Official Journal of the Division of Highways, Department of Public Works, State of California
RICHARD WINK, Editor HELEN HALSTED, Assistant Editor STEWART MITCHELL, Assistant Editor MERRITT Ra NICKERSON, Chief Photographer
Vol. 37 July-August, 195 Nos. 7-8
FRONT COVER Broom in bloom. State Route 93 winds its way Through patches of This colorful and prolific impor4 from Scot- land. This scene near Georgetown is typieal of a wide area of the Sierra foothills in the spring. —Photo by Bill Ruland
BACK COVER The Mother Lode Highway (State Route 49) crosses the Stanislaus River over this bridge located at the Calaveras-Tuolumne county line between Sonora and Angels Camp. —Phofo by Robert Rose
Table of Contents on Page 2
use Published in fhe interest of highway development in California. Editors are invited to photographs. information contained herein and fio request prints of any black and white
Address communications to CALIFORNIA HIGFlWAYS AND PUBLIC WORKS P. O. Box 1499 SACRAMENTO, CALIFORNIA e or rom ~ s rocs By ALAN S. HART District Engineer
~isTxicT III is composed of 11 eoun- at the Sacramento-San Joaquin county ties (Butte, Colusa, El Dorado, Glenn, line and proceeds northward through Nevada, Placer, Sacramento, Sierra, Sacramento to Woodland and then Sutter, Yolo, and Yuba) lying in the generally parallels the present High- northern portion of the Great Valley way US 99W until it leaves the dis- of California and in the Sierra Nevada trict at the Glenn-Tehama county line. region north and south of Lake Ta- The second north-south interstate hoe. It contains 12,688 square miles route referred to connects the east- which is serviced by 1,374 miles of west interstate route near Vacaville state highways. with the north-south interstate route The district is faced with every type near Dunnigan. This connection is to of planning and construction problem, provide a more direct connection for except. a desert, found anywhere in the traffic between the Bay area and the State. It contains metropolitan areas Pacific Northwest. and small villages, rugged mountains Planning for the improvement of the and marshy lowlands, regions of ex- many miles of highway in the district, treme cold and regions of subtropical many of which will never be graced climate, large rivers (the largest in the with the title of freeway, is progress- State) and dry washes (that can be- ing satisfactorily. However, major come raging torrents in a matter of emphasis in planning matters is being hours), and, above all, it has demands directed to the two interstate routes. for increased highway capacity on its highways, caused by an unprecedented US 40 Progress population growth in the past decade. Primary emphasis has been placed in the past year, and is still being placed, Major Routes Lis3ed on the east-west interstate route, High- The state highway network provides way US 40. This highway enters two major north-south routes and three the district at the Sacramento-Solano east-west routes that cross the Sierra county line and leaves the district in Nevada Mountains within the district. Sierra County on the eastern slope of A fourth such trans-Sierran route the Sierra Nevada Mountains at the passes through the district and crosses Nevada state line. In addition to being the mountain chain just to the north an integral part of the Interstate High- in District II. One north-south and one way System, this route will also be re- east-west route have been designated quired to service the many thousands as a part of the Federal Interstate High- of motorists that plan to attend the way System. A short section of a sec- 1960 Winter Olympic Games to be ond north-south interstate route is also held in Squaw Valley, near Truckee. within the district. Every effort is being made, with fi- The main north-south interstate nancing available, to convert as many route in the district enters the district miles of this highway as possible to a four-lane freeway prior to February, UPPfR—The Camino Bypass on US 50 in EI 1960. It is realized that all of the route Dorado County. LOWER—State Route 93 in the vicinity of Georgetown, EI Dorado County. ...Continued on poge 2
Highwpys California California
- - -
-- -- -
-- ---
------
------
- - comple- 54 used used by by being being traffic traffic to to prior prior
Williams Williams
HallG. HallG.
------
-
- - -
- -
------
- - - - -
------51 GriPPer GriPPer already of of this this
Portions Portions
were were
section section S. S.
Edward Edward
------
------
- - - -
-- --
- - -
------
50
24th.
the the
Walsh Frank Frank
June June J. J. of of
afternoon afternoon
section section
------
------
- -
------
Meehan----
46
this AndrewJ. AndrewJ. of of for for the the ceremony ceremony tory tory opening opening
Obituaries dedica- a a of of Commerce Commerce held held Chan7ber Chan7ber
51 ______
___ Frykland Frykland Colfax Basil Basil to to The The Colfax. Colfax. Glen Glen Heather Heather
-- -- -
50
-___- - __---
------
____-- Latimer Latimer Lynn Lynn from a a -mile -mile sect?on sect?on 6.1 was was this this date date
Retirements
on completed completed contract contract second second The The
54
______.
E. E. T. T. Awards______I. I. Receive Receive Cities Cities Five Five State, State, $2,570,000. approximately approximately cost cost
53
______
Meeting Meeting Have Have AASHO AASHO Will Will Francisco Francisco San San which project project the the on on contractors contractors joint joint
52
______April April in in Starts Starts
Construction Construction Bridge Bridge Martinez Martinez - Benicia the were were A~Iarysville A~Iarysville of of Incorporated, Incorporated,
52
______in in
Sacramento Sacramento Confab Confab Holds Holds Annual Annual E. E. I. I. T. T. Parker, Earl Earl H. H. and and Company Company tracting tracting
52
______Awards Awards Announced______-year -year -five Twenty Con- Baldwin Baldwin Commerce. Commerce. of of Chamber Chamber
51 _____
______Listed Listed Jobs Jobs
40 40 Freeway Freeway US US Current Current Nine Nine Area Auburn Auburn the the of of the the sponsorship sponsorship
49
______
-way -way Award.______Award.______-of Right Given Given Balfour Balfour Frank Frank under ceremonies ceremonies appropriate appropriate with with fic fic
48
Los Los Angeles._ in in
Made Made Awards Awards Bonneroo Bonneroo Annual Annual traf- to to opened opened was was road road The The Auburn. Auburn.
47 Service'
Devoted Devoted of of for for 'Years 'Years
H. H. Cited Cited Warlow Warlow Chester Chester Chairman Chairman Vice Vice CHC CHC in Avenue Avenue Elm Elm to to Newcastle Newcastle of of east east
47
Announced Winners Winners Board Board Award Award Merit Merit mile one one from from section section -mile -mile 3.6 the the
45
See See New New Highways Will Will
Motorists Motorists -bound -bound is One One Fair 1956. 1956. of of Act Act Highway Highway eral eral
Engineer District District Fed- Helwer, Helwer, By By Sam Sam the the under under California California
Northern Northern
35
L______District District
From From Report Report
in completed completed be be to to freeways freeways full full
County Riverside Riverside
Road Road Commissioner, Commissioner,
Powell, Powell, Assistant Assistant
Douglas Douglas By By
first
the the
were were
1957, 1957, and and 24, 24, June June on on
33
___ Bridge Bridge Crestmore Crestmore
traffic to to
were were opened opened these these Two Two of of
Engineer Nash, Nash, District District M. M. A. A.
By By
season. construction construction this this
completed completed
___ County County Monterey Monterey
be
will will contracts contracts nine nine the the of of Four Four
Engineer
Resident Resident
J. J.
D. D.
Hetherington, Hetherington, By By
------
------
------
23
Toro Toro Irvine -EI -EI
Completed Freeway Freeway
Engineer J. J. District District G. G. Meyer, Meyer, By By
16 ______X.____ X.____ District District From From Report Report $48,500,000. proximately proximately
15 __ __ ------ap- of of Lab.------New New Highway Highway expenditure expenditure the the for for call call detours, detours,
______14 Job to to Works Works Public Public two two major of of Named Named Fred Fred Jacobson Jacobson construction construction the the of of dition dition
ad- the the ~~ith ~~ith Engineer Senior Senior Dildine, Dildine, Equipment Equipment contracts contracts C. C. A. A. nine nine By By These These way. way.
