ADB Asian Development Bank GRA Grievances Redressal Authority AfDB African Development Bank FR Feasibility Report AIBP Accelerated Irrigation Benefits FRL Full Reservoir Level Programme GSI Geological Survey of AR Artificial Recharge Ha Hectare BB Brahmaputra Board HAD Hydrological Design Aid BCB Bansagar Control Board HE Hydro-electric BIS Bureau of Indian Standards HIS Hydrological Information System BRB Betwa River Board HP Hydrology Project CADWM Command Area Development & HPC High Performance Concrete Water Management CCA Culturable Command Area IBRD International Bank of Reconstruction and Development CEA Central Electricity Authority IDS Infrastructure Development Scheme CGWB Central Ground Water Board IEC Information, Education and Ch Chainage Communication CLA Central Loan Assistance IGNTU Indira Gandhi National Tribal CMC Cauvery Monitoring Committee University IMD India Meteorological Department CRA Cauvery River Authority IMTI Irrigation Management Training CSMRS Central Soil & Materials Research Institute Station INCGE Indian National Committee on cumec cubic metre per sec CM Geotechnical Engineering and cusec cubic foot per sec Construction Materials CWC Central Water Commission INCGW Indian National Committee on Ground CWPRS Central Water & Power Research Water Station INCH Indian National Committee on CWDT Cauvery Water Disputes Tribunal Hydraulic Research DBE Design Basic Earthquake INCID Indian National Committee on Irrigation and Drainage DPR Detailed Project Report INCOH Indian National Committee on DRIP Rehabilitation and Improvement Hydrology Project ISRO Indian Space Research Organisation DSARP Dam Safety Assurance and ISRWD Inter-State River Water Disputes Rehabilitation Project DSS Decision Support System JBIC Japan Bank for International Cooperation EFC Expenditure Finance Committee JCWR Joint Committee on Water Resources ERM Extension, Renovation and JET Joint Expert Team Modernization EW Exploratory Well JGE Joint Group of Experts FBP Farakka Barrage Project JRC Joint Rivers Commission FPARP Farmers’ Participatory Action KHLC Koshi High level Committee Research Programme KWDT Krishna Water Disputes Tribunal FMP Flood Management Programme m Meter GFCC Ganga Flood Control Committee M & M Major and Medium GHLSC Gandak High Level Standing Mha million hectares Committee MI Minor Irrigation

i

MoU Memorandum of Understanding Yojana MoEF Ministry of Environment & Forest PSC Permanent Standing Committee MoWR,RD Ministry of Water Resources, River PZ Piezometer &GR Development and Ganga Rejuvenation R&R Rehabilitation and Resettlement MPPGCL Madhya Pradesh Power Generation RFD Results Framework Document Corporation Ltd. NAPCC National Action Plan on Climate RMIS Rationalisation of Minor Irrigation Change Statistics NASC National Agriculture Science Centre ROS Reservoir operation system NCA Narmada Control Authority RRR Repair, Renovation and Restoration NCMP National Common Minimum RRSSC Regional Remote Sensing Service Programme Centre NCSDP National Committee on Seismic RTDAS Real Time Data Acquisition System Design Parameters RTSF Research Technology Support Facility NEEPCO North Eastern Electric Power SAC Standing Advisory Committee Corporation Limited SCEC Sub Committee on Embankment NeGP National e- Governance Plan Construction NERIWALM North Eastern Regional Institute of SFRC Steel Fibre Reinforced concrete Water and Land Management SS State Sector NGRI National Geophysical Research Institute SSCAC Sardar Sarovar Construction Advisory NHDC Narmada Hydro-electric Development Committee Corporation SSP Sardar Sarovar Project NLC Neyveli Lignite Corporation Limited SW Surface Water NLPMC National Level Programme Monitoring TAC Technical Advisory Committee Committee TAMC Technical Assistance and Management NLSC National Level Steering Committee Consultancy NPCC National Projects Construction TB Tungabhadra Board Corporation Ltd Th. Thousand NPP National Perspective Plan TOR Terms of Reference NRLD National Register of Large UYRB Upper Yamuna River Board NWDT Narmada Water Disputes Tribunal VWDT Vansadhara Water Dispute Tribunal NWM National Water Mission WALMI Water and Land Management Institute NRSC National Remote Sensing Centre WAPC Water and Power Consultancy NWDA National Water Development OS Services (India) Ltd. Authority WB World Bank OFD On Farm Development WEGWIS Web Enabled Ground Water ONGC Oil and Natural Gas Corporation Information System OW Observatory Well WQAA Water Quality Assessment Authority PAC Project Advisory Committee WRIS Water Resources Information System PAF Project Affected Families WUA Water User Association PDS Purpose Driven Studies WUE Water Use Efficiency PIM Participatory Irrigation Management PMKSY Pradahan Mantri Krishi Sinchai

ii

CONTENTS

SECTIONS: PAGE NO.

1. OVERVIEW 1 2. NATIONAL WATER POLICY 15 3. MAJOR PROGRAMMES 21 4. INTER-STATE RIVER ISSUES 59 5. INTERNATIONAL CO-OPERATION 65 6. EXTERNAL ASSISTANCE IN WATER RESOURCES SECTOR 69 7. ORGANISATIONS AND INSTITUTIONS 73 8. PUBLIC SECTOR ENTERPRISES 143 9. INITIATIVES IN NORTH EAST 161 10 ADMINISTRATION TRAINING AND GOVERNANACE 165 11. TRANSPARENCY 167 12. ROLE OF WOMEN IN WATER RESOURCES MANAGEMENT 169 13. PROGRESSIVE USE OF HINDI 171 14. STAFF WELFARE 175 15. VIGILANCE 179 16. APPOINTMENT OF PERSONS OF SPECIAL NEEDS 181

ANNEXURES: I ORGANIZATIONAL CHART OF MOWR, RD &GR II STAFF IN POSITION IN MOWR, RD & GR AS ON 31.12.2016 III LIST OF NAMES & ADDRESSES OF SENIOR OFFICERS & HEADS OF ORGANISATIONS UNDER THE MINISTRY OF WR, RD & GR IV BE, RE & ACTUAL EXPENDITURE UNDER PLAN SCHEMES DURING 2015-16 & 2016-17 V BUDGET AT A GLANCE (SECTOR-WISE) VI LIST OF CENTRAL PUBLIC INFORMATION OFFICERS / APPELLATE AUTHORITIES IN THE MINISTRY

iii

ANNEXURES: VII THE ESTIMATED FUND REQUIREMENT (CENTRAL ASSISTANCE AS WELL AS STATE SHARE) FOR COMPLETION OF 99 PROJECTS VIII STATE WISE SUMMARY OF NUMBER OF PROJECTS, THEIR ESTIMATED BALANCE COST, ADMISSIBLE CENTRAL ASSISTANCE AND TARGETED POTENTIAL UTILIZATION OF 99 PROJECTS IX COMPLETION OF PRIORITY PROJECTS DURING 2016-17 X CA RELEASED DURING 2016-17 UNDER AIBP XI STATE-WISE FUNDS RELEASED UNDER "FLOOD MANAGEMENT PROGRAMME" DURING XI AND XII PLANS TILL 31.12.2016 XII STATE-WISE DETAILS OF WORKS COMPLETED AND AREA PROTECTED UNDER FLOOD MANAGEMENT PROGRAMME DURING XITH PLAN

iv

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

vii

1. Overview

Our country is endowed with a rich The Ministry has also been and vast diversity of natural resources, allocated the subject of regulation and water being the most precious of them. development of inter-State rivers, Water security, water management and its implementation of awards of Tribunals, development is of immense importance in water quality assessment, bilateral and all walks of human life and also for all external assistance and co-operation living beings. Integrated water programmes in the field of water resources management is essential for environmental and matters relating to rivers common to sustenance, sustainable economic India and neighbouring countries. development of the country and for bettering human life through poverty The above-mentioned functions of reduction. the Ministry are performed through its two attached offices (Central Water The Ministry of Water Resources, Commission and Central Soil and River Development and Ganga Materials Research Station); seven sub- Rejuvenation (MoWR,RD&GR), ordinate offices (Central Ground Water Government of India, is responsible for Board, Central Water and Power Research conservation, management and Station, Ganga Flood Control development of water as a national Commission, Farakka Barrage Project, resource; overall national perspective of Sardar Sarovar Construction Advisory water planning and coordination in relation Committee, Bansagar Control Board and to diverse uses of water; general policy, Upper Yamuna River Board); six statutory technical assistance, research and bodies (Brahmaputra Board, Narmada development, training and matters relating Control Authority, Betwa River Board, to irrigation and multi-purpose projects, Tungabhadra Board, ground water management; conjunctive Management Board, and Krishna River use of surface and ground water, command Management Board); four autonomous area development, flood management societies/body (National Water including drainage, flood-proofing, water Development Agency, National Institute of logging, sea erosion and dam safety. Hydrology, North-Eastern Regional Institute of Water & Land Management, Twelve wings of the Ministry are as below: and National Ganga River Basin Authority); and two public sector enterprises (WAPCOS Limited and National Projects Construction Corporation Limited ).

The Ministry is headed by Hon‟ble Union Minister for Water Resources, River Development and Ganga Rejuvenation - Sushri Uma Bharti. Sushri

Uma Bharti took over the charge of the Ministry on 26th May, 2014. On 5th July

2016 two Ministers of State, viz. Shri Ganga Conservation Mission namely Vijay Goel and Dr. Sanjeev Kumar “Namami Gange” with an allocation of Rs. Balyan, also assumed their charges in the 2037 crore (Rs 1500 crore for Namami Ministry. Shri Shashi Shekhar was Gange and Rs. 355 crore for on-going Secretary of the Ministry w.e.f 5th June, NGRBA projects, 100 crore for project in 2015 and continued till 31st December the tributaries including river Yamuna and 2016. Dr. Amarjit Singh, working as Rs. 82 crore for National River Special Secretary/ Officer on Special Duty Conservation Programme). The work of in the Ministry, took over as Secretary rejuvenation of river Ganga and its w.e.f. 1st January, 2017. The tributaries has been transferred with effect organizational chart of the Ministry is at from 01.08.2014 to the Ministry of Water Annexure-I. The staff strength of the Resources, River Development and Ganga Ministry is at Annexure-II. A list of Rejuvenation. Heads of Organizations under the Ministry is at Annexure-III. “Namami Gange” approaches Ganga Rejuvenation by consolidating the existing MAJOR INITIATIVES ongoing efforts. Namami Gange focuses on cleaning of river Ganga in short term; it also has a comprehensive vision with seven main NATIONAL GANGA RIVER BASIN thrust areas as below: AUTHORITY (NGRBA) As per the approval of the Cabinet Committee on Economic Affairs (CCEA), the mandate of NGRBA is being implemented by the National Mission for Clean Ganga (NMCG). At national level NMCG is the coordinating body and is being supported by States-Level Program Management Groups (SPMGs) of UP, Uttarakhand, Bihar and West Bengal which, are also registered as societies under Societies Registration Act, 1860 and a dedicated Nodal Cell in Jharkhand. As th per the 306 amendment of the Capacity Building Cabinet approved the Namami Gange Public Outreach Government of India (Allocation of th Business) Rules, 1961 both NGRBA and program on 13 May, 2015 as a NMCG are allocated to the Ministry of comprehensive approach to rejuvenate the Water Resources, River Development & river Ganga and all tributaries under one Ganga Rejuvenation. umbrella. A comprehensive action plan for future has been finalized by the NGRBA th th The functions of National Ganga in its 4 meeting held on 27 October, 2014 based on the recommendations made River Basin Authority include th development of Ganga River Basin by the Group of Secretaries (GoS) on 28 Management Plan, regulation of activities August, 2014. The EFC proposal for aimed at prevention, control and „Namami Gange‟ was appraised by the abatement of pollution, to maintain water EFC chaired by the Secretary quality and to take measures relevant to (Expenditure) on 30.12.2014 and was the river ecology in Ganga basin states. recommended for an indicative cost of Rs. 20,000 crore. „Namami Gange‟ would also The Union Budget 2014-15 be covering river Yamuna as a major provided for setting up an Integrated tributary of river Ganga.

2

Flood Management were held. During this SPECIAL COMMITTEE ON “INTER- one day event extensive consultations were LINKING OF RIVERS” held among different stakeholders on The Ministry of Water Resources, several important and critical areas in the RD and GR has constituted a committee, water sector like River Basin Approach for named Special Committee on Interlinking Sustainable Development, Ground Water of Rivers (ILR) on 23rd September, Management, Water Security, Water 2014.The 8th meeting of the Special Management, Coordination between Committee, chaired by Sushri Uma Bharti, Centre and States, water conservation Hon‟ble Union Minister (WR, RD & GR) Innovation in Water Governance etc. was held on 8th February, 2016 in New Delhi. State Irrigation Ministers and MAJOR ACHIEVEMENTS UNDER Principal Secretaries/Secretaries of STATE SECTOR SCHEMES Irrigation/Water Resources Department of various States attend these meetings. After Under Accelerated Irrigation the first meeting itself it was decided to Benefits Programme, the State constitute four specific sub-committees: (i) Governments have been provided an Sub-committee for comprehensive amount of Rs. 58503.70crore as evaluation of various studies/reports; (ii) CLA/Grant under AIBP (MMI) since its Sub-committee for system studies for inception till March 2016-17. After identifications of most appropriate commencement of this Programme, 143 alternate plan; (iii) Sub-committee for major/medium irrigation projects have consensus building through negotiations been completed and 5 were foreclosed out and arriving at agreement between of 297 projects taken up under the concerned States; and (iv) Sub-committee programme so far. The irrigation potential for restructuring of National Water of 85.54 lakh hectare has been created Development Agency. Details of meeting through major/medium AIBP projects. of sub committees etc. is highlighted under the head NWDA in Chapter 7. During 2016-17, Central Assistance (CA) of Rs.3308 crore has been provided to various projects under AIBP.

Further, 16 projects have been included in the scheme of National Projects. Four projects, namely, Gosikhurd project of Maharashtra, Shahpurkandi project of Punjab, Teesta Barrage project of West Bengal, Saryu Nahar Pariyojana of Uttar Pradesh and Polavaram project of Andhra „JalManthan -3‟ at VigyanBhawan on 13.01.2017 Pradesh have been funded under the scheme of National Projects. Gosikhurd JAL MANTHAN -3 and Shahpurkandi projects have been Jal Manthan-3 was organized on provided grant amounting to th 13 January, 2017 at Vigyan Bhawan, Rs.2987.94crore and Rs.26.04 crore New Delhi. During the event, discussions respectively. Teesta Barrage project started on Implementation of PMKSY & receiving funding under the scheme of Improvement of Water Use Efficiency, National Projects during 2010-11 and Ecology Improvement, Participatory grant amounting to Rs.178.20 crore has Irrigation Management, River Basin been provided for the Management, River Rejuvenation and

3 project.SaryuNaharPariyojana of Uttar So far CA of Rs.562.469 crore under AIBP Pradesh started and Rs. 3364.16 crore under scheme of National project including Rs.2514 crore during 2016-17 has been provided for this project.

Further details of AIBP and National Projects are given at Chapter 3.

MAIN POLICY CHANGES IN AIBP

A Committee was constituted under Minister (WR), Chhattisgarh to prioritize the AIBP projects which can be funding under the scheme of National completed by 2019-20. In consultation Projects during 2012-13 and an amount of with States, the Committee identified 99 Rs.1221.60crore has been released. The such projects. The Government has scheme of National Project has been approved the funding of balance cost of approved for continuation and these projects amounting to about Rs. implementation in 12th Plan by Cabinet 775.95 crore including CDA&WM works Committee on Economic Affairs on through NABARD (both Central and State 12.09.2013 with proposed outlay of share). Further, cost for providing CA, Rs.8150.00 crore under the ambit of AIBP. escalation of 20% has been allowed on approved cost of project as on 1.4.2012. POLAVARAM PROJECT Further, a Mission has been established in AUTHORITY this Ministry to ensure completion of these projects. Further, a Council headed by Indira Sagar (Polavaram) project is located CEO, NITI Aayog has also been on river Godavari near Ramayyapet village established to look after overall of Polavaram Mandal of West Godavari implementation of the projects. district in Andhra Pradesh. The project is multipurpose major terminal reservoir COMMAND AREA DEVELOPMENT project on river Godavari for development AND WATER MANAGEMENT of Irrigation, Hydropower and drinking PROGRAMME (CAD&WM) water facilities to East Godavari, Vishakhapatnam, West Godavari and Krishna districts of Andhra Pradesh. Under the CAD&WM programme, initially, 60 major and medium irrigation The project will provide irrigation to 2.91 projects were taken up under the CAD Lakh Hectares(CCA) and hydropower Programme, covering a Culturable with installed capacity of 960 MW apart Command Area (CCA) of about 15 million from 23.44 TMC (663.7 MCM) drinking hectares. After inclusion of new projects, and industrial water supply to deletion of completed projects and Vishakhapatnam township and steel plant clubbing of some projects, about 150 and diversion of 80 TMC waters to river projects were under implementation in the th Krishna. In addition, 540 villages will also beginning of 12 Plan. The Programme be provided with drinking water facilities was restructured and renamed as in the command area. Command Area Development and Water Management (CAD&WM) Programme w.e.f. 1-4-2004. The Programme is being

4 implemented as a State Sector Scheme from 2008-09 onwards and is being implemented pari-passu with Accelerated Irrigation Benefits Programme (AIBP) during the 12thFive Year Plan.

The core components of physical works under CAD&WM relates to construction of field channels. Since its inception in 1974-75 up to March, 2014, CCA of about 20.8 Mha has been covered. Central Assistance of about Rs.5753crore has been Wardha Project (Maharashtra) released to States under the CAD Programme since its inception in 1974-75 REPAIR, RENOVATION & up to March, 2014. An amount of Rs RESTORATION OF WATER BODIES 691.74 crore has been released during (RRR) 2016-17as Central Assistance under Under the scheme, a total of 1354 PMKSY (HKKP). Details are in chapter 3. water bodies have been taken up for restoration during XII Plan, out of which PARTICIPATORY IRRIGATION 464 water bodies have been completed. MANAGEMENT (PIM) Central grant amounting to Rs. 264.67 crore has been released to the States for National Water Policy stresses completion of works on these water participatory approach in water resources bodies. management. It has been recognized that participation of beneficiaries will help SURFACE MINOR IRRIGATION greatly in the optimal upkeep of irrigation (SMI) SCHEME system and effective utilization of irrigation water. The participation of During XII Plan, 3348 SMI schemes have farmers in the management of irrigation been taken up under the programme out of would include transfer responsibility for which 1327 schemes have been reported to operation & maintenance and also be completed. CA of Rs.3327.9 crore has collection of water charges to the Water been released for these schemes out of Users‟ Association in their respective which an amount of Rs.140.9 crore was jurisdiction with effect from 2008-09. One released during 2016-17. time functional grant @Rs.1200/- per hectare to be shared by the Centre, State PRADHAN MANTRI KRISHI and Farmers in the ratio of 45:45:10 SINCHAI YOJANA (PMKSY) respectively is being paid to outlet level PMKSY is introduced in 2015-16 Water Users Associations‟ as incentive, with basic programme to focus on faster the interest from which is to be used for completion of ongoing Major and Medium maintenance. Other details of WUA is irrigation including National Project with given in Chapter 3. sub-components PMKSY AIBP, Har Khet ko Pani), Water shed development and Per Drop More Crop.

MAJOR ACHIEVEMENTS UNDER CENTRAL SECTOR SCHEMES

FLOOD FORECASTING

5

Flood Forecasting - In order to area and provided reasonable protection to enable the local administration to take 2.589 lakh ha of new flood prone area. The suitable administrative measures like Government of India has approved evacuation of people from flood affected continuation of Flood Management areas to safe relocations during flood Programme during XII Plan with an outlay season and also to enable the project of Rs. 10,000 crore. During Xll Plan, the authorities in proper operation of central assistance of Rs. 1307.07 crore has reservoirs, the activity of flood forecasting been released, which includes Rs.149.99 in India is performed by Central Water crore up to 31.12.2016 to States under Commission (CWC) on major rivers and Flood Management Programme. their important tributaries. For this purpose, CWC issues flood forecasts at HYDROLOGY PROJECT 199 stations (151 Level forecasting, 48 Phases of Hydrology Project (HP) were inflow forecasting) in the implemented only in 13 States. This has country. CWC has started three days resulted in a sectoral divide amongst the advisory forecast at some of the locations HP and non-HP States in terms of using rainfall-runoff modeling and rainfall equipment, technology, applications and forecast to give adequate lead time to the capacity building which have a direct disaster managers for preparedness. impact on water resources planning, development and management. Details are The forecasts issued by CWC prove to be in Chapter 3. very useful in saving life and public properties as a result of timely action by RESEARCH AND DEVELOPMENT the authorities.CWC has been making Under Indian National Committee continuous endeavour for modernization on Surface Water (INCSW), there are 75 and expansion of its flood forecasting research schemes under implementation, network in order to have desired automatic funded by the Ministry. Expenditure till system of data collection and real time December, 2016 was Rs. 26.82 crore data transmission. So far, 502 data against allocation of Rs. 55.50 collection stations have been modernized, crore(B.E.)/35.0 crore (R.E.). three Earth receiving Stations have been set up at New Delhi, Jaipur and Burla, 21 INFORMATION, EDUCATION AND Modeling Centers have been equipped COMMUNICATION with latest computer systems for analysis Ministry of Water Resources, River of data, flood forecast formulation and its Development and Ganga Rejuvenation had dissemination to concerned agencies erected a pavilion in Hall No.7-E in the expeditiously. For activities of flood 36th Edition of India International Trade forecasting, modernization and expansion Fair organized by ITPO in Pragati Maidan in Xll plan, a proposal amounting to Rs. from 14th to 27th November, 2016. The 281.0 crore is approved. pavilion was carrying different exhibitory materials viz. Physical models of various FLOOD MANAGEMENT projects/activities, banners, posters etc. PROGRAMME depicting various activities, programmes Under this Programme, a total of and Projects undertaken by the ten 420 works were approved for XII Five organizations under MoWR, RD and GR. Year Plan, out of which 252 works were A quiz and pantomime show was physically completed and the Central organized in the pavilion to make the Assistance of Rs. 3566 crore was released masses aware regarding water during XI Plan. The completed works have conservation and various aspects of water. restored 17.004 lakh ha of old flood prone

6

The theme of the pavilion for the year was: With the successful “Pradhan Mantri Krishi Sinchayee accomplishment of time specific anti- Yojana” (PMKSY) with sub-components erosion and bank protection works in consisting of Accelerated Irrigation critical reaches on river Ganga / Padma, Benefit Programme (AIBP), Har Khet Ko FBP authority has been able to ensure the Pani, More Crop Per Drop, Watershed safety of Farakka Barrage besides development. providing reasonable protection from floods to lives and livelihood of local people in the region. Apart from above, Farakka Barrage Project is facilitating implementation of India-Bangladesh Ganga Water Treaty -1996 on sharing of Ganga water between India and Bangladesh.

Central Model installed at MoWR pavilion, IITF 2016, PragatiMaidan, New Delhi

INFRASTRUCTURE DEVELOPMENT Infrastructure Development (ID) Scheme has been approved by the Government by merging four continuing Interaction with Farmers, Upper Tunga Project schemes viz. (i) Land & Building and (Karnataka) Information Technology Plan of Central Ground Water Board (CGWB), (ii) Land NATIONAL WATER MISSION & Building of Central Water Commission The Government of India launched (CWC). (iii) Information Technology National Action Plan on Climate Change Development Plan of Ministry of Water (NAPCC) which inter-alia identified the Resources, River Development and Ganga approach to be adopted to meet the Rejuvenation and (iv) e-Governance of the challenges of impact of climate change Ministry of Water Resources, River through eight National Missions including Development and Ganga Rejuvenation. National Water Mission with the main objective of “conservation of water, The Scheme aims at providing better minimizing wastage and ensuring its more working environment in the offices, equitable distribution both across and creation of assets and savings on payment within States through integrated water of monthly rent. To achieve this, resources development and management”. construction of offices at various locations, provision for construction of staff quarters “National Water Mission” document, as well as modernization of existing approved by the Union Cabinet on 6thApril offices of the Ministry (Proper), CWC and 2011 (details in Chapter 3) has identified five CGWB have been included under the goals for the mission as listed below: ambit of the Scheme.

FARAKKA BARRAGE PROJECT

7

3rd National Dam Safety Conference, February 2017, IIT Roorkee

The Dam Safety Organisation, CWC has received ISO 9001: 2008 certification for its Quality Management Systems from the Bureau of Indian Standards during the year 2015. Central Water Commission also received “CBIP Award 2016” for promoting Health and Safety of Large DAM REHABILITATION AND Dams under DRIP. IMPROVEMENT PROJECT (DRIP) Dam Rehabilitation and ORGANIZATIONS AND Improvement Project (DRIP) aims at INSTITUTIONS rehabilitation and improvement of about 223 large dams in four States (Madhya ATTACHED OFFICES Pradesh-50, Odisha-38, Kerala-31 and Tamil Nadu-104) with World Bank CENTRAL WATER COMMISSION funding. The total project cost is about The main activities of CWC may Rs.2100 crore and has become effective be summarized as follows: th from 18 April, 2012 and will be  Flood Forecasting and Assistance to implemented over a period of six-years. State Governments in Flood Management Third National Dam Safety Conference is  Collection and Analysis of organized by CWC in collaboration with Hydrological Data IIT Roorkee and UJVN Limited, on 18th th  Techno-Economic Appraisal of Projects and 19 February 2017 in IIT Roorkee. A  Monitoring of Selected Projects workshop on “Lessons Learnt from DRIP” including those receiving Central was also organized in which 136 delegates Assistance participated.  Planning & Design of Projects

 Surveys, Investigations and Preparation of Detailed Project Report  Studies on Environmental and Socio- Economic issues  Studies Related to Irrigation Planning and Water Management  Basin Planning and Management  National Water Resources Assessment

8

 Assistance in Resolution of Inter-State CENTRAL WATER AND POWER Water Disputes RESEARCH STATION (CWPRS)  Construction Equipment Planning CWPRS undertook studies on a no-  Studies on Dam Safety loss no-profit basis in the major sectors of  Research and Development water resources, river engineering, power  Standardization of Engineering sector and coastal development; details of Practices achievements given in Chapter 7.  Operation of Reservoirs  Training and Capacity Building  International Co-operation in Water Sector

Details of CWC are given in Chapter 7.

CENTRAL SOIL AND MATERIALS RESEARCH STATION (CSMRS) New Initiatives taken during financial year 2016-17 include: Centenary Celebration of CWPRS  Investigations for 6 Water resources projects GANGA FLOOD CONTROL  Publication of 1 research review papers/ COMMISSION (GFCC) documents The Commission has been assigned  Completion of 2 self sponsored research the following tasks: schemes  Preparation and Updation of  Evaluation of 7 Detailed Project comprehensive plans for flood Reports management of the river systems in the

Ganga basin; Details of CSMRS are given in Chapter 7.  Phasing/ sequencing of programme of implementation of works included in SUB-ORDINATE OFFICES the basin-wise plans;

 Providing technical guidance to the CENTRAL GROUND WATER Ganga basin States, namely, West BOARD Bengal, Bihar, Jharkhand, Uttar The main activities of CGWB may Pradesh, Uttarakhand, Chhattisgarh, be summarized as follows: Madhya Pradesh, Delhi, Haryana,  National Aquifer Mapping. Himachal Pradesh and Rajasthan on  Monitoring of Ground Water Regime in flood management; the Country.  According techno-economic appraisal  Estimation of Ground Water Resource. and clearance to flood management  Training under Rajiv Gandhi National schemes of the Ganga basin States with Ground Water Training and Research estimated cost of more than Rs. 12.5 Institute. crore and up to Rs. 25.0 crore except for  National Hydrology Project. schemes of the States of Haryana, Uttar  Demonstrative Project on Artificial Pradesh and Delhi on the river Yamuna recharge to Ground Water. in the reach from Tajewala to Okhla  Regulation of Ground Water Barrage. The schemes with estimated cost of more than Rs. 25.0 crore are Details CGWB is depicted in Chapter 7. appraised by GFCC and their techno-

9

economic clearance is accorded by achievements of SSCAC are given in TAC-MoWR. Chapter 7.  Monitoring the execution of the important flood control schemes BANSAGAR CONTROL BOARD particularly those receiving Central Bansagar Control Board was set up Assistance under Flood Management vide Government of India, Ministry of Programme or being executed under Agriculture and Irrigation Resolution Central Sector; No.8/17/74-DW-II dated 30th January,  Assessment of adequacy of the existing 1976. It was amended vide Resolution No. th waterways under road and rail bridges 8/17/74-DW-II dated 28 March, and additional waterways required to be 1978.Details of amendments are listed in provided for reducing the drainage Chapter 7. congestion to reasonable limits;  Performance evaluation of major flood UPPER YAMUNA RIVER BOARD control measures executed by the States "Upper Yamuna" refers to the including the Inter-State Flood Control reach of Yamuna from its origin at Schemes; Yamunotri to Okhla Barrage at Delhi. A Memorandum of Understanding (MoU) Details of GFCC are given in Chapter 7. was signed on 12th May, 1994amongst the basin States of Himachal Pradesh, Uttar SARDAR SAROVAR Pradesh, Haryana, Rajasthan and CONSTRUCTION ADVISORY Delhi, for sharing the utilizable surface COMMITTEE flows of river Yamuna up to Okhla. The The Sardar Sarovar Construction MoU also provided for creation of "Upper Advisory Committee (SSCAC) was Yamuna River Board" to implement the constittued in 1980 by the Government of said agreement. Accordingly, the Central India in accordance with the directives of Government constituted the Upper yamuna the Narmada Water Disputes Tribunal River Board in1995 as a subordinate office (NWDT) with a view to ensure efficient, under the Ministry of water Resources. economical and early execution of Unit – I After creation of Uttaranchal State in (Dam and Appurtenant works) and Unit – 2000, the resolution was modified to III (Hydropower works) of the Sardar include Uttaranchal (now Uttrakhand) also Sarovar Project. in the Board.

REGISTERED SOCIETIES

NATIONAL WATER DEVELOPMENT AUTHORITY (NWDA) The National Water Development Agency (NWDA) was set up in July 1982 by the Government of India as a Society under Societies Registration Act 1860 under the then Ministry of Irrigation (now SardarSarovar Dam () Ministry of Water Resources, River

Development and Ganga Rejuvenation) to The 84th meeting of the SSCAC was held study the feasibility of the links under on 19th December 2016 at New Delhi, Peninsular Component of National under Chairmanship of Secretary, MoWR, Perspective Plan. NWDA is fully funded RD & GR, New Delhi. Details of by the Government of India. Subsequently

10 in 1990, NWDA Society resolved to take up the studies of the Himalayan Component also. Further, on 28th June, 2006 preparation of Detailed Project Reports (DPRs) of link projects and pre- feasibility/ feasibility reports of intra-State links as proposed by States were also included in the functions of NWDA. Accordingly, the Ministry vide resolution International Workshop at NIH, Roorkee dated 30.11.2006 has modified the functions of NWDA Society. The The Objectives of NIH are: functions of NWDA were further modified  To undertake, aid, promote and vide the Ministry‟s resolution dated coordinate systematic and scientific 19.05.2011 to undertake the work of work on all aspects of hydrology; preparation of DPRs of intra-State links  To cooperate and collaborate with other also by NWDA, and the same has been national and international organizations published in the Gazette notification of th in the field of hydrology; Govt. of India dated 11 June, 2011.  To establish and maintain a research Further, two new Functions in the mandate and reference library in pursuance of of NWDA were added vide Gazette the objectives of the society and equip notification dated 07.10.2016. the same with books, reviews, magazines and other relevant Details of NWDA are in Chapter 7. publications;  To carry out activities that the Society may consider necessary, incidental or conducive to the attainment of the objectives for which the Institute has been established.

Details of Achievements of NIH are in Chapter 7.

NORTH EASTERN REGIONAL INSTITUTE OF WATER AND LAND NWDA: Meeting of Technical Advisory MANAGEMENT (NERIWALM) Committee

North Eastern Regional Institute of Water NATIONAL INSTITUTE OF and Land Management (NERIWALM) is a HYDROLOGY (NIH) Registered Society under the The National Institute of administrative control of the Ministry of Hydrology, a Govt. of India Society under Water Resources, RD & GR, Government the Ministry of Water Resources, River of India. This is only Water and Land Development & Ganga Rejuvenation, Management Institute (WLMI) established established in December 1978 at Roorkee, and governed by Government of India and is conducting basic, applied and strategic serving eight states of North East. research in the fields of hydrology and water resources development. The Institute Details of achievements of NERIWALM is fully aided by the Ministry of Water is given in Chapter 7. Resources, Govt. of India.

11

Statutory Bodies 1953 for completion of the Tungabhadra Project and for its operation and

maintenance. The Board is regulating NARMADA CONTROL AUTHORITY water for irrigation, Hydro power In pursuance of the decisions of the generation and other uses from the Narmada Water Disputes Tribunal reservoir. (NWDT) under Clause-XIV of its final order, the Government of India framed the Narmada Water Scheme, which, inter-alia, constituted the Narmada Control Authority and Review Committee in 1980 for proper implementation of the decisions and directions of the Tribunal.Details are given in Chapter 7.

Tungabhadra dam

Details of achievements of Tungabhadra Board are narrated in Chapter 7.

PUBLIC SECTOR ENTERPRISES

Indira Sagar Dam Project (Madhya Pradesh) WAPCOS Ltd. WAPCOS Limited is a “Mini BETWA RIVER BOARD Ratna-I” Public Sector Enterprise under A decision to harness the available the aegis of the Union Ministry of Water water resources of Betwa River was taken Resources, River Development and Ganga in a meeting held on 22nd July 1972 Rejuvenation. The company was th between Chief Ministers of Uttar Pradesh incorporated on June 26 1969 under the and Madhya Pradesh. Further Uttar Companies Act, 1956 to: Pradesh and Madhya Pradesh in a meeting  share India‟s experience and expertise, held on 9th December 1973 agreed for  facilitate Diplomatic Initiatives, and setting up of a tripartite Control Board for  to augment endeavors of State and the speedy, smooth and efficient execution Central Agencies. of the various inter-state projects of both the States. Betwa River Board (B.R.B) was constituted in 1976 by an Act of parliament to execute the Rajghat Dam Project and Power House.

Details of achievements of BRB are narrated in Chapter 7.

TUNGABHADRA BOARD Salma Dam Project (Afghanistan) executed by The Tungabhadra Board was WAPCOS constituted by the President of India in exercise of the powers vested under sub section (4), Section 66 of Andhra State Act

12

Details of achievements of the WAPCOS commissioning stage.Details of are given in Chapter 8. achievements of the NPCC are given in Chapter 8. NATIONAL PROJECTS CONSTRUCTION CORPORATION „INDIA-WRIS‟WEBSITE LIMITED (NPCC) National Projects Construction CWC & ISRO has jointly Corporation Limited (NPCC) was undertaken the work of development of established on 9th January 1957 as a Water Resources Information System premier construction company to create (India-WRIS) during 11th Plan. The first necessary infrastructure for economic full version of the website of India-WRIS development of the country. NPCC ltd (www.india-wris.nrsc.gov.in) was comply with Quality management launched by Hon‟ble Minister of Water requirements of ISO 9001-2008 for Resources on 7th December, 2010 in New execution of Civil Works for Thermal & Delhi. Subsequently, four more versions Hydro Electric Projects‟, River Valley of the website of India-WRIS have been Projects, Industrial Structures, Project launched. The ver. 4.1 was launched in Management Consultancy services for July, 2015 and is available in public buildings, Housings, Roads, Bridges and domain at 1:250000 scale. Details of Infrastructure Projects. In its 60 years of achievements of the India-WRIS are given in existence the Corporation has successfully Chapter 3 associated itself with completion of several National Projects from concept to

13

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

14

2. National Water Policy

NATIONAL WATER POLICY governing the exercise of legislative and/or executive (or devolved) powers by the Centre, the States and the local governing The National Water Policy (NWP), bodies. This should lead the way for 2012 serves as a policy guideline for essential legislation on water governance development and management of water in every State of the Union and devolution resources in the country. The objective of of necessary authority to the lower tiers of the National Water Policy, 2012 is to take government to deal with the local water cognizance of the existing situation, to situation. In pursuance, the Ministry had propose a framework for creation of a constituted an Expert Committee under the system of laws and institutions and for a Chairmanship of Dr. Y.K. Alagh to plan of action with a unified national prepare Draft National Water Bill. The perspective. In addition to prescribing Committee submitted its Report in May, policy recommendations, the National 2013. Water Policy, 2012 has emphasized on their implementation through the National Later a Committee under the Water Board by preparing a plan of action. Chairmanship of Dr.Mihir Shah has been constituted on 28.12.2015 to examine the Copies of the National Water provisions of the draft National Water Policy, 2012 have been forwarded to all Framework Law and suggest States/UTs and concerned Central changes/modifications therein taking into Ministries for necessary action. The account inter-alia the emerging challenges Ministry of Water Resources, River in the water sector, reuse of waste water Development and Ganga Rejuvenation has after treatment, the likely impact of also got prepared a road map for climate change on water resources, implementation of the National Water importance of river restoration/ Policy, 2012 through an Expert Committee rejuvenation, water contamination issue headed by Dr. S.R. Hashim. This report etc. has also been forwarded to all States/UTs for necessary action. Consultations are The Mihir Shah Committee ongoing with the State Governments for submitted a Draft Report in May, 2016 implementation of National Water Policy, containing the National Water Framework 2012 and forformulation of State Water Bill, 2016. The Bill was circulated to Policies. States/UTs and the concerned Central Ministries for obtaining their comments. DRAFT NATIONAL WATER The Bill was also placed on the website of FRAMEWORK LAW the Ministry for inviting comments from general public. After receiving the The National Water Policy, 2012, comments from various quarters, the Committee has submitted its final Report inter-alia, recommends that there is a need th to evolve a National Framework Law as an on 18 July, 2016. umbrella statement of general principles

15

The final report submitted by Dr. recognizing, encouraging and empowering Mihir Shah Committee has been circulated local initiatives. to all States/UTs and concerned Central (5) It proposes that the appropriate Ministries for inviting their comments on Government shall take into consideration the proposed National Water Framework the following: Bill, 2016 for taking further necessary (a) Water Use and Land Use action in the matter. The salient features of (b) Appropriate Treatment and Use the draft National Water Framework Bill, of Wastewater 2016 are as under:- (c) Standards for Water Quality (1) The draft National Water and Water Footprints Framework Bill, 2016 seeks to provide an (d) Water Use Prioritization. overarching national legal framework Provided that these uses of water are based on principles for protection, consistent with the objective of sustaining conservation, regulation and management aquifers and ecosystem indispensable to of water as a vital and stressed natural long terms sustenance of the resource. resource, under which legislation and (6) The draft Bill lays high priority to executive action on water at all levels of Integrated River Basin Development and governance can take place. Management, wherein a river basin, (2) The Bill proposes that every including associated aquifers, shall be individual should have a right to sufficient considered as the basis hydrological unit quantity of safe water for life within easy for planning, development and reach based on the principles of integrated management of water. Each State river basin management. The States shall Government shall develop, manage and hold water resources as a Common regulate basins of inter-State rivers Heritage and Public Trust. through a River Basin Master Plan to be (3) The draft Bill proposes that the implemented by an appropriate appropriate government shall strive institutional mechanism. towards rejuvenating river systems with (7) It proposes for establishment of a community participation, ensuring: River Basin Authority for each inter-State (a) „Aviral Dhara‟ – continuous river basin, or for a sub-basin for sub inter- flow in time and space including State river basin wherever appropriate for maintenance of connectivity of flow in optimum and sustainable development of each river system; the inter-State rivers and river valleys, (b) „Nirmal Dhara‟ – unpolluted with active participation and cooperation flow so that the quality of river waters is by all basin States to ensure equitable, not adversely affected by human activities; sustainable and efficient utilisation of and water resources with emphasis on demand (c) „Swachh Kinara‟ – clean and management through conjunctive and Aesthetic River banks with ecological integrated use of resources. Each River integrity. Basin Authority shall prepare a Master (4) It proposes that the appropriate Plan for the River Basin. government shall take all measures to (8) The Bill also proposes that the protect the ecological integrity necessary appropriate Government shall prepare and to sustain eco-systems dependent on water oversee the implementation of a Water and should adopt people-centred Security Plan for: decentralized water management, for both (a) Attainment of sufficient surface and ground water, including local quantity of safe water for life and rainwater harvesting, watershed sustainable livelihoods by every person; development and participatory irrigation and management, shall be prioritized, while

16

(b) Ensuring water security even in development of waters for twelve major times of emergencies like droughts and inter-State river basins in the country. floods. (2) It proposes principles of participation, cooperation, equitable and sustainable DRAFT RIVER BASIN management, conjunctive use, integrated MANAGEMENT BILL management, public trust doctrine and demand management for governing river The National Water Policy, 2012, basin development, management and inter-alia, recommends that there is a need regulation. for a comprehensive legislation for (3) It proposes a two-tier structure for a optimum development of inter-State rivers River Basin Authority, consisting of a and river valleys to facilitate inter-State Governing Council comprising, inter-alia, coordination ensuring scientific planning of Chief Ministers of riparian States and an of land and water resources taking Executive Board comprising, inter-alia, of basin/sub-basin as unit with unified Secretaries of riparian States, charged with perspectives of water in all its forms the technical and implementation powers (including precipitation, soil moisture, for the Governing Council decisions. ground and surface water) and ensuring (4) It proposes each River Basin Authority holistic and balanced development of both should prepare a River Basin Master Plan the catchment and the command areas. for the inter-State river basin under its Such legislation needs, inter alia, to deal jurisdiction on the principles of Integrated with and enable establishment of basin Water Resources Management. authorities, comprising the States (5) It proposes that the Governing Council concerned, with appropriate powers to follow persuasion, conciliation and plan, manage and regulate utilization of mediation as means to resolve disputes, water resource in the basins. whenever any dispute or difference arises between two or more State Governments In pursuance, Ministry of Water with respect to any recommendation given Resources, River Development & Ganga by the River Basin Authority or the refusal Rejuvenation had constituted a Committee or neglect of any State Government to under the Chairmanship of Justice (Retd.) undertake any measures in pursuance of T.S. Doabia to study the activities that are the River Basin Master Plan or Schemes. required for optimum development of river (6) It provides for referral of dispute(s) for basin and 16 changes required in the resolution under the Inter State River existing River Board Act, 1956 for Water Disputes Act, 1956, when the achievement of the same. The Committee Governing Council fails to determine the submitted is Report in November, 2012. issue(s) or resolve the water dispute(s) or The draft River Basin Management Bill where the State Governments disagree prepared by the Committee has been with the decision tendered by such circulated among all States, Union Governing Council. Territories and related Union Ministries (7) It proposes that the River Basin and also hosted on the Website of Ministry Authority be empowered to have its own of Water Resources, River Development & funds and requires them to prepare Annual Ganga Rejuvenation. The Salient Features Report to be laid before both Houses of of the draft River Basin Management Bill Parliament. are as under:- (8) It proposes that the Central (1) The Draft River Basin Management Government may give directions and make Bill proposes establishment of separate Rules for effective implementation of the River Basin Authorities for regulation and provisions of the Bill. It also proposes that every River Basin Authority be

17 empowered to make regulations for discharging its powers and functions etc. STRATEGIES The broad strategies to be adopted A committee under the for successful achievement of objectives of Chairmanship of Dr. Mihir shah has been the Jal Kranti Abhiyan are as follows: constituted to examine the report of Justice  Use of modern techniques coupled T.S. Doabia (Retd.) committee on River with traditional wisdom for devising Basin Management Bill. Dr. Mihir Shah area/region specific innovative Committee has further referred the matter measures for increasing water security; to the committee under the Chairmanship  Revival of traditional knowledge and of Retired Justice Giridhar Malivia. The sources for water conservation and Report of the Committee are still awaited. utilization;  Encouraging conjunctive use of JAL KRANTI ABHIYAN surface and groundwater;  Promotion of appropriate technologies INTRODUCTION for efficient and sustainable use of Ministry of Water Resources, River rainwater; Old and new ground water Development and Ganga Rejuvenation, schemes, Creation of additional Government of India, New Delhi is facilities for water conservation celebrating “Jal Kranti Abhiyan” during through construction of water the year 2015-16 in the country in order to harvesting structures; consolidate water conservation and  Rainwater harvesting for recharge to management in the country through a be made mandatory for residential, holistic and integrated approach involving commercial and industrial all stakeholders, making it a mass buildings/premises; movement. The Abhiyan has been  Selected interventions for maintaining th launched throughout the country on 05 the specified water quality standards; June, 2015, with special inauguration  Convergence of efforts of various functions held at Jaipur, Shimla and departments in water resources Jhansi. development and management;  Promotion of social regulation for OBJECTIVES meeting the demand as well as for The objectives of Jal Kranti optimizing the use-efficiency of water Abhiyan are as under: for various purposes especially  Strengthening grass root involvement industry, agriculture and domestic; of all stakeholders including  Institutionalization of village Panchayati Raj Institutions and local participation in water related schemes bodies in the water security and and projects and cost sharing for O&M development schemes (e.g. by the community to instill a sense of Participatory Irrigation Management belongingness, accountability and (PIM); responsible partnership.  Encouraging the adoption/utilization  Provision for incentivizing / honouring of traditional knowledge in water PRIs for devising innovative/unique resources conservation and its ways to create water security in their management; areas for amelioration in water related  To utilize sector level expertise from issues. different levels in government, NGO‟s,  A logo for Jal Kranti Abhiyan shall be citizens etc; and used to connect positively with all  Enhancing livelihood security through stakeholders. water security in rural areas.

18

Various activities under Jal Kranti JAL MANTHAN Abhiyan e.g. Jal Gram Yojana, Model Command Area, workshops etc are Jal Manthan is an initiative of the underway. Ministry of Water Resources, River Development & Ganga Rejuvenation for ACTIVITIES wider consultations among various Activities being undertaken under stakeholders for churning out new ideas as Jal Kranti Abhiyan are: well as tangible solutions to various water  Jal Gram Yojana sector issues. The First Jal Manthan was  Development of Model Command organized from 20-22nd Nov., 2014 at New Area Delhi resulting in many new perspectives  Mass Awareness Programme leading to greater understanding among  Other Activities the stakeholders of water sector.

SUCCESS Jal Manthan-2 was organized on 22-23 Success achieved under Jal Kranti February, 2016 with the theme “Integrated Abhiyan: Approach for Sustainable Water  Three meetings of the National Level Management”. On the First Day, Sessions Advisory and Monitoring Committee were held on PMKSY Priority Projects – for overall coordination and Implementation Issues; Inter Linking of monitoring Jal Kranti Abhiyan have rivers – Progress and Challenges; and been held so far. River Basin Approach – Present Status and  Under Jal Kranti Abhiyan, 1105 Jal Future Indication, whereas sessions on Grams have been identified so far and Second Day were held on Ground Water out of the 1105 Jal Grams, 246 Water and National Hydrology Project; Security Plans have been prepared. In Principles of Allocation of Water; Water addition to these 100 Dalit Jal Grams Management; Use of innovative has also been identified. Model Technologies and Water Conservation. Command Area in 10 different States th has also been identified. Jal Manthan-3 was organized on 13  DPR‟s for all the identified villages in January, 2017 at Vigyan Bhawan, New the States of have been Delhi. During the event, discussions on received and are at the stage of Implementation of PMKSY & approval. Improvement of Water Use Efficiency,  Facebook and Twitter Account for Jal Ecology Improvement, Participatory Kranti Abhiyan operationalized. Irrigation Management, River Basin Management, River Rejuvenation and Flood Management were held. During this one day event extensive consultations were held among different stakeholders on several important and critical areas in the water sector like River Basin Approach for Sustainable Development, Ground Water Management, Water Security, Water Management, Coordination between Centre and States, water conservation „Jal Manthan -3‟, 13th January 2017, Vigyan Innovation in Water Governance etc. Bhawan, New Delhi

19

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Pricele ss Water Annual Report 2016-17 Pricele ss Efforts

20

21

3. Major Programs

MAJOR PROGRAMMES Grant provided to States under AIBP to all (STATE SECTOR) of above project till 31.3.2015 was Rs. 67539.52crore. Twenty five States got

benefited from the programme. PRADHAN MANTRI KRISHI

SINCHAYEE YOJANA (PMKSY)- ESTABLISHMENT OF MISSION FOR COMPLETION OF PRIORITIZED IRRIGATION PROJECTS AND FUNDING ARRANGEMENTS.

ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP)

Central Government launched the Accelerated Irrigation Benefits Programme (AIBP) in the year 1996-97 to provide

Central Assistance to major/medium irrigation projects in the country, with the PRADHAN MANTRI KRISHI objective to accelerate implementation of SINCHAYEE YOJANA (PMKSY) such projects which were beyond resource During 2015-16, Pradhan Mantri capability of the States or were in Krishi Sinchayee Yojana (PMKSY) was advanced stage of completion. Priority launched with an aim to enhance physical was given to those projects which were access of water on farm and expand started in Pre-Fifth and Fifth Plan period cultivable area under assured irrigation, and also to those which were benefiting improve on farm water use efficiency, Tribal and Drought Prone Areas. From the introduce sustainable water conservation year 1999-2000 onwards, Central Loan practices etc. Major and medium Assistance under AIBP was also extended irrigation/multipurpose irrigation projects to minor surface irrigation projects (SMI) are being funded under PMKSY-AIBP and of special category States (N.E. States & Repair, Renovation and Restoration (RRR) Hilly States of H. P., Sikkim, J&K, of Water Bodies, Surface Minor Irrigation Uttaranchal and projects benefiting KBK (SMI) projects and Command Area districts of Orissa). Development & Water Management

(CADWM) projects are being funded Since its inception, 297 Irrigation / under PMKSY-Har Khet Ko Pani Multi Purpose Projects have been included (HKKP). During 2015-16, Central for funding under AIBP. Out of this 143 Assistance of Rs. 2327.82 crore was projects have been completed and 5 released for projects under AIBP and CA projects were foreclosed. An irrigation of Rs. 1905.81 crore was released for potential of 24.39 Lakh ha has been projects under CADWM, SMI and RRR of created through these completed projects. water bodies together. Total CA of The cumulative Central Loan Assistance /

21

Rs4233.63 crore was released during is estimated to be 76.03 lakh hectare (Lakh 2015-16 for PMKSY (AIBP+HKKP) ha).

PRIORITIZATION OF PROJECTS The Finance Minister in his budget The issues related to speech during 2016 has announced for implementation of projects under creation of dedicated Long Term Irrigation PMKSY-AIBP including prioritization of Fund (LTIF) in NABARD with an initial projects were deliberated in the Committee corpus of about Rs. 20,000 Crore and an headed by Minister (Water Resources) of amount of Rs.12517 crore has been Chhattisgarh. As per the information provided as budgetary resources and supplied by concerned States to the market borrowings during 2016- Committee, 99 projects were identified by 17.Accordingly a proposal was made for committee which could be completed by providing Central Assistance and State 2019-20[ 23 projects (Priority-I) by 2016- share for above mentioned 99 projects 17,31 projects (Priority-II) by 2017-18. through NABARD. and 45 projects (Priority-III) by Dec., 2019]. The Cabinet on 27.07.2016 approved establishment of the Mission to ensure completion of 99 prioritised projects in phases by Dec., 2019 including CAD&WM. The arrangement of funds for Central share/Assistance (CA) has been made by taking loan from NABARD as per year-wise requirements which could be paid back in 15 years‟ time keeping a grace period of 3 years. Further, the State Governments, if required, may borrow

funds from NABARD for the State One of the major reasons for the Share.The estimated fund requirement projects to remain incomplete was (Central Assistance as well as State share inadequate provision of funds by the for completion of these 99 projects is concerned State Governments. As a result, given at Annexure-VII.State wise large amount of funds spent on these summary of the number of projects, their projects were locked up and the benefits estimated balance cost, admissible Central envisaged at the time of formulation of the Assistance and targeted potential projects could not be achieved. This was a utilization is given at Annexure-VIII. cause for concern and initiative was required at the national level to remedy the Main provisions of Mission Mode situation. proposal are:  JointProposalfor release of CA to be MISSION MODE COMPLETION OF made by concerned officers of State PROJECTS Govt. and CWC. Total funds required for  States shall implement the project. completion of all the 99 identified projects  Mission will ensure overall have been estimated atRs.77595 crore coordination and outcome focused (Rs.48546 crore for project works and monitoring of components of PMKSY Rs.29049 crore for CAD works) with i.e. HKKP, Per drop more crop, estimated CA of Rs.31342crore.Likely Watershed development etc. potential utilization through these projects

22

 Maximize use of pressurized pipe A High Level Empowered irrigation and micro irrigation Committee (HLEC) comprising of Finance wherever possible. Minister, Minister (WR, RD & GR),  CAG audit, third party monitoring and Minister of Agriculture, Cooperation and monitoring by NABARD. Farmer‟s Welfare, Minister of Rural  Social audit in 10% of the projects in Development, Vice Chairman, NITI each State after completion. Aayog has also been constituted vide order dt 7.9.2016 which would review the progress of the identified 99 MMI projects and other components under PMKSY and also provide policy guidance for mid-term course correction if required.

National Water Development Agency (NWDA), a registered society under this Ministry identified to act as pass through agency for channelizing LTIF loan from NABARD for central assistance ACTION TAKEN ON THE (CA) to the identified 99 projects. The APPROVAL GIVEN BY THE Agreement between NABARD, NWDA CABINET and MoWR, RD & GR for providing A Mission has been established Central Share Funds has been signed on vide order dt. 7.9.2016 with the Officer on 06.09.2016 in consultation with Ministry Special Duty (now secretary) in the of Finance. MoAs for state share for Ministry of Water Resources, River Maharashtra, Gujarat, , MP, Development & Ganga Rejuvenation Bihar, Andhra Pradesh and Jharkhand (MoWR, RD & GR) as the Mission have been signed. Director . Online MIS system and mobile A Council headed by CEO, NITI based application for monitoring of Aayog and having Secretary(WR, RD & physical/financial progress of these GR), Secretary (A&C), Secretary (RD) projects has been developed. and Secretary(Finance), Chairman, NABARD as members, has been MONITORING OF PRIORITIZED established vide order dt. 7.9.2016 which PROJECTS shall look after the overall implementation The prioritized projects were of works and policy matters. Chief inspected by monitoring team of CWC Secretaries (or their representative) of the during first half of 2016-17 for States having large number of projects to ascertaining their physical and financial be completed under this programme i.e. progress. NITI Aayog has also visited 31 Andhra Pradesh, Maharashtra, Madhya projects.Second monitoring visits have Pradesh, Odisha and shall also started during February, 2017 and are be members. Further, one of Chief expected to be completely shortly. Secretaries(or his representative) from rest of the States implementing projects, under REVIEW OF THE PROGRESS OF this programme, shall also be a member by PROJECTS rotation. The Mission Director would be The progress of the projects is the Member Secretary of the Council. being reviewed regularly by Hon‟ble Minister(WR, RD & GR) and Secretary(WR, RD & GR).PMKSY

23

Council under Chairmanship of CEO, advance of the scheduled time. Out of total NITI Aayog reviewed the progress of 76.03 lakh ha. of irrigation potential PMKSY scheme in its First meeting held utilization by 2019-20, potential utilization on 25.10.2016.Another meeting is expected to be more than 14 lakh ha Committee under the chairmanship of during 2016-17 from all the 99 projects. Minister (WR), Chhattisgarh was also held on 23.11.2016 to review the progress of 99 Further, issues in respect of many prioritized projects under PMKSY. other projects which were at standstill such as Gosikhurd in Maharashtra state have Four review meetings were held in been streamlined and are getting back on Feb. 17 end/first week of March, 17 with the track so as to meet the completion the Principal Secretaries (WR/Irr), project targets of Dec., 2019. This project is authorities of different states and CWC likely to create an irrigation potential of regional Chief Engineers to review the 2.50 lakh ha. Similarly, Polavaram Project project wise progress of AIBP and CAD has been put on a fast track when components of the prioritized 99 projects. completed this project is likely to irrigate 2.9 lakh ha. The PS to PM also reviewed the progress of the projects twice during the Many States like Maharashtra have year. Hon‟ble Prime Minister also utilized innovative means such as reviewed the progress on 30.3.2017. installation of underground pressure pipelines to get over the difficulties of land acquisition.

