KY 3005 (Ring Road) Extension Public Information Meeting #2

Total Page:16

File Type:pdf, Size:1020Kb

KY 3005 (Ring Road) Extension Public Information Meeting #2 Project Update On November 13, 2013 the first public meeting for this project was held. Since then, field surveys, initial environmental analysis, traffic forecasts, and preliminary alternatives have been completed. Based KY 3005 (Ring Road) Extension on the public input received and the analyses conducted, the study from Western Kentucky Parkway to I-65 and US 31W, area has been reduced to the northern half of the initial area. including a new interchange with I-65 Also, since the last meeting the Kentucky Legislature enacted a new Six Year Highway Plan (2014-2020). The new plan includes funds for KYTC Item # 4-198.00 right-of-way acquisition, utility relocation, and construction. The Hardin County, Kentucky previous plan only had funds for the planning and design. Next Steps Based on your input tonight, our project team will continue to study the preliminary alignments to extend Ring Road east to I-65 and US 31W. The studies will include environmental analyses of the human and natural environment, design issues, cost, and public input. Ways to Submit Your Comments We encourage you to complete and leave the included comment sheet tonight. Also, take some home and distribute them to your Kentucky Transportation Cabinet friends and neighbors. Department of Highways District 4 Or, please mail, email or fax your comments by July 8, 2014. Elizabethtown, Kentucky Provide One-on-One comments with Project Staff. Contact Information Public Information Meeting #2 KYTC, Department of Highways District 4 Email: [email protected] Tuesday, June 24, 2014, 5:00 – 7:00 p.m. P.O. Box 309 Call: (270) 766-5066 634 East Dixie Highway OR Central Hardin High School Cafeteria Elizabethtown, Kentucky 42701 Fax: (270) 766-5069 Attention: Brad Bottoms, P.E. Project Manager Purpose of This Meeting The study area, since the meeting held in November 2013, has been reduced from the red dashed line to the green area. Only We are seeking your input regarding the proposed extension of KY alternatives in the green area are being studied. 3005 (Ring Road) east approximately 2.5 miles to create a new full interchange with Interstate-65 and then terminate at US 31W. KYTC has completed an initial Interchange Justification Study for the Ring Road extension and new interchange, and is now looking at alternative alignment locations. As we advance this project, we are seeking your input on the alignment options and environmental considerations such as cemeteries, utilities, community impacts and sinkholes. You are invited to view the display maps at your leisure. Personnel from KYTC District 4 and our consultants (Qk4) are available to answer your questions about this important project. Meeting materials can be found @ http://transportation.ky.gov/district-4/pages/ky3005_extension_to_i65.aspx Purpose and Needs for This Project The Purpose of the project is to improve the east-west system connectivity between the generally north-south radial routes and the interstate network on the south side of Elizabethtown. The Needs for the project are in large part based on the existing and projected land uses (residential and industrial) and resulting traffic patterns in this part of the county. Another goal has been identified for this project: To improve connectivity between the east and west side of Elizabethtown, including J. Patterson Industrial Park and the Glendale Industrial Site Goal Feel free to provide additional information, alignment options, or adjust the proposed alignments on the comment form. Thank you for your interest and your attendance tonight. .