1.3 _- _-
-______--- _- ___- Snow Snow Removal Removal
under now now contracts contracts the the of of completion completion
Design Design Engineer
District District G. G. A. A. Fluter, Fluter, By By
the with with line line state state Nevada Nevada the the
Lake Lake
to to
10
-_- - __ __--- _- _- Grapevine Grapevine
of of Donner end end east east from from the the available available
Engineer Hart, Hart, District District S. S. Alan Alan By By
will will be
freeway freeway -lane -lane of of four miles miles
1 ____ III III District District From From
Report Report
continuous -one -one Twenty Springs). Springs). Page
to to Soda Rocks Rocks (Hampshire (Hampshire struction struction
con- under under is is currently currently freeway freeway of of
six six miles only only where where miles miles 40 40 next next
the in in occur occur the the route route in in gaps gaps major major
The Vista. Vista. Monte Monte of of west west mile mile half half
one- to to Sacramento Sacramento from from standards) standards)
freeway to to it it of of (most (most highway highway vided vided
di- -lane -lane four uninterrupted uninterrupted of of miles miles
61 provide provide will will season, season, construction construction
1959 the the of of end end the the before before completion completion
of certain certain and and bid, bid, for for offered offered or or tion, tion,
construc- under under presently presently Contracts Contracts
the the to to prior prior games. service service in in placed placed be be
season construction construction —will 1958 1958 the the ing ing
advertised advertised for for bid bid dur- or or construction construction
them them of of now now nine nine under are are —there —there
Sacramento
Lalce. Lalce. Donner Donner All All
of of projects end end east east
N N Twelfth Twelfth Streets and and
Soda Soda from from
Springs Springs to to and and the Rocks Rocks
Works Works Building Public Public
Vista Vista Monte Monte to to of of Hampshire west west
exist exist will will from from gaps gaps one mile -half -half that that
completed completed by by be be cannot cannot this this and time time
1 page page from from Continued Continued
FROM FROM REPORT REPORT III DISTRICY DISTRICY tion of the entire project. McCam- mon-Wunderlich Company and Wun- derlich Construction Company of Palo Alto are the joint venture con- tractors for this $3,842,000 project. The S.S-mile section of freeway from Colfax to the Magra Overhead crossing of the Southern Pacific east of Colfax, is planned for use by the traveling public some time in October of this year. Fredrickson and Watson Construction Company and Ransome Company of Oakland ire the joint contractors for the project. The final construction cost for this portion of the route will be approximately $4,- 035,000. Starting with this project, and continuing for the remainder of the route over the mountains the traveled way is to be of Portland ce- ment concrete. The fourth project to be completed on Highway US 40 this year will be from near Floriston to the Nevada state line. When completed in August, this section will provide 5.4 miles of four-lane freeway through the Truckee River Canyon. Gibbons and Reed Company of Salt Lake City are the prime contractors for this project that will cost approximately $5,420,- 000. Careful planning by the contrac- tor and the Resident Engineer for the Division of Highways avoided the an- ticipated long delays to traffic in the narrow canyon.
Detours Constructed To avoid other anticipated major delays to traffic through particularly rugged terrain on this major transcon- tinental route during future freeway construction, two extensive detours were constructed. The first of these, from near Monte Vista to Alta, was This section of freeway on US 99-50 soufh of Sacramento will be complefed this summer. the Elk Grove completed in 1957 by Fredrickson and Road Interchange is in the foreground; fhe City of Sacramento on the horizon, Watson Construction Company of Oakland at a cost of $422,000. The second such detour, from near Boca time, and are expected to be com- an underpass at the Southern Pacific to near Floriston, in the Truckee pleted by the end of the 195:9 con- Railroad in l~Tewcastle. River Canyon has just been com- struction season. Bids were opened late in May for pleted. H. Earl Parker, Incorporated, The last of the five contracts, call- the construction of an additional 4.5 of Marysville is the contractor for this ing for the construction of 11.1 miles miles of freeway in the vicinity of project which will cost approximately of freeway south of the existing mold Run. The low bidder for this $564,000. highway between Roseville and New- work was a joint venture of Fredrick- Five contracts to construct sections castle is now advertised and bids are son and Watson Construction Com- of this route to freeway standards to be opened on July 16th. This sec- pany and Ransome Company of Oak- were provided for in the 1958-59 tion will provide 12 structures, seven land with an offer that will cost ap- Budget. All of these contracts have of which will provide for the inter- proximately $2,880,000. This section been let or advertised, at the present change of traffic, and one that will be will join the portion now under con-
~rnd Public Works 3 This photo shows paving operations in progress on the US 40 freeway in the Truckee River Canyon between Floriston and the Nevada state line. If is scheduled for completion this summer.
struction between Colfax and the $5,392,000. The heavy snow of the Company and Ransome Company of Magra Overhead. The first structure past winter has delayed the start of Oakland are again the contractors. on the new contract, the Alpine In- work until this time.. The contracting The contract calls for the construc- terchange, will actually extend -into on the project is again a joint ven- tion of structures in 11 locations, a the limits of the previous contract, ture composed of Clyde L. Wood, truck scalehouse, and preliminary but is being done at this time, rather Incorporated, Kirst Construction work for the ultimate construction of than at a future date as originally Company and Alwood Corporation an agricultural inspection station. planned, to insure there will be no or North Hollywood. The other contract will complete crossings at grade between Illinois- The two remaining interstate proj- the 21 miles of freeway east of the town, west of Colfax, and the Nevada ects under way are east of the crest Sierra Nevada from Donner Lake to state line. of the Sierra Nevada Mountains. One, the Nevada state line. This section from the east end Snow Delays Work of Donner Lake to from. near Boca to near Floriston, a near Boca, east of Truckee, will pro- distance of 6.7 miles, is being con- A six-mile section is naw under con- vide 8.8 miles of freeway at an ap- structed as a joint venture by Isbell struction between Hampshire Rocks proximate cost of $8,136,000. Fred- Construction Company of Rena in and Soda Springs at a cost of about rickson and Watson Construction conjunction. with Granite Construc-
4 California Highways tion Company of Watsonville, and Gordon H. Ball and Gordon H. Ball, Incorporated, of Danville. The ap- proximate cost will be $7,42.0,000. Plans are being prepared for the remaining 34 miles of this route be- tween Sacramento and the Nevada state line that, will permit construc- tion when financing is made available. The estimated cost to complete the conversion of the entire 122 miles of the route to a four-lane facility is $48,000,000.
Other Routes Closely allied to the development of Highway US 40 and to the 1960 Olympic Games is the widening of State Sign Route 89 from 0.2 mile south of Squaw Valley Road to the Donner Creek Railroad Underpass. When completed, this project will provide a 40-foot all-paved roadway from 8.3 miles. This widened section of highway, together with the antici- pated traffic controls at the time, is planned to handle the tremendous vol- ume of traffic during the periods when visitors are entering and leaving the This view eastward shows the four-lane interim improvement on US 50 befween Sacramento and Alder games site at Squaw Valley. Fredrick- Creek. Nimbus Dam and Reservoir is to the right. son and Watson Construction Com- pany and Ransome Company are the prime contractors far this $1,400,000 nigan, a contract was let this year to The conversion of Highway US improvement that is scheduled for a contracting group consisting of Gor- 99-50 to full freeway standards from completion in December of this year. don H. Ball, Gordon H. Ball, Incorpo- the San Joaquin county line north to West of Sacramento, plans for the rated, and &all and Simpson of Dan- Sacramento is rapidly approaching the improvement of US 40 are being ville to grade, place base material, and ultimate development as presently prepared. These plans include inter- erect the necessary structures for two planned. A. Teichert and Son, Sacra- changes for Davis and County Road lanes of an ultimate six-lane freeway mento contracting firm, plan to finish 104 and a new causeway over the Yolo from the Solano county line to near two contracts on this route during the Bypass. Madison, a distance of 13.4 miles. Sur- month of August. One project calls for Work on the north-south interstate facing and the construction of the ad- the construction of four lanes of full route is only beginning. The first ac- ditional lanes will be done under later freeway from 0.7 mile south of Galt tual construction on this route was contracts. This new route lies east of to 1.6 miles south of the Cosumnes completed in August, 1957, and pro- the present State Route 90, the more River at the approximate cost of $2,- videsfour lanes of freeway an US 99W commonly known Vacaville-Dunni- 800,000. The second project will pro- from High School Road through Ar- gan Cutoff. This stage of the construc- vide the northbound lanes of a full buckle to Salt Creek. This required the tion is scheduled for completion by the free~~ay from 1.8 miles south of the depressing of the highway through Ar- end of December. Cosumnes River to 0.2 mile south of buckle to provide for grade separation Elk Grove Road. This work will cost at Hall Street. The 1.6-mile section was Freeway Resolution Adopted about $2,000,000. constructed by Fredrickson and Wat- Two lanes of expressway have been Two contracts that will bring closer son Construction Company of Oakland constructed on this route through a the day that this route will meet free- at a cost of approximately $1,3 24,000. four-mile section between 2.7 and 6.7 way standards are being let this year. Public meetings have been held, and miles north of Madison. A freeway res- The bids on the first are to be opened the freeway route adopted, for the 23- alution has been adopted for the re- June 25th and will provide for the con- mile section from two miles south of maining five miles of this route to its struction of structures, approaches and Willows to the Tehama county line. junction with Highway US 99W, the highway lighting facilities from 1.8 On the short section of interstate other north-south interstate route in miles south of Florin Road to Broad- highway in the district south of Dun- the district. way in Sacramento. This section, and Public Works 5
6 6
California California Highways
center center the the of of picture picture is is Hall Hall the the Street Street Overcrossing.