RELEASE OF FUNDS

(i) AIBP: During 2016-17, apart from release of Central Assistance (CA) of Rs. 825 crore from the budget of ministry, CA of COMPLETION OF PROJECTS Rs. 2482.90crore has been released DURING 2016-17 through NABARD. Details are at After reviewing the progress of Annexure- X. projects it emerged that some of projects which were to be completed during current (ii) CAD works year would be completed next year due to CA of Rs. 854crore has been certain bottlenecks, whereas some of released through NABARD. projects which were to be completed next year have been fast tracked and are likely (iii) State share: to be completed by June, 2017. In all 21 State share amounting to Rs. 2099 AIBP projects having total potential of crore for Maharashtra and Rs. 970 crore 5.22 Lha. are likely to be completed by for Gujarat has been sanctioned to be June, 2017. Details of these projects are at released through NABARD during 2016- Annexure-IX. 17 as per their proposals. Further, State share for States of Andhra Pradesh, Along with completion of these 21 Jharkhand, Madhya Pradesh and Odisha projects, 22 projects of Maharashtra, 6 has also been sanctioned. An amount of projects of Odisha, 17 projects (including Rs.3334.98 crore has been released for phases) of Madhya Pradesh have been put State shares of projects of these States by on fast track and likely to be completed in NABARD.

24

 As per the modification in the (iv) Release of funds through LTIF guidelines of National Projects in during 2016-17: September, 2012, Extension, LTIF was set up during 2016-17 Renovation and Modernization (ERM) for irrigation schemes. This fund is being projects, envisaging restoration of lost utilized for providing Central Assistance irrigation potential of 2.0 lakh hectare (CA) to AIBP and CAD works as well as or more would now be eligible for state share to the states as per requirement inclusion as a National Project with for identified 99 projects and for CA to certain conditions. Polavaram project. Release of funds through LTIF during 2016-17 is as below: So far 16 projects have been identified in the scheme of National Item Funds released Projects. Five projects, namely, (Rs. crore) Gosikhurd (Maharashtra), Shahpurkandi AIBP (CA) 2482.90 (Punjab), Teesta Barrage (West Bengal), CAD (CA) 854.00 Saryu Nahar Pariyojana (Uttar Pradesh) State Share (AIBP) 3334.98 and Polavaram (Andhra Pradesh) have Polavaram Project 2414.16 been funded under the scheme of National Total 9086.02 Projects. Central Assistance (CA) of Rs. 2987.94 crore, Rs. 26.04 crore and Rs. In addition to above, Rs.825 crore 178.20 crore has been provided to for AIBP and Rs.100 crore for Polavaram Gosikhurd, Shahpur Kandi and Teesta project was released during 2016-17. Project respectively. Saryu Nahar Pariyojana of Uttar Pradesh starting NATIONAL PROJECTS getting funds under the scheme of National Project during 2012-13 and Central The Union Cabinet in its meeting th Assistance of Rs. 1221.60crore has been held on 7 February, 2008 approved the released for this project so far. Details of proposal of the Ministry of Water Polavaram Project is as below: Resources regarding implementation of National Projects with Central Assistance POLAVARAM MULTIPURPOSE of 90 % of the cost of the project as grant PROJECT falling in the following selection criteria:  International projects where usage of (i) Project: water in India is required by a treaty Polavaram Irrigation Project (also or where planning and early known as Indira Sagar (Polavaram) Project completion of the project is necessary is a multi-purpose project on the river in the interest of the country. Godavari in Andhra Pradesh (AP). It shall  Inter-State projects which are provide irrigation to 7.2 lakh acres (2.91 dragging on due to non-resolution of lakh ha) of Culturable Command Area inter-state issues relating to sharing of (CCA) in East Godavari, Visakhapatnam, costs, rehabilitation, aspects of power West Godavari and Krishna districts, help production, etc., including river inter- divert 80 TMCft of Godavari waters for linking projects. utilization in Krishna basin, 23.44 TMC of  Intra-state projects with additional water supply to industries in potential of more than 2 lakh hectare Visakhapatnam, domestic water supply to and with no dispute regarding sharing 28.5 lakh population in 540 villages, of water and where hydrology is generation of 960 MW power, etc. established. (ii) Status as National Project:

25

The Polavaram Irrigation Project was declared a National Project on 1st A Joint Committee of March, 2014 vide section 90 of AP MoWR,RD&GR and water resources Reorganization Act, 2014. Central departments, Government of Andhra Government has created Polavaram Pradesh , Chhattisgarh and Odisha has Project Authority (PPA) with Governing been constituted to resolve the interstate Body to execute the Project and obtain all issues including Polavaram project. One requisite clearances including meeting of the Committee has been held environmental, forests and rehabilitation and information sought by Government of and settlement norms and all court cases. Odisha and Chhattisgarh has been sent to The Govt. of India will provide 100% of them. the remaining cost of the irrigation component only of the project for the Approval from Ministry of Finance period starting from 01.04.2014 to the have been obtained for NABARD funding extent of the cost of the irrigation to the project during 2016-17 keeping in component on that date. view of limited budgetary resources

(iii) Financial Progress COMMAND AREA DEVELOPMENT Before declaration as a National AND WATER MANAGEMENT Project, an expenditure of Rs. 5135.87 crore has been incurred upto 31.03.2014 The Centrally Sponsored including Central Assistance of Rs. Command Area Development (CAD) 562.469 crore provided under AIBP. The Programme was launched in 1974-75 for CA released to Polavaram Project development of adequate delivery system Authority from FY 2014-15 onwards is as of irrigation water up to farmers‟ field with under: an objective to enhance water use efficiency and production and productivity Financial CA released to of crops per unit of land and water for Year Polavaram Project improving socio-economic condition of Authority(Rs. Crore) farmers. The Programme envisages 2014-15 250.00 integration of all activities relating to 2015-16 600.00 irrigated agriculture in a coordinated 2016-17 2514.16 manner with multi-disciplinary team under Total 3364.16 a Command Area Development Authority. *2414.16 through NABARD funding The Programme was restructured (iv) Efforts made for completion of and renamed as Command Area Project: Development and Water Management Dam Design Review Panel (CAD&WM) Programme w.e.f. 01-04- (DDRP) under the Chairmanship of Sri A. 2004. The Programme is being B. Pandya (former Chairman, CWC) have implemented pari-passu with Accelerated been constituted during June 2016 for Irrigation Benefits Programme (AIBP) technically sound and timely execution of during the XII Five Year Plan. The the project. DDRP monitors the execution programme is under implementation as a of the project related works and suggest sub-component of Har Khet Ko Pani measures for timely execution, quality (HKKP) component of Pradhan Mantri control aspects and measures to maintain Krishi Sinchai Yojna (PMKSY) - from the time lines for the completion of the 2015-16 onwards. The ongoing project. 5 meetings of DDRP have been CADWM programme has now been held so far. restricted to implementation of CAD

26 works of 99 prioritized AIBP projects farm outlets are not part of the micro- during 2016-17 to December, 2019. irrigation infrastructure. Farmers are expected to bear the cost of such devices The activities covered under CAD or avail subsidies available in extant component of a Project are broadly scheme of the Ministry of Agriculture. categorized as 'Structural' and 'Non- Structural' interventions. Structural Monitoring of CAD implementation is Intervention includes survey, planning, now planned to be carried out with the design and execution of: (i) On-Farm intent of continual improvement in three- Development (OFD) works;(ii) tier Monitoring System: Construction of field, intermediate & link drains; (iii) Correction of system deficiencies; and (iv) Reclamation of waterlogged areas. Non-Structural Intervention includes activities directed at strengthening of Participatory Irrigation Management (PIM):(i) One time Functional Grant to the registered Water Users' Associations (WUAs); (ii) One time Infrastructure Grant to the registered WUAs; (iii) Trainings, demonstration, and adaptive trials with respect to water use efficiency, increased productivity, and sustainable irrigation participatory environment.

To promote water use efficiency in irrigation, financial assistance is provided to the States for development of infrastructure for micro-irrigation to facilitate use of sprinkler / drip irrigation as an alternative to construction of field channels. At least 10% CCA of each project is to be covered under micro- All CAD works are planned, irrigation. Micro-irrigation infrastructure designed, tendered and executed by the includes components of sump, pump, State Governments through its pertinent HDPE pipelines, and pertinent devices Departments. Central Water Commission needed for bringing efficiency in water (CWC) through its CAD Cells in the conveyance and field applications (through Regional Offices of CWC and the Project sprinklers, rain guns, pivots etc). Monitoring Organization (PMO) at it‟s headquarter provides the overall In case of micro-irrigation, other monitoring and coordination support. The components such as land leveling, Detailed Project Report (DPR) of the CAD drainage works etc, would be reduced, or component of prioritized Project prepared entirely discarded; enabling certain cost by the concerned State Government is savings which is expected to offset the submitted to CAD Cell of the pertinent higher cost of Micro-irrigation Regional Office of CWC. CWC through infrastructure. The devices – such as its CAD Cell and the PMO appraises the sprinkler/ rain gun/ Drip sets etc. – needed DPR and forwards its recommendations to to be installed by individual farmers below the CADWM Wing of the Ministry.

27

CADWM Wing of Ministry processes the Target Actual Target Actual case for approval of competent level for inclusion of Project under CADWM XI Plan 1.32 1.686 1833 1680.12 Program. XII Plan

Funds under PMKSY (HKKP) for (up to 7.6 1.419* 15000 1887.87 the CAD component will be provided to 2015-16) the State Governments as per Cost Sharing Ratios (which will be applied on the (from 7.2 0.225* 14525 691.74^ 2016-17 Ceiling Costs) indicated below: onwards) (till date)

Cost sharing for the CAD component *The achievement is as per Central Assistance released;

Activities Eligible for Cost Sharing For eight North Eastern States and Funding Ratio three Himalayan States of Himachal All activities of Structural 50:50 Pradesh, Jammu & Kashmir, and interventions (Centre : State) Uttarakhand, the cost sharing norms for All activities of Non- 60:40 „All activities of Non-Structural Structural interventions (Centre : State) interventions except Functional Grant to excluding Functional WUAs‟ will be 75:25 (Centre : State) in Grant to WUAs lieu of 60:40 norm applicable for other Functional Grant to 45:45:10 States. registered WUAs (Centre: State: farmer) Since the inception of the Incremental Establishment 50:50 programme in 1974-75, 219 projects have Cost (Centre : State) ^Till December, 2016 been completed benefiting a Cultural Command Area (CCA) of about 15 Mha PARTICIPATORY IRRIGATION for which CA of about Rs.5028 crore have MANAGEMENT (PIM) been given ( up to March 2012). During National Water Policy stresses XII Plan period, a CCA of 7.6 Mha has participatory approach in water resources been targeted with CA amount of Rs management. It has been recognized that 15,000 crore which was subsequently participation of beneficiaries will help reduced to 3.6 Mha during midterm greatly in the optimal upkeep of irrigation appraisal. From 2015-16, the programme system and effective utilization of become HKKP component of PMKSY irrigation water. The participation of with a target of 1.5 Mha. Subsequently, farmers in the management of irrigation from2016-17 onwards, the role of would include transfer responsibility for programme has been restricted to 99 operation & maintenance and also prioritised AIBP projects. The physical collection of water charges to the Water and financial achievement of the project Users‟ Association in their respective during XI and XII Plan period are jurisdiction with effect from 2008-09. One summarised below: time functional grant @Rs.1200/- per hectare to be shared by the Centre, State Physical and financial achievement of the and Farmers in the ratio of 45:45:10 PMKSY (HKKP) during XI & XII Plan respectively is being paid to outlet level Plan Physical (in Financial Million (Central Water Users Associations‟ as incentive, hectare) Assistance) the interest from which is to be used for maintenance. Apart from this, an amount (Rs in crore) of Rs. 3.00 lakh (60% - Central: 40% - State) is being provided to each WUA as

28 one time infrastructure Grant. Overall 16 States viz. Andhra Pradesh, , Bihar, FLOOD MANAGEMENT Chhattisgarh, Goa, Gujarat, Karnataka, PROGRAMME Kerala, Madhya Pradesh, Maharashtra, Nagaland, Odisha, Rajasthan, Sikkim, The Flood Management Wing Tamil Nadu and Uttar Pradesh have either deals with matters concerning flood enacted exclusive legislation or amended management in the country, the Ganga their Irrigation Acts for involvement of Flood Control Commission, Farakka farmers in irrigation management. Other Barrage Project and matters related to States are also taking steps in this Ganga Basin States including Upper direction. So far 84,779 Water Users‟ Yamuna River Board. It has also Associations have been formed in various beenentrusted with international aspects of States covering an area of 17.84 million cooperation and development of Water hectare under various commands of Resourceswith Nepal and Bangladesh, irrigation projects. including implementation of the Ganga Water Sharing Treaty(1996) with Under the restructured “Command Bangladesh and Mahakali Treaty (1996) Area Development & Water Management” with Nepal. Programme, more emphasis is being given to participatory approach. Under this FLOOD MANAGEMENT Programme, payment of Central PROGRAMME Assistance to State is linked with the A State Sector SchemeDuring Xl formation of WUAs. During the year it is plan, the Government of lndia launched expected that more than 1000 WUAs will "Flood Management Programme" for be formed in New Projects. providing central assistance to the State Governments for undertaking the works REPAIR, RENOVATION & relatedto river management, flood control, RESTORATION (RRR) OF WATER anti-erosion, drainage development, flood BODIES proofing including flood prone area development programme, restoration of Under the scheme, a total of 1354 damaged flood management works and water bodies have been taken up for anti-sea erosion works. Under this restoration during XII Plan, out of which Programme, a total of 420 works were 464 water bodies have been completed. approved out of which 252 works were Central grant amounting to Rs. 264.67 physically completed and the central crore has been released to the States for assistance of Rs. 3566 crore was released completion of works on these water during Xl Plan. The completed works have bodies. restored 17.004lakh ha of old flood prone area and provided reasonable protection to SURFACE MINOR IRRIGATION 2.589 lakh ha of new flood prone area. The (SMI) SCHEME details of works approved, funds released so far and area protected are given in During XII Plan, 3348 SMI schemes have Annexure XI and XII respectively. been taken up under the programme out of which 1327 schemes have been reported to In view of demands by States and be completed. CA of Rs.3327.9 crore has also recommendations of Xll Plan been released for these schemes out of Working Groupon Flood Management and which an amount of Rs.140.9 crore was Region Specific Issues, the Government of released during 2016-17. lndia has approved continuation of Flood Management Programme during Xll Plan

29 with an outlay of Rs. 10,000crore. During in Xll plan, a proposal amounting to Rs. Xll Plan, the central assistance would also 281.0 crore is approved. be provided for catchment area treatment projects having objectives of flood FARAKKA BARRAGE PROJECT management. During Xll Plan, the central AUTHORITY assistance of Rs. 1307.07 crore has been The Farakka Barrage Project (FBP) released, which includes Rs.149.99 crore was commissioned in 1975 for up to 31.12.2016 to States under Flood preservation & maintenance of the Management Programme (FMP). Calcutta Port and for increasing the navigational depth of the Bhagirathi- FLOOD FORECASTING Hooghly waterway. In order to enable the local administration to take suitable administrative measures like evacuation of people from flood affected areas to safer locations during flood season and also to enable the project authorities in proper operation of reservoirs, the activity of flood forecasting in India is performed by Central Water Commission (CWC) on major rivers and their important tributaries. For this purpose, CWC issues flood forecasts at 199 stations (151 Level forecasting, 48 inflow forecasting) in the country. CWC has started three days advisory forecast at some of the locations using rainfall-runoff modeling and rainfall Farakka Barrage Project at Farakka forecast to give adequate lead time to the (Murshidabad) disaster managers for preparedness. The forecasts issued by CWC prove to be very The Farakka Barrage Project useful in saving life and public properties comprises of a 2245 m long barrage across as a result of timely action by the river Ganga at Farakka in Murshidabad authorities. district of West Bengal, a canal headregulator at Farakka for diverting CWC has been making continuous water to Feeder Canal, a 38.38 km long endeavour for modernization and Feeder Canal andJangipur Barrage at river expansion of itsflood forecasting network Bhagirathi-Hooghly system, besides the in order to have desired automatic system road cum rail bridge of data collection andreal time data across Ganga at Farakka, Navigation transmission. So far, 502 data collection Locks at Farakka, Jangipur and Kalindri, a stations have been modernized, road cumrail bridge across the Feeder three Earth receiving Stations have been Canal, Townships at Farakka, Ahiron and set up at New Delhi, Jaipur and Burla, 21 Khejuriaghat. Its appurtenant structures Modeling Centres have been equipped include flood embankments, marginal with latest computer systems for analysis bunds, afflux/guide bunds, etc. of data,flood forecast formulation and its dissemination to concerned agencies FBP authority has been assigned expeditiously.For activities of flood following major responsibilities: forecasting, modernization and expansion  Operation & Maintenance of Main Barrage

30

(a) 112 gates (in 109 bays) on main people in the region Apart from above, Barrage Farakka Barrage projects facilitating (b) 11 gates on Head-Regulator implementation of lndia-Bangladesh (c) 15 gates of Jangipur Barrage Ganga Water Treaty -1996 on sharing of (d) Navigational lock Gate / Regulator Ganga water between lndia and (e) Protective measures of apron and Bangladesh. river bed in u/s and d/s of Barrage.  Maintenance and Protective measures UPPER YAMUNA RIVER BOARD of Feeder Canal (38.38 Km. in length),structures across Feeder Canal, "Upper Yamuna" refers to the reach of Culverts, Inlets, Ferry Services, Yamuna from its origin at yamunotri to Inspection Road(both banks), Syphon, Okhla Barrage at Delhi. A Memorandum Buildings etc. of Understanding (MOU) was signed on th  Maintenance & protective anti-erosion 12 May, 1994amongst the basin States of works in the extended jurisdiction of Himachal Pradesh, Uttar Pradesh, 120 km(40 km upstream and 80 km Haryana, Rajasthan and Delhi, for sharing downstream of Barrage); along with the utilizable surface flows of river its allied structureslike marginal Yamuna up to Okhla. The MoU bundh, afflux bundh, inspection road, alsoprovided for creation of "Upper regulator, navigation locks,culverts, Yamuna River Board" to implement the guide bund etc. for the safety of said agreement. Barrage.  Maintenance of Farakka Township, Accordingly, the Central Khejuriaghat Township, Jangipur Government constituted the Upper yamuna Barrage colony, colony at Kalindri River Board in1995 as a subordinate office lock including maintenance of all under the Ministry of water Resources. civil, mechanical and electrical After creation of Uttaranchal State in structures. 2000, the resolution was modified to  Operation & Maintenance of all include Uttaranchal (now Uttrakhand) also equipments, vehicles and machineries in the Board. The resolution also provided etc. for constitution of a Review Committee, to be known as the Upper Yamuna Review Since the Gates of FBP have Committee (UYRC), comprising the Chief outlived their economic life and Ministers (Governor incase of President's serviceability, phase wise replacement of rule) of the co-basin States as Members all the gates of main barrage and Head and Union Minister/Minister of State for Regulator, remote control system, etc. Water Resources as Chairman, to have been under taken by FBP. So far 39 supervise the working of the Upper gates of the Farakka Barrage have been Yamuna River Board (UYRB). replaced with new gates and the work of replacement of remaining gates have been The Board comprises of Member taken up by FBP in phased manner. Wp&p),Central Water Commission as the Further, with the successful part time Chairman; one representative accomplishment of time specific anti- from each of the six basin States, Central erosion and bank protection works in Electricity Authority, Central Ground critical reaches on river Ganga/ Padma, Water Board and Central pollution Control FBP authority has been able to Board as its part-time Members and a full ensure the safety of Farakka Barrage time Member Secretary. The expenditure besides providing reasonable protection on the Board is share; equalityby the six from floods tolives and livelihood of local

31 basin States. The Board has sanctioned install telemetry system at the distribution staff strength of 58. points. UYRB has identified 11 locations where the telemetry system for observation The functions of the Board include of flow is to be installed. Accordingly, all aspects of water management in the UYRB prepared draft tender documents Upper Yamuna Basin, viz. implementation for installation of telemetry system. of the water sharing agreement; water allocation; water accounting and data MAJOR PROGRAMMES warehousing; monitoring and upgrading (CENTRALSECTOR) the quality of surface and ground water; co-ordination of the constitution of all DEVELOPMENT OF WATER projects in the -basin, integrated operation RESOURCE INFORMATION of all the projects, watershed development SYSTEM (India-WRIS) and catchment area treatment plans. The

Board has been making tentative seasonal CWC & ISRO has jointly distribution of water to basin States at undertaken the work of development of various distribution points. The Board has Water Resources Information System also been engaged in resolving the inter_ (India-WRIS) during 11th Plan. The first State issues amongst the basin States full version of the website of India-WRIS, related to water distribution and issues (www.india-wris.nrsc.gov.in) was related to benefits and cost sharing from launched by Hon‟ble Minister of Water the proposed storage projects in yamuna Resources on 7th December, 2010 in New Basin. The Board had constituted Water Delhi. Subsequently, four more versions Accounting Committee to prepare Water of the website of India-WRIS have been Accounting Manual for UYRB. The launched. The ver. 4.1 was launched in committee has finalized its report on July, 2015 and is available in public Water Accounting manual. The Board has domain at 1:250000 scale. held 49meetings so far. The last meeting was held on 24th May,2016. The information system contains

several GIS layers on water resources Following the complaints from projects, thematic layers like major water Rajasthan and Haryana that they were not bodies, land use/land cover, wastelands, receiving their due share of water from land degradation etc., environmental layers Okhla Barrage due to incorrect assessment as well as infrastructure and other of inflows at Okhla Barrage. UYRB in its administrative layers. The information 46th meeting of held on 01.08.2014, system has all the basic map viewing and constituted a committee of Superintending navigation capabilities like zoom, Engineers of Haryana, Rajasthan and Up overview, bookmark, table of contents, etc. for joint observations of the discharge at As per provision of Hydro-Meteorological Hindon Cut canal and Agra/Gurgaon Data Dissemination Policy 2013 (MoWR), canal, in order to resolve the issue of all unclassified data of CWC G&D gauge and discharge sites. The committee stations has been made available on India- has so far had three joint observations and WRIS website. itwould continue the joint observations, periodically. The centre for maintenance and

further development of the India-WRIS In the 6th meeting of UYRC held portal is functioning at Central Water on 20.03.2015, the then Additional Commission Headquarter at New Delhi Secretary (nowSecretary), WR,RD&GR since February 2015. The centre has taken suggested that WAPCOS may be asked to up following activities during 2015-16:

32

1. The work related to updation and A Centrally Sponsored Plan refinement of canal network and Scheme, “Rationalisation of Minor command boundary of major and Irrigation Statistics (RMIS)” was launched medium irrigation projects in respect of in 1987-88 in the Ministry of Water 19 States have been completed. The Resources with 100% assistance to the work in respect of remaining States is States/UTs. During Eleventh Five Year under progress. Plan, the RMIS scheme was converted as 2. Reservoir Module for real time data one of the components of the Central entry of reservoir data with users and Sector Scheme - Development of Water administrator access control and Resources Information System (DWRIS) automatic report generation has been of the Ministry of Water Resources, River created. Testing and operationalization Development & Ganga Rejuvenation. The of the module is under progress. main objective of the RMIS scheme is to 3. PMP Module with Probable Maximum build up a comprehensive and reliable Precipitation at grid points and patterns database in the Minor Irrigation (MI) of key storms, temporal distribution sector for effective planning and patterns of rainfall etc. is under policymaking.Under RMIS scheme, each development. This module will be State/UT has identified a Nodal helpful for direct assessment of Department for compilation of minor applicable PMP value for a catchment. irrigation statistics for the entire State/UT. 4. A “Near Real-time Hydrological A Statistical Cell consisting of suitable Observation Data Entry Using SMS” number of officers/staff has been set up in module for entry of Gauge/Discharge the nodal department for taking up the data is under development. Statistical work relating to the MI sector. 5. A “Web Based Water Quality Data These cells are responsible for collection, Entry” module for entry of water compilation and reporting of data on quality parameters is under development of minor irrigation relating to development. their State/UT on a regular basis. For this 6. Ground Water related data like Ground purpose, they coordinate with Departments water Aquifer, Industrial Cluster and of Rural Development, Agriculture and ground water resources maintained by Irrigation etc. at the State level. These cells CGWB has been included in the India- are also responsible for conducting census WRIS portal. of MI schemes on quinquennial basis with 7. Canal re-alignment mapping for the help of staff of State/UT Governments “Sankosh – Mahanadi Inter-Basin Link posted at district/block/village levels. Project” showing canals, the existing/ proposed structures and alternate links In the MI census, detailed has been completed. information on irrigation sources, namely, 8. In order to maintain and update such a Dug well, Shallow Tube well, Deep Tube large volume of water resources data at well, Surface Flow and Surface Lift national level, it has been planned to schemes including the irrigation potential establish a new setup “National Water created (IPC) and potential utilized (PU) is Resources Information Centre collected and compiled on systematic basis (NWRIC)” under the Ministry. throughout the country. Besides this, information on their ownership, the social RATIONALISATION OF MINOR class and holding size of the owner, IRRIGATION STATISTICS (RMIS) number of electrical/diesel devices used SCHEME for lifting water is also collected. Information in respect of adoption of water and energy conserving devices such as

33 sprinkler and drip irrigation, use of non- Bihar, Chhattisgarh, Gujarat, Haryana, conventional energy sources such as solar Jammu & Kashmir, Jharkhand, Karnataka, pumps, wind mills is also collected in the Madhya Pradesh, Maharashtra, Odisha, MI Census. The National Informatics Rajasthan, Telangana, Tamil Nadu, Centre unit in the MoWR,RD&GR is , Uttarakhand, Uttar Pradesh & associated with development of software, West Bengal and one Union Territory viz., processing of data and generation of Dadra & Nagar Haveli and National tables. Detailed data base on minor Capital Territory of Delhi. irrigation works in the country has been generated through four censuses carried During the flood season, CWC out under the scheme so far with reference operates Flood Control Room on 24X7 years 1986-87, 1993-94, 2000-01 & 2006- basis at Headquarter in New Delhi and 24 07 respectively. The census reports are Division Offices spread throughout the available on the website of the Ministry of country for monitoring the flood situation. Water Resources, River Development & On an average, about 6000 forecasts are Ganga Rejuvenation (www.wrmin.nic.in). being issued during flood season every The 5th Minor Irrigation Census is being year by the Central Water Commission. conducted with Reference Year 2013-14 in Normally, these forecasts are issued 6 to 34 States/UTs. Field work of 5th Minor 48 hours in advance, depending upon the Irrigation Census is in progress in river terrain, the locations of the flood States/UTs during 2015-16. forecasting sites and base stations. In Simultaneously software for processing addition to conventional flood forecasting the Census data has been developed at the methodology, mathematical model Central level and four Regional Data forecasting based on rainfall-runoff Processing Workshops have been methodology is also being used in some organized for imparting training on areas. This has enabled CWC to issue 1- software to officials from States/UTs. day/ 3-day advance forecast /advisory. Funds to 21 States/UTs for conduct of Census and to 22 States/UTs for During the flood season 2016 (May Continuation of Statistical Cells have been to December), 6239 flood forecasts (4969 sanctioned during 2015-16. level forecast and 1270 inflow forecasts) were issued out of which 5948 (95.34%) Under the RMIS scheme, an forecasts were found within accuracy limit expenditure of Rs. 7.21 croreup to31st (± 0.15 m for level forecast and ± 20% for December, 2015 has been incurred against inflow forecast). Since 2014, CWC is a Budget Estimate (BE) of Rs.12.70 crore using web-based software “e-SWIS” for for the financial year 2015-16. entry of hydrological data on hourly basis, analysis of data and dissemination of flood FLOOD FORECASTING forecasts is being entered by all divisions of CWC in since monsoon to monitor the CWC is providing Flood current status of the river. Forecasting service at 199 stations, of which 151 are level forecasting stations on Due to very heavy pre monsoon major rivers and 48 are inflow forecasting rainfall occurring in North-eastern region stations on major dams/barrages. Out of resulting in flood like situation in the year this, Flood Forecasting service at 23 2016, the flood forecasting service in st stations have been started during 2016. It Brahmaputra basin was started on 21 covers 19 major river systems in the April, about 10 days advance of the country and 20 States viz., Andhra designated flood season. During the year, Pradesh, , Assam, 245 daily bulletins (once daily), 58 Orange

34

Bulletins for High Flood Situation (Twice previous recorded Highest Flood level daily) and 81 Red Bulletins (every 3 (HFL) for the station, was witnessed at hours) for Unprecedented Flood Situation four(4) stations. High Flood Situations, were issued by CWC as per Standard where water level had attained within 0.5m Operating Procedure (SOP). The flood of previous HFL, were experienced at 18 forecast and water level information have stations; the details in this regard are given been made available to common public in Table 3.8. During 2016, CWC has also through website “https://india- analysed data of stations other than flood water.gov.in/ffs” on near real time basis. forecasts stations but receiving data on near real time basis. Based on analysis of During the flood season of 2016 such data, the details of stations (May to December), Unprecedented Flood experiencing unprecedented and high Situation, where the water level exceeded flood situation is given below:

18 Stations That Witnessed Unprecedented Flood Situations(May to December 2016) Sl. No. Station Name River District State Unprecedented Flood Situation 1 Ballia Ganga Ballia Uttar Pradesh 2 Gandhighat Ganga Patna Bihar 3 Hathidah Ganga Patna Bihar 4 Bhagalpur Ganga Bhagalpur Bihar High Flood Situation 1 Dibrugarh Brahmaputra Dibrugarh Assam 2 Neamatighat Brahmaputra Jorhat Assam 3 Tezpur Brahmaputra Sonitpur Assam 4 Goalpara Brahmaputra Goalpara Assam 5 Dhubri Brahmaputra Dhubri Assam 6 Nanglamoraghat Desang Sibsagar Assam 7 Kampur Kopili Assam 8 NT Road Crossing Jia-bharali Sonitpur Assam 9 Beki Road Bridge Beki Barpeta Assam 10 Golokganj Sankosh Dhubri Assam 11 Jhawa Mahananda Katihar Bihar 12 Kursela Kosi Katihar Bihar 13 Maner Sone Patna Bihar 14 Khagaria Burhi Gandak Khagaria Bihar 15 Dighaghat Ganga Patna Bihar 16 Kahalgaon Ganga Bhagalpur Bihar 17 Balrampur Rapti Balrampur Bihar 18 Ghazipur Ganga Ghazipur Uttar Pradesh

12 Stations That Witnessed Unprecedented Flood Situations other than Flood Forecast Stations 2016 Sl. No. Station Name River District State Unprecedented Flood Situation 1 Desangpani Desang Sibsagar Assam 2 Gajaria Burima West Tripura Tripura 3 Saharghat Adhwara Darbhanga Bihar 4 Nasik Godavari Nasik Maharashtra 5 Duddhi Kanhur Sonebhadra Uttar Pradesh 6 Dhariawad Jakham Pratapgarh Rajasthan 7 Kaimaha Urmil Mahoba Uttar Pradesh

35

Sl. No. Station Name River District State High Flood Situation 1 N H Crossing Aie Bongaigaon Assam 2 Paliakalan Sharda Kheri Uttar Pradesh 3 Kachhla bridge Ganga Badaun Uttar Pradesh 4 Bhinga Ghaghra Shrawasthi Uttar Pradesh 5 Sitamarhi Ganga Mirzapur Uttar Pradesh 6 Taibpur Mahananda Kishanganj Bihar 7 Runisaidpur Bagmati Sitamarhi Bihar 8 Dumariaghat Gandak East Champaran/ Bihar Gopalganj 9 Naugaon Yamuna Uttarkashi Uttarakhand 10 Kharra Rihand Sarguja Chhattisgarh 11 Jotasan Wakal Sabarkanta Gujarat 12 Japla Sone Palamau Jharkhand

The CWC Flood Control Room at flood forecasts/ alerts was made available New Delhi keeps a close watch of flood to common public on different Google situation likely to arise in country on the applications such as Google Web Search, basis of rainfall forecasts issued by the Google Now Cards, Google Maps and India Meteorological Department. Google Public Alerts Homepage which Necessary analysis are carried out on the can be accessed on desktop and smart receipt of warning of heavy to very heavy mobile phones. The information available rainfall with isolated extremely heavy to users include likely flood situation, rainfall received from IMD and suitable current water level, forecasted water level, advisory are issued to appropriated recommended action for affected people authority for taking flood preparedness and website address for detailed water exercise. During the year 2016, advisory level information. Availability of near was issued to the State Government of real-time flood information is very helpful Maharashtra, Karnataka, Telangana and to affected people in preparing and Andhra Pradesh in September. Another fighting flood disasters. The service was advisory inflow forecast for lakes launched in November 2015 and was fully surrounding Chennai was issued to the operational during monsoon season 2016. Government of Tamil Nadu in November in the backdrop of very severe cyclonic Central Water Commission also storm “Vardah”. compiles annual flood damage statistics based on data received from State Apart from regular bulletins, CWC Government. The damage data up to 2012 also provided requisite technical input to has been finalized and published. The data National Disaster Management Authority for the year 2013, 2014, 2015 and 2016 (NDMA) on regular basis as well as during has also been compiled and submitted to significant flood events to help then in States for confirmation. taking appropriate decision in planning pre and post flood disaster management MODERNIZATION OF FLOOD activities. FORECASTING SERVICES The Central Water Commission is As a new initiative, CWC making constant endeavour in updating partnered with Google for dissemination of and modernizing the forecasting services. flood forecasts/ alerts using their Public The forecasting of flood involves a Alert Platform based on Common Alerting number of steps, namely, data observation, Protocol (CAP). Using the service, the collection, transmission, compilation and

36 analysis, formulation of forecasts and their Chennai. The activities for establishment dissemination. To make the flood of 4Modeling Centres are in progress. forecasts more accurate, effective and timely, the modernization activities are In order to improve the flood being taken up on a continuous basis. forecast activity in CWC, the methodology based on mathematical model using During 9thPlan, telemetry system windows based Mike-11 software is was installed at 55 stations in Chambal and progressively being used. The progress of Upper Mahanadi basins for real time data use of mathematical model for flood collection and transmission to forecast forecasting is as under: formulation centres under the World Bank a. Inflow Forecasting for Gandhi Sagar aided DSARP scheme. During 10th Plan, Dam in Chambal River is under telemetry system was installed at 168 operation. stations in six river basins namely, b. Rainfall based modeling in Mahanadi Godavari (63), Krishna (41), Brahmaputra up to Naraj and Inflow Forecast at (21), Damodar (20), Yamuna (15) and Hirakund Dam is under operation. Mahanadi (8). Further, during 11th Plan, Further, two additional sites (Alipingal telemetry system was installed at 222 & Nimrapara) have also been stations in seven river basins namely, incorporated in the model. Indus (4), Ganga (63), Yamuna (25), c. Hydrodynamic (HD) based model for Narmada &Tapi (76), Mahanadi (36), Brahmaputra has been developed. The Brahmaputra (14) and Godavari (4). model for the reach from Tejpur to During XII Plan, telemetry system has Dhubari is under operation. Further been installed at 57 stations. The activity extension of the model is under for installation of telemetry system at 572 progress. stations are in progress. d. Rainfall based model for Hathnikund Barrage on river Yamuna was run on In order to receive and analyse data experimental basis. The collected by the telemetry stations, Earth Hydrodynamic (HD) based model for Receiving Station and Modeling Centres Yamuna in downstream reach is have been established in various parts of operational up toDelhi. Further the country during different plan period. extension of the model is under As on date, there are 3 Earth Receiving progress. Stations in the country at New Delhi, e. Rainfall based model for Alaknanda up Jaipur and Burla. A total of 22Modeling to Srinagar; inflow forecast model for Centre has been established in the country Bhagirathi at Tehri Dam and model for till the end of XI Plan. These Modeling Ganga for and is Centres are located at Agra, Asansol, operational. Bhubaneshwar, Bhusaval, Burla, f. Rainfall based modeling in Jhelum up Dehradun, Dibrugarh, Gandhinagar, to Ram Munshi Bagh has been Guwahati, (two stations one developed. Advisory Flood Forecast each for Krishna and Godavari basins), using above model and QPF inputs Jaipur, Jalpaiguri, Kurnool, Lucknow, from IMD were issued in 2016 Maithon, New Delhi (one at Headquarter monsoon. and one for Yamuna Basin), Patna, g. Development of rainfall based Flood Shimla, Surat and . The data Forecasting model for the entire Ganga reception from all the sites modernised is and Godavari Basin in under progress. being monitored from CWC Headquarter h. Models for Inflow forecasting of at New Delhi. During XII Plan, one Hathnur & Ukai Reservoir in Tapi Modeling Centre has been established at River and Madhuban Reservoir in

37

Damanganga River in Tapi basin have (includes 10 Central IAs and 39 State/ UT been developed. IAs), including the Ganga and i. Rainfall Based Runoff Modeling in Brahmaputra Basin States which were not Sharda (up to Sharda Barrage), Sutlej covered under previous phases of (up to Rampur) and Ghagra (up to B K Hydrology Project and as a follow-up and Ghat) is under progress. The model extension of Hydrology Project Phase –I for Sharda (up to Sharda Barrage) has and Phase-II. The project duration of NHP been calibrated for the year 2012-14, is eight years. while model for Sutlej (up to Rampur) has been calibrated for year 2013-14 The EFC of National Hydrology and Ghagra (up to B K Ghat) initially Project has been approved from the DEA, calibrated for the year 2015. These Ministry of Finance on 16.10.2015. The models will be further calibrated and Cabinet has approved the NHP on validated in next monsoon. 6.4.2016 as Central Sector Scheme with an outlay of Rs. 3679.7674 crore HYDROLOGY PROJECT [Rs.3,640crore for National Hydrology Project (NHP) and Rs.39.7674 crore for Previous phases of Hydrology creation of National Water Informatics Project (HP) were implemented only in 13 Centre (NWIC)]. While giving approval to States. This has resulted in a sectoral NHP, the Cabinet has also approved divide amongst the HP and non-HP States establishment of an independent in terms of equipment, technology, organization National Water Informatics applications and capacity building which Centre (NWIC) in New Delhi under the have a direct impact on water resources overall supervision of Secretary (WR, RD planning, development and management. & GR) as a repository of nation-wide water resource data. The components of The National Hydrology Project NHP are summarized below: (NHP) has been envisaged with pan-India coverage with 49 Implementing Agencies

Components of NHP Component Name Objectives A In-Situ Hydro-met Monitoring Expand and upgrade water resources System monitoring systems B National Water Information Develop centralized spatial data sets, including System remotely sensed data and support National Water Informatics Centre (NWIC). C Water Resources Operation & Develop Decision Support Systems (DSS) for Management Systems selected river basin planning, assessments, flood forecasting etc. D Water Resources Institutions Capacity building through trainings, and Capacity Building. establishment of Centre of Excellence, etc.

Expected Outcomes from NHP and NWIC for use by the disaster management are as under: authorities.  Data storage, exchange, analysis and  Assessment of surface and ground dissemination through National Water water resources in a river basin for Information Centre. better planning & allocation for  Lead time in flood forecast including PMKSY and other schemes of Govt. of flood inundation from 1day to 3 days - India.

38

 Reservoir operation through seasonal  A workshop has been organized on yield forecast, drought management, „Trend Analysis of Rivers Water SCADA systems, etc. Quality of India‟ in the month of September, 2016 in Delhi. The final outcome will be (i)  One training program on „Water reduction of flood and drought losses in Quality Monitoring and Assessment‟ the country, especially in the agricultural for capacity building of personnel sector of the economy, and (ii) improved associated with water quality preparedness to reduce impacts and losses monitoring & assessment activities has from hazardous events with respect to life, been organized at NWA, Pune in the livelihood, and all sectors of national month of November, 2016. economy.  One workshop on ‟Water Quality & its Management‟ and one training WATER QUALITY ASSESSMENT program on „Hands on Advanced AUTHORITY (WQAA) Instrument of Water Quality Monitoring & Testing‟ is being Water Quality Assessment organized in the month of January, Authority (WQAA), an Inter-Ministerial 2017 and March, 2017 respectively at Authority, was constituted under NIH, Roorkee. Environment (Protection) Act, 1986. Secretary, Ministry of Environment, The 13th meeting of WQAA is Forests & Climate Change is the Chairman scheduled to be held on 12th January, of WQAA and Joint Secretary (A), 2017 wherein the issues related with Ministry of Water Resources, RD & GR is notification of the Authority, Revision of its Member Secretary. Water Quality Cell UPWQM, rationalization & optimization in MoWR, RD & GR is providing of water quality stations, uploading of secretariat services to WQAA. The water quality data of CWC, CGWB & Authority deals with issues related to CPCB on a single web based platform water quality assessment and management. „India-WRIS‟, the study reports are likely The Authority is thriving for the to be discussed. standardization of water quality laboratories of CWC, CGWB and CPCB. RESEARCH AND DEVELOPMENT The Authority has decided "India-WRIS Web GIS" as a single web based platform Research & Development to host water quality data of various Programme in Water Sector is a plan Central/State agencies for utilization. The scheme under the Ministry of WR, RD & officials from WQAA secretariat inspected GR. Three organizations of ministry viz. thirteen Real Time Water Quality Central Water and Power Research Station Monitoring Stations (RTWQMS) (10 of (CWPRS), Central Soil and Material CPCB and 3 of CWC) to evaluate the Research Station (CSMRS) and National performance and suggested remedial Institute of Hydrology (NIH) are fully measures to CWC and CPCB. The report devoted to Research & Development in entitled "Status of Ground Water Quality water sector. CWPRS is the premier in Coastal Aquifers of India" prepared by national institute for research in the area of CGWB has been circulated to various hydraulics of water resources structure organizations for valuable comments. The related to irrigation, hydropower, report on "Status report on ground water navigation, coastal works and related quality of NCR region" has been submitted instrumentation. CSMRS is involved in the by CGWB. The other activities included research related to construction materials, the following: concrete technology, geophysics, rock

39 mechanics, soil mechanics and rockfill &drainage, hydrology, hydraulics and geo- testing technology. NIH is devoted to technical engineering & construction systematic and scientific studies in all materials. The research scheme pertaining aspects of Hydrology. The objective of to hydrology, hydraulics and geo-technical these organizations is to improve the engineering & construction materials present practices in planning, design and which so far were being dealt by INCOH, operation of water resources projects. INCH and INCGECM have been brought under INCSW with its Secretariat at CWC Under the Scheme, the Ministry of Sewa Bhawan, R.K. Puram, New Delhi. WR, RD & GR provides financial There are a number of research schemes assistance to promote research work in the presently under progress in various field of water resources sector. The organisations in the country with funding assistance is provided by way of grants to from the MoWR, RD&GR under the R&D academicians / experts in the Universities, Programme. IITs, recognized R&D laboratories / institutes, Water Resources / Irrigation Indian National Committee on Departments of the Central and State Ground Water (INCGW):Considering Governments in the country and NGOs for the importance of various issues related to carrying out research and studies related to ground water, a new committee viz. Indian water resources sector. Research proposals National Committee on Ground Water of applied nature as well as basic research (INCGW) with responsibility of are considered for financial assistance. The coordinating various research activities in coordination of the Programme for the relevant field has been constituted in providing financial assistance for research September 2008. After reconstitution of and development is done by Research & INCs in June, 2012, the mandate for Development Division under the Policy & INCGW remained unchanged. The Planning Wing of the Ministry. secretariat of INCGW is located at CGWB, Jam Nagar House. Expenditure till December, 2016 was Rs. 26.82 crore against allocation of Indian National Committee on Rs. 55.50 crore(B.E.)/35.0 crore (R.E.). Climate Change (INCCC): Similar to Physical achievement for the year 2016-17 above two committees, a third committee (up to31.12.2016) is preparation of “Indian National Committee on Climate technical reports / studies (119), Change (INCCC)” has been constituted to publication of research papers (106), address the issue of research in the field of organization of Training course / climate change impacts. The committee workshops / seminars / symposia (24) and has the following functions: training of personnel (448). 1. To co-ordinate and recommend funding for research Indian National Committee on proposals/schemes to be taken up by Surface Water (INCSW): The existing the research institutions/ organization/ four Indian National Committees (INCs) R&D labs in the country on basic i.e. INCH (Hydraulics), INCOH research, applied research and action (Hydrology), INCID (Irrigation & research, along with other areas of Drainage) and INCGECM (Geo-Technical research in the subject field. Engineering and Construction Materials) 2. To review the R&D programme in the have been merged and reconstituted as subject area; identify topics which Indian National Committee on Surface need immediate attention and Water (INCSW) with a mandate to deal encourage the national institutions to with the issues related to irrigation take up research on these topics. The

40

INCs committee may also identify and organizations under MoWR, RD and GR. recommend the institutions for taking A quiz and pantomime show was up research on specific topics etc. organized in the pavilion to make the Recently 10 new studies have been masses aware regarding water awarded to assess the basin wise conservation and various aspects of water. climate change impacts. The theme of the pavilion for the year was:“Pradhan Mantri Krishi Sinchayee INFORMATION, EDUCATION & Yojana” (PMKSY)with sub-components COMMUNICATION (IEC) consisting of Accelerated Irrigation Benefit Programme (AIBP), Har Khet Ko PARTICIPATION IN Pani, More Crop Per Drop, Watershed FAIRS/EXHIBITIONS development.

India International Trade Fair 2016: Various organizations under the Ministry of Water Resources, River Ministry exhibited their models. A central Development and Ganga Rejuvenation had Three Dimensional model of “Pradhan erected a pavilion in Hall No.7-E in the Mantri Krishi Sinchayee Yojana” 36th Edition of India International Trade (PMKSY) was prepared and exhibited by Fair organized by ITPO in Pragati Maidan CWCwith the vision of extending the from 14th to 27th November, 2016. The coverage of irrigation „Har Khet ko pani‟ pavilion was carrying different exhibitory and improving water use efficiency „More materials viz. Physical models of various Crop per drop‟ in a focused manner with projects/activities, banners, posters etc. end to end solution on source creation, depicting various activities, programmes distribution, management, field application and Projects undertaken by the ten and extension activities.

Dr. Sanjeev Kumar Balyan, Hon‟ble MoS(WR,RD&GR) inaugurated the Ministry‟s pavilion at India International Trade Fair- 2016 on 14th November, 2016

41

CWC had also displayed the Model of industrial pollution and Domestic India International Science Festival – pollution, Sewage treatment plant 2016: highlighting „Swachh Bharat Abhiyan‟. The Ministry participated in India The other highlights of the pavilion were International Science Festival – 2016 at Hydrologic cycle model and Waste Water New Delhi from 7th to 11th December, Management by NIH, display of river 2016 organized by Ministry of Science and linking project by NWDA, early flood Technology and Earth Sciences through warning system and port model by Central Water Commission, Central CWPRS, sprinkler and drip irrigation by Ground Water Board, Central Soil and pressure valve by WAPCOS, Geotechnical Material Research Station, National investigation and embankment protection Mission for Clean Ganga and National by CSMRS and the various programme Water Development Agency. and action plan to clean river Ganga by NMCG.The pavilion was visited by over ORGANISATION OF WORKSHOPS 1.55 lakh people as recorded by footfall /SEMINARS/ CONFERENCES machine. India Water Week 2016: This year for the Ministries & The fourth edition of India Water Departments Pavilion, the Pavilion of Week was observed from 4th to 8th April, MoWR,RD&GR has been adjudged 2016. The theme for this year‟s India Second for excellence in display and given Water week was “Water for all: Striving special appreciation certificate by ITPO, together”. Israel was associated as the which is a significant achievement for the partner country for this mega event. efforts taken by Ministry and all the organizations involved in the display.

Dignitaries at dais during INDIA WATER WEEK 2016

The Inaugural session of India Water Seminars (eight nos.), Brainstorming Week was followed by Plenary session sessions (six nos,), Panel Discussions and Water Resources Ministers conclave (seven nos.), Case studies (six nos.) and on first day. About 1500 delegates from Side Events (five nos.). These events were India and 20 other countries attended the held at ITPO, Pragati Maidan. Apart from conclave. The event was divided into this, an Exhibition „Water Expo-2016‟

42 showcasing the technologies and solutions interaction was oriented towards in water resources sector was also addressing the emerging issues related to organised at Hall No. 9, Pragati Maidan. groundwater and its governance to cope up with the competing demand tools and Bhujal Manthan-2: measure in order to ensure the most The Ministry has organized one efficient use of available resources thereby day “Bhujal Manthan-2” at Vigyan maintaining sustainability as well as Bhawan, New Delhi on 29.11.2016 on the quality. A mobile application named theme „Aquifer Mapping and Ground „Bhujal‟ was also launched by Hon‟ble Water Management‟. The one day Minister (WR,RD&GR) during the event.

Dignitaries at dais during Bhujal Manthan-2

Other Events: A programme was advertisement on „Water Conservation and organized on Dr. Bhimrao Ambedkar‟s other related areas‟ was issued in birth anniversary through Central Water collaboration with Ministry of Drinking Commission at NDMC Convention Water and Sanitation on 06.5.2016. Centre, New Delhi to highlight „the contribution of Dr. Bhimrao Ambedkar in ORGANISATION OF TRAINING Water Sector and discuss Way Forward‟ th PROGRAMMES on 19 April, 2016.A Seminar was also Various Workshops and Training organized through Central Water Programmes are being organized through Commission on „Marching Ahead on Dr. Central Water Commission and Central Bhimrao Ambedkar‟s path for th Ground Water Board aimed at delivering management of Water Sector‟ on 6 knowledge regarding efficient Water December, 2016 at CWC Auditorium, Management especially through various New Delhi. techniques of artificial recharge to benefit various stakeholders including non PUBLICITY THROUGH PRINT government organisations and village MEDIA I.E. NEWSPAPERS Pradhans from across the States / UTs. The /MAGAZINES trainings are being imparted by the officers An advertisement was issued on of Central Ground Water Board, State „Achievement / Schemes of the Ministry‟ Governments as well as experts from other during India Water Week 2016.An institutions.

43

Publicity through Print Media ACTIVITIES LIKELY/ i.e. newspapers/magazines: Central ANTICIPATED TO BE Ground Water Board has been entrusted UNDERTAKEN FROM 1ST with printing / distributing of Publicity JANUARY, 2017 TO 31ST MARCH, Materials(booklets/brochures/pamphlets/p 2017 osters etc.) spreading the messages of Electronic Media Campaign: Water Conservation and related issues. Production of 03 Radio Jingles and 01 Radio Spot through National Film JAL KRANTI ABHIYAN Development Corporation is in the final stage. Once developed, these Jingles/Spots Ministry of Water Resources, River will be aired through All India Radio / FM Development and Ganga Rejuvenation, Channels / Private Channels etc. Government of India, New Delhi is celebrating “Jal Kranti Abhiyan” during Painting Competition on Water the year 2015-16 in the country in order to Conservation:A three tier Painting consolidate water conservation and Competition has been organised since management in the country through a 2010 across the country for 6th, 7th and 8th holistic and integrated approach involving standard students in three stages, namely, all stakeholders, making it a mass School, State and National Level to spread movement. The Abhiyan has been awareness on water conservation. This launched throughout the country on 05th year, the School and State Level Painting June, 2015. To make this occasion special Competitionshave been successfully inauguration functions were held at Jaipur, conducted across all States/UTs. The 7th Shimla and Jhansi. National Level Painting Competition will be conducted in January, 2017 on the The objectives of Jal Kranti theme „Save Water, Save Life‟ or „Save Abhiyan are as under: Water, Save Earth‟.  Strengthening grass root involvement of all stakeholders including Essay Competition on Water Panchayati Raj Institutions and local Conservation: First Essay bodies in the water security and Competition has been successfully development schemes (e.g. organized in FY 2015-16 through Central Participatory Irrigation Management Ground Water Board, on the similar lines (PIM); Second National Essay Competition will  Encouraging the adoption/utilization be organized in the last quarter of FY of traditional knowledge in water 2016-17. resources conservation and its management; Mass Awareness activities under  To utilize sector level expertise from Tribal Sub Plan: The Ministry will different levels in government, NGO‟s, organise Drawing and Essay competition citizens etc; and for School children and other Special  Enhancing livelihood security through Awareness Programmes on Water water security in rural areas. Conservation in, Arunachal Pradesh, , Nagaland, , The broad strategies to be adopted Lakshadweep and Dadra and Nagar Haveli for successful achievement of objectives of under Tribal Sub Plan in the last quarter of the Jal Kranti Abhiyan are as follows: the FY 2016-17. a. Use of modern techniques coupled with traditional wisdom for devising area/region specific innovative

44

measures for increasing water (iii) Mass Awareness Programme security; (iv) Other Activities b. Revival of traditional knowledge and sources for water conservation and Success achieved under Jal Kranti utilization; Abhiyan are as below: c. Encouraging conjunctive use of 1. Three meetings of the National Level surface and groundwater; Advisory and Monitoring Committee d. Promotion of appropriate technologies for overall coordination and for efficient and sustainable use of monitoring Jal Kranti Abhiyan have rainwater; Old and new ground water been held so far. schemes, Creation of additional 2. Under Jal Kranti Abhiyan , 1105 Jal facilities for water conservation Grams have been identified so far and through construction of water out of the 1105 Jal Grams, 246 Water harvesting structures; Security Plans have been prepared. In e. Rainwater harvesting for recharge to addition to these 100 Dalit Jal Grams be made mandatory for residential, has also been identified. Model commercial and industrial Command Area in 10 different States buildings/premises; has also been identified. f. Selected interventions for maintaining 3. DPR‟s for all the identified villages in the specified water quality standards; the States of Nagaland have been g. Convergence of efforts of various received and are at the stage of departments in water resources approval. development and management; 4. Facebook and Twitter Account for Jal h. Promotion of social regulation for Kranti Abhiyan operationalized. meeting the demand as well as for optimizing the use-efficiency of water JAL MANTHAN for various purposes especially industry, agriculture and domestic; Jal Manthan is an initiative of the i. Institutionalization of village Ministry of Water Resources, River participation in water related schemes Development & Ganga Rejuvenation for and projects and cost sharing for wider consultations among various O&M by the community to instill a stakeholders for churning out new ideas as sense of belongingness, accountability well as tangible solutions to various water and responsible partnership. sector issues. j. Provision for incentivizing / honouring PRIs for devising The First Jal Manthan was innovative/unique ways to create organized from 20-22ndNov., 2014 at New water security in their areas for Delhi resulting in many new perspectives amelioration in water related issues. leading to greater understanding among k. A logo for Jal Kranti Abhiyan shall be the stakeholders of water sector. Jal used to connect positively with all Manthan-2 was organized on 22-23 stakeholders. February, 2016 with the theme “Integrated Approach for Sustainable Water Various activities under Jal Kranti Management”. On the First Day, Sessions Abhiyan e.g. Jal Gram Yojana, Model were held on PMKSY Priority Projects – Command Area, workshops etc are Implementation Issues; Inter Linking of underway; these include: rivers – Progress and Challenges; and (i) Jal Gram Yojana River Basin Approach – Present Status and (ii) Development of Model Command Future Indication, whereas sessions on Area Second Day were held on Ground Water

45 and National Hydrology Project; Management, River Rejuvenation and Principles of Allocation of Water; Water Flood Management were held. During this Management; Use of innovative one day event extensive consultations were Technologies and Water Conservation. held among different stakeholders on several important and critical areas in the Jal Manthan-3 was organized on water sector like River Basin Approach for 13th January, 2017 at Vigyan Bhavan, New Sustainable Development, Ground Water Delhi. During the event, discussions on Management, Water Security, Water Implementation of PMKSY & Management, Coordination between Improvement of Water Use Efficiency, Centre and States, water conservation Ecology Improvement, Participatory Innovation in Water Governance etc. Irrigation Management, River Basin

Hon‟ble Minister of Ministry of Water Resources, River Development & Ganga Rejuvenation Sushri Uma Bharti addressing during „Jal Manthan -3‟ at Vigyan Bhavan on 13.01.2017

BHUJAL MANTHAN

Ministry of Water Resources, River Development and Ganga Rejuvenation organized one day Seminar- Bhujal Manthan-2 on 29th November, 2016 at Vigyan Bhavan, New Delhi with a theme of “Aquifer Mapping and Ground Water Management”.