Recommended publications
  • Roundabout Planning, Design, and Operations Manual
    Roundabout Planning, Design, and Operations Manual December 2015 Alabama Department of Transportation ROUNDABOUT PLANNING, DESIGN, AND OPERATIONS MANUAL December 2015 Prepared by: The University Transportation Center for of Alabama Steven L. Jones, Ph.D. Abdulai Abdul Majeed Steering Committee Tim Barnett, P.E., ALDOT Office of Safety Operations Stuart Manson, P.E., ALDOT Office of Safety Operations Sonya Baker, ALDOT Office of Safety Operations Stacey Glass, P.E., ALDOT Maintenance Stan Biddick, ALDOT Design Bryan Fair, ALDOT Planning Steve Walker, P.E., ALDOT R.O.W. Vince Calametti, P.E., ALDOT 9th Division James Brown, P.E., ALDOT 2nd Division James Foster, P.E., Mobile County Clint Andrews, Federal Highway Administration Blair Perry, P.E., Gresham Smith & Partners Howard McCulloch, P.E., NE Roundabouts DISCLAIMER This manual provides guidelines and recommended practices for planning and designing roundabouts in the State of Alabama. This manual cannot address or anticipate all possible field conditions that will affect a roundabout design. It remains the ultimate responsibility of the design engineer to ensure that a design is appropriate for prevailing traffic and field conditions. TABLE OF CONTENTS 1. Introduction 1.1. Purpose ...................................................................................................... 1-5 1.2. Scope and Organization ............................................................................... 1-7 1.3. Limitations ...................................................................................................
    [Show full text]
  • Chapter 10 Grade Separations and Interchanges
    2005 Grade Separations and Interchanges CHAPTER 10 GRADE SEPARATIONS AND INTERCHANGES 10.0 INTRODUCTION AND GENERAL TYPES OF INTERCHANGES The ability to accommodate high volumes of traffic safely and efficiently through intersections depends largely on the arrangement that is provided for handling intersecting traffic. The greatest efficiency, safety, and capacity, and least amount of air pollution are attained when the intersecting through traffic lanes are grade separated. An interchange is a system of interconnecting roadways in conjunction with one or more grade separations that provide for the movement of traffic between two or more roadways or highways on different levels. Interchange design is the most specialized and highly developed form of intersection design. The designer should be thoroughly familiar with the material in Chapter 9 before starting the design of an interchange. Relevant portions of the following material covered in Chapter 9 also apply to interchange design: • general factors affecting design • basic data required • principles of channelization • design procedure • design standards Material previously covered is not repeated. The discussion which follows covers modifications in the above-mentioned material and additional material pertaining exclusively to interchanges. The economic effect on abutting properties resulting from the design of an intersection at-grade is usually confined to the area in the immediate vicinity of the intersection. An interchange or series of interchanges on a freeway or expressway through a community may affect large contiguous areas or even the entire community. For this reason, consideration should be given to an active public process to encourage context sensitive solutions. Interchanges must be located and designed to provide the most desirable overall plan of access, traffic service, and community development.
    [Show full text]
  • I-75/Laplaisance Road Interchange Reconstruction Presentation
    I-75 / LAPLAISANCE ROAD INTERCHANGE RECONSTRUCTION PROJECT OVERVIEW END construction limits along PROJECT LIMITS LaPlaisance Road Limited ROW Albain Ramp E City of Monroe Road Davis Ramp C Drain Monroe Township Fire Station No. 2 LaPlaisance Creek Limited Monroe Charter Township extends through ROW the project limits Ramp D Monroe Links of Lake Boat Club Erie Golf Course adjacent to Ramp B project limits Harbor Marine Trout’s Yacht Ramp A Basin Lake Erie BEGIN construction limits along LaPlaisance Road PROJECT DETAILS Interchange study completed to determine best alternative for design and construction Structure study approval from Federal Highway Reconstruction of LaPlaisance bridge over I-75 Reconstruction of LaPlaisance Road interchange Reconstruction of LaPlaisance Road Reconfiguration of interchange PROJECT TIMELINE Project Letting March 