NW-109 Wainganga-Pranahita River Final

Total Page:16

File Type:pdf, Size:1020Kb

NW-109 Wainganga-Pranahita River Final Final Feasibility Report National Waterway-109 Region V – Wainganga-Pranahita River Kaleshwaram to Chandapur (165.78km) SURVEY PERIOD: 30 MAY 2016 TO 03 JUL 2016 Volume - I Prepared for: Inland Waterways Authority of India (Ministry of Shipping, Govt. of India) A-13, Sector – 1, NOIDA Distt. Gautam Budh Nagar, Uttar Pradesh – 201 301 Document Distribution Date Revision Distribution Hard Copy Soft Copy INLAND WATERWAYS 9 Dec 2016 Rev – 0 01 01 AUTHORITY OF INDIA INLAND WATERWAYS 21 Apr 2017 Rev – 1.0 01 01 AUTHORITY OF INDIA INLAND WATERWAYS 01 Dec 2017 Rev – 1.1 04 04 AUTHORITY OF INDIA INLAND WATERWAYS 26 Oct 2018 Rev – 1.2 04 04 AUTHORITY OF INDIA ACKNOWLEDGEMENT IIC Technologies Ltd. expresses its sincere gratitude to IWAI for awarding the work of carrying out detailed hydrographic surveys in the New National Waterways in NW-109 in Region V – from Kaleshwaram to Chandapur village. We would like to use this opportunity to pen down our profound gratitude and appreciations to Shri Pravir Pandey, IA&AS, Chairman IWAI for spending his valuable time and guidance for completing this Project. IIC Technologies Ltd., would also like to thank, Shri Alok Ranjan, ICAS, Member (Finance), Shri Shashi Bhushan Shukla, Member (Traffic), Shri S.K. Gangwar, Member (Technical) for their valuable support during the execution of project. IIC Technologies Ltd, wishes to express their gratitude to Capt. Ashish Arya, Hydrographic Chief IWAI, Cdr. P.K. Srivastava ex-Hydrographic Chief and Shri SVK Reddy, Chief Engineer-I for their guidance and inspiration for this project. IIC Technologies Ltd, would also like to thank Sh. Rajiv Singhal, A.H.S., IWAI for his invaluable support and suggestions provided throughout the survey period. IIC Technologies Ltd, is pleased to place on records its sincere thanks to other staff and officers of IWAI for their excellent support and cooperation throughout the survey period. IWAI, Region V, Wainganga-Pranahita Final Feasibility Report Page i CONTENTS 1 Introduction........................................................................................................................ 4 1.1 Background................................................................................................................... 4 1.2 Tributaries / Network of Rivers / Basin ........................................................................ 5 1.3 State/ District through which river passes .................................................................... 6 1.4 Maps ............................................................................................................................. 6 1.4.1 Full course of the waterway...................................................................................... 6 1.4.2 Course of the waterway under study ........................................................................ 7 1.5 Scope of work ............................................................................................................... 7 2 Methodology Adopted to undertake Study ........................................................................ 8 2.1 Recce ............................................................................................................................ 8 2.2 Survey Resources and Methodology ............................................................................ 9 2.2.1 Survey Launch .......................................................................................................... 9 2.2.2 Survey Equipment .................................................................................................... 9 2.2.3 Topography Survey .................................................................................................. 9 2.2.4 Bathymetric Survey and Survey Launch ................................................................ 10 2.2.5 Calibration .............................................................................................................. 10 2.3 Description of Bench Marks (B.M.) / Authentic Reference Level ............................. 10 2.4 Tidal Influence Zone and Tidal Variation .................................................................. 11 2.5 Methodology to fix Chart Datum / Sounding Datum ................................................. 11 2.5.1 Sounding Datum ..................................................................................................... 12 2.5.2 Datum Calculation .................................................................................................. 12 2.6 Average of 06 years minimum Water Levels to arrive at CD .................................... 14 2.7 Transfer of Sounding Datum ...................................................................................... 