APPENDIX A-1 : Agency Contact List

Proposed Second Access Road to Scugog Island Class Environmental Assessment Study Environmental Study Report

Class Environmental Assessment for a Second Access Road to Scugog Island Township of Scugog

Postal Title First Name Last Name Title Company Address1 Address2 City Prov Code FEDERAL DEPARTMENTS AND AGENCIES Mr. Vic Karens Department of Fisheries and Oceans 867 Lakeshore Road, P.O Box 5050 Burlington ON L7R4A6

Ms. Theresa Finnerty Transport Canda 344 Slater Street Ottawa ON K1A8B1 Ms. Anjala Puvanathan Regional Environmental Assessment Health 2301 Midland Avenue ON M1P 4R7 Co-ordinator Mr. Rob Dobos Environment Canada P.O Box 5050, 867 Lakeshore Road Burlington ON L4R 1A2 Mr. Barry Putt Fisheries and Oceans Canada Navigable Waters Protection 201 North Front Street, Suite 703 Sarnia ON N7T 8B1 Mr. D.A. Reynolds, Regional Manager Engineering CN Rail CN MacMillan Yard, PO Box 1000 Concord ON L4K1B9 P.Eng. Services, Eastern Canada Region Ms. Cheyenne Loon Senior Environmental Advisor, Indian and Northern Affairs Canada Region 25 St. Clair Avenue E, 8th Floor Toronto ON M4T1M2 Environment Unit Mr. Elio Ramos Crossing Analyst TransCanada PipeLine Ltd. 450 – 1 Street S.W Calgary AB T2P5H1 PROVINCIAL MINISTRIES AND AGENCIES Ms. Andrea McDowell Environmental Officer Programs and Divestiture 4900 Yonge Street, 4th Floor Toronto Toronto ON M2N 6A5 Mr. Michael D'Mello Registrar Ministry of Consumer and Business Marketplace Standards and 251 Yonge Street, 32nd Floor Toronto ON M5B2N5 Services Services Branch Mr. Ron Von Bitter Data Co-Ordinator Ministry of Tourism, Culture and Heritage Operations 400 University Avenue, 4th Floor Toronto ON M7A2R9 Recreation Mr. John MacDonald Heritage Planner/ Archaeologist Ministry of Tourism, Culture and Heritage Operations 400 University Ave, 4th Floor Toronto ON M7A2R9 Recreation, Heritage Ms. Patricia Boeckner Director Ministry of Transportation Transportation Planning Branch 1201 Wilson Avenue, 3rd Floor, Bldg B Toronto ON M3M1J8

Mr. Hugh Fyffe Corridor Management Technician Ministry of Transportation Corridor Management Office 1201 Wilson Avenue, 7th Floor, Bldg D Toronto ON M3M1J8

Mr. Steven Mitchell Architect Ministry of Education Architecture and Assessment 900 Bay Street, Mowat Block, 21st Floor Toronto ON M7A1L2 Unit Ms. Audrey Bennett Director Ministry of Municipal Affairs and Provincial Planning and 777 Bay Street, 14th Floor Toronto ON M5G2E5 Housing Environmental Services Mr. Denis Lemoire Planning Specialist Ministry of Natural Resources Land Use Coordination Section 300 Water Street, PO Box 7000 Peterborough ON K9J8M5

Mr. Rob Fancy Ministry of Natural Resources Aurora District 50 Bloomington Road West Aurora ON L4G3G8 Mr. Ross Lashbrook Environmental Assessment and Ministry of the Environment Central Region Technical 5775 Yonge Street, 8th Floor Toronto ON M2M 4J1 Planning Coordinator Support Section Mr. Shawn Carey Environmental Assessment and Ministry of the Environment Air, Pesticides and 5775 Yonge Street, 8th Floor North York ON M2M4J1 Planning Coordinator Environmental Planning Mr. Malcolm Horne Heritage Planner/ Archaeologist Ministry of Culture, Tourism and York - Peel - Halton 400 University Ave. W., 4th Floor Toronto ON M7A2R9 Recreation Mr. Stephen A. Vokes Senior Project Manager Ministry of Transportation Highway Engineering - Toronto 1201 Wilson Avenue, 4th Floor, Bldg D Downsview ON M3M1J8 and Durham Mr. Bruce Singbush Manager (Acting) Ministry of Municipal Affairs and Community Planning and 777 Bay Street, 2nd Floor Toronto ON M5G2E5 Housing Development Mr. John Wilson Regional Director Ministry of Community and Social Central East Regional Office 465 Davis Drive Newmarket ON L3Y9TY Services Lois Deacon District Manager Ministry of Natural Resources Peterborough District 300 Water Street., PO Box 7000, South Peterborough ON K9J8M5 Tower, 1st Floor Mr. Ray Valaitis Rural Planner Ministry of Agriculture and Food Agricultural Land Use, Central 95 Dundas Street, RR#3 Brighton ON K0K1H0 and Northern Region Mr. Doug Carr Assistant Deputy Attorney General Ontario Native Affairs Secretariat 720 Bay Street, 4th Floor Toronto ON M5G2K1 and Secretary

TSH Project No.: 42-80421 Agency Contact List Class Environmental Assessment for a Second Access Road to Scugog Island Township of Scugog

