SAUDI RAILWAY COMPANY Bashar Almalik, Ph.D
Total Page:16
File Type:pdf, Size:1020Kb
SAUDI RAILWAY COMPANY Bashar AlMalik, Ph.D. CEO Milestones a royal decree SAR started named SAR as the transpor- Launch of the infra tation of Haramain owner of all Phosphate High-Speed Saudi Arabian minerals train - rail projects Passenger 2006 2015 between cities 2017 service 2019 The Council of 2011 started the 2016 Launch of 2018 Council of Ministers had transportation Passenger Ministers approved the of Bauxite Service resolution to licensing of Saudi minerals transfer of all Railway Compa- operational ny (SAR) that is and fixed wholly owned by assets of rail the Public Invest- transport ment Fund projects between the Kingdom's cities SAR Existing Network WAS (MGA) MAJOR NETWORK QURAYAT 3 HAZEM AL JALAMID North – East - HHR (PHOSPHATE) ALBUSYTA ALJAWF 5,590KM RAS ALKHAIR , HAIL AL BA ITHA (BAUXITE) JUBAIL WASIT ALQASIM (MS) DAMMAM MINES SUDAIR BUQAYQ 2 ALMAJMAAH HOFUF MEDINA PASSENGER RIYADH HARADH 15 STATIONS KAEC JEDDAH MAKKAH SAUDI ARABIA 2 PORTS 9 YARDS North Line Freight Station WORKSHOPS East Line Passenger & Freight Station 7 MAINTENANCE HHR Minerals Station Lines of Services MINERALS PASSENGERS FREIGHTS Passenger NORTH EASTERN HHR The length of the network is The length of the network is The length of the network is 1,250KM 733 KM 449 KM 6STATIONS 4 STATIONS 5 STATIONS RIYADH DAMMAM MAKKAH ALMAJMA’AH BUQAYQ JEDDAH CENTRAL QASSIM HAFOUF KING ABDULAZIZ AIRPORT HAIL RIYADH KAEC AL-JOUF MADINAH QURAYYATT Freight 480 TEU per train 480 = single tuck trips The length of the line is ﺟﺪة King Abdulaziz Port 556KM Total TEUs Delivered in 2017 325,000 Riyadh Dry Port TEU Transporting Freight through 2 stations By 2030 reach a ceiling of 1.1 million standard containers (TEUs) of cargo 1.1 million Minerals MINERAL RAIL LENGTH: 1,550 KM TYPES OF MINERALS - PHOSPHATE - BAUXITE - MOLTEN SULPHUR - PHOSPORIC ACID TOTAL ANNUAL TRANSPORT 10Million tons ONE TRAIN IS CAPABLE TO DELIVER MORE THAN 16,000 800,000 tons single truck trips ONE OF THE LONGEST TRAINS IN THE WORLD 3KM IN LENGTH SAR’S HHR ONE OF THE TOP 10 HIGHEST SPEED TRAINS LARGEST ETCS L2 MIXED TRATTIC NETORK 2400KM Future Plan Saudi Landbridge Is a Project to Link The Western Region at The Red Sea With The Eastern Region at The Arabian Gulf Configuration Length 1000 KM Non-Electrified RAS AL KHAIR Configuration TONS AXLE JUBAIL 32.4 LOAD DAMMAM RIYADH Volume and Investment Needs (Preliminary) MADINAH FREIGHT: Volume KAP 50-70 mn MT/year JEDDAH MAKKAH Capex 40-50BN SAR Timeline 7-8 Years Yanbu-KAP Link The Project Will Connect Industrial City of Yanbu With KAP as Part of The Western Rail Freight Corridor Configuration Length 200 KM Non-Electrified RAS AL KHAIR Configuration TONS AXLE LOAD 32.4 DAMMAM RIYADH MADINAH Volume and Investment Needs (Preliminary) YANBU Volume Passenger: 0.1mn pax/year KAP Containers: 2.8mn TEUs/year JEDDAH MAKKAH Capex 2-6BN SAR Timeline 4-5 Years Riyadh-Riyadh Link ( CTW410 ) Key Project to Connect The Existing North-South Railway and Riyadh - Dammam Networks Configuration • Connects North and East networks in Riyadh Length 40 KM Double Configuration Non-Electrified •32.4 Tons Axle Load Speed •Passenger: 200KM/H •General Freight: 120KM/H •Heavy Freight: 80KM/H Volume and Investment Needs (Preliminary) Capex 0.5-0.7BN SAR Timeline 3-4 Years GCC Project GCC Network will connect UAE, Salwa, Bahrain and Kuwait countries through the eastern area of KSA. GCC Project will Link with NSR (Jubail – Dammam) and Dammam – Riyadh network. Configuration Length 663 KM KHAFJI RAS AL KHAIR AL JUBAIL DAMMAM Passenger HALF MOON BAY Hafuf Services SALWA Fright BATHA Haradh Master Plan Thank You For any inquiries Please contact us on the following: Email: [email protected].