YOUR CITY WASTEWATER SERVICE FEES AT WORK IN YOUR NEIGHBORHOOD

Z18B and Avalon Boulevard Sewer Rehabilitation Project

Project Background The City of Los Angeles Department of Public Works will soon begin construction of a sewer project in your neighborhood. The project will include a number of improvements that will make your sewers more reliable for decades to come.

The project will prevent additional structural deterioration to sewer pipelines. These sewers are important because they carry wastewater to the Hyperion Water Reclamation Plant in Playa del Rey, where the wastewater is treated to a high quality before being released into the Santa Monica Bay.

Quick Facts Living with Construction______

• Scheduled Start: Fall 2016 • Weather or other circumstances could • Dust control will be provided in all project shift the work schedule. Neighbors will be areas. • Scheduled End: Spring 2018 informed as conditions warrant. • For public safety, enclosures or other barriers • The project area is bounded by • Construction will generally take place Monday will be used in construction areas wherever - 107th Street on the north, through Friday, from 7:00 a.m. until 4:00 necessary. p.m., and on major streets from 9:00 a.m. - on the • Flaggers will be used where traffic is south, until 3:30 p.m. to minimize traffic impacts. impacted. Night work, if required, will occur between - on the west, and 9:00 p.m. and 6:00 a.m. • Trash pickup, deliveries, access to businesses - on the east and residential driveways will be maintained. • In order to minimize disruption on your • Construction Cost: $1.6 million street, most of the construction work at most • Parking may be temporarily restricted in some areas, and signs will be posted in advance • Pipeline Length: 4.9 miles locations will be completed in about 5-10 business days. with details. Information______• Trucks and other equipment such as pipes • You will be notified 24-48 hours in advance will be used during construction, and you whenever sewer services may be temporarily If you have any questions about this interrupted. project, please call the City of Los Angeles may see open trench excavation and debris removal. Public Affairs Office at (213) 978-0333. You can also visit san.lacity.org > What We Do > Clean Water > Sewers > Construction and Capital Improvement Projects.

See construction map on back Z18B Imperial Highway and Avalon Boulevard Sewer Rehabilitation Project

T T

E SANT ST Y

E AAV A AN BL OR

K R

TH B 108THH ST VD NORGRAPE ST

108TH ST HICK OR OR 109TH ST TH

YY H

S

T E AV A 109TH ST

ADSWOR

WA E AV AND ST

S

R

D

WW NG JUNIPER ST

ORD

.

AD 110TH ST

ON

O

T

A

N

VD P 110TH ST WEIG

SPRING ST MAIN ST

ANF

BRO 111TH ST

SST

111TH PL M ON BL 111TH11 DR 111TH PL

E AV A LO 112TH ST WILMING

E AV 112TH ST 112TH ST 112TH ST

L AAVA

T WNEW 113TH ST 110 FWY 113TH ST

TO T

O

E AV AV 114TH ST

IMPERIALM HWY CENTRAL

E

TH T

E

E AAV

P

115TH ST E AV 115THH ST

S

AN PEDRO ST A W

ORORD

S 116TH ST VIS

O O

N

ADSWOR A

ANF

CL

W

ST 105 FWY 118TH ST

Y

VEN ST 118TH PL VE

WA NG S 118TH DR

DW

L

AD 119TH ST

O

SPRING ST BELHA S B = SEWER REPAIR

BRO 120TH ST

As a covered entity under Title II of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on the basis of disability and, upon request, will provide reasonable accommodation to ensure equal access to its programs, services, and activities.