Postal Title First Name Last Name Title Company Address1 Address2 City Prov Code Mr.FEDERAL Paul DEPARTMENTS Evans AND AGENCIES Assistant Deputy Minister Ministry of Public Infrastructure and Information Policy and Planning 7 Queen's Park Cres., 6th Floor Toronto ON M7A1Y7 Renewal Division Mr. Garfield Dales Head Transportation Ministry of Transportation Highway Engineering - Toronto 1201 Wilson Avenue, 4th Floo, Bldg D Downsview ON M3M1J8 and Durham MUNICIPAL AND REGIONAL Ms. Karen Yellowlees Durham Region Federation of 4441 Malcolm Road Nestleton ON L0B1L0 Agriculture Durham Region Manufacturer’s 74 Simcoe Street South, Suite 301 ON L1H4G6 Association Ms. Kim Coates Clerk Township of Scugog Municipal Office 181 Perry Street, Box 780 ON L9L 1A7 Ms. Jill Thompson 's of Scugog Island First B22521 Island Road Port Perry ON L9L1B6 Nation Mr. Tom Bonnana Scugog Memorial Public Library 231 Water Street, PO 1049 Port Perry ON L9L1A8 Scugog Community Centre 1655 Reach Street Port Perry ON L9L 1P2 P.M. Madill Regional Clerk The Regional Municipality of Durham PO Box 623, 605 Rossland Road East Whitby ON L1N 6A3

SCHOOL BOARDS/SCHOOLS Ms. Katherine Johnson Supervisor of Transportation Durham Catholic School Board 650 Rossland Road West Oshawa ON L1J7C4

Ms. Dorothy Jean Lane Route Coordinator Oshawa, Whitby, Durham Catholic School Board 650 Rossland Road West Oshawa ON L1J7C4 Scugog & Brock Ms. Lynda Smith Transportation Manager Durham District School Board 400 Taunton Road East Whitby ON L1R2K6 Mr. Craig Burch Director of Education Durham District School Board 400 Taunton Road East Whitby ON L1R2K6 Mr. Dave Lambert Principal Cartwright Central Public School 11 Alexander Street Blackstock ON L0B 1L0 Ms. Dianne Fennell Principal Epsom Public School 16052 Marsh Hill Rd. Port Perry ON L9L 1Y2 Ms. Carolyn Treadgold Principal R.H. Cornish Public School 494 Queen Street Port Perry ON L9L1K2 Ms. Sue Brimble Principal S.A. Cawker Public School 16200 Old Simcoe Road Port Perry ON L9L1P3 Ms. Brenda O'Donoghue Principal Good Shepherd Catholic High School 1650 Reach St. Port Perry ON L9L1B2

Mr. Jamie Kettrick Principal Immaculate Conception Catholic 1722 Scugog St. Port Perry ON L9L1E2 School Mr. Tim Taylor Principal Port Perry High School 160 Rosa Street, Po Box 870 Port Perry ON L9L1A7 UTILITIES Ms. Heather Rivet Bell Canada F2 North, 55 Athol Street East Oshawa ON L1H1J8 Mr. Thou Vuong Enbridge Consumers Gas Central Region 500 Elgin Mills Road Richmond ON L4C5G1 Mr. Dave Osborne Oshawa Public Utilities Commission 100 Simcoe Street South Oshawa ON L1H7M7

Mr. Ed Olsen General Manager Compton Cable 635 Regional Road 21 Utica ON L9L1B5 Mr. B. Jamie Bignell Hydro One 913 Cranford Drive Peterborough ON K9J3X1 Veridian 56 Taunton Rd. E. Ajax ON L1T3V3 Mr. Edwin Makkinga Enbridge Consumers Gas Environment Health and Safety 501 Consumers Road North York ON M2J 1P8 Group Mr. Jim Hisson Hydro One 483 Bay Street Toronto ON M5G2C9 EMERGENCY Mr. Miller Attn: Fire Chief Township of Scugog Fire Department 30 Crandell Street Port Perry ON L9L1J6 Richard Staff Jan Idzenga Detachment Commander Ontario Provincial Police Aurora Detachment 100 Bloomington Road W Aurora ON L4G 7N5 Sgt. Manager; Planner-Analyst Durham Region Police Services Oshawa ON L1G4B7 77 Centre Street North

TSH Project No.: 42-80421 Agency Contact List Class Environmental Assessment for a Second Access Road to Scugog Island Township of Scugog

Postal Title First Name Last Name Title Company Address1 Address2 City Prov Code Mr.FEDERAL Steve DEPARTMENTS McNenly AND AGENCIES Durham Region Ambulance Service 4040 Anderson Street Whitby ON L1R3P6 INSTITUTIONAL Anglican Church Ascension 268 North St Port Perry ON L9L 1B7 Blackstock United Church Box 250 Blackstock ON L0B1B0 Caesarea Christian Fellowship 3624 Regional Road 57 Caesarea ON L0B1E1 Emmanuel Pentecostal Church PO Box 634 Stn Main Port Perry ON L9L 1A6 Greenbank United Church PO Box 173 Greenbank ON L0C1B0 Hope Christian Reformed Church PO Box 1169 Port Perry ON L9L1A9 Immaculate Conception Church 1710 Scugog St Port Perry ON L9L1E2 Port Perry Baptist Church PO Box 25 Port Perry ON L9L1A2 Port Perry United Church 294 Queen St Port Perry ON L9L1B9 Presbyterian Church St John's PO Box 1135 Port Perry ON L9L1A9 ON L9L1B6 Scugog & Manchester United Church 19100 Island Rd Port Perry Seagrave United Church 15 Coryell Seagrave ON L0C1G0 St John's Anglican Church PO Box 194 Blackstock ON L0B 1B0 Victory Christian Centre 593 Alma St Port Perry ON L9L1C8 Port Perry Hospital 451 Paxton Street, Box 960 Port Perry ON L9L1A8 TRANSIT/TRANSPORTATION Mr. Michael Sone GO Transit 20 Bay Street, Suite 600 Toronto ON M5J2W3 Mr. Ben Chartier Handi Transit 44 William Street West, Oshawa ON L1G1J8 OTHER Ms. Rolanda Elijah Director - Intergovernemtnal Affairs Assoication of Iroquois & Allied Indians 387 Princess Avenue London ON N6B 2A7 Goreski's Lakeside Recreation 225 Platten Boulevard Port Perry ON L9L1B4 Mr. Ian McNab CAO Kawartha Region Conservation 277 Kenrei Road, RR#1 Lindsay ON K9V4R1 Authority (KRCA) Mr. Perry Steiner Great Blue Heron Charity Casino 21777 Island Road Port Perry ON L9L1B6 Scugog Island Marina 495 Carnegie Beach Road Port Perry ON L9L1B6 Ontario Cycling Association 1185 Eglinton Avenue East, Suite 408 North York ON M3C3C6 Mr. R.M Farewell Ontario Realty Corporation Real Estate Branch 777 Bay Street, 15th Floor Toronto ON L1G1C7 Mr. Craig Taylor President Scugog Chamber of Commerce 269 Queen Street, P.O. Box 1282 Port Perry ON L9L1B1 Durham Home & Small Business 1792 Liverpool Road, Box 207 Pickering ON L1V4V9 Association Durham Region Real Estate Board 50 Richmond Street E, Unit 14 Oshawa ON L1C7C7 Mr. Craig Belfry Scugog Shores Historical Museum 16210 Island Rd. Port Perry ON L9L1B4