t \'fetal \'fetal
plate plate
guardrails guardrails
were were
installed
aerial aerial An An
view view
of of freeway freeway
the the
through through the the Town Town
Arbuckle Arbuckle of of on on US US 99W. 99W. the the
separation separation
structure structure
in in
the
grade grade by by the the passenger passenger faster faster traffic.
passing passing trucks trucks of of moving moving slowly slowly up-
a a cost cost of of $157,000 $157,000 that that permit permit the
struction struction Company Company Sacramento Sacramento of of at
constructed constructed Harms Harms by by Brothers Brothers Con-
plished. plished. truck truck Six Six turnout turnout lanes lanes were
increase increase *_raffic *_raffic safety safety were were accom-
Near Near I,cho I,cho Summit, Summit, two two projects projects to
financing financing is is available.
tension tension of of this this work work to to the the west west when
being being are are prepared prepared for for the the future future ex-
approximate approximate cost cost $340,000. $340,000. of of Plans
struction struction Company Company Fresno Fresno of of at at an
Tahoe Tahoe Al Al and and done done was was by by Baun Baun Con-
reconstruction reconstruction with with between between Mays
street street section. section. This This work work together
widened widened 19~ 19~ 7 7 in in provide provide 64 to to -foot a a
Tahoe Tahoe to to Nevada Nevada the the state state line, line, was
portion portion A A this this route, route, of of from from Al
Camino Camino Pollock Pollock to to Pines.
secure secure way way to to resolution resolution such such a a from
Riverton. Riverton. and and Action Action `yell `yell under is is
to to east, east, the the and and between between Fresh Fresh Pond
Street Street Placerville Placerville ton ton in in two two miles and and
Placerville, Placerville, limit limit of of between between Washing-
near near Perks Perks Corner Corner the the to to west west city
from from Brighton Brighton to to Alder Alder Creek, Creek, from
resolutions resolutions way way have have adopted been been
mento mento
to to Nevada Nevada the the
state state
line. line. Free-
the the
past past year. year. This This project, project, which which
in- Brighton Brighton
Underpass Underpass which which provides
to to ~0 ~0 freeway freeway
a a
route route
from from Sacra-
widened widened
to to a a -lane -lane four divided divided
street street
in four four lanes lanes
created created a a problem problem at at the
plans plans prepared, prepared,
being being
convert convert to to
US
Florin Florin
Road Road to to Sutterville Sutterville Road Road
was
The The
conversion conversion
this this of of route route to
meetings meetings Public Public
being being are are held, held, and
Route Route 24 24 (Freeport (Freeport
Boulevard) Boulevard) from
Lane Lane Signals Signals Installed US US Improved 50 50
In, In, and and near near Sacramento, Sacramento, State State Sign
Commission Commission
for for
this this ~~ork. March March of of this this year. improvement. this this
the the -59 -59 1958
Budget Budget
and and by by the the Highway was was accepted accepted as as completed completed in Company Company Patterson Patterson of of constructed
amounting amounting
to to ~ ~ 1,100,000 1,100,000
A. A.
Teichert Teichert were were
added added and and to Son Son Sacramento of of John John Delphia Delphia and and Fred Fred Early, Early,
J. J. Jr.,
opened opened
July July l6th. l6th.
approximately approximately
Additional Additional
$1,000,000 $1,000,000 funds was was done done by lane lane expressway. expressway. A A
joint joint venture venture of
The The
bids bids
for for
this this
contract contract state state capital. capital. are are This This project, project, to to be costing community community Camino Camino of of with with a a four-
under under
the the
existing existing dential dential
growth growth financial financial in in the the schedule. area area east east of of the project project was was completed completed bypass bypass to to the
ber, ber,
1958, 1958,
that that
mendous mendous would would not not industrial, industrial, aviation, aviation, be be financed and and resi- In In 1957, 1957, November, November, $1,000,000 a a
vided vided
to to
start start
traffic traffic pressure pressure projects projects prior prior built built to to up up Decem- the the by by tre- for for work work this this early early June. in in
Act. Act.
These These
This This
work work additional additional was was funds funds necessary necessary to to were were ease ease pro- the submitted submitted Son Son $21,849 low low a a bid bid of of
included included
ramento ramento
in in city city the the 1958 1958 limit limit Federal Federal to to Highway Alder Alder Creek. from from Highway Highway Teichert Teichert 50. 50. and A. A.
was was
made made
new new on on
possible possible alignment, alignment, by by from from additional additional near near the the funds Sac- area area satisfactory satisfactory ingress ingress egress and and
Ells Ells
Grove Grove
pending pending
the the Road Road construction construction to to freeway freeway a a freeway of of standards, property property nue nue to to owners owners give give the in in
Cosumnes Cosumnes
four four lanes, lanes, as as River River an an to to interim interim 0.2 0.2 improvement, mile mile south south of quired quired the the Redding Redding relocation relocation of of Ave-
highway highway
the the
existing existing from from route route 1.8 1.8 was was miles miles widened widened south south of of to the installation installation The The this this system system of of re-
the the
future future
date. date. In In the the reconstruction reconstruction Sacramento Sacramento area, of of movement movement the the e~sting be be used used the the for for of of traffic.
route route The The
to to full full freeway freeway second second standards standards contract contract at at a on on times times this this the the During During lane lane other other route, will will not
made made
for for
the the conversion conversion
of of
the the entire during during the the traffic traffic evening evening only only Additional Additional hours. Funds Funds Provided
the the past past year, year, and and plans plans are are being hours, hours, and and morning morning
the the for for westbound
imately imately
$2,250,000.
Sierra Sierra Nevada Nevada
has has progressed progressed eastbound eastbound during traffic traffic lane lane for for
only only during
matedthe matedthe
initial initial
work work will will
cost cost 50 50
from from Sacramento Sacramento approx- easterly easterly the the possible possible over over the use use
make make of of
the the middle
put put
the the
route route
in in
operation. operation. The The It It improvement improvement
is is esti- of of structure. structure. This This Highway Highway US this this
signalization signalization
will
surfacing surfacing
and and
other other
work work
necessary necessary approximately approximately of of to lane lane install install control control $552,200. to to signals signals
through
Subsequent Subsequent
contracts contracts
will will
provide provide Incorporated, Incorporated, tion tion Company Company for of of of of Sacramento Sacramento cost
a a Stockton Stockton at at
$21,000 for for
way way
is is
nn nn
completely completely new new
constructed constructed alignment. Collins Collins to to let let by by McGillivray McGillivray was was Construc- Electrical Electrical
Company,
known known
as as
the the
South South
Sacramento Sacramento three three lanes lanes eluded eluded for for Free- signalization signalization only only and and was lighting, lighting, traffic. traffic. A A contract in nine locations by Wulfert Com- pany of San Leandro. Work was also done to improve the intersections of county roads with this transcontinental route. During the past year, two such intersection im- provements were completed, both in the Placerville area, one at El Dorado Road and the other at Missouri Flat Road. The Bureau of Public Roads is im- proving asection of the route be- tween Fresh Pond and Riverton, the so-called "cliff" section, to a four-lane expressway. The first contract on this work is nearing completion,: and a second contract is planned for ad- vertising this summer. The bureau is also improving and realigning a portion of State Sign Route 89, referred to as the Luther Pass Route, that connects Highway US 50 and State Sign Route 88. The 7.1-mile section being improved is from US 50 to Grass Lake.