Lighting of Lamp by Dignitaries in BHUJAL MANTHAN-2

The BhuJal Manthan program was inaugurated by Sushri Uma Bharati the

46

Hon‟ble Minister of WR, RD & GR, in platform to Government organizations, presence of Shri Narendra Singh Tomar, private service providers, drilling Hon‟ble Minister for Rural Development, contractors, drilling rig manufacturers and Panchayat Raj and Drinking Water, Sh. all related stakeholders in water well Shashi Shekhar, Secretary, Ministry of drilling to share their experiences and Water Resources RD& GR, Sh. difficulties in the field; iii) Assessing the Parameswaran Iyer, Secretary, Ministry of potential of the market in terms of Panchayat Raj, Dr. Amarjit Singh, OSD, equipment and capabilities for water well Ministry of Water Resources RD & GR, drilling and related data generation in Sh. K.B. Biswas, Chairman, CGWB, NAQUIM.The workshop was attended by Ministry of Water Resources, RD & GR. about 150 delegates including experts from During the Program Sushri Uma Bharati various Central and State Government the Hon‟ble Minister of WR, RD & GR, Departments, professionals, service released the app “Mera Bhujal” and Bhujal providers, drilling contractors and rig Manthan-2 Volume. It was attended by manufacturers. Distinguished invitees about 1200 experts and delegates including included Shri Shashi Shekhar, Secretary, Officers from various Ministries, Govt. MOWR, RD & GR, Shri Harbans Singh, Organizations (Central as well as State DG GSI, Dr R.D. Singh, Director, NIH, Governments), Non-Government Shri Subodh Kumar, ONGC, Dr. D.K. organizations, Academicians, Scientists Chadha & Dr. S.C. Dhiman, Ex Chairman, from Research Institutes working in the CGWB, Shri S.S.Chauhan, Dr. R. C. Jain, ground water domain and stakeholders like Shri Bhajan Singh, Shri Ashis Students, Farmers & Industrialists from Chakraborthy, Ex-Member, CGWB, and across the country. The Seminar was Senior officers of CGWB have also organized in five technical sessions with attended the workshop. following sub-themes followed by the Panel Discussions: A Workshop on “Palaeochannels -  Aquifer Mapping – A National Evolution and Ground Water Prospects” Perspective was organized by CGWB at CSMRS  Advances in Science & Technology in Auditorium, New Delhi. The programme Aquifer Mapping was inaugurated by Honorable Minister of  Groundwater Management: State, Water Resources, River Community Involvement & Development & Ganga Rejuvenation, Convergence Prof. Sanwar LalJat, in the presence of Sh.  Sustainable Management of U. P. Singh, Additional Secretary, Groundwater in Stressed Aquifer Ministry of Water Resources, River  Aquifers in Arid Area &Palaeo- Development and Ganga Rejuvenation, channels Sh. B. Rajendra, Joint Secretary, MoWR, RD & GR, Shri K.B Biswas, Chairman, A One day Workshop and Global CGWB and other dignitaries. Market Conference on “Emerging issues, Opportunities and Challenges in Water Padma Bhushan Prof. K.S. well drilling for Drilling Engineers, Valdiya, in his keynote speech discussed Service provider and Rig Manufactures” in detail about the origin and history of the was organized by CGWB on 24.05.2016 at palaeo-channels with special emphasis on New Delhi. The objectives of the the once mighty River Sarswati flowing workshop is i) to deliberate upon and to along the north westerns and western part assess emerging issues, opportunities and of India. Prof. Anindya Sarkar, Head, challenges in water well drilling and Dept. of Geology & geosciences, IIT related data generation; ii) to provide a Khargpur dealt with the archaeological

47 findings depicting one of the oldest presentations on various aspect of civilization along the floodplains of the modeling in soft rock areas. Total 80 rivers in the north western India which is invitees had participated in the workshop. recently published in the Journal Nature. Padma Shri Dr. Bisht explained in detail Central Ground Water Board, about the correlation between Ministry of WR, RD and GR, Govt. of archeological sites and the palaeo-channel India has organized a workshop on courses of river Sarswati. Prof. Rajiv 15.10.2016 at CSMRS, New Delhi. During Sinha, Head Geosciences Deptt. IIT workshop Sushri Uma Bharati the Hon‟ble Kanpur spoke about the sedimentological Minister of WR, RD & GR released the characters of the palaeo-channels. Dr. D. Report entitled “Palaeochannel of North Saha, Member CGWB, spoke about the India: Review & Assessment”, compiled by work being carried out by the department expert Committee constituted by the in the palaeochannel areas of river Ministry. Total about 200 invitees had Sarswati. During the panel discussion, participated in the workshop from CGWB Prof. S.K. Tandon emphasised the need for and other Department. further studies to accurately delineate the INFRASTRUCTURE palaeo-channels and ascertain their DEVELOPMENT characters particularly along the once mighty River Saraswati. Sh. Prashant Infrastructure Development (ID) Bhardwaj, briefed about the various Scheme has been approved by the activities being undertaken in the state of Government by merging four continuing Haryana in this regard. The programme schemes viz. (i) Land & Building and was attended by the luminaries from the Information Technology Plan of Central field of geosciences, water resources Ground Water Board (CGWB), (ii) Land engineering, archaeology, environment &Building of Central Water Commission etc. (CWC). (iii) Information Technology

Development Plan of Ministry of Water Central Ground Water Board, Resources, River Development and Ganga Ministry of WR, RD and GR, Govt. of Rejuvenation and (iv) e-Governance of the India has organized a workshop on 1st Ministry of Water Resources, River September 2016 at IIT, Kharagpur under Development and Ganga Rejuvenation. the NAQUIM. The theme of the Workshop was “Ground Water Modeling for Aquifer The Scheme aims at providing Management in Soft Rock Areas”. This better working environment in the offices, workshop mainly dealt with the challenges creation of assets and savings on payment and issues arising during Groundwater of monthly rent. To achieve this, modeling in Soft rock areas of Indo- construction of offices at various locations, Gangetic Plains. The workshop was provision for construction of staff quarters inaugurated by Dr. S K Bhattacharyya, as well as modernization of existing Acting Director, IIT, Kharagpur along offices of the Ministry (Proper), CWC and with Shri K B Biswas, Chairman, CGWB; CGWB have been included under the Dr. D Saha, Member, CGWB; Dr. ambit of the Scheme. Anindya Sarkar, Professor and Head,

Department of Geology and Geophysics, CWC – Land & Building:- IIT, Kharagpur; and Dr.J.Bhattacharya, Modernisation of CWC (Hqrs) and Professor and Head, School of construction works of residential quarters Environmental Studies, IIT, Kharagpur. at Guwahati, office building of Sub The workshop consisted of 2 Technical Division at Balasore are in progress. sessions each comprising of 4 Approval for procurement of land for

48 construction of SWRSD-III at 1. Hydrological observations and Mangaluruhas been accorded from flood forecasting on common border competent authority during the FY 2015- rivers with neighbouring countries: As 16. Acquisition of land for hutments is mutually agreed, the hydrological under process. observations and establishment of equipment for confirmation of CGWB – Land & Building:- hydrological and seismic parameters Expenditure Sanction for construction of considered at the time of preparation of Rajiv Gandhi National Ground Water DPR, are continuing. Training & Research Institute (RGNGWT&RI) building at Naya Raipur As per Indo-Bangladesh Treaty of 1996, has been issued to CGWB. Construction of during lean season (From 1st January to CGWB office building in Guwahati is in 31st May) the waters of Ganga River are progress. shared at Farakka and for this purpose joint hydrological observation at Farakka e-Governance:-The Ministry has (on Indian side) and at Harding Bridge (on taken following new initiatives for Bangladesh side) are carried out by joint strengthening e-Governance. teams deputed by both the a) Implementation of e-Procurement has countries.During the year, 2014-15 also, been further extended to National these observations were conducted in the Hydrology Project and External lean season during 1st April 2014 to 31st Assistance Division of the Ministry. May 2014 and again started in the next b) Hon‟ble Minister (WR, RD & GR) has lean season from 1st January 2015.The approved an Action Plan for the hydro-meteorological data of 54 sites implementation of e-Office. e-File located in Nepal was received in India as Management system is expected to be per Indo-Nepal bilateral arrangements. operationalized very soon. c) Development of MIS/ Dashboard for 2. Investigations of Water monitoring the Physical and Financial Resources projects in Neighboring progress of various projects/ Schemes countries: Nepal has a vast potential for has been approved by the Ministry. hydropower generation and continuous MIS for 99 projects under PMKSY has dialogues are held with Nepal on been prepared. construction of large storage projects. d) Development of e-Human Resources Under bilateral agreements with Nepal, the Management System (e-HRMS-Manav Pancheshwar Multipurpose Project, Sapta Sampada) for 6 Organizations under High Dam and Sun Kosi storage cum the Ministry on a pilot basis has been diversion have already been identified. initiated in coordination with NIC- Himachal Pradesh team. The field investigations for preparation of Detailed Project Report (DPR) of RIVER MANAGEMENT ACTIVITIES Pancheshwar Multipurpose Project on AND WORKS RELATED TO river Mahakali (known as Sarda in India) BORDER AREAS were completed by the Joint Project Office and draft DPRs prepared by India and The above central sector scheme Nepal. Subsequently, Pancheshwar has been approved in December 2014 for Development Authority (PDA) for Rs. 740 crore to cover the following implementation of the Project has been works/ schemes during XII Plan. The constituted. The Terms of Reference of scheme has following components: PDA, inter-alia, includes execution, operation and maintenance of the

49

Pancheshwar Project including finalisation 6th April 2011, has identified five goals for the of the DPR and as also to resolve the mission. outstanding bilateral issues between India and Nepal related to the project. NEW INITIATIVES TAKEN DURING THE CURRENT FINANCIAL YEAR The field investigations and preparation of (FROM 1ST APRIL TO 31ST DPR of Sapta Kosi High Dam and Sun DECEMBER, 2016) Kosi Storage cum diversion project, are in progress. Besides, feasibility study of Goal 1: Comprehensive water data base Kamla dam project and preliminary study in public domain and assessment of the of Bagmati Multipurpose Project have also impact of climate change on water been undertaken and are targeted to be resources. completed along with DPRs of Sapta Kosi High Dam and Sun Kosi Project. The field Strategies investigations suffered some delay due to  Review and establishment of network security aspects on Nepal Side but the for collection of additional necessary issues have been taken up with the data Government of Nepal and works have  Development of water resources been resumed and are in progress. information system  Development / implementation of 3. Pre-construction activities of modern technology for measurement of Pancheshwar, Naumure and activities of various data Panchehswar Development Authority:  Developing inventory of wetland A provision for undertaking  Research and studies on all aspects preconstruction activities by PDA has been related to impact of climate change on kept under the above scheme. An amount water resources including quality of Rs. 10 Crore has been released to PDA aspects of water resources with active during 2015-16. collaboration of all research 4. Grant-in-aid to States and Union organizations working in the area of Territories for flood management / anti- climate change sea erosion works: The scheme provides  Reassessment of basin-wise water for 100% grant to States and UTs for river situation management works.  Projection of the impact of climate change on water resources NATIONAL WATER MISSION 1.1 Initial projections of the impact The Government of India launched of climate change on water resources, National Action Plan on Climate Change including the likely change in water (NAPCC) which inter-alia identified the availability across time and space: approach to be adopted to meet the Studies on impact of climate change on challenges of impact of climate change water resources for seven river basins through eight National Missions including (Mahanadi, Mahi, Luni, Tapi, Sabarmati, National Water Mission with the main Subarnarekha and western flowing rivers objective of “conservation of water, from Tadri to ) in association minimizing wastage and ensuring its more with research institutes like IITs, NITs, equitable distribution both across and IISc. and NIH have been approved under within States through integrated water the Research & Development scheme of resources development and management”. the Ministry. A study on statistical The National Water Mission (NWM) downscaling of global climate change document, approved by the Union Cabinet on models for the river basins has also been

50 approved in 2016. The work has been CWC has been uploaded on the awarded to the project implementing India-WRIS portal. The data include agencies. Gauge, Discharge, Silt and Water Quality parameters as recorded by 1.2 Reassessment of river basin wise CWC Hydro Meteorological Stations water situation: CWC in collaboration since 1965. The data has been with NRSC has started the work on the updated up to 2014 in Version 4.1 reassessment of 19 river basins. Two India-WRIS. training programmes for CWC officials c. The ground water level and water have been conducted by NRSC and more quality data of Central Ground Water training programmes are planned for Board (CGWB) for the period 1996 regional offices. Procurement of 25 nos. of to 2016 has been made available on licenses of software (latest Arc GIS with India-WRIS. two no. of extensions- Spatial Analyst & d. National Water Informatics Centre 3D Analyst and ERDAS Imagine) has (NWIC) is being setup by been completed and installed in CWC HQ MoWR,RD & GR under National and in most of the concerned field offices. Hydrology Project and Costal Most of the requisite data has been Management Information System collected and field offices are collecting (CMIS) is being developed by CWC. the remaining data. Hands on training on Arc GIS and Erdas imagine software has 1.5 WebPortal & MIS for NWM: been imparted to CWC officers. National Water Mission Web Portal development has been made operational by 1.3 Establishment of network for NIC on their server. The URL of website collection of additional necessary data: is http:// For collection of necessary hydro- www.nationalwatermission.gov.in.The meteorological data, CWC has upgraded NWM website was launched on 26-04- existing 103 Hydrological Observation 2016 by Hon‟ble Minister Water Station (HoS). There are 878 HoS working Resource, River Development and Ganga in different river basins. CWC has a target Rejuvenation. Management Information to establish 800 new HoS in XII Plan, out System (MIS) has also being developed. of which CWC has opened 676 new HoS up to December, 2016. Goal 2: Promotion of citizen and state actions for water conservation, 1.4 Uploading the water data in augmentation and preservation public domain: a. Central Water Commission (CWC) Strategies has launched web based Water  Empowerment and involvement of Resources Information System Panchayati Raj Institutions, urban local (India-WRIS) in association with bodies, Water Users‟ Associations and National Remote Sensing Centre primary stakeholders in management of (NRSC).The Version 4.1 has been water resources with focus on water initiated in July 2015. More GIS conservation, augmentation and layers are being added in the new preservation Version and now GIS based data is  Promote participatory irrigation available in public domain at management 1:2,50,000 scale.  Sensitization of elected representatives b. As per Hydrological Data of overexploited areas on dimensions Dissemination Policy, the of the problems and to orient unclassified hydrological data of investment under MNREGP towards

51

water conservation being faced by WUAs with the overall  Provide incentives for water neutral objective of water conservation, increasing and water positive technologies in water use efficiency in irrigation sector. industry  Encourage participation of NGOs in 2.2 Second Regional Convention for various activities related to water Presidents of Water Users Associations resources management, particularly in (WUAs) on Participatory Irrigation planning, capacity building and mass Management (PIM).Held on 8th& 9th awareness January, 2016 at Water & Land  Involve and encourage corporate sector Management Institute (WALMI), / industries to take up, support and Aurangabad for Western Region for the promote water conservation, States of Maharashtra, Madhya Pradesh, augmentation and preservation within Gujarat, Chhattisgarh and Goa the industry and as part of corporate social responsibility

2.1 Regional Conventions of Water Users Associations (WUA): NWM has organized one National Convention of Water User Associations (WUAs) on Participatory Irrigation Management (PIM) on 7th- 8th November, 2014 at New

Delhi and three Regional Conventions covering WUAs and officials from . Northern (States of J&K, HP, Uttrakhand, 2.3 Training / Capacity Building / Punjab, Rajasthan and Haryana), Western Mass Awareness Programmes: 21 (Maharashtra, M.P., Gujarat, Chhattisgarh training/capacity building/mass awareness and Goa) and Southern (Andhra Pradesh, programmes have been organized till Telangana, Tamil Nadu, Karnataka and December 2016. Information on these Kerala) regions on 25-26 August 2015 at programmes are presented below: Ludhiana, 8-9th January, 2016 at WALMI Aurangabad and 24-25th September, 2016 at Bengaluru to identify the problems

Table-3.11: Training/capacity building/mass awareness programmes

S. Organization Nature of Training/Workshop/ No. of No Mass Awareness Programmes 1 NERIWALM, Tezpur IWM for WUAs, women &self help groups 1 2 WALMI, Aurangabad Workshops/Trainings on WUE in IWM 8 3 HIRMI, Trainings on WUE for farmers 1 4 NIRD&PR, Trainings / workshops on PIM, Basin level 3 Hyderabad IWM, WRM of over exploited areas, WUE for water resource system and PIM 5 NIH, Roorkee Brain Storming Session on impacts of 1 climate change on water resources 6 WALAMTARI, WUE, Water Management & Rainwater 3

52

Hyderabad Harvesting 7 CWPRS Pune National Seminar on Water Environment 1 (in Hindi) 8 NIH, Regional Centre, National Conference on Coastal Areas 1 Kakinada 9. India NPIM New Regional conventions on PIM for WUE at 2 Delhi Aurangabad &Bangalore WUE- Water use efficiency, IWM- Irrigation Water Management WUA – Water User Association PIM – Participatory Irrigation Management

multipurpose projects with carryover storages benefitting drought prone and 2.4. NWM Guidelines Prepared:NWM rain deficit areas hasprepared Guidelines (both uploaded in  Promotion of traditional system of websites of MoWR, RD & GR and NWM) water conservation for Organizing HRD / training / capacity  Physical sustainability of groundwater building / mass awareness programmes resources and Grants in Aid to NGOs/VOs in water  Intensive programme for ground water sector under NWM-TISS Water recharge in over-exploited, critical Programme. and semi-critical areas  Conservation and preservation of 2.5. NWM-TISS Water Project:The wetland MOU executed between NWM and Tata  Intensive programme for addressing Institute of Social Science (TISS), the quality aspects of drinking water Mumbai has been extended till March particularly in rural area 2017. As per the MOU, the following  Promotion of water purification and activities are carried out by TISS: desalination  To facilitate empanelment of  Systematic approach for coping with NGOs/VOs to implement activities floods recommended in the Mission document. 3.1 Intensive Programme for Ground  Evaluation of training modules, & Water Recharge for Over Exploited, capacities of Lead NGOs. Critical and Semi Critical Areas: All the  Oversee criteria and selection process 18 States/UTs having over exploited blocks of field NGOs based on have been requested to prepare State wise recommendations of NWM in implementation plans for rain water collaboration with Lead NGOs. harvesting and artificial recharge to ground  Site visits for field verification by a water based on the Master Plan of CGWB panel of multidisciplinary consultants/ for both rural and urban areas in consultation with Central Ground Water Goal 3: Focused attention to vulnerable Board and State Ground Water areas including over-exploited areas Departments. For implementation of intensive recharge in the over exploited Strategies blocks in nine States (Tamil Nadu, Andhra  Expeditious implementation of water Pradesh, Karnataka, Uttar Pradesh, resources projects particularly the Haryana, Telangana, Maharashtra,

53

Rajasthan, Punjab), the concerned States the CSMCRI. Three sites have been have been requested to prepare DPR for at identified in the State of Gujarat, and the least two over exploited blocks identified CSIR-CSMCRI has submitted a proposal by CGWB for implementation. For for installation of demonstrative implementation of intensive programme for desalination plants based on innovative ground water recharge, coordination is technologies. On successful being promoted amongst MNREGA, commissioning and performance Watershed development, Concerned State evaluation of desalination plants, Govt. Departments, CGWB and NWM. replication of technology in other areas of the Country having Brackish/saline 3.2 Mainstreaming Integrated ground water will be considered. Flood Management under Climate Change: Asian Development Bank Goal 4: Increasing water use efficiency (ADB) has completed the study by 20% “Operational Research to support mainstreaming of integrated flood Strategies management under climate change” with  Research in area of increasing water focus on community participation. Two use efficiency and maintaining its pilot studies have been completed for quality in agriculture, industry and Burhi Gandak basin in Bihar and domestic sector Brahmani-Baitarani basin in Odisha. The  Incentivize recycling of water project reports have been sent to State including wastewater Governments for implementation. A  Development of Eco-friendly scoping study for a National Water Use sanitation system Efficiency Improvement Support Program  Improve efficiency of urban water for Major/Medium Irrigation Projects has supply system been completed with technical assistance  Efficiency labeling of water from Asian Development Bank (ADB). appliances and fixtures Two pilot projects, Dharoi Irrigation  Promotion of water efficient Project in Gujarat and Sanjay Sarovar techniques and technologies Irrigation Project in Madhya Pradesh,  Undertake Pilot projects for have been taken up under Phase-II of the improvement in water use efficiency study. in collaboration with States  Promote Water Regulatory 3.3 Promotion of Water Authorities for ensuring equitable Purification and Desalination: In water distribution and rational charges coastal areas of the country, ground water for water facilities became brackish/saline due to over-  Promote mandatory water audit exploitation. For providing drinking water including those for drinking water supply to such affected habitations, it is purposes proposed to install desalination plants  Adequate provision for operation & based on the innovative technology maintenance of water resources developed by CSIR-Central Salt and projects Marine Chemicals Research Institute in  Incentive through award for water the States of Gujarat, Tamil Nadu and conservation & efficient use of water Andhra Pradesh. The matter is being  Incentivize use of efficient irrigation coordinated with Ministry of Drinking practices and fully utilize the created Water and Sanitation (MoDWS) for facilities identification of habitations for installation of the desalination plants by

54

4.1 Base Line studies for Improving Goal 5: Promotion of basin level WUE in Irrigation Sector: National integrated water resources management Water Mission, MoWR, RD&GR has awarded twenty one Baseline studies in Strategies respect of Major-Medium Irrigation  Review of National Water Policy projects for Improving Water Use  Review of State Water Policy Efficiency (WUA) in Irrigation Sector  Guidelines for different uses of water covering five states – Assam, Manipur, e.g., irrigation, drinking, industrial etc Andhra Pradesh, Telangana and particularly in context of basin wise Maharashtra. situations  Planning on the principle of integrated 4.2 marking studies for Improving water resources development and WUE in Industrial Sector: National management Water Mission, MoWR, RD&GR has  Expeditious formulation of the awarded a bench marking Study to “The projects for utilization of surplus flood Energy & Resources Institute (TERI)”, water for beneficial use of the society New Delhi to establish benchmarks in and implementation of projects after water use efficiency in industrial sector. evaluating costs and land acquisition The study would focus on two industrial problems sectors viz. Thermal power plants & textile  Ensuring convergence among various industries in phase-I and scoping exercise, water resources programmes preliminary baseline assessment & comprehensive water audit in Pulp & Paper and Steel Industries in the phase-II. 5.1 Preparation of State Specific Action 4.3 Demonstration projects on Use Plans (SSAP) for water sector: National of waste water: National Water Mission Water Mission has initiated action to (NWM), MoWR, RD&GR has awarded a prepare State Specific Action Plans Pilot Project on “Grey Water to Blue (SSAP) for water sector covering Water – Natural Treatment Techniques irrigation, agriculture, domestic water for Transforming Wastewater into supply, industrial water supply and waste Sustainable Useable Water” under Goal- water utilization in respect of all the IV. The project is being executed by States/UTs. The SSAP will present National Institute of Hydrology,(NIH), situation of water resources development Roorkee in collaboration with IIT, and management, water governance, Bombay and Utarakhand Jal Sansthan Institutional arrangements, water related (UJS), Government of Uttarakhand, policies, cross-boundary issues, Dehra Dun. agreements etc., Status Reports on problems/issues related to all the aspects For developing standards in respect of of water resources specific to the State, improving water use efficiency in and a set of probable solutions is part of domestic appliances, National Water SSAP. Twelve States namely, Andhra Mission, MoWR, RD&GR has Pradesh, Telangana, West Bengal, collaborated with Bureau of Indian Uttarakhand, Gujarat, Assam, Standard (BIS) for efficiency Chhattisgarh, Karnataka, Madhya Pradesh, labeling. Standards for Washing Machine Maharashtra, Odisha and Tamil Nadu have are under finalization and standards for been requested to prepare their State Dish Washer, Tap, Bathing Shower, Specific Action Plans, in the 1st phase. Toilet cistern etc. are under consideration. The North-Eastern Research Institute of Water and Land Management

55

(NERIWALM), Tezpur, Assam under the along with institutional capacity building Ministry of Water Resources, River of all participating agencies and with a Development & Ganga Rejuvenation is provision for enhancement of capacity in working as the nodal agency for dam safety areas of selected academic and coordination, monitoring for 19 research institutions. The original Project States/UTs. National Institute of cost is Rs. 2100 Crore [World Bank Hydrology(NIH) has been designated as funding is 80% of this cost (i.e. US$ = nodal agency for 17 States/UTs. 279.30 Million), and 20% is to borne by different agencies]. 5.2 Draft guide lines for Integrated Water Resources Development and Management: The draft guidelines for Integrated Water Resources Development and Management have been developed by CWC and are being finalized.

LIKELY AND ANTICIPATED ACHIEVEMENTS FROM 1ST JANUARY, 2017 TO 31ST MARCH, 2017

(i) Initiation of preparation of State Specific Plan for water sector in three States of Assam, Chhattisgarh and West Bengal, Arunachal Pradesh, and Sikkim.

(ii) 4 Base Line Studies for Improving Water Use Efficiency in Irrigation Sector. Emergency Action Plan: Guidelines & Model (iii)Regional Convention for Water Users EAP Associations on Participatory Irrigation Management in Eastern and North Eastern Key highlights of the project are Region will be conducted. summarized below:  Preparatory activities (DSRP DAM REHABILITATION AND inspections, Early finalization of key IMPROVEMENT PROJECT documents i.e. Project Screening (DRIP) Template, Design Flood Review, Dam Inspection by Dam Safety Review Panel, Keeping in view dam safety issues Environment and Social Management being faced by ours ageing large dams and Framework, Bidding Documents with an objective to address this issue in a completed for all 225 dam projects. So far, holistic way in all respect, Govt. of India rehabilitation works in respect of 186 dam undertook a comprehensive Dam Safety projects have been awarded and works Rehabilitation and Improvement Project completed for 14 dams. (DRIP) with financial assistance from the  Dam Safety Intuitional World Bank in April 2012 which covers strengthening of the State Dam Safety rehabilitation of 225 large dam projects Organisations of participating Sates and spreads across seven States (Jharkhand, Central Dam Safety Organisations is one Karnataka, Kerala, Madhya Pradesh, of the important components of this Odisha, Tamil Nadu, and Uttarakhand) project. Training programs with a focus on

56

DRIP implementation were initiated well development of inundations maps and in advance for building up in-house preparation of Emergency Action Plans for technical capabilities of participating 45 dams, has already been completed by States. So far, 69 training programmes CPMU and work is in progress for 11 were organized for the benefit of officials more dams. It is one of the important from various Implementing Agencies activities under DRIP, in order to ensure under DRIP in which over 2,372 personnel the safety of downstream habitations as have been trained in various aspects of well as important downstream installation. dam safety and rehabilitation. Two  Development of Dam Health and National Dam Safety Conferences Rehabilitation Monitoring Application organized, first at IIT Madras in 2015 (280 (DHARMA) is one of the important tools delegates participated) and IISc, Bengaluru for effective collection and management of in 2016 (425 delegates participated) to asset and health data for all large dam of disseminate the knowledge, issues, and India. Three modules have been developed lessons learnt in the Project to all and are in use by different IAs. Preparation stakeholders. The third National Dam of balance modules is under process and Safety Conference is scheduled on will be completed by June 2017. 18th&19th February 2017 at IIT Roorkee (about 400 delegates are expected to participate). In addition, one workshop on Lessons Learnt from DRIP was conducted which was attended by 135 participants from all over the Country. These Conferences are very useful events for non-DRIP States in terms of knowledge sharing and experiences being shared by DRIP and overseas professionals. Six Krishna Raja Sagar Dam, Karnataka technical exposure visits organized by  De-siltation work of two dams of World Bank to Japan covering 50 TANGEDCO is under evaluation stages. participants from Central as well as State Major intervention for Hydro-Mechanical agencies to have exposure on seismic, de- works of Krishna Raja Sagar dam in siltation, instrumentation and other dam Karnataka (more than 80 years old) about safety related issues. Two international 136 nos of spillway gates are planned to be training programs were organized under replaced. People-inclusive approach for this project in 2016 [Deltares, Netherland Dam Safety is being followed for and USBR, USA] benefiting about 36 construction of additional spillway of officials from States as well as Central Hirakud dam, Odisha costing more than Agencies. Two more such international Rs. 500.00Crore. training programs targeting 50 DRIP  Against the estimated cost of Rs. officials are scheduled in May-June 2017. 2100 Crore, total expenditure till  Central Dam Safety Organization December 2016 is Rs. 556 Cr, and an has been successfully obtained the ISO additional expenditure of Rs. 500 Crrore is 9001:2008 for Quality Management planned to be incurred by all the IAs System by the Bureau of Indian Standards during December 2016-March 2017. (BIS).  As a part of non-structural measures, Dam Break Analysis, as well as

57

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

58

4. Inter-state River Issues

INTER-STATE WATER DISPUTES Cauvery Water Disputes Tribunal ACT, 1956 (CWDT) The Cauvery Water Disputes Inter-State Water Disputes Tribunal (CWDT) was constituted (ISRWD) Act, 1956 was originally by the Government of India on 2nd enacted by the Parliament in 1956 June, 1990 to adjudicate the water for adjudication of disputes relating dispute regarding inter-state river to waters of Inter-State rivers and Cauvery and the river valleys river valleys. In view of the thereof. The term of CWDT has Sarkaria Commission been extended by the Government recommendations, the said Act has up to 02.11.2017 as per provisions been amended and came into of ISRWD Act, 1956. The Cauvery force from 6th August, 2002. The Water Dispute Tribunal has amendments include time frame for submitted its reports and decision constitution of the Inter-State Water under section 5 (2) of Inter-State Disputes Tribunals and time limit River Water Dispute Act, 1956 to for the Tribunals to give their Government on 5th February, 2007. awards. As per the amendment, Under Section 5(3) of the said Act, Central Government will have to the Central Government as well as constitute a Tribunal within a party States sought further period of one year from the date clarification/guidance in this regard. of receipt of a request from any The Tribunal took up the petitions State Government. Also, the award of the party States for of the Tribunal shall have the consideration on 10th July, 2007. In same force as an order or decree its order, the Tribunal, inter-alia, of Supreme Court. observed as under:- “It appears that the State of INTER-STATE WATER DISPUTES TRIBUNALS Karnataka, the State of Tamil Nadu and the State of Kerala

59

filed Special Leave Petitions arguments in these appeals are against the aforesaid decision of likely to take more than six regular this Tribunal dated 5th February, hearing days. In view of the 2007 before the Supreme Court. submission, subject to orders of The Supreme Court has granted the Hon’ble Chief Justice of India, Special Leave. The appeals are let the appeal be listed for final pending. According to us, in this disposal before the appropriate background, these applications bench in the month of February under Section 5(3) of the said 2012. In the meantime, the Act should be listed for orders Supreme Court heard Cauvery after disposal of the appeals by issues in IA I of 2013, IA 5 & 6 of the Supreme Court". 2012 under OS 3 of 2002 on 04.1.2013, 04.02.2013, 07.2.2013 Civil Appeal No.2453 of 2007 and finally on 25.2.2013 and of the State of Karnataka versus directed Central Government to State of Tamil Nadu and other publish final award of CWDT dated along with Civil Appeal No.2454 of 05.2.2007 as early as possible, 2007 and Civil Appeal No.2456 of and disposed of IA I of 2013, IA 5 2007 of the State of Kerala and & 6 of 2012 in OS 3 of 2002 State of Tamil Nadu respectively along with contempt petition 6I of came up for preliminary hearing 2013 in IA No. I of 2013. Further, before the Hon’ble Supreme Court it is directed to list 2453 of 2007 of India on 28.07.2008, 12.05.2009, along with connected matter and 06.05.2010 but decision could not OS 3 of 2001 and OS 3 of 2002 be arrived at. The matter was for final hearing on AUGUST 6, again listed before the three 2013. Accordingly, Central judge’s bench on 22nd September, Government has published final 2011 wherein it was ordered to list award of CWDT dated 05.2.2007 along with civil appeal in the third vide its notification dated week of October, 2011. The 19.02.2013 in official Gazette”. appeal, that was listed on 18.10. 2011, the Hon’ble Court mentioned IA No.6 in civil appeal No. that the Sr. Counsel appearing for 2456 of 2007 was taken up in the the parties submit that oral Hon’ble Supreme Court on

60

1.7.2013 and ordered for listing for Tribunal Mr. Justice N.P. Singh consideration on 5th July, 2013 by resigned on 9th April, 2012. In the giving time up to 4th July,2013 for meantime Ministry of Water putting up response by the Resources, RD & GR requested to rejoinder. The case was again Hon’ble Chief Justice of India for taken up on 5th July, 2013, and it appointment of Chairman of was ordered the rejoinder-Affidavit CWDT. Hon’ble Chief Justice of may be filed by the state of Tamil India nominated Dr. Justice B.S. Nadu within three weeks and list Chauhan sitting Judge of Supreme the same on 5th August, 2013. The Court of India to function as case was taken up on 5.8.2013 Chairman of CWDT, same was wherein it was ordered that having notified vide Notification No.1271 regard to good rains, learned (E) dated 13th May, 2014, Hon’ble Senior Counsel for the state of Dr. Justice B.S. Chauhan has Tamil Nadu is not desirous of joined the Tribunal on 21.5. 2014. pressing IA No. 6 of 2013 and accordingly it was ordered to list On joining of the Hon’ble the appeal on 15.1. 2014. Chairman on 21.5.2014, the CMP No. 01/2012 was taken up on 15th The original suit 3 of 2002 July, 2014 in the Tribunal, wherein was taken up by the Hon’ble the Tribunal vide order dated Supreme Court on 3.12.2013 and it 15.07.2014 desired that the State was ordered that the case is of Tamil Nadu may file a fresh connected to original suit 03/2001 application or press I.A. No. 11 and in the next date of hearing the filed by it in the Hon’ble Supreme case on 15.1.2014 the Hon’ble Court in Civil Appeal No. 2453 of Court has directed to list the group 2007 and get an appropriate of matters ‘For Directions’ on direction that this Tribunal may 12.3.2014 and further for listing of proceed with the application under case on 25.11.2014which was Section 5(3) of the Act 1956. further listed for 20.01.2015 and However, Hon’ble Supreme Court, then again listed for 12.1.2016 in its proceeding dated after which no listing date has 04.01.2017, passed an order in the been updated till date. Chairman, matter that appeals is likely to take

61 almost three weeks if the matter is 2010. Further, the tenure of the taken up every day at 2.00 p.m. Tribunal has been extended from and fix the appeals for hearing at time to time. 2.00 p.m. on 7th February, 2017. The Report and Decision Expenditure incurred by the Cauvery was pronounced on 30.12.2010 by Water Disputes Tribunal the KWDT-II under Section 5(2) of Sl. Rs. Specification the Act. Thereafter the Party States No. Lakhs i.e. Andhra Pradesh, Karnataka, Budget Allocation for i) 280.00 Maharashtra and also the Central 2016-17 Government had filed their Expenditure from 04/16 ii) 119.40 Reference Applications u/s 5(3) of to 12/16 the Act to the Tribunal. Cumulative Expenditure iii) 2279.74 up to31/12/16 Subsequently, replies and rejoinders were filed by the Party Krishna Water Disputes Tribunal States and the Central Govt. (KWDT) Arguments were advanced on The Krishna Water Disputes behalf of the Party States and Tribunal (KWDT) was constituted Central Govt. on the dates hearing on 02.04.2004 for adjudication of before the Hon’ble Tribunal. The the dispute relating to sharing of Tribunal concluded the hearing of waters of Inter-State river Krishna the arguments vide order dated and river valleys thereof. In the 30.08.2013. The order on Writ Petition No. 408 of 2008, References was pronounced by the Hon’ble Supreme Court has Tribunal on 29.11.2013 by way of ordered that the effective date of Further Report and same was constitution of the Tribunal will be forwarded to the Central Govt. and 01.02.2006. Consequently, the term the respective Party States under of the Tribunal was extended up to Sec. 5(3) of the Act for their 31.12.2010 as per provisions of information and implementation. ISRWD Act, 1956. The report and the decision by the Tribunal under Meanwhile, as per Andhra Section 5(2) of the Act were Pradesh Re-organization Act, 2014 forwarded to the Ministry of Water the term of the Tribunal has been Resources on 30th December,

62 extended for two years w.e.f. 1st The Hon’ble Supreme Court August, 2014 for submission of had directed Central Government further report by the Tribunal so as to constitute the Vansadhara to address the terms of reference Tribunal before February 2010. The specified in clauses (a) and (b) of Tribunal was notified on 24.02.2010 the Section 89 of the Andhra under the Chairmanship of Mr. Pradesh Re-organization Act, 2014 Justice B.N. Agrawal with Justice (6 of 2014). Nirmal Singh and Justice B.N. Chaturvedi as its Members. The Tribunal has framed However, Hon’ble Justice B.N. preliminary issues on the above Agrawal resigned from the post of reference and three hearings were Chairman on 09.12.2010 and conducted on the preliminary Justice Nirmal Singh, Member, issues on 25th Feb., 26th Feb, and resigned from the post of Member 27th Feb., 2015. Next date of with effect from 02.01.12. The hearing was fixed as 30.03.2015. Central Government has since Due to fire in the Tribunal building, nominated Hon’ble Dr. Justice the Tribunal work could not be Mukundakam Sharma as Chairman carried out as envisaged earlier. In of the Tribunal who took over view of time taken for completion charge of the post on 17.09.2011 of renovation work damaged court and Justice Shri Ghulam wing the term of the Tribunal has Mohammad as Member of the been extended for a further period Tribunal who took over charge of of one year w.e.f. 01.08.2016. the post on 08.04.12.

Expenditure incurred by the Krishna The Ministry of vide letter Water Disputes Tribunal No.1 (1)/ 87-GA dated 31.10.2011 Sl. Specification Rs. In No. Lakhs has allotted office space for VWDT i) Budget Allocation for 2016-17 260.00 at 5th floor, Mohan Singh Place, Expenditure incurred by the ii) 174.40 New Delhi. Tribunal from 4/16 to 12 /16 Cumulative Expenditure up to iii) st 1835.00 31 December, 2016 In the meantime, the State of Odisha had filed IA Nos.7 & 8 in VANSADHARA WATER DISPUTE TRIBUNAL Writ Petition (Civil) No.443/2006

63 pertaining to the effective date of River Water Disputes Act, functioning of the Tribunal as well 1956.” as providing Government residential accommodation to the Hon’ble In pursuance of the order of Chairman and Members of the the Hon’ble Supreme Court dated Tribunal respectively. The Hon’ble 13th December, 2013, the Central Supreme Court vide its order dated Government vide S.O. 778(E) 11.11.2013 in IA No.8 in Writ dated 14th March, 2014 has Petition(Civil) No.443/2006 directed decided that the effective date of that Bungalow No.105, New Moti constitution of said Tribunal shall Bagh, New Delhi be allocated to be 17th September, 2012, and the Chairman of the Vansadhara accordingly, under the provisions of Water Disputes Tribunal and further sub-section (2) of section 5 of the two Type VI houses in R.K. said act, the period of three years Puram, New Delhi to the Members of submission of report and of the said Tribunal. decision by the Vansadhara Water Disputes Tribunal shall commence Further, the Hon’ble Supreme from the 17th September, 2012. Court vide its order dated 13.12.2013 in I.A. No.7 in Writ The Tribunal delivered its order in Petition (Civil) No.443/2006 has I.A.No.1/2010 on 17th December, observed as under: 2013 allowing the Government of “It is common ground that Andhra Pradesh to construct a side Vansadhara Water Disputes weir along with the ancillary works Tribunal started functioning with as proposed and has, inter alia, effect from 17.9.2012. We are directed for constitution of a three of the view that this date be member Supervisory Flow considered as the effective Management and Regulation date of the Constitution of the Committee of river Vansadhara. said Tribunal for the purpose of The State of Odisha has filed a calculating the period of three Special Leave Petition against the years as provided under said order before the Hon’ble Section 5(2) of the Inter State Supreme Court and the matter is pending for hearing.

64

relating Inter-State river Mahadayi The Tribunal has already framed and the river valley thereof, the Issues of the dispute. Its has consisting of (1) Hon’ble Mr. recorded evidences of the Justice J.M. Panchal, Judge, witnesses of the State of Odisha Supreme Court of India as and is currently recording evidence Chairman, (2) Hon’ble Mr. Justice of witnesses of the State of Viney Mittal, Judge, High Court of Andhra Pradesh. Thereafter, the Madhya Pradesh as Member and arguments on the issues before (3) Hon’ble Mr. Justice P.S. the Tribunal will be taken up. Narayana, former Judge, High Further, the Central Government, Court of Andhra Pradesh as as per proviso in Section 5(2) of Member. ISRWD Act, has extended tenure of VWDT for a further period of The office accommodation for one year w.e.f. 17.9.2016. MWDT has been allotted at 5th Floor, A-Wing, Janpath Bhavan, Expenditure incurred by the New Delhi. The Tribunal held its Vansadhara Water Disputes Tribunal first sitting in its own office Rs. st S. premises on 21 August, 2013 and Specification Lakh No. having regard to the pleadings by s. the parties, framed 44 issues for i) Budget allocation for 452.00 determination and directed the 2016-17 parties to submit list of witnesses ii) Expenditure incurred by 311.40 to be examined. the Tribunal during 04/16 to 12 /16 In the sitting of the Tribunal MAHADAYI /MANDOVI WATER held on 03.09.2014, the Tribunal DISPUTES TRIBUNAL while observing that many of the The Central Government information provided by the States issued a Notification No. S.O. 2786 through various documents are (E) dated 16th November, 2010 inconsistent and/or incomplete, consisting a Tribunal called as “the gave a number of directions to the Mahadayi Water Disputes Tribunal” party States to produce data, for adjudication of water disputes undertake detailed analysis,

65 produce reports, inspect documents party States is to be taken up etc., on or before 02.12.2014. The next. During the cross examination Tribunal also directed the Central of witnesses, the state of Water Commission to furnish all Karnataka has moved IA No. 60 of available data / information relating 2015 to permit it at its own cost, to planning and development of to lift or pump 7tmc of water water resources of Mahadayi River annually from Mahadayi basin to Basin and to undertake a detailed Malaprabha basin during the analysis with a view to checking months of monsoon. This consistency of data and file report application has been disposed off on or before 02.12.2014. The by the Tribunal vide its order dated matter was directed to be listed on 27.07.2016. Further, examination of 09.12.2014.The requisite documents witness of state of Goa has been as directed have now been filed completed and examination of before the office of the Tribunal witnesses of state of Karnataka and the same were taken up by has been taken up. the Tribunal for hearing on 11.02.2015. Expenditure incurred by the Mahadayi River Water Disputes The Central Government Tribunal Sl. Rs in th Specification vide Notification dated 13 No. Lakhs. November, 2014 has decided that i) Budget allocation for 2016-17 310.00 Expnditure from 04/16 to ii) 200.00 the effective date of constitution of 12/16 st MWDT shall be 21 August, 2013 instead of 16th November, 2010. RAVI & BEAS WATERS TRIBUNAL Accordingly the Tribunal shall The Ravi and Beas Waters forward its report under Sub- Tribunal which was constituted on nd Section (2) of Section 5 of the 2 April, 1986 submitted its report th said Act to the Central Government on 30 January, 1987. The report within a period of 3 years there was circulated in May, 1987. A from, i.e. on or before 20th August, reference was made to the 2016. The Tribunal has already Tribunal in August, 1987 framed issues for determination comprising reference received from and recording of witnesses of the the Central Government and

66 references received from the issue on 10.11.2016 and Governments of Punjab, Haryana, accordingly, process to make the and Rajasthan, seeking Tribunal functional has been explanation/guidance on certain initiated by the Ministry. points in the report. Expenditure incurred by the Ravi & Beas

Water Disputes Tribunal The period for forwarding of Sl. Specification Rupees No. in further report by the Tribunal has Lakhs. been extended up to 5th August, i) Budget allocation for 2016-17 68.00 ii) Expenditure incurred by the 34.15 2017. A Presidential Reference Tribunal from 4/16 to 12/2016 related to Punjab Termination of Agreement Act, 2004 was made to Supreme Court. The Supreme Court has given its judgment on

67

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

68

69

5. International Cooperation

INDIA-BANGLADESH JOINT lndian Team visited the project site in RIVERS COMMISSION October, 2016 and held a meeting with An Indo-Bangladesh Joint Rivers Bangladesh officials at Dhaka, thereafter. Commission (JRC) is functioning since Further, a "Joint Technical Sub-Group' 1972 with a view to maintain liaison in comprising of lndian and Bangladesh order to ensure the most effective joint officials has been formed to jointly study effort; in maximizing the benefits from the different aspects of this Project. common river systems. It is headed by Water Resources Ministers of both the Cooperation in Flood Forecasting: India countries. Scores of meetings of the is providing the flood data of Farakka and Commission have been held in India as Sahibganj for Ganga (from 15th June well as in Bangladesh. to 15th October, and the flood data of Pandu, Goat para and Dhubri for Treaty on Sharing of Ganga/Ganges Brahmaputra and of Silchar for Barak Waters at Farakka: A Treaty was signed besides the data of river Teesta, Manu, by the Prime Ministers of India and Gumti, Jaladhaka and Torsa, Bangladesh on 12th December, 1996 for etc. during monsoon period (from 15th the sharing of Ganga/Ganges waters at May to 15th October to Bangladesh for use Farakka during the lean season. As per the of their flood forecasting and warning Treaty, the Ganga/Ganges waters is being arrangements. The transmission of flood shared at Farakka (which is the last control forecasting information from lndia during structure on river Ganga in lndia) during the monsoon which is being supplied free lean period, from 1st January to 31stMay of cost has enabled the Civil and Military every year, on 10-daily basis as per the authorities in Bangladesh to take formula provided in the Treaty. The precautionary measures and shift the validity of Treaty is 30 years. The sharing population affected by flood to safer of water as per the Treaty is being places. Flood data of above sites was monitored by a Joint Committee headed by communicated to Bangladesh on Members, JRC from both sides The 63rd continuous basis during the Monsoon of and 64th meeting of Joint Committee were the year 2016. held at Kolkata (in April, 2016) and Dhaka (in December, 2016), respectively. The INDIA- NEPAL COOPERATION: "Ganga Water Treaty of 1996 with Bangladesh is being implemented to the Pancheshwar Multipurpose project satisfaction of both the countries since (5600MW): Pancheshwar Multipurpose 1997. Project is the centerpiece of the Mahakali (Sarda) Treaty of 1996 signed between Proposed "Ganga/Padma Barrage lndia and Nepal. The project envisages Project" in Bangladesh: Government of construction of Pancheshwar dam having 2 Bangladesh has proposed to construct Power Houses with installed capacity of "Ganga/Padma Barrage Project" at 4800 MW as peaking station and Pangsha in Bangladesh. In this context, an reregulation them at Rupaligad having

65

installed capacity of 240 MW. The project Resources (JCWR): Seventh meeting of will also provide irrigation to an area of lndia- Nepal Joint Committee on Water 4.3 lakh ha (2.6 lakh ha in lndia and 1.7 Resources (JCWR) was held on 24-25 lakh ha in Nepal). January, 2013 at Kathmandu, Nepal. During the meeting, all issues related to Pursuant to Article '10 of the Mahakali cooperation in water resources including Treaty, Pancheshwar Development Mahakali treaty were discussed. Progress Authority (PDA) for implementation of the of investigation of Sapta Kosi High Dam Project has been constituted. The Terms of Project and Sun Kosi Storage-cum- Reference of PDA, inter alia, includes Diversion Scheme was also execution, operation and maintenance of reviewed. All other issues concerning the Pancheshwar project including floods and irrigation on common border finalisation of the DPR. Five meetings of areas were discussed and it was agreed to the Governing Body (GB) of the PDA resolve them mutually. have been held. The draft final DPR of the project has been submitted by the lndia-Nepal Joint Standing Technical WAPCOS Limited in November, 2016. Committee (JSTC): Fifth Meeting of The draft final DPR of Pancheshwar lndia- Nepal Joint Standing Technical Multipurpose project has been circulated Committee (JSTC) was held on 26th May, currently for comprehensive examination 2016 at New Delhi in which a outstanding and appraisal technical issues between the two countries were discussed. Sapta Kosi High Dam Multipurpose Project & Sun Kosi cum Diversion lndia-Nepal Joint Team of Experts Scheme(3300 MW):For undertaking the (JTE): Fourteenth meeting of Joint Team Joint Investigations of Sapta Kosi High of Experts (JTE) was held in January, Dam Multipurpose project and Sun Kosi 2015 at New Delhi, Nepal and progress of Storage-cum-Diversion Scheme, a Joint the works was reviewed. The tenure of Project Office (JPO-SKSKI) was set up in JPO-SKSKI has been extended up to 28th Nepal in August, 2004 to take up field February, 2017. investigations and preparation of Joint DPR . The tenure of JPO-SKSKI has been BILATERAL COOPERATION extended up to 28th February, 2O17. The year 2016 has been quite productive in terms of developing bilateral lndia-Nepal Joint Ministerial Level cooperation in water sector as Ministry of Commission on Water Resources Water Resources, River Development and (JMCWR): India-Nepal Joint Committee Ganga Rejuvenation has signed on Water Resources (JCWR) during its 3rd agreements with Tanzania, European meeting held from29th September, 2008 to Union, Hungary and Israel. It will 1st October, 2008 at Kathmandu Nepal strengthen mutual cooperation between recommended constitution of Joint India and respective foreign country and Ministerial Level Committee on Water its agencies to derive maximum benefits in Resources (JMCWR) to be headed by the areas of water harvesting, water Ministers of Water Resources of lndia and conservation, water management, ground Nepal. The composition of the JMCWR water management, recycling/reuse of was also decided by JCWR. The first waste water etc. to name a few. meeting of JMCWR was held on 15th February, 2012 at New Delhi. A brief on the Memorandum of Understandings (MoU) signed during 2016 lndia-Nepal Joint Committee on Water are as follows:

66

between India and European Union on 7th October 2016 under Indo-European Water India-Israel: A memorandum of Partnership (IEWP) with a view to bring understanding was signed between India together representatives and relevant and Israel was signed on 11th November stakeholders, including interested EU 2016 on “cooperation at the regional, Member States and Indian States, national and international levels in the European and Indian Institutions, business field of water resources development and and civil society to strengthen, promote management by collaborating and sharing and develop cooperation in the field of of experience and expertise in the areas water management on the basis of mutually agreed upon, including equality, reciprocity and mutual benefit. techniques in the efficient use of water This MoU has been signed for a period of resources, recycling/reuse of waste water, five years and the benefits of this MoU desalination, aquifer recharge and in-situ will accrue after convening the first water conservation techniques”, for a meeting of Joint Working Group from period of five years. Benefits will accrue both the countries. after convening the first meeting of Joint Working Group from both the countries. India-Tanzania: A Memorandum of Understanding (MoU) was signed between India-Hungary: A Memorandum of India and Hungary on 10th July 2016 for Understanding (MoU) was signed between “bilateral cooperation in the field of Water India and Hungary on 16th October 2016 Resources Management and Development for “cooperation in the areas of River by collaboration and sharing of experience Basin Management Planning, Integrated and expertise on the areas mutually agreed Water Resources Management; Water and upon including techniques in water Waste Water Management; Water related harvesting, water conservation, surface education, research & development; and groundwater management and Management of Ground Water”, for a development, aquifer recharge”, for a period of five years. Benefits will accrue period of five years. Benefits will accrue after convening the first meeting of Joint after convening the first meeting of Joint Working Group from both the countries. Working Group from both the countries.

India-European Union: A Memorandum of Understanding (MoU) was signed

67

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

68

6. External Assistance in Water Resources sector

The Ministry of Water Resources, River Development and Ganga Rejuvenation A brief status of World Bank assisted assists the State Governments in availing ongoing externally aided projects is given external assistance from different funding in Table 6.1. agencies to fill up the resource gap and state of the art technology for water resources development and management in EXTERNALLY AIDED PROJECTS the country. Presently, there are 14 (ASIAN DEVELOPMENT BANK) ongoing externally aided projects in water Out of 5 ongoing externally aided sector implemented in various States with projects by Asian Development Bank the assistance from different funding (ADB), 1 relates to coastal protection in agencies, viz. World Bank (7 projects), Maharashtra and Karnataka, 1 relates to Asian Development Bank (5 projects) and flood and erosion management in Assam; Japan International Cooperation Agency 1 relates to sustainable water resources (JICA) (2 projects). management in Karnataka, 1 relates to integrated irrigation agriculture in Odisha and 1 relates to climate adaptation in EXTERNALLY AIDED PROJECTS Cauvery Delta Basin in Tamil Nadu. (WORLD BANK) Out of 7 ongoing externally aided Brief status of World Bank assisted projects assisted by the World Bank, 2 ongoing externally aided projects is given relate to water sector restructuring in the in Table 6.2. states of Andhra Pradesh and Uttar Pradesh; 2 relate to community based tank management in the states of Andhra EXTERNALLY AIDED PROJECTS Pradesh, Telangana & Odisha; 1 relates to (JAPAN INTERNATIONAL irrigated agriculture modernization in COOPERATION AGENCY) Tamil Nadu, 1 relates to development of Out of 2 externally aided projects minor irrigation project in West Bengal by JICA, 1 relates to livelihood and 1 relates to Dam rehabilitation & improvement project in Andhra Pradesh Improvement Project covering Madhya and 1 relates to irrigation project in Pradesh, Odisha, Kerala, Tamil Nadu, Odisha. Given in Table 6.3. Karnataka, Uttarakhand and Jharkhand.

