Grand Welcome Planned for Dr M During Visit to Sabah (NST 12/05

Total Page:16

File Type:pdf, Size:1020Kb

Grand Welcome Planned for Dr M During Visit to Sabah (NST 12/05 12/05/1999 Grand welcome planned for Dr M during visit to Sabah KOTA KINABALU, Tues. - Datuk Seri Dr Mahathir Mohamad will be given a grand welcome when he arrives on Thursday for his first visit to Sabah after the Barisan Nasional victory in the recent State election. About 10,000 people, including leaders and members of BN component parties in Sabah are expected to throng the Kota Kinabalu airport to welcome the Prime Minister who is scheduled to arrive at 2pm. A committee headed by Deputy Chief Minister and Minister of Agriculture Development and Food Industry, Datuk Lajim Ukin, is overseeing preparations for Dr Mahathir's visit. Lajim said 70 horsemen from Kota Belud, Sabah Polo Association and Sabah Turf Club will lead the procession during Dr Mahathir's 15-minute drive to the Pan Pacific Sutera Hotel where he will be staying. Soon after his arrival, Dr Mahathir who is also the BN chairman, will attend a closed door meeting with State Ministers, Assistant Ministers and BN State Assemblymen at the hotel. He will attend a tahlil at the State Mosque before proceeding to the Likas Stadium to attend a thanksgiving gathering for the BN victory in the March 12-13 election. The BN had won 31 of the 48 State Assembly seats, while the rest were won by the opposition Parti Bersatu Sabah. Lajim said about 30,000 people are expected to attend the gathering. On Friday, Dr Mahathir will be in Ranau, about 108km from here, to address some 10,000 BN supporters to fulfill his promise to visit the district after the election. He was supposed to address a gathering at the Ranau community centre on the eve of the election but had to cancel his trip due to bad weather. (END) .
Recommended publications
  • Ibs in Ibs Malaysia
    7/15/2012 DEPARTMENT OF CIVIL ENGINEERING, RAZAK SCHOOL OF ENGINEERING AND ADVANCED TECHNOLOGY, UNIVERSITI TEKNOLOGI MALAYSIA KUALA LUMPUR ESTABLISHMENT AND DEVELOPMENT OF IBS IN IBS MALAYSIA Mohammad Abedi 1 BRIEF OVERVIEW BRIEF OVERVIEW y Due to the traditional labour-intensive practices, y Compared to other sectors, the construction industry suffers from low productivity, safety the 3-D Syndrome (Dirty, Difficult & Dangerous) and quality control. has always been associated with the construction industry. y Traditional method of building process y Thus, it threatens the global competitiveness of brings all the workers, machineries, and Malaysian Construction Industry. materials to the ground where the building is y CIDB strongly supports the use of Industrialised to be constructed. It contributes to Building Systems (IBS) in order to reduce the inconsistent quality, prone to delays, substantial material waste, and dangerous dependency on foreign labour and increase working environment. productivity, quality and safety in the local construction industry. 3 4 INTRODUCTION INTRODUCTION ¾ The most significant, feasible and practical y Based on the structural aspects of the systems, IBS definition of IBS in Malaysia was introduced by the can be divided into five common types (CIDB, 2003) : Construction Industry Development Board in 9 Precast Concrete System Malaysia’s Roadmap of IBS (CIDB, 2003),asa construction technique in which components are 9 Formwork System manufactured in a controlled environment (on or 9 Blockwork System off site), transported, positioned and assembled 9 Steel Frame System into a structure with minimal additional site 9 Timber Frame System works. 3 6 1 7/15/2012 Precast Concrete System Formwork System y Pre-cast Concrete Framing, Panel and Box systems: Formwork Systems: Includes tunnel forms, beams and columns Includes pre-cast concrete columns, beams, slabs, walls,”3- molding forms, permanent steel formworks, metal decks and etc.