17 2.8 Table indicating tidal variation at Different Observation Points ................................ 17 2.9 Salient features of Dam, Barrages, Weirs, etc. ........................................................... 17 2.10 Erected Bench Mark Pillars .................................................................................... 17 2.11 Chart Datum / Sounding Datum and Reductions Details ....................................... 18 2.12 HFL/MHWS values of Bridges/Cross Structures ................................................... 18 2.13 Graph: Sounding Datum and HFL vs Chainage ..................................................... 19 2.14 Average Bed Slope ................................................................................................. 20 2.15 Details of Dam, Barrages, Weirs, Anicut, etc. ....................................................... 21 2.16 Details of Locks ...................................................................................................... 21 IWAI, Region V, Wainganga-Pranahita Final Feasibility Report Page ii 2.17 Details of Aqueducts .............................................................................................. 21 2.18 Details of existing Bridges and Crossings over waterway ..................................... 21 2.19 Details of other Cross structures, pipe-lines, underwater cables ............................ 22 2.20 Details of High Tension Lines ................................................................................ 22 2.21 Current Meter and Discharge details ...................................................................... 23 2.22 Water Samples ........................................................................................................ 23 3 Description of waterway .................................................................................................. 23 3.1 Sub Stretch 1: Kaleshwaram to Ramannapetha Ray (Chainage 0.00km to 30.00km)24 3.1.1 Observed and reduced Bed Profile of the stretch ................................................... 27 3.2 Sub-Stretch-2: Ramannapetha to Avalmari (30.0km to 60.0km) ............................... 28 3.2.1 Observed and reduced Bed Profile of the stretch ................................................... 30 3.3 Sub-Stretch-3: Avalmari to Mahagaon Kh. (60.0km to 90.0km) ............................... 31 3.3.1 Observed and reduced Bed Profile of the stretch ................................................... 33 3.4 Sub-Stretch-4: Mahagaon Kh. to Illur (90.0km to 120.0km) ..................................... 34 3.4.1 Observed and reduced Bed Profile of the stretch ................................................... 36 3.5 Sub-Stretch-5: Illur to Juni Ladholi (120.0km to 150.0km) ....................................... 37 3.5.1 Observed and reduced Bed Profile of the stretch ................................................... 39 3.6 Sub-Stretch-6: Juni Ladholi to Chandarpur (150.0km to 165.78km) ......................... 40 3.6.1 Observed and reduced Bed Profile of the stretch ................................................... 43 3.7 Other aspects of Waterway ......................................................................................... 43 3.7.1 Details of Irrigation Canals and outlets .................................................................. 43 3.7.2 Industries ................................................................................................................ 43 3.7.3 Crops ...................................................................................................................... 44 3.7.4 Important cities/towns ............................................................................................ 44 3.7.5 Road Network ......................................................................................................... 44 3.7.6 Railway Network .................................................................................................... 45 3.7.7 Land Use ................................................................................................................. 46 3.7.8 Construction Material ............................................................................................. 47 3.7.9 Condition of Banks ................................................................................................. 47 3.7.10 Jetties and Terminals .......................................................................................... 47 3.7.11 Cargo Movement ................................................................................................ 47 3.7.12 Passenger Ferry Services .................................................................................... 47 3.7.13 Historic importance ...........................................................................................