69

Table – 6.1 World Bank Assisted Ongoing Projects in water sector As on Dec’2016 No State Name of Project Original Original Total Amount State Cum. Agreement closing Project of Govt. disburse date/ date/ Cost assistanc share/ ment Terminal Extende e other disburseme d closing US$/ funding US$/ nt date date US$ mill XDR in US$ in XDR in INR in cr million million million 1 2 3 4 5 6 7 8 9 1 Tamil Nadu 4846-IN: Tamil Nadu 12.02.2007 31.03.13 566.00 335.00 50.20 289.57 Irrigated Agriculture 15.01.2016 15.01.16 (USD) (IBRD) Modernization and Water Bodies Restoration & Management Project 2 Andhra 4857-IN: Andhra Pradesh 08.06.20073 31.12.12 217.80 87.00 72.70 Pradesh & & Telangana Community 1.07.2016 31.07.16 (USD) (IBRD) Telangana Based Tank Management Project - 4291-IN: Andhra Pradesh 58.14 50.78 & Telangana Community (XDR) Based Tank Management Project 3 Odisha 7576-IN: Orissa 27.01.20093 31.08.14 76.39 38.47 31.06 Community Tanks 0.06.2016 30.06.16 (USD) (IBRD) Management Project 4499-IN: Orissa 16.98 - 16.98 Community Tank (XDR) Management Project 4 Andhra 7897-IN: Water Sector 14.08.2010 31.07.16 988.97 450.60 505.40 253.05 Pradesh & Improvement Project 28.07.2018 28.07.18 (USD) (IBRD) Telangana 5 Madhya 7943-IN: Dam 21.12.2011 30.06.18 437.50 139.65 72.73 0.44 Pradesh, Rehabilitation and 30.06.2018 (USD) (IBRD) Odisha, Improvement Project Kerala & 4787-IN: Dam 93.02 33.08 Tamil Nadu, Rehabilitation and (XDR) Karnataka, Improvement Project Uttarakhand, Jharkhand 6 West Bengal 8090-IN: West Bengal 21.12.2011 31.12.17 300.00 30.00 50.00 1.22 Accelerated Development 31.12.2017 (USD) (IBRD) of Minor Irrigation Project 5014-IN: West Bengal 78.20 36.23 Accelerated Development (XDR) of Minor Irrigation Project 5298 IN: Uttar Pradesh 24.10.2013 31.10.20 515.00 239.40 155.00 55.81 Water Sector 31.10.2020 (USD) (XDR) 7 Uttar Pradesh Restructuring Project, Phase-2

70

Table-6.2 Asian Development Bank assisted Ongoing Projects in water sector As on Dec’16 No State Name of Project Agreement Original Total Amt of State Cumulativ date / closing Project loan Govt. e Terminal date/ Cost assistance share/ disbursem date of Extended others ent disburseme date US$ mill US$ nt US$ mil mill US$ mill 1 Maharashtra 2679-IND: Sustainable 17.8.2011/ 31.12.2014/ 58.50 47.40 11.10 23.45 & Karnataka Coastal Protection and 30.6.2017 30.6.2017 Management Investment Program-I 2 Assam 2684-IND: Assam 10.5.2011/ 30.9.2014/ 120 48.50 30 30.28 Integrated Flood and 31.7.2017 31.7.2017 River-bank Erosion Risk Management Investment Program-I 3 Karnataka 3172-IND: Karnataka 7.5.2015/ 31.3.2019 48 31 17 1.25 Integrated & Sustainable 31.3.2019 Water Resources Management Invest. Program-1 4 Odisha 3265-IND: Orissa 7.6.2016/ 17.9.2018 172 120 48 0 Integrated Irrigated 17.9.2018 Agriculture & Water Management Investment Program-2 5 Tamil Nadu 3394-IND: Climate 14.7.2016/ 14.7.2023 144 100 44 0 Adaptation in Vennar 14.7.2023 Sub-basin in Cauvery Delta Project

Table-6.3 JICA Assisted ongoing projects in water sector As on Dec’16 No State Name of Project Agreement Original Total Amt of State Cumulati date / closing date/ Project loan Govt. ve Terminal Extended Cost assistanc share/ disburse date of date e other ment disbursemen INR in JPY mill/ INR in JPY mill t crore INR in cr. cr. 1 Andhra IDP-181: Andhra 30.3.2007/ Mar 2013/ 1137.98 23974 - 13987 Pradesh & Pradesh Irrigation & 10.7.2017 10.7.2017 crore (JPY) (JPY) Telangana Livelihood Improvement Project Phase-I 2 Odisha IDP-244: Rengali 30.3.2015/ 30.3.2026 2148 32378 0 Irrigation Project 30.3.2026 crore (JPY) - Phase-2 IDP-244A: Rengali 1581 0 Irrigation Project (JPY) Phase-2

71

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

72

7. Organisations and Institutions

ATTACHED OFFICES activities of the wings are carried out by 18 functional units at the headquarters,

each headed by a Chief Engineer. The CENTRAL WATER COMMISSION National Water Academy, Pune headed by

a Chief Engineer is also a part of the Central Water Commission with its Commission. Besides this, the headquarters at New Delhi is a premier Commission also has 13 Regional technical organisation in the field of Water Organizations, each headed by a Chief Resources in the country since 1945. The Engineer. The main activities of CWC Commission has been entrusted with the may be summarized as follows: general responsibility of initiating, coordinating and furthering, in  Flood Forecasting and Assistance to consultation with the State Governments State Governments in Flood concerned, schemes for control, Management conservation and utilization of water  Collection and Analysis of resources throughout the country for the Hydrological Data purpose of Irrigation, Flood Control,  Techno-Economic Appraisal of Drinking Water Supply and Water Power Projects Development.  Monitoring of Selected Projects including those receiving Central Assistance  Planning & Design of Projects  Surveys, Investigations and Preparation of Detailed Project Report (DPR)  Studies on Environmental and Socio- Economic issues  Studies Related to Irrigation Planning and Water Management  Basin Planning and Management CWC Headquarter at R.K.Puram, New Delhi  National Water Resources Assessment

Central Water Commission is  Assistance in Resolution of Inter-State Water Disputes headed by a Chairman with status of an Ex-officio Secretary to the Government of  Construction Equipment Planning India. The Commission has three  Studies on Dam Safety technical wings, namely:  Research and Development  Designs and Research Wing  Standardization of Engineering  Water Planning and Projects Wing Practices  River Management Wing  Operation of Reservoirs  Training and Capacity Building Each wing is headed by a Member  International Co-operation in Water with the status of an Ex-officio Additional Sector Secretary to the Government of India. The

73

MAJOR ACTIVITIES Quality network covers 67 main rivers, Major activities of CWC are as 138 tributaries and 55 sub-tributaries. under: CWC is maintaining a three tier (i) Hydrological Observations: laboratory system for analysis of the Central Water Commission is physico-chemical parameters of the water. operating a network of 954 hydro- The level- I laboratories are located at all meteorological observation stations 406 field water quality monitoring (including 76 exclusive meteorological stations where physical parameters such stations) throughout the country on all as temperature, colour, odour specific major river basins to observe (i) water conductivity, electrical conductivity, total level (gauge), (ii) discharge, (iii) water dissolved solids, pH and dissolved oxygen quality, (iv) silt besides (v) selected of river water are observed. There are 18 meteorological parameters including snow level–II laboratories located at selected observations at key stations. The Division Offices throughout India to hydrological data collected from sites is analyze 25 nos. physico-chemical scrutinized, validated and published in the characteristics and bacteriological form of Water Year Book, Water Quality parameters of water. Five (5) level-III / II+ Year Book and Sediment Year Book, etc. laboratories are functioning at Coimbatore, The data so collected is utilized for Delhi, Guwahati, Hyderabad, Varanasi and planning and development of water where 41 parameters including heavy resources projects, climate change studies, metals / toxic parameters and pesticides water availability studies, flood / inflow are analysed. forecasting, examination of international & inter-State issues, river morphological During the year 2016-17, the studies, inland waterway development, National River Water Quality Laboratory, Reservoir Siltation studies and research CWC, New Delhi has been accredited by related activities, etc. National Accreditation Board for Testing and Calibration Laboratories (NABL) in accordance with Standard ISO/IEC 17025:2005 in the discipline of chemical and biological testing.

The water quality data generated is computerized in Data Base system and disseminated in the form of Water Quality Gauge & Flood Forecasting Site (Bharuch) Year Books, Status Reports and Bulletins. The water quality data is used by different During the 12th Plan, 676 new agencies for planning of water resources hydro-meteorological observation stations project, research purposes etc.The water have been opened. However, due to quality data being so collected are put in paucity of required manpower, these various uses related to planning and stations are not fully functional. development of water resources projects.

(ii) Water Quality Monitoring: CWC is operating online Water Central Water Commission is Quality Monitoring System at three sites, monitoring water quality at 406 key namely, Agra (Jawahar Bridge) on river locations covering all the major river Yamuna, Lucknow on river Gomti and basins of India. At present CWC Water Moradabad on river Ramganga for measurement of pH, conductivity,

74 temperature, dissolved oxygen, bio- irrigation to 29,07,471 hectare area and chemical oxygen demand (BOD), flood protection projects will provide Chemical Oxygen Demand (COD). The protection to 1,69,990 persons and real time water quality data is available for 2,45,096 hectare area land. As of now, 14 above sites from 18th July, 2013 onwards new irrigation projects (8 Major & 6 on web site http://cwc.rtwqms.com. Medium), 6 ERM (all Major) as well as 3 revised cost estimates (all Major) are (iii) Survey and Investigation: under different stages of appraisal. CWC is carrying out surveys and investigations for preparation of Detailed Project Reports (DPRs) in the NE region, Sikkim, Uttrakhand, Biharand J&K on the request of the respective States for development of water resources potential for irrigation, hydropower and other uses.

The investigations for various projects were continued during 2016-17 namely, Ujh MP Project (J&K), Kalez Khola HE Project (Sikkim), Rukni Barna Dam (Madhya Pradesh) Irrigation Project (Assam), Sonai Irrigation Project (Assam), Tarumchu HEP(Sikkim), Apart from the appraisal of Kali Khola HEP (Sikkim).The estimate for Irrigation and Flood Control projects, civil new project Berinium HEP has been components of hydroelectric projects are submitted to the ministry for approval. also appraised by Central Water Commission and coordinated by Project A Joint Project Office, Sapta Kosi, Appraisal Organization (PAO). The Sun Kosi Investigations (JPO-SKSKI) appraisal of Civil aspects including based in Biratnagar (Nepal) is carrying out appraisal of cost estimates for 11 surveys and investigations for preparation hydroelectric projects have been of DPR of Sapta Kosi high dam and Sun completed during the current year (up to Kosi storage-cum-diversion project jointly December 2016). Other components of with Nepal for mutual benefit of both the hydro-electric projects are appraised in countries. The JPO-SKSKI was set up in CEA and TEC to the project is also August, 2004 for completion of accorded by the CEA. During the year investigation work within a period of 30 2016-17 (up to December, 2016), CEA has months. However, the project investigation accorded TEC to hydro-electric projects works has been delayed due to local law having total installed capacity of 8167 and order problem and the current target MW. for completion of work is February, 2017. A web enabled Project Appraisal (iv) Project Appraisal: Management System (e-PAMS) is under During the year 2016-17 (up to development. A dashboard has already Dec, 2016), technical examinations of 34 been made operational for monitoring the water resources projects (17 irrigation and status of appraisal of ongoing Major & 17 flood protection) were completed and Medium Irrigation Projects and flood accepted by the Advisory Committee of control projects. Ministry of Water Resources. The irrigation projects accepted by the The revised Guidelines for Advisory Committee would provide Submission, Appraisal and Acceptance of

75

Irrigation and Multipurpose Projects has To supplement the existing been issued in January, 2017. monitoring mechanism by providing authentic and objective data base on (v) Project Monitoring: existing irrigation infrastructure, it was felt A three tier system of monitoring necessary to utilize remote sensing at Centre, State and Project level was technique for the assessment of irrigation introduced in 1975. At Central level, this potential creation in AIBP assisted work was entrusted to CWC. The main projects. At the instance of Planning objective of monitoring is to ensure the Commission, pilot studies of two projects achievement of physical and financial i.e. Upper Krishna in Karnataka and targets and achieve the targets of creation Teesta Barrage in West Bengal were of irrigation potential. Monitoring system carried out successfully using Satellite is also expected to contribute in Data by NRSA Hyderabad. The study identification of the inputs required, results of the assessment were found analysis of the reasons for any satisfactory and compared well with shortfalls/bottlenecks and suggest remedial ground realities. measures etc., with a view to complete the projects in a time bound manner. Subsequently, it was decided to take up the projects on a National Scale During 2016-17, a total of 47 (20 covering about 10 Million Ha of Irrigation Major and 27 medium) projects under Potential spread across different states in General monitoring and 149 (73 Major, 55 India. In first phase, the assessment of Medium and 21 ERM) on-going projects Irrigation Potential Creation through under AIBP are targeted by CWC field mapping of irrigation infrastructures to units. During 2016-17(up to December monitor the progress was assigned to 2016), 5 monitoring visits were undertaken NRSC, Hyderabad in respect of 53 on- and 4 status reports were issued in respect going AIBP assisted projects covering area of projects under General Monitoring. of 5447.743 Th. ha during 2007-08. The Similarly, 92 visits were undertaken and study has been completed during 2009- 89 status reports were issued for projects 10. In the second phase, the assessment under AIBP. of irrigation potential of 50 AIBP projects using Cartosat satellite data covering an Central Grants totaling to Rs. area of 851.428 Th Ha has been completed 821.89 Crore have been released to 10 by NRSC, Hyderabad during 2013-14. All Major & Medium Irrigation Projects under the 50 reports have been submitted by AIBP during 2016-17 (till December NRSC, Hyderabad. 2016). Further, Central Assistance (Loan) through NABARD totaling to Rs. 849.51 Crore was also released to 39 Major & Medium Irrigation Projects under AIBP during 2016-17 (till December 2016). Since the inception of the AIBP, the cumulative total Central Loan Assistance / Grant provided to States for 297 projects is Omkareshwar Canal (Madhya Pradesh) Rs. 57272.51 Crore (till December 2016). The number of States benefited from the In order to supplement the existing programme is 25. As on 31.12.2016, out of monitoring mechanism, it was decided to 297 projects, 143 projects have been develop in-house capacity for carry out completed and 5 projects were deferred. above study on regular basis. Accordingly, 13 projects on pilot basis

76 were identified for the in house practice. the study of river Gandak has been Processed Cartosat imageries of all the 13 conducted by CWPRS, Pune. projects were hosted by NRSC for satellite based online monitoring of AIBP projects During the 12th Plan period, A using BHUVAN web services (SatAIBP). provision of Rs 15.60 Crore has been Four of the pilot projects were fully allocated under the Plan Scheme „R&D digitized for their executed project Programme in Water Sector‟ for the works networks. The remaining projects are related to morphological studies. So far, partially digitized, under progress and consultancy works for morphological persuasion for want of minor/ sub-minor- studies of 15 rivers (Ganga, Sharda, Rapti, wise design lengths and corresponding Kosi, Bagmati, Yamuna, Bramhaputra, designed irrigation potentials (IPs) as well Subansiri, Pagladiya, Krishna, as IPs through direct outlets (Dos) from Tungbhadra, Mahananda, Mahanadi, main/branch/distributaries from the project Hoogli, & Tapti) by using Remote Sensing authorities/State Governments. technology have been awarded to IITs /NITs on nomination basis. The scheduled Proposal for procurement of time for completion of these studies are satellite imageries and hiring professional two years. The studies are under progress. services of NRSC for online monitoring of projects under AIBP-PMKSY using BHUVAN portal has been submitted to MoWR, RD & GR. A project monitoring system (MIS) has been developed by MoWR, RD & GR for online monitoring of projects under AIBP & CAD-PMKSY.

(vi) Morphological Studies: The study of river morphology and Hirakud Dam (Odisha) implementation of suitable river training works as appropriate have become imperative for our nation as large areas of (vii) National Water Mission and the country are affected by floods every Climate Change Issues: year causing severe damage to life and The “National Water Mission” was property in spite of existing flood control formulated by Ministry of Water measures taken both by Central and State Resources with main objective of Governments. Problems are aggregating “conservation of water, minimizing mainly due to large quantity of silt/ wastage and ensuring its more equitable sediment being carried and deposited in its distribution both across and within States downstream reaches. The special through integrated water resources behaviour of the river needs to be development and management”. The thoroughly understood for evolving Mission, duly approved by the effective strategies to overcome the Government, has set five goals to achieve problem posed by it. the above objective, which are: 1. Comprehensive water data base in Morphological study of three rivers public domain and assessment of the namely, Ghaghra, Sutluj and Gandak have impact of climate change on water been completed till the end of 11th Plan resource. period. The study of Ghaghra and Satluj 2. Promotion of citizen and state actions have been conducted by NIH, Roorkee and for water conservation ,augmentation and preservation.

77

3. Focused attention on vulnerable areas glacial lakes and water bodies greater than including over-exploited areas 50 ha area with the area of base year 2009 4. Increasing water use efficiency by using satellite data received from NRSC, 20% Hyderabad. Monthly Monitoring Reports 5. Promotion of basin level integrated have been sent to Central/State Govt water resources management. agencies and other stack holders.

Climate Change cell was created in The work “Snowmelt Runoff CWC in August, 2007 to deal with all the Forecasting in Himalayan River Basin” studies, works and reports on the subject has been taken up by CWC in association regarding impact of climate change on with NRSC, Hyderabad. The model water resources being referred to CWC. development for the study has been CWC provides inputs and assistance to completed and experimental forecasts NWM secretariat in examining the were formulated by NRSC. Model research proposals related to climate developed by NRSC has been handed change received in NWM Secretariat. over/installed at CWC, Snow Hydrology Division and M&A Dte, CWC, Shimla. NRSC officials have also imparted brief training on the model to CWC officials from different Himalayan River Basins.

(viii) Hydrological Studies: Hydrological studies form the backbone of a water resources project. The success of a project is largely governed by the hydrological inputs. The inputs at Detailed Project Report (DPR) or Pre- Feasibility (PFR) stage are made available Seminar on “Waste Water – Monitoring and in the form of: Management” on World Water Day 22nd (i) Water availability/Yield Studies. March 2017 at New Delhi (ii) Design flood estimation. (iii) Sedimentation studies. MoWR has established six Chairs (iv) Diversion flood studies. in Academic institutes - IIT Kanpur, IIT Kharagpur, IIT Guwahati, IIT Roorkee, In addition to above, special NIT Patna and NIT Srinagar with the studies in respect of review of flood objective of carrying out studies and hydrology for existing projects as per dam research on “Impact of climate change on safety guidelines is also carried out. Water Resources”. Management Committees have been constituted under The country has been divided into the Chairmanship of Chairman, CWC for 7 zones and further into 26 hydro- each of the Institute separately which has meteorologically homogeneous sub-zones to meet once in a year. and flood estimation models are developed for each subzone to compute the design Monitoring of Glacial lakes/Water flood in un-gauged catchments. So far, bodies in the Himalayan Region of Indian flood estimation reports covering 24 sub- river basin has been carried out on zones have been published. The periodic monthly basis from June to October. The revisions/updating of earlier reports are main objective of the study is to monitor carried out whenever additional data are the changes in the spatial extent of the received.

78

Srilanka and African countries by way of Design precipitation (PMP/SPS) design consultancy or in the technical estimates are basic inputs in computing appraisal of the projects. Four design units design flood magnitudes. Estimation of are functioning to cater to specific design storm depths has been found to be a requirements and to attend to special major bottleneck in design flood studies design related problems of different since necessary data and expertise is regions. These units have specialized available with only a few organizations directorates for Hydel Civil Design, like IMD and CWC. In order to overcome Concrete & Masonry Dam Design, this, CWC has published generalized PMP Embankment Design, Gates Design and Atlases covering almost entire country, Barrage & Canal Design. which gives a first-hand estimate of design storm depths. At present CWC is providing design consultancy to 54 projects. Out of During the year 2016-17 (up to this, 24 projects (including 4 from North December, 2016), Technical examination Eastern region and 3 from neighbouring of hydrological aspects of DPRs in respect countries) are at construction stage; 10 of 117 projects have been carried out in projects (including 2 from North Eastern CWC. Out of this, 65 projects have been region and 2 from neighbouring countries) cleared. The observations in respect of are at DPR stage and 20 projects remaining projects were communicated to (including 02 from North Eastern region the concerned project authority. and 2 from neighbouring countries)involve special problems. CWC also provides support in the field of Hydrology related to capacity In addition to above, technical building and training, modernization, BIS examinations of DPRs of 73 nos. of standardization, development of computer Hydro-electric/ Irrigation/ Flood software as well as technical coordination Management/ Multi Purpose Projects were with National and International also carried out during the year (till Dec organizations. 2016). These include 5 projects from neighbouring countries, namely, Nepal (4) and Bhutan (1). Out of these, DPRs of 30 nos. of projects have been cleared. Remaining 43 nos. of projects are at various level of appraisal.

(x) Dam Rehabilitation & Improvement Project (DRIP): Dam Rehabilitation and Improvement Project (DRIP) is the World Bank assisted project with the provision of rehabilitation of 217 dam projects

Tehri Dam (Uttrakhand) (comprising 242 dams) in the seven participating States (namely, Jharkhand, (ix) Design Consultancy: Karnataka, Kerala, Madhya Pradesh, Central water Commission is Odisha, Tamil Nadu and Uttarakhand) actively associated with design of majority along with institutional strengthening of the mega water resources projects in component for participating States and India and neighbouring countries viz. Central Water Commission. It has become Nepal, Bhutan, Afghanistan, Myanmar,

79 effective from 18th April 2012 for have also been organized, first at IIT implementation over a period of six-years. Madras (24-25th March, 2015) and Second at IISc, Bangalore (12-13th Jan, 2016) in Under the project, Project which 425 delegates participated. The Screening Templates in respect of 215 Third National Dam Safety Conference is dam projects have been approved by the scheduled to be organized by CWC in World Bank. Tender Documents in respect collaboration with IIT Roorkee and UJVN of 199 dam projects have also been Limited, on 18th and 19th February 2017 in approved and works in respect of 186 dam IIT Roorkee. A workshop on “Lessons projects have been awarded. Work on the Learnt from DRIP” was also organized in preparation of Asset Management Tool which 136 delegates participated. (Dam Health And Rehabilitation Monitoring Application (DHARMA)) is in The Dam Safety Organisation, advanced stage. Three static data modules CWC has received ISO 9001: 2008 out of a total of seven modules envisaged certification for its Quality Management have been launched for implementation. Systems from the Bureau of Indian Standards during the year 2015. Central Several guidelines and manuals are also Water Commission also received “CBIP being developed under the project with the Award 2016” for promoting Health and guidance of renowned specialists working Safety of Large Dams under DRIP. in the respective fields working in close coordination with expert committees. Total (xi) National Register of Large Dams: of sixteen guidelines and manuals As per the latest information encompassing different facets of dam compiled under the National Register of design, construction, operation, Large Dams (NRLD) maintained by CWC, maintenance and rehabilitation are there are 5701 large dams in the country as envisaged. Capacity Building of various on January 2017. Out of this, 5254 large academic institutes has also been taken up dams have been completed and 447 large within the funds allotted for central dams are under construction. The NRLD is component of DRIP Plan Scheme. available on CWC Website. The compilation of NRLD is expected to prove useful/ handy to all engineers, planners and policy makers associated with Water resources sectors

(xii) National Committee on Dam Safety (NCDS): Ministry of Irrigation, Government of India constituted a Standing Committee under the Chairmanship of Chairman, Central Water Commission in 1982 to review the existing practices and to evolve DRIP: Knowledge sharing visit unified procedures of dam safety for all dams in India. Subsequently, Ministry of Twenty Five (25) trainings have Water Resources reconstituted the been conducted by the Central Project Standing Committee in 1987 as the Management Unit for DRIP Project, National Committee on Dam Safety to: wherein about 859 officials have been  Monitor the follow-up action on the trained on different aspects of Dam Safety. report on Dam Safety procedures both Two National Dam Safety Conference at the Centre and at the State level,

80

 Oversee dam safety activities in technical institutions and Govt. various States and suggest organizations as its Members. Director improvements to bring dam safety FE&SA, CWC is the Member Secretary of practices in line with state-of the art the NCSDP. practices consistent with Indian conditions, and During 2016-17, one meeting (31st)  Act as a forum for exchange of views of NCSDP was held on 23rd June, 2016. on techniques adopted for remedial During the meeting, site specific seismic measures to relieve distress in dams. study reports of 13 projects were discussed and cleared by the Committee. The National Committee has been again reconstituted in October, 2015 and (xiv) Dam Break and Other Special members from State like Himachal Studies: Pradesh, Meghalaya and Telangana have Dam break analysis is carried out been included. The Committee now to prepare the inundation map and disaster consists of 31 members drawn from 18 management plan in the unlikely event of States, 5 Dam Safety Organisations and dam failure. It estimates the maximum various other organizations viz. MoWR, water level at the downstream locations of CWC, GSI, IMD, and BBMB. 36 meetings the dam in the event of a hypothetical of NCDS have been held so far. The last failure of the dam. Further, GLOF Studies meeting was held on 11.1.2016. are carried out to account for the flood, resulting from the breach of moraine dams, in the design of the projects. During the year, GLOF study report of Bursar H E Project, J&K has been examined and cleared. Further, GLOF Study in respect of Sapta Kosi H E Project, Nepal and Sun Kosi H E Project, Nepal is under progress .

(xv) Environmental Management and Rehabilitation & Resettlement: CWC is compiling data relating to salient features of Rehabilitation & Resettlement aspects of Major/Medium, existing /on-going water resources projects based on the information received from Inspection inside the dam gallery various State Governments. Till now, the information received from State (xiii) National Committee on Seismic Governments related to 490 Major and Design Parameters: Medium Irrigation Projects have been The National Committee on compiled. CWC is also compiling data Seismic Design Parameters (NCSDP) was relating to Submergence, R&R Issues of constituted through MoWR Order dated Major & Medium Projects monitored by 21st October 1991 with the objective to field organizations of CWC and also recommend the Seismic Design information received from various State Parameters for the proposals received from Governments. Till now, the information the dam owners. The Member (D&R), received in respect of 92 Major and CWC is the chairman of the Committee Medium Irrigation Projects have been with 11 other experts from various compiled engineering disciplines from different

81

The draft Rehabilitation & information received in respect of 12 Resettlement Plan for Siang Single Storage projects has been compiled. Project prepared by CWC in August 2015 was modified to include best provisions of (xvi)Environmental Impact Assessment: various existing R&R Plans and provisions Central Water Commission (CWC) in “Right to Fair Compensation and has taken up Environmental Transparency in Land Acquisition, Evaluation/Impact Assessment Study of Rehabilitation & Resettlement Rules – selected river valley projects in the 2015. A tentative estimate for country. The studies in respect of 7 Rehabilitation & Resettlement Plan for projects namely, Jayakawadi Stage-I Upper Siang Basin Project (Arunachal (Maharashtra), Barna Project (Madhya Pradesh has also been prepared. Pradesh), Salandi Project, Mahi Bajaj Sagar Project (Rajasthan), Mahanadi Delta Project (Orissa), Ramganga Project (Uttar Pradesh) and Singur Project(Andhra Pradesh) has been completed so far. It is now proposed to carry out the study for 6 more completed irrigation projects, namely, Ukai Project, Durgawati Irrigation Project, Eastern Koshi Canal Project, Paralkot Dam Project, Sutiyapat Project and Tawa Project. The Expression of Interest for short-listing firms for Stakeholder sensitization: IITF 2016, Pragati conducting the studies has been published. Maidan, New Delhi (xvii) Application of Remote Sensing A National Environmental Techniques in Water Resources Sector: Monitoring Committee for River Valley The important studies undertaken Projects (NEMCRVP) has been set up by during the year is as under: the Ministry of Water Resources to (i) The work “Sedimentation Assessment monitor implementation of Environment of 30 Reservoirs using Remote Management Plan and observance of Sensing Technique” has been environmental clearance. Member (Water awarded to MERI . Nine (9) Planning & Projects) is the Chairman of reservoirs have been found feasible this inter-ministerial multi-disciplinary for the study. The consultant has Committee. NEMCRVP has submitted final reports for these 9 representatives of Ministries of (Nine) reservoirs in July 2016. The Environment & Forests, Agriculture & Co- final reports have been circulated to operation, Tribal Affairs and Water relevant Directorates of CWC, State Resources, besides Planning Commission. and project authorities. (ii) Sedimentation Assessment study of The latest status of the Ghataprabha Reservoir (Karnataka) implementation of the environmental has been done in-house. safeguards of the projects have been sought from the Chairmen of the State (xviii) Development of Water Resource Level Environmental Monitoring Information System: Committees for consideration of National CWC & ISRO has jointly Environmental Monitoring Committee for undertaken the work of development of appropriate action in the matter. The Water Resources Information System (India-WRIS) during 11thPlan. The first

82 full version of the website of India-WRIS CWC officers from various regional (www.india-wris.nrsc.gov.in) was offices for conducting “Crop Area launched by Hon‟ble Minister of Water Assessment Study using Remote Sensing Resources on 7th December, 2010. Technique to assess the gap in irrigation Subsequently, four more versions of the potential creation and utilization. website of India-WRIS have been launched. The Ver. 4.1 was launched in (xix) Performance Overview of July, 2015 and is available in public Irrigation Projects: domain at 1:250000 scale. Large investment has been made for creating irrigation facilities in the The information system contains country which has contributed in achieving 105 GIS layers grouped in five heads: 1) the food security of the country. Watershed atlas, 2) administrative layers, Evaluation of performance of completed 3) Water resources projects, 4) thematic irrigation projects periodically provides an layers and 5) environmental data. The opportunity to assess the actual major GIS layer generated are basin/sub- performance of projects vis-a-vis basin/watershed, river network, canal envisaged objectives and targeted benefits, network, water body, major and medium identify problematic area and corrective irrigation project (dam, barrage etc), road measures to address them. This has also network, town and village extent, CWC been emphasized by Planning Commission HO network and CGWB well data. As per as well as in the reports of Working Group provision of Hydro-Meteorological Data of Ministry of Water Resources. Dissemination Policy 2013 (MoWR), all unclassified data of CWC G&D stations Keeping in view these aspects, has been made available on India-WRIS Central Water Commission is carrying out website. various studies and dealing with other related issues of completed major/ medium The centre for maintenance and irrigation projects in the country. The further development of the India-WRIS details are given below: portal is functioning at Central Water Commission Headquarter at New Delhi since February 2015. The centre has taken up following activities during 2016-17 (till 31st December): 1. Command boundaries and canal layer refinement for 1700 MMI projects completed. 2. Crop area assessment study for forty five (45) AIBP commands for assessing gap in irrigation potential & actual utilization. 3. PMP Atlas integration. 4. Uploading of H.O. data of CWC for Seminar on “Second Green Revolution: Role 2014-15. of Irrigation and Drainage”, 24th June 2016 at 5. Reservoir module for 91 reservoirs New Delhi which are being monitored by CWC have been operationalized. (xx) Performance Evaluation of Completed Irrigation Projects: During the current financial year, Central Water Commission is the centre has also imparted training to 30 carrying out Post Project Performance

83

Evaluation Studies of completed the overall demand of water is about 80%. major/medium irrigation projects in the However, water use efficiency in irrigation country. Studies include evaluation of sector is relatively low. Central Water system performance and agro-economic, Commission is undertaking Water Use socio-economic and environmental Efficiency studies of completed impacts of project including economic major/medium irrigation projects in the analysis. Identifying deficiencies and country with the objective of having recommending corrective measures for assessment of water use efficiency of improving the performance of project for irrigation projects. The studies cover the achieving the envisaged objectives and following aspects of irrigation projects: targeted benefits is part of the studies. A i) Reservoir Filling Efficiencies (Inflow Technical Advisory Committee (TAC) and Release Pattern) under the Chairmanship of Member ii) Delivery System/Conveyance (WP&P), CWC has been constituted for Efficiency guiding, supervising and approving above iii) On farm Application Efficiency studies. iv) Drainage Efficiency v) Irrigation Potential Created and During 2016-17, the Post Project Utilized Performance Evaluation Studies of following six irrigation projects are on- A Technical Advisory Committee going. under the Chairmanship of Member (i) Krishnagiri Medium Irrigation (WP&P), CWC has been constituted for Project, Tamil Nadu guiding, supervising and approving the (ii) Giri Medium Irrigation Project, studies. During 2016-17, the Water Use Himachal Pradesh Efficiency studies of following four (iii) Jayakwadi Stage-I Irrigation Project, major/medium irrigation projects are Maharashtra ongoing. (iv) Salandi Irrigation Project, Odisha (i) Mahanadi Delta Stage-I Irrigation (v) Bhimsager Irrigation Project, Project, Orissa. Rajasthan (ii) Baitarani Irrigation System, Orissa. (vi) Som-Kamla-Amba Irrigation Project, (iii) Bahuda Irrigation Project, Orissa. Rajasthan (iv) Baghua Stage-I Irrigation System, Orissa. In addition, following five new studies are under consideration. (xxii) Capacity Survey of Important (i) Gunta Nala Dam Project, Uttar Reservoirs in the Country: Pradesh Capacity survey of reservoirs, (ii) Maudha Dam Project, Uttar Pradesh hitherto known as hydrographical survey (iii) Mayurakshi Reservoir Project, West of major reservoirs, was initiated by CWC Bengal in the VIII Plan. Till date, the capacity (iv) Kumari Irrigation Scheme, West survey of 36 reservoirs has been Bengal completed. During XII Plan, The capacity (v) Saharajori Irrigation Scheme, West survey work of 25 reservoirs has been Bengal targeted. Process for awarding work for capacity survey of 8 reservoirs in under (xxi) Water Use Efficiency Studies of progress. Completed Major/Medium Irrigation Projects: (xxiii) Indian National Committee on Irrigation sector is the biggest Surface Water (INCSW): consumer of fresh water and its share in

84

The Indian National Committee on international delegates also attended Surface Water (INCSW) has been the function. constituted by MoWR,RD&GR with an  A special R&D Session of INCSW objective to promote research work in the was organised on 5th September 2016 field of Water Resources Engineering at New Delhi. The Principal (Surface Water aspect) by providing Investigators and Researchers of financial assistance by way of grants to ongoing research schemes of INCSW academicians/experts in the Universities, and officers of various organisations IITs, recognized R&D laboratories, Water including CWC attended the session. Resources/ Irrigation departments of the The various aspects including R&D in Central and State Governments and NGOs water sector in developed countries, under R&D Programme of the Ministry. requirement of environmental flows in INCSW is headed by Chairman, CWC and water resources projects and water comprises of members representing conflict management were discussed MoWR/CWC, CSMRS, CWPRS, NIH, during the session. DST, Min.ofAgr., WALMIs, IIT, NGOs  An Interactive Session was organised etc. Director, WS&RS Directorate, CWC on 2.12.2016 at New Delhi on the is the Member Secretary of the Committee. theme “Storm Water Hydraulics”. Eminent experts namely, Prof. Hager, Department of Civil Environment & Geomatics Engineering, ETH, Zurich, Switzerland and Prof. S. Majumdar, Emeritus Professor, Delhi Technological University attended the session and delivered lectures on related topics.  An Innovation Session was organized in collaboration with TERI and M/s Yellow Tropus Pvt. Ltd. on the topic R&D Session of INCSW, 5th September 2016 “Evaporation Control from Reservoirs at New Delhi using Floating Solar Panels” on 21.12.2016 at New Delhi. The role of The important activities conducted Floating Solar Panels in water savings under the aegis of INCSW are given and energy production was highlighted below: during the session.  A one day event “India Irrigation  About 92 research schemes are Forum” was organised in collaboration presently ongoing in various with ICID as a special event during the organisations in the country with India Water Week 2016. The event funding from the MoWR,RD&GR had participation from Asian under the R&D Programme. A total Development Bank, FAO, IWMI, grant of about 12.30 Cr has been World Bank and various Central and released so far. Further, a proposal for State organisations. establishment of INCSW-Research  A seminar on “Second Green Chair on “Water Sector Conflicts and Revolution: Role of Irrigation and Governance” at Centre for Policy Drainage” was organised in Research (CPR), New Delhi with a collaboration with ICID on ICID corpus fund of Rs. 3 Crore is under Foundation Day on 24.06.2016 at New consideration in the Ministry. Delhi. Many distinguished (xxiv) Training & Capacity Building:

85

Central Water Commission offers (iii) As Regional Training Centre of training to water sector professionals every WMO, one Distance Learning year. These training are organised at Programs on Basic Hydrological National Water Academy (NWA), CWC Sciences for Asian Region Countries Headquarter and field offices of CWC. was conducted in which 52 officers have been trained. The National Water Academy, (iv) Management Development Program CWC is a centre of excellence for for senior officers of DRIP was imparting training on all facets of Water conducted during 25-29 April 2016. Resources Development and Management This series program for Non covering the different areas of planning, Technical Officers of MoWR, design, evaluation, construction, operation RD&GR and CWC officers was and monitoring of water resources conducted during 16-20 August 2016. projects, and also the application of high- (v) ToT Program on Climate Change was end technology in water sector. The conducted during 25-27 July 2016. programs at NWA are open to all Second such program for media stakeholders of water sector including personnel was conducted during 28- those from NGOs, Media, Private Sector 29 July 2016. Organisations, academic institutions, (vi) During this financial year, a 26 weeks PSUs, individuals and foreign nationals 28th Induction Training Program for also. During 2016-17 (up to December, newly appointed CWES officers has 2016) NWA conducted 25 training been concluded in June 2016. The programs in which 758 (1535 manweeks) 29th Induction Training Program has officers participated. been started from 3rd October 2016. 17 Group „A‟ CWES Officers are participating in this program.

During 2016-17 (up to December, 2016), CWC-HQ / Field Office also conducted 26 programs in which 633 in- service officers participated.

In order to ensure capacity building of its officers, CWC also sends officers to National Water Academy (Pune) training programs / workshops/ seminars organised by other organisation, both in India and abroad. During the year 2016- Some of the notable program 17 (up to December 2016) CWC has sent organised by NWA are as under: 244 officers to 37 programs / workshops/ (i) Two Training Programmes for the seminars. This includes 11programs officials of Flood Warning Section, conducted abroad in which 24 officers Royal Government of Bhutan were participated. conducted during July 2016 (one

during 18-22 July 2016 and another CENTRAL SOIL AND MATERIALS during 25-29 July 2016). RESEARCH STATION (ii) Two Weeks Core Area Training

(CAT) on Basin Planning Central Soil and Materials Research Management for middle level CWES Station (CSMRS), New Delhi, is a premier officers were conducted during the organization in the country dealing with the period from 22nd August to 2nd field and laboratory investigations, and September, 2016.

86 research in the areas of geotechnical deformability, geophysical engineering and civil engineering materials, investigations, numerical modeling particularly for construction of river valley  Rock Mechanics (II) including rock projects and safety evaluation of existing mechanics laboratory investigations, dams. The Research Station is also workshop & instrumentation and involved in quality control of construction electronics for various river valley projects. The Research Station primarily functions as an INVESTIGATIONS FOR PROJECTS adviser and consultant to the various Thirty three projects, including four Departments of Government of India, State abroad and seven in North- East region of Governments and Government of India India, were investigated. The investigations Undertakings. The Research Station has comprised field and laboratory been constantly updating its facilities and investigations in the areas of Soil, Rock, training its staff for the last three decades Rockfill, Geosynthetics, Concrete and its and has acquired some unique capabilities constituents. in the country in the field of geotechnical engineering and construction materials‟ characterization.

The sphere of activities of the Research Station is covered under the following main areas:  Soil Mechanics including studies on expansive soils, studies on dispersive soils, hydraulic fracturing of core materials, soil chemistry and quality control  Rockfill, Soil Dynamics including Uniaxial Jacking Test at Pancheshwar Geosynthetics, Numerical Modeling Multipurpose Project, Nepal/ India and Quality Control  Concrete Technology including The investigate projects are as construction materials survey and under: characterisation, design of concrete (i) International Projects: mixes, roller compacted concrete, 1. Pancheshwar Multipurpose Project, substitution of sand with bottom ash, India/Nepal thermal studies and quality control 2. Punatsangchhu –I H.E. Project, Bhutan  Concrete Diagnostics and Chemistry 3. Punatsangchhu –II H.E. Project, including diagnostic investigation/ Bhutan health monitoring, material for repair 4. Rupaligarh HE Project, and rehabilitation, petrography, India/Nepal chemical investigation, durability of

concrete, chemistry and mineralogy, (ii) Indian Projects: water quality, alkali aggregate Projects in North-East India reaction, new material such as 5. Doimukh HE Project, Arunachal polymer, grout etc. Pradesh SSC/SFRC/HPC/HSC/CFRD and 6. Kalej Khola H.E.P, Sikkim quality control 7. Lower Kopili HE Project, Assam  Rock Mechanics (I) including 8. Mawphu HE Project, Meghalaya foundation rock characterisation, in- 9. Rukni Irrigation Project, Assam situ measurements such as stress &

87

10. Subansiri Downstream Works principal policy formulating advisory body Guwahati, Assam to the Government on all matters relating 11. Tlawng Hydroelectric Project, to Research Station. This committee is Aizwal, Mizoram headed by Secretary (WR), Ministry of Water Resources, RD&GR, New Delhi, Projects in other parts of India and has a total strength of 15 members. 12. Bhaunrat Dam Project, Uttar Pradesh STANDING TECHNICAL ADVISORY 13. Bist Doab Canal , Punjab COMMITTEE 14. Devsari HE Project, Uttarakhand The Standing Technical Advisory 15. Eastern Kosi Canal System, Water Committee (STAC) of CSMRS is a Resources deptt., Flying Squad advisory body for guidance, scrutiny and circle-1, Patna, Bihar review of technical matters of CSMRS. 16. Gosikhurd Project, Maharashtra This committee also provides technical 17. Hail HE Project, H.P. input to the Governing Council. The 18. Hirakud Dam Project, Odisha committee is headed by Member (D&R), 19. Indirasagar Power Station Project, Central Water Commission, New Delhi, Madhya Pradesh and has a total strength of 15 members. 20. Kanhar irrigation project UP 21. Kharkai Barrage Project, Important achievements of CMSRS Jharkhand during 2016-17 22. Kirthai-I HE Project, J&K. Success Indicators Achievements 23. Konar Dam, Jharkhand (Anticipated) 24. Luhri Hydro Electric Project Stage- Technical reports brought 75 Nos. I, Himachal Pradesh out / published 25. Parichha Thermal Power Project, Publication of research 08 Nos. Jhansi, Uttar Pradesh papers in International 26. Polavaram Head Works, journals Polavaram, Andhra Pradesh Publication of research 34 Nos. 27. SirkariBhyol-Rupsiabagr HE papers in National and Project, Uttarakhand International level 28. Subarnarekha Multipurpose Project conferences seminars/ Symposium ( Kharkai Barrage) Jharkhand No. of Detailed Project 07 Nos. 29. Upper Indravati Pumped storage Reports (DPRs) cleared Project, Orissa Training programme 13 Nos. 30. Vindhyachal Super Thermal Power organized Project, Madhya Pradesh 31. Vishnugadh Pipalkoti Project, SELF- SPONSORED RESEARCH Uttarakhand SCHEMES 32. Vyasi HE Project, Uttarakhand The self-sponsored research 33. Wainganga-Nalganga Link Canal schemes currently in progress are as Project (NWDA), Maharashtra follows: 34. Kalpong river, Diglipur, Andaman 1. Leaching studies on fly ash both under and Nicobar Islands laminar and vertical percolation on a 35. Nathpa Jhakri HE Project, Jhakri, fixed flow rate for different HP solid/liquid ratio. 2. Performance of mortar cubes mixed GOVERNING COUNCIL FOR with different sulphate concentration CSMRS and allowed to remain in different The Governing Council (GC) is a curing conditions for assessment of

88

effect on its engineering and physical Replacement of Natural Aggregates in parameters. Concrete” 3. Study on the aspects related to 19. Strength and durability aspects of Acidification of Kopili River due to multi blend concrete with particular Coal Mining to provide the viable reference to underwater abrasion. solutions to the problem using locally 20. Influence of mica content on strength available algal blooms. and durability of concrete 4. Effect of water quality of Yamuna 21. Study on batch to batch variation in River on upcoming civil engineering properties of chemical admixtures and structures along river side with ageing effect on using in concrete reference to its effect on concrete & steel. 5. Deformability characteristics of rock mass 6. In-situ Stress Measurement in rock mass 7. Shear Strength Parameters of rock mass 8. Comparison of Uniaxial Compressive

Strength and Indirect Tensile Strength Collection of UD Samples at Kharkai Barrage (Brazilian method) of Rock in Project, Jharkhand Laboratory 9. Compilation and interpretation of TRAINING PROGRAMMES properties and parameters of 25 A) Scheduled Training Programmes variants of Basalt 1. Organized training course on 10. Compilation and Interpretation of 20 “Geotechnical Investigation and Variants of Gneiss Quality Control Testing for Earthen 11. Data base on different rock tests on Dams & Canals” for Quality Control laboratory investigations - referred to Engineers, Water Resources CSMRS for DPR review (10 Projects) Department, Maharashtra 6th - 8th 12. Prediction of stress-strain-volume June, 2016 at CSMRS, New Delhi. change behaviour using Hardening 2. Organized training course on “Use of Soil (HS) model Geosynthetics for Water Resources 13. Effect of fines on strength and Projects “on 29th & 30th September, deformability characteristics of 2016 at CSMRS, New Delhi. rockfill material 3. Organized Training course on 14. Research Scheme on Effect of dump “Concrete Construction Materials waste material on soil properties and Quality Control for Hydraulic 15. Research Scheme on Improvement of Structures” on 7-8th Sep, 2016 in Expansive Soil using Fly ash CSMRS. 16. Research Scheme on Modification of 4. Organized training course on properties of fine grained soils using “Surface and Sub Surface Organic materials Assessment of Rock Mass” at 17. Self sponsored Research Scheme: CSMRS on 24-25 October 2016. Mitigation of ASR by using Lithium 5. Organized Training Programme on Nitrate “Civil Quality Aspects and Concrete 18. A self sponsored research scheme Mix Design - Hydropower Project titled “Use of Artificial Aggregates Construction”, 16-18th November (Iron & Steel Slag) as Partial 2016, jointly by CSMRS and CBIP, New Delhi

89

6. Organized training course on - Publication of research review papers/ “Chemical aspects of water quality documents : 1 Nos. and its effect on durability of - Completion of self sponsored research concrete” during 8-9 December, schemes : 2Nos. 2016 at CSMRS - Evaluation of Detailed Project Reports : 7 Nos. B) Training Programme to the Students from Different Colleges/ SUB-ORDINATE OFFICES Universities/ Institutions on

laboratory testing in the field of Soil CENTRAL GROUND WATER Mechanics, Rock Mechanics and BOARD (CGWB) Concrete Technology

1. Gurgaon College of Engineering (03 Central Ground Water Board Students) (CGWB), under the Ministry of Water 2. Northen India Engineering College Resources, RD & GR is a (05 Students) multidisciplinary Scientific Organization. 3. Sikkim Manipal Institute of The Board is headed by the Chairman and Technology (02 students) has following wings, each headed by a 4. Gautam Budha University, Noida (04 Member: students)  Sustainable Management & Liaison 5. Ch. Braham Prakash Government  Survey, Assessment & Monitoring Engineering College (06 Students)  Exploratory Drilling & Materials 6. P.M. College of Engineering (01 Management Student)  Technology Transfer & Water Quality 7. RCM Polytechnic College , Haryana  Finance Wing

FINANCIAL ACHIEVEMENTS The Rajiv Gandhi National Ground Financial Outlays: Water Training and Research Institute is a) Under Plan located at Raipur which is headed by  Outlays for the F. Y. 2016-17 : Director (RGI). The administrative & Rs.16.20Crore financial matters of the CGWB are dealt  Expenditure incurred : with by the Director (Administration) and Rs.14.07Crore (tentative) Finance & Accounts Officer (FAO)  Revised Estimate : respectively. The Board has 18 Regional Rs.14.077Crore offices, each headed by a Regional b) Under Non Plan Director, supported by 17 Engineering  Outlays for the F. Y. 2016-17 : Divisions and 11 State Unit Offices for Rs.12.37Crore undertaking various field activities.  Expenditure incurred : Rs.13.98Crore (tentative) Mandate of CGWB:  Revised Estimate : To Develop and disseminate technologies, Rs.13.98Crore monitor and implement national policies for the Scientific and Sustainable development NEW INITIATIVES TAKEN DURING and management of India's Ground Water 2016-17 Resources, including their exploration, Following new initiatives were assessment, conservation, augmentation, taken during 2016-17: protection from pollution and distribution, based on principles of economic and - Investigations for Water resources ecological efficiency and equity. projects : 6 Nos.

90

Main Activities of Central Ground the Aquifer Mapping and Management Water Board are:- Programme to cover around 8.89 lakh 1. National Aquifer Mapping. sq.km area in the first phase. However, an 2. Monitoring of Ground Water Regime area of 5.25 lakh sq.km have been re- in the Country. prioritized, by providing priority to regions 3. Estimation of Ground Water Resource. of high level of ground water extraction, 4. Training under Rajiv Gandhi National water quality deterioration etc. in the Ground Water Training and Research States of Haryana, Punjab, Rajasthan, Institute. Gujarat, Andhra Pradesh, Telangana, 5. National Hydrology Project. Karnataka, Tamil Nadu and Bundelkhand 6. Demonstrative Project on Artificial Region of the States of Uttar Pradesh and recharge to Ground Water. Madhya Pradesh. Besides, various 7. Regulation of Ground Water activities in other States (covering an area of 3.64 lakh sq.km) has also been initiated. CGWB has prepared a portal and put on their various The major activities envisaged activities/achievements etc. at under Aquifer mapping and preparation of www.cgwb.gov.in. The portal contains Aquifer Management Plans are publications, downloads of manual/ Compilation of existing data, Data Gap guides/ reports, state ground water Analysis, Generation of additional data profiles, district broachers, Ground Water and Preparation of Aquifer Plan. Each Information System (GWIS) and RTI etc. activity has number of sub-activities and tasks and is carried out as per detail ACHIEVEMENTS OF CGWB protocol for implementation. DURING THE YEAR 2016-17 AS ON 31ST DECEMBER, 2016

(i) Aquifer Mapping: Aquifer Mapping is a multidisciplinary scientific process wherein a combination of geologic, geophysical, hydro geological, hydrological and water quality data are integrated to characterize the quantity, quality and distribution of ground water in aquifers. Aquifer mapping at the appropriate scale has to be devised and sustainable management plan to be prepared and implemented for this common pool resource. This will help achieving drinking water security, Uttamsara OW, Tal. Bhatukli, Amravati improved irrigational facility sustainability District in ground water resources development in large part of rural India and many parts of (ii) Data generation for Aquifer urban India. Aquifer mapping has been Mapping: taken up in priority areas on 1:50,000 scale Various Data Generation activities during XII Plan period ( 2012-17) viz. exploratory drilling, geophysical surveys, chemical quality studies and other Out of 23 lakh sq.km map-able hydro geological surveys are taken up area of the Country, CGWB has initiated during the year 2016-17 for value addition

91 to aquifer maps. The individual Aquifer Management Plan under National achievements of data generation activities Aquifer Mapping and Management are as follows: Programme has been completed for 2.92 lakh sq.km during 2016-17 till 31st (1) Ground Water Exploration: December, 2016. During XII Plan, the The exploration is aimed at total area covered under NAQUIM is 5.20 generation of precise demarcation of lakh sq km up to December 2016. During aquifer disposition and determining their XII Plan up to31st March 2017, hydrological parameters It is being Preparation of Aquifer Map and Aquifer carried out by the Board through a fleet Management Plan will be completed for of 84 drilling rigs (28 Direct Rotary, 53 5.65 Lakh Sq.km Down the Hole and3 Percussion Combination types). During financial year (iv) Water Supply Investigations: 2016-17 (up to31.12.2016), the Central The Board provides assistance to Ground Water Board has constructed 509 defense and government agencies to solve wells (EW-352, OW-124, PZ-33) their immediate water supply problems by including 64 high yielding wells to assess selecting suitable sites for construction of the ground water potential in different ground water abstraction structures. The hydro geological set up. 750 wells are Board has carried out a total of 140 likely to be completed by 31st March, investigations during this year up to 31st 2017. December, 2016. 180 investigations are likely to be completed by 31st March, (2) Geophysical Studies: 2017. Geophysical studies are undertaken as an integral part of aquifer mapping and short-term water supply investigations. During 2016-17 up to 31st December, 2016, Central Ground water Board has carried out 1126 Vertical Electrical Soundings, 73.70 line kilometer resistively profiling and geophysical logging of 48 bore holes in various parts of the country. In all, 2000 Vertical Electrical Soundings and geophysical logging of 100 bore holes is likely to be st achieved by 31 March, 2017. High Yielding Exploratory Well at Pohregaon EW, Renapur Taluka, Latur District (3) Water Quality Analysis: 24388 nos of water samples were (v) Ground Water Regime Monitoring: analyzed for the basic constituents, heavy The Board has monitored the metals (such as Cu, Zn, Fe, Mn, CO, Cd, ground water levels in the country through Cr, Ni, Pb etc.), organic and specific a network of about 23000 Ground Water constituents during year 2016-17 up to Observation Wells for month of April/May 31st December, 2016. Chemical analysis 2016, August 2016 and November 2016 of 30,000 water samples is likely to be in all Regions. Additional 502 observation completed by 31st March, 2017. wells have been established to enhance the density of existing observation wells. (iii) Aquifer Maps and Management Water Quality of the wells is monitored Plan: during pre-monsoon period. In all, 1900 Preparation of Aquifer Map and monitoring wells are likely to be

92 established by 31st March, 2017. view the requirements of the National Project on Aquifer Management (vi) Estimation of Ground Water (NAQUIM). These trainings will enable Resource of the Country: creation of a trained workforce for The Dynamic Ground Water implementation of National Project on Resources of the country have been Aquifer Management and overall assessed jointly by respective state ground sustainable development of ground water water departments and Central Ground resources. Total outlay for RGNGWTRI Water Board under the supervision of the component for XII Plan is Rs 90.00 Crore. State Level Committees. The Dynamic Ground Water Resources assessment with reference to the base year 2013 has been computed .

(vii) Rajiv Gandhi National Ground Water Training and Research Institute (RGNTRI): Rajiv Gandhi National Ground

Water Training and Research Institute Participants from Nepal during field demo on (RGNGWTRI) located at Raipur, Geophysical Survey (Ground Water Chhattisgarh caters to the training Technology and Management, November 216) requirements of Central Ground Water Board and for many Central and State As a part of this three-tiered Government Organizations, Academic training programme, during the entire plan Institutes, NGOs etc. in the field of ground period (2012-17) a total of 174 Tier- I water. (National Level) training courses are proposed in which professionals from Dynamic Ground Water Resources of Central/State Government departments, India As On 0213 Academic Institutions etc. are to be 1 Annual Replenishable 447 trained. Under Tier- II (State Level) Ground Water Resources (bcm/yr) training programme, a total of 222 courses 2 Net Annual Ground Water 411 Availability (bcm/yr) are proposed in which ground water 3 Annual ground water draft 253 professionals, NGOs, VOs, PRIs etc are for irrigation, Domestic & (bcm/yr) proposed to be trained. Similarly, 1250 Industrial uses Tier -III (Block Level) training programme 4 Stage of Ground Water 62% are proposed in which NGOs, PRIs, Development Progressive Farmers and other 5 Categorization of stakeholders at grassroots level are to be Blocks/Mandals/Talukas trained. Achievements in the year 2016-17 Total Assessment Units 6584 (as on 31st December, 2016) are: Safe 4520  RGNGWTRI has organized 61 training Semi-critical 681 programmes including 27 tier I Critical 253 (National Level) and 13 tier II (State Over-exploited 1034 Level) and 21 Tier III (block Level) Saline 96 training programmes. As a part of

these training programmes a total of During XII Plan, RGNGWTRI 4234 participants including more than under HRD and Capacity Building Scheme 900 female participants were imparted of MoWR, RD & GR is implementing a training on various aspects of ground three-tiered training programme keeping in water.

