennedy, and Governor Almond, and residents ofthe 6 communities along the River, including Glocester, North Smithfield, Smithfield, Johnston, North Providence and Providence. The river was chosen in part because ofthe significant role it played in the Industrial Revolution. The Woonasquatucket was one ofthe first rivers to be dammed by mill-owners to insure a steady Undated photograph of Riverside Mills in Providence. supply of water year-round for their mills. In the last thirty years, The building in the foreground still exists.
    [Show full text]
  • ATTENDANCE: A. Members Present
    The Rhode Island Rivers Council c/o RI Water Resources Board One Capitol Hill Providence, RI 02908 www.ririvers.org [email protected] Minutes of RIRC Meeting Wednesday, June 12, 2019 Meeting – 4 pm DEM Office of Water Resources – Conference Room 280C 235 Promenade Street, Providence, RI ATTENDANCE: A. Members Present: Veronica Berounsky, Chair Alicia Eichinger, Vice Chair Charles Horbert Walter Galloway Rachel Calabro Ernie Panciera Eugenia Marks B. Guests in Attendance: Elise Torello, Wood-Pawcatuck Watershed Association Michael Zarum, Buckeye Brook Coalition Jennifer Paquet, RI DEM Douglas Stephens, Woonasquatucket River Watershed Council Michael Bradlee, Friends of the Moshassuck Julia Bancroft, Narragansett Bay Estuary Program Susan Kiernan, RI DEM John Zwarg, RI DEM Betsy Dake, RI DEM Arthur Plitt, Blackstone River Watershed Council – Friends of the Moshassuck Margherita Pryor, US EPA Chelsea Glinna, VHB Introductions: All attending board members and guests introduced themselves. Prior to the start of the RIRC Meeting, representatives were available from RI DEM to provide a presentation and give the Watershed Councils an update on things they are working on. Updates were provided on multiple topics as follows: RI Non-Point Source Management Plan: This is overseen by EPA, and is required by Section 319 of the Clean Water Act. The plan is consistent with the State’s “Water Quality 2035” plan Plan elements were described Water quality conditions (descriptive) Management Framework Rules Statewide Priorities Implementation It has a five-year planning horizon focused on RIDEM actions. Priorities include stormwater; OWTS, agriculture, road salt, turf management, pet waste, and “other” sources. Other acknowledged stressors include: wetland alterations; aquatic invasives, stream connectivity, water withdrawals, and climate change.
    [Show full text]
  • Visual Grounded Analysis: Developing and Testing a Method for Preliminary Visual Research
    Visual Grounded Analysis: Developing and testing a method for Preliminary Visual Research Lisa Cerutti PhD A thesis submitted in partial fulfilment of the requirements for the degree of Doctor of Philosophy (PhD) Sir John Cass Faculty of Art, Architecture and Design London Metropolitan University i June 2017 v II ABSTRACT Approaching a new design project by performing preliminary visual research is a common practice in educational and studio settings, particularly in Jewellery and Fashion Design. Collecting images around a given subject or theme — for better understanding its visual traits, or for future reference — could be seen as the counterpart, in visual terms, of a literature search. However, ‘visual research’ is an expression often used rather vaguely for indicating a spectrum of unstructured methodological approaches, whose procedures and underlying assumptions tend to remain unexplained, undisclosed or unquestioned in everyday studio practice. When creative practice becomes an integral part of academic research, though, there is an increased need for rigor and explicitness regarding every aspect about it, including all the work preliminary to it. This research aims to develop and test a systematic method for conducting and documenting visual research in the preliminary stages of the design process, contributing to new knowledge in the form of a new visual method, also applicable as a design tool. A reflection on the vagueness and implicitness of the Intuitive Approach (IA) to visual research adopted in the initial stage of this PhD motivated the search for an alternative method that could make transparent and rigorous the taken-for-granted, subjective assumptions behind the research initially conducted.