Recommended publications
  • GOVERNMENT of TELANGANA ABSTRACT Public Services
    GOVERNMENT OF TELANGANA ABSTRACT Public Services – Formation /Reorganization of New Districts, Revenue Divisions and Mandals in Telangana State – Re-organization of Circles/Divisions/Sub- Divisions/Mandals in all cadres - Orders – Issued. PANCHAYAT RAJ & RURAL DEVELOPMENT (PR.I) DEPARTENT G.O.Ms.No.71 Dt:11.10.2016 Read the following:- 1. G.O.Ms.No.5, PR&RD(Estt.I) Dept. Dt:16.01.2015 and subsequent amendments, G.O.Ms.No.45, dt:23.5.2015, G.O.Ms.No.59, dt:31.7.2015 and G.O.Ms.No.6, dt:13.01.2016. 2. G.O.Ms.No.221 to 250, Revenue (DA-CMRF) Department, dt:11.10.2016 3. G.O.Ms.No.144, Finance (HRM.I) Department, dt:11.10.2016 4. From the E-in-C, PR, Hyderbad Letter No.B-II/Reorg.district/ 338/2016, Dt.17.9.2016, Dt:29.9.2016 & Dt:08.10.2016. ORDER: In the reference first read above Government have issued orders rationalising the PRI, PIU & Q C wings for effective implementation of works programme in PRED to achieve the targets of the Govt. 2. In the reference second read above Government of Telangana have issued notifications for formation/reorganization of Districts, Divisions and Mandals in the State of Telangana for better administration and development of areas concerned. 3. In the reference 3rd read above, Government have issued orders re- distributing cadre strength among (30) districts. 4. In the reference fourth read above the Engineer-in-Chief, PR has submitted proposals for re-organization of PRED to be co-terminus with the new districts jurisdiction and to change the nomenclature of Superintending Engineer, PR as Regional officer and Executive Engineer of the District Office as District Panchayat Raj Engineer (DPRE).
    [Show full text]
  • State District City Address Type Telangana Adilabad
    STATE DISTRICT CITY ADDRESS TYPE AXIS BANK ATM, SHOP NO2 H NO;9116 BESIDE SBH ATM TELANGANA ADILABAD ADILABAD OFFSITE BELLAMPALLY MAIN RD BELLAMPALLY ADILABAD DT AP504251 AXIS BANK ATM, SHOP NO H NO11227 TO 230 CHENNUR ROAD TELANGANA ADILABAD ADILABAD MACHERIAL RAJIV RAHADARI ( HYDERABAD) BESIDE ANDHRA BANK OFFSITE ATM MANCHERIAL ADILABAD DISTRICT AP 504208 AXIS BANK ATM, D NO 1 1 46 4 10 COLLECTOR CHOWK MAIN ROAD TELANGANA ADILABAD ADILABAD OFFSITE ADILABAD 504001 AXIS BANK ATM, H NO 8 36 RAMNAGAR CCC X ROAD NASPUR TELANGANA ADILABAD ADILABAD OFFSITE MANCHERIAL ADILABAD TELANGANA 504302 AXIS BANK ATM, H NO 1 1 43 1 A 1 OPP RAITHUBAZAR BESIDE ICICI TELANGANA ADILABAD ADILABAD OFFSITE ATM ADILABAD TELANGANA 504001 AXIS BANK ATM, UTKUR CROSS ROAD, MAIN ROAD, LUXEITPET, TELANGANA ADILABAD ADILABAD OFFSITE ADILABAD 504215, TELANGANA AXIS BANK LTD HNO 4360/1011OPP BUS STAND N H NO7ADILABAD TELANGANA ADILABAD ADILABAD ONSITE 504001 ANDHRA PRADESH AXIS BANK ATM NETAJI CHOWK HNO4360/10 11 OPP BUS STAND NH TELANGANA ADILABAD ADILABAD OFFSITE NO7 ADILABAD ANDHRA PRADESH AXIS BANK ATM, D NO 28 4 140/1 CALTEX BESIDE HDFC BANK TELANGANA ADILABAD BELLAMPALLE OFFSITE BELAMPALLY DIST ADILABAD ANDHRA PRADESH 504251 AXIS BANK ATM, H NO 11 136 DASNAPUR GRAM PANCHAYAT TELANGANA ADILABAD DASNAPUR MAVALA OPP TANISHA GARDEN FUNCTION HALL ADILABAD 504001 OFFSITE AP AXIS BANK ATM SHOP NO1 HNO 13243 HIGHWAY ROAD INSPECTION TELANGANA ADILABAD MANCHERIAL OFFSITE BUNGLOW MANCHERIAL ADILABAD DT AP 504208 AXIS BANK ATM PUSKUR RESTURANT PVT.LTD C/O SRI JAGANADHA TELANGANA
    [Show full text]
  • Pre-Feasibility Report Proposed Ajansara Barrage Project for Lift