93

 During the remaining part of ongoing 2016. The agenda items like Achievements AAP , the target of 35 nos tier I, 17 nos made in Aquifer Mapping and tier II and 35 nos Tier III training Management Plan Programme, Sharing of programmes are likely to be information with States for Aquifer completed by 31st March, 2017 and Mapping and Management Plan, Proposal 6264 participants are likely to be for Aquifer Mapping and Management trained in various training courses. Plan Programme for 2017-22 etc has been discussed during meeting. (viii) Demonstrative Projects on Artificial Recharge to Groundwater & Rainwater Harvesting: CGWB has implemented demonstrative projects on artificial recharge to Groundwater and Rain Water Harvesting in the states of Andhra Pradesh, Arunachal Pradesh, Bihar, Chhattisgarh, Delhi, Gujarat, Himachal Pradesh, Jammu & Kashmir, Jharkhand, Karnataka, Kerala, Madhya Pradesh, Boulder Check dam at Podi artificial Recharge Maharastra, Nagaland, Orissa, Punjab, to Ground Water in Patilah Nala, Water Shed, Rajasthan, Tamil Nadu, Telengana, Uttar Block Bilha district Bilaspur Pradesh, West Bengal and UT Chandigarh, (22 States/UT) during XI Plan. A total of (x) Scrutiny of Major/Medium 133 projects amounting to Rs. 99.87 Crore Irrigation Projects: envisaging construction of 1661 recharge As per the directives of Planning structures were approved and funds of Rs. Commission, the CGWB is scrutinizing 92.69 Crore were released till March 31, the Major and Medium Irrigation project 2016. During 2016-17, no spillover reports/proposals sent by the State balance funds was released as second Government / Central Water Commission/ installment for the ongoing projects. A Command Area Development & Water total of 26 artificial recharge structures Management Wing of Ministry of Water were constructed during 2016-17 and total Resources from the point of view of their structures constructed under the scheme th impact on groundwater regime. Specific are 1460 (as on 30 November, 2016). A recommendations are being made on the total of 1480 artificial recharge structures st projects and submitted to the concerned are likely to be completed by 31 March, for compliance. The 5 projects examined 2017. during 2016-17 (as on 31.12. 2016) are:  Sher-Shakkar-Machharewa Complex (ix) Fourth Meeting of National Inter- Project, Madhya Pradesh departmental Steering Committee  Dwarakeshwar-Gandeshwari (NISC): Reservoir Project(New Major), West Fourth meeting of National Inter- Bengal departmental Steering Committee (NISC)  Singatalur Lift Irrigation Scheme- for monitoring the National Project on Karnataka Aquifer Mapping and Management  Kanhar Barrage Project, Jharkhand (NAQUIM) held under the Chairmanship of Secretary of Ministry of Water  Restoration and Lining work of Resources, River Development and Ganga Western Main Canal and Ara Main Rejuvenation at MoWR, Shram Shakti canal & its system-Bihar

Bhawan, New Delhi on 26th September,

94

Observations on 1 Irrigation ground water domain and stakeholders like Project is under scrutiny at Regional office Students, Farmers & Industrialists from of Board as on 31.12.2016. across the country. The Seminar was organized in following technical sessions:  Aquifer Mapping – A National Perspective  Advances in Science & Technology in Aquifer Mapping  Groundwater Management: Community Involvement & Convergence  Sustainable Management of Groundwater in Stressed Aquifer  Aquifers in Arid Area & Palaeo- Check Dam At Phangeri, Kathua, Jammu & channels Kashmir (xii) Workshops/Seminars organized by (xi) One Day Seminar – Bhujal CGWB: Manthan-2:  One day Workshop and Global Ministry of Water Resources, River Market Conference on “Emerging Development and Ganga Rejuvenation issues, Opportunities and Challenges organized one day Seminar- Bhujal in Water well drilling for Drilling Manthan-2 on 29th November, 2016 at Engineers, Service provider and Rig Vigyan Bhavan, New Delhi with a theme Manufactures” was organized by of “Aquifer Mapping and Ground Water CGWB on 24.05.2016 at New Delhi. Management”. The Bhujal Manthan  A Workshop on “Palaeochannels - program was inaugurated by Sushri Uma Evolution and Ground Water Bharati the Hon‟ble Minister of WR, RD Prospects” was organized by & GR, in presence of Shri Narendra CGWB at CSMRS Auditorium, New Singh Tomar, Hon‟ble Minister for Rural Delhi. The programme was Development, Panchayat Raj and Drinking inaugurated by Honorable Minister of Water, Sh. Shashi Shekhar, Secretary, State, Water Resources, River Ministry of Water Resources RD& GR, Development & Ganga Rejuvenation, Sh. Parameswaran Iyer, Secretary, Prof. Sanwar Lal Jat. Ministry of Panchayat Raj, Dr. Amarjit . A workshop was organized on 1st Singh, then OSD, Ministry of Water September 2016 at IIT, Kharagpur Resources RD & GR, Sh. K.B. Biswas, under the NAQUIM. The theme of the Chairman, CGWB, Ministry of Water Workshop was “Ground Water Resources, RD & GR. During the Program Modeling for Aquifer Management in Sushri Uma Bharati the Hon‟ble Minister Soft Rock Areas”. Total 80 invitees of WR, RD & GR, released the app “ Mera had participated in the workshop. Bhujal” and Bhujal Manthan-2 Volume.  A workshop was organized on

15.10.2016 at CSMRS, New Delhi in Bhujal Manthan-2 was attended by which Sushri Uma Bharati the Hon‟ble about 1200 experts and delegates including Minister of WR, RD & GR released Officers from various Ministries, Govt. the Report entitled “Palaeochannel of Organizations (Central as well as State North India: Review & Assessment”, Governments), Non-Government compiled by expert Committee Organizations, Academicians, Scientists constituted by the Ministry. About 200 from Research Institutes working in the

95

invitees had participated in the procurement of additional licenses and workshop. hosting; data integration and training for Pan India expansion. (xiii) Activities under taken by CGWB d) PDS: A purpose driven study in the North Eastern Region: proposed to be taken up in sub-basin The Central Ground Water Board above Ramganga confluence of Ganga is conducting scientific and technical Basin, for stream aquifer relationship, studies for ground water assessment, delineation of aquifer contamination development and management in the North through solute transport model & pilot Eastern Region. Major achievements of study for aquifer remediation. the North Eastern Region in the year 2016- e) River Basin Studies: A joint 17 up to 31st December, 2016 are given collaborative study with CWC for Chapter 9: Initiatives in the North East. River Basin Studies. f) Institutions Capacity Enhancement: o International Trainings: As per the training calendar o Domain specific training: In house Trainings of 3 trainings per year for 1 week duration for a batch of 15- 20 trainees at RGI, Raipur. o Workshops/awareness Programmes - 6 programmes per year. o Training in collaboration with USGS, as per the MoU to be signed Discussions with the personnel of Ralegaonsiddhi watershed development works with USGS by the Ministry g) Technical Guidance & Support to States in the implementation of NHP: (xiv) National Hydrology Project CGWB had submitted Project In 2016-17, a budget of Rs 69.5 Lakh Implementation Plan for Rs 85.0 Crore, in has been allocated for CGWB. Till respect of NHP, which is spread over a December 2016, bids for real time period of 8 years. CGWB proposes to take water quality monitoring in the Tamil up following activities under NHP: Nadu & UT of Puducherry were under a) Real time monitoring of water quality preparation and action has been in coastal aquifers in Tamil Nadu & initiated for conducting 3 Nos of UT of Puducherry: Construction of Domain specific training and 6 60 piezometers & installation of Awareness raising Campaigns have DWLR with telemetry (includes, been initiated. By end of march 2017, supply, installation & maintenance for it has been envisaged to complete 3 5 years after 1 year of warranty) Nos of Domain specific training at b) Establishment of Center of Excellence RGI, Raipur and 6 Awareness raising for groundwater modeling: It will Campaigns in NE States (2 Nos), support the modeling studies of PDS, Jharkhand (1 No), Rajasthan (1 No), Joint study of CGWB & CWC in Uttarakhand (1 No) & West Bengal (1 River Basin Modeling and also assist No) would be completed. Bid is likely State Groundwater agencies & to be floated for construction of Regional Offices of CGWB to take up piezometers and bid document for modeling studies. supply & installation of DWLRs c) eGEMS: Consultancy for Design, would be finalized. development and Implementation of Additional Modules, including

96

(xv) 7thPainting Competition on Water In pursuance of the order passed by Conservation and Water Pollution the Hon‟ble Supreme Court of India, The Painting competition is one of Central Ground Water Board has been the activities to create awareness among constituted as Central Ground Water students for conservation of water and Authority (CGWA) under subsection(3) of spread the same in School/Society through Section 3 of the Environment (Protection) these children. The competition is held in Act, 1986 vide notification No. S.O. 38 (E) three stages – the School Level dated 14.1.1997 for the purpose of competition, followed by the State Level regulation and control of ground water competition and finally culminating with management and development in the the National Level competition held at country. The Central Ground Water New Delhi. Fifty winners from the school Authority was re-constituted vide S. O. level competition were selected in each 1121(E) dated 13th May, 2010. state for participation in the state level painting competition which was held in During 2016-17, up to December November,2016. Winner students are 2016, CGWA has framed new awarded cash prizes worth Rs. 20,000/-, Guidelines/Criteria for evaluation of the first prize winner is awarded Rs proposals/requests for ground water 5,000/-, 2 nd Prize Rs 3,000/-, 3 rd Prize abstraction by Food parks/Agro Based Rs 2,000/- and ten consolation prizes of Rs Industries in Notified areas. These 1,000/- each are also presented. Each guidelines are effective from 31.08.2016 winner student is also awarded a certificate and are available on website www.cgwa- of merit and all participating students are noc.gov.in issued participation certificate. The National Painting competition is proposed CENTRAL WATERAND POWER to be held at New Delhi in Jan/Feb, 2017. RESEARCH STATION This year more than 13 lakhs students from 13,447 schools participated in the The Central Water and Power school level painting competition. The Research Station (CWPRS), Pune, theme at the school level painting established in 1916 by the then Bombay competition was “Save Water- Save Life” Presidency as a Special Irrigation District, whereas the theme for State level painting is the leading national hydraulic research Competition was “Save Water-Save institute under the Ministry of Water Earth”. Resources, River Development and Ganga Rejuvenation (MoWR, RD&GR), New Delhi. In its early days of formation, this institute played important role by conducted outstanding research work for the Sukkar Barrage in Sind, the largest irrigation project in the world (1927 to 1932). Recognizing its role in the systematic study of various phases of water flow, including floods, the institution was taken over by the Check Dam at Kothapallimitta Village Government of India in 1936. With the Artificial Recharge Structures on ground water dawn of independence, and launching of in Chittor District, Andhra Pradesh planned development of water resources of the nation, CWPRS became the principal CENTRAL GROUND WATER central agency to cater to the research and AUTHORITY development (R&D) needs of hydraulics

97 and allied disciplines for evolving safe and  River Engineering economical designs of hydraulic structures  River and Reservoir Systems involved in water resources projects, river Modeling engineering, power generation and coastal  Reservoir and Appurtenant Structures engineering projects.  Coastal and Offshore Engineering  Foundation and Structures  Applied Earth Sciences  Instrumentation, Calibration and Testing Facilities

GANGA FLOOD CONTROL COMMISSION

Ganga Flood Control Commission was established in 1972 with its Model of Nandgaon Port Headquarters at Patna. The Commission is headed by a Chairman with two full time A Brief Summary of Achievements of Members and other supporting officers and CWPRS staff. The representatives of concerned Indicators Previous Current central ministries and departments as well Year Year (Up to as the Engineer-in-Chief/ Chief Engineers 10.02.2017) of the Ganga basin States are part time Studies Awarded 85 Members/ permanent invitees. (Nos.) 105 Amount (Rs. 13.96 The Commission has been assigned Crore) 24.17 the following tasks: Reports Submitted 106 76 (Nos.)  Preparation and Updation of Papers Published 65 83 comprehensive plans for flood (Nos.) management of the river systems in Participation in 51 103 the Ganga basin Seminars/  Phasing/ sequencing of programme of Symposia/ implementation of works included in Conferences the basin-wise plans (Nos.)  Providing technical guidance to the Lectures Delivered 74 75 Ganga basin States, namely, West (Nos.) Bengal, Bihar, Jharkhand, Uttar Technical 17 17 Committee Pradesh, Uttarakhand, Chhattisgarh, Meetings (Nos.) Madhya Pradesh, Delhi, Haryana, Training of 120 288 Himachal Pradesh and Rajasthan on Personnel (Nos.) flood management Training 10 16  According techno-economic appraisal Programmes/ and clearance to flood management Conferences schemes of the Ganga basin States Organized (Nos.) with estimated cost of more than Rs. 12.5 crore and up to Rs. 25.0 crore The research activities at CWPRS except for schemes of the States of can be grouped into seven major Haryana, Uttar Pradesh and Delhi on disciplines as listed below. the river Yamuna in the reach from

98

Tajewala to Okhla Barrage. The taken up and completed in time bound schemes with estimated cost of more manner. than Rs. 25.0 crore are appraised by GFCC and their techno-economic (ii) Updating of Comprehensive Plan for clearance is accorded by TAC-MoWR Flood Management:  Monitoring the execution of the Comprehensive plans for flood important flood control schemes management for all the 23 river systems of particularly those receiving Central the Ganga basin were prepared between Assistance under Flood Management 1975 and 1990. The work of updating Programme or being executed under these comprehensive plans was taken up Central Sector due to changes, additional information/  Assessment of adequacy of the data on hydro- meteorology and existing waterways under the road and morphology in the basin in the subsequent rail bridges and additional waterways years. All comprehensive plans except required to be provided for reducing comprehensive plan for Flood the drainage congestion to reasonable Management for Kosi river system have limits been updated once. Second updating of 5  Performance evaluation of major plans has also been completed. During the flood control measures executed by year the first updation of the the States including the Inter-State comprehensive plan of Kosi river system Flood Control Schemes is under progress and second updation of Rupnarayan-Haldi-Rusulpuris nearly ACHIEVEMENTS DURING 2016-17 complete.

(i) Maintenance of Flood Protection (iii) Monitoring of Important Flood Works of Kosi and Gandak Projects: Management Schemes: The Flood Protection Works on GFCC is monitoring about 138 river Kosi and Gandak are being carried flood management schemes which, inter- out based on site inspection after every alia, include: flood season and on the recommendations a) 114 flood management schemes of Kosi High Level Committee (KHLC) supported under “Flood Management and Gandak High Level Standing Programme” of Ministry of Water Committee (GHLSC) respectively. The Resources River Development and reimbursement of expenditure incurred on Ganga rejuvenation maintenance of the flood protection works b) 2 schemes of maintenance of flood executed in Nepal portion is made by protection works of Kosi and Gandak Government of India after utilization Projects in Nepal; certificate of the same is received from the c) 3 schemes viz., extension of State Government of Bihar for Kosi and embankment along Lalbakeya, Kamla Government of Uttar Pradesh for Gandak and Bagmati rivers in Nepal; and respectively. d) 19 schemes on common/ border rivers in West Bengal along India- Like previous years, this year also, Bangladesh border under the Central the KHLC/GHLSC inspected the flood Sector Scheme “River Management protection works on river Kosi and Activities and Works related to Border Gandak during 7th November -9th Areas”. November 2016 and 17th -19thoctober, 2016 respectively, held meetings and (iv) Techno-economic Appraisal of finalized the recommendations for flood Flood Management Schemes: protection works on these rivers to be

99

Techno-economic appraisal of During the 4th meeting of Joint flood management schemes of Ganga Committee on Water Resources held in basin States is a continuing activity of March, 2009 at New Delhi, a committee GFCC. 60 number of flood management for flood management known as Joint schemes were received in GFCC from Committee on Inundation & Flood Ganga Basin States during 2016-17 (up to Management (JCIFM) was constituted 30thDecember, 2016) including spill over after merging various other committees projects from previous years, out of which namely SCIP, HLTC, JCFM, SCEC and 28 schemes were accorded techno- SCFF into a single committee. The terms economic clearance and on 13 schemes of reference of JCIFM are compliance were issued, 11 schemes were  The JCIFM shall be an umbrella dropped and 8 schemes are under Committee to implement the decisions examination in GFCC. of JSTC in inundation and flood management issues. COMMITTEES  The JCIFM shall address the issues related to flood management and (i) India-Nepal Joint Committee on inundation and can form Task Water Resources (JCWR): Group(s), if required. An India-Nepal Joint Committee  The JCIFM shall monitor the progress on Water Resources (JCWR) headed by of works and provide guidance to task the Water Resources Secretaries of both group(s) and report to JSTC. the countries is functioning with the mandate to act as umbrella committee for Ten meetings of JCIFM have been held. all other sub-committees and groups under The 10th meeting of the Committee was it. Chairman, GFCC is a member of the held during 6th -10th December, 2015 at JCWR. Seven meetings of JCWR have Kathmandu. In the meeting various issues been held so far. The last meeting was held relating to flood inundation and Flood in Kathmandu on 24-25 January 2013. Management were discussed and decision taken. (ii) Joint Standing Technical Committee (JSTC): (iv) Ganga Flood Control Board This committee was constituted Meeting (GFCB): rd during the 3 meeting of India-Nepal Joint The 17th meeting of Ganga Flood Committee on Water Resources (JCWR) Control Board (GFCB), chaired by held from 29.09.08 to 01.10.08 in Hon‟ble Minister, Water Resources, River Kathmandu (Nepal). Chairman, GFCC is Development & Ganga rejuvenation was the Team Leader of the Indian Side of the held on 28th May,2015 at Patna, in which Committee. The main function of JSTC is various issues related to Ganga basin to coordinate with existing committees and States were discussed and necessary action sub-committees under the JCWR. Five on the decisions of said meeting are being meetings of JSTC have been held so far. taken by GFCC. The last meeting was held in New Delhi on 26.05.2016 in which various issues were (v) Ganga Flood Control Commission discussed and decisions taken for follow (GFCC): up action in the matter. The 49th meeting of Ganga Flood Control Commission (GFCC) was held on (iii) Joint Committee on Inundation and 8thJune, 2016 at New Delhi under the Flood Management (JCIFM) between chairmanship of Shri G.S. Jha, Chairman, India and Nepal: GFCC during which the problems faced by the States in implementing

100 recommendations given in the Control Authority are members of the Comprehensive Plans and other relevant committee. The secretariatof the issues were discussed. Committee is located at Vadodara and it has a full time secretary of the rank of (vi) Expert Committee for formulation Joint Secretary belonging to the Central of guidelines for use of geo-textile/ geo- Water Engineeing (Group – A) service. bags/ geo-tubes in construction of flood SSCAC is a very small organisation management works: working under MoWR, RD & GR, hence The 5thmeeting of the “Expert there is no direct recruitement. Committee for formulation of guidelines for use of geo-textile/ geo-bags/ geo-tubes SARDAR SAROVAR in construction of flood management CONSTRUCTION ADVISORY works” was held on 14.03.2016 at Sewa COMMITTEE (SSCAC) MEETING Bhawan, New Delhi, in which the interim The 84th meeting of the SSCAC guidelines were finalized. was held on 19th December 2016 at New Delhi, under Chairmanship of Secretary, SARDAR SAROVAR MoWR, RD & GR, New Delhi. Wherein CONSTRUCTION ADVISORY following important issues related to COMMITTEE Sardar Sarovar Project (SSP) were deliberated and appropriate decision taken: The Sardar Sarovar Construction  Insurance Coverage for Sardar Advisory Committee (SSCAC) was Sarovar Power Houses. constittued in 1980 by the Government of  Real Time Data Acquisition System India in accordance with the directives of (RTDAS) and commissioning of the Narmada Water Disputes Tribunal Water Management System. (NWDT) with a view to ensure efficient,  Closure of contract awarded to M/s economical and early execution of Unit – I Intrax for work package IV of EMC of (Dam and Appurtenant works) and Unit – NCA. III (Hydro – power works) of the Sardar  Payment of Share Cost of SSP by the Sarovar Project. Party States.  Annual Development Plan 2016-2017 for Unit-I and Unit-III works of SSP.  Meeting of Dam Safety Panel for Sardar Sarovar Project.  Review of the progress of Unit-I and Unit-III works of Sardar Sarovar Project: Raising the height of Sardar

Sardar Sarovar Dam (Gujarat) Sarovar Dam above Crest level (i.e. 121.92m). The Secretary, Ministry of Water  Construction of Garudeshwar Weir Resources, is the Chairman of the SSCAC.  Revised Cost Estimate of Unit-I (Dam The officers of the departments like Water & Appurtenant works) and Unit III Resources, Irrigation, Power, Finance and (Hydro power works) of SSP at price Revenue etc. concerned with the level 2014-2015 Constructionof the project, of the four  Construction of new high level bridge party states viz Gujarat, Maharashtra, in u/s of existing Gora Bridge on river Rajasthan and Madhya Pradesh along Narmada with concerned officers from the  Supply, Installation and Government of India and the Narmada Commissioning of Isolated Phase Bus

101

Ducts, Static Frequency Convertor fitting of rubber seals are started and it is and Phase Reversal Switches along in completion stage. with all required accessories (i.e. balance items) for pumping mode FINANCIAL ACHIEVEMENTS operation of 6 X 200 MW T. G. Sets SSCAC has continuously made of River Bed Power House (RBPH) at efforts to minimise the outstanding share Sardar Sarovar Hydro Electric Project cost of SSP payble by the party States. (SSHEP) at Kevadia Colony. Total unsdisputed share of expenditure as  Taking up in PPP mode a Small on September 2016 amounting to Rs. Hydro Power Project at Godbole gate 35038.43crore has been resolved amongst to the party States. Balance undisputed share  Continuation of temporary posts in cost dues remaining is Rs. 1081.52crore. Sardar Sarovar Construction Advisory Committee BANSAGAR CONTROL BOARD

PERMANENT STANDING Bansagar Dam was raised to its full COMMITTEE (PSC) MEETINGS height along with erection of 18 nos. The Sardar Sarovar Radial Crest Gates in June, 2006. This Construction Advisory Committee has a year i.e., in 2016-17, the reservoir got sub-committee named as Permanent filled up to Full Reservoir Level (FRL) i.e. Standing Committee (PSC), with the RL 341.64 m on 17.9.2016. The dam at Executive Member, Narmada Control Full Reservoir Level envisages to provide Authority as the Chairman, and irrigation in an area of about 5.00 lakh representatives from the Ministry of Water hectares in the three States of Madhya Resources, Central Water Commission, Pradesh, Uttar Pradesh and Bihar besides Central Electricity Authority and all the hydropower generation of 425 MW in four party States are Members. The addition to providing domestic and Secretary, SSCAC is the Member industrial water supply to a number of Secretary of the PSC. villages and cities. The updated revised cost of Rs. 1582.94 crore (PL 2009) of the 111th& 112th meeting of PSC of Bansagar Dam (Unit-I) has been finalized SSCAC were held on 26th July 2016 & 9th which is to be shared by the three States of November 2016 at New Delhi M.P., U.P. and Bihar in the agreed ratio. respectively, wherein important issues related to Sardar Sarovar Project (SSP) Bansagar Control Board was set up were deliberated and appropriate decision vide Government of India, Ministry of taken. Agriculture and Irrigation Resolution th No.8/17/74-DW-II dated 30 January, PHYSICAL ACHIEVEMENTS 1976. It was amended vide Resolution No. th (SARDAR SAROVAR PROJECT) 8/17/74-DW-II dated 28 March, 1978. All 29 piers of This Resolution was in accordance with an raised up to final level. All 30 nos. of agreement reached between the bridge span completed at final height. All Governments of Madhya Pradesh, Uttar th 30 nos. of pier cap raised to final height. Pradesh and Bihar on 16 September, All 30 nos. parapet wall spans completed. 1973 for sharing the waters of River Sone All 30 nos. radial gates installed and raised and the cost of the Bansagar Dam. up to EL 134.15m during 2016-17. Fitting & alignment of wall plates are completed. The Union Minister of Water Second stage concreting in wall plate and Resources, River Development and Ganga Rejuvenation is the Chairman of the Board

102 and Union Minister of Power, Chief Bansagar Control Board. The party States Ministers, Minister-in-charge of Irrigation are carrying out the execution of the canals and Finance of the three States and and power system independently under Minister-in-charge of Electricity of their jurisdiction. Madhya Pradesh are its members. The Executive Committee set up under the The benefit and cost of the dam, Chairmanship of the Chairman, Central including land acquisition and Water Commission, manages the day to- rehabilitation are shared by Madhya day affairs of the Board. The expenditure Pradesh, Uttar Pradesh and Bihar in the on the office of the Board is met out of ratio of 2:1:1. The Project was originally budge grant of Union Ministry of Water estimated to cost Rs. 91.30 crore (PL: Resources and subsequently reimbursed by 1978). The revised cost of the project at the three States of Madhya Pradesh, Uttar 1991 price level was Rs. 936.00 crore Pradesh and Bihar. [Civil Works Rs. 300.00 crore and Land Acquisition & Rehabilitation (LA&R) Main features of the resolution (with Works Rs. 636.00 crore]. The cost amendment) leading to setting up of estimate based on Madhya Pradesh Bansagar Control Board: Unified Civil Schedule of Rates (UCSR) 1998 was Rs. 1054.96 crore (Civil Works “In consultation with the Governments Rs. 391.30 crore and LA&R Works Rs. of Madhya Pradesh, Bihar and Uttar Pradesh, 636.66 crore). The estimated cost of the it has been decided to set up the Bansagar project has been further revised at 2009 Control Board with a view to ensuring the efficient, economical and early execution of price level for Rs. 1582.94 crore (PL 2009) Bansagar Dam including all connected works with B.C. Ratio of 1.63. The project with in Madhya Pradesh, but excluding the canal the updated revised cost estimate of Rs. systems which will be executed by respective 1582.94 crore (PL 2009) has been States namely, Madhya Pradesh, Uttar Pradesh accepted by the Advisory Committee of and Bihar. The Control Board will be in M/o Water Resources in its 102nd meeting overall charge of the project including its held on 28th January, 2010 and technical and financial aspects. The actual subsequently approved by the Planning work of construction will be carried out under Commission. the direction of the Control Board by the Chief Engineer concerned of the Madhya Pradesh COMPONENTS OF BANSAGAR DAM Government.” The Bansagar Dam envisages “The Three State Governments agree construction of:- to delegate powers to the Chief Engineer,  67.5 m high masonry dam including Madhya Pradesh, to contract for works, rockfill flanks across the Sone river supplies and services under the direction of the just downstream of the gorge at Control Board. The contract in respect of all Kusumah (Deoland). Length of works will, however, be executed in the name masonry dam, left rockfill dam and of the Governor of Madhya Pradesh.” right rockfill dam are 670.00 m, 161.00 m and 185.00 m respectively. BANSAGAR DAM PROJECT  Six low earth dykes, four on the left Bansagar is a multipurpose river bank of Sone river and two on its right valley project on river Sone in Madhya bank with a total length of 6.95 km. Pradesh envisaging both irrigation and  Kuteshwar Lime Stone Deposits hydroelectric power generation. The Protection works. Bansagar Project is being executed by the Water Resource Department, Government BENEFIT FROM THE PROJECT of Madhya Pradesh under direction of

103

Power generation from the Project required numbers in model villages have (in Madhya Pradesh) is 425 MW already been done and handed over to the PAP's. R&R Programme has been Irrigation benefits of the project is implemented based on norms approved by given below: the Executive Committee and orders issued by Government of Madhya Pradesh. Irrigation benefits of Bansagar Dam Comprehensive R&R Policy for the Annual Irrigation in M.P. (in the 2.49 project has been finalized and districts of Rewa, Sidhi, Satna lakh implemented. and Shahdol) hectare STATUS OF RELEASE OF WATER Annual Irrigation in U.P. (in the 1.5 TO BENEFICIARY STATES FROM districts of Mirjapur and lakh BANSAGAR DAM (2014-15) ) hectare As per the information provided by the Engineer-in-Chief, Water Resource Annual Irrigation in Bihar 0.94 Department, Government of Madhya (towards stabilizing irrigation lakh Pradesh, the total water released to the through old Sone Canal system) hectare States of Madhya Pradesh, Uttar Pradesh and Bihar from April, 2015 to March, 2016 is 2066.05 M.Cum, 904.243 M.Cum PROGRESS OF WORKS and 169.878 M.Cum respectively. The left and right rock fill dam have been completed up to top level i.e. FINANCIAL ACHIVEMENT OF RL 347.00 m. All masonry non-overflow BANSAGAR DAM (UNIT-I) (2016-17) blocks and both the key blocks on either The sub-head wise Expenditure sides have been completed up to top during the financial year 2016-17 (up to elevation at RL 347.00 m. Spillway blocks November 2016) and cumulative have been raised up to crest level (RL expenditure up to November 2016 is as 326.40 m) and spillway Piers & Bridge under: have been completed. Fabrication and erection of 18 Nos. Radial Crest Gates and Expenditure during 2016-17 (Rs. Crore) Stop-Log Gates have also been fully Sub Head Exp. in Cumulative completed by June, 2006. All construction 2016-17 Expenditure sluices have been plugged and gates (up to up to lowered. Works on installation of 11/2016) 11/2016 Irrigation Sluice Gates have been fully Establishment 12.80 289.10 Tools & plants - 2.078 completed. Work on all the six Saddles has Suspense (debit) - 148.58 also been fully completed. Works 08.00 1400.45 Suspense - (-) 143.347 The dam at its full height has Salary of Daily 15.84 102.154 submerged 336 villages. Approximately wages & Work 1.5 lakh PAP's of 54,686 families have Charges been affected. Total 58,753.40 hectare Total 36.64 1814.87 land is coming under submergence, out of which 37,090.40 hectare is private land; STATUS OF CONTRIBUTION OF 17,185 hectare is revenue land and 4,478 FUND hectare of forestland. The Private land of According to Bansagar Agreement of 1973 37090.40 hectare has been fully acquired for construction of Bansagar Dam, the along with the property compensation. three participating states i.e. M.P., U.P. Development of residential plots in and Bihar have to share the cost of

104 construction in the ratio of 2:1:1 incurred and contribution of the respectively. The details of expenditure participating states as on 30.11.2016 as during 2016-17 (up to Nov.2016) and the per information provided by WRD, Govt. total expenditure of Rs. 1814.85 crore of MP is as given in below:

Status of Contribution (in Rs. Crore) SHARE DUE SHARE RECEIVED BALANCE SHARE Total Exp. M.P. U.P. Bihar M.P. U.P. Bihar M.P. U.P. Bihar Up to 03/2016 889.116 444.558 444.558 925.42 409.96 419.052 (+)36.304 (-) 4.598 (-) 25.506 1778.23

During 2016-17 up 18.32 09.16 09.16 18.32 - - (-) 09.16 (-) 09.16 to 30.11.16 (36.640) Total as on 30.11.16 907.436 453.718 453.718 943.74 409.96 419.052 (+)36.304 (-)43.758 (-) 34.666 (1814.87)

UPPER YAMUNA RIVER BOARD Chief Engineer from Central Electricity Authority and representatives of Central Upper Yamuna River Board is a Ground Water Board and Central Pollution subordinate office under Ministry of Water Control Board as part time Members. The Resources, River Development & Ganga Board has a full time Member-Secretary Rejuvenation, Government of India. A who does not belong to beneficiary states. memorandum of Understanding (MoU) The expenditure on the Board is shared was signed by the Chief Ministers of equally by the six basin States. The Board Himachal Pradesh, Haryana, Utter has sanctioned staff strength of 58 and all Pradesh, Rajasthan and National Capital the posts of Board Secretariat are filled on Territory of Delhi on 12th May, 1994 deputation basis from Staff/Officers of regarding allocation of utilizable surface Central/State Government. flow of River Yamuna up to Okhla Barrage (Upper Yamuna) among the co- UPPER YAMUNA REVIEW basin States. In order to implement the said COMMITTEE MoU, Upper Yamuna River Board As per Resolution dated 11th (UYRB) was constituted by the Resolution March, 1995, there shall be a “Upper No. 10(66)/71-IT dated 11th March 1995 of Yamuna Review Committee(UYRC)” MoWR, RD & GR, Govt. of India in comprising of the Chief Ministers accordance with the provision of the MoU. (Governor in case of President‟s Rule) of After creation of Uttaranchal State in the States of Himachal Pradesh, Haryana, 2000, the resolution was modified to Rajasthan, Utter Pradesh, Uttarakhand, and include Uttaranchal (now Uttarakhand) National Capital Territory of Delhi under also in the Boarding 2001. the Chairmanship of the Hon‟ble Minister, MoWR, RD & GR, Govt. of India for The Board consists of Member, assessment of working of the UYRB and Central Water Commission as part time ensure implementation of MoU dated Chairman and one nominee each from the 12.05.1994 regarding allocation of surface States of Utter Pradesh, Uttarakhand, flow of Yamuna and issue directions as Haryana, Rajasthan, Himachal Pradesh, may be necessary for the proper and National Capital Territory of Delhi not development and management of the upper below the rank of the Chief Engineer, a

105 reaches of the Yamuna River Basin up to directly into the river in compliance of the and including Okhla Barrage. aforesaid order.

FUNCTIONS OF UYRB Government of India has included The main function of Upper the three proposed storage projects in the Yamuna River Board is to regulate the upper reaches of Yamuna and its allocation of available flows amongst the tributaries known as Renukaji Dam, beneficiary States and also monitoring the Kishau Dam and Lakhwar-Vyasi Projects return flows; monitoring conserving and as National Projects for which 90% of the upgrading the quality of surface and cost of irrigation and drinking water ground water; maintaining hydro- supply component of the project shall be meteorological data for the basin; over provided by the Government of India. viewing plans for watershed management; Investment clearance for Lakhwar project monitoring and reviewing the progress of on River Yamuna was accorded by Govt. all projects up to and including Okhla of India in April, 2016 and further barrage. activities regarding the development of the project are in progress. Vyasi Project on ACTIVITIES OF UYRB River Yamuna is under construction and The Board has been making 40% work has been completed. The tentative seasonal distribution of water to project is scheduled for commissioning by basin States at various distribution points. December, 2018. An MoU has been signed In continuation to above, Board has started between Govt. of Uttarakhand and Govt. the process of installation of telemetry of Himachal Pradesh on dated 20th June, system to observe discharge at 11 locations 2015 for the execution of Kishau MPP on in the basin to ensure real-time River Tons, tributary of River Yamuna in dissemination of flow data amongst Sirmaur Distt., HP and in Dehradun Distt., participating States. UYRB finalized the Uttarakhand as the project is to be „Water Accounting Manual‟ for Upper executed through a joint venture between Yamuna Basin and had been circulated to Govt. of both the States. all basin States for its implementation. Memorandum of Association In MoU dated 12th May, 1995, the (MoA), Article of Association (AoA) and States have agreed that a minimum flow in Memorandum of Understanding (MoU) proportion of completion of upstream between Uttarakhand & Himachal Pradesh storages going up to10 cumec shall be for the execution of Kishau MPP has been maintained downstream of Tajewala/ approved by the Government of Hathnikund and downstream of Okhla Uttarakhand vide letter dated 27.07.2016 Headwork throughout the year from of Secretary, Power, Govt. of Uttarakhand, ecological considerations as upstream Dehradun. Land acquisition and other storages are built up progressively in a activities for the Renukaji Dam Project on phased manner. Meanwhile, Hon‟ble NGT river Giri, tributary of River Yamuna are ordered vide order dated 11.06.2015 that in progress. “The state of Haryana shall release of 10 cumec water directly into main stream of UYRB has continuously been river Yamuna from Hathnikund Barrage engaged itself in resolving the inter- State and maintain e-flow of the river till issues amongst the basin States and Wazirabad. Accordingly, UYRB asked signing of Agreements related to water Haryana State to comply the aforesaid distribution and related to benefits and cost order and at present,10 cumec water is sharing from the proposed above three being released from Hathnikund Barrage projects in Upper Yamuna Basin.

106

functions of NWDA Society. The UYRB has been working to resolve functions of NWDA were further modified actively on various issues amongst the vide the Ministry‟s resolution dated Basin States of Upper Yamuna reaches 19.05.2011 to undertake the work of viz. Share of Yamuna Water to Rajasthan preparation of DPRs of intra-State links at Ex-Tajewala, Short supply of Yamuna also by NWDA, and the same has been water to Rajasthan from Okhla headwork, published in the Gazette notification of Interceptor Sewer Scheme for Yamuna Govt. of India dated 11th June, 2011. River, Schemes for Gurgaon Feeder Canal Further, two new Functions in the mandate and Agra Canal, Pollution of Yamuna raw of NWDA were added vide Gazette water at Wazirabad, Division of Utilizable notification dated 07.10.2016. Water Resources of Yamuna River between Uttar Pradesh and Uttarakhand FUNCTIONS OF NWDA etc. UYRB has also started the process of The Agency functions with the construction of its office building at following main objectives: Board‟s land namely Plot No. C-56/3,  To carry out detailed survey and Sector – 62, NOIDA. investigations of possible reservoir sites and inter-connecting links in Board has organized 49 meetings order to establish feasibility of the of the Board and 6 meetings of the UYRC proposal of Peninsular Rivers since its constitution to till date and 50th Development and Himalayan Rivers meeting is scheduled to be held in Feb., Development Components forming 2017. part of the National Perspective for Water Resources Development REGISTERED SOCIETIES prepared by the then Ministry of Irrigation (now Ministry of Water

Resources, RD & GR) and Central NATIONAL WATER Water Commission. DEVELOPMENT AGENCY  To carry out detailed surveys about The National Water Development the quantum of water in various Agency (NWDA) was set up in July 1982 Peninsular River systems and by the Government of India as a Society Himalayan River systems which can under Societies Registration Act 1860 be transferred to other basins/States under the then Ministry of Irrigation (now after meeting the reasonable needs of Ministry of Water Resources, River the basin/States in the foreseeable Development and Ganga Rejuvenation) to future. study the feasibility of the links under  To prepare Feasibility Report (FR) of Peninsular Component of National the various components of the scheme Perspective Plan. NWDA is fully funded relating to Peninsular Rivers by the Government of India. Subsequently development and Himalayan Rivers in 1990, NWDA Society resolved to take development. up the studies of the Himalayan  To prepare DPR of river link Component also. Further, on 28th June, proposals under National Perspective 2006 preparation of Detailed Project Plan for Water Resources Reports (DPRs) of link projects and pre- Development after concurrence of the feasibility/ feasibility reports of intra-State concerned States. links as proposed by States were also  To prepare Pre – Feasibility / included in the functions of NWDA. Feasibility / Detailed Project Reports Accordingly, the Ministry vide resolution of the Intra-State links as may be dated 30.11.2006 has modified the proposed by the States. The

107

concurrence of the concerned co-basin NWDA is headed by the Director States for such proposals may be General of the rank of Additional obtained before taking up their FRs / Secretary to the Govt. of India. He is the DPRs. Principal Executive Officer of the Society,  To undertake/ construct/ repair/ responsible for proper administration of renovate / rehabilitate / implement the the affairs and funds of the Society. He is projects either on its own or through assisted by Chief Engineer (HQ) & an appointed Agency/ Organization/ Directors in this regard, and he is also PSU or Company and the projects responsible for coordination and general forming part of interlinking of rivers, supervision of the activities of the Society. for completion of projects falling The Headquarters of the Agency is at New under Pradhan Mantri Krishi Sinchai Delhi. NWDA has 2 Field Organisations Yojana (PMKSY) of which projects each headed by a Chief Engineer, 5 Circles under Accelerated Irrigation Benefits each headed by a Superintending Engineer, Programme (AIBP) are also included 16 Divisions each headed by an Executive and similar other projects. Engineer and 2 Sub-Divisions each headed  NWDA to act as a repository of by an Assistant Executive borrowed funds or money received on Engineer/Assistant Engineer. deposit or loan given on interest or otherwise in such manner, as directed INTER BASIN WATER TRANSFER by MOWR, RD & GR and to secure PROPOSALS: the repayment of any such borrowed The National Water Development funds/money deposits/loan etc. by Agency has been carrying out studies of way of mortgage, pledge, change or inter-linking of rivers under National lien upon all or any other property, Perspective Plan for water resources assets or revenue of the society both development. The proposal comprises two present and future. components, namely; (a) Peninsular Rivers  To do all such other things the Society Development Component and (b) may consider necessary, incidental, Himalayan Rivers Development supplementary or conducive to the Component. attainment of above objectives. (i) Peninsular Rivers Development Hon‟ble Union Minister of Water Component: Resources, River Development and Ganga Under Peninsular Component, Rejuvenation (WR, RD and GR) is the NWDA has completed collection of data President of the Society. The President and water balance studies of all 137 exercises such powers for the conduct of basins/sub-basins and 52 identified the business of the Society as may be diversion points (including 3 additional vested in him/her by the Society. studies), 58 reservoir studies, Toposheet studies of 18 links including 1 additional The Governing Body (GB) of the study and all 18 pre-feasibility reports. NWDA Society under the Chairmanship of Based on these studies, NWDA has the Secretary (WR, RD and GR), Govt. of identified 16 water transfer links under India, manages, administers, directs and Peninsular Component for Surveys and controls the affairs and funds of the Investigations and preparation of Society subject to the rules, bye-laws and Feasibility Reports. So far FRs of 14 links orders of the Society and generally pursue under Peninsular Component has been and carries out the activities of the Society. completed. DPR of Ken-Betwa Link Project Phase-I, Ken-Betwa Link Project ORGANIZATIONAL SET-UP Phase-II, Damanganga – Pinjal Link

108

Project and Par-Tapi-Narmada Link incidental benefits of flood control, Project have been completed by NWDA. navigation, water supply, fisheries, salinity and pollution control etc. in various States. (ii) Himalayan Rivers Development Component: NWDA has identified the States The studies in respect of which are to be benefited from the inter- Himalayan Rivers Development basin water transfer links and assessed the Component were started by NWDA during annual irrigation benefits likely to accrue the year 1991-92. The Himalayan to the concerned States from these link Component envisages construction of schemes. While the Himalayan storage reservoirs on the principal Component of the inter-basin water tributaries of the Ganga and the transfer proposal will benefit directly Uttar Brahmaputra in India, Nepal and Bhutan, Pradesh, Uttrakhand, Haryana, Rajasthan, along with inter-linking canal systems to Gujarat, Assam, West Bengal, Bihar, transfer surplus flows of the eastern Jharkhand and Odisha and enrich the tributaries of the Ganga to the west, apart Peninsular Component from the surplus from linking of the main Brahmaputra and waters of Brahmaputra, the Peninsular its tributaries with the Ganga and Ganga Component will benefit Andhra Pradesh, with Mahanadi. Under the Himalayan Telangana, Odisha, Karnataka, Tamil Rivers Development Component, NWDA Nadu, Kerala, Puducherry, Madhya has completed water balance studies of all Pradesh, Uttar Pradesh, Rajasthan, the 19 diversion points, Toposheet studies Maharashtra and Gujarat. of 16 storage reservoirs & 19 water transfer links and pre-feasibility report of PREPARATION OF DETAILED 14 links. Based on these studies, NWDA PROJECT REPORT (DPR) has identified 14 water transfer links under Himalayan Component for Surveys and (i) Ken-Betwa Link Project: Investigations and preparation of A tripartite Memorandum of Feasibility Reports (FRs). So far FRs of 2 Understanding (MoU) for the preparation links (Indian portion) in the Himalayan of Detailed Project Report (DPR) of Ken- Component have been completed. The Betwa Link Project was signed amongst surveys and investigations and preparation the Union of India, Governments of of draft feasibility reports of seven more Madhya Pradesh and Uttar Pradesh on links in Indian portion have been 25.8.2005. completed. Field surveys & investigations Ken-Betwa Project has been for the remaining links under Himalayan declared as a National Project by the Component are under progress except one Government of India in the year 2008 and link which lies entirely in Nepal. subsequently been included as a part of Prime Minister‟s package for development BENEFITS FROM INTER BASIN of drought prone Bundelkhand region. WATER TRANSFER LINK SCHEMES (a) Ken-Betwa link Project Phase-I: The National Perspective Plan The Ken-Betwa Link Project- would give additional benefits of 25 Phase-I was considered by the Advisory million ha of irrigation from surface Committee on Irrigation, Flood Control & waters, 10 million ha by increased use of Multipurpose Projects of Ministry of ground waters, raising the ultimate Water Resources, RD & GR chaired by the irrigation potential from 140 million ha to Secretary (WR, RD & GR) in its 129th 175 million ha and generation of 34000 meeting held on 8th July, 2016. The megawatt of power, apart from the Advisory Committee has accorded the

109 techno-economic clearance subjected to (R&R) plan for Scheduled Tribe Project Statutory Clearances. Affected Families (STPFs) in respect of Ken-Betwa Link Project, Phase-I has been Ken-Betwa Link Project, Phase-I submitted to the Ministry of Tribal Affairs, was considered by Expert Appraisal New Delhi in prescribed format along with Committee (EAC) of MOEF&CC for other documents on 7.06.2016. MoTA has Environmental Clearance (EC) in its accorded the clearance vide letter dated various meetings. Newly constituted 04.01.2017. Expert Appraisal Committee again considered the environmental clearance in The proposal was considered in the its first meeting held on 30.12.2016 and 2nd meeting of Investment Clearance recommended for accord of environmental committee of MoWR, RD & GR held on clearance. 24.10.2016 under the Chairmanship of Secretary (WR, RD & GR). Finance The proposal for wildlife clearance Ministry has been requested on 08.12.2016 was considered by the Standing to consider funding at 90:10. Committee of National Board of Wild Life (NBWL) in its 39th meeting held on (b) Ken-Betwa link Project Phase-II: 23.8.2016 and recommended for accord of The Environmental Clearance for Wild Life Clearance of the project with the Lower Orr dam has been considered by condition that landscape plan for the area EAC of MoEF & CC in its 93rd meeting will be finalized with National Tiger held on 2nd May, 2016 and recommended Conservation Authority (NTCA) in lead, the project proposal for grant of assisted by WII, State Forest Department Environmental Clearance (EC). and Project Proponent. Application of forest clearance of NWDA had submitted the proposal Lower Orr dam under Ken-Betwa Link for forest land diversion clearance to Project Phase-II has been submitted online MoEF & CC and made all the compliance to MoEF & CC on 02.10.2014. Approval of queries raised by them. The Forest of CAT plan from CCF, Shivpuri and Department of Madhya Pradesh State has Ashok Nagar, MP has been received and completed all the activities related to forest uploaded on website of MoEF & CC. The land diversion clearance and submitted the proposal of Forest Land diversion proposal to MOEF&CC on 10th October, clearance in respect of Lower Orr dam has 2016. MOEF&CC vide letter dated 18th been submitted by Government of Madhya October, 2016 directed ACCF (C), Bhopal Pradesh along with its recommendations to for site inspection of forest for diversion. MoEF&CC, Forest Division for forest land The proposal of according forest land diversion clearance. The Forest Advisory diversion clearance for the project was Committee (FAC) of MoWR, RD & GR considered in Forest Advisory Committee has discussed the proposal in its 6th (FAC) in its 6th meeting held on 9-10 meeting held on 10.11.2016. November, 2016 and constituted a committee with a direction to inspect the (ii) Damanganga-Pinjal Link Project: site, verify relevant documents/reports and The Detailed Project Report furnish its report to MoEF & CC which (DPR) of Damanganga - Pinjal link project would be placed before FAC. has been completed by NWDA during March, 2014. The matter regarding The proposal seeking clearance sharing of water is under discussions from Ministry of Tribal Affairs (MoTA), amongst the officials of the Governments GoI for Resettlement and Rehabilitation of Maharashtra and Gujarat States and

110

NWDA. Municipal Corporation of Greater discussed in the last four meetings of the Mumbai (MCGM) has submitted the Special Committee. application for forest land diversion clearance online to MoEF & CC on 30th As Par-Tapi-Narmada and June 2016. Damanganga-Pinjal Projects are linked, it was decided in the earlier meetings that the The proposal seeking clearance issue of water sharing in both the projects from Ministry of Tribal Affairs (MoTA), would be discussed first at the senior Government of India for Resettlement and officers level of the two States and Rehabilitation (R&R) Plan for Scheduled MoWR, RD & GR. Tribe Project Affected Families in respect of Damanganga-Pinjal Link Project has Hon‟ble Union Minister for WR, been submitted by Municipal Corporation RD & GR held a meeting with Hon‟ble of Greater Mumbai (MCGM) to the Chief Minister, Maharashtra at Mumbai on Ministry of Tribal Affairs, New Delhi in 3rd May, 2016 where in Damanganga- prescribed format along with other Pinjal and Par-Tapi-Narmada link projects documents on 30th June, 2016. The were discussed among other issues. proposal is under examination in MoTA. has submitted their observations on the DPR of Par-Tapi- The Water Resources Department Narmada Link Project. The DPR is under of Government of Gujarat vide their letter revision considering the observations of dated 3rd August 2016 requested NWDA Government of Gujarat. not to proceed for forest land diversion clearance and clearance of Rehabilitation As suggested by Chief Secretary, & Resettlement plan for schedule tribe Govt. of Gujarat during discussions with project affected families of Gujarat State OSD, MoWR, RD & GR on 16.11.2016, without approval/consent of Government NWDA has now explored possibilities of of Gujarat. adding additional tribal areas as follows:  Projects proposed by Govt. of Gujarat Damanganga-Pinjal Link Project on the left side of the Canal in south was considered by the Advisory Gujarat(57489 ha Annual irrigation). Committee on Irrigation, Flood Control &  Tribal areas in enroute right side by Multipurpose Projects of Ministry of lift (36200 ha Annual irrigation). Water Resources, RD & GR chaired by the  Tribal areas in vicinity of reservoirs in Secretary (WR, RD & GR) in its 129th Valsad and Dang districts( by lift) meeting held on 8th July, 2016. The (12514 ha Annual irrigation). Advisory Committee has accorded the  Tribal areas right side of Narmada techno-economic clearance to the project Main Canal in Chhota Udepur and subject to submission of Forest land Panchmahal districts (by lift) (27470 diversion clearance from MoEF & CC and ha Annual irrigation). clearance for the R&R of project affected  Target Command in Saurashtra tribal population from MoTA. (18000 ha Annual irrigation).

(iii) Par-Tapi-Narmada Link Project Thus there is a proposal to retain The DPR of Par-Tapi-Narmada the originally proposed enroute command Link Project has been completed by of 76500 ha (about 33% of total NWDA and submitted to Water Resources command), reduce the target command in Departments of Government of Gujarat Saurashtra from 1.51 Lakh ha to 18000 ha and Maharashtra in August, 2015. The (about 8 % of total command area), matter regarding sharing of water has been include command of about 45000 ha of 5

111 medium schemes (about 25% of total CONSTITUTION OF SPECIAL command) and provide Irrigation to Tribal COMMITTEE ON “INTERLINKING areas in Chhota Udepur, Panchmahal, OF RIVERS”. Valsad and Dangs districts for about 76000 The Hon‟ble Supreme Court in the ha (about 33% of total command). The matter of Writ Petition (Civil) No.512 of Secretary (WR, RD & GR) held a meeting 2002 on Networking of Rivers along with with Hon‟ble Chief Minister of Gujarat on Writ Petition No.668 of 2002 delivered a 31.12.2016 at Gandhinagar and made judgment dated 27.2.2012. The Hon‟ble presentation on the revised scenario of this Supreme Court has directed that an link. Response from Govt. of Gujarat was appropriate body should be created to plan, positive. construct and implement the inter linking of rivers program for the benefit of the (iv) Intra-State links: nation as a whole. NWDA so far has received 46 proposals of Intra-State links from 9 States Extract (Para 63) of Supreme Court’s viz; Maharashtra, Gujarat, Jharkhand, Judgment on Networking of Rivers: Odisha, Bihar, Rajasthan, Tamil Nadu, Karnataka and Chhattisgarh. The Pre- “We would recommend, with all the feasibility Reports (PFRs) of 36 Intra-State judicial authority at our command that these links have been completed. The DPR of 2 projects are in the national interest, as is the Intra-State links namely (i) Burhi Gandak- unanimous view of all experts, most State Governments and particularly, the Central Noon-Baya-Ganga and (ii) Kosi - Mechi of government. But this Court may not be very Bihar were earlier completed and appropriate forum for planning and submitted to Govt. of Bihar in December, implementation of such a programme having 2013 and March, 2014 respectively. These wide national dimensions and ramifications. It are under appraisal in Central Water will not only be desirable, but also inevitable Commission. The Ponnaiyar - Palar link of that an appropriate body should be created to Tamil Nadu, Wainganga-Nalganga link of plan, construct and implement this inter Maharashtra, Barakar-Damodar- linking of rivers program for the benefit of the Subarnarekha link of Jharkhand and nation as a whole”. Vamsadhara-Rushikulya of Odisha have been taken up for preparation of DPR by Further, Hon‟ble Apex Court vide NWDA on the request made by the their judgment in a Writ Petition (Civil) on concerned States. Networking of Rivers (Inter-linking of Rivers) had directed that the Ken-Betwa The Detailed Project Report of inter-linking project be taken up for Kosi-Mechi Intra-State link project was implementation at the first instance and the submitted to CWC for examination. After progress be placed bi-annually before the establishing technical viability, the Kosi- Cabinet. The Hon‟ble Apex Court had also Mechi link project was considered by the directed constitution of a Special Advisory Committee on Irrigation, Flood Committee under the chairmanship of Control & Multipurpose Projects of Hon‟ble Minister for Water Resources, Ministry of Water Resources, RD & GR River Development and Ganga chaired by the Secretary (WR, RD & GR) Rejuvenation for carrying forward the in its meeting held on 8th July, 2016. inter-linking of rivers programme. After deliberation, the Advisory Committee accepted the Kosi-Mechi link In compliance MoWR, RD and GR project proposal subject to the Statutory has constituted a committee called Special Clearances. Committee on Interlinking of Rivers under the Chairpersonship of Hon‟ble Minister

112 for WR, RD & GR vide Gazette Notification dated 23rd September, 2014. The Sub-Committee-III for Restructuring of National Water Eleven meetings of the Special Development Agency had completed the Committee for Interlinking of Rivers have assigned work and submitted its Report to been held on 17.10.2014, 6.01.2015, Hon‟ble Minister (WR, RD & GR) and 19.03.2015, 14.05.2015, 13.07.2015, Chairperson, Special Committee on 15.09.2015 18.11.2015, 08.02.2016, 21.09.2015. Cabinet in its meeting held on 29.04.2016, 26.07.2016 and 09.11.2016 15.11.2016 had reviewed the status-cum- respectively at New Delhi. State Irrigation progress report of ILR projects. /Water Resources Ministers and Principal Secretaries/Secretaries of various States MoWR, RD & GR also constituted and other members attended the meetings. a group on Intra-State river links under the chairmanship of Shri A.D. Mohile, Former Special Committee for Interlinking Chairman, CWC. The group has finalized of Rivers has constituted four specific sub- its report and submitted it to MoWR, RD committees; (i) Sub-committee for & GR on 28.05.2015. comprehensive evaluation of various studies/reports (ii) Sub- Committee for SPECIAL GENERAL MEETING (SGM) & system studies for identification of most ANNUAL GENERAL MEETING (AGM) th appropriate alternate plan, (iii) Sub – Fifth (5 ) Special General Meeting Committee for restructuring of National (SGM) &thirtieth (30th) Annual General Water Development Agency and (iv) Sub- Meeting (AGM) of National Water Committee for consensus building through Development Agency (NWDA) Society negotiations and arriving at agreement were held under the Chairpersonship of between concerned States. The three Sub- Sushri Uma Bharti, Hon‟ble Minister for Committees (i-iii) have been constituted Water Resources, River Development and nd vide MoWR, RD&GR O.M. dated Ganga Rejuvenation on 22 June, 2016 at 13.02.2015. Seven meetings of the Sub- New Delhi. Shri Sanwar Lal Jat, Hon‟ble Committee –I have been held so far on Minister of State for WR, RD & GR; Shri 26.02.2015, 11.03.2015, 07.04.2015, Mathew T. Thomas, Hon‟ble Minister, 30.06.2015, 21.08.2015, 29.09.2015 and Water Resources Department, Govt. of 26.07.2016. Nine meetings of the Sub- Kerala; Shri Girish Mahajan, Hon‟ble Committee –II have been held so far on Minister of Water Resources, Govt. of 26.02.2015, 12.03.2015, 07.04.2015, Maharashtra; Shri Surender Singh Patel, 11.05.2015, 28.07.2015, 21.08.2015, Hon‟ble Minister of State for Irrigation, 29.09.2015, 13.05.2016 and 30.08.2016. Govt. of Uttar Pradesh; Shri T. Harish Rao, Hon‟ble Minister of Irrigation, A Consensus Group has been Govt.of Telangana; Shri Devineni Uma constituted by Ministry of Water Maheshwar Rao, Hon‟ble Minister of Resources in June, 2002, under the Water Resources, Govt. of Andhra Chairmanship of Chairman, Central Water Pradesh; Shri Rajiv Ranjan Singh, Hon‟ble Commission with DG, NWDA as Member Minister, WRD, Bihar and Shri Babubhai Secretary. 11 meetings of the Group were Bokhiriya, Hon‟ble Minister, Water held. This group has been renamed as Resources, Government of Gujarat and „Sub-Committee for consensus building Members/representatives from various through negotiations and arriving at Central Government and State agreements between the concerned states‟. Government Organisations attended the This Sub-Committee-IV has held two meeting. meetings on 17.04.2015 and 30.10.2015.

113

GOVERNING BODY (GB) MEETING regarding eligibility of further release of 63rd Governing Body Meeting of CA. Further, recommendation to NWDA was held under the chairmanship NABARD shall also be given regarding of Secretary (WR, RD & GR) on release of State share. 13.06.2016 at New Delhi. Principal Secretaries or representatives of State and NWDA shall act as pass through Senior Officers of MoWR, RD & GR, window for CA to be provided to States CWC and NWDA attended the meeting. through NABARD funding. It shall ensure that funds received from NABARD are released for projects within 1 day of its receipt from NABARD so as to avoid any parking of funds.

