Heritage at Risk Register 2020, South West

Total Page:16

File Type:pdf, Size:1020Kb

Load more

South West Register 2020 HERITAGE AT RISK 2020 / SOUTH WEST Contents The Register III Content and criteria III Key statistics V Key to the entries VI Entries on the Register by local planning VIII authority Bath and North East Somerset (UA) 1 Bournemouth Christchurch and Poole 3 (UA) Bristol, City of (UA) 5 Cornwall (UA) 8 Devon 48 Dartmoor (NP) 48 East Devon 71 Exeter 77 Exmoor (NP) 78 Mid Devon 79 North Devon 82 South Hams 86 Teignbridge 93 Torridge 96 West Devon 103 Dorset (UA) 107 Gloucestershire 145 Cheltenham 145 Cotswold 146 Forest of Dean 150 Gloucester 153 Stroud 154 Tewkesbury 158 Isles of Scilly (UA) 161 North Somerset (UA) 165 Plymouth, City of (UA) 167 Somerset 171 Exmoor (NP) 171 Mendip 174 Sedgemoor 180 Somerset West and Taunton 184 South Somerset 189 South Gloucestershire (UA) 194 Swindon (UA) 197 Torbay (UA) 199 Wiltshire (UA) 201 II HERITAGE AT RISK 2020 / SOUTH WEST THE REGISTER Many structures fall into the ‘not applicable’ category, The Heritage at Risk Register includes historic for example: ruins, walls, gates, headstones or boundary buildings and sites at risk of being lost through stones. neglect, decay or deterioration. Condition is assessed as ‘very bad’, ‘poor’, ‘fair’ or It includes all types of designated heritage assets, ‘good’. The condition of buildings or structures on including Conservation Areas, which are designated the Register is typically very bad or poor, but can be and assessed by Local Planning Authorities. fair or, very occasionally, good. This reflects the fact that some buildings or structures are vulnerable The aim of the Register is to focus attention on because they are empty, underused or face those places in greatest need. Historic England, in redundancy without a new use to secure their partnership with others, is able to help tackle future. Assessing vulnerability in the case of buildings heritage at risk. We work with owners, friends in fair condition necessarily involves judgement and groups, developers and other stakeholders to find discretion. A few buildings remain on the Register in imaginative solutions for historic places and sites at good condition, having been repaired or mothballed, risk across England. but still awaiting a new use or occupancy. More information about our role, the advice and Buildings or structures are removed from the funding available, and useful publications and Register when they are fully repaired/consolidated, guidance is available on our website. and their future secured either through occupation and use, or through the adoption of appropriate Criteria for inclusion management. on the Register PLACES OF WORSHIP To be considered for inclusion on the Register, places RISK ASSESSMENTS of worship must be listed grade I, grade II* or grade II on the National Heritage List for England, and be used Heritage assets included on the Register are assessed as a public place of worship at least six times a year. according to the nature of the site. The risk assessment methodologies outlined below are based Places of worship are assessed on the basis of on factors which can threaten the different types of condition only. If a place of worship is in very bad or heritage assets and lead to them becoming at risk. poor condition, it is added to the Register. This includes places of worship which are generally in fair BUILDINGS AND STRUCTURES or good condition but have major problems with one key element, like the tower. To be considered for inclusion on the Register, buildings or structures must be: Once on the Register, places of worship can move through the condition categories (e.g. from very bad • listed on the National Heritage List for England; to poor, to fair, even good) as repairs are and implemented and the condition improves, until they • in secular (non-worship) use. are fully repaired and can be removed from the And either: Register. This means that there are some places of • a grade I or II* listed building, or worship in good condition on the Register but with • a grade II listed building in London, or outstanding issues still to be resolved at the time when • a structural scheduled monument with they were assessed. upstanding remains. ARCHAEOLOGY Buildings or structures are assessed on the basis of condition and, where applicable, occupancy (or use) To be considered for inclusion on the Register, reflecting the fact that a building which is occupied archaeological sites must be listed as scheduled is generally less vulnerable than one that is not. monuments and included on the National Heritage List for England. Occupancy (or use) is assessed as ‘vacant’, ‘part- occupied’, ‘occupied’, ‘not applicable’, or occasionally, Archaeology assessments cover scheduled ‘unknown’. earthworks and buried archaeology. III HERITAGE AT RISK 2020 / SOUTH WEST The risk assessment is based on their condition and Wreck sites are assessed based on their current vulnerability, the trend in their