SENER in the Unveiling of Barcelona's Metro Line 9 Between Zona

Total Page:16

File Type:pdf, Size:1020Kb

SENER in the Unveiling of Barcelona's Metro Line 9 Between Zona PRESS RELEASE SENER in the unveiling of Barcelona’s metro line 9 between Zona Universitària and Barcelona airport The engineering and technology group worked throughout the full life cycle of this project, which set new standards for metro lines worldwide. Barcelona (Spain), February 12, 2016 – The engineering and technology group SENER attended the unveiling of the South section of Barcelona metro line 9, which took place during the morning of February 12. Guests included the president of the Catalonia Government, Carles Puigdemont, and other representatives of public institutions. The new line section connects the following municipalities of the metropolitan area: Barcelona, L’Hospitalet and El Prat de Llobregat. This addresses the demand from different urban areas which, until now, lacked a public transport railway connection. The newly opened section connects the two airport terminals, the exhibition sites, industrial areas, residential areas and the city centre (15 stations and a depot situates in Zona Franca). Many passengers are currently using line 9, the first section of which was launched in December 2009. SENER played a key role in line 9, being responsible for providing technical assistance for the integration of all infrastructure and systems, and participating in the Project and Construction Management of systems, stations and civil works. The project was one of notable technical complexity, its 52 stations and total length of 47.8 km making it the largest automated line in Europe and one of the most modern in the world. In this regard, the Director of SENER in Catalonia, Òscar Julià, highligted “the excellent work of the SENER team, as they were not only responsible for defining and supervising the technical functionalities, managing the integration of interfaces and providing assistance during the operation of the line, but also delivered an exhaustive global risk analysis. In it, SENER defined, distributed and assigned the safety requirements for each of the subsystems, making Barcelona metro’s line 9 one of the safest on the continent.” The longest driverless line in Europe Barcelona metro’s line 9 runs as a driverless Unattended Train Operation (UTO), allowing trains to circulate autonomously. This offers users a service with greater safety, regularity and availability, and there is more flexibility to bring supply into line with demand, since trains are added or removed automatically, in accordance with transport requirements. This automation also offers high levels of safety: all platforms have panels preventing access to the tracks, fitted with doors that open in sync with the opening of the train doors to give access to the cars. The closing-off of the platforms offers other advantages, such as better temperature control and soundproofing of the platforms. Furthermore, the stations have large-capacity elevators. The signaling system is automatic and wireless, as it is the video transmission system installed in the trains, which gives the control center a real-time view of the cars and the track. The entire line operation is managed from a central control center, where qualified personnel supervise the trains’ For more information: Oihana Casas. Communication. SENER. Tel (+34) 91 807 73 18 / (+34) 679 31 40 85 www.sener-group.com movements. There is also a second emergency control center capable of taking over operations if the main control center fails. Continuous communication is maintained between the control center and the trains to regulate intervals and timetables. At the same time, other telecommunication systems keep passengers informed and supervise security by means of video surveillance cameras, telephone, intercom and megaphone systems. These also allow continuous communication between the controllers, as well as access to the emergency services. These systems are organized through two independent data networks that converge onto one IP data platform. There are manifold subsystems that in conjunction underlie the functioning of the metro. Their integration, which was the responsibility of SENER, is critical to guarantee the efficiency of the installations. In point of fact, the launch of line 9 sets new standards in the design and construction of metro systems, making Barcelona a global example for urban transport. About SENER SENER is a private engineering and technology group founded in 1956. It seeks to offer its clients the most advanced technological solutions and enjoys international recognition thanks to its independence and its commitment to innovation and quality. SENER has a workforce of near 6,000 professionals distributed across its offices in Algeria, Argentina, Brazil, South Korea, Chile, China, Colombia, the United Arab Emirates, Spain, the United States, Japan, Mexico, Poland, Portugal and the United Kingdom. The group’s turnover exceeds 1.305 billion Euros (2014 data). SENER engages in the specific activities of Engineering and Construction. It also has industrial holdings in companies involved in Aeronautics, as well as in the field of Energy and Environment. In the area of Engineering and Construction, SENER has become a world leader in Aerospace, Infrastructures and Transport, Power, Oil & Gas, and Marine. In 2016, SENER will be celebrating its 60th anniversary with a long track record of projects, international experience and a team comprised of thousands of professionals who are the co-creators of the innovations that have marked its past and will shape its future. Follow us on: For more information: Oihana Casas. Communication. SENER. Tel (+34) 91 807 73 18 / (+34) 679 31 40 85 www.sener-group.com .