    PRE-FEASIBILITY REPORT PROPOSED AJANSARA BARRAGE PROJECT M/s. Vidharbha FOR LIFT IRRIGATION CAPACITY:TOTAL 30004 CCA Irrigation Development at Village Ajansara, Taluka Hinganghat, District Wardha, Maharashtra Corporation (VIDC) STUDY PERIOD PROPOSED AJANSARA BARRAGE PROJECT FOR LIFT IRRIGATION FOR TOTAL 30004 CCA AND 24000 ICA AT VILLAGE AJANSARA, TALUKA HINGANGHAT, DISTRICT WARDHA, MS INDEX BY M/S. VIDHARBHA IRRIGATION DEVELOPMENT CORPORATION (VIDC) INDEX Sr. No. Particular Page No. 1 Executive Summary 1 2 INTRODUCTION OF THE PROJECT/ BACKGROUND 6 INFORMATION 2.1 Identification of project 6 2.2 Brief History of nature of the project 7 2.3 Need for the project and its importance to the country and 7 region 2.4 Benefit of Project 9 3 PROJECT DESCRIPTION 10 3.1 Type of project including interlinked and interdependent 10 projects, if any 3.2 Regulatory Frame Work 10 3.3 Location (map showing general location, specific location, 11 and project boundary & project site layout) with coordinates 3.4 Details of alternate sites considered and the basis of 21 selecting the proposed site, particularly the environmental considerations gone into should be highlighted 3.5 Size or magnitude of operation 21 3.6 Project description with process details (a schematic 21 diagram/ flow chart showing the project layout, components of the project etc. 3.6.1 Design Feature of Head Work 21 3.6.2 Rolled Filled Earth Dam 22 3.6.3 Barrage 23 3.6.4 Design of Barrage 23 3.6.5 Foundation of Barrage 23 4 IRRIGATION PLANNING 24 4.1 Existing and Proposed Facilities in Command Area 24 4.2 Existing and Proposed Cropping Patterns 24 4.3 Soil Survey 24 4.4 Evaporation Losses 25 5 SURVEY AND INVESTIGATION 25 5.1 Topographical Survey & Investigation 25 5.2 Survey for Barrage 25 5.3 Submergence Survey 25 5.4 Canal and Command Area Survey 25 5.5 Survey for Construction Material 25 5.6 Geotechnical Investigation 26 6 PROJECT HYDROLOGY 26 6.1 General Climate and Hydrology 26 6.2 Hydrological Data 27 6.2.1 Catchment Area 27 SMS Envocare Ltd.
    [Show full text]
  • List Police Station Under the District (Comma Separated) Printable District
    Passport District Name DPHQ Name List of Pincode Under the District (Comma Separated) List Police Station Under the District (comma Separated) Printable District Saifabad, Ramgopalpet, Nampally, Abids , Begum Bazar , Narayanaguda, Chikkadpally, Musheerabad , Gandhi Nagar , Market, Marredpally, 500001, 500002, 500003, 500004, 500005, 500006, 500007, 500008, Trimulghery, Bollarum, Mahankali, Gopalapuram, Lallaguda, Chilkalguda, 500012, 500013, 500015, 500016, 500017, 500018, 500020, 500022, Bowenpally, Karkhana, Begumpet, Tukaramgate, Sulthan Bazar, 500023, 500024, 500025, 500026, 500027, 500028, 500029, 500030, Afzalgunj, Chaderghat, Malakpet, Saidabad, Amberpet, Kachiguda, 500031, 500033, 500034, 500035, 500036, 500038, 500039, 500040, Nallakunta, Osmania University, Golconda, Langarhouse, Asifnagar, Hyderabad Commissioner of Police, Hyderabad 500041, 500044, 500045, 500048, 500051, 500052, 500053, 500057, Hyderabad Tappachabutra, Habeebnagar, Kulsumpura, Mangalhat, Shahinayathgunj, 500058, 500059, 500060, 500061, 500062, 500063, 500064, 500065, Humayun Nagar, Panjagutta, Jubilee Hills, SR Nagar, Banjarahills, 500066, 500067, 500068, 500069, 500070, 500071, 500073, 500074, Charminar , Hussainialam, Kamatipura, Kalapather, Bahadurpura, 500076, 500077, 500079, 500080, 500082, 500085 ,500081, 500095, Chandrayangutta, Chatrinaka, Shalibanda, Falaknuma, Dabeerpura, 500011, 500096, 500009 Mirchowk, Reinbazar, Moghalpura, Santoshnagar, Madannapet , Bhavaninagar, Kanchanbagh 500005, 500008, 500018, 500019, 500030, 500032, 500033, 500046, Madhapur,