5, 2021 Spring 2021 to Spring 2022 Construction! Bridge and • LaPlaisance Rd bridge over I-75 and LaPlaisance Road pavement constructed in 1955 condition • LaPlaisance Rd interchange ramps reconstructed in 1974 • 25-year (2045) traffic projections Interchange • Reconfiguration of interchange Modernization • Shorter bridge to reduce upfront and future maintenance costs PROJECT NEED SPECIFIC PROJECT INFORMATION (INTERCHANGE RECONFIGURATION) LaPlaisance Road over I-75 (existing condition) Bridge currently closed to traffic Requires replacement due to current condition Existing 14 ft-3 inch (SB) minimum posted underclearance LaPlaisance Road and Ramps The existing interchange operates at an
    [Show full text]
  • American Title a Sociation ~ ~
    OFFICIAL PUBLICATION AMERICAN TITLE A SOCIATION ~ ~ VOUJME XXXVI JUNE, 1957 NUMBER 6 TITLE NEWS Official Publication of THE AMERICAN TITLE ASSOCIATION 3608 Guardian Building-Detroit 26, Michigan Volume XXXVI June, 1957 Number 6 Table of Contents Introduction-The Federal Highway Program ......... ... ................ .. .................... 2 J. E. Sheridan Highway Laws Relating to Controlled Access Roads ..... .. ....... ........... 6 Norman A. Erbe Title Companies and the Expanded Right of Way Problems ...... ............. .. 39 , Daniel W. Rosencrans Arthur A. Anderson Samuel J. Some William A . Thuma INTRODUCTION The Federal Highway Program J. E. SHERIDAN We are extremely grateful to Nor­ veloped its planning sufficiently to man A. Erbe, Attorney General of the show to the satisfaction of the dis­ State of Iowa, for permission to re­ trict engineer the effect of the pro­ print his splendid brief embracing posed construction upon adjace.nt the highway laws of various states property, the treatment of access con­ relating to the control in access roads. trol in the area of Federal acquisi­ Mr. Erbe originally presented this m tion, and that appropriate arrange­ narrative form before the convention ments have been made for mainte­ of the Iowa Title Association in May nance and supervision over the land of this year. As is readily ascertain­ to be acquired and held in the name able, this is the result of a compre­ of the United States pending transfer hensive study of various laws touch· of title and jurisdiction to the State ing on the incidents of highway regu­ or the proper subdivision thereof." lations. Additionally, we are privi­ It is suggested that our members leged to carry the panel discussion bring this quoted portion to the at­ of the American Right of Way Asso­ tention of officers of the Highway ciation Convention held in Chicago, Department and the office of its legal May 16 and 17, dealing with "Title division, plus the Office of the Attor­ Companies and the Expanded Right ney General within the members' ju­ of Way Problems".
    [Show full text]
  • Petition For/Request to Initiate Vacation of Public Highway, Street, Alley Or Easement Requirements and Process Overview
    Petition for/request to initiate vacation of public highway, street, alley or easement Requirements and process overview The City of St. Louis Park will vacate public highways, streets, alleys or easements if it is found that the city has no current or future need for these lands. Proceedings to vacate such land may be commenced by petition of a majority of the owners of property fronting upon the portion of the public highway, street, alley or easement to be vacated, by action of the St. Louis Park City Council or by recommendation of the St. Louis Park Planning Commission. In order to constitute a petition for vacation, a majority of abutting property owners of the portion of public highway or street to be vacated must appear on the petition form. If the request is for vacation of a public alley or easement, it must be signed by the majority of owners of property adjacent to the alley or easement in the block where the alley or easement is situated, whether or not the petition requests vacation of the entire alley or easement. The petition shall be filed with the city clerk. If the application represents a request to the planning commission to recommend and to the city council to initiate vacation, that must be specifically stated. The applicant is encouraged to discuss the proposal with community development staff prior to completion of final plans and filing of a petition/request. Submittal checklist ☐ Petition/request ☐ Filing fee (see application for fee schedule) ☐ A complete and accurate legal property description must be submitted if the property to be vacated is an easement.