condition, and their condition, vulnerability and the way they are being likely future vulnerability. A site’s condition is managed. expressed in terms of the scale and severity of adverse effects on it, ranging from ‘extensive Wrecks are vulnerable to both environmental and significant problems’ to ‘minor localised problems’. human impacts. Risks that contribute to inclusion on the Register range from unauthorised access to Archaeological entries are removed from the erosion and fishing damage. The monitoring process Register once sufficient progress has been made to ensures that the significance of the site is identified address the identified issues, and a significant and maintained. In spite of the inherent difficulties in reduction in the level of risk has been demonstrated. caring for this type of site, careful management must be maintained. PARKS AND GARDENS Wrecks are removed from the Register once an To be considered for inclusion on the Register, parks appropriate management and monitoring regime and gardens must be listed as grade I, grade II* or is operational. grade II and included on the National Heritage List for England. Parks and gardens are assessed in terms of CONSERVATION AREAS condition and vulnerability. Steps being taken by owners to address problems are also taken into Once a year Historic England asks every local consideration. authority in England to consider the state of its conservation areas and fill in (and update as Parks and gardens assessed as being at risk are typically appropriate) risk assessment questionnaires for affected by development and neglect. They have those that cause concern, or are believed to no frequently been altered by development or are faced longer be at risk. with major change. The original function of these landscapes has often changed and divided ownership Conservation areas that are deteriorating, or are in leads to the loss of their cohesive historic design. very bad or poor condition and not expected to change significantly in the next three years, are Park and garden entries are removed from the defined as being at risk. Register once steps have been taken to address issues and positive progress is being made. The approach taken to assess conservation areas at risk has been refined since the first survey in 2008/2009. An BATTLEFIELDS overall category for condition, vulnerability and trend is included for each conservation area on the Heritage at To be considered for inclusion on the Register, Risk Register. Conservation areas identified as at risk in battlefields must be listed and included on the 2009, but not reassessed since using the revised National Heritage List for England. Battlefields methodology, are included on the Register but with deemed to be at risk of loss of cultural significance limited information. are included on the Register. Conservation areas are removed from the Register The principal risks and threats are: once plans have been put in place to address the • development pressure e.g. issues that led to the conservation area being at risk, encroachment of buildings; and once positive progress is being made. • pressures of particular use within the site e.g. arable cultivation; THE EFFECT OF COVID-19 ON THE • damage e.g. unregulated metal detecting. COLLECTION AND COLLATION OF Battlefields are removed from the Register either THE STATISTICS USED FOR THE 2020 when damaging activities cease/are managed, or when REGISTERS threats recede due to effective planning. The collection of this year’s data has been affected by WRECK SITES Covid-19. From the onset of ‘lockdown’ site visits were not possible for either our staff or local authority To be considered for inclusion on the Register, colleagues, meaning that the usual level of on-site wrecks must be listed and included on the National checking of existing or proposed entries on/for the Heritage List for England. Register was not possible for that period. However, desk-based assessments and updates were carried out. IV HERITAGE AT RISK 2020 / SOUTH WEST Key statistics BUILDINGS AND STRUCTURES BATTLEFIELDS • Nationally, 766 (3.4%) out of a total of 22,485 • Of the 47 registered battlefields in England, 3 grade I and II* listed buildings (excluding places of (6.4%) are on the Register. None of the 10 worship) are on the Register. In the South West registered battlefields in the South West are on the percentage is 3.0% (160 listed secular the Register. buildings). • In addition to this, of the 6,993 scheduled WRECK SITES monuments in the South West, 48 (0.7%) • Of the 54 protected wreck sites around England’s structural scheduled monuments are on the coast, 3 (5.6%) are on the Register. None of the Register. 27 protected wreck sites in the South West are on the Register. • 5 building or structure entries (including structural scheduled monuments) have been removed from the 2019 South West Register because their futures have been secured, and 18 have been CONSERVATION AREAS added.
Recommended publications
  • (Electoral Changes) Order 1999