    [Show full text]
  • Fortnightly October 16-31.Pdf
    1. ECONOMY 1. CPI-IW Base Year Revised to 2016 04 2. Interest-on-interest waiver to cost Exchequer ` 7,500 Crore 06 1.1. ECONOMY SNIPPETS 1. MACS 6478 08 2. Comparison of India and Bangladesh’s GDP 09 3. Heeng Cultivation Project 11 2. ENVIRONMENT 1. Microbes to Fight Oil Spillage in Oceans 13 2. Emission of N2O 14 3. Seagrass in Gulf of Mannar 16 2.1. ENVIRONMENT SNIPPETS 1. Madhuca Diplostemon Tree 18 2. Bioremediation Mechanism 18 3. Indo-Pacific Humpback Dolphin 19 4. Skinks 20 5. National Authority for Recycling of Ships 21 6. Flash Flood Warning System for South Asian Countries 22 7. Habitat decline for Himalayan brown bear by 2050 23 8. Active Zone of Himalayas 25 9. Typhoon Molave 26 3. POLITY & GOVERNANCE 1. Gujarat Disturbed Areas Act 27 2. Thalassemia Bal Sewa Yojna 28 3. MSP, Government procurement key to India’s food security, says PM 31 4. EC to Kaleshwaram Given in Violation of law, Says NGT 32 5. Government increases Poll Spend Ceiling by 10% 34 6. Demand for Repeal of UAPA 36 7. Parliament Panel Mulls action against Amazon 37 8. Outsiders can buy Land in Jammu and Kashmir 39 9. CPCB flags Pollution Control at Railway Stations 40 www.iasgatewayy.comwww. Vetriiias.com / www.iasgatewayy.com Daily044 Current-26265326/9884421666/9884472636 Affairs | Monthly Magazines | Online Tests 1 | P a g e 10.NAFED to Import Onions 41 3.1. POLITY & GOVERNANCE SNIPPETS 1. Survey of Villages Abadi and Mapping with Improvised Technology in Village Areas (SVAMITVA) 43 2.
    [Show full text]
  • DISTRICT SURVEY REPORT for SAND MINING INCLUDING OTHER MINOR MINERAL CHANDRAPUR DISTRICT, MAHARASHTRA
    DISTRICT SURVEY REPORT For SAND MINING INCLUDING OTHER MINOR MINERAL CHANDRAPUR DISTRICT, MAHARASHTRA As per Notification No. S.O. 3611 (E) New Delhi, the 25th July, 2018 of Ministry of Environment Forest and Climate change, Government of India Prepared by: District Mining Officer Collector Office, Chandrapur 2019 - 2020 .. ;:- CERTIFICATE The District Survey Report preparation has been undertaken in compliance as per Notification No. S.O. 3611 (E) New Delhi, the 25th July, 2018 of Ministry of Environment Forests and Climate Change, Government of India. Every effort have been made to cover sand mining location, area and overview of mining activity in the district with all its relevant features pertaining to geology and mineral wealth in replenishable and non-replenishable areas of rivers, stream and other sand sources. This report will be a model and guiding document which is a compendium of available mineral resources, geographical set up, environmental and ecological set up of the district and is based on data of various departments, published reports, and websites. The District Survey Report will form the basis for application for environmental clearance, preparation of reports and appraisal of projects. Prepared by: Approved by: ~ District Collector, Chandrapur PREFACE The Ministry of Environment, Forests & Climate Change (MoEF&CC), Government of India, made Environmental Clearance (EC) for mining of minerals mandatory through its Notification of 27th January, 1994 under the provisions of Environment Protection Act, 1986. Keeping in view the experience gained in environmental clearance process over a period of one decade, the MoEF&CC came out with Environmental Impact Notification, SO 1533 (E), dated 14th September 2006.