    [Show full text]
  • M·'Sia. Ready Lor Nepailesl
    -M·'sia. ready lor Nepailesl ... Malaysia, Nepal women's national teams set their base in Sabah to test their comp'etitive skills N S", ~;;l.. 5 . ::>a) r ::z. o By FRANCIS XAVIER nine new faces ... they are into Francis@newsabah- the third. w~e~ of our thiid times.com.my training camp," "So, Nepal will·be an·ideal KOTA KINABALU: It may opponent for Malaysia be­ be just an international cause we know they are a very friendly battle, but for na­ fast and organised team. with a tional women head coach reputation as the SAFF run­ Mohd Asyraaf Fong Abdul­ ner-up winners. lah, their date with Nepal at "We have met them once the Likas Stadium tonight, last December (which Nepal is an important meeting that hosted and won f-o) so we he will take seriously. know their qualities that they He insisted that this · is an have ... they ·are a very strong opportunity for him to right team. the wrongs in his side ahead of "It is some kind of a sim­ the SEA Games, which ulation game for us because Malaysia will be hosting this our opponents in SEA Games coming August. like Vietnam, Thailand and For that reason, Asyraaf is Myanmar have the same qual­ set to start his strongest pos­ ities," said Asyraaf. sible squad in the 8.15pm tie, . According to him, after the as he wants to see how far his date with Nepal, he is also side has developed after en­ hoping to .play at least two tering the third phase of cen-.
    [Show full text]
  • Property Market Review 2018 / 2019 Contents
    PROPERTY MARKET REVIEW 2018 / 2019 CONTENTS Foreword Property Northern 02 04 Market 07 Region Snapshot Central Southern East Coast 31 Region 57 Region 75 Region East Malaysia The Year Glossary 99 Region 115 Ahead 117 This publication is prepared by Rahim & Co Research for information only. It highlights only selected projects as examples in order to provide a general overview of property market trends. Whilst reasonable care has been exercised in preparing this document, it is subject to change without notice. Interested parties should not rely on the statements or representations made in this document but must satisfy themselves through their own investigation or otherwise as to the accuracy. This publication may not be reproduced in any form or in any manner, in part or as a whole, without writen permission from the publisher, Rahim & Co Research. The publisher accepts no responsibility or liability as to its accuracy or to any party for reliance on the contents of this publication. 2 FOREWORD by Tan Sri Dato’ (Dr) Abdul Rahim Abdul Rahman 2018 has been an eventful year for all Malaysians, as Speed Rail) project. This move was lauded by the World witnessed by Pakatan Harapan’s historical win in the 14th Bank, who is expecting Malaysia’s economy to expand at General Election. The word “Hope”, or in the parlance of 4.7% in 2019 and 4.6% in 2020 – a slower growth rate in the younger generation – “#Hope”, could well just be the the short term as a trade-off for greater stability ahead, theme to aptly define and summarize the current year and as the nation addresses its public sector debt and source possibly the year ahead.
    [Show full text]
  • WTW Property Market 2011 C H Williams Talhar & Wong
    C H Williams Talhar & Wong WTW Property Market 2011 C H WILLIAMS TALHAR & WONG Established in 1960, C H Williams Talhar & Wong (WTW) is a leading real estate services company in Malaysia and Brunei (headquartered in Kuala Lumpur) operating with 25 branches and associated offices. WTW provides Valuation & Advisory Services, Agency & Transactional Services and Management Services. HISTORY Colin Harold Williams established “C H Williams & Co, Valuer & Estate Agent” when he set up office in Kuala Lumpur in 1960. Messrs C H Williams Talhar & Wong was formed in 1973 following the merger with Johor based Talhar & Co (Valuer & Estate Agent) and the inclusion of Dato Wong Choon Kee. PRESENT MANAGEMENT The Group is headed by Chairman, Mohd Talhar Abdul Rahman who guides the group on policy developments and identifies key marketing strategies which have been instrumental in maintaining the strong competitive edge of WTW. The current Managing Directors of the WTW Group operations are: ► C H Williams Talhar & Wong Sdn Bhd Foo Gee Jen ► C H Williams Talhar & Wong (Sabah) Sdn Bhd Chong Choon Kim C H Williams Talhar & Wong ► C H Williams Talhar & Wong & Yeo Sdn Bhd (operating in Sarawak) Robert Ting ► WTW Bovis Sdn Bhd Dinesh Nambiar 2 Chairman’s Foreword resuscitated space, can generate their trades and on how much was spent to refit the buildings on top of the acquiring cost of the landed assets in the first instance. There are still nonetheless many buildings in major towns and cities which remain unproductive. These bear witness to the excesses of our past euphoric boom periods. Renewed awareness and urgent re-thinking in solving urban blight is as much a priority if the well- being of our urban environment is to rise in tandem with the country’s expected economic transformation.