TSH Project No.: 42-80421 Agency Contact List

Township of Scugog

APPENDIX A-2 : Agency Notification

Proposed Second Access Road to Scugog Island Class Environmental Assessment Study Environmental Study Report

TOWNSHIP OF SCUGOG

NOTICE OF STUDY COMMENCEMENT

Proposed Second Access Road to Scugog Island

www.township.scugog.on.ca Class Environmental Assessment Study

The Township of Scugog is initiating a Class Environmental Assessment for an additional access to Scugog Island to service residents, businesses and the agricultural community. A wide range of alternatives will be examined as part of the study including operational and/or physical modifications and improvements to existing facilities within or near the Study Area; alternative modes of transportation; and a new access road.

This notice signals the commencement of the Class Environmental Assessment - a study which will define the problem, identify and evaluate alternative solutions, and determine a preferred solution in consultation with the Township of Scugog, regulatory agencies, and the public. The study is being conducted in compliance with Schedule C of the Municipal Class Environmental Assessment (June 2000), which is approved under the Ontario Environmental Assessment Act.

As part of the consultation process, the Township will establish a Steering Committee that will meet at key points in the process to provide input to the Project Team. Another key component of the study will be public consultation through two Public Information Centres (PICs). The PICs will provide members of the public with an opportunity to meet the Project Team, review the study scope and discuss issues related to the project including alternative solutions, environmental considerations, evaluation criteria and alternative designs. Details regarding the planned PICs will be advertised as the study progresses. The map below shows the approximate limits of the study area.

Information requests or questions may be directed to:

Mr. Gene Chartier, P.Eng. Commissioner of Infrastructure & Development Township of Scugog 181 Perry Street P.O. Box 780 Port Perry, Ontario L9L 1A7 Phone: 905 985-7346 Fax: 905 985-9914 Email: [email protected] or

Mr. Mike Delsey, P. Eng. Consultant Project Manager TSH Engineers Architects and Planners 300 Water Street Whitby, Ontario L1N 9J2 Phone: 905 668-9363 Fax: 905 668-0221 Email: [email protected]

TOWNSHIP OF SCUGOG

PUBLIC INFORMATION CENTRE #2

Proposed Second Access Road to Scugog Island www.township.scugog.on.ca Class Environmental Assessment Study

The Township of Scugog is examining the merit of providing a second access road to Scugog Island. This road would offer an alternative to Island Road (Regional Road 7) if it becomes obstructed or impassable due to an unforeseen event.

The Township is conducting this study in accordance with Schedule C of the Municipal Class Environmental Assessment (June 2000), which is an approved planning process under the Ontario Environmental Assessment Act. Public consultation is an important element of this process. To date, the Township has held one Public Information Centre (PIC), on September 22, 2005, to provide information on the study scope, need and justification for improvements, alternative solutions, and environmental considerations.

A second PIC is planned to provide the public an opportunity to review the recommended design alternative and evaluation process, and to comment on the study material. The PIC has been scheduled for:

Thursday, November 24, 2005 Scugog Island Community Hall 2710 Demara Road 5:00 – 8:00 pm

Input and comments will be accepted until December 2, 2005. Information requests or questions may be directed to:

Mr. Gene Chartier, P.Eng. Mr. Mike Delsey, P. Eng. Commissioner of Infrastructure & Development Consultant Project Manager Township of Scugog TSH Engineers Architects and Planners 181 Perry Street 300 Water Street P.O. Box 780 Whitby, Ontario L1N 9J2 or Port Perry, Ontario L9L 1A7 Phone: 905 668-9363 Phone: 905 985-7346 Fax: 905 668-0221 Fax: 905 985-9914 Email: [email protected] Email: [email protected]

This notice first issued on November 4 th and 18 th 2005

TOWNSHIP OF SCUGOG

NOTICE OF STUDY COMPLETION

Proposed Second Access Road to Scugog Island Class Environmental Assessment Study www.township.scugog.on.ca

The Township of Scugog initiated a Class Environmental Assessment to examine the need for an additional access road to Scugog Island. A wide range of alternatives were examined as part of the study including operational and/or physical modifications and improvements to existing facilities within or near the Study Area; alternative modes of transportation; and a new access road. The recommended design to be carried forward includes two new access roads from Highway 7A to Ashbridge’s Road and from Ma Browns’ Road to Pine Point Road. The existing entrance to Reader Road from Highway 7A will be closed.

The Township has planned this project under Schedule C of the Municipal Class Environmental Assessment (June 2000). The Environmental Study Report (ESR) has been completed and, by this Notice, is being placed in the public record for review. Subject to comments received as a result of this Notice and the receipt of necessary approvals, the Township may proceed with design and construction of this project.