Relocation Necessary The proposed construction of ~ a major dam on the Feather River above Oroville made necessary the reloca- tion of a portion of the Feather River Highway, Highway US 40 Alternate, from Oroville to Jarbo Gap. This re- location, to be done under several contracts, presently is requiring the. construction of 13.7 miles of roadway, on new alignment, from near Wicks. Corner to Jarbo Gap. This work, costing approximately $9,500,000, is being done by McCammon-Wunder- lich Construction Company of Palo Alto. Other features of this relocation, a dual purpose bridge over the West Branch of the Feather River to accom- modate the highway and the Western Pacific Railroad and the extension of the relocation from Wicks Corner to Oroville with a new bridge over the Feather River at Oroville, are con- tingent upon appropriations by the State Legislature. South of Oroville, Baldwin Con- tracting Company of Marysville has a contract for $580,000 to relocate US 40 Alternate from the Union High School to a point near Adelaide. This work is the initial two lanes of an ulti- UPPER—Relocation of US 40 Alternate along fhe Feather River between Wicks Corner and Jarbo Gap. A mate four-lane expressway. This con- dual-purpose bridge carryeng fhe highway and railroad over the West Branch of the Feather River, which tract also includes the widening of the extends from left to right across the center of the picture, will connect the two visible construction areas. LOWER—An aerial view eastward of fhe Sfate Sign Route 32 improvement between Chico and Hog existing highway from the end of the Springs. A portion of the one-way couplet in Chico shows in the fAreground. and Public Works 7 for an article UPPER—A ground view of the improvement on Stafe Sign Route 32 east of Chico. See the March-April issue of California Highways and Public Warks Downieville. on the opening of this section of highway. LOWER—An improved section of the Mother Lode Highway (State Sign Route 49) in Sierra County west of g California Highways relocation to the junction of the Oro- Yuba City. This 6.5 mile improvement Butte City Road to Codora Four Cor- ville-Richvale Road. It is anticipated cost approximately $1,061,000. The ners and calls for the replacement of this improved facility will be avail- route has been adopted as a freeway, the Sheppards Slough Bridge between able for pu~~lic use la*° in September although only two lanes of the ulti- Willows and Glenn. These two proj- of this year. mate expressway have been con- ects will call for the expenditure of structed, and the route, and freeway approximately x$868,000. Highway Relocated resolution, has been adopted from In the northern end of the district, Hog Springs to Lomo. Interim Improvemen4 in Glemi and Butte Counties, work is A portion of this same route is After considerable discussion a free- being done to improve State Sign presently being widened between Or- wav agreement has been approved by Route 32. Work was completed in land and 1.6 miles east of the Sacra- the City Council of Chico, and the the past year to relocate this route mento River. This worl~ is being done Butte County Board of Supervisors, from 1~Iain Street in Chico to Hog under a contract to Baun Construction for the construction of a freeway Springs to the east. This work was Company of Fresno and also includes along the so-called Sheridan Avenue done from Fir Street in Chico to Hog the widening of two portions of the route in Chico. Until financing of Springs by A. Teichert and Son of Hamilton City-Glenn Highway and a this route is possible, it is necessary Sacramento, and the one-way couplet section of the Willows-Butte City to improve the present route through between Main and Fir Streets on Highway. This same construction firm Chico on an interim basis. To this end, Eighth and Ninth Streets was com- has a second contract that extends the Main and Broadway will become a
pleted by Lester L. Rice and Sons of limits of the widening of the Willows- ...Continued on page 50
Freeway construction on US 4Q near Floriston in Sierra County. The section from Floriston to the Nevada state line will be completed this summer. end Public Works g
10 10
California California HRghways
were were
constructed, constructed,
together together with with the the the U. U. S. S. Army Army to to establish establish Fort ...Continued ...Continued on on page page 12
sidered sidered
because because of of
high high cost initial initial
for for California California and and persuaded Nevada, Nevada,
frontier frontier
town town of of Havilah.
cuts cuts and and fills fills high high not not previously previously con-
Beale, Beale,
Commissioner Commissioner
of of
Affairs Indian Indian
fields fields on on
the the
Kern Kern River River to to and and the
mileage mileage by by alignment. alignment. better better Deep tion, tion, General General Edward Edward Fitzgerald
established established a a
stage stage
to to line line the the gold
lic lic the the by by reducing reducing traveling traveling time time and tion tion to to the the Sebastian Sebastian Reserva- Indian Indian
Canyon Canyon
was was Phineas Phineas
Banning Banning who monetary monetary savings savings pub- accruing accruing to to the the and and because because its its of of convenient convenient loca-
Another Another user user historic historic Division Division of of of of Grapevine Highways Highways the the vast of of Canyon Canyon by by horse horse and and thieves, cattle cattle
creasing creasing awareness awareness on on of of the the the part part Because Because two two hours hours of of at at an an the the Grapevine use use easy easy of of pace.
-1934 -1934 in in
Route Route 1933 reflected reflected in- an an
hours. hours.
The The trip trip today today takes takes less less than Fort Fort Tejon
The The reconstruction reconstruction Ridge of of the the geles geles and and Fort Fort Tejon Tejon listed listed 32%z as as
northerly northerly
slopes slopes of of
Wheeler Wheeler Ridge. with with Los Los Angeles). the the travel travel time time between between Los Los An-
use use
of of Grapevine Grapevine
Canyon Canyon and and the stage stage api, api, was was Mojave, Mojave, Palmdale, Palmdale, Newhall Newhall line line and on on a a regular regular schedule
exact exact
site site
of of this this
road, road, including including the Francisco. Francisco. on on San San Tehach- the the (via (via Midway Midway Route" Route" From From that that date date on, on, the
(Route (Route
238) 238)
occupy occupy will will the almost almost which which here here stamina stamina took took October October of of the the motor out out 8, 8, 1858, 1858, a a on on its its way way to
tions tions
the the interstate interstate future future
freeway mail mail with with away away grades percent percent from from old old stage stage 30 30 the the St. St. Louis. Louis. stopped
to to
this this
route route shows shows
that that many many loca- in in agitation. agitation. field field Overland Overland The The road road new new does entirely entirely Mail Mail Station. Station. The The first
San San
Joaquin Joaquin
A A Valley. Valley. modern modern note State State in in was was discouraging discouraging and and the the establishment establishment division here here state state of of a a Butter-
that that
used used
the the grid grid west west side side of of the heretofore heretofore sections sections An An important important divided divided the milestone milestone of of the the fort for for
Camino Camino Viejo Viejo Los Los Angeles," Angeles," a a
a a trail
moting moting unity unity the the and and integrity integrity of was was abandoned abandoned
in in 1861.
California California by by way way of of the the famed famed "El
and and great great powerful powerful influence influence in in pro- here here in in
varying varying
numbers numbers
until until the the fort
missions missions and and ranchos ranchos from from Southern
has has Route Route Ridge Ridge become become already already a 1857, 1857,
November, November,
and and
were were
stationed
cisco cisco and and the the Northern Northern California
1916 1916 A A "The comment comment of of reads: reads: camels camels
first first
arrived arrived at at
Fort Fort Tejon Tejon in
the the 1800 1800 year year traveled traveled to to San San Fran-
road. of of the the War War Jefferson Jefferson
of of Davis Davis 1857. 1857.
in in
The
F,arly F,arly Spanish Spanish settlers settlers even even before
travelers travelers were were and and soon soon portions using using established established by by direction direction
of of Secretary
geles.