    [Show full text]
  • Public Cellular Services) Determination No
    MANDATORY STANDARDS FOR QUALITY OF SERVICE (PUBLIC CELLULAR SERVICES) DETERMINATION NO. 2 OF 2002 REPORT ON ASSESSMENTS OF PUBLIC CELLULAR SERVICES FOR THE PERIOD ENDING DECEMBER 2004 Background 1. The seven separate Commission Determinations are as follows: Commission Determination on Licensees subject Effective date the Mandatory Standards to Determination Public Switched Telephone Network ASP 1 January 2003 Service Determination 1 of 2002 Public Cellular Service ASP 1 January 2003 Determination 2 of 2002 Dial Up Internet Access Service ASP 1 January 2003 Determination 3 of 2002 Content Applications Services CASP 1 January 2003 Determination 4 of 2002 Public Payphone ASP 1 June 2004 Determination 3 of 2003 Digital Leased Line NSP 1 January 2004 Determination 4 of 2003 Broadband Access NSP 1 January 2004 Determination 5 of 2003 2. Non-compliance to the MS Quality of Service is a breach of section 105 (3) CMA where a person subject to a Mandatory Standard shall comply with the mandatory standard. 3. In the event a person omits or neglects to comply with such mandatory standard, he shall be liable to a fine not exceeding one hundred thousand ringgit or to imprisonment for a term not exceeding two years or both as provided for by Section 242. 4. Commission Determination on the Mandatory Standards for Quality of Service (Public Cellular Service), Determination 2 of 2002 contains standards which are reported by licensees as well as technical assessments which The Malaysian Communications and Multimedia Commission (MCMC) conduct. 1 5. MCMC has recently completed the technical assessment on cellular networks. The assessment was conducted on three cellular networks, namely Celcom, DiGi and Maxis.
    [Show full text]
  • Optimizing a Full-Time Music Ministry Team for a Church Planting Project
    Andrews University Digital Commons @ Andrews University Project Documents Graduate Research 2012 Optimizing a Full-time Music Ministry Team for a Church Planting Project in the Northern Asia- pacific Division Dong Hee Shin Andrews University This research is a product of the graduate program in Doctor of Ministry DMin at Andrews University. Find out more about the program. Follow this and additional works at: https://digitalcommons.andrews.edu/dmin Part of the Missions and World Christianity Commons Recommended Citation Shin, Dong Hee, "Optimizing a Full-time Music Ministry Team for a Church Planting Project in the Northern Asia-pacific Division" (2012). Project Documents. 119. https://digitalcommons.andrews.edu/dmin/119 This Project Report is brought to you for free and open access by the Graduate Research at Digital Commons @ Andrews University. It has been accepted for inclusion in Project Documents by an authorized administrator of Digital Commons @ Andrews University. For more information, please contact [email protected]. Thank you for your interest in the Andrews University Digital Library of Dissertations and Theses. Please honor the copyright of this document by not duplicating or distributing additional copies in any form without the author’s express written permission. Thanks for your cooperation. ABSTRACT OPTIMIZING A FULL-TIME MUSIC MINISTRY TEAM FOR A CHURCH PLANTING PROJECT IN THE NORTHERN ASIA-PACIFIC DIVISION by Dong Hee Shin Adviser: Jeanette Bryson ABSTRACT OF GRADUATE STUDENT RESEARCH Project Document Andrews University Seventh-day Adventist Theological Seminary Title: OPTIMIZING A FULL-TIME MUSIC MINISTRY TEAM FOR A CHURCH PLANTING PROJECT IN THE NORTHERN ASIA-PACIFIC DIVISION Name of researcher: Dong Hee Shin Name and degree of faculty adviser: Jeanette Bryson, Ph.D.