Based on joint proposals received in mission, Third party monitoring visits would be planned in such a way that such reports are available before release of next installment. Further, the visits of third party shall be planned keeping in view of 62nd Meeting of Governing Body, 27th January, the visits that shall be made by the CWC. 2016 at New Delhi NWDA has been identified to act ND FORTY SECOND (42 ) MEETING as an agency for borrowing resources from OF TECHNICAL ADVISORY LTIF and release Central Assistance to the COMMITTEE (TAC) State Governments towards the prioritized nd The Forty second (42 ) meeting of PMKSY-AIBP (Major & Medium rd TAC of NWDA was held on 23 May, Irrigation) Projects and their CADWM 2016 at New Delhi under the works, for their completion in time bound Chairmanship of Chairman, CWC. TAC manner. Memorandum of Agreement for considered and approved the modified borrowing from NABARD to fund Central guidelines regarding the preparation of share in these projects was signed by this Preliminary Water Balance Study report. Ministry of Water Resources, RD & GR, NWDA and NABARD on 6th September, NABARD FUNDING UNDER PMKSY- 2016. AIBP A Project Monitoring Unit (PMU) INDIA WATER WEEK-2016. will be established under NWDA to work The Ministry of Water Resources, in coordination with CWC for monitoring River Development and Ganga as well as updation of information under Rejuvenation, Govt. of India has been PMKSY. This will help NWDA to process organizing India Water Week (IWW) as an and recommend the process for NABARD international conference cum exhibition funding and release of Central Assistance event since 2012. NWDA has been to the State under PMKSY-AIBP. PMU entrusted with the task of organizing the shall be headed by an officer of the rank of India Water Week by the MoWR, RD & Chief Engineer with supporting units GR. comprising of experts. The fourth India Water Week-2016 PMU shall prepare a with the theme “Water for All-Striving comprehensive note based upon Together” was organized during 4- 8 monitoring reports of Third Party & CWC April, 2016 at New Delhi comprising of an

114

International Conference and Exhibition. Resources, Govt. of India. The objectives Israel was associated as Partner Country in of NIH are: the organization of IWW-2016. The  To undertake, aid, promote and Hon‟ble President of India was the Chief coordinate systematic and scientific Guest for the valedictory function of the work on all aspects of hydrology: th Conference on 8 April, 2016.  To cooperate and collaborate with other national and international The conference encompassed all organizations in the field of major topics related to water resources hydrology: development and management and thus  To establish and maintain a research provided the right platform for the Water and reference library in pursuance of Resources fraternity for coming out with the objectives of the society and equip pragmatic strategies towards achieving the the same with books, reviews, goal of „Water for All‟ in line with magazines and other relevant Government of India‟s vision, “Sab Ka publications: Sath, Sab Ka Vikaas”. The issue of water  To carry out activities that the Society scarcity was also discussed and covered in may consider necessary, incidental or the relevant session of the conference. conducive to the attainment of the objectives for which the Institute has The entire event was organized by been established. NWDA in association with CWC and other organizations of MoWR, RD &GR. About 1500 delegates from India and abroad participated in the conference.

PARTICIPATION IN INDIA INTERNATIONAL TRADE FAIR – 2016 AND OTHER WATER EXPO NWDA participated in following events: Er R D Singh, Director NIH was awarded  India International Trade Fair during Rajbhasha Kirti Purskar by the Hon‟ble 14-27 November, 2016 at New Delhi President of India on September 14, 2016 at  India International Science Festival Rashtrapati Bhawan, New Delhi. during 7-11 December, 2016 at New Delhi. ORGANIZATION The Union Minister of Water Resources is the President of the NIH NATIONAL INSTITUTE OF Society and the Union Minister of State of HYDROLOGY (NIH) Water Resources is its Vice- President. The Ministers-in-Charge of Irrigation/ The National Institute of Water Resources in the states (ten States to Hydrology, a Govt. of India Society under be nominated for every three years by the the Ministry of Water Resources, River President of the Society), the Secretaries of Development & Ganga Rejuvenation, Ministries in the Government of India established in December 1978 at Roorkee, concerned with water and related areas, is conducting basic, applied and strategic and eminent experts in hydrology and research in the fields of hydrology and water resources are members of the water resources development. The Institute Society. The Secretary, Ministry of Water is fully aided by the Ministry of Water Resources, Government of India, is the Chairman of the Governing Body. The

115

Institute‟s research and other technical  R&D under National Water Mission activities are monitored and guided by the  Technology transfer and outreach Technical Advisory Committee (TAC), activities headed by the Chairman, Central Water Commission. The Director of the Institute The studies and research in the is appointed by the Government of India Institute are being carried out broadly and is the Principal Executive Officer of under the following major categories: the Society.  Basic studies and research  Applied studies and research The studies and research in the  Software development Institute are carried out under five  Field and laboratory oriented and scientific themes at the Headquarters, two strategic research Centers for Flood Management Studies  Sponsored research and four regional centers. The five scientific themes at the Headquarters are: The Institute has been undertaking (1) Environmental Hydrology, (2) Ground research studies for providing solutions to Water Hydrology, (3) Hydrological the real life hydrological problems in the Investigations, (4) Surface Water field using advanced techniques. Some of Hydrology, and (5) Water Resources the significant contributions of NIH Systems. The Institute has a Research include studies for solution of real-life Management and Outreach Division problems related to augmentation of water (RMOD), which provides the interface supply and water management in cities, with various research and academic glacier contribution in streamflow of institutions. Himalayan rivers for hydro-electric power

projects, watershed development, water The Institute has set up six regional quality management plan for lakes, centers in order to deal with the area watershed development, storm water specific hydrological issues of different drainage network in cities, flood regions in the country and for providing inundation mapping and flood risk zoning, effective interaction with the States in the and water quality assessment in major region. These Centres are: (1) Hard Rock cities. Regional Centre (Belgaum), (2) Western

Himalayan Regional Centre (Jammu), (3) CONSULTANCY CAPABILITIES Deltaic Regional Centre (Kakinada); (4) The Institute has excellent Central India Hydrology Regional Centre capabilities in the areas of hydrology and (Bhopal), (5) Centre for Flood water resources to take up national and Management Studies for Brahmaputra international consultancy. The Institute is basin (Guwahati), and (6) Centre for Flood taking up consultancy projects, which Management Studies for Ganga basin provide a good opportunity for the (Patna). scientists of NIH to implement the results

of their research for solving need-based MAJOR RESEARCH AREAS problems. The major research areas identified under 12th Plan are: LABORATORIES  Hydrology of extremes The Institute has the following well  Regional hydrology equipped laboratories with state-of-art  Environmental hydrology instruments to provide the necessary  Integrated water resources support to field studies: management  Nuclear Hydrology  Hydrology for watershed management  Remote Sensing & GIS

116

 Soil Water interest. The objective of the training  Water Quality courses was to upgrade the knowledge,  Snow & Glacier skills and attitudes of the field engineers,  Centre of Excellence for Advanced NGO representatives, research students Groundwater Research and other stakeholders operating in  Hydrological Instrumentation different state. Thirty-one Scientists and scientific staff of the Institute were trained TECHNICAL PUBLICATION at various places in the country. The research output of the Institute IMPORTANT EVENTS is published in the form of reports and peer th reviewed scientific papers. During the year The Institute participated in the 36 2016-17, the Institute has published 162 India International Trade Fair (IITF-2016), papers in reputed international and held at New Delhi during Nov 14-27, national journals and proceedings of 2016, by putting up a stall in the pavilion international and national conferences and of Ministry of Water Resources symposia. During the year, 59 studies were showcasing activities of the Institute - going on. Physical models of Hydrologic Cycle and Working Model of Sewage Treatment based on Constructed Wetland Technology during the exhibition.

NORTH EASTERN REGIONAL INSTITUTE OF WATER AND LAND MANAGEMENT (NERIWALM)

North Eastern Regional Institute of Water and Land Management (NERIWALM) is a Registered Society

India Water Week Exhibition-2016 on the under the administrative control of the theme: Water for All – Striving Together at Ministry of Water Resources, RD & GR, Pragati Maidan org. by MOWR during April Government of India. This is only Water 4-8, 2016 and Land Management Institute (WLMI) established and governed by Government TECHNOLOGY TRANSFER of India and serving eight states of North One of the main objectives of the East. It was established by North Eastern Institute is to transfer the developed Council (NEC), Shillong, Ministry of technology to the target users. Besides Home Affairs during December, 1989. It wide dissemination of reports and research was transferred to Ministry of Water papers, organization of workshops, Resources, RD & GR by the NEC, training courses, seminars, symposia, Ministry of Development of North Eastern conferences, brain storming sessions, etc. Region (DoNER) w.e.f. 1st April, 2012. have been major activities under the NERIWALM has been functioning under Technology Transfer Programme. The a two tier administration i.e. „Governing Institute has organized 21 training Body (GB)‟, Presided over by Hon‟ble programmes for field engineers, scientists, Minister, MoWR, RD & GR and researchers, etc. „Executive Council (EC)‟ which is Chaired by the Secretary, MoWR, RD & GR. CAPACITY BUILDING ACTIVITIES NIH organized a number of ACHIEVEMENT OF ACTIVITIES training courses covering various topics of

117

The Institute has been conducting objectives of National Water Policy and different capacity building activities based National Water Mission, Government of on an approved Training Calendar, 2016- India. Physical and financial achievements 17. The capacity building activities include and new initiative taken up from April to training programmes, conferences, December, 2016 and likely/anticipated workshop and seminars covering various achievements from January, 2017 to subjects and issues related to water and March, 2017 are given below: land resources management and fulfilling

Physical and financial achievement and new initiatives of activities during 2016-17 Activity Achievement from 1st Anticipated achievement April, 2016 to 31st 1st January to 31st December, 2016 March, 2017 Physical Financial Physical Financial (Nos.) (Rs. lakh) (Nos.) (Rs. lakh) Capacity building activities 40 6.40 15 5.60 (training/workshop/conferences) Programme sponsored by National Water Mission a) Training programmes 01 0.88 03 3.69 b) R&D on Base line study on Water Use Efficiency 04 12.95 04(continued) of five irrigation projects 01(new) 4.70 c) As Nodal Agency of NWM for preparation of State 09 States 175.44 03 States 60.00 Specific Action Plan (SSAP) of Water Sector (Phase-I) : 12 states d) Phase-II -- -- 07 states *84.00 Seven NE Region States (under (*subject to process) release) New Initiatives a) Collaborative programme with Assam Agricultural 04 0.80 01 0.20 University on “In –situ Water Management in different Crops” b) Collaborative programme with ICAR NE Hills 01 0.25 02 0.50 Centre, Umium, Shillong on “ Rain water Harvesting”

no. S.O. 3187(E) dt. 7-10-2016 under NATIONAL GANGA RIVER BASIN EPA‟1986. AUTHORITY (NGRBA) The Act envisages five tier NATIONAL MISSION FOR CLEAN structure at national, state and district level GANGA to take measures for prevention, control National Mission for Clean Ganga and abatement of environmental pollution (NMCG), registered as a society on in river Ganga and to ensure continuous 12.8.2011 under the Societies Registration adequate flow of water so as to rejuvenate Act‟1860. It acted as implementation arm the river Ganga as below: of National Ganga River Basin Authority  National Ganga Council under (NGRBA) which was constituted under the chairmanship of Hon‟ble Prime provisions of the Environment (Protection) Minister of India, Act (EPA), 1986. NGRBA thereafter, has  Empowered Task Force (ETF) on been dissolved with effect from the river Ganga under chairmanship of 7.10.2016, since constitution of National Hon‟ble Union Minister of Water Council for Rejuvenation, Protection and Resources, River Development and Management of River Ganga (referred as Ganga Rejuvenation, National Ganga Council) vide notification

118

 National Mission for Clean Ganga (iii) National Ganga Plan, and (iv) Ghat (NMCG), Works and Beautification of River Fronts.  State Ganga Committees, and  District Ganga Committees in every During FY:2061-17, an amount of specified district abutting river Ganga Rs. 735.40 crore was released to State and its tributaries in the states. Programme Management Groups (SPMGs) for the implementation of the NMCG has a two-tier management projects under NGRBA till end of structure and comprises of Governing December 2016. Council and Executive Committee. Both of them are headed by Director General, Financial achievement (Rs. Crore) NMCG. Executive Committee has been Particulars Amount authorized to accord approval for all 01.04.2016 to 31.12.2016 735.40 projects up to Rs.1000 crore. Similar to Anticipated achievement/ released against various projects structure at national level, State for the period from January to Programme Management Groups March,2017 105.00 (SPMGs) acts as implementing arm of State Ganga Committees. Thus the newly POLLUTION MANAGEMENT created structure attempts to bring all Cleaning of river Ganga is being stakeholders on one platform to take a carried out through various activities holistic approach towards the task of focusing on point and non-point sources Ganga cleaning and rejuvenation. for abatement of pollution, including treatment of municipal sewage, treatment The first Meeting of ETF, chaired of industrial effluent, river surface by Hon‟ble Union Minister of Water cleaning, rural sanitation, afforestation & Resources, River Development and Ganga bio-diversity etc. The details are given in Rejuvenation, was held on 8.2.2017. following paras.

(i) Municipal Pollution: The municipal sewage being generated in cities on banks of Ganga is being managed by a mix of Interception & Diversion projects, sewerage network and Sewage Treatment Plant (STP) projects. As on 31.12.2016 aggregate of 145 MLD capacity and sewerage network of 1050 km has been completed and made operational under NGRBA/ Namami Cleaning of Ghats Gange. Further, STP projects with additional treatment capacity of 728 MLD FUNDING & SANCTION OF PROJECTS and sewerage network projects of 3960 km NMCG receives grants from have been sanctioned and are in various Government of India for implementing the stages of implementation. Namami Gange Program. The allocation for this program for the current financial NMCG has so far sanctioned 86 year of 2016 – 17 is BE Rs. 2,500 crore Sewerage Infrastructure projects in 57 divided into four components viz.: (i) towns in Ganga River Basin at Rs. 8558.65 NRCP-Externally Aided Program, (ii) Crore under Namami Gange Program NRCP- Non Externally Aided Program, including Externally Aided projects (EAP)

119 component with the assistance of Japan World Bank. Details are as under: International Agency (JICA) and the

EAP Components under Namami Gange State No. of towns No. of Total Sanctioned Total Exp. No. of projects Projects Cost (Rs. Crore) (Rs. Crore) completed Uttarakhand 11 20 287.16 100.05 7 Uttar Pradesh 11 18 2742.99 1044.12 4 Bihar 7 14 2155.62 160.61 Jharkhand 1 1 146.59 12.57 West Bengal 24 30 1352.51 682.82 24 Haryana 2 2 217.87 188.23 Delhi 1 1 1655.91 17.18 Total 57 86 8558.65 2205.58 35

(ii) Industrial Pollution:  Preparation of Detailed Project Report In context of industrial pollution, (DPR) for Zero Liquid discharge besides others, tannery, textile, sugar, (ZLD) based system for tannery paper & pulp and distillery have been cluster at Jajmau, Kanpur. identified as polluting industries. For  DiagNos.tic Study and Feasibility prevention of pollution from industrial Report (DS&FR) and DPR units in Ganga Basin, out of 27 molasses preparation for 5 Textile cluster based distilleries, Zero Liquid Discharge namely Pilkhua, Farukhabad, (ZLD) has been achieved in 17. Further, , Ruma and Bhadoi. out of 67 paper and pulp industries, water conservation norms have been achieved in (a) Tanneries: Out of total 456 existing 55 and effluent treatment to the tertiary tannery units located in U.P, 14 have been level has been achieved in 58 of them. dismantled and 442 remain functional. Verification of compliance status to the Amongst these functional 442 units, 437 latest standards notified by Ministry of units comprising into 3 clusters in U.P. Environment & Forest & Climate Change viz., Kanpur (400 units), Banther (23 (MoEF&CC) in respect of sugar industry units), and Unnao (14 units) are connected is under progress and wastewater to CETPs. All the three CETPs are non- generation norms of 200 liters/ton has been compliant so far as Central Pollution achieved in 45 out of 67 of such sugar Control Board (CPCB) norms are units. concerned and directions have been issue for their up-gradation. Accordingly, DPR Tannery and textile sectors are has been prepared for ZLD based CETP dominated by small scale units and for tannery cluster at Jajmau, Kanpur. adoption of CETPs is a viable and However, functional ETPs exists for environmentally sound option for balance 5 units located in UP. management of their effluent. DiagNos.tic and feasibility studies have been carried (b) Textile: DiagNos.tic Study and out by NMCG and it suggests Zero Liquid Feasibility Report (DSFR) for CETP at 4 discharge (ZLD) based CETP as a reliable textile cluster (Philkua, Mathura, and environmentally sound option for Farukhabad, and Ruma) have been effluent management from small scale completed. Tamil Nadu Water Investment industries in Ganga Basin. Towards this, Company Ltd. (TWIC) has been asked to following initiatives have been taken. prepare DPR in respect of these 4 clusters.

120

Preparation of DSFR in respect of Badohi Textile cluster is in progress. (iv) Entry Level Activities: The entry level activities have been (iii) Monitoring of Pollution: initiated through Central Public Sector Towards monitoring of industrial Units (CPSUs) for providing visible pollution, effluent monitoring stations impact in short term. The entry level (EMS) have been installed in 572 out of activities include river surface cleaning, 760 GPIs and real time reports are being repair / modernization / development of captured at dashboard from 266 such ghats and crematoria. installations. 135 GPIs have been closed for non-compliance to stipulated norms (a) River Surface Cleaning: River surface and 17 have been exempted as ZLD has cleaning services through trash skimmers been achieved in them. Balance 36 units have been hired for 11 towns. These trash are under process of installation of online skimmers are operational in Patna (Bihar) EMS. Further, monitoring data and Sahibganj (Jharkhand). Mobilization connectivity to MoWR, RD & GR, CPCB, is under progress for the remaining towns. State and SPCBs is being undertaken on However, manual cleaning operations have priority. started from 1.1.2017.

Monitoring of River Pollution

Water quality monitoring is being carried out by manual monitoring at 57 River surface cleaning through trash skimmers locations. Beside 8 existing real time water quality monitoring station (b) Ghat Cleaning: IL&FS Environmental (RTWQMS), a network of 71 such stations Infrastructure and Services Ltd. (IEISL) has been planned. Installation of 36 has been engaged for cleaning of 84 ghats RTWQMS planned in Phase – 1 is under in Varanasi for 3 years and a tripartite progress out of 5 stations have been agreement between NMCG, Varanasi operationalised. Installation and Nagar Nigam and IEISL has been signed operationalization of balance station are and work has commenced from under process. 17/10/2016.

121

(c) Ghats/ Crematoria: Details of Ghats/ Crematoria taken up in states are as under:

Ghats / Crematorium Cleaning State No. of Total Sanctioned No. of Ghats to be No. of crematoria towns Cost (Rs. Crore) created to be created Uttarakhand 5 207.36 35 35 Uttar Pradesh 7 697.73 97 66 Bihar 4 134.06 21 5 Jharkhand 2 70.76 15 4 West Bengal 3 21 11 6 Total 21 1130.91 179 116

RURAL SANITATION AND GANGA Initiatives through Wildlife GRAM Institute of India (WII), Dehradun, a Ganga Gram initiative has been science based aquatic species restoration conceptualized to promote rural sanitation plan by involving multiple stakeholders in the villages located on the banks of river has been initiated. Similarly, initiatives Ganga with an aim to reduce the pollution through Central Institute for Inland load on river Ganga from such villages. Fisheries (CIFRI) to assess fish Major activities of Ganga Gram are: composition, diversity, fish production and  Making villages open defecation free. habitat alteration to develop a  Management of village solid and comprehensive conservation and liquid wastes entering in the river and restoration plan for fisheries was initiated. increasing pollution load. Initiatives through CEE, aqua life  Promotion of organic farming to conservation education programme on control pollution from use of educating school children and village pesticides and fertilizers in community for sustainable actions was agriculture. also carried out.  Plantation of medicinal plants. (ii) Afforestation:  Rejuvenation of village ponds and ground water recharging. Forest Research Institute (FRI),  Setting up crematoria etc. Dehradun was entrusted an assignment to prepare Detailed Project Report (DPR) on Ministry of Drinking Water and “Forestry Intervention for Ganga”. The Sanitation has been provided Rs. 578 DPR includes the proposals for various Crore to undertake rural sanitation forestry interventions of the 5 participating activities in 1651 Gram Panchayats. states of Uttarakhand, UP, Bihar, Ministry of Drinking Water and Sanitation Jharkhand and West Bengal with a total has completed construction of 8,53,397 cost of 2300 Crore and implementation toilets out of targeted 15,27,105 units. period of 5 years w.e.f FY: 2016-17 to 2020-21. Rs.50.8 Crore was released in Project on Rural Sanitation this financial year against action plan of initiatives for Ganga Rejuvenation in States.

Jharkhand amounting to Rs. 127 Crore is being implemented by United Nations SYNERGY WITH CENTRAL Development Program (UNDP). The MINISTRIES projects covers 78 villages (46100 Signing of Memorandum of Households) in Sahibganj District of Undertakings (MoUs) with Central Jharkhand and aims at following: Ministries has been carried out as per (i) Biodiversity Conservation: details below for effective coordination

122 and establishing synergy with various has also attracted funding from multilateral government ministries. These ministries agencies such as World Bank (Us $ 1 are Shipping, Human Resource billion) and Japan International Development, Rural Development, Cooperation Agency (Rs.496.90 Cr). Railways, Tourism, AYUSH, Petroleum ( Limited for PUBLIC OUTREACH Mathura Refinery), Department of Youth The following important media Affairs, Drinking Water & Sanitation, activities were organized: Agriculture.  Sarpanch Sammelan: This programme was conducted in ECO TASK FORCE/ GANGA TASK Allahabad on 20th August 2016 during FORCE which Hon. Union Minister for Water For awareness, monitoring, Resources, River Development and organized participation and crowd Ganga Rejuvenation addressed 1651 management etc. one Battalion Ganga Sarpanchs of villages along river Eco-Task Force, a Territorial Army unit, Ganga. During this programme, was deployed. Composite Eco Task Force Seechewal model for rural sanitation has been deployed in various locations was apprised for waste water along the main stem of the river, with the management in villages along the river. objective to guard Ghats, plantation,  NMCG pavilion at International manage mass congregations, lead public Trade Fair-2016: In an attempt to participation and mass mobilization, public popularize Namami Gange programme awareness and strengthening public and showcase the activities and steps involvement etc. Territorial Army was taken to cleanse river Ganga, a engaged for one year initially and their pavilion was put up at International period of engagement has been now Trade Fair in November 2016 in New extended for next seven months. Delhi, which was awarded.  India International Science Festival- INTERNATIONAL COOPERATION 2016: NMCG also participated in IISF NMCG endeavors to deploy best in December 2016 in New Delhi to available knowledge and resources across evoke the interests of technocrats to the world for Ganga rejuvenation. Clean contribute in the Namami Gange Ganga has been a perennial attraction for programme. many international countries that have  Pravasi Bharatiya Divas-2017: expertise in river rejuvenation. Countries NMCG participated in the Pravasi such as Australia, United Kingdom, Bharatiya Divas in January 2017 in Germany, Finland, Israel etc. have shown Bangalore and was benefitted by interest in collaborating with India for invaluable suggestions of the NRI Ganga rejuvenation. Germany has signed community from across the globe. The an implementation agreement with participation proved fruitful as several National Mission for Clean Ganga for overseas residents showed interest in technical cooperation worth of 3 million Namami Gange programme and Euros. The main focus of this cooperation extended assistance. Minister of State is on Indo-German knowledge exchange, for Water Resources, River information & data management, and Development and Ganga Rejuvenation public outreach both at national level and Mr. Vijay Goel visited the NMCG stall Uttarakhand State level. KfW, the German and applauded the NMCG efforts. Development Bank, has offered a financial cooperation for Euro 120 million for the State of Uttarakhand. Ganga rejuvenation

123

STATUTORY BODIES Board was constituted with the Union Minister of Water Resources, River

Development & Ganga Rejuvenation as BRAHMAPUTRA BOARD the Chairman, Chief Minister of Assam,

Manipur, Meghalaya, Nagaland, Tripura, Brahmaputra Board was Arunachal Pradesh, Mizoram, and Union constituted in the year 1980 by an Act of Minister / Ministers of State - Finance, Parliament (No. 46 of 1980 called “The Surface Transport, Power, Agriculture, Brahmaputra Board Act”) with the Ministers of State- Water Resources and objective of planning and integrated Secretary to the Ministry of Water implementation of measures for control of Resources, RD&GR Govt. of India, floods and bank erosion in Brahmaputra Chairman of Central Water Commission as and for matters connected therewith. It Members and Chairman of Brahmaputra started functioning since 11th January, Board as the Member-Secretary. Member 1982 with headquarters at Guwahati, (RM), CWC is a permanent Invitee. Assam. The jurisdiction of the Board includes the states of Arunachal Pradesh, THE NORTH EASTERN Assam, Meghalaya, Manipur, Mizoram, HYDRAULIC & ALLIED RESEARCH Nagaland, Tripura, Sikkim and West INSTITUTE (NEHARI): Bengal (Jalpaiguri, Coochbehar, The institute was established near Alipurduar and Darjeeling districts falling Guwahati with facilities of Hydraulic in Brahmaputra Basin). Modeling, Soil Testing, Concrete and

Rock Mechanics Laboratory in association The proposal of restructuring of with CSMRS, CWPRS. The Board has Brahmaputra Board is under active successfully carried out sample testing as consideration of the Ministry so as to requested by various organizations like enable the Board to address various Water NEEPCO, CWC, NEC, NHPC and State Resources Development issues of all Governments of Assam, Manipur, North-Eastern States. Meghalaya and Mizoram for their on-

going projects. So far, NEHARI has COMPOSITION OF BRAHMAPUTRA completed physical model studies of (i) BOARD Jiadhal River, (ii) River Brahmaputra from The Board consists of the Porvita to South Salmara, (iii) Chairman, Vice-Chairman, General Island and (iv) (Jia Bharali Manager and Financial Adviser as Ex- in Assam). officio members and 17 part time

Members representing 7 States of the MAJOR FUNCTIONS North Eastern Region; North Eastern The main function of the Board as Council; concerned Ministries of per the Act is „Survey and Investigation‟ Government of India, namely, Water and preparation of Master Plans for the Resources, Finance, Agriculture, Power, control of flood and bank erosion and Road Transport & Highways; improvement of drainage giving due Organizations of Government of India, importance to the development and namely, Central Water Commission, utilization of Water Resources of the Central Electricity Authority, India Brahmaputra Valley for irrigation, Meteorological Department and hydropower, navigation and other Geological Survey of India. beneficial purposes within the jurisdiction

of the Board. HIGH POWERED REVIEW BOARD

A High Powered Review Board to oversee the work of the Brahmaputra

124

Other important functions are The important activities of preparation of Detailed Project Reports Brahmaputra Board under its jurisdiction (DPRs) and Estimates of projects proposed are as below: in the Master Plans, approved by Ministry of Water Resources and construction of (i) Master Plans: Multipurpose Dams and other works in the Brahmaputra Board had taken up field of management and development of preparation of Master Plans of the main water resources under its jurisdiction stem of the Brahmaputra and Barak along proposed in the Master Plans. with 68 major tributaries of Brahmaputra including Majuli Island, River Dhaleswari ACHIEVEMENTS OF THE YEAR and rivers of Meghalaya, Mizoram, Manipur and Tripura in three parts as under in Table below:

Master Plans at Main Stem of the Brahmaputra and Barak Part River No. Status Part-I Main stem 1 Approved by Government of India Part-II Master Plan on 1 Approved by Government of India Barak River and its tributaries except Dhaleswari Part-III Master Plan on 68 o Approved by Government of India-47 Master tributaries of the Plans Brahmaputra and o Approved by the Board and submitted to rivers of Tripura MoWR,RD&GR for approval. Further including Majuli observations of MoWR,RD&GR, Further Island and updated as per suggestion of MoWR,RD&GR Dhaleswari utilising tools of modern technology- 8 Master Plans o Draft Master Plan completed and under process of submission to MoWR,RD&GR, for Approval of Government of India-5 Master Plans o New Master Plans identified - 8 Sub-basins Total 70

All 57 Master Plans identified up- Master Plan of Imphal River in to XI Plan have been completed by Manipur, in Tripura and 2 Brahmaputra Board. Out of above, 49 Master Plans in the State of Mizoram, Master Plans have been approved by namely, Tuichang and Kaladan Government of India. During the year (Kolodyne) are identified for preparation 2016-17: 8 Master Plans approved by the of Master Plans during XII Plan. Board were submitted for approval of MoWR,RD&GR. These Master Plans are (ii) 'Survey & Investigation' and further modified incorporating some Preparation of Detailed Project Reports additional data collected utilizing tools of of Multipurpose Projects: modern technology. Brahmaputra Board took up 'Survey & Investigation' of 14 of Multipurpose Projects in Brahmaputra and

125

Barak Basin and in the south flowing currently under S & I and DPR preparation rivers of Meghalaya. Status of Projects is given below:

Survey & Investigation' of 14 of Multipurpose Projects in Brahmaputra & Barak Basin Sl Name of Basin Installed Status No. Project Capacity (MW) A- Completed DPR 1 Dihang Brahmaputra 20000 Single- stage project DPR was completed in (Siang) Dam 1983 by the Board. Handed over to NHPC under Project 3 stage development in 2000 2 Subansiri Brahmaputra 4800 Single stage project DPR was completed in 1983 Dam Project by the Board. Handed over to NHPC under 3 stage development in 2000 3 Tipaimukh Barak 1500 DPR completed in 1995.Handed over to Dam Project NEEPCO in 1999 4 Bairabi Dam Barak 75 Handed over to Govt. of Mizoram in 2000 Project 5 Pagladiya Brahmaputra 3 Under Implementation of Brahmaputra Board. Dam Project Field activities halted due to non completion of zirath survey by Government of Assam. B- DPR Partially completed 1 Dibang Dam Brahmaputra 4900 S & I Executed by the Board and DPR partially Project completed. Handed over to NHPC in 2006. 2 Lohit Dam Brahmaputra 3000 S & I completed. Project entrusted to Private Project Developer by Govt. of Arunachal Pradesh in 2009 3 Kynshi Stage- Others 450 S & I was under final stage of completion. I Dam Project Govt of Meghalaya assigned the Project private 4 Kynshi Stage-II Others 450 developers in 2011 Dam Project

Status of Projects currently under S & I and DPR preparation Name of Project State Basin Installed Status Capacity (MW) Kulsi Multi- Assam & Brahmaputra 55 DPR Completed in June Purpose Meghalaya 2014 is under appraisal of Project(Identified CWC for techno-economic as National clearance Project) Noa-Dehing Arunachal Brahmaputra 71 DPR Completed in March Dam Pradesh 2014 is under appraisal of Project(Identified CWC for techno-economic as National clearance Project) Simsang Dam Meghalaya Others 65 DPR to be completed by Project March 2019 Killing Dam Assam & Brahmaputra 85 DPR to be completed by Project Meghalaya December 2017 Jiadhal Dam Arunachal Brahmaputra 70 DPR to be completed by Project Pradesh March 2018

126

ANTI-EROSION AND FLOOD was given to Brahmaputra Board in the MANAGEMENT SCHEMES year 1999. Physical activities on the ground started in the year 2004. (i) Protection of Majuli Island from Flood and Erosion: The total area of the land mass of Majuli is the largest inhabited fresh Majuli Main Island was 502.21 sq km in water River Island in the world. It is the year 2004. Since the year 2004, with situated between latitudes 26º45‟N and regular implementation of ant-erosion / 27º10‟N, and longitudes between 93º40‟E bank protection measures by Brahmaputra and 94º35‟E. Majuli has been the cultural Board, the total area of Majuli Island has capital and the cradle of Assamese increased to 524.29 sq km till the year civilization since the 16th century. 2016. Currently, works under Phase-II Sankardeva, a pioneer of the medieval-age &III are under execution. Construction of neo-vaishnavite movement, preached a 4 out of 5 spurs, river bank revetments, monotheist form of Hinduism called as laying permeable RCC porcupine screens, Vaishnavism and established monasteries construction of 'Raised Platforms' in low and hermitages known as sattras. The lying flood vulnerable areas completed. sattras preserve antiques like weapons, Remaining works of Spur No. 2 will be utensils, jewellery and other items of completed by March 2017. cultural significance. The inhabitants of Majuli are mostly tribals - predominantly Expenditure incurred by Brahmaputra from the Mising, Deori and Sonowal Board on undertaking measures for Kachari tribes. Majuli is also famous for protection of Majuli Island from floods pottery. and erosion under Phase-II & Phase-III are detailed below. MoDoNER accorded Majuli Island has constantly been approval for funding Rs. 207.00crore to subjected to erosion by the mighty implement works for Protection of Majuli Brahmaputra. Responsibility for Island from flood and erosion under NLCP undertaking anti-erosion works for in the phasing of three years from 2016-17 protection of certain spots in Majuli Island to 2018-19.

Measures for Protection of Majuli Island From Floods and Erosion Phase-II & III

Sl. Description Estimated Actual Remarks No. Cost Expenditure 1 Phase-II & Phase-III 115.99cr 117.50 cr 96.27% of physical progress has been (up to31.12.206 achieved. Targeted to be completed by March, 2017. 2 Phase-IV MoWR,RD&GR accorded approval of Rs. 35.00 crore to implement additional works.

(ii) Restoration of Dibang and Lohit existence of more areas of Tinsukia and Rivers at Dhola-Hatighuli: Dibrugarh Districts of Assam situated all Avulsion of left bank of River along the newly developed channel. Lohit occurred at confluence of Lohit with Initially significant combined flow of Dibang - near Dhola-Hatighuli located in Dibang and Lohit rivers started to pass Dumdooma, Civil Sub-division of through Ananta Nala to Dangari – a Tinsukia district in 1989 due to breach in tributary of river Dibru. Since the year Saikhowa Bund. Gradual widening of the 2000, the Balu Nala became dominant and channel with time was threatening the almost entire diverted flow of Lohit and

127

Dibang Rivers started passing through of Rs 74.48 crore has so far been incurred Balu Nala. Gradual widening of the by Brahmaputra Board on execution of channel with time was the threatening works envisaged under Phase-I, Phase-II, existence of more areas of Tinsukia and Phase-III and Phase-IV. With construction Dibrugarh Districts of Assam, situated of 'Tie-Bund', the lands which hitherto along the newly developed channel. were part of main channel of Dibang River are now completely protected from floods The scheme “Avulsion of and erosion. The desertees from the areas Brahmaputra at Dhola-Hatighuli have returned back and restarted (Measures for diversion of River Dibang to cultivation in a big way. its original course) with ancillary anti- erosion measures” prepared by 11 villages under Doomduma Government of Assam was approved by Revenue Circle in an area of about 1500 ha Ministry of Water Resources, Government got protection from floods, since the year of India in the Technical Advisory 2004 onwards, on construction of Committee (TAC) meeting held in May, retirement bund at Hatighuli area on Left 2002 and Brahmaputra Board was bank of Lohit river. Phase – IV works entrusted with the responsibility for completed in March 2016 as below: execution of the scheme. Total expenditure

Construction of Retirement Bund at Hatighuli Area on Left Bank of Lohit River Sl. Description Estimated Cost Actual Expenditure Remarks No. (Rs. in crore) (Rs. in crore) 1 Phase-IV 54.43 56.50 (up to Completed in (December 2013) December‟16) March 2016.

(iii) Other Schemes: Expenditure is Rs. 3.45 crore up to a) Protection of Balat Village in December 2016. Meghalaya on River Umngi. Part –I of c) An anti-erosion measure in Maslabari scheme amounting Rs. 5.63 crore was in Assam near International Border- taken up for implementation and tender for implementation of the completed with an expenditure of Rs. scheme is under process. 4.82 crore. b) Anti-erosion works for protection of DRAINAGE DEVELOPMENT Mankachar, Kalair-Alga International SCHEMES (DDS) Border area from erosion of river Brahmaputra Board identified41 Brahmaputra, Assam- Implementation drainage congested areas for preparation of of the scheme started in March Detailed Project Report (DPR)based upon 2015.Work of bank revetment works the studies carried out under49 approved with boulder spur has to be modified Master Plans. During 2016-17, the DPR of substituting boulder with Geo-bag due Pola DDS completed and Techno- to ban by Hon‟ble High Court of economic clearance has been received. Meghalaya on boulder extraction. The DPR has been revised substituting Regarding Demow DDS, CWC boulder by geobag; it was cleared by requested to get the design of the DPR of CWC for Rs. 20.25 crore. Further, due Demow DDS to be vetted from CWC to inability of state Government to headquarters. provide land, the work of construction of retirement bund is held up.

128

MONITORING OF SCHEMES Sikkim and part of West Bengal falling UNDER FLOOD MANAGEMENT under Brahmaputra Basin since X Five PROGRAMME Year Plan. Details of schemes undertaken Brahmaputra Board is entrusted by Government of India under Flood with monitoring of schemes under Flood Management Programme and monitored Management Programme in respect of by Brahmaputra Board is shown below in entire North Eastern Region including Tables shown below:

Details of schemes undertaken by Government of India under Flood Management Programme and monitored by Brahmaputra Board during X Plan

Name of State Nos of schemes Central Grant released (Rs. crore) Assam 44 78.8182 Arunachal Pradesh 7 16.3755 Manipur 4 7.911 Mizoram 3 6.1980 Tripura 7 12.7635 Meghalaya 2 2.635 Nagaland 1 3.897 Sikkim 3 8.595 West Bengal 3 9.01 Total 74 146.2032

Details of schemes undertaken by Government of India under Flood Management Programme and monitored by Brahmaputra Board during XI Plan Name of State Nos of schemes Central Grant released (Rs. in crore) Assam 100 748.860 Arunachal Pradesh 21 80.409 West Bengal 6 13.394 Sikkim 28 83.689 Nagaland 11 28.965 Manipur 22 66.3365 Tripura 11 23.625 Meghalaya 0 3.814 Mizoram 2 14.4845

Details of schemes undertaken by Government of India under Flood Management Programme and monitored by Brahmaputra Board Status during XII Plan

up up

Plan State Share 31.03.12 XI PlanXI released to State Share State Released Released in XII Plan in XII Central Share Central Share Central Share Central No of Scheme No No of schemes of schemes No of schemes No Estimated Cost Estimated completed during during completed Spill over Central Central Spill over spilled over to XII to over spilled Schemes approved approved Schemes Arunachal Pradesh 21 224.68 202.21 22.47 78.77 11 10 123.44 0 64.219 Assam 100 1146.79 1032.12 114.67 744.9 77 23 287.22 41 66.14 Manipur 22 109.34 98.41 10.93 65.03 20 2 33.37 6.45 Meghalaya 0 ------0 Mizoram 2 9.13 8.22 0.91 3.4 Nil 2 4.82 0

129

up up

Plan State Share 31.03.12 XI PlanXI released to State Share State Released Released in XII Plan in XII Central Share Central Share Central Share Central No of Scheme No No of schemes of schemes No of schemes No Estimated Cost Estimated completed during during completed Spill over Central Central Spill over spilled over to XII to over spilled Schemes approved approved Schemes Nagaland 11 49.35 44.42 4.93 28.96 9 2 15.46 3 15.59 Tripura 11 26.57 23.91 2.66 20.91 4 7 3 0 Sikkim 28 165.59 149.03 16.56 82.86 21 7 66.17 17 8.15 West Bengal 6 22.33 16.75 5.58 13.39 6 0 3.36 0 Total 201 1753.78 1575.07 178.71 1038.22 148 53 536.84 61 16.549

NARMADA CONTROL AUTHORITY Maharashtra, Gujarat & Rajasthan, one full time Executive Member and three full time In pursuance of the decisions of the Members appointed by the Central Narmada Water Disputes Tribunal Government and four part time Members (NWDT) under Clause-XIV of its final one each nominated by each party States. order, the Government of India framed the Narmada Water Scheme, which, inter-alia, The Review Committee for constituted the Narmada Control Authority Narmada Control Authority (RCNCA) is and Review Committee in 1980 for proper headed by the Union Minister of Water implementation of the decisions and Resources comprises Union Minister for directions of the Tribunal. Environment & Forest and Chief Ministers of four party States viz. Madhya Pradesh, The Narmada Control Authority Rajasthan, Maharashtra & Gujarat as (NCA) has been vested with powers for Members. the implementation of the orders of the Tribunal with respect to the storage, The Narmada Control apportionment, regulation and control of Authority has its Head Quarter at Indore the Narmada water, sharing of power (MP), Regional Offices at Indore, Bhopal benefits from Sardar Sarovar Project & Vadodara, Liaison Unit in New Delhi (SSP), regulated release of water by and Field Offices at Mandla, Madhya Pradesh, acquisition of land likely Hoshangabad, Kevadia and Indore. to be submerged under the Sardar Sarovar Project by the concerned States, MEETING OF NARMADA CONTROL compensation, resettlement/rehabilitation AUTHORITY, SUB-COMMITTEES / of the oustees, and sharing of costs and SUB-GROUPS implementation of the environmental During the year (1.4.2016 to safeguard measures. 30.12.2016) four Meetings of the Sardar Sarovar Reservoir Regulation Committee, The Authority is headed by the two meetings of Power Sub–Committee, Secretary, Ministry of Water Resources, one meeting each of Narmada Main Canal Govt. of India, as its Chairman, with (NMC) Sub-Committee, Environment Secretaries of the Union Ministries of Sub-Committee and Task Force of NCA Power, Environment & Forests, Social were held. Justice & Empowerment and Tribal Welfare, Chief Secretaries of the four PROGRESS OF SARDAR SAROVAR party States, viz. Madhya Pradesh, PROJECT

130

to be completed in the year 2016-17. The (i) SSP Dam: progress of Narmada Canal portion in NCA in its 86th (emergency) Rajasthan is about 99.98% and only 4 km Meeting held on 12th June, 2014 decided portion at sub minor level is remaining due that “The Sardar Sarovar Narmada Nigam to local issues. Limited is permitted to carry out Phase-I proposal comprising construction of piers, overhead bridge and installation of gates in open or raised position at SSP as per the approved design. The project authorities should comply with the conditions as laid down by the two Sub-groups of NCA. Particular care may be taken in preparing plan to provide timely safeguard in case of untoward / unforeseen incident,”

As per the decision, the Naramada Canal: 1 MW Canal Top construction of Sardar Sarovar Dam up to Solar Project full height to facilitate FRL of 138.68 Meter in a phased manner,Phase-1 UTILIZATION OF WATER construction of piers, overhead bridge & The Narmada water is being installation of gates to be kept in supplied to Central Gujarat/ North Gujarat open/raised position have been completed. and Saurashtra region of Gujarat. Partial 432 nos. of instrument required for irrigation benefits are being achieved by installation in Dam were procured and the releasing Narmada water from the Sardar work is nearing completion. An Sarovar Dam since it has been raised up to expenditure ofRs.5708.05 Crore has been EL 121.92 m. Govt. of Gujarat has created incurred on Dam and Appurtenant works a irrigation potential of 13.45 Lakh ha out (Unit-1) up toOctober, 2016 out of which of 17.92 Lakh ha up to minor level and Rs. 95.6 Crore was incurred during the the CCA development up to sub-minor year 2016-17. level is 9.88 Lakh ha against 18.45 Lakh ha till October,2016. 1.23 Lakh ha area (ii) Narmada Canal: has been irrigated & drinking water supply Works on Narmada Main Canal to the quantity of 837.04 MCM provided (NMC) from Head Regulator to Gujarat till October, 2016 during the irrigation Rajasthan border (Ch. 0 to 458.318 km) is year i.e. from July, 2016 to June, 2017 in almost completed. Works of 74.0 km. Gujarat. Narmada Main Canal in Rajasthan is also completed. Rajasthan has also created an irrigation potential of 2.46 Lakh ha to In Gujarat the works on all branch utilize Narmada water. Drinking water canals of NMC from 0 to 458.318 km have benefits is being provided to 1541 Villages almost been completed except Kachh &three Towns of Jallore & Barmer Branch Canal. 95 % of distribution system Districts in Rajasthan. 2.30 Lakh ha area in NMC from 0 KM to 144.5 km up to has been irrigated till October,2016 during minor level have been completed and the irrigation year i.e. July,2016 to balance work is scheduled to be completed June,2017. in the year 2016-17. 61 % of distribution system including sub minors have been ENVIRONMENTAL MONITORING completed and balance work is scheduled ACTIVITIES

131

Environment Sub-Group of Guard Measures in the party States Narmada Control Authority is chaired by namely: Madhya Pradesh, Maharashtra, Secretary,Ministry of Environment and Gujarat and Rajasthan. Forests, monitors various surveys, studies and implementation of Environmental In the recent past 49th meeting of Safeguard Measures in respect of Sardar Environment Sub-Group (ESG) of NCA Sarovar Project and Indira Sagar Project as was held on 31.08.2016 to review per terms of Narmada Water Scheme and implementation of Environment Safeguard various clearances issued to the projects by Measures and follow-up meeting on the Central Government including 18.11.2016 to review the progress of clearance from environmental angle issued compliance of decisions of ESG meeting. by Ministry of Environment & Forest, Govt. of India. Accordingly, the progress RESETTLEMENT & on following activities is being monitored REHABILITATION ACTIVITIES by the Narmada Control Authority.  Phased Catchment Area Treatment (i) Sardar Sarovar Project (SSP)  Compensatory Afforestation The progress of R&R is being  Command Area Development monitored by the Resettlement and  Flora, Fauna & Carrying Capacity of Rehabilitation (R&R) Sub-Group chaired surrounding area by the Secretary, Ministry of Social Justice and Empowerment and also by a Task  Seismicity nd  Health Aspects Force constituted by the NCA in its 72 meeting held on 8.9.2004. In addition,  Archaeological & Anthropological aspects Chairman/Chairperson of R&R Sub-Group and NCA's Member (E&R) and R&R Progress reports received from the Officials undertake field visits as per party states are discussed in Environment requirements for the submergence villages Sub-Group meeting and are also being and R&R sites in the States of Madhya displayed on website: www.nca.gov.in. Pradesh, Maharashtra & Gujarat. The The NCA officers are also making field Table below indicates overall cumulative visits to assess the progress of progress of R&R of Project Affected implementation of Environment Safe Families (PAF), up to December, 2016. Sardar Sarovar Project- Progress of R&R up to 31st December, 2016 Dam State No. of Total PAFs Total PAFs Balance PAFs height Villages resettled likely to be affected resettled 138.68m. Gujarat 19 4762 4758 4 Maharashtra 33 4313 3841 472 Madhya Pradesh 192 37754 37754** ** Total 244 46829* 46353 476* * This number may change after inclusion of PAFs to be declared by Grievance Redressal Authorities (GRAs) /State Governments including impact of backwater level. ** 630 PAFs are yet to be paid 2nd installments of Special Rehabilitation Package (SRP)

(ii) Indira Sagar Project (ISP): from time to time, the NCA is In pursuance to the direction of coordinating with Grievances Redressal Hon‟ble High Court of M.P. dated Authority (GRA)-ISP, NVDA and 6.9.2006 in WP. No. 3022 of 2005 and NHDC, and NCA‟s R&R officials are decisions of R&R Sub-Group of NCA also undertaking field visits. The table

132 below indicates the progress of R&R up to 31st December, 2016.

Indira Sagar Project - Progress of R&R up to 31st December, 2016 Sl Description Total Project Total PAFs Balance No. Affected Families resettled PAFs to be (PAFs) resettled 1. Up toFRL 40505 40505 0 2. In Harsud Left out ward 9,12,13 693 691 02 3. Islands affected 111 111 0 4. Additional PAFs identified in resurvey -PAFs between Back Water Level & FRL to 3322 1759 1563 MWL Grant Total (1+4) 44631 43066 1565

(iii) Court Cases: Following court cases are Sub- Indira Sagar & Omkareshwar Canal Judice. Projects: Sardar Sarovar Project (SSP):  Writ Petition No. 11232 of 2010 and  IA No.18-22 in Writ Petition No. 328 11233 of 2010 in the Hon‟ble High of 2002 and Contempt Petition No.18 Court of Madhya Pradesh, Indore in Hon‟ble Supreme Court. Bench , (M.P.)  IA No. 40-45 of 2014 in IA No.18-22 in Writ Petition No. 328 of 2002 in (iv) Meeting of R&R Sub-Group: Hon‟ble Supreme Court. The 77th meeting of R&R& Sub-  Writ Petition No.14765 of 2007 in the Group of NCA was held on 27.06.2013. Hon‟ble High Court of Madhya Pradesh, Jabalpur. (v) Meeting of the Task Force of NCA:  Writ Petition No.18183 of 2014 in the The 31st meeting of the Task Force Hon‟ble High Court of Madhya of NCA was held on 19.11.2016. Pradesh, Jabalpur ENERGY MANAGEMENT CENTRE  Contempt Petition No.843/2015in WP (EMC) No.18183 of 2014 in the Hon‟ble High Court of Madhya Pradesh, Energy Management Centre Jabalpur. (EMC), NCA, Indore is planning, scheduling & coordinating activities of

 Original Application (OA)No.78 of Power Generation of Sardar Sarovar 2015 in National Green Tribunal Power Complex (River Bed Power House (NGT), Central Zone, Bhopal, 6X200 MW & Canal Head Power House Madhya Pradesh. 5X50 MW) in consultation with Western  Writ Petition No. 14040 of 2013, WP Regional Power Committee (WRPC), No. 14038 of 2013, WP No. 14036 of Western Regional Load Dispatch Centre 2013, WP No. 2152 of 2016, WP No. (WRLDC), Central Electricity Authority 2168 of 2016, WP No. 2143of 2016, (CEA) and beneficiary States & concerned WP No. 2154 of 2016, WP No. 2164 State Generation/Transmission of 2016 and WP No. 4480 of 2016 in departments. The generation planning, Hon‟ble High Court of Madhya daily scheduling, monitoring of Pradesh bench at Indore. generation, transmission planning,  Writ Petition No. 9655 of 2016 in schedule for maintenance and energy Hon‟ble High Court of judicature of accounting etc. are carried out in Bombay bench at Aurangabad. compliance of NWDT Award. The total

133 energy generation at SSP complex was 2791.374 MUs (2257.024 MUs from REAL TIME DATA ACQUISITION RBPH &534.350 MUs from CHPH) SYSTEM IN NARMADA BASIN: during the FY 2016-17 (April, 2016to NCA was entrusted with the works November, 2016). The net power of establishment of Real Time Data available at bus bar in RBPH switchyard Acquisition System comprising of 26 (after allowing for station auxiliaries) was remote stations and 1 Master Control shared among the party States i.e. Madhya Centre at Indore in Narmada Basin under Pradesh, Maharashtra and Gujarat in the Phase-I. At present, 4 project stations and ratio of 57%, 27% and 16% respectively as MCC are operational and hourly hydro prescribed by the NWDT Award. Apart metrological data from the sensors are from energy generation, RBPH units are being received with varied degree of also being operated in synchronous performance and stored at MCC, Indore. condenser mode as per requirement for Based on these information and also voltage regulation and to provide stability analyzing manually collected data from to the grid. During the FY 2016-17 (up to other 14 Remote Stations, NCA issues the November, 2016) SSP machines were daily hydrological status report containing operated for 319 hours in synchronous important hydrological parameters like condenser mode. water level, live storage, inflow / discharge for the major reservoirs operation table for Further, in compliance to monsoon period and Non monsoon period the directions issued by Western Regional and 10 daily releases etc in the Narmada Power Committee (WRPC), quarterly Basin. Due to deterioration of satellite mock drill for crisis management/disaster KALPANA-I and ageing and obsoleteness management was carried out at SSP and of the equipment leading to failure of the quarterly reports sent regularly to all stations beyond their revival. It is decided concerned viz. WRPC/CEA. A Black Start that the second Phase of RTDAS Mock Drill Exercise (BSMD) was comprising 42 stations will be installed by conducted on 14th December 2016 with Madhya Pradesh in whole basin and at SSP Unit No. 2 at Sardar Sarovar Project. H.R. of NMC & Gujarat -Rajasthan in an integrated manner and provide the data (i) Performance of River Bed Power seamlessly on real time basis to NCA as House (RBPH), SSP [6 X 200 Mw]: well as to other party States. Meanwhile, The total energy generation decision is taken to upgrade 4 project achieved from RBPH from April 2016 to stations with GSM technology by November, 2016 was2257.024 MUs. The installing the cell net modem with the anticipated energy generation from RBPH, exiting data logger so that the data can be SSP for remaining months / period of 1st assessed in mobile/PC with internet December, 2016 to 31st March, 2017 of facility on real time basis. Accordingly, F.Y. 2016-17 is will be 432.00 MUs. one cell Net Modem and the Data logger has been installed at ISP Remote Station (ii) Performance of Canal Head Power on 1st March, 2016 on trial basis for 3 House (CHPH), SSP [5 x 50 MW]: months without financial and legal The total energy generation implication and started getting data achieved from CHPH from April 2016 to through M/s Stevens Water Monitoring November, 2016 was 534.350MUs. The System, USA based who has agreed to anticipated energy generation from CHPH, install on trial basis for three months. The SSP for remaining months / period of 1st data were being received through their December, 2016 to 31st March, 2017 of cloud based on GSM/GPRS Technology F.Y. 2016-17 is will be 330.00 MUs. using the user ID provided by them .The

134

System found working satisfactorily held on 9th December 1973 agreed for during the trial period. Therefore as per setting up of a tripartite Control Board for decision taken in 19th Hydromet Meeting the speedy, smooth and efficient execution to upgrade the existing 4 project station of the various inter-state projects of both namely Bargi, Tawa , ISP and SSP, NCA the States. Betwa River Board (B.R.B) was as initiated for the action for up gradation constituted in 1976 by an Act of by installing cell Net Modem/ E Tracker parliament to execute the Rajghat Dam with necessary accessories after Project and Power House. The project completing necessary codal authority started construction of the project formalities.NCA will develop water under the overall guidance of Betwa River management software for inflow Board after promulgation of Betwa River forecasting & water Accounting and also Board Act 1976. The benefits and cost of Simulation studies for integrated reservoir the above projects are being shared equally operation and flood forecasting etc. by both the State Governments.

