Shopping Centre Site, Elephant and Castle, 26, 28, 30 and 32 New Kent Road, Arches 6 and 7 Elephant Road, and London College of Communications Site, London Se1

Total Page:16

File Type:pdf, Size:1020Kb

Shopping Centre Site, Elephant and Castle, 26, 28, 30 and 32 New Kent Road, Arches 6 and 7 Elephant Road, and London College of Communications Site, London Se1 Item No. Classification: Date: Meeting Name: 7.1 Open 30 January 2018 Planning Committee Report title: Development Management planning application: 16/AP/4458 for: Full Planning Permission Address: SHOPPING CENTRE SITE, ELEPHANT AND CASTLE, 26, 28, 30 AND 32 NEW KENT ROAD, ARCHES 6 AND 7 ELEPHANT ROAD, AND LONDON COLLEGE OF COMMUNICATIONS SITE, LONDON SE1 Proposal: Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys (with a maximum building height of 124.5m AOD) above multi- level and single basements, to provide a range of uses including 979 residential units (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station; means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures. Ward(s) or East Walworth groups Cathedrals affected: From: Director of Planning Application Start Date 02/12/2016 Application Expiry Date 24/03/2017 Earliest Decision Date 19/01/2017 Draft Planning Performance Agreement RECOMMENDATION 1. a) That planning permission be granted, subject to conditions and referral to the Mayor of London, and the applicant entering into an appropriate legal agreement by no later than 18 December 2018. b) That environmental information be taken into account as required by Regulation 3(4) of the Town and Country Planning (Environmental Impact Assessments) Regulations 2011 (as amended). c) That following the issuing of the permission, the Director of Planning place a statement on the Statutory Register pursuant to Regulation 24 of the Town and Country Planning (Environmental Impact Assessments) Regulations 2011 which contains the information required by Regulation 21, and that for the purposes of Regulation 24(1)(c) the main reasons and considerations on which the planning committee's decision is based are as set out as in the report. d) In the event that the requirements of (a) are not met by 18 December 2018, that the Director of Planning be authorised to refuse planning permission, if appropriate, for the reasons set out at paragraph 720 of this report. COMMITTEE DEFERRAL 2. Members will be aware that this item was deferred from a committee meeting in December 2017 at the applicant’s request. The item was deferred to allow time for further negotiations in relation to the affordable retail proposal. This has now been addressed and is set out in paragraph 88 of this report. 3. The following substantive changes have been made to the report: Introduction added setting out the strategic context of the proposal (paragraphs 5 to 8). Update to the policy list to reflect the adoption of GLA Supplementary Planning Guidance and changes to plan references in the draft New Southwark Plan (paragraphs 61, 67 and 68). Inclusion of information regarding works currently / recently carried out at the shopping centre which should form part of transition measures within the Local Business Support and Relocation Strategy (paragraph 87). Confirmation that 10% on-site affordable retail would be provided, spilt equally across both sites, and that the off-site affordable retail contribution would no longer be required – s106 obligations section and information on affordable retail which would be delivered in the opportunity area updated accordingly (paragraphs 96, 186, 208, and 714). Changes in relation to when the database of relocation opportunities would be available (paragraph 184). Update that the Council has submitted a planning application to convert garages at Perronet House to affordable retail space (paragraph 209). Correction to internal sunlight figures to proposed flats on east site (paragraph 406). Inclusion of additional information regarding shadow to the proposed communal gardens (paragraphs 447 and 448). Inclusion of cumulative impact sunlight figures for neighbouring properties (paragraph 519). Clarification that CIL figures quoted in report are pre affordable housing relief (paragraph 723). Additional text in conclusion including on daylight and sunlight impacts and the delivery of a station box for the Northern Line (739 and 740). 4. Conditions changes to the draft recommendation: Condition added regarding highway works to Oswin Street; Condition amended regarding sound proofing of flats next to Corsica Studios. INTRODUCTION (new section) 5. The redevelopment of the shopping centre as proposed by this application has been a long held aspiration and is reflected in a series of development plan documents over many years. The Elephant and Castle has experienced enormous change over the past 10 years with the redevelopment of the Heygate Estate which is well under way, the new leisure centre, developments at Elephant One and One the Elephant to name a few. However, the Elephant and Castle Shopping Centre has been seen as a very poor design almost since it was completed in the 1960s. Perhaps, more importantly, the access to Elephant and Castle Underground Station has also been seen as a severe defect in the functioning of the area, preventing the town centre from taking its proper place as a focus for the commercial and social life of Southwark and south London. The redevelopment of the shopping centre will provide key new infrastructure to support the changing environment. Critically this scheme provides a unique opportunity for improvements to the Northern Line ticket hall to support new and existing residential development, commercial development and the various education institutions in the area including the London College of Communications which would relocate within the new development, reinforcing the area’s