    [Show full text]
  • Mr. Gupta Detailed the Current Status of India's Road Network and Its
    Mr. Gupta detailed the current status of India’s road network and its maintenance: “The total length of the road network in India is 4.69 million km. It is the second largest road network in the world, just after the United States. ….. The national highways constitute 82,000 kilometers, 1.7 percent of the total length, and carry 40 percent of the total traffic.” “65 percent of total traffic and 90 percent of passenger traffic are being serviced by roads. The corresponding figures in the 1950s were 12 percent and 31.6 percent. The compounded annual growth rate of traffic on roads during the last two decades has been 9 percent. Road maintenance, however, is not commensurate with the traffic growth rate.” “The Indian Constitution assigns responsibility for the national highway network to the central government while State governments are responsible for developing and maintaining the state highways, major district roads, other district roads, and village roads. ….. The Ministry of Road Transport & Highways is the apex organization in the road sector in the country responsible for the planning, development, and maintenance of the national highways. It extends technical and financial support to state governments for the development of state roads, the connectivity of roads of interest and economic importance; it evolves the standards and specifications for roads and bridges in the country.” “Several road development programs are being implemented in the country. The first, the National Highway Development Program, is one of the world's largest road development programs. It comprises seven phases of development of more than 55,000 km of national highways; of which 21,000 km of road length has already been completed.” “Another is the Rural Road Development Program fully funded by the central government to supplement the efforts of the state governments in the construction and maintenance of the rural road network.
    [Show full text]
  • GUIDELINES for TIMING and COORDINATING DIAMOND November 2000 INTERCHANGES with ADJACENT TRAFFIC SIGNALS 6
    Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. TX-00/4913-2 4. Title and Subtitle 5. Report Date GUIDELINES FOR TIMING AND COORDINATING DIAMOND November 2000 INTERCHANGES WITH ADJACENT TRAFFIC SIGNALS 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Nadeem A. Chaudhary and Chi-Leung Chu Report 4913-2 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 Project No. 7-4913 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Research: Construction Division September 1998 – August 2000 Research and Technology Transfer Section 14. Sponsoring Agency Code P. O. Box 5080 Austin, Texas 78763-5080 15. Supplementary Notes Research performed in cooperation with the Texas Department of Transportation. Research Project Title: Operational Strategies for Arterial Congestion at Interchanges 16. Abstract This report contains guidelines for timing diamond interchanges and for coordinating diamond interchanges with closely spaced adjacent signals on the arterial. Texas Transportation Institute (TTI) researchers developed these guidelines during a two-year project funded by the Texas Department of Transportation. 17. Key Words 18. Distribution Statement Diamond Interchanges, Capacity Analysis, Traffic No restrictions. This document is available to the Signal Coordination, Traffic Congestion, Signalized public through NTIS: Arterials National Technical Information Service 5285 Port Royal Road Springfield, Virginia 22161 19. Security Classif.(of this report) 20. Security Classif.(of this page) 21. No. of Pages 22. Price Unclassified Unclassified 50 Form DOT F 1700.7 (8-72) Reproduction of completed page authorized GUIDELINES FOR TIMING AND COORDINATING DIAMOND INTERCHANGES WITH ADJACENT TRAFFIC SIGNALS by Nadeem A.
    [Show full text]
  • Adopted Text
    THIS PAGE INTENTIONALLY LEFT BLANK Amendment No. 2017-28 Adopted November 17, 2020 AMENDMENT TO THE COMPREHENSIVE PLAN (2017 EDITION) The following changes to the Comprehensive Plan have adopted by the Board of Supervisors. To identify changes from the previously adopted Plan, new text is shown with underline and deleted text shown with strikethrough. MODIFY: Fairfax County Comprehensive Plan, 2017 Edition, Area III, Fairfax Center Area, as amended through 7-31-2018, Fairfax Center Area-Wide Recommendations, page 8, to delete strikethrough text: “The core area near the first Metrorail station is planned for a mix of uses at a variety of intensities, some of which are tied to the funding of the Metrorail extension, or in the interim, funding of a Bus Rapid Transit System. Any development or redevelopment occurring prior to the funding of the Metrorail extension should not preclude higher-intensity transit-oriented development that is envisioned in the future. …” MODIFY: Fairfax County Comprehensive Plan, 2017 Edition, Area III, Fairfax Center Area, Amended through 7-31-2018, Land Use Plan Recommendations – Suburban Center Core Area, Land Unit A, Land Use Recommendations, page 37: “Sub-unit A1 Baseline: Mixed use up to .15 FAR Overlay: Mixed use up to .65 FAR; 1.0 FAR Sub-unit A1 consists of approximately 133 acres, including a 109.5-acre portion that and contains the Fair Oaks regional mall Regional Mall at its center (“Mall Property” or “Mall”), as shown on Figure 11. and several Several office buildings, and hotels, and other commercial uses around its the perimeter of the Mall Property occupy the approximately 24-acre remainder of the sub-unit.