Construction Construction 1914 was was started started in in U. U. the the for for S. S. Army Army Camel Camel
Corps,
1854 1854 and and used used route route this this to to Los Los
An-
surveys surveys ordered." were were Tejon Tejon was was the the western western
headquarters
his his trips trips California California two two to to 1824 in in
its its 25, 25, feasibility feasibility and and on on January January 1912, other other in in ways. ways. For For example, example,
Fort
1727. 1727. Army Army Spanish Spanish Kit Kit in in Carson Carson
in
his his findings findings dissipated dissipated all all as as doubt doubt to activity activity the the for for area, area, and and was was notable
pursuing pursuing deserters deserters while while
from from
the
Engineer Engineer at at vision vision Los Los Angeles, Angeles, and fort fort the the was was the the center center of of
social
Pedro Pedro Don Don Fages, Fages,
who who
this this
used used route
explored explored Clark, Clark, Di- Lewis Lewis by by the the W. W. gust gust 10, 10, 1854. 1854. During During its its active active
years
this this historic historic through through pass pass began began
with
1916, 1916, stated stated "The "The in in part, part, was route route construction construction on on fort fort the the began began Au-
Recorded Recorded travel travel by by
Europeans
the the Highway Highway Commission Commission dated dated July, at at a a site site with with abundant abundant water. water. The
Bulletin Bulletin Los Los Angeles, Angeles, and and the the of field field Tejon Tejon the the near near top top of of the the History canyon
complete complete a a new new Bakers- between between road road
------
- -
------
Maximum Maximum grade grade 0 30% 6 °/ construction, construction, Route Route Ridge Ridge which which 0 was 6% 6 °/
Minimum Minimum
radius
curve curve .______
Unknown 70 70 ft. 1,000 1,000 ft. 1,300 1,300 ft. commenting commenting the the In In on on original
Maximum Maximum elevation elevation __.______.______4,233 4,234
4,183
4,183
Highway Highway by by the the
Act.
Castaic Castaic Junction) Junction)
------
_------__ -- Unknown 38,5? 38,5? 1 1 °
3,062 3,062 ° 2,928°
bonds bonds
from from raised raised authorized sold sold as as
curvature curvature Total Total (Grapevine (Grapevine Starion Starion to
a a $18,000,000 of of with with portion portion the the Length Length (Bakersfield (Bakersfield to to Los Los Angeles)______Angeles)______170 170 mi. 124 124 117 117 mi. mi. 117 117 mi.
1909. 1909. Construction Construction was was completed road) (county (county highway highway highway
passage passage to to 1914 State State of of the the Highway Highway Act Act state state of state
Previous 1914 1933 1958 was was Canyon Canyon the the result result the direct direct of of
highway highway through through state state Grapevine the the most most feasible feasible direct direct route." Angeles:
development development The The
original of of the the fills fills and and meandering meandering to to streams streams secure parison parison of of the the various various routes routes to to Los
F. F. Atkinson Atkinson
Company Company is is completed. ried ried through through deep deep cuts cuts and and over over deep The The following following table table shows shows the the com-
contract contract awarded awarded recently recently to to the the Guy highway highway design design with with the the roadway roadway original original car- Ridge Ridge Route Route 1915." in in
$7,000,000 $7,000,000 a a new new
interstate interstate highway rebuilding rebuilding as as "the "the last last word word in in modern fornia fornia since since the the construction construction of of the
through through sage sage
Grapevine Grapevine Canyon Canyon when A A comment comment 1933 1933 of of describes describes the greatest greatest blow blow to to sectionalism sectionalism in in Cali-
a a refreshing refreshing
improvement improvement in in the the pas- passing passing maneuver. the the reconstruction reconstruction was was truly truly "the
Los Los and and Angeles Angeles Bakersfield Bakersfield will will lanes lanes find the the on on roadbed roadbed to to facilitate facilitate the it it
was was the the that that stated stated completion completion of
MoTOxisTS MoTOxisTS
on on US US 99 99 Route Route between then then new new concept concept three three of of traveling dedication dedication At At the the ceremony ceremony in in 1933,
G. G. By By FLUTER, FLUTER, A. A. Design Design Engineer District District
v v US US 99 99 Will Will Be Be -laved Eight
Y~ Y~ ~~ ~~ / / (~ (~ ~ ~ Historic Historic Section Section Canyon Canyon of A dramatic shot of the Grapevine Grade showing the present highway (right) heading southward up into the canyon and the old 1914 highway twisting its way up the grade on fhe left. The present highway is seven miles shorter than the old 1914 road. and Public Works ~ ~
~ ~ 2 2 California California Highways
the floods," floods," computing computing greater greater and and through through the the work. advertised advertised bids. for for
the the damage damage caused caused by likely likely to to be be eration eration 2,300,000 2,300,000 vehicles vehicles will will pass 000 000 are are pending pending been award award or or have have
"estimating The The usual usual economics economics of of side side of of the the canyon. canyon. During During this this op- state state projects projects totaling totaling some some $20,000,-
of of debris debris made. second second load load is is lanes lanes to to place place traffic traffic all all on on the the west since since 1956. 1956. 1, 1, Five Five more more inter- July July
An An allowance allowance yards yards per for for six six cubic cubic of of permanent permanent pavement pavement on on the the uphill ects ects totaling totaling $179,179,800 $179,179,800 awarded
a a storm storm of of rare rare cloudburst cloudburst intensity. low low the the building building of of necessary necessary portions There There have have been been proj- 50'interstate 50'interstate
second. second. of This This is is equivalent equivalent per per the the 1. 1. Construct Construct sufficient sufficient detours detours to to al- miles.
adopted adopted cubic cubic feet for for
design design was was
3,000 3,000 highways highways within within the the State State 2,315 to to as as follows:
discharge discharge finally is is full, full, the the
Castaic Castaic
pressways pressways and and other other multilane, multilane, divided travel, travel, and and after after many many was was set trials, trials,
when when flood flood Lalce on on Cuddy Cuddy Creek Creek
bring bring the the total total length length of of freeways, freeways, ex- ruption ruption and and inconvenience inconvenience to to public
1914, 1914,
possible record record
flood flood of of the the
Completion Completion of of these these projects projects will was was developed developed to to minimize minimize the the dis-
rain rain currence currence similar similar to of of an an intense intense
$405,525,900. The The order order of of work work for for the the contract
a a
cloudburst cloudburst storm, storm, possible possible true true re-
355 355
had had
contracts contracts under under way way totaling
a a safe safe passage.
as as
possibility possibility
factors factors
involved, involved, of such such
reports reports
that, that,
as as of of June June 30, 30, 1958, 1958, it
cerned cerned with with the the problems problems of of making
of of
the the After After many
consideration consideration
The The
State State
Division Division
of of Highways
the the Highways Highways Division Division of of are are all all con-
project.
NEW NEW CONTRACT CONTRACT TOTAL
contractor, contractor, G. G. Atkinson Atkinson & & F. F. Co., Co., and
problems problems
the the
one one of of of of the major major
The The California California Highway Highway Patrol, Patrol, the Total------
------
$6,950,000
use use conduit conduit constituted size to to for for the the
regard regard to to public public safety.
erations erations necessary necessary to to determine determine the
Miscellaneous Miscellaneous 260,000 ______
struction struction take take on on special special significance significance in
The The and and course. course. consid- calculations calculations Bridges Bridges _ _
380,000
______
an an
average average day, day,
the the problems problems of of con-
Other Other a a closed closed conduit conduit drainage drainage for for 9,000 9,000 feet feet of of its ______400,000
trucks trucks passing passing through through this this
canyon canyon on Grapevine Grapevine Creek Creek Conduit___.___ Conduit___.___ 1,240,000
the the
is is be be sage sage placed placed in in in canyon, canyon,
to to
------
------
------
Paving Paving 1,970,000
With With 9,700 9,700 cars cars 3,300
passenger passenger and and
needing needing
Grapevine Grapevine
Creek, Creek, also also
pas-
Grading Grading ------$2,700,000
back back the the slopes slopes on on both both cutting cutting walls.
Construction the the work work be be will will divided divided
as as follows:
distance distance two two of of miles, approximately approximately
At At Creek. the the contract contract prices, prices,
the the cost cost of
of of eight eight lanes, lanes, it it require, require, will will for for a
chosen chosen traffic. in in which which to to place place Grapevine
needed needed a a width width for for divided divided highway
4. 4. gular gular culvert culvert 10 10 feet feet by by 8 8 Open Open feet feet was
completed completed
highway highway
to
row row that that in in to to provide provide order order the
From From the the above above calculations calculations 000 000 a a vehicles vehicles
rectan- will will pass).
steep, steep, file file with with rocky rocky slopes, slopes, so so nar-
alternate alternate was was conduits, conduits, strcted strcted performed.
under under
paragraph paragraph
No. No. 1 1
(2,300,-
Grapevine Grapevine narrow narrow Canyon Canyon is is a a de-
and and comparing comparing the the cost cost 3. 3. of of possible Reconstruct Reconstruct the the gaps gaps not not con-
vide vide waterway waterway the the for for time. greater greater floods," Draonaye Draonaye Problems
additional additional capital capital investment investment 4,600,000 4,600,000 to to pro- vehicles vehicles
will will pass pass
during during this
from from 10 10
Continued Continued
page page
.. .. .
just just equal equal the the allowable allowable annual annual cost cost of place place traffic traffic on on them. them. An An estimated
GRAPEViPIE
annual annual cost cost thereof, thereof, which which 2. 2. "should Construct Construct all all downhill downhill lanes lanes and
freeway freeway is is 1960. 1960. Some Some 13,000 13,000 completed completed in in vehicles vehicles a a day day now now pass pass this this section section of of US US along along 99.