position as a major centre for higher education and further contributing to the life and character of the area. 6. While the proposal realises the council’s long held ambitions to make the Elephant and Castle the successful town centre that has been promised by its regeneration plans, it would also make a significant contribution to much needed new homes in the borough. Given the complexities and risks involved in demolishing the existing shopping centre and creating a new town centre with a new Underground entrance and link to the National Rail Station, it can be expected that there would be challenges to the viability of the scheme affecting its ability to deliver affordable housing. In spite of this, the development would achieve over 35% affordable housing, with a substantial part of this being at London Living Rent levels which would provide a wide range of people with the opportunity to live in this highly accessible central London location. There would, however, be a review mechanism which could lead to further improvements to the affordable housing offer as uncertainties about future costs and values are removed. 7. The redevelopment of the shopping centre would inevitably have impacts on the wide range of independent businesses that have established there over the years. The redevelopment proposal takes account of this, provides support for these businesses, and complies with the council’s Supplementary Planning Guidance by providing 10% affordable retail space on site. 8. The application before you is therefore one which would contribute to the transformation of this very significant part of London and an area at the heart of Southwark. BACKGROUND INFORMATION 9. Two applications have been submitted by Elephant and Castle Properties Co. Ltd. The first is for full planning permission for a comprehensive redevelopment of Elephant and Castle shopping centre, 26, 28, 30 New Kent Road and arches 6 and 7 Elephant Road, and the London College of Communications (LCC) site. The existing London College of Communications building would be demolished, and it adjoins the northern elevation of the Metropolitan Tabernacle church, the façade of which is grade II listed. In light of this a second application for listed building consent for minor amendments to the northern elevation of the Tabernacle has been submitted, and this is considered in a separate report listed as item 13.2 on the committee agenda. Site location and description 10. The site is located in the heart of the Elephant and Castle Opportunity Area which covers an area spanning 122 hectares. It extends just beyond St George’s Circus to the north, New Kent Road to the east, Walworth Road as far as Burgess Park to the south, and Kennington Park Road to the west; the borough boundary with Lambeth is approximately 160m to the south-west. Located on what for centuries was the main road into London from the south, Elephant and Castle has long been a bustling south London centre and is a transport hub, served by both the Northern and Bakerloo Line underground lines, a railway station and numerous bus routes. The number of theatres and taverns which were established in the area gave it a reputation as the “Piccadilly Circus” of south London. However, the area was redeveloped in the 1960s following bomb damage during WWII, and a number of issues arose out of the redevelopment including a predominance of large, single use buildings, an environment dominated by heavy traffic, and disconnected public realm. 11. Elephant and Castle is undergoing a period of transformation, with significant redevelopment taking place. The local planning policy framework for managing the regeneration of the area is the adopted Elephant and Castle Supplementary Planning Document / Opportunity Area Planning Framework (SPD / OAPF). The SPD sets out a vision for the area which includes transforming it into an attractive central London destination, making it a more desirable place to live for existing and new residents, with excellent shopping, leisure, learning and cultural facilities, and significant new housing.
Recommended publications
  • Shakespeare's Lost Playhouse
    Shakespeare’s Lost Playhouse The playhouse at Newington Butts has long remained on the fringes of histories of Shakespeare’s career and of the golden age of the theatre with which his name is associated. A mile outside London, and relatively disused by the time Shakespeare began his career in the theatre, this playhouse has been easy to forget. Yet for eleven days in June, 1594, it was home to the two companies that would come to dominate the London theatres. Thanks to the ledgers of theatre entrepreneur Philip Henslowe, we have a record of this short venture. Shakespeare’s Lost Playhouse is an exploration of a brief moment in time when the focus of the theatrical world in England was on this small playhouse. To write this history, Laurie Johnson draws on archival studies, archaeology, en- vironmental studies, geography, social, political, and cultural studies, as well as methods developed within literary and theatre history to expand the scope of our understanding of the theatres, the rise of the playing business, and the formations of the playing companies. Laurie Johnson is Associate Professor of English and cultural studies at the University of Southern Queensland, current President of the Australian and New Zealand Shakespeare Association, and editorial board member with the journal Shakespeare. His publications include The Tain of Hamlet (2013), and the edited collections Embodied Cognition and Shakespeare’s Theatre: The Early Modern Body-Mind (with John Sutton and Evelyn Tribble, Routledge, 2014) and Rapt in Secret Studies: Emerging Shakespeares (with Darryl Chalk, 2010). Routledge Studies in Shakespeare For a full list of titles in this series, please visit www.routledge.com.