WATER ACCOUNTING The Union Minister of Water NCA prepares Annual Water Resources in the Chairman of the Board. Account (AWA) of Narmada Basin and Union Minister of Power, Union Minister the draft AWA for the year 2015-16 has of Water Resources, Chief Ministers and been prepared and circulated to the party Ministers-in-charge of Finance, Irrigation States for their comments. NCA allocates and Power of the two States are its the water among the party states on the members. An Executive Committee of the basis of utilizable flow assessed by the end Board headed by Chairman, Central Water of October each year at ex SSP. On the Commission manages the activities of the basis of inflow in to the various reservoirs, Board. release for various purposes and change in storages, etc. during the year 2016-17, RAJGHAT DAM PROJECT storage in the major and medium The Rajghat Dam with appurtenant reservoirs in Narmada basin, utilization by structures has been constructed across Party States during monsoon and spillage River Betwa to provide Irrigation facilities at ex-SSP, the utilizable flow was assessed to 1.38 lakh ha. In Uttar Pradesh and 1.21 36.27 MAF which was 29% higher than lakh Ha. In Madhya Pradesh with power 28.00 MAF at 75% dependability. Water generation of 45 MW through Rajghat allocation to the party States are being Hydro Electric Project at the toe of dam on done as per the provision made in the left flank. The cost as well as benefits of NWDT Award. NCA effectively monitors the project are to be shared equally by both the regulation and uses of Narmada water the States. Construction work of Dam and on 10-daily basis by issuing the O.M on Power House have been completed. the basis of approved Reservoir Operation Table and actual status of reservoirs and (i) Land Acquisition: Key G&D stations on Narmada River. The dam submerges 38 villages in U.P. and 31 villages in M.P. State. BETWA RIVER BOARD Compensation in M.P. area is completed. In U.P. the District Administration, A decision to harness the available Lalitpur had paid the land compensation of water resources of Betwa River was taken 25 villages and BRB have paid the in a meeting held on 22nd July 1972 compensation of 13 villages by mutual between Chief Ministers of Uttar Pradesh negotiation except the property and Madhya Pradesh. Further Uttar compensation of village Kalapahar Pradesh and Madhya Pradesh in a meeting between FRL and MWL and the case

135 has already been submitted for its states by Chief Engineer, BRB for valuation to the concerned department transition period until the project is taken of U.P. over by one of the party states. The matter was discussed in Secretary, MOWR level (ii) Planning and Present status of meeting held on 02.02.2006. It was agreed Rajghat Power House works: to operate O&M account of the project The estimate of Rajghat Hydro from October, 2005. Both the states agreed Electric Project at 1997 price level was Rs. to contribute their due share towards O&M 131.26 crore which included Rs. 58.41 held in addition to pending liabilities under crore for the civil works. The further capital cost. The State of U.P. have paid revised cost of the civil works of Power only Rs. 107.50 crore and M.P. has paid House is Rs. 66.89 crore at December, only Rs. 53.40 crore against their due 1999 price level and same has been share up to December, 2016. furnished by BRB to MPPGCL. MPPGCL have contributed Rs. 59.51 crore. The total (iv) Utilization of present storage: expenditure incurred on civil works of The phase-1 of the construction of Rajghat Power House till June, 2008 is Rs. Dam up to Spillway crest level was 63.15 crore. completed in 1992. Since then reservoir storage is being utilized in down stream in The three unit of Power House Betwa Canal System (U.P) and Bhander have been tested and commissioned during Canal System (UP & MP) the impounding 1999-2000. From 1999-2000 to 2009-2010 of water above crest level has been started (Ten years) total units of power generation since 1999-2000. from Rajghat Power House are 10613 lakh units. FINANCIAL POSITION OF BETWA RIVER BOARD (iii) O & M Estimate of Rajghat Dam The State-wise share/ financial Project during Transition Period: position of Betwa River Board at the end An estimate amounting to Rs. 9.00 of January 2017 is as under: Crore per annum towards O&M has been prepared and submitted to both the party

Financial position of Betwa River Board (in Rupees Crore) S.No. Item U.P. M.P. Total 1. Apportioned cost as per revised cost estimate. 150.30 150.30 300.600 2. Contribution received 150.30 150.30 300.600 3. Revenue/other receipts - - 43.15 4. Contribution due against O&M head up to 127.975 127.975 255.95 December , 2016 5. Contribution received against O&M head up to 107.50 53.41 160.91 December, 2016 6. Balance to be contributed against O&M head up to 20.475 74.565 95.04 December, 2016 7. Gross expenditure up to December, 2016 - - 502.09 8. Balance available with BRB in January,2017 - - 2.57

TUNGABHADRA BOARD exercise of the powers vested under sub section (4), Section 66 of Andhra State Act The Tungabhadra Board was 1953 for completion of the Tungabhadra constituted by the President of India in Project and for its operation and

136 maintenance. The Board is regulating the right side in the Reservoir evaporation water for irrigation, Hydro power loss shall be shared by the State of generation and other uses from the Karnataka and Andhra Pradesh in the ratio reservoir. of 3.5 : 5.5. There is no surplus over spillway in this water year 2016-2017. The Board consists of a Chairman, appointed by the Government of India, and (ii) Hydro Electric Scheme: three Members, one each representing the Two Power Houses are maintained States of Andhra Pradesh, Karnataka and by the Tungabhadra Board, with a total Government of India. In the discharge of installed capacity of 72 MW and a target its assigned functions, the Board exercises of 179 million units of power generation is powers of a State Government. It makes envisaged during the water year 2015- rules for the conduct of its own business. 2016. Against this, the power generated till The Government of Andhra Pradesh and end of December 2015 was 103.2675 the Government of Karnataka provide million units. The power generated is funds in agreed proportions and also shared between the States of Karnataka depute staff to man the various specified and Andhra Pradesh in the ratio of 20:80. posts, as per an agreed proportion. The working table for canal wise distribution (iii) Mini Hydel Power Plant: of water to the States is prepared every A Mini Hydel Plant at the head of year by the Tungabhadra Board in Right Bank High Level Canal of the consultation with the State Governments, Tungabhadra Project under Build, Operate, and is reviewed from time to time during Own and Transfer (BOOT) system through the water year. The regulation of water is an independent power producer viz., M/s carried out in accordance with the agreed NCL Energy Ltd., Hyderabad has been working table. commissioned on 27-10-2004. The Mini Hydel Plant comprised 3 units of 2.75 MW NEW INITIATIVES (FROM 1ST each and generated 3.432 million units up APRIL 2016 TO 31ST DECEMBER to December 2016. The power generated is 2016) purchased by the Transmission Corporations of Karnataka and Andhra (i) Irrigation Wing: Pradesh in the agreed ratio of 20:80. The Tungabhadra Reservoir filled up to the full reservoir level 493.14 One more new Mini Hydel plant (1617.91 ft.) in this year. The inflow in to was implemented at the head of the reservoir from April2016 to Rayabasavanna canal of Tungabhadra December2016 was 2455.08 Million Cubic Project under Build, Operate, Own and Meters (Mcum) (86.691 TMC). The Transfer (BOOT) system through an utilization by the Karnataka State, Andhra independent power producer viz., M/s Pradesh &Telangana till end of Khandaleru Power Company Limited, December2016 was 1460.43MCum Hyderabad. The project construction was (51.569 TMC), 595.76MCum started in September‟2012 and (21.037TMC) and 46.38Mcum (1.638 commissioned in record time of 11 months TMC) respectively as against the likely i.e., 31-8-2013. The total project capital abstraction of 1982.40MCum (70TMC) for cost is Rs.11.5crore. The Mini Hydel plant the water year 2016-17. Evaporation comprising single unit of 1.4 MW has losses from April2016 to generated 3.391 million units up to December2016were 86.26MCum (3.046 December 2016. The power generated is TMC) to be shared equally by the State of purchased by the GESCOM, Gulbarga Karnataka on left side and the half share of

137

(Karnataka) and rate of power purchase is Indira Sagar (Polavaram) project is Rs.2.80 per unit. located on river Godavari near Ramayyapet village of Polavaram Mandal (iv) Fisheries Wing: of West Godavari district in Andhra The Tungabhadra reservoir has a Pradesh. The project is multipurpose major water spread area of 378sq.km at full terminal reservoir project on river reservoir level affording tremendous scope Godavari for development of Irrigation, for development of fisheries. Quality fish Hydropower and drinking water facilities seeds are produced and reared in the to East Godavari, Vishakhapatnam, West Board's Fish Farm to meet the demand of Godavari and Krishna districts of Andhra the public and for stocking in the reservoir Pradesh. The project will provide to increase the biomass of fish wealth. The irrigation to 2.91 Lakh Hectares(CCA) and fishing rights of the reservoir was renewed hydropower with installed capacity of 960 for the year 2016-17 to a local Fishermen's MW apart from 23.44 TMC (663.7 MCM) Cooperative Society for Rs.90.47 lakhs. In drinking and industrial water supply to order to facilitate preservation of fish Vishakhapatnam township and steel plant catch, the Board is running an ice-cum- and diversion of 80 TMC waters to river cold storage plant. The gross earnings Krishna. The ultimate irrigation potential from the Ice Plant up to December2016 is of the project is 4.368 lakh ha and annual 11.89 lakhs. power generation will be 2369.43 million units. In addition, 540 villages will also be BOARD MEETING provided with drinking water facilities in In between April to December the command area. 2016 Tungabhadra Board held one meeting. The Polavaram Irrigation Project was declared a National Project on dated LIKELY/ ANTICIPATED 01.03.2014 vide section 90 of AP ACHIEVEMENT FROM 1ST JANUARY Reorganization Act, 2014 with Union ST 2016 TO 31 MARCH 2016: Government to take under its control the regulation and development of the Irrigation Wing: Due to poor monsoon this Polavaram Project. Central Government year, there is no water for utilizing during has created Polavaram Project Authority rabi season. Minimum canal maintenance (PPA) with Governing Body to execute the works will be carried out. Modernization Project and obtain all requisite clearances. of canals will be taken up subject to allotment of additional funds from the The project was accorded GoAP investment clearance by the Planning Commission for Rs 10151.04 cr (at 2005- Hydro Electric Scheme: Anticipated power 06 price level) in 2009. The estimated cost generation from Jan‟2017 to Mar‟2017 at 2010-11 level is Rs.16010.45 crore. The will be 3 million units. project was under construction with Central Assistance under Accelerated Fisheries Wing: Likely earnings from Irrigation Benefits Programme (AIBP). An Jan‟2017 to Mar‟2017 will be expenditure of Rs 5135.87 crore has been approximately Rs.4.00 lakhs. incurred up to31.03.2014 including Central Assistance of Rs 562.469 crore POLAVARAM PROJECT provided under AIBP. After declaration of AUTHORITY National Project since 01.04.2014 additional Rs. 3059.51 crore have been incurred till Oct, 2016. Out of above,

138

Ministry of Water Resources, River convene Apex Council meeting as and Development & Ganga Rejuvenation has when required to resolve the issues raised released Rs 950 crore to PPA from their by both the states. (The two projects regular budget allocation and Rs 1981.54 referred were Palamuru- Ranga Reddy Lift crore through NABARD funding. Irrigation Scheme(LIS) and Dindi LIS taken up by Telangana. (ii) The issue of agenda item AUTONOMOUS BODIES WORKING ARRAGEMENT FOR SHARING OF WATER was taken up for

discussion and following decision taken. KRISHNA AND GODAVARI RIVER Decision: GOI will make efforts to MANAGEMENT BOARDS expedite finalization of KWDT II award.

(iii) The issue of agenda item APEX COUNCIL MEETING TRANSPARENT MECHANISM FOR The meeting is necessitated MEASURING OUT FLOWS AND on account of the Hon‟ble Supreme Court INFLOWS AT DIFFERENT of India directions on the Writ Petition LOCATIONS AND RESERVOIRS was filed by Alla Venkata Gopala Krishna Rao taken up for discussion and following and Others versus Union of India and decision taken. Others with respect to construction of two Decision: Installation of telemetry new projects namely, Palamuru – as agreed by both the States. Both the Rangareddy Lift Irrigation Scheme (LIS) states agreed to keep the Joint Team and Dindi LIS contemplated by comprising engineers from both the states Government of Telangana State. The in all the projects for transparent Hon‟ble Supreme Court of India in its monitoring. order Dt:20.07.2016 has directed: (iv) The issue of agenda item “…… Convening of the MECHANISM FOR REPLENISHMENT meeting of the Apex Council, as AND OVER/UNDER DRAWAL BY expeditiously as possible. The Apex THE TWO STATES IN A GIVEN Council shall examine the issues with WATER YEAR was taken up for reference to the construction of two discussion and following decision taken. projects after affording an opportunity of Decision: Both The states agreed hearing, to the concerned State parties.” for continuation of 2015-16 working arrangement for sharing of waters during The first Apex council meeting was 2016-17 also. held at New Delhi on 21.09.2016 under (v) The issue of agenda item the Chairpersonship of Hon'ble Union PRINCIPLES FOR SHARING OF Minister ,M/o WR, RD & GR with Chief GODAVARI WATER DIVERTED TO Ministers of Andhra Pradesh & Telangana KRISHNA was taken up for discussion and the agenda items discussed and and following decision taken. decisions arrived are as follows. Decision: MoWR will examine the (i) The issue of agenda item grievance of Telangana in the constitution TAKING UP OF PROJECTS REFERRED of the Expert Committee. MoWR will BY THE HON‟BLE SUPREME COURT make a reference to KWDT II to expedite IN W.P.NO.116 OF 2016 FOR its award due to urgency in the matter. RESOLUTION BY THE APEX COUNCIL was taken up for discussion BOARD MEETINGS and following decision taken. During 2016-17, two Board Decision: Due to divergent Meetings were convened by KRMB on 27- position taken by the States on this item, 05-2016 and 26-08-2016 at Hyderabad. In

139 the fifth board meeting a Sub-committee 01-2017 for addressing the following comprising Chief Engineer, KRMB and issues: Chief Engineers (Inter State) from both  Preparation of Manual on Operating States has been constituted to look into Rules/Procedures in respect of modalities of accounting for utilization of Common projects located on River water in minor irrigation scheme and Krishna related issues. The Sub-committee  Allocation of Godavari waters being convened 2-meetings and referred the transferred to Krishna basin in matter to 3-Member Committee. accordance with Godavari Water Disputes Tribunal Award,1980. THREE MEMBER COMMITTEE MEETINGS PARLIAMENTARY STANDING During 2016-17, 5 meetings of COMMITTEE STUDY VISIT three member Committee consisting of The Parliamentary Standing Engineer in Chief of both the States and Committee in the meeting convened at Member Secretary, KRMB were convened Hyderabad on 4th June 2016 interacted (2 Meetings in Water Year 2015-16 & 3 with officials of State Governments of Meetings in Water Year 2016-17) to Telangana and Andhra Pradesh and other discuss and approve the water indents organizations and also with Krishna River placed by the States from the Common Management Board. Reservoirs of & Nagarjunasagar Project based on the availability of water STAFF OF KRMB SECRETARIAT and utilizations already made. The KRMB Secretariat is functioning with staff deputed from TELEMETRY Government of Andhra Pradesh and Telemetry system is proposed to be Telangana. Recently, in December 2016, installed at Nagarjuna Sagar Project , 3 Nos. of staff from CWC/MoWR in the Srisailam project and Jurala Project at cadre of Deputy Director (1 No) and AD-II selected locations in Phase-I. Total 18 (2 Nos.) Joined in KRMB on deputation. Nos.. of telemetry sites have been selected for above three projects and through e- BUDGET AND EXPENDITURE procurement system, agency for The Budget approved by Board for implementation of telemetry systems at all KRMB for the financial year 2016-17 is those 18 selected sites has been finalized. Rs 1180.00 Lakhs. The funds are initially provided by the State of Andhra Pradesh. KRMB team and Project The expenditure incurred up to Authorities visited various Projects December,2016 is Rs 137.04 Lakhs and located in Krishna River and also river is towards salaries and day to day to locations where water level sensors/ expenditure of KRMB Secretariat. Velocity sensors are to be installed in phase-II and tentatively finalized about 30 GODAVARI RIVER MANAGEMENT Nos.. of locations. BOARD

CONSTITUTION OF EXPERT REGULATIONS COMMITTEE BY MOWR The Regulations - 2014 of GRMB The MoWR, RD & GR, New Delhi were approved in 3,d Board meeting and has constituted five member Expert was communicated to MoWR, RD & GR Committee vide office Memorandum for further action. No.R/16011/2/2016-Pen.Riv-58 dated:09-

140

PARLIAMENTARY STANDING reference to KWDT-II to expedite its COMMITTEE award due to urgency in the matter. Parliamentary Standing Committee meeting on Water Resources was held on EXPERT COMMITTEE BY MOWR 4th June, 2016 at Hyderabad in which The MoWR, RD & GR has officials of both the State Governments of reconstituted five member Expert Andhra Pradesh and Telangana and Committee vide office memorandum officials of GRMB participated. No.R/16011/2/2016· Pen. Riv/58. dated 09-01-2016 for addressing the allocation APEX COUNCIL of Godavari waters being transferred to The 1st meeting of Apex Council Krishna basin in accordance with Godavari was held on 21-09-2016 at New Delhi in Water Disputes Tribunal Award. 1980. which, inter alia, the issue of 'principles of sharing of Godavari water to Krishna‟ was BUDGET discussed and it was decided by the Apex An expenditure of Rs.83.58,975/- Council that MoWR would examine the was incurred by GRMB up to 31st grievance of Te1angana in the constitution December, 2016 during the FY 2016-17. of Expert Committee and would make a

141

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

142

8. Public sector Enterprises

WAPCOS LIMITED  To adopt international standards in surveys, investigations, designs, cost WAPCOS Limited is a “Mini estimates, project planning including Ratna-I” Public Sector Enterprise under environmental studies and project the aegis of the Union Ministry of Water management services for cost- Resources, River Development and Ganga effective and integrated development Rejuvenation. The company was of Water resources, Power and incorporated on June 26th 1969 under the Infrastructure Projects Companies Act, 1956 to:  To promote research and development  share India’s experience and expertise, through interaction with other national  facilitate Diplomatic Initiatives, and and international agencies  augment endeavors of State and  To maintain pre-eminence in the field Central Agencies. of consultancy through diversification in allied fields WAPCOS is a technology driven  To secure a fair monetary return to the consultancy and EPC organization with enterprise as a result of its operations strong global presence in the field of through improved productivity Water, Power and Infrastructure sectors.  To play a dynamic role in use of state- WAPCOS has the requisite experience & of-the-art consultancy for innovative expertise to undertake Consultancy & EPC design alternatives projects of any scale and complexity in the  To attract the best available talent and sectors of its operation. The quality promote a committed and motivated management systems of WAPCOS comply workforce with the Quality Assurance requirements  To strive to achieve client satisfaction of ISO 9001:2008 for Consultancy  To promote WAPCOS as a Brand Services in Water Resources, Power and Name Infrastructure Development Projects.

OBJECTIVES Vision / Mission of WAPCOS

The objectives of the WAPCOS Vision: To be a Premier Consultancy are: Organization recognized as a Brand in Water,  To perform the role of a premier Power and Infrastructure Development for agency for offering integrated package Total Project Solutions in India and Abroad. of services of scientific, technological and managerial quality for optimal Mission: Sustained Profitable Growth, planning and development of Projects Excellence in Performance, Use of State-of-  To adopt modern technology and the-art Technical Expertise, Innovativeness systems to build in quality, reliability and Capacity Building to Meet Society’s Needs Globally. and accuracy thereby ensuring customer satisfaction FIELDS OF SPECIALIZATION  To continue the pace of growth of Main Fields of specialization of the domestic and overseas business and to Company cover Irrigation and Drainage, transfer know-how to Clients

143

Flood Control and Land Reclamation, WAPCOS' spectrum of services covers a wide River Management, Dams, Reservoir range of activities: Engineering and Barrages, Integrated Agriculture Development, Watershed Management, Hydropower and Thermal Power Generation, Power Transmission and Distribution, Rural Electrification, Ground Water Exploration, Minor Irrigation, Water Supply and Sanitation (Rural and Urban), Environmental Engineering including Environmental Impact Assessment and Environmental Audit, Ports and Harbours and Inland Waterways, Roads & Bridges; Rain Water Harvesting; Ghats Development; Survey & Investigations, System Studies & Information Technology, City Development Plans, Financial Management Systems, Quality Control and Construction Supervision, Roads & Bridges. The Company provides concept to commissioning services for developmental projects in India and Abroad. MOU SCORE FOR YEAR 2015-16 REGISTRATION WITH The Company’s performance is INTERNATIONAL ORGANISATIONS adjudged based on the MOU signed by WAPCOS is registered with WAPCOS and Ministry of Water various international funding agencies for Resources, River Development & Ganga participating in the funded projects like Rejuvenation every year based on guidelines and negotiations held with the  World Bank Task Force of Department of Public  Asian Development Bank Enterprises, Government of India. It  African Development Bank covers the various Financial Performance  Japan Bank for International Indicators like Sales Turnover from Cooperation Consultancy and Engineering Projects,  United Nations Office for Project excluding interest and other income Services (Operating Turnover), Profitability and dynamic indicators like Order Booking, DIVIDEND Human Resource Management, Business In view of the excellent Development Plan 2015-2020, Brand performance of the company for the year Building, Risk Management Policy, 2015-16, dividend of Rs. 25.25 Crore, Customer Satisfaction, Projects which is highest-ever in the history of the Implementation etc. company and is 72.14% of the paid-up capital of Rs. 35.00 Crore, was paid in The Company has become eligible August, 2016. for “Excellent” rating under the MoU system of Company’s performance evaluation by the Department of Public Enterprises. The Company is consistently

144 securing Excellent Rating under the MoU Development & Ganga Rejuvenation, System as established by Department of Government of India. The Company has Public Enterprises, Ministry of Heavy also received appreciation from the House Industries and Public Enterprises, of People National Assembly of Government of India. Further the Afghanistan on Successful Completion of Company has achieved the highest Afghan – India Friendship Dam and achievable MoU score of 1.00 (Excellent) Honorary Appreciation issued by The for the last 6 consecutive years. Presidential Office of the Islamic Republic of Afghanistan on Successful Completion Operations Abroad: Apart from India, of Afghan – India Friendship Dam. WAPCOS has successfully completed/on- going consultancy assignments abroad and is The Company has received several currently engaged in providing consultancy prestigious National/International Awards services in: such as “Meritorious Award-Corporate  Angola  Maldives Governance” instituted by Standing  Afghanistan  Mali Conference of Public Enterprises, an apex  Bangladesh  Mongolia body of Central Government owned Public  Benin  Mozambique Enterprises; Prestigious 'VAJRA' Award in  Bhutan  Myanmar the Category: ENERTIA- Award for  Burkina Faso  Nepal "INDIA’s Most Valuable Power Sector  Burundi  Niger Enterprise - Making Global Impact" in  Cambodia  Nigeria  Central African  Philippines “10th ENERTIA Awards – “India & South Republic  Rwanda Asia’s Awards for Excellence in  Chad  Senegal Sustainable Energy & Power”; CBIP  DR Congo  Sierra Leone Award - 2016 for “Best Consultancy  Ethiopia  South Sudan Organization in Water Resources Sector”;  Fiji  Sri Lanka India Africa Champion-in-Biz-Awards –  Ghana  Swaziland 2016 for “Dedicated Leadership in  Guinea Conakry  Tanzania Infrastructure” and “Achievement in  Kenya  Trinidad & Tobago Power & Renewable Energy” supported by  Lao PDR  Togo The ASSOCHAM; “Top Performing  Lesotho  Uganda CPSEs’ “MOU Excellence Award”  Liberia  Yemen instituted by Department of Public  Malawi  Zimbabwe Enterprises, Government of India; “Best Consultancy Organisation” - Instituted by AWARDS AND RECOGNITION FOR Central Board of Irrigation and Power, a WAPCOS premier Institution setup by the Hon’ble President of India Government of India; Company of the presented Award for Excellence and Year - PSE Excellence Award instituted by Outstanding Contribution to the Public Department of Public Enterprises, Ministry Sector Management-Institutionalinstituted of Heavy Industry and Public Enterprises, by Standing Conference of Public Government of India and Indian Chamber Enterprises, an apex body of Central of Commerce to recognize the contribution Government owned Public Enterprises to of Public Sector to the Indian Economy; recognize the contribution of Public Best Performing PSU Award – “Mini Enterprises to WAPCOS. The Company Ratna” instituted by India Today Group; has received appreciations on Successful Organization with Innovative HR Practices Completion of Afghan – India Friendship – by Asian Confederation of Businesses; Dam (Salma Dam) from Hon'ble Union Water Awards - Best Consultancy Minister of Water Resources, River Company, Best Indian Water Company to

145

Work and Made in India – Best Water Narendra Modi Ji at Herat, Afghanistan on Company (Public Sector) supported by 4th June 2016. The enormity of this project UNESCO and ASSOCHAM; PSE and the goodwill generated by it, was Excellence Award – Corporate reflected in the celebratory events and Governance and Corporate Social outpouring of euphoria by common Responsibility & Sustainability Award, Afghans on the streets of Herat in the run instituted by Indian Chamber of up inauguration. Streets of Herat and the Commerce; “National Award for dam site even decorated with the huge Excellence in Cost Management” banners welcoming Hon’ble Prime conferred by The Institute of Cost and Minister and thanking India for the dam as Works Accountants of India, a premier a symbol of timeless friendship between professional body set up under the Act of the two nations. The Ministry of Water Parliament etc. Resources, River Development and Ganga Rejuvenation organized a felicitation INNOVATION AND CHANGE ceremony to commemorate the successful ORIENTATION completion of the project at New Delhi on Over the last few years, WAPCOS 22nd June 2016 to felicitate the officials of has successfully diversified into the WAPCOS Limited, Officials of Govt. Construction sector and involved in of Afghanistan and people representative construction of projects in various sectors of Afghanistan, who were involved in the such as dams, buildings, STP’s, Protection successful construction of Afghan-India of Archaeology sites etc. WAPCOS now Friendship Dam. has the requisite experience & expertise to undertake EPC projects of any scale and WAPCOS has made significant complexity in the sectors of its operation. breakthrough in various flagships of Government of India Schemes and has been able to secure projects under the following Schemes: (i) Namami Gange, Integrated Ganga Conservation Mission - The Government of India approved the flagship “Namami Gange” Program which integrates the efforts to clean and protect the Ganga river in a comprehensive manner. WAPCOS is involved in the following Projects including preparation of DPR for Development of Chandi Ghat at Ms. Masooda Karokhi, Hon’ble Member of Parliament, Islamic Republic of Afghanistan Haridwar, Uttarakhand; Development of presenting Appreciation to CMD, WAPCOS Ghats and Crematoria in the stretch from on behalf of National Assembly of Rishikesh to Devprayag; Development of Afghanistan Ghats and Crematoria in the stretch from Devprayag to Rudraprayag, Uttarakhand WAPCOS has successfully and Infrastructure in various towns along implemented Afghan-India Friendship river Ganga and its tributaries in Dam in Afghanistan in the most difficult Uttarakhand and Uttar Pradesh etc. terrain and conditions in the remote areas (ii) Atal Mission for of Afghanistan. The dam was jointly Rejuvenation and Urban Transformation inaugurated by the Hon’ble President of (AMRUT) - WAPCOS is the Project Afghanistan Dr. Mohammad Ashraf Ghani Development and Management Consultant and Hon’ble Prime Minister of India Shri (PDMC) for this Scheme in Madhya

146

Pradesh, Kerala, Haryana, Meghalaya and The Company has a two tier Telangana and is appointed for the Corporate Social Responsibility and preparation of DPR for Rajasthan. sustainability Structure, First tier being of (iii) Smart City Mission - Senior Officials of the Company and WAPCOS prepared the Smart City Second Tier of Board Level Committee. Proposal for Guwahati City and was Activities have been undertaken in ranked 17th in the 1st Round. Work of different States of India and in diverse preparing the Smart City Proposal for fields, which include Empowerment of Shimla has also recently been awarded to Women through Skill Development WAPCOS. Activities, Environmental Sustainability, (iv) Pradhan Mantri Krishi Promotion of Renewable Sources of Sinchayee Yojana (PMKSY) - Energy - Non-Conventional Energy Government of India is committed to Sources, Construction of Rainwater accord high priority to water conservation harvesting structures and water and its management. WAPCOS is conservation awareness programs in preparing the District Irrigation Plans for backward areas, School Sanitation, Rajasthan under this Scheme. WAPCOS is Hygiene and Health, Healthcare providing special emphasis on pressure programme for underprivileged people, irrigation, with a view to improve overall Upliftment of deprived society, Promoting irrigation efficiency and to achieve the Water and Energy conservation and Water objective of “MORE CROP MORE Quality Monitoring through education DROP”. program. A Training session was also (v) Deen Dayal Upadhyaya organized to sensitize the employees and Gram Jyoti Yojana (DDUGJY) - change their mindset/orientation. WAPCOS is the REC Quality Monitor on behalf of Rural Electrification Corporation The monitoring of CSR Activities and Project Management Agency (PMA) was done regularly by independent and Third Party Inspecting Agency (TPIA) agencies and such activities were also for the utilities of respective states of reported to TISS Hub. Bihar, Haryana, Karnataka, Kerala, Maharashtra, Tamil Nadu, Uttar Pradesh, CORPORATE GOVERNANCE West Bengal, Assam, Tripura, Jharkhand, WAPCOS is committed to Haryana, Manipur, Nagaland, Himachal adoption of and adherence to best Pradesh, Jammu & Kashmir, Rajasthan Corporate Governance practices. It has and Madhya Pradesh. been complying with the guidelines on (vi) Integrated Power Corporate Governance issued by the Development Scheme (IPDS) – WAPCOS Department of Public Enterprises (DPE), is acting as the Third Party Independent Government of India. The company is Evaluation Agency – Energy Accounting having Audit and Remuneration committee (TPIA-EA) on behalf of Power Finance in place and has received “Nil” comments Corporation and Project Management from CAG for the last 11 years. Agency (PMA) under DISCOM for the states of Uttar Pradesh, Kerala, Madhya FINANCIAL PERFORMANCE Pradesh, Assam, Tripura, Nagaland, The Company has achieved Meghalaya, Punjab & Chandigarh, turnover of Rs. 24609 lakh from Haryana, Arunachal Pradesh, Manipur, Consultancy and Engineering Projects Mizoram and Rajasthan. (Unaudited) for the year ending 30.09.2016 as against the previous figure CORPORATE SOCIAL of Rs. 18337 lakh for the corresponding RESPONSIBILITY & SUSTAINABILITY period.

147

which is provided by Govt. of Afghanistan FOREIGN PROJECTS intermittently. The project is being executed in the most adverse security Asian Region conditions. The Hydro-Mechanical and Electro-Mechanical equipment were sent (i) Afghan-India Friendship Dam (Salma from India via Iran. Cement, steel, Dam) Project reinforcement Explosives etc. were Salma Dam Project is a imported to Afghanistan from neighboring multipurpose project planned for countries. Steel plates for penstock ferrules generating 42 MW of power, irrigating were procured from Japan. 75000 ha area of land, water supply and other benefits to the People of Afghanistan. It is funded by Ministry of External Affairs. WAPCOS is implementing the project on behalf of Ministry of External Affairs.

The Salma Dam is across Harirud river and is located in the Chist-e-Sharif district of Herat province in Afghanistan. The Project comprises construction of 107.5 meters high, 550 meter long earth & rock fill dam having 633 million cum Downstream View of Spillway, Afghan-India gross capacity of reservoir. Other Friendship Dam (Salma Dam), Afghanistan components of the project are i) surface powerhouse of installed capacity of 42 Milestones Achieved in Year 2015- MW with three power units of 14 MW 2016, in spite of deteriorating security each ii) concrete spillway 36 m wide & 63 conditions and accessibility constraints at m high, 2100 cumec capacity controlled by the site, are as follows: the 3 nos radial gates iii) diversion tunnel  The balance civil works of dam, 8.5m dia. & 630 m long on right flank iv) spillway, power house and switchyard Irrigation sluice of 15 cumec discharge have been completed capacity v) 4.25m dia. & 523m long steel  The Diversion tunnel gate was closed penstock vi) 157 km long, 110 Kv on 26.07.2015 and filling of reservoir transmission line for evacuation of power had been started. to Herat city. Work also includes supply of  The water level of reservoir reached all hydro-mechanical and electro- up to spillway crest level (EL 1633.5 mechanical equipment from India. m) i.e. 93.0 m of dam height.  After successful closure of DT gate, The project site is located in a very the Cabinet of Govt. of Afghanistan remote area of Herat province and has renamed the Salma Dam Project connected with the nearest commercial as Afghan–India Friendship Dam as town of Herat by 160 km kachha road. people of Afghanistan celebrated This dilapidated kachha road has been filling of reservoir and lot of Goodwill closed for the Indian project officials by has been generated. the Govt. of Afghanistan since January  The H.E. President of GoA; Governor 2011 because of the reported presence of of Herat; Ministry of Energy & Water Anti-Government elements and random and Ministry of Foreign Affairs of plantation of mines on the road. All Govt. of Afghanistan appreciated the Indians come to Herat only by Helicopter

148

progress of the project and  100% Civil construction of 42 MW contribution of WAPCOS, in powerhouse for Unit-I, Unit-II and particular. Unit-III have been completed.  The Irrigation sluice gates were  100% Infrastructure works including successfully commissioned on project colony, bye pass roads, Project 17.03.2016 to release of water for roads, explosive magazine houses etc. irrigation purpose. have been completed.  The pre-commissioning testing and  100% works of fabrication and mechanical spinning of Units-II and erection of 523 m long steel penstock Unit-I have been successfully carried ferrules have been completed. out on 12.03.16 and 29.03.16  100% erection works transmission line respectively. have been completed except testing &  The balance work of transmission line synchronization with Herat sub- comprising i) Rerouting of 4 Km station. transmission line including erection of  100% Hydro-mechanical and Electro- 12 nos. tower & stringing ii) Mechanical equipment have been underground cabling works in deployed to project site from India via concrete box near Herat Substation Iran. have been completed in spite of  95% erection works of Hydro- deteriorating security condition in the mechanical equipment and 93% work area. erection work of Electro-mechanical equipment has been completed.  70% Architectural and finishing works in the project area have been completed.

(ii) Bangladesh  Techno Commercial Feasibility Study for setting up an Inland Container Port at Narayanganj

(iii) Bhutan  Consultancy Services for Kuri Gongri Hon’ble Prime Minister of India, Shri HE Project Narendra Modi and Hon’ble President of the Islamic Republic of Afghanistan, Mr.  Detailed Design Engineering for Mohammad Ashraf Ghani jointly inaugurating Punatsangchhu-I Hydro Electric the Afghan-India Friendship Dam (Salma Project (6x200MW) Dam), in Herat, Afghanistan on June 04, 2016  Detailed Design Engineering for Punatsangchhu-II Hydro Electric The cumulative progress of works in Project (6x170MW) various fronts is as below:  Technical Services on Design &  100% construction work of 107.5 m Construction of 400 KV Transmission high Earth &Rockfill main dam lines Mangdechhu Hydro-Electric including curtain and consolidation Project grouting have been completed.  100% construction work Concrete (iv) Cambodia Spillway including Bucket, Apron and  Project Management Consultancy for plunge pool have been completed. Construction of 230 kV Double Circuit Transmission Line between

149

Kratie & Stung Treng and Associated Kulekhani-III Hydro Electric Project 230/22 kV Substation at Kratie in (14 MW) Cambodia  Project Management Consultancy for  Study of Groundwater Resources of Strengthening of India - Nepal Power Kampong Speu Province Transmission line Interconnection at  Siem Reap River Basin- Development 132 KV Level. of Master Plan  Designand Construction for 220 KV  Stung Tasal Water Resources Koshi Corridor Transmission Line and Development Project Substation

(v) Lao PDR  Engineering, Procurement and Construction of 230KV & 115KV Transmission Line and Associated Substation Projects  Extension of Thabok and Nabong Substation at 230KV rating, Extension of one no. of 115 KV line bay at Namgnung (Thasla) 115/22 KV Substation, 115 KV Single Circuit Ferrule Erection Chamber Punatsangchhu-I Transmission line from Nam Gnuang Hydro-Electric Project (Thasla) to Laksao, 115/22 KV Substation at Laksao African Region  Construction of Storage Dams & Development of Irrigation Systems (i) Burundi  Development of Irrigation schemes in  Project Management Consultancy for Champassack Province the execution of Kabu-16 (20 MW) Hydro Electric Project, related

Substation and Transmission Lines (vi) Mongolia

 Project Management Consultancy for (ii) D. R. Congo Indian-Mongolian Joint IT Education and Outsourcing Center Project  Project Management Consultancy for Grand Katende Hydro Electric Project (vii) Myanmar (64MW)  Development of Irrigation and Land Consolidation Schemes  Detailed Project Report of Development of Power Transmission  Feasibility and Detailed Project report and Distribution System in Bandundu for the Mytkyina –Putao Road in (Kakobola Hydro Project) Province Kachin State  Detailed Project Report of Development of Power Transmission (viii) Nepal and Distribution System in Kasai  Detailed Project Reports and CEIA (Katende Hydro Project) Province Study of Pancheshwar Multipurpose

Project (4800MW) (iii) Liberia  Construction Supervision and  Detailed Project Report for Construction Management for Development of Transmission and Rahughat Hydro Electric Project (32 Distribution Projects MW)

 Construction Supervision and (iv) Mozambique Construction Management for

150

 Design Services for Project of Improving the Quality of Power (vii) Sierra Leone Supply-Distribution (Lot-1)  Supply and Installation of Solar Street  Consultancy Services for Design for Lights in Freetown, Lungi and 12 Project of Improving the Quality of Districts Headquarter Towns Power Supply-Distribution (Lot-1)- Addendum-2 (viii) Tanzania  Strategy Paper on Integrated Water  Environmental Impact Assessment Resource Development and Study for the Environmental Management for Limpopo River Basin Clearance of DSM Port  Detail Design Review, Pre-Contract  Augmentation of Water Supply Services and Supervision of Civil Scheme in Dar es Salaam and Works Contract for Multinational Chalinze (Design & Construction Nacala Road Corridor Project- Phase Supervision Phase) I, Nampula – Cuamba Road Project,  Extension of Lake Victoria Pipeline to Lot B: Ribaue- Malema (103 km) Tabora, Igunga and Nzega (Design  Design Check and Supervision of Phase) Rehabilitation and Expansion of  Water Supply System at Igurusi Cuamba City Water Supply Training Institute  Design and Construction Supervision of Rehabilitation of Road N280/281 (ix) Uganda Between Tica, Buzi And Nova Sofala  Consulting Services for projects In Sofala Province Management and Construction  Irrigation Service Provider for Supervision of 1392 Km of Medium Horticulture under PROIRRI Voltage Lines and 1482 Km of Low Sustainable Irrigation Development Voltage Network. Project (x) Zimbabwe (v) Republic of Togo  Skill support for Operation and  Assistance to Client for Engineering Maintenance of Hwange Thermal studies, Supervision and Control of Power Station (920 MW) for Rural Electrification Project Phase 4 Zimbabwe Power Company  Project Management and Construction  Provision of Specialist Consultancy Supervision Consultancy Services for Services for Hwange Stages I And II 161kV Line Kara – Mango – Dapaong Plant Improvement at Hwange Transmission Line and Related Thermal Power Station Substation  Replacement of existing boilers with  Control and Inspection of Agricultural CFBC boilers for Small Thermal Equipment and supervision of Power Station at Harare, Bulawayo construction works in the project of and Munyati for Zimbabwe Power operating 1000 ha of Rice, Sorghum Company (ZPC) and Maize  Supply of Custom Built Simulators for 220 MW and 120 MW units similar to (vi) Rwanda Hwange Power Station and to train the  Supervision of engineering- trainers for Skill Development of procurement-construction of the 15 Zimbabwean Engineers and Operators MW peat-to-power plant  Project Management Consultancy  Export Targeting Modern Irrigated Services for Gairezi Hydro Electric Agriculture Project Project (30MW)

151

 Provision of Training Services in  Model Studies for Etalin Hydro Plant Optimization at Hwange Power Electric Project (3097 MW) Station, Zimbabwe (iii) Assam Other Region  Environmental Impact Assessment Studies for Lower Kopili Hydro Fiji Electric Project Clients Representative for Design  Proposal for Assisting Guwahati to and Build Contract – Upgrading Water and participate in Smart Cities Challenge Waste Water Pipe Network –  Comprehensive Development Plan for Central/Eastern and Western Urban the Majuli Cultural landscape Region Centers (MCLR)

(iv) Goa  Environmental Impact Assessment Study for capital dredging in navigation channel at Marmugao Port  Feasibility Report for Capital Dredging at the Mormugao Port

(v) Gujarat  Consultancy Services for Preparation of DPR for Bhadbhut Barrage and Diversion Works Power House (Machine Hall) Punatsangchhu-I  Development of Fishing Ports in Hydro-Electric Project Veraval Fishery Habour Phase-II and Bhadreshvar Fishery Harbour INDIAN PROJECTS  Development of Fishing Ports in Porbandar Fishery Habour Phase-II (i) Andhra Pradesh and Okha Fishery Harbour  APPDCL-2X800 MW-SDSTPS-Sea  Setting up of Project Management Water Intake & Outfall System - Cell at Gandhinagar Consultancy Studies for Filed  Dredging of Mangrol Fishery Monitoring of Shoreline Changes and Harbour, Porbandar Fishery Harbour Intake Basin for SWIO System and Madhwad Fish Landing Centres  Detailed Project Reports,  LPG Project at Okha Environmental Impact Assessment  Environmental Impact Assessment Studies, Tender Preparation including study for Par-Tapi-Narmada Link Project Supervision etc. for Project Development of Fisheries Harbours,  Providing Third party Technical Fish Landing Centers and other Consultancy Services for supervision Infrastructure Projects of Fisheries of Refurbishing, Restoring and Department installation of radial gate parts and  APGENCO - Srikakulam Thermal other appurtenant parts to its full Power Project (4x1000 MW) performance for main dam of Sardar  Feasibility study for transportation of Sarovar Project along with other Barge through River Krishna Near associated hydro mechanical works Nagayalanka  Block contouring, planning, design and preparation of plans, estimates of (ii) Arunachal Pradesh

152

distribution of Sardar Sarovar  Project Management Consultant for Narmada Nigam Limited network & Augmentation and Re-organization of drainage down stream of chak for the Water Supply Scheme in Leh command area under Various Canals  Project Management Consultant for Sewerage Schemes in Leh (vi) Haryana  Project Management Consultant for  Survey and preparation of Detailed Solid Waste Management in Leh Project Reports/ Tender Document for 9 ULBs of Haryana State under (ix) Jharkhand AMRUT Mission  Detailed Project Report for Ghat  Construction of Major Repair to Projects in Rajmahal Arterial Roads at NSG Garrison,  Detailed Project Report for Ghat Manesar Projects in Sahibganj  Construction Supervision Consultancy Services for works awarded for (x) Kerala Farrukh Nagar, Nuh, Haily Mandi,  PMC works for operation & Pataudi and Sonipat Town maintenance for various facilities of Kochi SEZ. (vii) Himachal Pradesh  Environmental Impact Assessment  Consultancy Services for preparation Study for Multiuser Liquid Terminal of prefeasibility Report & DPR for the at Cochin Port Project providing irrigation reclaimed  Environmental Impact Assessment Area under Swan River Study for demolition and Channelization Management reconstruction of North Jetty at Programme including adjoining Cochin Naval Base Irrigable Area in District Una  KRWSA- Consulting services for  Basin Study for Chanju Basin Independent Construction Quality &  Community Based Tourism Activities Surveillance Batch I, II and Tribal including Skill Development, Gramapanchayaths of Jalanidhi Phase Training, etc. in Chintpurni Cluster at II under RPMU Kannur, Idukki and Una District Malappuram  Engagement of Project Management Agency to provide management (xi) Madhya Pradesh services for effectively assisting the  Environmental Impact Assessment HPSEBL in discharging its functions study for Sonpur Medium Irrigation of timely executing the Government Project, Sagar of India (GoI) centrally sponsored  Environmental Impact Assessment Deendayal Upadhyaya Gram Jyoti study for Surajpura Medium Irrigation Yojana and Integrated Power Project, Sagar Development Scheme  Environmental Impact Assessment study for Tarped Irrigation Project (viii) Jammu & Kashmir  Project Development and  Detailed Project Reports of (i) Water Management Consultant for AMRUT Supply & Sewerage (ii) Solid Waste including Project Management of Management (iii) Improvement of other Notified Schemes in Project Road & Traffic Management in Area, Package – II District Kargil  Project Management Consultant for  Project Management Consultant for Development of Ring Road No. 4, Improvement of Road Networks in Road Network System, Water Supply Leh

153

System, Sewerage, Electrical  Detailed Project Report of Turini HE Networks, Storm Water Drains and Project for the Power & Electricity Reuse system including defect liability Department, Govt. of Mizoram specified area at Kamal Vihar, Raipur  Design, Project Management (ix) Odisha Consultancy& Construction of Apex  Consultancy Chiplima Hydro Electric Building in Naya Raipur Project, Chiplima, Odisha Services for  Master Plan & Preliminary feasibility Renovation and Modernization of Unit report for Kharun River Project # 3 Development of the Down Stream of  Comprehensive Contract Management Mahadev Ghat, Raipur Services for Renovation &  Feasibility Report and Detailed Modernization of Hirakud HEP, Project Report on Sewerage and Burla, Unit No. 5 & 6 (2x43.6 MW) Sewage Treatment for Bhopal City  Comprehensive Contract Management  Supervision of Project Monitoring, Services for Implementation of Supervision of Quality of Work and Renovation & Modernization of Preparation of Bill of Quantities under Balimela HEP, Unit No. 1 to 6 (6x60 RGGVY XIIth Plan for Jabalpur, MW) Katni, Sagar, Satna, Chhindwara  Proof Engineering Consultancy for Execution of Upper Indravati (xii) Maharashtra Irrigation Project  Consultancy Services for 500MW  Detailed Project Report for Upper Ultra Mega Solar Power Project. Indravati Pumped Storage Project  Design Consultancy of Purna Barrage- (600 MW) 2 (nerDhamna) Distt. Akola  Project Management Consultancy  Design Consultancy of Kwatha Services for 81 nos Barrage, Distt. Akola 33/11kVSubstations & Associated  Design Consultancy of Pedhi Barrage Lines for Packages 4, 5, 6, 7, Phase Distt. Amravti 1(B), 3-1A(R) &4-1A(R) within  Con-current Evaluation of Gosikhurd Jurisdiction of DISCOMs – NESCO National Project & WESCO Area under Segment – II  Feasibility Studies and Preliminary Phase – I of Odisha Distribution Design of Proposed Reservoir for System Strengthening Project MVVPL Hill Station Project (ODSSP)  Study analysis and necessary  Project Management Consultancy for clearances for creation of new Construction Of 84 Nos 33/11KV navigational channel Substations & Associated Lines For  Technical Proposal for rehabilitation Packages 3, 4 & 5 Under Phase-II of of surface water inlet pipe for intake Odisha Distribution System well of Dhariwal Infrastructure Ltd., Strengthening Project (ODSSP) in Chandrapur NESCO & WESCO Area  Techno-economic feasibility study for  Project Management Consultancy coastal cargo in Maharashtra and (PMC) For Construction of 76 Nos. development of Vasai, Jaigad and 33/11kv Substations & Associated Rajpuri Creeks for integrated transport Lines For Packages 3,4 & 5 Under Phase-III of Odisha Distribution (xiii) Mizoram System Strengthening Project (ODSSP) in NESCO & WESCO Area

154

 Project Management Consultancy for  Executing Kundah pumped Storage Implementation of Mega lift Projects Hydro-Electric Project (4x125MW) in in Cluster No.III Nilgiri Hills  Owners’ Engineer for Construction of  Basin Study for Vennar Basin Ash Pipe Line & Ash Pond for 2 X  Environmental Impact Assessment 660 MW– IB Valley Thermal Power study for Construction of Groyne at Project under Phase II Keelavaippar, Vembar, Periyathalai,  Owners Proof Engineering Veerapanyapattinum Consultants (PEC) for Execution of  Preliminary Engineering for Lift Canal System of Upper Indravati development of the Waterways stretch Irrigation Project between Shollinganallur to  Additional Survey and Investigation Kalpakkam of South Buckingham for setting up a riverine port on river Canal of NW-4 in Engineering, Mahanadi near Paradip Procurement and Construction Mode  Project Management Consultancy for  Project proposal for development of ODAFFP Fishery Feeders (Phase-I) Sholinganallur to Thiruvanmiyur Project stretch of south Buckingham Canal of  Wave Modeling/Tranquility Study in NW-4 on Engineering, Procurement PICT facility, at Paradip Port, Odisha and Construction mode for Paradip International Cargo  Coastal Disaster Risk Reduction Terminal Project Assisted by World Bank - Detailed Project Report (Residual (x) Punjab Work) for the Reconstruction and  Electro-Mechanical works of Shahpur Modernization Fishing Harbour at kandi Hydro Electric Project Mallipattinam in Thanjavur District (206MW), Gurdaspur  Construction quality Management & Technical supervision for (xi) Rajasthan IAMWARM Project  Pre-feasibility study report for  Detailed Project Report for development of inland port in Jalore “Improvements and Rehabilitation of and Barmer Grand Anicut Canal System in  Preparation of various Thematic Cauvery Basin Layers of Watershed Projects, IWRM  Detailed Project Report , Rapid Environmental Impact Assessment (xii) Sikkim Report, Tender Documents /  Detailed Design, Construction Evaluation, Project Management Supervision for Balance Works of Consultancy Services and Post Project 1,200MW (6*200MW) Teesta-III Evaluation Study for Desilting of H.E. Project, North Sikkim Vaigai, Pechipparai, Mettur,  Lender’s Engineer of 400KV Teesta Amaravathy Reservoirs and III Hydro Electric Project to SrivaikuntamAnicut Kishanganj Transmission Line Project  Investigation, Design and preparation (xiv) Telangana of Detailed Project Report for  Detailed Project Report for two construction of Alternate Highway Barrages between Yellampally- from Melli to Singtam Medigadda as well as the other reservoirs to increase its capacity and (xiii) Tamil Nadu its integration with Kaleshwaram Lift Irrigation scheme

155

 Integrated Rajiv Gandhi-Indira support to legal consultant of Gandhi -Dummugudem Project WBSEDCL  Engagement of consultant for the (xv) Uttrakhand work of "Renovation/Modernization  Lender’s Engineer for THDC Pumped of Navigational lock at Farakka under Storage HE Project (4X250MW) Farakka Barrage Project"- Scoping  Condition Assessment & Feasibility Study Study for Sewerage / STPs  Extension of Short Term Measure infrastructure / bio-digester, Entry Study level Activities for repair and  Maintenance Dredging in Hooghly modernization including public Estuary in the shipping channel of amenities of ghats, river surface Kolkata Port cleaning, village drain treatment and modernization of crematoria – under (xviii) Delhi Namami Gange Programme  Appointment of Project Design &  Design Supervision Consultancy Management Agency (PDMA) for Bhimtal, Infrastructure Development Implementation of SMART grid Investment Program for Tourism infrastructure including Enhancing of  Detail Project Reports for Tourism Existing Network in NDMC Power component of Namami Gange Distribution Area  Concurrent Monitoring, Quality  Preparation of Manual on Storm Monitoring, Mid-term and Final Water Drainage System for CPHEEO, Evaluation of Accelerated Irrigation Ministry of Urban Development, Benefit Programme Government  Detailed Project Report for  Techno-Economic Appraisal of the Chandighat Project, Haridwar Detailed Project Reports of Infrastructure Project submitted by the (xvi) Uttar Pradesh State Government of North-Eastern  Monitoring & Evaluation Study for Region under NLCPR Scheme UPSLR-III Project  Pre-Feasibility Study for the Ground  Aquifer Mapping Project-Lalitpur and Water Recharge through Abandoned Jhanshi-Bundelkhand Mines pits in Bhatti Area & North  Drilling and Construction of Western Region, Delhi Jal Board Exploratory/Observation Well in Ballia district (xix) Pondicherry  Drilling and Construction of  PIA-Fisheries-Hiring of Consultancy Exploratory/Observation Well in Services for redesign & revising the Ghazipur district associated documents & drawings for Slipway at the Fishing Harbours of (xvii) West Bengal Puducherry & Karaikal  Providing Consultancy Services as local Consultant for Phase I & Phase (xx) Others II for Turga Pumped Storage Project  Engineering Measure for limiting (1000 MW) maximum water level at KAPP-3&4  Consultancy Services for Detailed below RL 50.3m - incorporating the Analysis & Preparation of Reports changes in the road alignment and pertaining to delayed completion of new bridge for Nuclear Power Hydro Power Project at TLDP-III, Corporation of India Ltd. NHPC and providing technical

156

 Two stage Detailed Project Report of Projects, Environmental Projects, Thermal Cluster -5 of Proposed 53 National Power Projects, Hydro-Electric Power Waterways Projects, Dams, Barrages & Canals,  Two stage Detailed Project Report of Tunnels & Underground Projects and Real proposed 4 Inland Waterways in the Estate Works. State of Gujarat and Maharashtra  Rural Electrification Corporation FINANCIAL STATUS Quality Monitors for Rural The authorized capital of the Electrification Works in 17 States corporation is Rs. 700 Crore and its Paid under DDUGJY XI/XII Plan up Capital is Rs. 94.53 Crore. The  Third Party Independent Evaluation Corporation achieved a turnover (total Agency (TPIEA-EA) Under income) of Rs. 1002 crore during 2015-16 Restructured Accelerated Power compared to previous year’s turnover Development And Reforms (total income) of Rs 1145.25 crore. The Programme in 12 States turnover during the year 2015-16 is anticipated amount to Rs. 1215 crore, NATIONAL PROJECTS whereas the turnover of Rs. 696 crore is CONSTRUCTION CORPORATION achieved up to December 2016. The net LIMITED (NPCC) worth of corporation is Rs 118.36 crore with profit of Rs 10.81 crore as on National Projects Construction 31.3.2016.

Corporation Limited (NPCC) was st established on 9th January 1957 as a The order book position as on 1 premier construction company to create January 2017 stand at Rs. 4487 crore. The necessary infrastructure for economic turnover of the Corporation during last five development of the country. NPCC ltd years and the achievement for the current comply with Quality management year 2016 - 17 is given below: requirements of ISO 9001-2008 for execution of Civil Works for Thermal & Hydro Electric Projects’, River Valley Projects, Industrial Structures, Project Management Consultancy services for buildings, Housings, Roads, Bridges and Infrastructure Projects. In its 60 years of existence the Corporation has successfully associated itself with completion of several National Projects from concept to commissioning stage. Some of them are in remote and hazardous location over the country. The corporation is making profit NPCC is executing projects for for the last six years and now has a various Ministries/ Govt. Departments/ positive net worth. Organizations as their “Extended engineering Arm” like MoRD, MHA, FIELDS OF SPECIALIZATION MoH, MoFPI, Banks, Ministry of NPCC’s fields of specialization AYUSH, Ministry of Youth Affairs & include: Townships & Other Residential Sports, Central Universities as well as Buildings, Institutional Buildings, Office State Governments. NPCC had added new Complexes, Roads, Bridges & Fly-Overs, clients like Indira Gandhi National Tribal Hospitals & Health Sector Projects, University, Amarkantak & Manipur, Industrial Structures, Surface Transport Ministry of Youth Affairs & Sports,

157

Municipal Corporations of Shimoga and Bagalkot, SC/ST Commission, Govt. of (i) Building Works Odisha, Karnataka, Container Corporation  Construction of New Building at of India Ltd, Central Warehousing Kolkata for NRIADD, Ministry of Corporation, National Bank for AYUSH Agriculture and Rural Development  Renovation and Modernization of (NABARD), Bank of Baroda etc. for its CWC (HQ) Sewa Bhawan, New Delhi value addition for infrastructure  Various works of Construction/Up development of country. gradation/ Renovation & Maintenance of IARI, Pusa Campus, New Delhi  Construction of Academic Block, Girls and Boys Hostels at Udhampur Campus of Jammu University  Works of Construction/Up gradation/ Renovation & Maintenance of Sports Authority of India, New Delhi  Construction of quarters for Container Corporation of India Ltd. at New Delhi and Jaipur (Rajasthan)

NPCC’s Corporate Office at Gurugram  Construction of Office building for Punjab and Sindh Bank, Ranjeet Nagar, New Delhi  Development of property for Bank of Baroda at Sion, Mumbai  Construction of Buildings for Rajiv Gandhi national Ground Water Training & Research Institute(RGI), Raipur (Chhattisgarh)  Construction of 3 Bed Room flats at Muthi (3 blocks of G+11 of 24 Units each) for Jammu Development Authority.  Construction of buildings for Indira Synthetic Hockey Turf & Automatic Sprinkler Gandhi National Tribal University System at Sai, Bengaluru Campus at Amarkanthak (M.P) and Manipur. STATUS OF MAJOR WORKS  Assam Rifles Quarters at different UNDER EXECUTION locations in the state of Nagaland, At present, the corporation is Arunachal Pradesh, Manipur, working at more than 140 projects spread Mizoram, Meghalaya, Tripura, Sikkim all over the country. These includes Indo & Assam. Bangladesh Border Fencing works in  Construction of Building in the state Tripura, Mizoram, Assam & Meghalaya, of Tripura. Assam Rifle works in different States of  Construction of Silver Jubilee Hall & North Eastern, Irrigation & River Valley Academic Block at NERIST, Itanagar Projects (Dolaithabi Barrage in Manipur),  Construction of five College of Hydroelectric Projects (Haithiari Power Central Agricultural University house in Uttrakhand) & other (CAU), Imphal at Nagaland, miscellaneous projects. Some of the major Mizoram and Tripura. projects are summarized below:-

158

 Development of infrastructure  Road and Drain Improvement works facilities for National Institute of at Bagalkote District. Karnataka Pharmaceutical Education and  New Hathiari Hydro Electric Project Research (NIPER), Hyderabad in Uttrakhand  Construction of three Nos. Ekalabya Model Residential School Building for ST&SC Development Department, Odisha  Construction of Swimming Pool, Hostel Building, Wrestling hall , Staff Qtrs. & allied works, Repair & Renovation work of SAI and Bharat Scouts & Guides works all over the country  Construction of godowns and Up- gradation of internal roads of CWC works at UP, Kolkata and Chhattisgarh Road and Drain Improvement Works at Bagalkote  Construction work of 2nd phase for work of Central Research Institutes (CRI) of CCRYN at Village INITIATIVE IN NORTH EASTERN Devarkhana- Distt Jhajhhar, Haryana STATES DEVELOPMENT and Nagamangala - Distt Mandya , NPCC is working in eight north- Karnataka eastern states for the last 35 years for developing the infrastructure and other  Permanent Administrative Building social amenities for the upliftment of for NERIST at Nirjuli, Itanagar socio-economy of the peoples of north  Construction of Bank Building at Plot eastern states. It is creating further national No.C-1 Vedvyas , Meerut (U.P.) integrity as Govt. has taken all the pain for  Development of property for Bank of security, safety & peaceful life of the Baroda at Sion, Mumbai people of these states. The details of such initiatives are covered under Section 9: (ii) Road Works & Other Projects Initiatives in the North East.  Indo Bangladesh Border fencing, road works and Border out post at Assam, Tripura, Mizoram, West Bengal and Meghalaya.  Flood lighting works of Indo Bangladesh Border Fencing in the States of Assam, Meghalaya and Tripura.  Assam Rifles Building works in North Eastern States- Assam, Tripura, Manipur and Nagaland. Indo-Bangladesh Border fencing work at  PMGSY Roads works in Bihar, Tripura Jharkhand, Uttar Pradesh and West Bengal.  Road and Drain Improvement works at Shimoga District, Karnataka

159

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

160

9. Initiatives In the North East

National Institute of Hydrology remote sensing and geographic information system The North Eastern Regional Centre (NERC), Guwahati catering for the seven CSMRS N-E States, Sikkim and parts of West Bengal (Teestha Basin) was established in CSMRS, in association with Water August 1988 at Guwahati and has been Resources Department (WR/MWRDA) of working for various water resources Meghalay, conducted a mass awareness problems of the region. Considering flood programme on “Jal Kranti Abhiyan” on as the major problem in the region, 22.12.2015 in the water scarce remote area Ministry of Water Resources, Govt. of of Mendipathar, Resubelpara, North Garo India decided to rededicate the Regional Hills District, Meghalaya. The program Centre towards service of the region and was organized to sensitize the people to renamed it as NIH Centre for Flood protect water bodies and water sources and Management Studies for the Brahmaputra to stop disposal of waste into rivers and Basin (NIH-CFMS). streams thereby making the water fit for human use and consumption. Other As per the five-year action plan of projects include: Doimukh HE Project, th 11 plan period, the centre had worked in Arunachal Pradesh, Kalej Khola H.E.P, the thrust areas of: (i) Flood estimation and Sikkim, Lower Kopili HE Project, Assam, routing; (ii) Structural / non structural Mawphu HE Project, Meghalaya, Rukni measures for flood management; (iii) Irrigation Project, Assam, Subansiri Integrated watershed management for Downstream Works Guwahati, Assam and flood control; (iv) Hydrological data base Tlawng Hydroelectric Project, Aizwal, management system; (v) Drainage Mizoram. congestion and erosion problems; (vi) Water quality problems; (vii) Socio- economic aspect of flood disaster; and (viii) Technology transfer activities. Keeping in view the importance of the above thrust area, the Centre proposed to continue the work in the above thrust area during the 12th plan period with more emphasis on pilot basin studies. During the

year under report, the Centre has been Discussion with members of Water Users working on the following studies: Associations  Flood Inundation Mapping using Rainfall-Runoff-Inundation (RRI) NPCC Model for Kulsi River Basin (Assam/Meghalaya) NPCC is working in eight north  Application of Universal Soil Loss eastern states for the last 35 years for Equation(USLE) model for estimation developing the infrastructure and other of soil loss in Kulsi River Basin using social amenities for the upliftment of

161 socio-economy of the peoples of North NPCC is building the Infrastructure Eastern States as detailed below: for Jawahar Navodaya Vidyalaya in the extreme difficult location of Lawngtalai (i) Indo-Bangladesh Border Fencing Lunglei, Kolasib in the state of Mizoram & and Road Works Bagmara of Meghalaya. NPCC has completed 585.38 Km of fencing works and 437.22 Km of Road (v) National Institute of Electronics & Works in the border areas of Indo- Information Technology (NIELIT) Works Bangladesh Border. NPCC is playing a major role for creating infrastructure for 10 extension (ii) Indo-Bangladesh Border Flood- centers and one Centre of NIELIT in the Lighting Works N.E. states of Mizoram, Nagaland, NPCC has taken Border Flood Manipur, Arunachal Pradesh, Meghalaya Light Work of 632.36Km in Tripura and and Assam. 485.370km in Meghalaya. The Border Flood Light is helping to BSF 24hrs vigil (vi) Assam Rifle Works- over insurgent groups & illegal migrant of NPCC has completed the building Bangladesh. works of more than 4 lakh Sq.m in total with 950 Km of Roads and 25 Km of Security Wall & Lighting for Assam Rifle.