The Environmental Study Report is available for review at the following locations commencing on June 29, 2007:

Township of Scugog Scugog Memorial Public Library Municipal Office 231 Water Street, P.O. 1049 181 Perry Street, Box 780 Port Perry, ON L9L 1A8 Port Perry, ON L9L 1A7 Tel. 905-985-7686 Tel. 905-985-7346 Hours: Hours: 10:00 am – 6:00 pm (Mon., Wed., Fri.) 8:30 am to 4:30 pm (Mon-Fri) 10:00 am – 9:00 pm (Tues., Wed.) 10:00 pm – 5:00 pm (Sat.) 1:00 pm – 5:00 pm (Sun.)

Further information may be obtained from the Township’s consultants, TSH Engineers Planners Architects, 300 Water Street, Whitby, ON, L1N 9J2. Telephone: 905-668-9363. Attention Mr. Mike Delsey, P.Eng., Project Manager. Preferred Design Please provide written comment to the Township Clerk at the above address within 30 business days from the date of this Notice. If concerns regarding this project cannot be resolved in discussion with the municipality, a person may request that the Minister of the Environment make an order for the project to comply with Part II of the Environment Assessment Act (referred to as a Part II Order), which addresses individual environmental assessments. Requests must be received by the Minister at the address below by August 3, 2007. A copy of the request must also be sent to the Township Clerk and Project Manager. If no request is received by the date listed, the Proposed Second Access Road to Scugog Island may proceed to design and construction as outlined in the Environmental Study Report.

The Honourable Laurel C. Broten Ontario Minister of the Environment 12th Floor, 135 St. Clair Avenue West Toronto, ON M4V 1P5 Telephone: (416) 314-6790 Fax: (416) 314-7337

This Notice issued 29th June, 2007.

Township of Scugog

APPENDIX A-3 : Agency Correspondence

Proposed Second Access Road to Scugog Island Class Environmental Assessment Study Environmental Study Report

Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

FEDERAL AGENCIES

September 13 th , 2005 - Notice of Study Commencement and Public Information Department of Centre # 1 mailed. Fisheries and Mr. Vic Karens November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Oceans June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Department of Centre # 1 mailed. Fisheries and Mr. Barry Putt November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Oceans June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information September 14 th , 2005 –Letter received regarding the Navigable Centre # 1 mailed. Waters Protection Act and Railway Safety Act, their potential for th triggers and the recommendation to include CEAA requirements November 9 , 2005 – Notice of Public Information Center # 2 mailed. into the provincial environmental assessment. June 28, 2007 – Notice of Study Completion mailed. September 26 th , 2005 – Email received regarding the Navigable Waters Protection Act and Railway Safety Act, their potential for Ms. Theresa Transport Canada triggers and the recommendation to include CEAA requirements Finnerty into the provincial environmental assessment and attachment of the Application Guide for construction occurring in a navigable body of water. Also, that the attachments had been faxed to the Project Manager several times unsuccessfully. October 3 rd , 2005 - Letter received regarding the Navigable Waters Protection Act and attachment of the Application Guide for construction occurring in a navigable body of water. September 13 th , 2005 - Notice of Study Commencement and Public Information Ms. Anjala Centre # 1 mailed. Health Canada th Puvanathan November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Environment Centre # 1 mailed. Mr. Rob Dobos th Canada November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Mr. D.A. Centre # 1 mailed. CN Rail th Reynolds November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

th September 13 , 2005 - Notice of Study Commencement and Public Information th Centre # 1 mailed. November 16 , 2005 – Letter received regarding no Specific Indian & Northern Ms. Cheyenne Claims for land in the area but recommending contact with the Affairs Canada Loon November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Mississauga’s of Scugog Island to advise them of the Project and seek input. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information TransCanada Mr. Elio Centre # 1 mailed. Pipeline Ltd Ramos November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. PROVINCIAL AGENCIES

September 13 th , 2005 - Notice of Study Commencement and Public Information Programs & Ms. Andrea Centre # 1 mailed. Divestiture McDowell November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. Michael Centre # 1 mailed. Consumer & th D’Mello November 9 , 2005 – Notice of Public Information Center # 2 mailed. Business Services June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. Ron Von Centre # 1 mailed. Tourism, Culture & th Bitter November 9 , 2005 – Notice of Public Information Center # 2 mailed. Recreation June 28, 2007 – Notice of Study Completion mailed.