    (Electoral Changes) Order 1999

    STATUTORY INSTRUMENTS 1999 No. 2472 LOCAL GOVERNMENT, ENGLAND The District of Torridge (Electoral Changes) Order 1999 Made ---- 6thSeptember 1999 Coming into force in accordance with article 1(2) Whereas the Local Government Commission for England, acting pursuant to section 15(4) of the Local Government Act 1992(a), has submitted to the Secretary of State a report dated January 1999 on its review of the district of Torridge together with its recommendations: And whereas the Secretary of State has decided to give effect to those recommendations: Now, therefore, the Secretary of State, in exercise of the powers conferred on him by sections 17(b) and 26 of the Local Government Act 1992, and of all other powers enabling him in that behalf, hereby makes the following Order: Citation, commencement and interpretation 1.—(1) This Order may be cited as the District of Torridge (Electoral Changes) Order 1999. (2) This Order shall come into force— (a) for the purpose of all proceedings preliminary or relating to any election to be held on 1st May 2003, on 10th October 2002; (b) for all other purposes, on 1st May 2003. (3) In this Order— ‘‘the district’’ means the district of Torridge; ‘‘existing’’, in relation to a ward, means the ward as it exists on the date this Order is made; and any reference to the map is a reference to the map prepared by the Department of the Environment, Transport and the Regions marked ‘‘Map of the District of Tor- ridge (Electoral Changes) Order 1999’’, and deposited in accordance with regulation 27 of the Local Government Changes for England Regulations 1994(c).
  • The Scale and Impact of the Farming, Food, Drink & Rural Economy In

    The Scale and Impact of the Farming, Food, Drink & Rural Economy In

    The Scale and Impact of the Farming, Food, Drink & Rural Economy in Gloucestershire The Scale and Impact of the Farming, Food, Drink & Rural Economy in Gloucestershire March 2019 the gloucestershire agrifood and rural economy final report.docx March 2019 The Scale and Impact of the Farming, Food, Drink & Rural Economy in Gloucestershire Contents Introduction ................................................................................................................................ 3 Executive Summary ................................................................................................................... 4 Gloucestershire’s Agriculture and Food Sector .......................................................................... 6 UK & Global Context .............................................................................................................. 6 The Scale of Gloucestershire Agriculture and pre Consumer Food Chain .............................. 8 The Consumer End of the Gloucestershire Food Chain .........................................................15 Non Farming Enterprises and diversification..........................................................................16 Major Companies in the Gloucestershire Agricultural, Food & Drink Sector ...........................18 The ‘End to End’ Food Chain .................................................................................................19 Gloucestershire’s Rural Economy .............................................................................................20
  • Here It Became Obvious That Hollacombe Crediton and Not Hollacombe Winkleigh Was Implied and Quite a Different Proposition

    Here It Became Obvious That Hollacombe Crediton and Not Hollacombe Winkleigh Was Implied and Quite a Different Proposition

    INTRODUCTION In 1876 Charles Worthy wrote “The History of the Manor and Church of Winkleigh”, the first and only book on Winkleigh to be published. Although this valuable little handbook contains many items of interest, not all of which fall within the range of its title, it is not a complete history and consequently fails to meet the requirements of the Devonshire Association. More than a dozen years ago a friend remarked to me that the monks of Crediton at one time used to walk to Hollacombe in order to preach at the ancient chapel of Hollacombe Barton. I was so surprised by this seemingly long trek that I made enquiries of the Devonshire Association. I was referred to the Tower Library of Crediton Church where it became obvious that Hollacombe Crediton and not Hollacombe Winkleigh was implied and quite a different proposition. Meantime the Honorary General Editor of the Parochial Section (Hugh R. Watkins Esq.) suggested that I should write a history of Winkleigh. The undertaking was accepted although it was clear that my only qualification for the task was a deep regard for the associations of the parish combined with a particularly intense love for the hamlet of Hollacombe. The result of this labour of love, produced in scanty spare time, and spread over the intervening years should be considered with these points in view. The proof of this present pudding will be measured by the ease with which the less immediately interesting parts can be assimilated by the general reader. Due care has been taken to verify all the subject matter.
  • Copyrighted Material