    [Show full text]
  • St Simon Catholic Church Likas
    “A DAY TO BLESS MALAYSIA” Sunday 15 September, 2013 beginning at 7 pm at Likas Stadium, Kota Kinabalu. Theme: “Crossover Into Next 50 St Simon Catholic Years”. All parishioners are encouraged to take part. Food coupons at RM5 will be on sale from this Sunday. Church Likas Address: Jln Punat Tanah, Off Jln Tuaran TH 25 ANNIVERSARY OF GOOD SHEPHERD MISSION IN SABAH Mile 3.5 (KM 6), 88400 Kota Kinabalu The Good Shepherd Sisters and their Mission Partners cordially invite you Tel: 088-212713 Fax: 088-288713 Email: to join them in prayer and celebration on the occasion of the 25th Anniver- [email protected] Webpage: http://stsimonlikas.wordpress.com Saints & Feast Days sary of their Good Shepherd Mission in Sabah. The Eucharistic Celebration Office Hrs: Mon-Fri: 9.00am - 1.00pm; 2.00pm-5.00pm is at 9.00 am in St Simon Church on Saturday, 5th October, 2013 and fol- Sat: 9.00am - 1.00pm 3 Sept - St Gregory the Great, pope Rector: Rev. Cosmas Lee All are most welcome! 8 Sept - The Nativity of the Blessed Virgin lowed by lunch in the parish hall. Mary Sunday Services: 9 Sept - St Peter Claver, priest YEAR OF FAITH EUCHARISTIC RETREAT Masses (Eng) - 8.30am; 5.00pm; 12 Sept—The Most Holy Name of Mary Theme : “Retreat With Mary” Rosary - 4.15pm Confession - 8.15am; 4.45pm 13 Sept—St John Chrysostom, bishop Organised By : Eucharistic Adoration Ministry Weekday Masses (Chapel) 14 Sept—The Exaltation of the Holy Cross 15 Sept—Our Lady of Sorrows Stella Maris Church Mon, Tue, Wed, Fri - 6.30pm Holy Hour - th th (Chapel) Every Thursday 16 Sept—Ss Cornelius & Cyprian, martyrs Date : 14 To 16 September, 2013 7.30pm followed by Mass at 8.30pm 17 Sept—St Robert Bellarmine, bishop Venue : Pace Bene Retreat Centre, Papar Weekly Intercessory Prayers - every Tuesday after 19 Sept—St Januarius, martyr Retreat Master : Rev.
    [Show full text]
  • Deltariver Brochure2.Pdf
    ENSCONCED BY GREENERY, YOUR SEARCH FOR THE IDEAL LIGHT INDUSTRIAL BASE IS AT AN END. DELTA RIVERSIDE OFFERS THE PERFECT BLEND OF NATURE’S ALLURE AND QUALITY DESIGN. 4675 MILES 2185 MILES SEPANGGAR BAY N TO CHINA TO JAPAN CONTAINER PORT 5 MILES PULAU SEPANGGAR SOUTH CHINA SEA Delta Riverside is a unique development and the very first of its kind for light industries in Sabah. Located in the state’s UNIVERSITI MALAYSIA SABAH capital city of Kota Kinabalu, this project is 1 BORNEO HYPERMALL ideal for multinational corporations (MNCs) and aspiring entrepreneurs wishing to engage with the region’s promising economy. HOSPITAL WANITA DAN PULAU GAYA KANAK-KANAK SABAH The site lies within close proximity to INANAM RIVER surrounding amenities of retail, commerce, 176 MILES TO medical care and logistics resources. The SANDAKAN, SABAH KOTA KINABALU Jalan Tuaran Bypass (highway) ensures easy LIKAS BAY CONNECTIVITY PORT accessibility to Kota Kinabalu Port and the 4 MILES 4 MILES city centre. LIKAS STADIUM & CONVENIENCE JALAN TUARAN BYPASS KOLOMBONG/BDC INDUSTRIAL ESTATE PULAU MANUKAN KOTA KINABALU CITY CENTER SABAH MEDICAL 6 MILES CENTRE 120 MILES TO BANDAR SERI BEGAWAN, BRUNEI 458 MILES KOTA KINABALU TO SIBU, SABAH 8 MILES TO 1783 MILES KOTA KINABALU 704 MILES TO SINGAPORE INTERNATIONAL AIRPORT KUCHING, SARAWAK HOSPITAL WANITA DAN UTILITY TREATMENT BANGKA-BANGKA CENDERAMATA & CEMPAKA KANAK-KANAK SABAH POND VILLAGE VILLAGE INANAM RIVER UJANA KINGFISHER KINGFISHER PARK 4 LIKAS VILLAGE N UNIVERSITI MALAYSIA SABAH MENARA TUN MUSTAPHA STATE ADMIN CENTER LIKAS BAY 32 31 Cossetted within the gentle, natural meander of twin river channels, Delta Riverside sits on over 18 acres.