    [Show full text]
  • Fairs and Festivals, (17 Karimnagar)
    PRG. 179.17 (N) 750 KARIMNAGAR CENSUS OF INDIA 1961 VOLUME II ANDHRA PRADESH PART VII - B (17) F AIRS AND FESTIV (17. Karimnagar District) A. CHANDRA SEKHAR OF THE INDIAN ADMINISTRATIVE SERVICE Superintendent of Census Operations, Andhra Pradesh Price: Rs. 5.25 P. or 12 Sh. 3 d. or $ 1.89 c. 1961 CENSUS PUBLICATIONS, ANDHRA PRADESH (All the Census Publications of this State bear Vol. No. II) PART I-A (i) General Report (Chapters I to V) PART I-A (ii) General Report (Chapters VI to IX) PART I-A (iii) Gen'eral Report (Chapters eX to Xll) PART I-B Report on Vital Statistics PART I-C Subsidiary Tables PART II-A General Population Tables PART II-B (i) Economic Tables (B-1 to B-IV) PART II-B eii) Economic Tables (B-V to B-IX] PART II-C Cultural and Migration Tables PART III Household Economic Tables PART IV-A Report on Housing and Establishments (with Subsidiary Tables) PART IV-B Housing and Establishment Tables PART V-A Special Tables for Scheduled Castes and Scheduled Tribes PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Villag~ Survey Monographs (46) PART VII-A (1) l PART VlI-A (2) ~ ... Handicrafts Survey Reports (Selected Crafts) I PART VII-A (3) J PART VII-B (1 to 20) ... Fairs and Festivals (Separate Book for each District) PART VIII-A Administration Report-Enumeration l }- (Not for sale) PART VIII-B Administration Report-Tabulation J PART IX State Atlas PART X Special Report on Hyderabad City District Census Handbooks (Separate Volume for each District) I 1.
    [Show full text]
  • Reply 149.Pdf
    File No.I-12011/190/2020-WPP Coord. 201 I/47269/2021(1) Government of India भारत सरकार जल शक्तित मंत्रालय Ministry of Jal Shakti जल संसाधन नदी 픿कास एं गंगा संरक्षण 픿भाग Deptt. of Water Resources, RD&GR कᴂ द्रीय जल आयोग Central Water Commission जल आयोजन एं प섿रयोजनासमꅍय ꄿनदेशालय WP&P COORDINATION DIRECTORATE विषय: सूचना का अधिकार, 2005 के अंतर्गत Shri Srikanth Aluvala, Aluvala Srikanth, Vavilalapally, Karimnagar,Telangana 505001 email [email protected] के आेदन क्रमांक CWCND/R/T/21/00011 दिनांक 22/01/2021 饍ारा मांर्गी र्गई सूचना के संबं मे। (Information sought under RTI Act by Shri Srikanth Aluvala, Aluvala Srikanth, Vavilalapally, Karimnagar,Telangana 505001 email [email protected] vide RTI application No CWCND/R/T/21/00011 Dt 22/01/2021 –reg) With reference to above RTI Application, which is received in this office on dt 25/01/2021 on transfer from Under Secretary & Nodal for RTI, CWC, New Delhi, vide letter No A-49012/8/2021/RTI/31 dated 25/01/2021 the point wise information, as available in WP&P Wing of CWC, is as under: S. Information sought Information/Reply No. 1 What are the DPRs of The Project Proposal (DPR) of Kaleshwaram Project Kaleshwaram Project, approval, was received in February, 2017 and techno-economical necessary needs, financial aspects, appraisal was completed as per laid down Procedures Advantages, utilization certificates, and Guidelines. DPR was considered & accepted in water availability, water the 136th meeting of Advisory Committee of DoWR, procurement and along with all the RD&GR on 6th June, 2018 with an estimated cost of project details which is related to Rs 80190.46 Cr (Price Level 2015-16).