    [Show full text]
  • Twenty Reasons to Reject Delancey's
    TWENTY REASONS TO REJECT DELANCEY’S SHOPPING CENTRE PLANNING APPLICATION (Based on the attached planning committee report) 1 There will be very little increase in the amount of retail floorspace in the new centre (Planning Committee report, paragraph 78). 2 Only half the required affordable retail units would be provided. Delancey has not given any explanation for this. Instead it wants pay Southwark £753,000, but this still breaches the local planning guidance (Paragraph 88). 3 There will be less leisure use space (Paragraph 98, 143). 4 There will be 36% affordable housing (Paragraph 337), but only 33 ‘social rented’ homes, the cheapest with rent of £160pw (Paragraphs 347, 348) and only on 3-year tenancies (Paragraphs 350, 352). 5 There will be 979 homes (Paragraph 336) and all will be rented, none for sale, breaking another breach (Paragraph 338). 6 Delancey, an off-shore private company, will be the landlord of all the homes, including the affordable housing (Paragraph 342). 7 Most of the ‘affordable’ homes will be for those who earn more than £50,000 a year (348) and these will be means tested (Paragraphs 352, 383). 8 There will be no London Affordable Rented Homes, despite London Mayor Sadiq Khan, saying he wants a third of such homes in new housing developments (AH and Viability SPG, 2017 para 2.40). 9 Funding for the new Northern Line ticket hall has not been agreed between TfL and Delancey (Paragraph 550). 10 Southwark proposes moving traders into disused garages at the bottom of council block Perronet House (Paragraph 183).
    [Show full text]
  • The Rockingham Street Anomaly - Southwark a Geoarchaeological Evaluation
    THE ROCKINGHAM STREET ANOMALY - SOUTHWARK A GEOARCHAEOLOGICAL EVALUATION Preliminary report April 2019 Michael Hacker, Prof. Rob Scaife, Peter Collins. CONTENTS 1. Introduction 2. Anomalous buried hollows 3. The Rockingham Street Anomaly 4. Archaeological and historical background 5. The 2017 soil sample 6. Pollen analysis 7. Soil analysis 8. Discussion 9. Conclusion 10. Acknowledgments 11. Bibliography 12. Maps ILLUSTRATIONS Fig. 1 Artwork by Gail Dickerson Fig. 2 Rockingham Street Anomaly geology Fig. 3 Section through the Rockingham Street Anomaly Fig. 4 Location of Rockingham Street Anomaly Fig. 5 Rocque’s map of 1746 Fig. 6 Fairburn’s map of 1802 Fig. 7 Prehistoric seed and insect remains Table 1 Pollen count data Page 1 1. INTRODUCTION Hidden beneath the surface of the Central London Thames floodplain lie numerous, deep, crater- like pits known as 'anomalous buried hollows’ (or sometimes drift filled or scour filled hollows). They penetrate deep into the London Clay and sometimes beyond. Most of these hollows are filled with sands and gravels. They are believed to have formed under sub-arctic, peri-glacial conditions. One of these hollows, The Rockingham Street Anomaly, is situated in the London Borough of Southwark, close to Elephant and Castle. It is nearly 300m wide and over 19m deep. The Rockingham Street Anomaly is exceptional in that unlike most of the other hollows, a substantial part of the fill comprises a deep accumulation of peat. The peat was first identified during the construction of a sewer in the early 20th century and the general shape of the hollow and presence of peat have been confirmed by subsequent boreholes in the area.