The The
black black lines lines superimposed superimposed on on this this aerial aerial of of the the Grapevine Grapevine Canyon Canyon show show the the planned planned location location of of the the norih6ound norih6ound and and southbound southbound roadways roadways new after after the the Motor Grader Units Prove o`~V/ V e m O~a Worth During Past Winter
By A. C. DILDINE, Senior Equipment Engineer
TxE Mnix east-west highway link in early days transportation stopped. removal units. The push plows dis- the northern part of California is Today too much depends on this place the snow from one location to through the Sierra. This highway sys- transportation to allow the roads to be another immediately adjacent to the tem had its beginning in 1895 when choked with snow for any long peri- trailing edge of the plow. To move the Placerville-Lake Tahoe wagon road ods of time. snow completely out of the way ne- was taken over by the State. This was With the construction of the mod- cessitates amachine capable of picking followed in 1909 by the completion of ern highway system maintenance has it up and throwing it to a location off state acquisition of the road which con- become increasingly important. And the road. Such a machine requires nected Auburn, Donner Lake, Truckee with increased dependency on the power to handle the loads imposed on and Lake Tahoe. In 1919 a state road main east-west routes over the Sierra, it. The most common snow removal was authorized between Truckee and it has become important to keep them units operating in the mountains at Verde on the California-Nevada line. open the year around. Winter usage present are the auger-type rotary These were the beginnings of the of the highways requires dependable snowplows which are mounted on modern state highway system over high-powered snow removal equip- large heavy-duty four-wheel-drive trucks. the Sierra. The necessity of keeping ment. Until this past winter the Division these roads open was also the start of More Power of Highways had the snow remo~~al problem. a fleet of 42 auger- Snow removal equipment has pro- type rotary units operating in the In the winter months ground trans- gressed from crude wooden plows various mountain areas of the State. portation in the Sierra is continually mounted across the front of trucks to In recent years, with the increasing hampered by heavy snowfall. In modern push plows and rotary snow capacity and use of mountain high-
One of the auger-type rotary units mounted on a heavy-duty four-wheel-drive motor grader used by the Division of Highways in snow removal last winter and Public Works 13
14 14
Highways California California
-type -type rotary. rotary. auger the the
mechanism plow plow combinations combinations rigidly rigidly are are built the the snow snow removal removal problem.
the the
In In motor The The new new - grader mounted mounted - units motor motor grader grader snow- rotary rotary a a necessary necessary additional additional to to tool tool aid aid in
material material to to discharge discharge the the fan. snow snow rough rough removal removal operations operations going. makes makes them
even even and and ice, ice, feeding feeding the the loosened bility bility and and for for long long traction traction heavy continuous -duty -duty for for crowding crowding under
loosening loosening snow snow of of consistency, any any place place larger larger the the tires, tires, but but units units truck truck provides provides their their capa- better better stability
ting ting edges edges augers augers and and are are capable capable grader grader of units units additional additional will will completely completely weight weight not not and and re- wheelbase, wheelbase, plus
one one in in side side a a steady steady stream. stream. The The under under cut- severe severe wheelbase wheelbase conditions. conditions. The The of of motor the the truck truck units. units. This
move move xo xo it it which which a a fan fan discharges discharges to to remove remove it it mately mately to heavy heavy three three packed packed hard- feet feet snow, longer longer than than the
tal tal augers augers bite bite that that into into winter's winter's the the snow snow and truck truck has has usage usage proven proven unit. unit. their their The The ability wheelbase wheelbase approxi- is is
steel steel cutting cutting edges edges three three and and continuous continuous for for horizon- which which hard hard is is usage. usage. 8,000 8,000 The The past pounds pounds more more the than than
The The common common rotary rotary unit unit consists consists weighs weighs of approximately approximately 33,000 33,000 pounds,
similarity similarity type type ends. rotary rotary unit unit motor motor and and grader Managers.
The The
mounted mounted on on
new new
the the combination combination trucks, trucks,
but but of of the the there there auger- the Association Association Chamber Chamber of of of of Commerce
box box
is is
relatively relatively
the the same same as as that eration eration under under emergency emergency conditions. He He is is president president past past of of California the the
is is
in in District District
IX IX (Bishop). (Bishop).
The The auger clutches clutches allow allow The The single single engine engine op- ecutives ecutives University University at at the the of of Oregon.
District District III III
(Marysville) (Marysville)
and and the the third clutches clutches common common to to a a drive drive stitute stitute shaft. of of Commercial Commercial Trade Trade and and Ex-
motor motor graders. graders.
Two Two of of
the the units units are are in mitted mitted from from each each engine engine through graduated graduated and and from from the the Western Western In-
large large
heavy
-duty -duty four -wheel -drive electric electric tachometers. tachometers. firm. firm. Power Power is is trans- He He studied studied Alameda Alameda in in schools
auger
-type -type rotary rotary units units mounted mounted nn controlled controlled mostatically mostatically shutters, shutters, and area area Bay Bay container container manufacturing
the the
purchase purchase
and and
operation operation of of three equipped equipped also also hourmeters, hourmeters, with with meda meda ther- recently recently has has and and been been with with a
The The
result result
of of this this investigation investigation was extreme extreme temperature. temperature. water water Jacobson Jacobson They They has has are his his made made home home in in Ala-
traction, traction, could could
be be
obtained. them them case case in in of of low low oil oil pressure pressure or sistant sistant cashier cashier Yuba Yuba in in City.
creased creased
weight, weight, which which
results results
safety safety
devices devices in in better automatically automatically to to stop his his last last post post with with the the bank bank as- being being
operating operating
rotary rotary plows plows
The The where where engines engines equipped equipped are are in- with Bank Bank of of America America from from 1943, 1930 1930 to to
methods methods
gating gating other other
of of mounting mounting and ization ization of of the the engines. ber ber of of Commerce. Commerce. He He with with was was the
Equipment Equipment Department Department
began began investi- and and repairs repairs simplified simplified manager manager by by ant ant standard- the the of of the the Sacramento Sacramento Cham-
way. way.
Consequently, Consequently, two two years years ago ago the snakes snakes 1943 1943 procurement procurement the the From From of of parts spare spare to to 1950, 1950, was was he he assist-
the the of of speed speed clearing clearing a a choked choked high-
engine engine powers powers the the motor motor grader. grader. This of of ber ber Commerce.