    [Show full text]
  • TELANGANA STATE ELECTRICITY REGULATORY COMMISSION 11-4-660, 5Th Floor, Singareni Bhavan, Red Hills, Hyderabad
    TELANGANA STATE ELECTRICITY REGULATORY COMMISSION 11-4-660, 5th Floor, Singareni Bhavan, Red Hills, Hyderabad. Phone Nos. (040) 23397625/ 23311125 to 28 Fax No. (040) 23397489 Website www.tserc.gov.in PUBLIC NOTICE O. P. No. 12 of 2020 In the matter of according approval for further amending the distribution and retail supply licence granted earlier to M/s. Northern Power Distribution Company of Telangana Limited (TSNPDCL) and also to permit taking over of assets falling under the additional area of operation from M/s. Southern Power Distribution Company of Telangana Limited (TSSPDCL). Whereas the Telangana State Electricity Regulatory Commission (TSERC) has granted license (License No. 14 of 2000) on 29.12.2000 under Section 15 of the Telangana Electricity Reform Act, 1998 (State Act No. 30 of 1998) to the Northern Power Distribution Company of Andhra Pradesh Limited (APNPDCL), for carrying on the business of distribution and retail supply of electricity within the area of supply of Warangal, Khammam, Karimnagar, Nizamabad and Adilabad Districts for a period of 30 years. And whereas, consequent to the bifurcation of the state on 02.06.2014 and pursuant to government order vide G. O. Ms. Nos. 221 to 235 dated 11.10.2016 in respect of Formation / Reorganization of Districts, Revenue Divisions and Mandals in the Telangana state issued by the Government of Telangana (GoTS), the Commission considering the request of the licensee and noticing that there is no opposition to the amendment of the licence, has modified the Licence No. 14 of 2000 on the file of TSERC by order dated 17.03.2017.
    [Show full text]
  • Integrated Development and Management Plan for Water Resources Wainganga Sub- Basin (Godavari), Maharashtra
    Annual Report on IWP sponsored Project Integrated Development and Management Plan for Water Resources Wainganga Sub- Basin (Godavari), Maharashtra For the, Water Resources Department, Government of Maharashtra Prepared and Submitted by, Gomukh Environmental Trust for Sustainable Development, Pune 24th December, 2012 1 Acknowledgements: The Gomukh Environmental Trust for Sustainable Development commenced with the task of preparing an ‘Integrated Water Resource Development Plan for the Wainganga Sub- basin’. We wish to thank the Water Resources Department of Government of Maharashtra for giving us the opportunity for taking on this immense task. We would also like to express our sincere gratitude to India Water Partnership (IWP), New Delhi for providing us with the financial assistance in the initial months. This helped us to conduct our stakeholder meetings and workshops on the field. The IWP has also provided us with funds for printing the book the first part of the book on “Wainganga: Planning for Water Resource Development”. The Trust is especially indebted to Dr. D.M. More for his guidance and unstinting support. We are also thankful to our field-coordinator Mr. Manish Rajankar whose research work and field experiences proved extremely valuable in data collection and procurement of documents from various government agencies and departments. Finally, we wish to acknowledge all the elderly villages residing on the banks of Wainganga and in settlements and villages in forests who gave us intricate details and important insights about the dynamic interactions of streams, river and forests. Table of content: Acknowledgements: ............................................................................................................... 2 1. The Wainganga Shodh Yatra .............................................................................................. 5 2. West Zone Water Partnership Workshops and International Water Forums: ..................