    [Show full text]
  • Woonasquatucket River in Providence95
    WOONASQUATUCKET RIVER WATERSHED COUNCIL: Miles 1 SMITH STREET ORMS STREET WOONASQUATUCKET RIVER IN PROVIDENCE95 RIVER AVENUE RI State M o s House h PROMENADE STREET a s s 0 MILES u c k Mall KINSLEY AVENUE R VALLEY STREET River ket i uc 5 v at e ANGELL STREET ACORN 4 u r 1 sq STREET Waterplace na oo Park 3 W WATERMAN AVENUE Eagle ORIAL B .5 M O COLLEGE STREET ME U LE Square V A 0.25 R HARRIS AVENUE 6 Downtown D ATWELLS AVENUE 6 10 Providence BENEFIT STREET SOUTHMAIN WATER STREET ST ATWELLS AVENUE Donigian 7 2 Park 8 1A 25 DYER STREET 0. DEAN STREET 0.5 1 1 BROADWAY Providence River BIKE PATH 00 0.75 95 POST ROAD POINT WESTMINSTER STREET STREET Ninigret mAP LEGEND 9 Park 6 WATER ACCESS l POINTS OF INTEREST n P PARKING 195 n WATER ROADS BIKE PATH CAUTION CONSERVATION LAND u 10 n ELMWOOD AVE LEVEL Beginner/Intermediate (tides) round trip from the South Water Street Landing 1 up to Eagle START/END South Water Street Landing, Providence Square l6 and back. You can also put in at Donigian Park 8 RIVER MILES 4 miles round trip and paddle down to South Water Street. However, above Eagle TIME 1-2 hours Square the channel is narrow and winding and there is some 7 DESCRIPTION Tidal, flatwater, urban river quickwater u so less experienced paddlers should choose the round-trip option from South Water Street. While the tide starts SCENERY The urban heart of Providence, but with a surprising number of trees along the river west of Dean Street to influence the river in a small way at Donigian Park, it becomes 295 GPS N 41º 49’ 20.39”, W 71º 24’ 21.49” significant below Atwells Avenue and Eagle Square.
    [Show full text]
  • 2018 Annual Report
    THE POWER OF OUR NETWORK ANNUAL 2018 REPORT 2018 BY THE NUMBERS CELEBRATING 30 YEARS AND THE VIBRANT FUTURE OF OUR NETWORK 4,146 500 River Network was founded thirty years ago to strengthen local efforts to protect rivers. Over three INDIVIDUALS HOURS OF SUPPORT educated through decades our focus has remained remarkably consistent: We connect people to save rivers. That provided in simple tagline belies a tremendous amount of action to protect and restore waters across the country, particularly at the local level. Today this network is over 6,000 strong. 88 38 As backbone to this network, we educate and empower champions to effectively engage their EVENTS (River Rally, communities, influence decision makers, assert their opinion on policy change, and translate DIRECT strategies from our national network into local solutions for healthy rivers and clean water. Every webinars, and workshops) CONSULTATIONS day, thousands of these local champions are working across the U.S. Take a moment to meet our network and learn their stories. River Network began by helping river and watershed organizations expand protections for $80,000 13,385 pristine rivers. Since then our ambitions, leadership, and programs have evolved to align with our SCHOLARSHIPS granted to understanding of what rivers need to remain healthy, the challenges of a changing climate, and VOLUNTEERS attended significant shifts in the social, political, and economic context of water. While remaining committed to bolstering local groups and grassroots efforts, we now build Nicole Silk 141 24 coalitions across sectors—uniting NGOs, tribal nations, government agencies, and businesses RIVER RALLY PARTICIPANTS RIVER NETWORK to achieve bigger impacts.
    [Show full text]
  • Activity Report for Our Conservation Partners
    Activity Report for our Conservation Partners March – April 2009 Volume 1, Number 3 In This Issue Message From Pooh Vongkhamdy, State Conservationist • Upper Greetings from the Rhode Island Natural Resources Narragansett Bay Conservation Service State Office. During my first two months as Rhode Island State Conservationist, • Lower I worked extensively with staff to implement the Narragansett Bay 2008 Farm Bill programs. In addition, I spent a considerable amount of time meeting the various • Economics partners who pay an integral role in conservation • Biological efforts throughout Rhode Island. Sciences Highlights among the various activities include the following: • Earth Team NRCS worked with several partners to arrange a tour of Joslin Farm in Volunteer Scituate, RI where the general public was invited to learn about the project goals and progress to encourage wildlife habitat. The tour was a • Outreach And success with over 130 attendees and much positive feedback regarding Communications our efforts. • Performance Considerable progress was made on the Gooseneck Cove Wetland Update Reserve Program (WRP) project where NRCS provided approximately half of the funds needed to replace culverts and dam removal. It was • Engineering the first intentional dam removal in the State’s history. Services Several additional outreach events were completed including two • Resource recruiting events and a presentation at the unveiling of the Conservation & Woonasquatucket River Watershed River Panels at Providence Place Development where NRCS provided over $4.5 million in WHIP funds for the fish passage and river conservation efforts. • Soils Program NRCS staff worked diligently to roll out funding opportunities under the American Recovery and Reinvestment Act (ARRA) for Emergency Watershed Protection-Floodplain Easements (EWP-FPE) where a total of 30 applications were received.