Recommended publications
  • Zona Franca.Ok
    CONTINGUTS • EL POLÍGON INDUSTRIAL DE LA ZONA FRANCA • PROPOSTES PER ANAR EN TRANSPORT PÚBLIC COL·LECTIU • PROPOSTES PER FER UN ÚS MÉS RACIONAL DEL VEHICLE PRIVAT • ELS AVANTATGES D’UNA MOBILITAT MÉS SOSTENIBLE • UN EXERCICI PRÀCTIC: LA MOBILITAT I L’ECONOMIA DOMÈSTICA • RECURSOS I SERVEIS D’INTERÈS Coordinació Manuel Ferri, COORDINADOR DE MOBILITAT. COMISSIÓ OBRERA NACIONAL DE CATALUNYA Continguts Antoni París –Comunicació Ambiental- Disseny gràfic Domènec Òrrit Assessorament Mayte Capdet, AUTORITAT DEL TRANSPORT METROPOLITÀ Ramon Molist, CONSORCI ZONA FRANCA DE BARCELONA Pere Navarro, COMISSIONAT DE MOBILITAT. AJUNTAMENT DE BARCELONA Pau Noy, ASSOCIACIÓ PER A LA PROMOCIÓ DEL TRANSPORT PÚBLIC M. Teresa Tacias, TRANSPORTS METROPOLITANS DE BARCELONA Manuel Villalante, TRANSPORTS METROPOLITANS DE BARCELONA M. Àngels Villalba, CETRAMSA/ENTITAT METROPOLITANA DEL TRANSPORT Neus T. Figueras Aplicacions cartogràfiques Cristina Farré, CARTPLAN Imatges Ramon Panosa, PANOSA BORRÀS, SL Rosa Rodrigo, CONSORCI ZONA FRANCA DE BARCELONA Abril 2004 2 EL POLÍGON INDUSTRIAL DE LA ZONA FRANCA l Polígon Industrial de la Zona La superfície ocupada pel Polígon E Franca de Barcelona ocupa una Industrial de la Zona Franca superfície de 600 hectàrees, situades correspondria aproximadament entre la muntanya de Montjuïc, el riu a unes 600 illes de l’Eixample, Llobregat i el port, i limita amb els i representa un 6% del territori municipis de l’Hospitalet de Llobregat i de Barcelona. el Prat de Llobregat. A les 250 empreses del Polígon hi tre- ballen més de 43.000 persones (l’1,8 per cent de la població activa catalana), nombre equivalent, aproximadament, a la població de ciutats com Castelldefels o Gavà. El Polígon dóna feina també de forma indirecta a més de 275.000 persones.
    [Show full text]
  • Ingemey Consultores 2013
    Línea 5 del Metro de Barcelona Túnel de Olesa Tubería forzada de Moralets II INGEMEY CONSULTORES 2013 Línea 9 del Metro de Barcelona ÍNDICE 1 EMPRESA 1.1 PRESENTACIÓN 1.2 NUESTROS VALORES 1.3 SERVICIOS 1.4 POLÍTICA DE CALIDAD Y MEDIOAMBIENTAL 2 ACTIVIDADES DE LA EMPRESA 2.1 TÚNELES Y OBRAS SUBTERRÁNEAS 2.2 GEOTECNIA 2.3 ESTRUCTURAS 3 CLIENTES Línea 9 del Metro de Barcelona 4 PROYECTOS 4.1 BARCELONA METRO – LINE 9 SAGRERA TAV-GPRG 4.2 BARCELONA METRO – LINE 9 PARC LOGÍSTIC-ZONA UNIVERSITÀRIA 4.3 HIGH VELOCITY LINE MADRID-ZARAGOZA- BARCELONA-FRENCH BORDER BORRASSÁ-FIGUERAS 4.4 BARCELONA ORBITAL HIGHWAY B-40 OLESA DE MONTSERRAT-VILADECAVALS INGEMEY CONSULTORES, S.L. Línea 9 del Metro de Barcelona C/ PORTUGAL 3, PORTAL 3, 1ºD 28224 POZUELO DE ALARCÓN (MADRID) T: 91 799 17 24 F: 91 352 25 17 (C) Copyright INGEMEY CONSULTORES [email protected] June, 201.3 www.ingemey.es 1 EMPRESA 1.1 PRESENTACIÓN 1.2 NUESTROS VALORES 1.3 SERVICIOS 1.4 POLÍTICA DE CALIDAD Y MEDIOAMBIENTAL 1.1 Presentación INGEMEY CONSULTORES S.L. es una compañía española de consultoría e ingeniería fundada en 2008. De capital totalmente privado e independiente de suministradores y constructores, nace para desarrollar su trabaJo en el campo de la ingeniería estructural y geotécnica, abarcando tanto el proyecto, como la asesoría y asistencia técnica. Ha trabaJado para las empresas constructoras y consultoras líderes en España, tanto en proyectos nacionales como internacionales. La prioridad de Ingemey son los clientes, tanto privados como públicos. La constante puesta al día y permanente innovación permiten ofrecer soluciones a medida, basadas en tecnología de última generación.