    [Show full text]
  • Telangana State Information Commission
    TELANGANA STATE INFORMATION COMMISSION (Under Right to Information Act, 2005) Samachara Hakku Bhavan, D.No.5-4-399, ‘4’ Storied Commercial Complex, Housing Board Building, Mojam Jahi Market, Hyderabad – 500 001. Phone Nos: 040-24740665 (o); 040-24740592(f) Appeal No. 13644/CIC/2018 Dated: 10-03-2020 Appellant : Sri Yedla Jitender, Peddapalli District-505172. Respondents : The Public Information Officer (U/RTI Act, 2005) / O/o The Executive Engineer, I & CAD Department, Kaleshwaram Project Division No.2, Kataram, Jaya Shankar Bhupalpally District The Appellate Authority (U/RTI Act, 2005) / O/o The Executive Engineer, I & CAD Department, Kaleshwaram Project Division No.2, Kataram, Jaya Shankar Bhupalpally District O R D E R Sri Yedla Jitender, Peddapalli District-505172 has filed 2nd appeal dated 05-10-2018 which was received by this Commission on 05-10-2018 for not getting the information sought by him from the PIO / O/o The Executive Engineer, I & CAD Department, Kaleshwaram Project Division No.2, Kataram, Jaya Shankar Bhupalpally District and 1st Appellate Authority / O/o The Executive Engineer, I & CAD Department, Kaleshwaram Project Division No.2, Kataram, Jaya Shankar Bhupalpally District. The brief facts of the case as per the appeal and other records received along with it are that the appellant herein filed an application dated 12-06-2018 before the PIO under Sec.6(1) of the RTI Act, 2005, requesting to furnish the information on the following points mentioned in his application: TSIC The Public Information Officer / O/o. the Dy. Executive Engineer, Kaleshwaram Project Circle No. 1, Ramagundam, Peddapalli Dist vide Lr.No.SE/KPC-1/Ramagundam/2018/71/R, dated 12-06-2018 has transferred the application u/s 6(3) of the RTI Act to the Public Information Officer / O/o.
    [Show full text]
  • GRMB Annual Report 2018-19 | 59
    Government of India Ministry of Jal Shakti Department of Water Resources, River Development & Ganga Rejuvenation Godavari River Management Board GODAVARI RIVER Origin Brahmagiri near Trimbakeshwar, Nashik Dist., Maharashtra Geographical Area 9.50 % of Total Geographical Area of India Location Latitude – 16°19’ to 22°34’ North Longitude – 73°24’ to 83° 40’ East Boundaries West: Western Ghats North: Satmala hills, Ajanta range and the Mahadeo hills East: Eastern Ghats & Bay of Bengal South: Balaghat & Mahadeo ranges, stretching from eastern flank of Western Ghats & Anantgiri and other ranges of the hills. Ridges separate the Godavari basin from Krishna basin. Catchment Area 3,12,812 Sq.km. Length of the River 1465 km States Maharashtra, Madhya Pradesh, Chhattisgarh, Odisha, Karnataka, Telangana, Andhra Pradesh and Puducherry (Yanam). Length in AP & TS 772 km Major Tributaries Pravara, Manjira, Manair – Right side of River Purna, Pranhita, Indravati, Sabari – Left side of River Sub- basins Twelve (G1- G12) Select Dams/ Head works Gangapur Dam, Jayakwadi Dam, Srirama Sagar, Sripada across Main Godavari Yellampally, Kaleshwaram Projects (Medigadda, Annaram & Sundilla barrages), Dummugudem Anicut, Polavaram Dam (under construction), Dowleswaram Barrage. Hydro power stations Upper Indravati 600 MW Machkund 120 MW Balimela 510 MW Upper Sileru 240 MW Lower Sileru 460 MW Upper Kolab 320 MW Pench 160 MW Ghatghar pumped storage 250 MW Polavaram (under 960 MW construction) ANNUAL REPORT 2018-19 GODAVARI RIVER MANAGEMENT BOARD 5th Floor, Jalasoudha,
    [Show full text]