    [Show full text]
  • A Nation Transformed by His Love Exercise Grace in Building Relationships Between Christians and Churches
    PP 5872/11/2012 (031125) Oct – Dec 2012 EDITORIAL What’s Inside? 3 Chairman: The River of God A Nation Transformed 5 Ushering in Jubilee across Malaysia 7 Jubilee: A Window of by His Love Opportunity 8 Inward Transformation, Outward ALAYSIA, a land of opportunities and grace, a melting pot of races and Action religions and today, a migrant preferred destination. Some of us may not 10 Tax Deduction on Tithes think much of it, but Malaysia is truly a land of promise as many prophets M 10 Back to Nature! have proclaimed over this country. The issue is, are we missing the “open heaven” opportunities that God has set for us? 11 Trustees and Church Governance Given the opportunity to be vessels for national transformation, how should 12 Building Up Daughters of the Christian community respond to this privilege and grace of God? The clarion Destiny call is to “Transform the Nation through the Local Church” and to be effective, the 14 Lost in Translation church itself must first experience transformation. What does a transformed Malaysian church look like? One who is passionately in love with God will bear the fruit of the Holy Spirit and maintain an intimate relationship with Him. The Bible speaks of David, a man after God’s heart (1 Samuel 13:13-14) as one who was quick to respond and obey the Lord. The nation would experience much greater Godly transformation if only we as the church are obedient to Him. Human wisdom and wrong priorities are common barriers (Proverbs 3:5-6) because we chose to submit to self rather than to our Lord.
    [Show full text]
  • Greater Kota Kinabalu Epp 1 : Modernizing Kota Kinabalu City
    GREATER KOTA KINABALU EPP 1 : MODERNIZING KOTA KINABALU CITY EPP 1 : PROJECT 01 JESSELTON WATERFRONT DEVELOPMENT DESCRIPTION High-end Residential Developments Retail Commercial Office Towers Waterfront Hotels International Cruise Terminal ( 2 phase ) 300 berths of multiple lengths Marina Challenges Key outcome / benefit of this project • Market Demand Waterfront Development • Infrastructure to support the development eg. • Will be a tourism friendly development and center Water, sewerage , power supply & broadband of tourism activity, which consists of broad walk, service. marina activities, high-end shopping arcade, 5-star • Resources during construction hotel and international cruise terminal • Increase of material cost • Increase volume of Traffic in CBD area Marina facilities • Cruise Terminal development which requires • To accommodate the need to have more berths relocation of general cargo (parking bays for boats) in Greater KK • Capacity at Sutera Marina Harbour has already reached its maximum (104 berths) • More economic spillover effect to the local economy/retailers Enablers Required to make it happen MIXED USE DEVS. WATERFRONT LUXURY VILLA INTERNATIONAL CRUISE TERMINAL • To improve the main infrastructure to support this new development • 10 Storey Shopping Arcade and Corporate Offices • Waterfront Apartments And Bungalows • International Cruise Terminal Complex • Practical traffic system without sacrificing Project • 10 Storey Luxury Waterfront Condominium • Marina Facilities – Clubhouse • Marina Facilities Land area • Thematic Retail Outlets • Maritime Museum • Duty Free Complex & Entertainment Center • Land approval for cruise terminal development • Boutique Hotel • The Aquarium • International Bazaar EPP 1 : PROJECT 02 EPP 1 : PROJECT 03 SABAH INTERNATIONAL CONVENTION CENTRE (SICC) DESCRIPTION Challenges The site is located strategically at the tail-end of the proposed • Traffic congestion on Jalan Tanjung Lipat (inbound Jesselton Waterfront Development.