snow. snow. This This would would aid aid materially materially in
mounted mounted truck - units. units. The The same same model Manager Manager of of the the California California
Cham-
State State
and and stability stability when when cutting cutting dense into into
more more h.p. h.p. is is than than available available on on the before before that that Central Central was was
District Coast Coast
larger larger would would tires tires have have tracrion better better
operate operate augers augers the the fan. fan. and and This This is is 70 1955 1955 in in and and 1956, 1956, for for and and
years five five
with with unit unit a a longer longer wheelbase wheelbase
and
engines engines provide provide a a of of total total 270 270 h.p. h.p. to A~Ierchants A~Ierchants Association Association of of
Sacramento
conditions conditions of of rough rough going. going. A A
heavier
grader grader
forward forward of of the the cab. cab. These These two Jacobson Jacobson manager manager was was of of
the the Retail
would would be be advantageous advantageous under under certain mounted mounted on on each each of of side side the the
motor
organizations." civic civic
ways, ways,
it it was was
seen seen that that heavier heavier units is is powered powered by by two two diesel diesel engines
with with son son governing governing local local bodies bodies and
department department maintain maintain improve improve and and liai-
better better
the the traction, traction, Equipment Equipment Department Department reported. ground ground and and experience experience will will the help help
One One
the the new new heavy heavy of of units units grader grader motor motor in in action action last last winter. winter. Increased Increased weight weight of of the the unet unet
resulted resulted
in
"Fred "Fred Jacobson's Jacobson's particular particular back-
vacant vacant position position department. to to the the
munications munications was was to to restore restore this this long-
of of part part program program our our better better for for com-
citizens citizens the the with with California. California. of of One
Highway Highway Commission Commission close close in in touch
the the department department and and California the the
"VVe "VVe are are all all doing doing we we to to can can keep
ment:
Jacobson's Jacobson's announcing announcing in in appoint-
California California Highway Highway Commission, Commission, said,
Public Public Works Works and and chairman chairman of of the
C. C. Gilliss, Gilliss, M. M. State State Director Director of
Public Public Works. of of
resentative resentative of of the the State State Department
June June office office took took 16th 16th as as special special rep-
chambers chambers of of commerce commerce in in
California,
Fred Fred Jacobson, Jacobson, long long associated associated
with
Public Public To To Works Works Job
Fred Fred Jacobson Jacobson Named Comm►ssioners Attend Laying of Cornerstone
TxF MnTExiai.s and Research Depart- ment of the Division of Highways has moved into its new $1,377,000 Headquarters Laboratory at 5900 Fol- som Boulevard. Completion of the new building was marked formally by a cornerstone laying ceremony on May 21st which was attended by members of the Cali- fornia Highway Commission and other state officials. Director of Public Works C. M. Gillis, who is also chairman of the Highway Commission, stressed the important role- the. Materials and Re- search Department has played in developing and improving highway construction methods not only in Cali- fornia but nationally and internation- ally as well. "We spend a lot of money for high- ways and most of it is spent for mate- rials to build roads and bridges," ~illiss said. "All divisions of the De- partment of Public Works are aware of the great responsibility involved in the large expenditures of public money. The principle of competitive bidding assures the taxpayer that the work will be performed. at the lowest cost commensurate with adequate quality. It is important that the State is able to check the quality of the materials. This is one of the important missions of the laboratory." Harmer E. Davis, Director of the Institute of Transportation and Traf- fic Engineering at the University of Commissioner Chester H. Warlow trowels mortar while Director of Public Works C. M. Gilliss (left) and California in Berkeley, said: members of the Highway Laboratory staff look an "The list of honors and awards by national organizations to members of The new laboratory, which pro- tiVhen it first began operations in this Materials and Research group for vides 65,000 square feet of space for 1912, the department had one geolo- outstanding contributions is impres- a wide range of research and testing ~ist and one testing engineer. Its lab- sive, as is the list of important com- equipment, was designed by the Divi- oratory was a small wooden building mittee posts held in technical and sion of Architecture. at the State Fairgrounds. In 1922 the professional societies." The work of the Materials and Re- Headquarters Laboratory was moved seareh Department is divided into two to 3435 Serra Way. After the. ceremonies, the commis- main categories—research to develop As the State's highway program has sioners and guests toured the new better highway construction methods grown, the department has faced an laboratory where the various uses of and materials, and testing to make increasingly acute need for added the equipment were explained by en- sure the State gets its money's worth space. In recent years its Sacramento gineers of the 1Vlaterials and Research from every highway construction activities have been conducted at sev- Department. dollar. . .Continued on page 50 and Public Works 15
16 Highways California California
Tennessee Tennessee (right). Street Street
highways highways Congress Congress and and have busses. in in authorized authorized cars cars 1956 1956 in in
at at signalized signalized intersections intersections as as the the one one such such of
to to appeal appeal travel travel others others
our program program who who many many Highway Highway which
System System
with with the the traffic traffic encountered at at present present slowdown slowdown
a~ a~ the the one one at at Laurel Laurel will will do do Street Street away (left) (left) and and hunting, hunting, camping camping hiking fishing, fishing, highways highways Interstate National National with with the the
aration aration structures structures
on on Vallejo Vallejo US US 40 40 through through
such
vacationers vacationers
resorts, year. year.
state
Ski Ski each each of of need need the the some some to to
integrate integrate
PHOTOS PHOTOS AT AT TOP TOP
OF OF PAGE. PAGE.
Construction Construction
of of sep-
parks parks attract attract tourists tourists thousands thousands demands demands and of of Increased Increased and and the traffic traffic
99, 99, Calaveras Calaveras Trees Trees Park, Park, and and other the the -south -south major major US US Big Big artery. north
system.
worldwide worldwide Yosemite Yosemite interest. interest. through through National central central the the north area, area, - and
upon upon its its transportation automotive automotive
recreation recreation area area X X of contains contains District District west west areas areas US US district, district, 50 of of the the
lishments, lishments, all all of of which which depend
in in turn turn
mountains mountains the the These These boundaries boundaries within within district. district. are are north- US US of 40 40 in in the the
tional tional area, area, and and its its on on estab- military military
U. U. That That Nevada S. S. the the which which sign sign portion portion Sierra Sierra routes routes traverse traverse of of the
its its
agricultural agricultural pursuit, pursuit, on on its its recrea-
primarily primarily past past has has been been along along the the three
Attractions
Many Many
great great area area hinges hinges a a large large to to
extent extent
on
phasis phasis on on freeway freeway construction construction the in in
The The economic economic
importance importance
this
of of
ties ties of of railroads. three three major major structed structed War War since since II. II. World World The The em-
range.
a a deep deep with with facili- port port and and water water rail rail freeways freeways have have of of which which been been con-
Valley Valley
to to
the the rugged rugged Sierra Sierra Nevada markets, markets, central central due due to to location its its work work is is developing developing the the rapidly rapidly system
ranging ranging
from from the the flat flat San San Joaquin equipment equipment domestic domestic for for foreign district, district, and and the the of of backbone backbone road road net- the the
in in
nine nine counties counties diverse diverse with with terrain, materials, materials, food food products, products, supplies supplies and X, X, In In District District in in any- any- highway as as
°cludes °cludes 1,400 1,400 miles miles state state of of highways a a point point movement movement for for large large of of raw Merced.
portion portion
of of Central Central California. California. It It in- motor motor vehicles. vehicles. by by is is a a Stockton Stockton and and focal Castle Castle ton, ton, Force Force Base Base Air Air near
ters ters in in Stockton, Stockton,
extends extends over over a a large livestock livestock which which are are hauled hauled to to Sharpe Sharpe market and and Depot Depot General General in in Stock-
X, X,
District District has has its its which which headquar- produce produce ties ties minerals minerals timber, timber, and Fairfield, Fairfield, the the Naval Naval Supply Supply Annex
of of this this progress. mills. mills. neries neries and and The The mountain mountain coun- Travis Travis Island, Island, Force Force Air Air Base Base near
been been prepared prepared to to inform inform Californians harvests harvests ing ing to to of of the the markets, markets, can- S. S. the the U. U. Naval Naval Shipyard Shipyard at at Mare
public. public. toring toring This This overall overall has report report accommodate accommodate road road net net to to Arsenal, Arsenal, the the truck- founded founded over over 100 100 years years ago,
proved proved highway highway facilities facilities for for the the mo- activities activities essing essing demand demand an an extensive Defense Defense of of include include historic historic Benicia
Burns Burns 1947 1947 Act Act in in in in providing providing im- Agriculture Agriculture each each year. year. and and Major Major proc- food food installations installations of of the the Department
since since the the enactment enactment of of the the Collier- systems systems produces produces a a wealth wealth Army, Army, of of crops Navy Navy of of and and Air Air Force Force bases.
has has ways ways made made considerable considerable progress highly highly with with developed developed its its strategic strategic its its irrigation location, location, a a large large number
DisTxicT DisTxicT
X X of of the the Division Division of of The The flat, flat, High- fertile fertile San San Joaquin Joaquin Valley There There are are in in District District X, X, because because of
J. J. G. G. MEYER, MEYER, By By District District Engineer
s s roc ~ ~
..