    [Show full text]
  • White Book of the Sustainable Mobility in the Early XXI Century
    White Book of the Sustainable Mobility in the early XXI century Con laCon colaboración Con la lacolaboración colaboración de: de: de: Con Con la colaboraciónla colaboración de: de: Con la colaboración de: Con laConCon colaboración la la colaboración colaboración de: de: de: Editor: Clúster d’Eficiència Energètica de Catalunya (CEEC) / Via Laietana, 39, 08003 Barcelona Coordination: Jaume Roca (COMSA EMTE), Bàrbara Urdillo (CEEC), MªJosé Viladomiu (Institut Cerdà) Authors: Jordi Castells (ICAEN), Albert Cot (COMSA EMTE), Miquel Cruz (IREC), Albert Fayós (GTD), Albert Guasch (Institut Cerdà), David Huguet (UPC), Marc Iglesias (Institut Cerdà), Jaume Roca (COMSA EMTE), Manel Sanmartí (IREC), Narcís Teixidó (Institut Cerdà), Narcís Vidal (ENDESA), Roberto Villafáfila (CITCEA -UPC) Technical review: Francesc Astals (Department of transport, UPC) Translation and linguistic review: Tick Translations® Design: Kunste Design Studio Index Foreward ..................................................................................................................................... 4 Introduction ................................................................................................................................ 5 Conflicts and problems associated with mobility ............................................................... 6 1. Incentive parking and Bus-HOV lanes .............................................................................. 8 2. Urban mobility management .............................................................................................
    [Show full text]
  • Autorevista Nº 2154
    Sumario 3 Actualidad 23 Tecnalia inicia su andadura en el campo Especial Nissan Special de la investigación_______________________________ 8 La UE aprueba el nuevo Reglamento de distribución _ 10 Navigation Technologies se presenta en España ___ 12 La producción del X83 muestra las virtudes El diseño de vehículos busca superar las limitaciones de una sólida alianza _________________________ 24 impuestas por la seguridad _______________________ 14 Production of the X83 demonstrates the virtues of a solid alliance ___________________________ 24 18 Nissan exprime al máximo sus posibilidades en compras ________________________________ 36 Premio Dirigente del Año Nissan squeezes the utmost out of the Director of the Year Award purchasing function _________________________ 37 Presentación de los candidatos al premio Nuevos conceptos transforman los suministros Dirigente del Año 2002, otorgado por AutoRevista__ 18 para el X83 _________________________________ 44 Presentation of the candidates for AutoRevista´s New logistics approaches transform supply Director of the Year Award 2002 ________________ 18 for the X83 _________________________________ 44 La pareja Trafic y Vivaro se convierte en trío Empresas/Companies con el Primastar _____________________________ 52 The Primastar joins the Trafic and Vivaro to Gameko se consolida como referente make up a trio ______________________________ 52 de la industria de componentes mecanizados ________ 74 Gameko consolidates its position as a leading reference in the machined parts industry ___________
    [Show full text]
  • Custodio, E., Garcia, J.L
    120 SEA WATER ENCROACHMENT IN THE LLOBREGAT AND BESOS AREAS, NEAR BARCELONA (CATALONIA, SPAIN) 1 by Emilio Custodio, Dr. Ing. ABSTRACT The Llobregat and Bes6s areas, though small, are highly important aquifers for the Barcelona peripherical zones, and support a complex of urban, industrial and irrigated areas. They are young river deltas containing a two aquifer system, interconected upstream and at the delta boundaries. The deep aquifers support most of the abstractions, specially in the Llobregat area, the most important one. Since 1965 different studies have been completed and a partial observation network has been operated. Sea water encroachment proceeds into the deep aquifer through two main tracts along the Llobregat delta sea limit, corresponding to more coarse alluvial deposits, and their effects appear with a delay of 10 to 15 years. In between the salty water penetrations there are portions of re­ sidual fresh water, in the less permeable formations. Industrial wells pumping salt water aid in controling the salinization of other areas upstream, but when abandoned there is a step increase in chloride content. A wide mixing front develops and no Ghyben­ Herzberginterface can be found, though the general consequences apply. 1 Barcelona's International Groundwater Course. ETSIIB.- Polytecnical University of Barcelona and Eastern Pyrenees Water Agency. 121 VALLES' GRAVEN hnrbour \ (> { ~I>- 0 ... '1. \ " v N ~ 1>- ~ ~ p.. ~ ~ ~ E T 0 0 2 3km E 15 represents 15.106 m3/year ~ Pr~sent irri gahd area !ndustrial pumping center ~ with river water Supply wells --- - Irrigation canal Main irrigation wells ==t> Water divertion ® Recharge wells a Recho r gebyploughing Fig.