    Copyrighted Material

    176 Exchange (Penzance), Rail Ale Trail, 114 43, 49 Seven Stones pub (St Index Falmouth Art Gallery, Martin’s), 168 Index 101–102 Skinner’s Brewery A Foundry Gallery (Truro), 138 Abbey Gardens (Tresco), 167 (St Ives), 48 Barton Farm Museum Accommodations, 7, 167 Gallery Tresco (New (Lostwithiel), 149 in Bodmin, 95 Gimsby), 167 Beaches, 66–71, 159, 160, on Bryher, 168 Goldfish (Penzance), 49 164, 166, 167 in Bude, 98–99 Great Atlantic Gallery Beacon Farm, 81 in Falmouth, 102, 103 (St Just), 45 Beady Pool (St Agnes), 168 in Fowey, 106, 107 Hayle Gallery, 48 Bedruthan Steps, 15, 122 helpful websites, 25 Leach Pottery, 47, 49 Betjeman, Sir John, 77, 109, in Launceston, 110–111 Little Picture Gallery 118, 147 in Looe, 115 (Mousehole), 43 Bicycling, 74–75 in Lostwithiel, 119 Market House Gallery Camel Trail, 3, 15, 74, in Newquay, 122–123 (Marazion), 48 84–85, 93, 94, 126 in Padstow, 126 Newlyn Art Gallery, Cardinham Woods in Penzance, 130–131 43, 49 (Bodmin), 94 in St Ives, 135–136 Out of the Blue (Maraz- Clay Trails, 75 self-catering, 25 ion), 48 Coast-to-Coast Trail, in Truro, 139–140 Over the Moon Gallery 86–87, 138 Active-8 (Liskeard), 90 (St Just), 45 Cornish Way, 75 Airports, 165, 173 Pendeen Pottery & Gal- Mineral Tramways Amusement parks, 36–37 lery (Pendeen), 46 Coast-to-Coast, 74 Ancient Cornwall, 50–55 Penlee House Gallery & National Cycle Route, 75 Animal parks and Museum (Penzance), rentals, 75, 85, 87, sanctuaries 11, 43, 49, 129 165, 173 Cornwall Wildlife Trust, Round House & Capstan tours, 84–87 113 Gallery (Sennen Cove, Birding,
  • Get Around the North Devon Festival With

    Get Around the North Devon Festival With

    Bursting with experiences Over 150 events to enjoy Many of them free 3, 2, 1 .. it’s here Thank yo u .. After the long cold winter may only flourish briefly, North Devon Festival to our funders and supporters, without whom the festival would not be possible. the North Devon Festival is so don’t miss them. is produced by Major funder Sponsors Media supporters ready to unfurl its many Choose from over 150 blooms this June. The events North Devon Gazette assorted events including come in all shapes, sizes North Devon Journal Art Trek Open Studios , Community & Heritage and colours, some may Primary Times GoldCoast Oceanfest , Fringe Queen’s Theatre, Boutport thrive the whole month The Voice – Festival FM Theatrefest , Barnstaple Street, Barnstaple, North through, whereas others Fringe , plus music, dance, Devon, EX31 1SY We would also like to comedy, drama, community Other funders Box Office: 01271 32 42 42 extend our thanks to all & heritage, nature and northdevonfestival.org our business supporters. n c e action events, many of Barnstaple Fringe d a which are free. Brochure design by Bruce Aiken Distributed by TMS Marketing It’s all waiting to be Website designed and hosted by NetTecs experienced – so what will studio@QT you do this June? jazz t h e a t r e drama n u f d n w o r s p o k e c o m e d y 2 3 Explore online... where the information is infinite and don’t forget eNews - Stay abreast of the action and sign up today The Voice Listen out for updates on our dedicated festival radio station.
  • Community Network Member Electoral Division Organisation / Project Grant Description Grant Amount Year St Blazey, Fowey & Lo