    [Show full text]
  • 7. Service Specification Route: 363 Contract Reference: QC53604 the Date of Tender for This ITT Is: No Later Than 12 Noon on M
    7. Service Specification Route: 363 Contract Reference: QC53604 This Service Specification forms section 7 of the ITT and should be read in conjunction with the ITT document, Version 1 dated 29 September 2011. You are formally invited to tender for the provision of the bus service detailed below and in accordance with this Service Specification. Tenderers must ensure that a Compliant Tender is submitted and this will only be considered for evaluation if all parts of the Tender documents, as set out in section 11, have been received by the Corporation by the Date of Tender. The Tender must be fully completed in the required format, in accordance with the Instructions to Tenderers. A Compliant Tender must comply fully with the requirements of the Framework Agreement; adhere to the requirements of the Service Specification; and reflect the price of operating the Services with new vehicles. Route Number 363 Terminus Points Crystal Palace Bus Station and Elephant & Castle, London Road Contract Basis Incentivised Commencement Date 12th November 2016 Vehicle Type 87 capacity, dual door, double deck Current Maximum Approved 10.1 metres long and 2.55 metres wide Dimensions New Vehicles Mandatory Yes Hybrid Price Required Yes Sponsored Route No Advertising Rights Operator Minimum Performance Standard Average Excess Wait Time - No more than 1.00 minutes Extension Threshold Average Excess Wait Time Threshold - 0.90 minutes Minimum Operated Mileage No less than 98.00% The Date of Tender for this ITT is: No later than 12 Noon on Monday 2nd November 2015 Tenderers should refer to section 3 of Part A for the Service Specification Explanatory Notes and Appendix B of section 5 for the Example Service Specification of the ITT document.
    [Show full text]
  • 415 Responses to Issues Raised
    Consultation on the proposed extension to bus route 415 Responses to the main issues raised February 2015 Consultation on the proposed extension to bus route 415 Responses to the main issues raised TfL responses to the main issues raised This document summarises our response to the main issues raised. Set out below are the main points put to us during the consultation and our response to these. Our proposals In January 2015, TfL launched a five week consultation to gain public and stakeholder feedback to an extension of bus route 415. The route currently runs from Tulse Hill to Elephant & Castle station. We proposed to extend route 415 from Elephant & Castle station to Old Kent Road, Tesco, as a response to stakeholder and customer feedback regarding crowding along New and Old Kent Road. As part of the proposals, the route would no longer serve stops on Newington Causeway. Main issues raised and TfL's response It will be inconvenient if buses no longer serve stops F and H at Newington Causeway as it will increase current journey times, making access to the Bakerloo Line and Southbank University difficult especially for wheelchair users The nearest stops are located approximately 200 metres from the existing first and last stops, around a 2½ minute walk. Whilst we appreciate this will cause inconvenience for some customers, extending the 415 provides new journey opportunities and ensures that we can provide capacity to meet demand between Old Kent Road and Elephant & Castle. Will the extension have any negative impact on the reliability of the 415 service? Additional resources will be added into the schedule to ensure the route can operate reliability.
    [Show full text]
  • 136-142 New Kent Road, Elephant & Castle
    planning report D&P/4271/01 18 December 2017 136-142 New Kent Road, Elephant & Castle in the London Borough of Southwark planning application no. 17/AP/3910 Strategic planning application stage 1 referral Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008. The proposal Redevelopment to provide a part 15 storey, part 9 storey, part 6 storey and part 2 storey mixed- use building providing 85 residential units, 1,241 sq.m. of flexible business floor space/community space and 597 sq.m. of retail floor space. The proposal includes a new pedestrian route through the site linking New Kent Road with Munton Road. The applicant The applicant is Gralaw One Ltd and Capital Homes, and the architect is Collado Collins. Strategic issues summary Land use principle: mixed-use redevelopment of this site in the Elephant & Castle Opportunity Area and Central Activities Zone is supported. However, the applicant must commit to no net loss of employment floorspace and address concerns over the quality of the space. (paragraphs 12- 16) Affordable housing: 35% by habitable room, with a 50:50 split between affordable rent and shared ownership. GLA officers will robustly scrutinise the applicant’s viability assessment. The use of grant should be explored and modelled to increase the offer. Concerns over affordability also need to be addressed. Early implementation and late stage review mechanisms should be secured if the draft London Plan 50% threshold is not met. (paragraphs 17-21) Urban design: generally supported; concerns regarding the quality and generosity of the pedestrian route through the scheme should be addressed.