    [Show full text]
  • Appendix B Resumes
    appendix B ReSumeS SR 99 BoRed Tunnel AlTeRnative deSign-Build PRojecT DragAdoS uSA — TuToR PeRini — HnTB Appendix B – Resumes TUNNEL ProPosal – SR 99 Bored Tunnel alTernaTive TUNNEL Appendix B – Resumes The ability of any organization to succeed lies in the rigorous objectives for cost, schedule, safety and talent, experience and commitment of its members. quality. He is joined by individuals who bring a The STP Team has chosen its top industry experts, successful track record in: who are recognized leaders in their fields of expertise • Managing tunnel and other highway and and have a history of working successfully in team- transportation capital improvement projects. based, fast-paced, execution-oriented environments. They are personally committed to the Project • Working in densely populated urban and share WSDOT’s enthusiasm and passion for environments. successfully completing this world-class tunnel. • Controlling cost, schedule, safety and quality STP Team Project Manager Alvaro Fernandez’s on large, complex projects. more than 30 years of experience includes recent • Working effectively in team-based responsibility for the M-30 South Bypass South environmental with multiple interfaces. Tunnel Project in Madrid, a 2.25-mile, 49.25-foot- As shown in this section, we have chosen the diameter, two-level, design-build highway tunnel in strongest possible group of professionals whose a highly populated city. Alvaro has strong leadership talent and experience are aligned with the SR 99 skills managing large, diverse, multidiscipline
    [Show full text]
  • Rigid Catenary March 2021
    SECTOR REFERENCE LIST Rigid Catenary March 2021 Project Name Location Date Length Voltage Design (km) Speed (km/h) Metro Buenos Aires Line B Alem-Rosas Argentina 2014 25 600 V 90 Metro Buenos Aires Line E Bolívar-Retiro Argentina 2018 4 1,5 kV 90 Perth- Forestfield Airport link Australia 2019 15 25 kV 140 Melbourne Metro Rail Project Australia Design 1 1,5 kV 90 ÖBB Marchtrent-Traun Austria 1993 0.5 15 - SNCV Charleroi Belgium 1992 0.7 750 V 80 STIB Schaerbeek Depot Brussels Belgium 1998 0.77 750 V 20 STIB Rogier Tunnel Brussels Belgium 2008 0.5 750 V 80 STIB Haren Depot Belgium 2008 3 750 V 20 STIB Thomas Tunnel Brussels Belgium 2009 0.1 750 V 20 STIB Marconi depot Belgium 2016 5 750 V 20 STIB Simonis Belgium 2017 3.1 750 V 20 INFRABEL Tunnel Saint Martin Liege Belgium 2019 1.35 3 kV 80 INFRABEL Tunnel Pierreuse Belgium 2020 3.2 3 kV 80 Metro Sao Paulo Line 4 Brazil 2010 28 1.5 kV 110 Metro Sao Paulo Line 5 phase 1 Brazil 2013 2.3 1.5 kV 100 Metro Sao Paulo Line 5 phase 2 Brazil 2018 21 1.5 kV 100 Metro Sao Paulo Line 4 Extension Brazil 2021 4.5 1.5 kV 110 Metro Sofia Line 3 Bulgaria 2018-2019 23.04 1.5 kV 90 Toronto Saint Clair station Canada 2016 0.37 750 V 30 Ottawa Confederation Line Canada 2018 7.88 1.5 kV 90 Metro Santiago de Chine L3 & 6 Chile 2016 79.75 1.5 kV 80 Guangzhou China 1999 0.2 1.5 kV - MTR Hong Kong SIL-KTE China 2015 12 1.5 kV 90 MTR Hong Kong SCL China 2017 25 25 kV 130 March 2021 © Pandrol 2021 1 of 6 Rigid Catenary Helsinki-Vantaa Airport Finland 2012 16 25 kV 120 RATP Défense/Nation RER A France 1983 0.4 1.5 kV
    [Show full text]
  • Memoria-ESTRATEGIA-DELTA A4 Completa.Pdf