    Community Network Member Electoral Division Organisation / Project Grant Description Grant Amount Year St Blazey, Fowey & Lo

    Community Electoral Organisation / Grant Network Member Division Project Grant Description Amount Year St Blazey, Squires Field Fowey & Fowey & Community Purchase of Lostwithiel Virr A Tywardreath Centre Storage Shed £500.00 2017-18 St Blazey, Fowey & Par & St Blazey Surf Life Saving ECO Surf life Lostwithiel Rowse J Gate Great Britain saving Champs £50.00 2017-18 St Blazey, Fowey & Fowey & Fowey Town Disabled Swing for Lostwithiel Virr A Tywardreath Council Squires Field £500.00 2017-18 St Blazey, Materials for Fowey & Fowey & Fowey Town painting of Lostwithiel Virr A Tywardreath Forum benches £257.80 2017-18 St Blazey, Contribution to Fowey & St Blazey Lantern Making Lostwithiel Giles P St Blazey Reclaimed Workshops £150.00 2017-18 St Blazey, Contribution to Fowey & Par & St Blazey St Blazey Lantern Making Lostwithiel Rowse J Gate Reclaimed Workshops £100.00 2017-18 St Blazey, Drama Express Fowey & Pantomime 2018 - Lostwithiel Giles P St Blazey Drama Express Venue Hire £200.00 2017-18 St Blazey, Fowey & Kernow Youth Lostwithiel Giles P St Blazey CIC Ice Skating Trip £150.00 2017-18 St Blazey, Fowey & PL24 Community Christmas Cheer Lostwithiel Giles P St Blazey Association 2017 £200.00 2017-18 St Blazey, Ingredients for Fowey & Keep Cornwall meals for those in Lostwithiel Giles P St Blazey Fed food poverty £200.00 2017-18 St Blazey, Fowey & Par & St Blazey Friends of Par Volunteer Group - Lostwithiel Rowse J Gate Beach Storage £300.00 2017-18 St Blazey, Purchase of Fowey & Par & St Blazey PL24 Community outdoor seating for Lostwithiel
  • 'I Should Want Nothing More': Edward Thomas and Simplicity

    'I Should Want Nothing More': Edward Thomas and Simplicity

    Journal of the British Academy, 7, 89–121. DOI https://doi.org/10.5871/jba/007.089 Posted 4 November 2019. © The British Academy 2019 ‘I should want nothing more’: Edward Thomas and simplicity Chatterton Lecture on Poetry read 1 November 2018 GUY CUTHBERTSON Abstract: In the years before the First World War, the ‘Simple Life’ became somewhat fashionable, and Edward Thomas (1878–1917) was one of those Edwardians who were attracted to simplicity, both as a way of life and as a way of writing. As a book reviewer and biographer, he greatly admired simplicity in literature (as seen in, among others, William Cobbett, W. H. Davies, J. M. Synge and Robert Frost). His prose moved towards plainness, and his poetry is beautifully simple. This simplicity has been problematic, however. His poetry is unsuited to the decoding and exegesis (which might be suited to Modernism) that universities seek to conduct. Academics studying his poetry have allowed themselves to believe that they have found complexity, hidden beneath superficial simplicity, whereas in fact Thomas is a poet of genuine bareness, clear-as-glass honesty, magical brevity and childlike simplicity. His simplicity has been popular, and seems to suit some 21st-century fashions. Keywords: the Simple Life, simplicity, complexity, Edwardians, universities, First World War, Modernism, Robert Frost, William Cobbett, J. M. Synge In the decade or so before the First World War, simplicity became somewhat fashionable—indeed it was a religion for some. This craze is captured rather wonderfully in the Edwardian hit musical The Arcadians (1909), where the central character is given the name ‘Simplicitas’, idyllic Arcady is recreated in London at a successful new health food restaurant and men are ‘keen as a knife / On the simple life’.1 Although some might want it otherwise, Edward Thomas was part of this atmos- phere.
  • RIVER TAW CATCHMENT MANAGEMENT PLAN CONSULTATION REPORT En V Ir O N M E N T Ag E N C Y