(vii) Other activities for development of North Eastern States NPCC has constructed the barrages & other socio-economic development project with financial support from Japan International Cooperation Agency (JICA). Works carried out by NPCC cover: Gomti Hydro Project, Maharani Barrage, Khowai Indo-Bangladesh Border fencing along with Barrage, Manu Barrage, Kalashi Barrage, Flood lighting work Tripura Tribal Area Autonomous District Council works, Khuga Dam in Manipur, (iii) Border out Post work College of Fisheries under Central MHA (GoI) has awarded the Agriculture University, IGNOU Works, construction of BOP works in extreme Singda Dam, Loktak river valley project, difficult area of Tripura (50 Numbers), Dolaithabi river valley project etc. Mizoram (21), Assam (6), Meghalaya (17), and West Bengal (94) for monitoring the border activities by BSF. At present NPCC has completed 59 Border out Post.

(iv) Indira Gandhi National Tribal University (IGNTU) Works NPCC is involved in creating infrastructure & regional centre of IGNTU Manipur costing Rs. 66.0 crore, which is now completed. Border out Post for Border Security Force at Dupli Para, Meghalaya (v) Jawahar Navodaya Vidyalaya (JNV) Works

162

CGWB development and management in the North Eastern Region. Major achievements of the The Central Ground Water Board North Eastern Region in the year 2016-17 is conducting scientific and technical up to 31st December, 2016 are given studies for ground water assessment, below:

Major achievements of the North Eastern region Activities Achievements Field Activities for Aquifer Mapping:  Ground Water During financial year 2016-17 (up to31.12.2016), the Central Exploration Ground Water Board has constructed 14 wells (EW-9, OW-3 and PZ-2). However, 30 wells are likely to be achieved by 31.03.2017.  Geophysical Studies Central Ground Water Board has carried out 53 Vertical Electrical Soundings(VES) in various parts of NER. and the figures are likely to be achieved to 80(VES) by 31.03.2017.  Water Quality 1140 nos of water samples were analyzed for the basic Analysis constituents, heavy metals (such as Cu, Zn, Fe, Mn, CO, Cd, Cr, Ni, Pb etc. and 1300 Water Quality Analysis are likely to be achieved by 31.03.2017. Other Activities: Ground Water Regime Monitoring of water level from GWMS for the month of March, Monitoring August, November, 2016 completed. The monitoring of wells in January’ 2017 will be achieved by 31.3.2017. Short Term Water 35 nos. Short Term Water Supply Investigation has been carried Supply Investigation. out and about 50 nos. Short Term Water Supply Investigation are likely to be completed by 31.03.2017. Ground Water Resources Ground Water Resources Assessment (as on March, 2013) Assessment (No of completed in all 7 states. States/ UT) (As on 31- 03-2013) Preparation of State 3 State reports have been completed. Reports. Ground Water Year Ground Water Year Book of NE State Submitted Books

BRAHMAPUTRA BOARD of pamphlet, leaflet etc. (b) Specific emphasis on the need of Tribal by Brahmaputra Board being the nodal hoarding of banner and (c) Special organization for the North-East States is awareness meeting & On-the-spot Art going to conduct Mass Awareness competition in the states of Nagaland, activities on Water Conservation under Mizoram, Arunachal Pradesh and Tribal Sub plan (IEC activities). The Meghalaya will be conducted during activities are proposed like- (a) Preparation January & February 2016.

163

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

164

10. Administration Training and Governance

Establishment Matters Cell is also part of the Administration Section. Details of the activities of above The Administration Section of the Committee/ Cell are given in Section 14 Ministry is primarily responsible for the (Staff Welfare) of this Report. establishment, personnel and administrative matters of the officers and Implementation of Training Policy of staff of the Ministry (Proper). The section the Ministry is the Cadre Controlling Authority of posts borne on CSS/CSSS/CSCS sanctioned in Administration Division the Ministry (Proper), Central Water administers the Budget allocated under Commission and Central Soil & Materials ‘Training of Ministry of Water Resources, Research Station. RD & GR officers’ under HRD & Capacity Building Scheme. It is meant to Administration Section also train officers/ officials of the Ministry in handles other matters like filling up of reputed Institutions located in India and posts by Direct Recruitment/ Deputation/ abroad in different fields, induction Promotion, Termination of Probation, training on selection/ recruitment in the Confirmation, grant of financial Ministry. Officers/ officials are also upgradation under Modified Assured deputed on mid-career training at various Career Progression Scheme, release of levels/stages in their career as well as for annual increments, pay fixation, thematic training like leadership maintenance of Confidential Reports, development, stress management, ethics sanction of TA/ LTC advance, House and values, finance, administration, etc. Building Advance, Motor Car/ Scooter/ Cycle advances, GPF advance/ A total of 225 officers/officials of withdrawals, framing/ amendment of the Ministry were sent for training till Recruitment Rules, finalization of pension/ December 2016. In total 25 in-house family pension cases, leave of all kinds, trainings were organized in the Ministry forwarding of applications etc. Also deals for training employees on various topics with ISO Certification in respect of like Service Book maintenance, Administration & Ground Water & PP Reservation Roster, Noting/ Drafting, wing. Stress Management etc. by availing the expertise of in-house trainers as well as For prevention of sexual faculty from ISTM. harassment of women employees, a Committee is functioning under An amount of Rs. 2 crore was Administration Section to look into the allocated for training of Ministry of Water complaints of the women working in the Resources, RD & GR officers for the year Main Secretariat of the Ministry. The 2016-17 out of which Rs. 76 Lakhs have Scheduled Castes/ Scheduled Tribes and been utilized till 31.12.2016. Other Backward Classes (SCs/STs/OBCs)

165

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

166

11. Transparency

THE RIGHT TO INFORMATION The Coordination Section of ACT, 2005 Ministry of Water Resources, RD & GR, Room No. 19, B-wing, Ground Floor, The Right to Information Act, 2005 Shram Shakti Bhawan, Rafi Marg, New came into effect from 12.10.2005. As Delhi has been assigned the task of provided under Section 4(1) (b) of the Act, accepting applications and the fees under all the 17 manuals in respect of Ministry the RTI Act. The RTI petitions are (Sectt.) and its organizations were forwarded to the concerned CPIOs and the prepared and have been placed in the fees are deposited with the DDO, Ministry Ministry’s website of Water Resources, River Development http://www.mowr.gov.in. Appointment of and Ganga Rejuvenation. The requisite Central Public Information Officers fees for providing information under RTI (CPIOs) made in terms of section 5 (1) and Act, 2005 can be paid either through (2) of the said Act and hosted in the Demand Draft/ Postal Order issued in website of the Ministry and concerned favour of Pay & Account Officer, Ministry organizations. of Water Resources, River Development and Ganga Rejuvenation or by cash.

167

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

168

12. Role of Women in Water Resources Management

Role of women in water resources in management of water resources. Water management and conservation has been Users’ Associations can contribute duly recognized. The National Water significantly in this regard and bring in a Policy while stressing on participatory new culture among the water users. approach in water resources management, specifically provides for necessary legal and institutional changes to be made at various levels for the purpose of ensuring appropriate role for women.

In pursuance of the provisions in the National Water Policy, farmers are to be involved progressively in various aspects of management of irrigation systems, particularly in water distribution Women make significant contribution to and collection of water charges. The the agriculture labour force Ministry of Water Resources, while issuing guidelines, specifically emphasized In recent past, some of the States, that the States consider representation of such as Madhya Pradesh have attempted to women in the Water Users’ Associations ensure that all farm owners, be it men or (WUAs) at all levels. As a result, many women, are made rightful members of the States have amended their Irrigation Acts outlet committees. Efforts have also been or came out with Specific Acts on made to ensure that where there are no Participatory Irrigation Management. women members, at least one woman from

the area must be taken even if she is not a Considering the importance of land owner. Further, at least one woman women in terms of their numerical strength shall be nominated to the Governing Body and the significant contribution they make of the Association. to the agricultural labour force, there is a need to encourage participation of women

169

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

170

13. Progressive use of Hindi

Effective measures have been taken Ministry as well as in its various offices for progressive use of Hindi for official and pinpointed shortfalls in relation to purposes in various sections and attached targets prescribed by Department of and subordinate offices of the Ministry Official Language. The measures were during the year. Efforts were also made to also suggested for removal of the ensure compliance of various orders/ shortfalls. instructions issued by the Department of Official Language. In order to encourage the use of Hindi in the official work of the Ministry, The Second Sub-Committee of messages and appeal were issued by the Parliamentary Committee on Official Hon'ble Union Minister of Water Language inspected 8 offices of the Resources, River Development & Ganga Ministry of Water Resources, River Rejuvenation , Hon'ble Minister of state Development & Ganga Rejuvenation viz. for Water Resources, River Development (1) Central Ground Water Board, Division- & Ganga Rejuvenation and Secretary, 14, Bengaluru; (2) Narmada Central Ministry of Water Resources, River Board, Indore; (3) Central Soil and Development & Ganga Rejuvenation on Material Research Station, New Delhi; (4) 29.08.2016 and 31.08.2016 respectively. Hydrology Observation Circle, Dhanbad; (5) Central Ground Water Board, Hindi Fortnight was organized in Chandigarh; (6) Central Ground Water the Ministry from 01.09.2016 to Board (Regional Office). During these 15.09.2016. The competitions like inspections the parliamentary Committee Rajbhasha Quiz, Hindi Noting & Drafting, on Official Language suggested various Hindi Essay, Hindi Typing, Hindi Essay measures for progressive use of Hindi. (only for MTS and equivalent), Hindi Debate and Hindi Poetry Recitation were Ministry’s Hindi Advisory organized. Officers and employees of the Committee constituted under the Ministry enthusiastically participated in chairmanship of Hon’ble Minister, these competitions. First, Second and Ministry of Water Resources, River Third prizes of Rs. 4000/-, Rs.2500/ and Development and Ganga Rejuvenation Rs. 1500/- respectively were given to held its meeting on 19.07.2016 and winners of each of these competitions. 19.10.2016. There was also provision of four consolation prizes of Rs. 1000/- for each of The meetings of Official Language these competitions. The prizes were given Implementation Committee of the Ministry to 51 meritorious participants. under the Chairmanship of Economic Advisor and In-charge Official Language, Incentive Schemes like, ‘Rajbhasha Ministry of Water Resources, River Vaijayanti Puraskar Yojana’ and Development & Ganga Rejuvenation have ‘Incentive Scheme for doing work in been convened regularly. In these Hindi’ were implemented in the Minstry meetings, the Committee reviewed the for Promoting the Implementation of progress made in the use of Hindi in the Official Language Policy. ‘Rajbhasha

171

Vaijayenti Puraskar Yojana’ is for Development and Ganga Rejuvenation promoting the Hindi work in Attached and Hindi workshop was organized on Subordinate Organizations of the Ministry. 29.06.2016 and 30.06.2016 to fill quarterly The winners are selected after evaluating report properly and on problem of total work in Hindi of the Organization. computer Hindi (Unicode) typing and its The Office, Which gets first prize, is given solution in which 27 and 23 officers and Shield and certificate; second and third employees participated. On 27.12.2016, a prize winning offices are given cups and Hindi workshop was organized for the Certificates. Under ‘The incentive scheme officers and employees of the Ministry of for doing work in Hindi’ provision has Water Resources, River Development and been made to give cash awards each year Ganga Rejuvenation, on ‘noting drafting in to the officers and employees on the basis government work – theoretical of the work done by them in Hindi. considerations and practical training’ in which 14 officers and employees For the Officers and employees of participated. the Ministry of Water Resources, River

172

SWACHHATA PAKHWADA 2016-17

173

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

174

14. Staff Welfare

The Administration Section of the The Cell is regulating and Ministry is primarily responsible for the monitoring the status of filling up the establishment, personnel and backlog vacancies for SCs/ STs/ OBCs in administrative matters of the officers and its attached/subordinate offices and taking staff of the Ministry (Proper). The section corrective measures wherever found is the Cadre Controlling Authority of posts necessary. Liaison Officer carries out borne on CSS/ CSSS/ CSCS sanctioned in inspections in respect of Attached/ the Ministry (Proper), Central Water Subordinate offices for supervising/ Commission and Central Soil & Materials rectifying deficiencies for correct Research Station. implementation of reservation roster.

Administration Section also COMPLAINT COMMITTEE ON handles other matters like filling up of SEXUAL HARASSMENT OF posts by Direct Recruitment/ Deputation/ WOMEN EMPLOYEES Promotion, Termination of Probation, Confirmation, grant of financial up In Compliance with the guidelines gradation under Modified Assured Career laid down by the Hon’ble Supreme Court Progression Scheme, release of annual of India on prevention of sexual increments, pay fixation, maintenance of harassment of women employees, a Confidential Reports, sanction of TA/LTC Committee is functioning to look into the advance, House Building Advance, Motor complaints of the women working in the Car/ Scooter/ Cycle advances, GPF Main Secretariat of the Ministry. The advance/ withdrawals, framing/ composition of the Committee is as below: amendment of Recruitment Rules, finalization of pension/ family pension i) Smt. Bindu Sreedathan, Director cases, leave of all kinds, forwarding of (Chairperson) applications etc. ii) Shri A.K. Kaushik, Under Secretary (Member) MONITORING OF RESERVATION iii) Smt. Mamta Sharma, Section FOR SCs/ STs/ OBCs Officer (Member) iv) Representative of Nari Raksha The Scheduled Castes/Scheduled Samiti, NGO (Member) Tribes and Other Backward Classes (SCs/STs/OBCs) Cell also forms part of The Complains Committee shall be Administration Section. It renders deemed to be the Inquiring Authority secretarial assistance to Liaison Officers appointed by the Disciplinary Authority for SCs/STs and OBCs in discharging the for the purpose of CCS (CCA) Rules, 1965 functions on various matters relating to and its reports are to be treated as Inquiry reservation for SCs/STs/OBCs in Report. It will examine the complaints Government Services and carrying out made against sexual harassment by women inspections of reservation rosters. employee(s) and, if necessary, conduct an enquiry. On completion of the same, the Committee will submit its findings to the

175

Joint Secretary (Admn), Ministry of Water has been designated as Director (Public & Resources, RD & GR for further necessary staff Grievances) and all grievances are to action. be disposed off within a period of 60 days. Most of the grievances received are related During the year ending 31st to service matters, payment of pensionary December, 2016, one complaint was benefits, programmes undertaken by received by the Committee on the Ministry etc. Further, Centralized Public recommendations of National Commission Grievance Redress and Monitoring System for Scheduled Casts. The Committee has (CPGRAMS) software developed by agreed unanimously that the allegations do Deptt. of AR & PG, is regularly monitored not fall under the ambit of sexual in the Ministry. harassment and is outside the purview of the Committee. Similar Committees have During the period from 1st January, already been constituted in the 2015 to 31st December, 2015, a total organizations under this Ministry. number of 5168 grievance petitions were received in this Ministry. Besides, 136 REDRESSAL OF PUBLIC/ STAFF grievance petitions were carried forward GRIEVANCES which were pending at the end of 31st December, 2014. Out of total 5304 A Grievances Redress Cell was set grievance petitions, 4508 were settled up in the Ministry of Water Resources, RD during the above period. A list of postal & GR which entertains the grievances of addresses of Public/Staff Grievance employees/officers working in various officers in the Ministry and its various organizations under the Ministry. Shri organizations is at Annexure-VII. Banarsi Ram, Deputy Secretary (Coord.),

176

SWACHHATA PAKHWADA 2016-17

177

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

178

15. Vigilance

The Vigilance matters relating to the organizations under the Ministry this Ministry and its Subordinate through periodical returns prescribed by organizations are handled by the Vigilance CVC, DoPT, etc. The Division prepares Division of this Ministry, which functions the “List of officers of Doubtful Integrity” under the guidance, supervision and and the “Agreed List” in consultation with control of a part time Chief Vigilance CBI. Officer of the level of Joint Secretary assisted by a Deputy Secretary and the This year, Vigilance Awareness Vigilance Section. Various aspects Week was observed from 26th October, pertaining to Vigilance cases of all the 2015 to 31st October, 2015. Various employees of the Ministry (Proper) and all competitions were held which received Group A and retired Officers of the wide participation from the employees. attached/subordinate offices as well as Preventive Vigilance Inspection of one Group-A Officers of other Organizations organisation under the purview of the under the Ministry, including PSUs are Ministry has been carried out so far during dealt with by the Division. the year 2015-16 and it is proposed to conduct two more preventive inspection The Vigilance Division functions during the next three months of this as a link between the Ministry and the Financial Year with a view to check Central Vigilance Commission and other various irregularities and identify Authorities in the matters pertaining to corruption prone areas. Vigilance. This Division tenders advice, wherever required, on vigilance matters, to The Vigilance Division is also the Attached and Subordinate Offices, responsible for calling for the Annual PSUs, Statutory Bodies etc. under the Property Returns of all Officers/Officials administrative control of the Ministry, in of Group „A‟,„B‟ and „C‟ including consultation with CVC and other agencies/ erstwhile Group „D‟ Staff and monitoring departments. them. Annual Property Returns for the year ending 2015 are being collected and This Division monitors the recorded and after the returns are received, disciplinary cases and related matters of the same will be computerized.

179

MINISTRY OF

WATER RIVER GANGA RESOURCES DEVELOPMENT REJUVENATION

Priceless Water

Annual Report 2016-17

Priceless Efforts

180

16. Appointment of Persons of Special Needs

MONITORING OF RESERVATION Needs are given facilities, concessions and FOR PERSONS WITH relaxations at the time of test/ interview as SPECIAL NEEDS per the rules on the subject matter. The posts identified to be filled up by the Monitoring of the recruitment of Persons with Special Needs in Groups A, persons with Special Needs is being done B, C & D categories as per the revised list to ensure fulfillment of 3% quota for the of posts notified by the Ministry of Social category by the Ministry as well as various Justice and Empowerment, are filled up as organisations under it. Periodic reports on per the requirement of the different offices the progress made are being sent regularly under this Ministry. to the Ministry of Social Justice & Empowerment. Accordingly, 3% of The relevant reservation rosters as posts/vacancies (1% each for Orthopedics, prescribed by the Government are also Blind & Hearing Handicapped) are maintained for planning the reservation of reserved to be filled up from Persons with Persons with Special Needs. Special Needs. The Persons with Special

181

SWACHHATA PAKHWADA 2016-17

182

Annexure – I

Organizational Chart of MoWR, RD & GR

Annexure – II

STAFF IN POSITION IN THE MINISTRY OF WATER RESOURCES, RD &GR

AS ON 31.12.2016

Group A Group B Group C

Gazetted Non-Gazetted

Total SC ST PH OBC Total SC ST PH OBC Total SC ST PH OBC Total SC ST PH OBC

96 18 8 - 12 60 10 3 - - 120 21 3 6 18 153 54 4 3 28

Annexure – III

List of Names & Addresses of Senior Officers & Heads of Organisations under the Ministry of WR, RD & GR

S. No. Name of the Organisation Head of the Organisation

1. Government of India Dr. Amarjit Singh, Ministry of Water Resources, Secretary Room No. 412, IV Floor, Tel No. 23710305, 23715919 Shram Shakti Bhavan, Fax. 23731553 Rafi Marg, New Delhi.

2. Government of India Shri. Ministry of Water Resources, Additional Director General (Stat)

Room No. 6, 2nd Floor, Tel No. 24691080 Fax. 24691080 B wing, Lok Nayak Bhawan, Khan Market, New Delhi.

3. Government of India Shri. Akhil Kumar, Ministry of Water Resources, Joint Secretary (Admn.&GW) Room No. 403, IV Floor, Tel No. 23710343 Shram Shakti Bhavan, Fax. 23730719 Rafi Marg, New Delhi.

Government of India Dr. M. Satyanarayana, 4. Ministry of Water Resources, Adviser (C&M/NWM) Room No.220, 2nd Floor, Tel No. 24366614 Block No.3,CGO Complex, Fax. 24366614 Lodi Road, New Delhi.

Government of India Shri., Sanjay Kundu Ministry of Water Resources, Joint Secretary (PP), 5. Room No. 404, IV Floor, Tel No. 23711946 Fax. 23711946 Shram Shakti Bhavan, Rafi Marg, New Delhi.

Government of India Shri Jagmohan Gupta, 6. Ministry of Water Resources, Joint Secretary & Financial Adviser Room No. 401, IV Floor, Tel No. 23710297 Shram Shakti Bhavan, Fax. 23710297 Rafi Marg, New Delhi.

Government of India Shri K Vohra, 7. Ministry of Water Resources, Commissioner (SPR) Room No. 411, IV Floor, Tel No. 23710107 Shram Shakti Bhavan, Fax. 23350051 Rafi Marg, New Delhi.

Government of India Shri J. Chandrashekhar , Ministry of Water Resources, Commissioner (Flood Management) th Room No. 827, 8 Floor, Tel No. 24368238 CGO Complex, Lodi Road, Fax. 24362780 New Delhi-110 001

Government of India Shri T.S. Mehra, Ministry of Water Resources, Commissioner (B&B) Room No. 204, 2nd Floor, Tel No. 24364724 CGO Complex, Lodi Road, Fax. 24367093 New Delhi-110 001

Government of India Ministry of Water Resources, Shri P.K. Saxena, Room No. 814, 8th Floor, Commissioner (Indus) CGO Complex, Lodi Road, Tel No. 24361540 New Delhi-110 001 Fax. 24361540

Government of India Shri Sanjay Kundu, Ministry of Water Resources, Commissioner (Pen. River) Room No. 236, 2nd Floor, Tel No. 23382256 A wing, Krishi Bhavan, Fax. 23382256 Rafi Marg, New Delhi-110 001

Government of India Ministry of Water Resources, Shri K.M.M. Alimalmigothi, Room No. 7, Ground Floor, Economic Adviser Shastri Bhavan, Tel No. 23383078 Dr. Rajendra Prasad Road, Fax. 23383078 New Delhi-110 001

Government of India Ministry of Water Resources, B.K. Pillai Room No. 236, Krishi Bhavan, Commissioner CAD New Delhi-110 001 Tel No. 23382256 Fax. Government of India Ministry of Water Resources, Room No. 235, II Floor, Shri Joginder Singh, Block III CGO Complex, Adviser Technical Lodhi Road Tel No. 24369170 New Delhi-110 003 Fax.

Government of India Shri U.P. Singh, Ministry of Water Resources, Director General (NMCG) 3rd Floor,MDSS Blg., Tel No. 23072900 Rear wing 9, CGO Complex, Fax. 23049566 Lodi Road, New Delhi-110001 Attached Offices 1. Central Water Commission, Shri., Room No. 326, Sewa Bhawan, Tel. No.26715351 R.K. Puram, New Delhi Fax: 26108614 2. Central Soil and Materials Shri. Hasan Abdullah, Director Research Station, Tel. No. 26961894, 26967985 Room No. 111, Hauz Khas, Fax: 26967985 New Delhi-110016 Subordinate Offices 3. Farakka Barrage Project, Shri A.K. Singh, P.O. Farakka Barrage, General Manager Distt. Murshidabad-742212 Tel. No. 03485-253644 (W.B.) Fax: 03485-253608

4. Ganga Flood Control Shri, Arun Kumar Sinha, (Member Commission, Planning CWC) Chairman, Sinchai Bhawan, III floor, Addl. Charge, Patna-800015 Tel. No. 0612-2217294 Fax: 0612-2217960

5. Central Water and Power Shri M.K. Sinha, Director Research Station, Tel. No. 020-24380552 P.O. Khadakwasla, Fax: 020-24381004 Pune-411024

6. Central Ground Water Board, Shri K.B. Biswas, Chairman Jamnagar House, New Delhi Tel. No. 0129-2477100 Fax: 0129 2477200

7. Bansagar Control Board, Shri T.D. Sharma, Secretary Samab Colony, Tel. No. 07662-226318 Rewa (Madhya Pradesh) Fax : 07662-242433

8. Sardar Sarovar Construction Shri Gulshan Raj, Advisory Committee, Secretary Narmada Bhawan, Tel. No. 0265-2421438 A Block, IV Floor, Fax 0265-2437262 Vadodara-390001 9. Upper Yamuna River Board Shri S. Masood Husain, Chairman, 201, “S”, Sewa Bhawan, R.K. Addl. Charge Puram, New Delhi-110016 Tel. No. 26108590 Fax: 26195289 Public Sector Undertakings 10. Water and Power Consultancy Shri R.K. Gupta, Services (India) Limited, 5th Chairman Floor, „Kailash‟, 26, Kasturba Tel. No.23313881 Gandhi Marg, New Delhi- Fax: 23314924

11. National Projects Construction Shri H.L. Chaudhary, Chairman & Corporation Limited, Plot No.67- Managing Director, 68, Sector-25, Faridabad Tel. No. 0129-2231269 (Haryana) Fax : 0129-26484842

Autonomous National Institute of Hydrology, Dr. R.D. Singh, Director Bodies Jal Vigyan Bhawan, Roorkee- Tel. No. 01332-272106 12. 247667 (Uttarakhand) Fax: 01332-272123/273976

13. National Water Development Shri S. Masood Husain, Director Agency, 18-20, Community General Centre, Saket, New Delhi-110017 Tel. No. 26519164 Fax: 26513846

Statutory Bodies Narmada Control Authority, Dr. M.K. Sinha, Executive Member 14. Narmada Sadan Sec-B, Scheme Tel. No. 0731-2557276 No.74-C, Vijay Nagar, Indore- Fax : 0731-2559888 452010

15. Brahmaputra Board, Basistha, Shri Sanjay Kundu, Chairman Guwahati Addl. charge Tel. No. 0361-2301099 Fax 0361-2301099

16. Betwa River Board, Nandanpura, Sh. V.K. Gupta, Chief Engineer Jhansi-284003 Tel. No. 0510-2480210 Fax : 0510-2480749

17. Tungabhadra Board, Tungabhadra Shri R.K. Gupta, Chairman Dam, Taluk: Hospet, Tel. No. 040-29808740 Distt:Bellary, Karntaka State, PIN Fax 040-29808742 : 583225

Annexure – IV

BE, RE & Actual Expenditure under Plan schemes during 2015-16 & 2016-17

Group/ Scheme Component Actuals BE RE Exp. upto 31.12.2016 2015- 2016-17 2016-17 16

I. Major Irrigation Projects

1. Polavaram Multipurpose Project 400.00 100.00 100.00 100.00

2. Farakka Barrage Project 72.61 80.00 65.00 38.23

3. Dam Rehabilitation & Improvement Programme 14.32 23.98 45.00 15.72

4. Water Project of NCT 0.00 0.02 0.00 0.00

Total: Major Irrigation Projects 486.93 204.00 210.00 153.95

II. Namami Gange

1. National Ganga Plan 1000.00 2150.00 1440.50 1440.50

2. Ghat Works for Beautification of River Front 100.00 100.00 67.00 67.00

Total: Namami Gange 1100.00 2250.00 1507.50 1507.50

III. River Basin Management

1. National Water Mission 6.74 25.00 5.00 3.29

2. River Basin Management 159.02 173.60 175.00 111.41

3. Flood Forecasting 35.56 60.00 42.00 30.34

4. Interlinking of rivers 0.00 1.00 0.01 0.00

Total: River Basin Management 201.32 259.60 222.01 145.04

IV. Water Resource Management

1. Development of Water Resources Information System 56.20 84.87 70.00 57.14

2. Ground Water Management and Regulation 138.57 303.39 115.00 85.51 3. National Hydrology Project 0.70 165.00 54.93 1.64

4. Research and Development Water Resources 41.72 55.00 35.00 28.72

5. Irrigation Management Programme 0.00 0.01 0.01 0.00

6. HRD/Capacity Building Programme 18.44 32.00 16.00 14.54

7. infrastructure Development 7.45 20.00 10.00 2.24

Total: Water Resource Management 263.08 660.27 300.94 189.79

V. Pradhan Mantri Krishi Sinchai Yojana: AIBP and PMKSY (HKKP) (State/UT Plan)

1. Accelerated Irrigation Benefit Progamme (AIBP) 2998.77 1000.00 999.87 999.86

2. PMKSY (Har Khet Ko Pani) 1498.86 500.00 420.89 420.88

3. Impact Assessment Studies of 0.04 AIBP Projects 1.00 0.05 0.02

4. Flood Management Programme 0.00 150.00 150.00 149.99

5. River Management Activities and 190.21 200.00 61.74 16.27 works related to Border Areas

6. Irrigation Census 9.82 25.13 15.00 13.01

Total: Pradhan Mantri Krishi Sinchai Yojana: AIBP and PMKSY (HKKP) (State/UT Plan) 4697.70 1876.13 1647.55 1600.03

VI. National River Conservation Plan 532.00 250.00 167.50 167.50

Grand total: (I-VI) 7281.03 5500.00 4055.50 3763.81

Annexure – V

BUDGET AT A GLANCE (SECTOR-WISE) (Rupees in crore)

Sl. Sector/ Organisation/ Actuals 2015-16 BE 2016-17 RE 2016-17 No. Scheme

Plan Non- Plan Non- Plan Non- Plan Plan Plan

1. 2. 3. 4. 5. 6. 7. 8.

I. Establishment Expenditure of the Centre

1.Secretariat Economic Services

1. Ministry of Water Resources 0.00 43.54 0.00 48.00 0.00 50.96 - Secretariat

2. Krishna Water Dispute 0.00 2.49 0.00 2.60 0.00 2.20 Tribunal

3. Cauvery Water Dispute 0.00 1.91 0.00 2.80 0.00 1.68 Tribunal

4. Ravi-Beas Waters Tribunal 0.00 0.39 0.00 0.68 0.00 0.46

5. Vansadhara Water Dispute 0.00 3.83 0.00 4.52 0.00 3.90 Tribunal

6. Mahadayi Water Dispute 0.00 2.58 0.00 3.10 0.00 2.50 Tribunal

Total: 0.00 54.74 0.00 61.70 0.00 61.70

Attached, Subordinate and Other Offices

1. Central Water Commission 0.00 261.56 0.00 312.90 0.00 312.00

2. Central Water and Power 0.00 45.54 0.00 52.24 0.00 52.00 Research Station

3. Central Soil and Material 0.00 11.63 0.00 12.37 0.00 12.37 Sl. Sector/ Organisation/ Actuals 2015-16 BE 2016-17 RE 2016-17 No. Scheme

Plan Non- Plan Non- Plan Non- Plan Plan Plan

1. 2. 3. 4. 5. 6. 7. 8.

Research Station

4. Sardar Sarovar Construction 0.00 0.78 0.00 1.00 0.00 1.00 Advisory Committee

5. Bansagar Control Board 0.00 0.33 0.00 0.40 0.00 0.40

6. Upper Yamuna River Board 0.00 2.33 0.00 2.40 0.00 2.40

7. Central Ground Water Board 0.00 147.13 0.00 171.80 0.00 172.00

8. National Institute of 0.00 15.43 0.00 19.00 0.00 19.00 Hydrology

Total: 0.00 484.73 0.00 572.11 0.00 571.17

II. Central Sector

1. National River Conservation 532.00 0.00 250.00 0.00 167.50 0.00 Programme

2. Namami Gange – National 1000.00 0.00 2150.00 0.00 1440.50 0.00 Ganga Plan

3. Ghat Works for 100.00 0.00 100.00 0.00 67.00 0.00 Beautification of River Front

Total: 1632.00 0.00 2500.00 0.00 1675.00 0.00

Major Irrigation Projects

1. Polavaram Multipurpose 400.00 0.00 100.00 0.00 100.00 0.00 Project

2. Farakka Barrage Project 72.61 41.55 80.00 63.40 65.00 63.13

3. Emergent Flood Protection 0.00 0.00 0.00 3.00 0.00 3.00 Sl. Sector/ Organisation/ Actuals 2015-16 BE 2016-17 RE 2016-17 No. Scheme

Plan Non- Plan Non- Plan Non- Plan Plan Plan

1. 2. 3. 4. 5. 6. 7. 8.

Works in Eastern and Western Sectors

4. Water Projects for National 0.00 0.00 0.02 0.00 0.00 0.00 Capital Territory

5. Dam Rehabilitation and 14.32 0.00 23.98 0.00 45.00 0.00 Improvement Programme

Total: 486.93 41.55 204.00 66.40 210.00 66.13

River Basin Management

1. National Water Mission 6.74 0.00 25.00 0.00 5.00 0.00

2. River Basin Management 159.02 0.00 173.60 0.00 175.00 0.00

3. Flood Forecasting 35.56 0.00 60.00 0.00 42.00 0.00

4. Interlinking of Rivers 0.00 0.00 1.00 0.00 0.01 0.00

Total: 201.32 0.00 259.60 0.00 222.01 0.00

Water Resources Management

1. Development of Water 56.20 0.00 84.87 0.00 70.00 0.00 Resources Information System

2. Ground Water Management 138.57 0.00 303.39 0.00 115.00 0.00 and Regulation

3. National Hydrology Project 0.70 0.00 165.00 0.00 54.93 0.00

4. Research and Development 41.72 0.00 55.00 0.00 35.00 0.00

5. Irrigation Management 0.00 0.00 0.01 0.00 0.01 0.00 Sl. Sector/ Organisation/ Actuals 2015-16 BE 2016-17 RE 2016-17 No. Scheme

Plan Non- Plan Non- Plan Non- Plan Plan Plan

1. 2. 3. 4. 5. 6. 7. 8.

Programme

6. HRD/ Capacity Building 18.44 0.00 32.00 0.00 16.00 0.00 Programme

7. Infrastructure Development 7.45 0.00 20.00 0.00 10.00 0.00

Total: 263.08 0.00 660.27 0.00 300.94 0.00

III. Centrally Sponsored

Pradhan Mantri Krishi Sinchai Yojana and other Schemes

1. Accelerated Irrigation 2998.77 0.00 1000.00 0.00 999.87 0.00 Benefit Program

2. Pradhan Mantri Krishi 1498.86 0.00 500.00 0.00 420.89 0.00 Sinchai Yojana: Har Khet Ko Pani

3. Impact Assessment Studies 0.04 0.00 1.00 0.00 0.05 0.00

4. Assistance for Sutlej Yamuna 0.00 0.00 0.00 1.00 0.00 1.00 Link Canal Project

5. Flood Management 0.00 0.00 150.00 0.00 150.00 0.00 Programme

6. River Management Activities 190.21 0.00 200.00 0.00 61.74 0.00 and Works Related to Border Areas

7. Irrigation Census 9.82 0.00 25.13 0.00 15.00 0.00

8. National Ground Water 0.00 0.00 0.00 0.00 0.00 0.00 Management Improvement Scheme Sl. Sector/ Organisation/ Actuals 2015-16 BE 2016-17 RE 2016-17 No. Scheme

Plan Non- Plan Non- Plan Non- Plan Plan Plan

1. 2. 3. 4. 5. 6. 7. 8.

Total: 4697.70 0.00 1876.13 1.00 1647.55 1.00

Grand Total: 7281.03 581.03 5500.00 701.21 4055.50 700.00

Annexure – VI

List of Central Public Information Officers / Appellate Authorities in the Ministry

S.No. Name & Designation of Name of the Section/ Name & Designation of the CPIO appointed Desk/ work Appellate Authority appointed (S/Shri/Smt) (S/Shri/Smt/Kum)

1. A.K. Kaushik, Under Administration Section & Secretary (Admn) SC/ST/OBC Cell/cash Tel. No. 23738126 Section Email id: usadmn [email protected] Surender Kumar Garg, DS 2. R.K. Ojha, Under General Administration & (Admn, GA and Cash) Secretary (GA) CR Sections Tel. No. 23708150 Email id : dsadmn- Tel. No. 23710303 [email protected] Email id: [email protected]

3. Ashok Kumar Gupta, e-Governance Cell Under Secretary (e- Gov.)

Tel. No. 23714350

Email id: [email protected]

4. Arun Kumar, Under Coordination Section Secretary (Coord) Banarsi Ram, DS (Coord & Tel. No. 23716894 ID) Tel. No. 23716747 Email id: uscoord- [email protected] Email id : dscoord- [email protected] A. Ashok Kumar Gupta, Infrastructure Development Under Secretary (ID)

Tel. No. 23714350

Email id: [email protected] 5. R.N. Dixit, Under Secretary (E-III & Parliament) Chandan Mukherjee (E-III & Tel. No. 23766944 E-III & Parliament Parliament) Emai id: usparl Tel. No 23711459 Email id: [email protected] [email protected]

6. Ajay Kumar, Under Central Ground Water Secretary (CGWB) Board Desk Khatchin Langel, Dir (GWE Tel. No. 23711370 & E- Email id: usgw II) [email protected] Tel. No. 23714734

7. S.K. Kataria, Under Establishment-II Section Secretary (E-II) Tel. No. 23716928

Email id : use2- [email protected]

8. S.K. Kataria, Under Public Sector Undertakings L.B. Toulte, DS (PSU) Secretary (PSU & Section and PPP Cell Tel. No. 23382448 PPP) Tel. No. 23716928 Email id: [email protected]

9. Vigilance Section Ms. Surinder Kaur, Director Pratip Deb, Under (Vigilance & Estt) Tel. No. Secretary (Vig) Tel. No. 23716928 23711988 Email-id:usvig- Email id : direst- [email protected] [email protected]

B. Narendra Singh, Under E-I Section Ms. Surinder Kaur, Director Secretary (E-I) (Vigilance & Estt) Tel. No. 23711988 Tel. No. 237316928 Email id : direst- Email id: use1- [email protected] [email protected]

10. Vinod Kumar, Under Information, Education & Secretary (IEC) Communication Cell Ashok Gupta, Dir( GW & IEC) Tel. No. 23714350 Tel. No. 24363417 Email id: Email id : dirgw- [email protected] [email protected] 11 Anil Kumar Wahi, Ground Water Desk Under Secretary (GW) Tel. No. 23766907 Email id : usgw2- [email protected]

12 Mukesh Kumar, Under Secretary (EA External Assistance and & IC and O&M) L.B. Toulte, DS(EA & IC International Cooperation and Tel. No. 23074005 Desks including Foreign O&M) Email id: Training & Bilateral issues Tel. No. 23382448 [email protected] and O&M

13 B.L. Meena, Under Water Quality Issues Ravindra Singh, Director Secretary (B&B) (Water Quality)

Tel. No. 24367116 Tel. No. 24362133

Email id: Email id: wqcell- [email protected] [email protected]

14 Shraddha Mathur, Official Language Section M.C. Bhardwaj, Dy. Director Assistant Director (OL) (OL) Tel. No. 23711486 Tel. No. 24367106 Email id: [email protected] Email id : [email protected]

15 Avanish Kanth, Sr. Hydrology Project N.K. Manglik, SJC(NHP) Hydrogeologist Tel. No. 24367109

Tel. No. 24367081

Email id: [email protected]

16 B.L. Meena, Under Matters of Brahmaputra & Ajay Kumar Gupta, Sr. Joint . Secretary (B&B) Barak Wing Commissioner (B&B)

Tel. No. 24367116 Tel. No. 24367590

Email id: [email protected]

17 M.S. Sahare, Sr. Joint Flood Management Wing J. Chandrasekhar Iyer, Commissioner (FM) Commissioner (FM) Tel. No. 24392095 Tel. No. 24368238 Email id: mssahare- Email id: commer- [email protected] [email protected]

18 M.S. Verma, Sr. Joint Flood Management Wing J. Chandrasekhar Iyer, Commissioner (FM) Commissioner (FM) Tel. No. 24362160 Tel. No. 24368238 Email id: Email id: commer-

[email protected] [email protected] n

19. S.K. Basu, Under Policy and Planning S.K. Sharma, Sr. Joint Secretary (PP) Section Commissioner (PP) Tel. No. 23719627 Email id : uspp Tel. No. 23719503 [email protected] Email id: [email protected] 20. Vinod Kumar, Under

Secretary (E-IV) Matters related to NCA, Tel. No. 23714350 BCB, BRB, SSCAC, Email id: Tungabhadra Board and establishment matters of [email protected] NWDA 21. Ravi Sinha, CAD related matters B.R.K. Pillai, Director (CADWM) Commissioner(CAD) Tel. 23382481 Tel. No. 23382256 Email id: Email: [email protected] [email protected]

21 Pinki Pande, SO(BM) River Basin Management, Virender Sharma, Sr. JC Tel. No. 24368344 Administration of UP, (BM) Bihar, MP Reorganisation Tel. No. 24367109 [email protected] Act, Inter State Water Email id: sjcbm- Disputes Act, Inter State [email protected] Water Disputes Tribunal, technical matters of NWDA and Inter-linking of Rivers

22. Bisny Suresh Kumar, Project Section Bhupinder Singh, Sr. Joint Section Officr (Projects) Commissioner (SPR) Tel. No. 23711370 Tel. No. 23385186 Email id : project1- Email id: [email protected] [email protected]

23. Manoj Kumar S.K. Kamboj, Sr. JC (Pen. Sharvar, Under River) Secretary (Pen. Tel. No. 23388020 River) Peninsular River Wing Tel. No. 23383059 Email id: uspenriv- [email protected]

24. Kiran Pramanik, Minor Irrigation & Water K. Vohra, Commr (SPR) Sr. Joint Bodies Tel. No. 23710107 Commissioner (MI) Email id : commpr- Tel. No. 23387834 [email protected] Email id:

25. Rajveer Singh, DC Indus Wing Rakesh Kumar, Sr. JC (Indus) (Indus) Tel. No. 24360332 Tel. No. 24361467 Email id: dcindus- [email protected] [email protected] 26. Bindu Sreedathan, Director Om Prakash Gupta, (MI SEO (MI Stat) Stats) Tel. No. 24656135 Minor Irrigation Statistics Tel. No. 246496 Email id: Email id: dirmi- [email protected] [email protected] 27. Vijay Shrivastava, Under Secretary Manish Tripathi, Director (Finance) (Finance) Finance Wing – Finance Tel. No. 23719302 Tel. No. 23711360 Desks and Budget Section Email id: Email id: dirfin- vijayk.srivastava@nic [email protected] .in 28. S.K. Mohiddin, Scientist National Water Mission Joginder Singh, Advisor „C‟ (National Water (Tech) Mission) Tel. No. 24369170 Tel. No. 24362133 Email id: [email protected] Email id:

[email protected]

29. K.K. Sapra, US NMCG & NGRBA Nityanand Ray, Deputy (NMCG) Secretary (NMCG) Tel. No. 23049417 Tel. No. 23049506

30. K.N. Joshi, Assistant Matters related to Principal Controller of Accounts Office and Cash Accounts Section Tel. No. 23384843 31. Nafe Singh, Pay & Matters related to Pay &

Accounts Officer Accounts Office (FBP) (FBP) Tel. No. 03485- 253648

32. Sunita R. Shinde, Sr. Matters related to Pay & Accounts Officer Accounts Office (CWPRS) Anil Srivastava, Controller of (CWPRS) Accounts Tel. No. 020-24381813 Tel. No. 23386644 33. Balbir Singh, Sr. Matters related to Pay & Email id: [email protected] Accounts Officer Accounts Office (CGWB) (CGWB)

Tel. No. 0129-2410370

34. Upendra Malhotra, Matters related to Pay & Sr. Accounts Officer Accounts Office (CWC) (CWC) Tel No. 26012185

35. J.P. Singh, Sr. Accounts Matters related to Pay & Officer (CSMRS) Accounts Office (CSMRS)

Tel. No. 26850358

Note : In case work of any CPIO/ Appellate Authority is changed due to transfer/ retirement/ any other reasons and a new official joins in place of the existing CPIO/ Appellate Authority, he/ she would automatically be the CPIO/ Appellate Authority of the allotted work. In case any CPIO/ Appellate Authority proceeds on leave/ training, the concerned Link Officer or the officer who is entrusted with the charge of the post of the concerned Division/ Branch Head would automatically be the CPIO/ Appellate Authority of the allotted work.

Annexure-VII

The estimated fund requirement (Central Assistance as well as State share) for completion of 99 projects

Fund required for completion (Rs. in crore) Central Irrigation No. of Share Potential Category Projects (Rs. in Utilisation crore) (Lakh Ha.) AIBP CAD TOTAL

Priority-I projects 23 7956 5466 13423 6535 14.53 (Completion by 3/2017)

Priority-II projects 31 8080 4825 12905 4269 12.95 (Completion by 3/2018)

Priority-III projects (Completion by 45 32510 18757 51268 20538 48.55 12/2019)

TOTAL 99 48546 29049 77595 31342 76.03

Note: Figures mentioned as per information compiled /received from States. However, while processing CA proposals, the figures considered would be as per actual and therefore may change.

Annexure-VIII State wise summary of number of projects, their estimated balance cost, admissible Central Assistance and targeted potential utilization of 99 Projects (Rs. In crore) Balance CA Targeted No. of Projects Balance Balance State Sl. admissible Irrigation State Name cost as Share as on No. as on Potential Priority-I Priority-II Priority-III Total on 1.04.16 1/4/16 1/04/2016 (Th. Ha.) 1 Andhra Pradesh 8 8 1818 610.6 1207.6 263.3 2 Assam 2 1 3 832 307.3 525.0 124.9 3 Bihar 2 2 459 199.0 259.7 37.3 4 Chhattisgarh 3 3 715 199.0 516.1 47.6 5 Goa 1 1 44 26.3 17.6 14.5 6 Gujarat 1 1 8107 3685.7 4421.4 1792.0 7 Jammu & Kashmir 3 1 4 356 184.0 171.5 61.4 8 Jharkhand 1 1 3426 2232.8 1193.3 236.8 9 Karnataka 2 3 5 3185 1837.3 1347.4 252.8 10 Kerala 2 2 220 98.3 121.2 38.1 11 Madhya Pradesh 2 11 1 14 11732 3624.9 8107.3 872.6 12 Maharashtra 7 19 26 19950 5503.2 14446.6 850.8 13 Manipur 2 2 602 309.9 291.7 37.0 14 Odisha 1 2 5 8 4628 2299.6 2327.9 327.7 15 Punjab 2 2 363 143.7 219.3 92.0 16 Rajasthan 1 1 2 1564 733.3 830.9 315.6 17 Telangana 1 9 1 11 7666 4226.3 3439.8 585.1 18 Uttar Pradesh 1 3 4 11929 5120.8 6808.4 1653.0 TOTAL 23 31 45 99 77595 31342 46253 7603 Note: Figures mentioned as per information compiled /received from States. However, while processing CA proposals, the figures considered would be as per actual and therefore may change.

Annexure-IX

Completion of Priority projects during 2016-17

Sl. No. Project Name Targeted Project CAD Completion Target Irrigatio Complet n ion Potenti Target( al (Th. Month/ Ha.) Year) Andhra Pradesh 1 Maddigedda 1.42 Completed Completed Chhattisgarh 2 Maniyari Tank 14.52 Jun-17 Jun-18 3 Kharung 10.3 Mar-17 Jul-18 Karnataka 4 Sri Rameswar Irrigation 13.8 Jun-17 Jun-18 Madhya Pradesh 5 Sindh Project Phase II 162.1 Jun-17 Jun-18 6 Singhpur Project 10.2 Jun-17 Jun-18 7 Mahuar Project 13.78 Mar-17 Jun-18 8 Indira Sagar Project Canal Phase 33.14 Jun-17 - V (Khargone Lift ) Maharashtra 9 Bawanthadi (IS) 27.71 Jun-17 Jun-18 10 Lower Panzara 6.79 Mar-17 Jun-18 11 NandurMadhmeshwarPh-II 20.5 Jun-17 Jun-17 12 Dongargaon 2.77 Jun-17 Jun-17 Odisha 13 Upper Indravati(KBK) 85.95 Complete Completed d 14 Rukura-Tribal 7.65 Jun-17 Jun-17 Punjab 15 Kandi Canal Extension (Ph.II) 23.33 Jun-17 Not reqd as water made available upto 2.5 ha through underground pipelines 16 Rehabilitation of Ist Patiala 68.62 Jun-17 Already completed Feeder and Kotla Branch Project Telangana 17 Gollavagu Project 3.85 Jun-17 Jun-18 18 Rallivagu project 2.43 Jun-17 Jun-18 19 Mathadivagu Project 3.44 Jun-17 Jun-18 20 Peddavagu @ Neelwai 6.07 Jun-17 Jun-18 project 21 Palemvagu project 4.1 Jun-17 Jun-18 TOTAL 522.47

Annexure –X CA released during 2016-17 under AIBP

CA Release during 2016-17 (in State No of Projects Crores) Gujarat 961.878 1 Jharkhand 145.75 1 Karnataka 131.324 2 Madhya Pradesh 265.89 18 Maharashtra 361.32 23 Manipur 89.25 2 Odisha 308.2 8 Punjab 47.17 2 Rajasthan 45.9 2 Telangana 538.8 5 Uttar Pradesh 73.6 2 Total = 2969.082 66

Annexure –XI

State-Wise Funds Released under "Flood Management Programme" during XI and XII Plans till 31.12.2016 (Rs. in crore)

Sl. State Funds Funds Released During XIIth Plan Total No. Released 2012-13 2013-4 2014-5 2015-6 2015-7 Total Funds during (XIIth Released XIthPlan Plan) Arunachal 1 78.77 16.83 47.39 23.69 87.91 166.68 Pradesh 2 Assam 744.90 2.51 15.25 47.14 64.85 809.79 3 Bihar 680.79 54.48 88.57 24.92 16.67 184.64 865.43 4 Chattisgarh 15.57 3.75 3.75 19.32 5 Goa 9.98 2.00 2.00 11.98 6 Gujarat 2.00 0.00 2.00 7 Haryana 46.91 0.00 46.91 Himachal 8 165.31 19.92 9.75 115.20 27.00 50.00 221.87 387.18 Pradesh Jammu & 9 243.50 39.36 28.29 15.16 46.58 40.56 169.95 413.45 Kashmir 10 Jharkhand 17.07 4.27 4.27 21.34 11 Karnataka 20.00 0.00 20.00 12 Kerala 63.68 55.22 55.22 118.90 13 Manipur 65.03 0.95 16.96 6.45 24.36 89.39 14 Mizoram 3.40 1.46 0.47 1.93 5.33 15 Nagaland 28.96 15.45 13.08 2.51 23.13 54.17 83.12 16 Orissa 95.64 0.00 95.64 17 Puducherry 7.50 0.00 7.50 18 Punjab 40.43 0.00 40.43 19 Sikkim 82.86 2.43 5.72 8.15 91.01 20 Tamilnadu 59.82 0.00 59.82 21 Tripura 20.91 0.00 20.91 Uttar 22 290.69 45.42 30.48 21.83 13.50 111.22 401.91 Pradesh 23 Uttrankhand 49.63 53.14 43.82 57.02 153.98 203.61 West 24 642.87 9.49 128.81 7.84 12.61 158.75 801.62 Bengal Total 3476.21 193.85 379.00 320.23 264.00 149.99 1307.07 4783.28 Spilled over works of Xth 89.79 0.00 89.79 Plan Grand Total 3566.00 1307.07 4873.07

Annexure –XII

State-wise Details of Works completed and Area Protected Under Flood Management Programme during XIth Plan

Total Schemes Completed(As on date) Sl. Area protected in lakh ha State Population No Old Area New Area Nos. Total benefited in Lakh restored Protected Arunachal. 11 0.000 0.566 0.566 0.697 1 Pradesh 2 Assam 77 3.864 1.007 4.871 97.848 3 Bihar 26 10.237 0.285 10.522 70.920 4 Goa 1 0.000 0.002 0.002 0.150 5 J&K 8 0.900 0.000 0.900 0.000 6 Manipur 19 0.000 0.280 0.280 1.582 7 Nagaland 9 0.000 0.004 0.004 0.600 8 Orissa 60 1.474 0.082 1.556 7.202 9 Sikkim 21 0.000 0.201 0.201 2.397 10 Uttar Pradesh 6 0.442 0.096 0.538 4.005 11 Uttrankhand 3 0.000 0.001 0.001 0.053 12 West Bengal 7 0.087 0.063 0.150 11.810 13 Tripura 4 0.000 0.002 0.002 0.013 Total 252 17.004 2.589 19.593 197.277