    92 1 ESTRATÈGIA DELTA DEL LLOBREGAT Ajuntament de Barcelona Ajuntament de l’Hospitalet de Llobregat Ajuntament del Prat de Llobregat COMITÉ D’OPERADORS Port de Barcelona Aeroport de Barcelona-El Prat Consorci de la Zona Franca Mercabarna CILSA Fira de Barcelona Fira 2000 ADIF FGC TMB BSM REDACCIÓ Oficina estratègica de l’àmbit del pla del Delta del Llobregat Barcelona Regional ALTRES COL·LABORADORS Universitat Politècnica de Catalunya Estudi Ramon Folch Institut Cerdà Cinesi Gestió i Promoció Aeroportuària Ignasi Ragàs Prat DISSENY Serracatafau IMATGES Arxiu fotogràfic de Barcelona Regional Consorci de la Zona Franca Museu d’Història de Barcelona Ajuntament de Barcelona Gerència Municipal Oficina estratègica de l’àmbit del pla del Delta del Llobregat Ciutat, 3 08002 Barcelona Maig 2018 2 Assolir un paradigma més sostenible per a la plataforma econòmica del Delta del Llobregat, al qual l’impuls a l’activitat econòmica per a generar ocupació inclusiva, vagi de la mà de la reducció de greuges ambientals del delta i la disminució del conjunt de les externali- tats produïdes pels establiments industrials i la mobilitat, tot restituint a aquest territori, a més, la seva condició de part integral i vivible de la ciutat metropolitana. 3 ACRÒNIMS I ABREVIATURES ADIF m2st/m2 Administrador de Infraestructuras Índex d’edificabilitat (resulta de la relació Ferroviarias entre el sostre edificable admès i una AENA unitat de superfície de sòl determinada Aeropuertos Españoles i s’expressa en metre quadrat de sostre y Navegación Aérea edificable/metre
    [Show full text]
  • Automated Metro, Safer and More Efficient
    Automated Metro, safer and more efficient State-of-the-art technology at your service Transports Metropolitans de Barcelona Barcelona, on the road to automation The Barcelona Metro is on the road to automation. The medium- or long-term perspective is for 43% of the TMB network (70 to 160 kilometres) to be automated. The new lines, such as the L9/L10, have been conceived as automated lines and some of the existing ones will be progressively converted. Following L9/10, which was put into operation as an automated line from the outset, L2 will have to be technologically converted and adopt automated operation, as was recently done with L11. This is because, when it is extended to the airport through the Parc Logístic fork, L2 will share part of the infrastructure with L9. The two lines will require compatible trains and systems to operate jointly on the same infrastructure. The benefits of automation TMB’s commitment to automation is consistent 2) More passengers in less time with its desire to provide the best possible service. Automation enables more passengers to The introduction of automated metro systems not be transported in less time using the same only provides more safety, reliability and flexibility infrastructure. Thanks to their sophisticated control while adapting the supply to the demand, it also and monitoring systems, trains can run during peak enables more efficient management of the system times at shorter intervals, under two minutes, with and an increase in the capacity of the networks. An safety totally guaranteed. automated metro system can run with high journey frequencies, complete safety and optimum regularity.