    [Show full text]
  • Old Kent Road Employment Study
    Old Kent Road Employment Study March 2016 The Old Kent Road Employment Study is an employment study jointly prepared by the London Borough of Southwark and the Greater London Authority’s Regeneration Team Copyright Base Maps © Crown Copyright and database right 2014. Ordnance Survey 100032216 GLA Project team Acknowledgements Tim Cutts, Paul Harper, Tina Jadav, Alex Marsh and Barbara-Ann Overwater All the guest researchers who gave their time to help with the initial survey work Guest researchers Tom Weaver, Tom Buttrick, Nick Wolff, Participants in the Old Kent Road Natalie Ntim, Philip Waters, George Community Forum, whose invaluable local Mitzalis, Kate Johnson, Susannah Pettit, knowledge and helpful feedback shaped Kevin Dykes, Ambrose Omoma and the report into a more accurate and user Suley Muhidin friendly document Drawings by Tina Jadav, Alex Marsh, and Edmund Bird for his comments and Alison Mayer historical insight All surveys were completed in autumn All the businesses that gave their time to 2014 and spring 2015. participate in the creation of this study Content Introduction 3 Historical context 4 Current context 6 Methodology 11 Analysis 13 Site types 19 Case Studies 24 Business aspirations 43 Next steps 45 Weber Industries are an arts fabrication firm based on Haymerle Road. They have been commissioned for a huge variety of projects with past clients ranging from large retailers to well know fine artists Introduction The Old Kent Road is a historic London Together with the Greater London Au- detailed understanding of what currently high street made iconic by its position as thority, Southwark Council are preparing exists in the area, an indispensable part the lowest value property on the Monop- a new plan for the Old Kent Road and of any plan making process.
    [Show full text]
  • Old Kent Road and Beyond
    Old Kent Road and beyond Old Kent Road Area audit CASS CITIES 2015-16 4 Contents City NOT suburb 6 Who we are 8 Why we asked? 10 2014 GLA survey 12 History and context 14 The economic mix 18 Location, location, location 26 An industrial strength economy 30 What is made here? 36 People at work 40 Independent business 44 A city needs mixed typologies 48 Civic life 52 Planned deconstruction 56 Acknowledgements 60 Bibliography 61 A catalogue of businesses 62 345 AINTRODUCTION CITY NEEDS MIXED TYPOLOGIES 6 City NOT suburb The Old Kent Road is simply a fascinating place. An warehouses. Today the Old Kent Road houses a diverse ancient artery to the south east of central London, which array of economic activity, most of which is not always is the fragment of a connection between the heart of visible at first glance. Beyond the main road lies an the city to the counties of Kent and beyond. economic powerhouse. So shouldn’t this grow as well? Built up over centuries from complex layers of urbanity, City making is not simple, there is no one size fits a melting pot of ingredients which make up a living, all approach. Like people, places are individuals and breathing and working piece of city. But how much cities thrive on just that, they are made up of millions longer will the Old Kent Road have the lowest value on of activities, jobs and lives. The Old Kent Road is an the Monopoly board? example of this, what we like to call ‘super-mix’ and we believe there is room for even more mix.
    [Show full text]
  • Elephant and Castle Shopping Centre and London College of Communication Site in the London Borough of Southwark Planning Application No
    planning report D&P/3654/01 30 January 2017 Elephant and Castle shopping centre and London College of Communication site in the London Borough of Southwark planning application no. 16/AP/4458 Strategic planning application stage 1 referral Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008. The proposal Comprehensive mixed-use redevelopment comprising buildings ranging from 2 to 35 storeys to provide 979 residential units; a new shopping centre; office space; a new college building; assembly and leisure space; and a new station entrance and station box for the Northern Line at Elephant and Castle London Underground station. The applicant The applicant is Elephant & Castle Properties, and the architect is Allies and Morrison. Strategic issues summary Principle of development: This mixed use scheme positively responds to strategic objectives for the regeneration of the Elephant and Castle Opportunity Area (paragraphs 19 to 22). Mix of uses: The mix of proposed residential, retail, leisure and educational uses is strongly supported for this CAZ location. The applicant, nevertheless, needs to work with Southwark and existing occupiers to progress the detail of its business relocation strategy (paragraphs 23 to 31). Housing: The proposed build to rent housing contribution (35% affordable) is strongly supported pending an independent viability review (paragraphs 32 to 45). Urban design: The scheme would significantly increase the permeability and legibility of the area, whilst successfully accommodating a rich mix of uses that would support the vibrancy and sustainability of Elephant and Castle town centre (paragraphs 46 to 54).