    [Show full text]
  • Rice County, Minnesota Highway
    A B C D E F G H I J R 22 WR22 W21 R W21 R WR20 W R20 WR19 Road Name Location Road Name Location Eaton Ave................G4-5, G8, G9, G9-10G9,G8, EatonAve................G4-5, 13000 12000 11000 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 E..............H7-J7 200th St EavesAve...............G3 200th St W.............A7 200th St EbelAve..................G5 201st Ct W.............B7 201stCt EbelWa y.................G3 202ndW............A7 St EbertCt....................G3 Rice County, 204th St E..............G7 204th St EchaCt..................G3 rt 205th St W.............C7 205th St D8-9 D6-7, EchoAve.................D4-5, 1 W.............C7 206th St EchoCt....................D8 1 Edg e brookDr...........G3 3000 E..............F8 208th St 209th St W.............C8 209th St Edward sWa y...........G5 3000 S co tt County Scott I8-J8 E..............I8, 210th St G9 EilerAve...................G6-8, 210th St W.............A8-D8 210th St ElginCt.....................D6 Minnesota ElginTrl....................D8 Porter 02 E..............H8-I8 215th St 04 C8B8, W.............A8, 215th St ElktonTrl..................D8 Creek 218th St W.............A8 218th St ElmCt.......................G6 06 05 04 03 02 06 01 Bridg e waterTowns hip County Wheatland County Porter03 Creek W e bsterTowns hip I8 E..............F8-H8, 220th St D9-10D8,D6, D5-6, D4-5, ElmoreAve...............D2-3, 4000 01 T112NR21W T111NR20W Ditch 14 Ditch 31 W.............B8-C8 220th St ElmorePath..............D6 4000 Delano 1. Ave De 1. cke Ct r 222ndW............D8-E8 St ElmoreTrl.................D6 05 ElmoreWa y..............D6 Highway Map Rice County, W 41stSt 2.
    [Show full text]
  • Phase II Highway Corridor Strategy Descriptions Technical
    ENTRAL ORK OUNTY ONNECTIONS TUDY CENTRAL YORK COUNTY CONNECTIONS STUDY PHASE II HIGHWAY CORRIDOR STRATEGY DESCRIPTIONS PHASE II TECHNICAL MEMORANDUM SEPTEMBER 2011 Prepared for: Maine Department Maine Turnpike Authority of Transportation Prepared by: In association with: Morris Communications • Kevin Hooper Associates T.Y. Lin • Planning Decisions • Facet Decision Systems Dr. Charles Colgan, University of Southern Maine • Evan Richert Normandeau Associates • Preservation Company This document is formatted for two-sided printing. Document II-4 ENTRAL ORK OUNTY ONNECTIONS TUDY CENTRAL YORK COUNTY CONNECTIONS STUDY 1 INTRODUCTION This document summarizes the potential highway corridor improvements – called strategies – that are being tested and evaluated for Phase II of the Central York County Connections Study (CYCCS). Phase II Highway Strategies are a starting point in the development and consideration of candidate improvements for the study; they are not recommendations, nor are they the only strategies that will be studied. Phase II strategies are conceptual in nature, and not yet detailed, specific proposals. Strategies considered later in the study during Phase III, as well as those ultimately recommended by the study, may differ considerably from the initial strategies currently under evaluation in Phase II. Specific aspects of these initially proposed strategies may be dropped, carried forward or combined in different ways, depending on the results of the analyses conducted during Phase II. The study is guided by a Purpose and Need Statement, which articulates that the study is to identify transportation and related land use strategies that enhance economic development opportunities and preserve and improve the regional transportation system. Additional information on the study, including the full Purpose and Need Statement, is available at the project website: www.connectingyorkcounty.org.