th Ministry of September 13 , 2005 - Notice of Study Commencement and Public Information Tourism, Culture & Mr. John Centre # 1 mailed. Recreation - MacDonald November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Heritage June 28, 2007 – Notice of Study Completion mailed. September 13 th, 2005 - Notice of Study Commencement and Public Information Ministry of Ms. Patricia Centre # 1 mailed. Transportation Boeckner November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13th , 2005 - Notice of Study Commencement and Public Information Ministry of Centre # 1 mailed. Mr. Hugh Fyffe th Transportation November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. Steven Centre # 1 mailed. Education Mitchell November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Ms. Audrey Centre # 1 mailed. Municipal Affairs & th Bennett November 9 , 2005 – Notice of Public Information Center # 2 mailed. Housing June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Natural Mr. Denis Centre # 1 mailed. Resources Lemoire November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Natural Centre # 1 mailed. Mr. Rob Fancy th Resources November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information September 9 th , 2005 – Letter received regarding the Notice of Centre # 1 mailed. Study Commencement and the listing of the project as a Schedule th C. Also, general comments were provided for assistance to the November 9 , 2005 – Notice of Public Information Center # 2 mailed. Project Team with regard to: Ministry of Mr. Ross June 28, 2007 – Notice of Study Completion mailed.  Ecosystem Protection & Restoration Environment Lashbrook  Greenbelt Planning Area  Groundwater/Surfacewater  Dust & Noise  Contaminated Soils  Mitigation &Monitoring  Class EA Process September 13 th , 2005 - Notice of Study Commencement and Public Information March 23 rd , 2006 – Letter received regarding property owned by Centre # 1 mailed. Harri Liljalehto that is within the Study Area and could be directly Ministry of Mr. Shawn affected. The letter referred to a submission by Mr. Luljalehto of November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Environment Carey November 2005 that has yet to be responded to by the Township June 28, 2007 – Notice of Study Completion mailed. of Scugog and reminded the Project Team of its responsibilities with regard to consultation. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Culture, Mr. Malcolm Centre # 1 mailed. tourism & th Horne November 9 , 2005 – Notice of Public Information Center # 2 mailed. Recreation June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. Stephen Centre # 1 mailed. Transportation Vokes November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. Bruce Centre # 1 mailed. Municipal Affairs & th Singbush November 9 , 2005 – Notice of Public Information Center # 2 mailed. Housing June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. John Centre # 1 mailed. Community & th Wilson November 9 , 2005 – Notice of Public Information Center # 2 mailed. Social Services June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Natural Mr. Louis Centre # 1 mailed. Resources Deacon November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. Ray Centre # 1 mailed. Agriculture & Food Valaitis November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information September 13 th , 2005 – Letter received regarding the Secretariat Ontario Native Centre # 1 mailed. having reviewed the material and being aware of no land claims in the area that would be impacted by the project. Also, that Mr. Doug Carr November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Affairs Secretariat Aboriginal Peoples of three groups should be contacted as June 28, 2007 – Notice of Study Completion mailed. potentially being impacted by the project.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Public Centre # 1 mailed. Infrastructure & Mr. Paul Evans November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Renewal June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ministry of Mr. Garfield Centre # 1 mailed. Transportation Dales November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. MUNICIPAL & REGIONAL AGENCIES September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Region Ms. Karen Centre # 1 mailed. Federation of th Yellowless November 9 , 2005 – Notice of Public Information Center # 2 mailed. Agriculture June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Region’s Centre # 1 mailed. Manufacturer’s November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Association June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ms. Kim Centre # 1 mailed. Township of Scugog th Coates November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Stakeholder Meetings were held with Chief Tracy Gauthier , Mississauga’s of Centre # 1 mailed. representing the Mississauga’s of Scugog Island June 27 th , Ms. Jill st th Scugog Island th November 1 , and November 10 , 2005. The meetings of Thompson * November 9 , 2005 – Notice of Public Information Center # 2 mailed. th th First Nation June 27 and November 10 were held with all members of June 28, 2007 – Notice of Study Completion mailed. the Stakeholder group.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Scugog Memorial Ms. Tom Centre # 1 mailed.

Public Library Bonnana November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Scugog Community Centre # 1 mailed. th Centre November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information The Regional Centre # 1 mailed. Municipality of P.Madill November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Durham June 28, 2007 – Notice of Study Completion mailed. SCHOOL BOARDS / SCHOOLS

September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Catholic Ms. Katherine Centre # 1 mailed. School Board Johnson November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Catholic Ms. Dorothy Centre # 1 mailed. School Board Jean Lane November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Durham District Ms. Lynda Centre # 1 mailed. School Board Smith November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Durham District Mr. Craig Centre # 1 mailed. School Board Burch November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Cartwright Central Mr. Dave Centre # 1 mailed. Public School Lambert November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Epsom Public Ms. Dianne Centre # 1 mailed. School Fennell November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information RH Cornish Public Ms. Carolyn Centre # 1 mailed. School Treadgold November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. SA Cawker Public Ms. Sue th School Brimble November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Good Shepherd Centre # 1 mailed. Ms. Brenda Catholic High th O’Donoghue November 9 , 2005 – Notice of Public Information Center # 2 mailed. School June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Immaculate Centre # 1 mailed. Mr. Jamie Conception th Kettrick November 9 , 2005 – Notice of Public Information Center # 2 mailed. Catholic School June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Port Perry High Mr. Tim Taylor th School November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

UTILITIES

September 13 th , 2005 - Notice of Study Commencement and Public Information Ms. Heather Centre # 1 mailed. Bell Canada th Rivet November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Enbridge Centre # 1 mailed. Mr. Thou Vong th Consumers Gas November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Oshawa Public Mr. Dave Centre # 1 mailed. Utilities th Osborne November 9 , 2005 – Notice of Public Information Center # 2 mailed. Commission June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Compton Cable Mr. Ed Olsen November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Mr. B. Jamie Centre # 1 mailed. Hydro One th Bignell November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Veridian November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Enbridge Mr. Edwin Centre # 1 mailed. Consumers Gas Makkinga November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Hydro One Mr. Jim Hisson November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. EMERGENCY

September 13 th , 2005 - Notice of Study Commencement and Public Information Township of Scugog Centre # 1 mailed. Fire Chief th Fire Department November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ontario Provincial Staff Sgt. Jan Centre # 1 mailed. Police Idzenga November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Region Manager; Plans Centre # 1 mailed. Police Services Analyst November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Region Mr. Steve Centre # 1 mailed. August 24th, 2005 – Letter received regarding Second Access road and its consistency with Durham Region Ambulance Service November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Ambulance Service McNenly principles of contingency and preparedness planning. June 28, 2007 – Notice of Study Completion mailed. INSTITUTIONAL

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Anglican Church th Ascension November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Blackstock Untied th Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Caesarea Centre # 1 mailed. Christian November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Fellowship June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Emmanuel th Pentecostal Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Greenbank United th Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Hope Christian th Reformed Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Immaculate th Conception Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Port Perry Baptist th Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Port Perry United th Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Presbyterian th Church St. Johns November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Scugog & Centre # 1 mailed. Manchester United November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Church June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Seagrave United th Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. St Johns Anglican th Church November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Victory Christian th Centre November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

September 13 th , 2005 - Notice of Study Commencement and Public Information Centre # 1 mailed. Port Perry Hospital November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

TRANSIT / TRANSPORTATION

September 13 th , 2005 - Notice of Study Commencement and Public Information Mr. Michael Centre # 1 mailed. Go Transit th Sone November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Mr. Ben Centre # 1 mailed. Handi Transit th Chartier November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. OTHER