    [Show full text]
  • 101 Newington Causeway London SE1
    101 Newington Causeway London SE1 Significant Zone 1 Development Opportunity 02 Executive Summary 06 Location 18 The Site 22 The Opportunity 40 Planning 42 Sales Process & Deal Structure 44 Market Research & Overview 48 Further Information 49 Contacts 2 Executive Summary An outstanding opportunity to create a landmark scheme through the redevelopment of the existing Salvation Army UK Territorial Headquarters • Freehold development site located in the heart of Elephant & Castle • Rare opportunity to create a mixed use scheme through redevelopment of Zone 1 site in London Borough of Southwark • 0 .65 acre (0.26 hectare) site currently occupied by Salvation Army UK & Republic of Ireland Territorial Headquarters • T hree buildings currently occupy the site: 10 storey existing B1 office building with basement, a 5 storey building used for publishing with ancillary shop, and a single storey building with staff facilities including prayer room and band practice hall • Existing total gross internal floor space of the three buildings is approximately 8,446.7 sq m (90,918 sq ft) GIA • The Salvation Army is to relocate to new premises within the borough • P re-application discussions with London Borough of Southwark in August 2018 for comprehensive redevelopment to provide 39 storey tower and 14 storey commercial building on-site • Pre-application proposals include residential use (238 units) or student use (630 units) within a 39 storey tower, and a separate 14 storey office building with proposed total scheme GIA of up to 31,753 sq m (341,790 sq
    [Show full text]
  • PLAYHOUSES Gabriel Egan
    12. PLAYHOUSES Gabriel Egan RAMA DOES NOT NEED purpose-built venues. celebrated actor Richard, and his brother-in-law, John Most of the scripts produced in the 2,500-year his­ Brayne. Nine years earlier, Brayne had dipped his toe D tory of recorded drama can be performed quite into theater building by installing temporary galleries adequately outdoors or within any room large enough to and a stage, with an accompanying tower or turret, in hold the performers and spectators. However, to give large the garden of the Red Lion farm in Stepney, but for the numbers of spectators a reasonable view of the action, and Theatre he and Burbage borrowed heavily to produce to charge them effectivelyYor the privilege, a custom-built something substantial: a timber-framed amphitheater performance space is needed. The ancient Greeks, whose on firm foundations, with a thatched roof and a plas­ culture flourished in the centuries before Christ, per­ tered exterior (Egan). The Red Lion does not count as the formed their plays outdoors in increasingly sophisti­ first purpose-built venue because it was merely a tempo­ cated stone amphitheaters that took advantage of natural rary construction without foundations, built for a par­ hollows in the ground to arrange the audience in an arc ticular set of performances. around the performers. The Roman culture that flourished Burbage and Brayne's decision to call their permanent in the first 600 years after Christ copied the Greek design building the Theatre evoked the old Roman amphitheaters, but also produced freestanding urban theaters. Instead of and visitors to London commented that it looked like one, putting the spectators in shallow tiers of seats, the Roman being virtually round although made of wood and plaster urban theater stacked them in a vertical tube of galleries; rather than stone.
    [Show full text]
  • This Planning Officer Report
    Item No. Classification Decision Level Date 4 OPEN PLANNING 21.3.06 COMMITTEE From Title of Report Head of Planning and Transport DEVELOPMENT CONTROL Proposal (05-AP-1694) Address Provision of market square and basement land bounded by Elephant Road, service area. Castle Industrial Estate, Deacon Way and open space fronting Walworth Road (Also see linked application 05 - AP - 1693) Ward East Walworth PURPOSE 1 To consider the above application, which is for Planning Committee, consideration because of the number of objections received and because it is linked to a major application (05 – AP – 1693) included for consideration elsewhere in this agenda. RECOMENDATION 2 Grant planning permission subject to a legal agreement and heads of terms as outlined in the report for the Castle Industrial Estate (ref 05 – AP – 1693). BACKGROUND 3 The application site forms part of a wider area identified for major regeneration by the GLA and the London Borough of Southwark. The Elephant and Castle have been identified is an Opportunity Area. Supplementary Planning Guidance was adopted in 2004 for this area and is known as the Elephant and Castle Development Framework. The Framework identifies the preferred structure, form and setting out of new development at Elephant Castle. 4 The application site currently accommodates an existing playground and green open space. The site measures 0.16 hectare, which forms an integral part of the proposed development on the Castle Industrial Estate the Elephant and Castle Master Plan. The application site is bounded by the main application site (Castle Industrial Site) to the north, the Heygate Housing estate to the east and an open space area fronting onto Walworth to the south with Elephant Road and the Elephant and Castle Railway Station to the west.
    [Show full text]