    [Show full text]
  • What Are the Advantages of Roundabouts?
    What is a roundabout? A roundabout is an intersection where traffic travels around a Circulatory central island in a counter- Truck Apron Roadway clockwise direction. Vehicles entering or exiting the roundabout must yield to vehicles, bicyclists, and pedestrians. Figure 1 presents the elements of a roundabout. Yield Line Splitter Island Figure 1: Elements of a Roundabout What are the advantages of roundabouts? • Less Traffic Conflict: Figure 2 compares the conflict points between a conventional intersection and a modern roundabout. The lower number of conflict points translates to less potential for accidents. • Greater safety(1): Primarily achieved by slower speeds and elimination of left turns. Design elements of the roundabouts cause drivers to reduce their speeds. • Efficient traffic flow: Up to 50% increase in traffic capacity • Reduced Pollution and fuel usage: Less stops, shorter queues and no left turn storage. • Money saved: No signal equipment to install or maintain, plus savings in electricity use. • Community benefits: Traffic calming and enhanced aesthetics by landscaping. (1) Statistics published by the U.S. Dept. of transportation, Federal Highway Administration shows roundabouts to have the following advantages over conventional intersections: • 90% reduction in fatalities • 76% reduction in injuries • 35% reduction in pedestrian accidents. Signalized Intersection Roundabout Figure 2: Conflict Point Comparison How to Use a Roundabout Driving a car • Slow down as you approach the intersection. • Yield to pedestrians and bicyclists crossing the roadway. • Watch for signs and pavement markings. • Enter the roundabout if gap in traffic is sufficient. • Drive in a counter-clockwise direction around the roundabout until you reach your exit. Do not stop or pass other vehicles.
    [Show full text]
  • Movingforward
    FORWARD movingfAll 2010 A quarterly review of news and information about Pennsylvania local roads. When to Use Stop Signs in Alleys A Guide to Understanding the State’s Requirements Related to Traffic-Control Devices at Alley Intersections by Patrick Wright, Pennoni Associates When deciding whether to use stop signs and other An alley is considered a “highway” in the Vehicle traffic-control devices in alleys, municipalities Code because it is a “roadway open to the use of the should be familiar with two major issues. The first public.” Following this logic, the junction of an alley is whether traffic control is even required, and the with another highway (including another alley) is con- second is how to properly place the signs especially sidered an “intersection” under the Vehicle Code, and within the space constraints found in most alleys. thus crosswalks (whether marked or unmarked) exist. Understanding Alleys What Traffic-Control and Intersections Devices Are Required? Alleys are defined separately in both the Now that the definitions of alleys and intersec- Pennsylvania Vehicle Code (Title 75) and the tions have been clarified, the next step is to deter- Manual on Uniform Traffic Control Devices mine what traffic-control devices are required for (MUTCD). According to the Vehicle Code (Title alleys. As at any intersection, the Vehicle Code does 75, Section 102) as well as the MUTCD, an alley not necessarily require stop signs or other traffic-con- is “a street or highway intended to provide access to trol devices. Instead, the code has specific “rules of the rear or side of lots or buildings in urban districts the road” that govern driving behavior and the right- and not intended for the purpose of through of-way at intersections depending on the situation.
    [Show full text]