September 13 th , 2005 - Notice of Study Commencement and Public Information Association of th Ms. Rolanda Centre # 1 mailed. December 15 , 2005 – Letter received regarding PIC # 2 and Iroquois & Allied th addition to project mailing list of the “Oneida Nation of the Elijah November 9 , 2005 – Notice of Public Information Center # 2 mailed. Indians Thames”. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Goreski’s Lakeside Centre # 1 mailed. th Recreation November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Mr. Ian Centre # 1 mailed. Conservation th McNab November 9 , 2005 – Notice of Public Information Center # 2 mailed. Authority June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Stakeholder Meetings were held with Mr. Arnold Block, Mr. Melvin Centre # 1 mailed. representing the Blue Heron Casino June 27 th , November Great Blue Heron st th th Bartholomeusz th 1 , and November 10 , 2005. The meetings of June 27 Charity Casino November 9 , 2005 – Notice of Public Information Center # 2 mailed. th * and November 10 were held with all members of the June 28, 2007 – Notice of Study Completion mailed. Stakeholder group. September 13 th , 2005 - Notice of Study Commencement and Public Information Scugog Island Centre # 1 mailed. th Marina November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

September 13 th , 2005 - Notice of Study Commencement and Public Information Ontario Cycling Centre # 1 mailed. th Association November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Ontario Realty Mr. R.M. Centre # 1 mailed. Corporation Farewell November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Scugog Chamber of Mr. Craig Centre # 1 mailed. Commerce Taylor November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Home & Centre # 1 mailed. Small Business November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Association June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Durham Region Centre # 1 mailed. th Real Estate Board November 9 , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed. September 13 th , 2005 - Notice of Study Commencement and Public Information Scugog Shores Mr. Craig Centre # 1 mailed. Historical Museum Belfry November 9 th , 2005 – Notice of Public Information Center # 2 mailed. June 28, 2007 – Notice of Study Completion mailed.

*Denotes Contact as a Member of the Stakeholder Committee for the Project Township of Scugog: Proposed Second Access Road to Scugog Island

AGENCY CORRESPONDENCE

CONTACT AGENCY CORRESPONDENCE SENT RESPONSES RECIEVED NAME

November 9 th , 2005 – Notice of Public Information Center # 2 mailed. Stakeholder Meetings were held with Mr. Arnold Block, representing the Moto Cross Track, November 1 st , and Mr. Rene June 28, 2007 – Notice of Study Completion mailed. th th Moto Cross Track November 10 , 2005. The meetings of June 27 and Goose * November 10 th were held with all members of the Stakeholder group.

*Denotes Contact as a Member of the Stakeholder Committee for the Project

Township of Scugog

APPENDIX A-4: Steering Committee Documentation

Proposed Second Access Road to Scugog Island Class Environmental Assessment Study Environmental Study Report

Class Environmental Assessment for a Second Access Road to Scugog Island Steering Committee Membership List

Title First Last Name Role Representing Name Melvin Bartholomeusz Great Blue Heron Charity Casino Chief Tracy Gauthier Mississaugas First Nation Councillor Lynn Hodgson Ward 3 Councillor Township of Scugog Councillor Angela Johnson Mississaugas First Nation Kathryn McCann Acting CAO Township of Scugog Councillor Jim McMillen Regional Township of Scugog Councillor Mayor Marilyn Pearce Township of Scugog Susan Siopis Region of Durham Linda Whetung Legal Mississaugas First Nation Representation Tim Wright Roads Manager Township of Scugog Lisa Fitton Recording Township of Scugog Secretary Gene Chartier Township of Scugog

MINUTES OF THE SECOND ACCESS STAKEHOLDERS MEETING

HELD THURSDAY, FEBRUARY 3, 2005

AT 10:00 AM IN THE TOWNSHIP OF SCUGOG COUNCIL CHAMBERS

Present: Marilyn Pearce, Mayor, Township of Scugog, Chair Melvin Bartholomeusz, Great Blue Heron Charity Casino Gene Chartier , Manager Transportation Planning & Design, Region of Durham Lynn Hodgson , Councillor Ward 3, Township of Scugog Kathryn McCann , Acting CAO/Treasurer, Township of Scugog Jim McEwen , Totten Sims Hubicki Jim McMillen , Regional Councillor, Township of Scugog Linda Whetung , Legal Counsel, Mississaugas of Scugog Island First Nation Tim Wright , Roads Manager, Township of Scugog Lisa Fitton , Recording Secretary, Township of Scugog

The Mayor welcomed everyone and explained the purpose of today’s meeting was to review what was discussed at the meeting held on November 29, 2004 with regards to completing an Environmental Assessment (EA) for a Second Island Access and to confirm the partners. Proposed partners to complete the EA are the Township of Scugog, Region of Durham and the Great Blue Heron Casino.

• Township of Scugog noted that they have budgeted $50,000 towards the EA, pending budget approval.

• Region of Durham – from a staff perspective, Region of Durham staff recommend contributing $50,000 to the EA. Region currently going through the budgeting process – Region expects to be a partner.

• Great Blue Heron Casino has budgeted $50,000 for the EA. Noted that their commitment is only to the EA phase of the project.

Discussions moved to completing the Terms of Reference for this project. Noted that once the Terms of Reference are completed it must be circulated to the involved stakeholders for their agreement and the next phase would be tendering the EA.

Page 1 of 3 Second Island Access Meeting February 3, 2005

Discussion regarding Terms of Reference included but was not limited to the following points:

• Timeframe to complete the EA was questioned. Noted it is estimated to take six to eight months

• Region noted they have a standard format of Terms of Reference which could be customized to suit. Differences in policies between the Region and Township will need to be verified. Requested the information be forwarded to the Township of Scugog’s Acting CAO for review.