    [Show full text]
  • A Westfield 4Th of July Projscta
    Going for glory TWo thumbs up Salute America Athletes prepare for Kids' Stuff seeks Display your pride Garden State Games youngsters' reviews on the 4th of July Sam pag#> A-9 %— baek pag« of INSIDE Record Sol : Thursday. July 1,1993 A Forbes Newspaper 50 cents A parting hug A Westfield 4th of July projscta. This (tawing v* be haU July 20 at Ins Steak and Ate; IMountaMd*, NJ. Ths prim In- Park concerts will cfadsa 2antfiicotar T.V.. • git oar- ttcatv wont Apnoono Jewewv and 4^a% a^awtfab^aa^aM frw 44hw^aw ast C^^^aAr mark Fourth fetes and A*. The Uons Club •*» larg- est santoa dub In tw worid win •y LOMMOFFETT 1.4 rraaon iiiemDsrs. For more m- THE RECORD tormalon cal Mke at 664-48B0. Far those spending this holiday weekend in West- Authors wanted field, there are plenty of ways to catch the spirit of TheWs JJJbrarJy to 1776. oompang a M of WestHeld authors Fourth of July festivities begin Thursday night with to b* uMd during Wettfefcfs b> an outdoor concert in Mindowaskin Park. The West- cmtanntol oalspratlon. Thto 1st wfl field Concert band will perform 8-10 p.m. at the tnduds currant residents of West- park's gazebo. laid and people who graw up hem but toe ataswhsm raw. authors of At intermission, a special ceremony sponsored by •don and nonJeson along with the Sons of the American Revolution and the Daugh- writers who have been published In ters of the American Revolution will be held. books, newepapenii magazines or The ceremony will include an appearance from the mon» aohotoiV foumato.
    [Show full text]
  • RIRC Booklet Combined 2 27 2019
    THE RHODE ISLAND RIVERS COUNCIL www.ririvers.org One Capitol Hill Providence, Rhode Island 02908 [email protected] RHODE ISLAND RIVERS COUNCIL MEMBERSHIP Veronica Berounsky, Chair Alicia Eichinger, Vice Chair Robert Billington Rachel Calabro Walter Galloway Charles Horbert Elise Torello INSTITUTIONAL MEMBERS Paul Gonsalves for Michael DiBiase, Department of Administration Eugenia Marks for Kathleen Crawley, Water Resources Board Ernie Panciera for Janet Coit, Department of Environmental Management Peder Schaefer for Mayor James Diossa, League of Cities and Towns Mike Walker for Stefan Pryor, Commerce Corporation Jeff Willis for Grover Fugate, Coastal Resource Management Council ACKNOWLEDGEMENTS Photographs in this publication provided by: Rhode Island Rivers Council Elise Torello, cover photograph, Upper Wood River Charles Biddle, "Children Planting, Middlebridge", pg. 1 Booklet compilation and design services provided by Liz Garofalo THANK YOU This booklet was made possible by a RI legislative grant sponsored by Representatives: Carol Hagan McEntee, (D-District 33, South Kingstown/Narragansett) Robert E. Craven, Sr., (D-District 32, North Kingstown) 2 RHODERHODE ISLANDISLAND WATERSHEDS WATERSHEDS MAP MAP 3 RHODE ISLAND RIVERS COUNCIL ABOUT US The Rhode Island Rivers Council (RIRC) is charged with coordinating state policies to protect rivers and watersheds. Our unique contribution is to strengthen local watershed councils as partners in rivers and watershed protection. Created by statute (RIGL 46-28) in 1991 as an associated function of the Rhode Island Water Resources Board, the RIRC mission is to preserve and improve the quality of Rhode Island's rivers and their watersheds and to work with public entities to develop plans to safely increase river use. Under the Rhode Island Rivers Council statute, rivers are defined as "a flowing body of water or estuary, including streams, creeks, brooks, ponds, coastal ponds, small lakes, and reservoirs." WHAT WE DO The RIRC plays a key role in the state's comprehensive environmental efforts.