    RIVER TAW CATCHMENT MANAGEMENT PLAN CONSULTATION REPORT En V Ir O N M E N T Ag E N C Y

    NRA South West 28 RIVER TAW CATCHMENT MANAGEMENT PLAN CONSULTATION REPORT En v ir o n m e n t Ag e n c y NATIONAL LIBRARY & INFORMATION SERVICE HEAD OFFICE Rio House, Waterside Drive, Aztec West, Almondsbury, Bristol BS32 4UD NRA Copyright Waiver This report is intended to be used widely and may be quoted, copied or reproduced in any way, provided that the extracts are not quoted out of context and that due acknowledgement is given to the National Rivers Authority. Published December 1994 RIVER TAW CATCHMENT MANAGEMENT PLAN National Rivers Authority' Information Centre CONSULTATION REPORT Head Office Class No FOREWORD Accession No ... The National Rivers Authority has, since its formation in 19#9^bLUi ilu dueling lliL piULLii of catchment management. A major initiative is the commitment to produce Catchment Management Plans setting out the Authority’s vision for realising the potential of each local water environment. An important stage in the production of the plans is a period of public consultation. The NRA is keen to draw on the expertise and interest of the communities involved. Please comment, your views are important. A final plan will then be producted with an agreed action programme for the future protection and enhancement of this important catchment. The Information Centre Auth°»>y Watersidewl°"lRLvers Drive Aztec West Almondsbury Bristol BS12 4UD THE NATIONAL RIVERS AUTHORITY The NRA's mission and aims are as follows: " We will protect and improve the water environment by the effective management of water resources and by substantial reductions in pollution. We will aim to provide effective defence for people and property against flooding from rivers and the sea.
  • Ringing Round Devon

    Ringing Round Devon

    Ringing Round THE GUILD OF DEVONSHIRE RINGERS Devon Newsletter 112: December 2018 ‘to promote an environment in which ringing can flourish’. Last Sunday we witnessed what ‘flourish’ looks like – more of that, Guild Events please. Whilst it is impossible to thank all key individuals by name, I RINGING REMEMBERS would like to pay a special tribute to Vicki Chapman – Ringing Remembers Project Coordinator, Colin Chapman – Coordinator’s ‘roadie’, Alan Regin – Steward of the CCCBR Rolls of Honour, Andrew Hall – developer and administrator of the Ringing Remembers web platform, and Bruce and Eileen Butler – who linked thousands of enquirers to guilds, districts and towers. And there are so many others… My thanks go also to all those who have come to ringing through this route; may you continue to develop in skill and gain many happy years of fulfilment in your ringing. And to that widespread army of ringing teachers who have risen to the challenge of training so many enthusiastic learners – well done! Last Sunday was a day of reflection, a day of commemoration, a day of participation. Bellringers everywhere were able to say: ‘I was there – I remembered’. Christopher O’Mahony The badge issued to all new ringers who registered in time Photo by Lesley Oates Note from our Guild President I think all of our members deserve to be congratulated on the ‘WE REMEMBERED’ – A MESSAGE FROM THE fantastic number of towers in Devon which were heard ringing for PRESIDENT OF THE CENTRAL COUNCIL OF the Armistice on Sunday. Much has been shared on social media CHURCH BELL RINGERS.
  • Higher Nansloe Farm Helston Cornwall

    Higher Nansloe Farm Helston Cornwall

    Higher Nansloe Farm Helston Cornwall Post-Excavation Assessment and Updated Project Design for Coastline Design and Build Ltd CA Project: 889011 CA Report: 18038 May 2019 Higher Nansloe Farm Helston Cornwall Post-Excavation Assessment and Updated Project Design CA Project: 889011 CA Report: 18038 Jonathan Orellana, Project Officer prepared by and Jonathan Hart, Senior Publications Officer date 8 May 2019 checked by Jonathan Hart, Senior Publications Officer date 8 May 2019 approved by Karen Walker, Principal Post-Excavation Manager signed 08/05/2019 date issue 01 This report is confidential to the client. Cotswold Archaeology accepts no responsibility or liability to any third party to whom this report, or any part of it, is made known. Any such party relies upon this report entirely at their own risk. No part of this report may be reproduced by any means without permission. 1 Higher Nansloe Farm, Helston, Cornwall: Post-Excavation Assessment and Updated Project Design © Cotswold Archaeology CONTENTS SUMMARY ....................................................................................................................................... 4 1 INTRODUCTION ............................................................................................................... 5 2 AIMS AND OBJECTIVES .................................................................................................. 7 3 METHODOLOGY .............................................................................................................. 8 4 RESULTS .........................................................................................................................
  • Painswick to Winchcombe Cycle Route