• Preliminary documentation was requested by the Region. TSH will forward the preliminary analysis information they have to the Region representative.

• Bridge option. Noted that a bridge at the north end does not address the emergency services concern.

• Process was questioned with regards to a Steering Committee or approaching each agency on an individual basis. The group agreed to continue as the Steering Committee. Members will be responsible for reporting back to their respective agencies and bringing forward their agencies feedback.

• Stakeholders. Ministry of Transportation was identified; Region representative noted they will contact the MTO regarding their participation. Conservation Authorities, neighbouring municipalities and Goreski’s Resort were noted as other potential stakeholders.

• Public notification. Region will handle via their consultants.

• Agencies will forward information to the Acting CAO of the Township of Scugog until the Director of Public Works position is filled. The CAO’s office will be responsible for forwarding information to the involved groups during this time as well.

Public notification process was discussed. It was noted that the EA is a study not the final design and that it is valid for five years. The EA remains valid after the five year time-frame as long as there is ongoing work moving the project forward.

A copy of the Township of Scugog’s Master Fire Plan and any other relevant information was requested for the Region to assist with the Terms of Reference. Discussed if Police and/or Fire would have the numbers regarding number of times Island Road has been shut down. It was noted that both Police and Fire Emergency Services will be consulted.

Page 2 of 3 Second Island Access Meeting February 3, 2005

The Region’s staff will begin working on the Terms of Reference and the public can be advised the project is officially underway. Mayor Pearce thanked everyone for assisting to move this project forward.

Minutes recorded by: Mrs. Lisa Fitton Please report errors and omissions as soon as possible. Thank you.

Page 3 of 3 MINUTES OF THE SECOND ACCESS STAKEHOLDERS MEETING

HELD MONDAY, JUNE 27, 2005

AT 10:00 AM IN THE TOWNSHIP OF SCUGOG COUNCIL CHAMBERS

Present: Marilyn Pearce, Mayor, Township of Scugog, Chair Jim McMillen , Regional Councillor, Township of Scugog Lynn Hodgson , Councillor Ward 3, Township of Scugog Tracy Gauthier, Chief, Mississaugas of Scugog Island First Nation Angela Johnson, Councillor, Mississaugas of Scugog Island First Nation Della Charles, Councillor, Mississaugas of Scugog Island First Nation Garfield Dales, Ministry of Transportation Michael Lang, Ministry of Transportation Sabeen Khokhar, Totten Sims Hubicki Mike Delsey, Totten Sims Hubicki James Garland, Region of Durham Gene Chartier , Commissioner of Infrastructure & Development Tim Wright , Roads Manager, Township of Scugog Shawna Cornish , Recording Secretary, Township of Scugog

1. INTRODUCTION

The Mayor welcomed everyone and briefly reviewed the history of the Steering Committee and the progress that has been made since the initial meeting of November 29, 2004. The Request for Proposal was awarded to Totten Sims Hubicki (TSH) in May and the Township has appointed Gene Chartier as Commissioner of Infrastructure & Development.

2. ADOPTION OF THE MINUTES

Minutes of the February 3, 2005 meeting were reviewed.

Committee Recommendation: THAT the minutes be adopted as circulated.

Page 1 of 4 Second Island Access Meeting June 27, 2005

3. ROLE OF THE STEERING COMMITTEE

Discussion included the following items:

COMMUNCIATION PLAN

Mr. Chartier reviewed the draft Communication Plan, which outlines the responsibilities and activities of the Steering Committee.

ACTION: Steering Committee members to review draft Communication Plan and provide any comments to Township staff by the end of July. Township staff to determine preferred method of advertising Study events.

TARGET AUDIENCES:

Mr. Chartier noted that several stakeholders, in addition to government and regulatory agencies, will have an interest in the study. Employees and patrons of the Great Blue Heron Charity Casino are a key audience to be reached through the Study. Other target groups identified include local Island businesses, such as Goreski’s, and the hospital staff who reside on the Island.

ACTION: Township staff to contact Mr. Block, the new General Manager of the Great Blue Heron Charity Casino, to discuss how input from the patrons and staff of the casino can be addressed. Township staff to obtain a copy of the Council minutes summarizing the presentation by Dr. Brown for a second access to the Island.

PUBLIC INFORMATION CENTRES:

Mr. Chartier asked for any input regarding the location and format of the public information centres. Chief Gauthier suggested that the meetings take place at the Mississaugas’ community hall. The Steering Committee concurred, subject to availability.

ACTION: Chief Gauthier to check the availability of the hall in late September and late November of 2005. Page 2 of 4 Second Island Access Meeting June 27, 2005

Mr. Chartier suggested that the first public information meeting consist of a drop in format and the second meeting could possibly be a formal presentation. The Steering Committee concurred.

Mr. Chartier recommended that presentations be made to the Township’s General Purpose and Administration Committee prior to each public information centre. The Steering Committee concurred.

4. STUDY PROCESS AND SCHEDULE

Mr. Delsey reviewed the Municipal Class Environmental Assessment process. Mr. Chartier commented that once the Environmental Study Report is approved, the Township has five years to initiate the project.

Discussion took place regarding the process, with questions arising about the problem identification phase. Councillor Hodgson stated that there were residents who had already contacted him regarding the effects of the proposed second access on the volume of traffic on other Township roads.

ACTION: Councillor Hodgson to forward names of residents who have voiced concern to Mr. Delsey to add to the Study list.

Mr. Delsey reviewed the Study schedule handout. Mr. Dales suggested there be a special meeting with MTO to discuss potential implications for Highway 7A. TSH asked Mr. Garland to assist with obtaining information from the Region’s GIS staff.

ACTION: TSH to confirm with Kawartha Conservation regarding any different layers than the Region GIS.