    [Show full text]
  • ACS, Actividades De Construcción Y Servicios, S.A. and Subsidiaries
    ACS, Actividades de Construcción y Servicios, S.A. and Subsidiaries Consolidated Financial Statements for the year ended 31 December 2014, prepared in accordance with International Financial Reporting Standards (IFRSs) as adopted by the European Union and Consolidated Directors' Report ACS, Actividades de Construcción y Servicios, S.A. and Subsidiaries Consolidated Financial Statements for the year ended 31 December 2014, prepared in accordance with International Financial Reporting Standards (IFRSs) as adopted by the European Union ACS, Actividades de Construcción y Servicios, S.A. and Subsidiaries - Consolidated Financial Statements INDEX Page - Consolidation statement of financial position at 31 December 2014 ....................................................................................................................... 5 - Consolidated income statement for the year ended 31 December 2014 ................................................................................................................. 7 - Consolidated statement of comprehensive income for the year ended 31 December 2014 .................................................................................... 8 - Consolidated statement of changes in equity for the year ended 31 December 2014 ............................................................................................. 9 - Consolidated statement of cash flows for the year ended 31 December 2014 ...................................................................................................... 10 -
    [Show full text]
  • DOCTORAL the SIS Structural Design
    Structural design and characterisation of FRC precast segments THESIS Doctoral thesis written by: Lin Liao Directed by: Antonio Aguado de Cea Albert de la Fuente Antequera Sergio Henrique Pialarissi Cavalaro Barcelona, September 2015 DOCTORAL Universitat Politècnica de Catalunya Departament d´Enginyeria de la Construcció Acta de calificación de tesis doctoral Curso académico: Nombre y apellidos: Lin Liao Programa de doctorado: Construction Engineering Unidad estructural responsable del programa: Department of Construction Engineering Resolución del Tribunal Reunido el Tribunal designado a tal efecto, el doctorando / la doctoranda expone el tema de la su tesis doctoral titulada: Structural design and characterisation of FRC precast segments. Acabada la lectura y después de dar respuesta a las cuestiones formuladas por los miembros titulares del tribunal, éste otorga la calificación: NO APTO APROBADO NOTABLE SOBRESALIENTE (Nombre, apellidos y firma) (Nombre, apellidos y firma) Presidente/a Secretario/a (Nombre, apellidos y firma) (Nombre, apellidos y firma) (Nombre, apellidos y firma) Vocal Vocal Vocal ______________________, _______ de __________________ de _______________ El resultado del escrutinio de los votos emitidos por los miembros titulares del tribunal, efectuado por la Escuela de Doctorado, a instancia de la Comisión de Doctorado de la UPC, otorga la MENCIÓN CUM LAUDE: SÍ NO (Nombre, apellidos y firma) (Nombre, apellidos y firma) Presidente de la Comisión Permanente de la Escuela de Secretario de la Comisión Permanente de la Escuela de Doctorado Doctorado Barcelona a _______ de ____________________ de __________ Three passions, simple but overwhelmingly strong, have governed my life: the longing for love, the search for knowledge, and unbearable pity for the suffering of mankind.
    [Show full text]
  • Planning System of Metro Networks. Comparison Between Copenhagen and Barcelona Jordi Frigola Almar 57
    Planning system of metro networks. Comparison between Copenhagen and Barcelona 3. The Barcelona’s metro 3.1. Introduction Barcelona, unlike Copenhagen, has a big metro network for more than 80 years. This metro, together with suburban railways, bus service and the new tram provides Barcelona with a great public transport network to move through the Metropolitan region. However, the increase of population, work places and the development of private transport need to offer a better public service, with better connections between different transport modes to compete directly with the private transport, such as cars and motorbikes. For that reason, in 1997, the Metropolitan Transport Authority (ATM) was created in order to plan the public transport infrastructures in the Barcelona Metropolitan Area. Aside from that, ATM acts as a mediator between the public Administrative and the different operators that take part in the public transport. Hence, ATM created the Infrastructure Master Plan for public transport 2001-2010 (PDI), which basically describes the development of the public transport in the Barcelona Metropolitan Region within the next years. That means the improvement of the actual network, enlarging the existing lines, putting new rolling stock, etc, or creating new ones to fulfil the demand. But also ATM is responsible to plan and coordinate the services, define an integration fare system and manage the mobility. One of the most important infrastructure within the PDI and improvement in the public transport will be the new metro line, L9, the largest in Europe, which will connect the Barcelona’s airport with L’Hospitalet de Llobregat, the northern part of Barcelona, Santa Coloma de Gramenet and Badalona, as well as The Zona Franca, which is the largest industrial area in Spain.
    [Show full text]