    [Show full text]
  • Did You Fall in Love with Blackstone Heritage
    Blackstone Heritage Corridor 2018 for a walk, a tour, a GO! bike ride, a paddle, a boat ride, a special event or harvest experience – all in the month of September Proudly in the wonderful Blackstone sponsored by River Valley National Heritage Corridor. GO! Table of Contents Welcome ........................ 2-3 Map ............................... 4 Listing of Experiences & Events ...................... 8-36 Trash Responsibly ........... 15 Be a GearHead! ................ 19 Page 19 Our Newest National Park ..37 Bikeway Maps ............ 38-40 VIP Program .................... 42 Photo Contest ................. 42 Support the Blackstone Heritage Corridor ............ 45 Online Shop .................... 45 Page 37 SEPTEMBER 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Visit us at Page 38-40 BlackstoneHeritageCorridor.org for more free, guided experiences and special events (some may charge fees)! Updated daily. Page 42 670 Linwood Avenue Whitinsville, MA 01588 508-234-4242 BlackstoneHeritageCorridor.org Cover photo by Angie Stormont Page 42 ©2018 Blackstone Heritage Corridor, Inc. Table of Contents 1 The Blackstone River Valley National Heritage We welcome you Corridor is most notably known as the Birthplace to September in the of the American Industrial Revolution and the first place of tolerance and diversity in the Blackstone country. In the fall, its many other attributes come vividly into focus as the crispness of Heritage Corridor! autumn grows from the last warmth of summer. Explore our exceptional National Heritage Corridor during a season of anticipation. Every living thing is in preparation mode. Squirrels and chipmunks are gathering food for the winter.
    [Show full text]
  • Simulated and Observed 2010 Flood-Water Elevations in Selected River Reaches in the Moshassuck and Woonasquatucket River Basins, Rhode Island
    Prepared in cooperation with the U.S. Department of Homeland Security-Federal Emergency Management Agency Simulated and Observed 2010 Flood-Water Elevations in Selected River Reaches in the Moshassuck and Woonasquatucket River Basins, Rhode Island Scientific Investigations Report 2013–5191 U.S. Department of the Interior U.S. Geological Survey Front cover. Photograph of Woonasquatucket River flooding on Valley Street looking toward Atwells Avenue, Providence, Rhode Island. Simulated and Observed 2010 Flood-Water Elevations in Selected River Reaches in the Moshassuck and Woonasquatucket River Basins, Rhode Island By Phillip J. Zarriello, David E. Straub, and Stephen M. Westenbroek Prepared in cooperation with the U.S. Department of Homeland Security-Federal Emergency Management Agency Scientific Investigations Report 2013–5191 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior SALLY JEWELL, Secretary U.S. Geological Survey Suzette M. Kimball, Acting Director U.S. Geological Survey, Reston, Virginia: 2014 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment, visit http://www.usgs.gov or call 1–888–ASK–USGS. For an overview of USGS information products, including maps, imagery, and publications, visit http://www.usgs.gov/pubprod To order this and other USGS information products, visit http://store.usgs.gov Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this information product, for the most part, is in the public domain, it also may contain copyrighted materials as noted in the text.
    [Show full text]
  • 60 Dams Removed to Restore Rivers in 2010
    60 dams removed to restore rivers in 2010 American Rivers releases annual list including dams in California, Maine, Maryland, Massachusetts, Michigan, North Carolina, New Hampshire, New York, Pennsylvania, Ohio, Oregon, Rhode Island, Virginia and Vermont. Nationwide, 888 dams have been removed to date. 450 dams have been removed since 1999. Dam removal brings a variety of benefits to local communities, including restoring river health and clean water, revitalizing fish and wildlife, improving public safety and recreation, and enhancing local economies. Working in a variety of functions with partner organizations throughout the country, American Rivers contributed financial and technical support in many of the removals and was solely responsible for the removal of a number of others. Contact information is provided for each dam removal. For further information about the list, please contact Serena McClain, American Rivers’ Director of River Restoration Program at 202.243.7044 or [email protected]. This list includes all known dam removals that occurred in 2010, regardless of the level of American Rivers’ involvement. Dams are categorized by alphabetically by state. Glenbrook Gulch Dam, Glenbrook Gulch (Albion River), California: The 10-foot high Glenbrook Gulch Dam removal restored 0.66 miles of the Albion River for coho and steelhead. The project will also restore instream habitat with the placement of large woody debris, re-establish hydrologic connectivity, and prevent collapse of this earthen structure. Contact: Joe Pecharich (NOAA), (707) 575-6095, [email protected]. Lower Montsweag Dam, Montsweag Brook, Maine: Lower Montsweag Brook Dam acted as a complete barrier to fish passage. The goal of the project was to restore native and diadromous fisheries resources in the lower watershed though removal of the dam, which was completed in early November 2010.
    [Show full text]