5. CONSULTATION PROGRAM

Mr. Delsey suggested TSH, Mr. Chartier, Chief Gauthier and the Councillors from the Missisaugas of Scugog Island First Nation meet in the July to discuss any needs and future growth of the First Nation. Councillor Hodgson made mention of the large MX motorcross events that takes place on the Island on the weekends, which increase traffic volumes. It was suggested that the individual organizing the events be added to the Study list by TSH. Page 3 of 4 Second Island Access Meeting June 27, 2005

ACTION: Chief Gauthier to provide Township staff with the individual’s contact information.

6. NEXT MEETING

Next meeting to take place the 3 rd or 4 th week in August.

7. ADJOURNMENT

Minutes recorded by: Ms. Shawna Cornish Please report errors and omissions as soon as possible. Thank you.

Page 4 of 4 MINUTES OF THE SECOND ISLAND ACCESS STEERING COMMITTEE MEETING

HELD MONDAY, NOVEMBER 10, 2005

AT 10:00 AM IN THE TOWNSHIP OF SCUGOG COUNCIL CHAMBERS

Present: Marilyn Pearce, Mayor, Township of Scugog, Chair Jim McMillen , Regional Councillor, Township of Scugog Lynn Hodgson , Councillor Ward 3, Township of Scugog Michael Lang, Ministry of Transportation Sabeen Khokhar, Totten Sims Hubicki Mike Delsey, Totten Sims Hubicki James Garland, Region of Durham Gene Chartier , Commissioner of Infrastructure & Development Tim Wright , Roads Manager, Township of Scugog Shawna Cornish , Recording Secretary, Township of Scugog

1. INTRODUCTION

The Mayor welcomed everyone and indicated the purpose of this meeting was to review the status of the Municipal Class Environmental Assessment study and the alternative design concepts for the north and south connections.

2. ADOPTION OF THE MINUTES

Minutes of the June 27, 2005 meeting were reviewed.

Committee Recommendation: THAT the minutes be adopted as circulated.

3. STUDY PROGRESS TO DATE

Mr. Delsey reviewed the results of Public Information Centre (PIC) #1, which was held on September 22, 2005. In total, 63 residents signed in, although attendance was higher, and 27 comment sheets were received.

Page 1 of 4 Second Island Access Meeting November 10, 2005

The overall consensus from the PIC was that most people supported the concept of the second access road, but were concerned about the location.

The project team reviewed other consultation activities that have taken place:

● Mr. Delsey noted that Mr. Chartier, Ms. Khokhar and himself had met with Fire Chief Miller. Chief Miller does not support an exclusive route for emergency vehicles due to concerns about the gate and keys being distributed to all emergency vehicles.

● Mr. Chartier and Ms. Khokhar met with Mr. Block from the Great Blue Heron Charity Casino. Mr. Block indicated that there were no plans at this time for expansion of the Casino.

● Mr. Chartier and Ms. Khokhar met with the Council of the Mississauga’s of Scugog Island First Nation. Chief Gauthier indicated that there were no plans at this time for any new development on their lands.

● Ms. Khokhar met with Mr. Rene Goose who organizes the motorcross events that take place on the Island on the weekends. Mr. Goose indicated that he hopes to expand the motor track by next spring and predicts that membership will increase. He estimates that 200 people attend the track on the weekends.

Mayor Pearce suggested that the project team contact the new managers at Goreski’s Resort to discuss any future expansion plans.

Mr. Chartier noted that the meetings confirmed the findings to date, which support a second access road to the Island. Without expansion of the Casino or the Mississauga’s of Scugog Island lands, a need for a second access to the Island exists.

4. ALTERNATIVE DESIGN CONCEPTS

Mr. Delsey provided a map to illustrate the alternative routes for the southern and northern connections.

Page 2 of 4 Second Island Access Meeting November 10, 2005

Discussion regarding the southern connection followed. Mayor Pearce expressed concern that Alternative 2 for the southern connection would result in a more direct access from Highway 7A onto the Island, thereby potentially serving as a by-pass to Island Road. Alternative 1 cannot be seen from the highway and is not a direct route.

Discussion regarding the northern connection followed. Mr. Delsey suggested the preferred routes be either Alternative 4 or 5 with Alternative 5 being the most preferred.

Mr. Delsey noted that the priority for the Township would be the southern connection, which would provide an alternative to Island Road for emergency vehicles between Highway 7A and Ma Brown’s Road.

Mr. Delsey also noted that each alternative would be constructed as per the Township’s Design Criteria and will be to the same standard as the adjacent roads.

Mr. Lang asked TSH to provide the Ministry of Transportation (MTO) documentation regarding the new intersection proposed on Highway 7A, and its merits compared to the existing Reader Road location. Mr. Delsey requested MTO to submit a written response indicating the MTO’s preferred alternative for the southern connection, based on this review.

The Committee agreed that the preferred alternatives were the following:

- Alternative 2 for the southern connection - Alternative 4 for the northern connection

These alternatives will be presented at PIC #2 as the preferred locations from a technical perspective, subject to MTO’s review.

5. STUDY PROCESS AND SCHEDULE

Mr. Chartier explained to the Committee that there will be a presentation regarding PIC #2 at the General Purpose and Administration Committee meeting on November 21, 2005.

Page 3 of 4 Second Island Access Meeting November 10, 2005

PIC #2 will be held November 24, 2005 at the Scugog Island Hall at 5:00 p.m. Advertisements were placed in the Bulletin Board on November 4 th and 18 th .

Councillor Hodgson noted that he received the advertisement as a flyer in the Port Perry Star. Ms. Khokhar will investigate.

Mr. Chartier reviewed the remaining steps and actions for the Municipal Class Environmental Assessment study. After the PIC, the project team will review the comments and finalize the Environmental Study Report (ESR). There will be a public review held for 30 days after the ESR is filed. TSH is aiming to have the ESR finished in March 2006.

6. ADJOURNMENT

Minutes recorded by: Ms. Shawna Cornish Please report errors and omissions as soon as possible. Thank you.

Page 4 of 4