    Painswick to Winchcombe Cycle Route

    Great Comberton A4184 Elmley Castle B4035 Netherton B4632 B4081 Hinton on the Green Kersoe A38 CHIPPING CAMPDEN A46(T) Aston Somerville Uckinghall Broadway Ashton under Hill Kemerton A438 (T) M50 B4081 Wormington B4479 Laverton B4080 Beckford Blockley Ashchurch B4078 for Tewkesbury Bushley B4079 Great Washbourne Stanton A38 A38 Key to Map A417 TEWKESBURY A438 Alderton Snowshill Day A438 Bourton-on-the-Hill Symbols: B4079 A44 At a Glance M5 Teddington B4632 4 Stanway M50 B4208 Dymock Painswick to WinchcombeA424 Linkend Oxenton Didbrook A435 PH A hilly route from start to A Road Dixton Gretton Cutsdean Hailes B Road Kempley Deerhurst PH finish taking you through the Corse Ford 6 At fork TL SP BRIMPSFIELD. B4213 B4211 B4213 PH Gotherington Minor Road Tredington WINCHCOMBE Farmcote rolling Cotswold hills and Tirley PH 7 At T junctionB4077 TL SP BIRDLIP/CHELTENHAM. Botloe’s Green Apperley 6 7 8 9 10 Condicote Motorway Bishop’s Cleeve PH Several capturing the essence of Temple8 GuitingTR SP CIRENCESTER. Hardwicke 22 Lower Apperley Built-up Area Upleadon Haseld Coombe Hill the Cotswold countryside. Kineton9 Speed aware – Steep descent on narrow B4221 River Severn Orchard Nook PH Roundabouts A417 Gorsley A417 21 lane. Beware of oncoming traffic. The route follows mainly Newent A436 Kilcot A4091 Southam Barton Hartpury Ashleworth Boddington 10 At T junction TL. Lower Swell quiet lanes, and has some Railway Stations B4224 PH Guiting Power PH Charlton Abbots PH11 Cross over A 435 road SP UPPER COBERLEY. strenuous climbs and steep B4216 Prestbury Railway Lines Highleadon Extreme Care crossing A435. Aston Crews Staverton Hawling PH Upper Slaughter descents.
  • Environment Agency South West Region

    Environment Agency South West Region

    ENVIRONMENT AGENCY SOUTH WEST REGION 1997 ANNUAL HYDROMETRIC REPORT Environment Agency Manley House, Kestrel Way Sowton Industrial Estate Exeter EX2 7LQ Tel 01392 444000 Fax 01392 444238 GTN 7-24-X 1000 Foreword The 1997 Hydrometric Report is the third document of its kind to be produced since the formation of the Environment Agency (South West Region) from the National Rivers Authority, Her Majesty Inspectorate of Pollution and Waste Regulation Authorities. The document is the fourth in a series of reports produced on an annua! basis when all available data for the year has been archived. The principal purpose of the report is to increase the awareness of the hydrometry within the South West Region through listing the current and historic hydrometric networks, key hydrometric staff contacts, what data is available and the reporting options available to users. If you have any comments regarding the content or format of this report then please direct these to the Regional Hydrometric Section at Exeter. A questionnaire is attached to collate your views on the annual hydrometric report. Your time in filling in the questionnaire is appreciated. ENVIRONMENT AGENCY Contents Page number 1.1 Introduction.............................. .................................................... ........-................1 1.2 Hydrometric staff contacts.................................................................................. 2 1.3 South West Region hydrometric network overview......................................3 2.1 Hydrological summary: overview