    [Show full text]
  • Real Estate Market Outlook 2020 Malaysia Final 7 Jan MAL
    CBRE|WTW RESEARCH | APAC MALAYSIA INTRODUCTION ‘WHEN WILL THE MARKET IMPROVE? The property market regained some strength in 2019, the underlining optimism attributable to continued market resilience and market players who have remained unwavering despite the economic turbulence. On the broader front, over-supply, down trending transactions, weaker prices are symptoms of market uncertainty which may be due to inconsistency of government policies and lack of comprehensive and timely market information. While over-supply is currently found in almost all sectors, this could be addressed in the mid-term if the economy turns around to prospects of high sustainable growth from its current outlook of uncertainty and doldrums. Bottom line, we want carefully crafted government policies which are then implemented consistently, long term. FOO GEE JEN MANAGING DIRECTOR CBRE | WTW FORMATION In 1975, C H Williams Talhar Wong & Yeo (WTWY) CBRE | WTW entered into an agreement in May was established in Sarawak. C H Williams Talhar & 2016 to form a joint venture to provide a deep, Wong (Sabah) (WTWS) was established in 1977. broad service offering for the clients of both firms. This combines Malaysia’s largest real estate services The current management is headed by Group provider, WTW’s local expertise and in-depth Chairman, Mohd Talhar Abdul Rahman. relationships in Malaysia with CBRE’s global reach and broad array of market leading services. The current Managing Directors of the WTW Group operations are: The union of CBRE and WTW is particularly • CBRE | WTW: Foo Gee Jen significant because of our shared history. In the1970s, CBRE acquired businesses from WTW in • C H Williams Talhar & Wong (Sabah) Sdn Bhd: Singapore and Hong Kong, which remain an integral Leong Shin Yau part of CBRE’s Asian operations.
    [Show full text]
  • October Newsletter
    October pph 324/10/2012 (031059) - 116/19 With another blink of an eye, we are finally entering the third quarter of 2019! The man- agement would like to express its appreciation to all of the patrons for your continuous support and assisting the management in making our mall better each day. We would also like to welcome the new kiosks opening this month – Aunty Fet Dumpling (Lot PF5, 4th Floor), Adeeb Alzam Enterprise (Green Kiosk, 4th Floor) and Famous Electric Shop (Vape) (L10-D, Basement Floor). Moreover, there is a new food court opening on the 5th Floor – Food Eden. The management would like to welcome the new tenants of Food Eden, which are Apiwon Cafe (Lot A1), Bb.q Chicken ( Lot A2), Kimbap (Lot A3), Cendol Ina ( Lot A4-2) and Eat Eat Dim Sum ( Lot A4-4). Coming back to our Marketing/ Events section, we have conducted our annual Halloween event of Scarywood: Horrorween, which was held on 19th – 21st October. This year, we manage to achieve about 1000 of participants joining our Halloween events, such as Colouring Contest, Spot the Difference, Pumpkin Carving, Spooktacular Costume Contest and Trick or Treat. We could have not done it without the support from the sponsors namely Palm Café, The Place Concept, Kak Kiah Cake House, Beauty Wonderland, 90’s Restaurant, Kim Fah Restaurant, e. Noveal, 6D Motion & Adventure, J&B Enterprise, Eaton’s, Modern Craft, Ki-Yomi and Little Party. Without your support and contribution, our Halloween event would not be a success. Thank you once again! Our next event will be the annual Blood Donation, which will be held on 9th November.
    [Show full text]