e e or or rom
.~ -.__ - .. .___- _ _ made it necessary to extend the dis- IntersinTe System Routes 74 and 75, between the Mar- in trict's freeway planning efforts. As a Approximately 190 miles of existing tinez-Benicia Bridge and US 40 result, portions of Sign Routes 12, 16, or proposed highways in the district Vallejo. The Martinez-Benicia Bridge 21, 48, 120, 132 and 152 have been have been included in the Federal was authorized by the 1955 Session of adopted as freeways. Supplementing Interstate Highway System which is the California Legislature in combina- the freeway system throughout the proposed for rapid development as tion with the Carquinez Bridge. district is an important secondary net- indicated by the Federal Highway Negotiations are under way with the work of feeder routes and connecting Act of 1956. U. S. Government for rights-of-way road laterals. This includes Sign Route 49, Portions of the interstate system in for approximately three miles of construction within the limits of the a foothill route on the western slopes this district on which routes have been of the Sierra Benicia Arsenal. It is anticipated that Nevada; Sign Route 88, adopted and design studies under way Carson Pass Highway; Sign Route 4, this right-of-way transaction will be include 44 miles of US 40 in Solano which connects Stockton with the in- completed by October 1st. Construc- Napa Counties, between the Car- dustrial area around Carquinez Strait and tion of the Martinez-Benicia Bridge is and continues east from Stockton over quinez Bridge and the Yolo county scheduled to begin April, 1959. Ebbetts and Monitor Passes; Sign line; 11 miles of State Route 90 in Portions of the interstate system Route 108, Sonora Pass; and Sign Solano County from US 40 near that have not been adopted included Route 140, the all-year highway into Vacaville to the Yolo county line; 110 miles of Westside Freeway and Yosemite. approximately 6.6 miles on State connecting links between the Alameda
\' % •.\~ ~ ~v, oPLACEflVILLE ANFLttVIL ~` ~ry t~~/
A L ~ I OSACRAMENTO .~ E ~•l
r-. ~r,~ s ~ A ~~ v --~ ,~ '`.~ GPpVE ACKSON,~ KELUMNEOM ~Ar~ GAITe _~.i~ /~ HILL L-.~~ ~, py BRIDGEPORT AN ANDREAS r ra, ALLEY CREST ~RD\ SPFINGSy
~I NGEI.~ CAMPT U I. ~T WAIN HARTE SOJ~ DEN ' \
f~~~ P FAHNINGTON _ ,~ ~ ~ ~~~~: ,y ,..~ LIVERMORE I S MODE T A ~z ~~ ~ ATERFOND~~,, ~ ~ "'. EHES `~'kl A 1 R IC P ~ ~_yi~ ~j "~. tEYES x 1 ue ~': H ATTEpSON
_ '~
~~ ICED ~\ / M E It ~ 93E ID\'1~~ STATE OF CALIFORNIA L E G E N D ~,r~- ~'-'_~ DEPARTMENT OF PUBLIC WORKS r• DIVISION OF HIGHWAYS COMPLETED AND ~ EXPRESSWAY LOS BANOS UNDER CONSTRUCTION { FULL FREEWAY DISTRICT' ~ BUDGETED ...... ««~» OS PALOS R /, FREEWAYS FREEWAY ROUTE ADOPTED ~~ g ~,\ / SCALE IN MILES 5 10 .\ /. 0 5 IS 20 25 \/ 1956
and Public Works 17 county line and a junction with the proposed Westside Freeway (State Route 238) east of Tracy and a con- nection from west of Tracy to Stock- ton. Westside Freeway In 1957 the State Legislature, in Chapter 2(i, Statutes of 1957, declared that Route 238 "is hereby- added to the State Highway System, to extend from a point on Route 4 south of Bakersfield to a point on Route 7 near ~~oodlaizd, on a route along the west- erly side of the San Joaquin Valley to be selected by the California Highway Commission, which route may include all or portions of any existing state highway route or routes." The portion within the limits of District X comprises about 110 miles of the route. The portion between the Fresno county line and west of Patter- son has been the subject of public meetings and a definite route for this portion of the freeway was adopted by the California Highway Commis- sion in June, 1958. The portion between west of Pat- terson and south of Stockton, includ- ing the connection of legislative Route 110 and all of legislative Route 5 (US 50), has been the subject of pub- lic meetings, but no recommendations have been made as yet. Public meet- ings will be scheduled for the balance of the route in the near future.. A great deal of construction work has been in progress in District X. A brief resume which has been grouped according to sign route designation, follows below: US 40 The District X portion of this high- way runs from Carquinez Bridge through Solano County to the Yolo county line. In December of 1957 work was completed on 11/ miles of eight-lane freeway from the Carquinez Bridge to one-half mile north of the Vallejo Wye. The worl~ was performed by Fredrickson and Watson Construction Company and Ransome Company and required approximately 18 months to complete. This contract, which was a part of ,An aerial view of U$ 99 in San Joaquin County showing the twin spans across the Mokelumne River with frontage road passing under the north end of the bridges the conversion of US 40 to full free- way status, included facilities for a
1 California Highways connection to the new parallel Car- half mile north of Redwood Street Under an already completed contract, quinez Bridge. under which the existing four-lane the .Magazine Street Overcrossing and The work was financed from Car- highway is being converted to a six- the frontage roads between Sequoia quinez Strait Bridge construction lane freeway. and Alhambra Streets were con- funds, Chapter 960, Statutes of 1955 Work includes the construction of structed by Harms Bros., contractor. Bond Resolution adopted by the Cali- seven bridges, the Laurel Street Over- us so fornia Toll Bridge Authority October crossing, the Route 7-74 Separation, 4, 19.55. Benicia Road Overcrossing, Georgia US 50 enters District X through Closely allied with this project are Street Overcrossing, Springs Road Altamont Pass, joins US 99 at Stock- several Bridge Department contracts Overcrossing, Tennessee Street Over- ton and continues north to the Sacra- amounting to approximately $1,500,- crossing, and the Redwood .Street mento county line. 000 for bridge administration build- Overcrossing. Approximately 15'/z miles of US 50 ings, toll collecting systems, and bridge Harms Bros., C. M. Syar and Erick- between Tracy Overhead and Stock- maintenance shops. son, Philips and Weisberg are the ton are under improvement at a total A second highway contract is cur- contractors. (The estimated cost is cost of $3,558,000. From Tracy to rently in progress between 0.2 mile $4,500,000, and the project is expected Kasson Road (better known as Grant north of the Vallejo Wye and one- to be completed in December,. 1958.) Line Road), a 3%z-mile interim proj-
Construction on fihe Yosemite All-year Highway (Sign Route 140) eight miles north of Mariposa is improving this imparfant recreation route
anc~ Public Works 19
Highways California California 20 20
A 1957. 1957. A October, October, was was in in levee levee road. road. completed completed tortuous tortuous anarrow, anarrow, ing ing roads. frontage frontage tem tem of of
Highway, 49, 49, Lode Lode the the Route Route Mother Mother a a sys- with with route route replac- separation separation direct direct a a project project follows follows Road) Road) ington ington
Sign on on major major improvement improvement One One 4 (Farm- -75 -75 and and Route Route Overcrossing Overcrossing The bridge. bridge. River River the the Mokelumne Mokelumne
Stockton South South Interchange, Interchange, Road Road Route Route 49 Sign Sign Vista Vista to Rio Rio bridge bridge at at mento mento River River
Mariposa the the are are project project $1,000,000 $1,000,000
Sacra-
end end the the of of east east the the frotn frotn 12 12
was was
$1,018,750.
the in in Included Included
status. status. freeway freeway full full to to
Route Sign Sign %Z %Z on on
-mile -mile 5 5 improvement improvement
of of work
cost cost the the the the
and and contractor, contractor,
75 Route Route and and Road Road Mariposa Mariposa tween tween
a July July were were opened opened for for in in Bids Bids
was was the Bros. Bros.
Denverton. Denverton.
Fredrickson Fredrickson
Bypass Bypass be- Stockton Stockton the the of of portion portion
310,000.
east east
of of
of
mile mile one
Suisun Suisun and and
-half -half
a
to to convert convert
proposes proposes
project project
The The
3,-
is is $ $ the the at at
estimated estimated and and total total cost cost
miles miles
east
% % 2 2
accomplished accomplished between between
99. US US on on
project project
third third freeway freeway
for for a a
1960 This This be be will will in in completed completed
project project
Work Work of of
was
Base. Base. Travis Travis
Air Air
Force Force
1958 2, 2, July July
on on
opened opened Bids Bids were were
Road, Road, Route Route Rio Rio and and Vista Vista Sign Sign 12.
limits
extended extended
around around the the alignment alignment
. same same
year. year. the the of of November November 99, 99, the the West West tive tive Sacramento- Route Route
a a new of of
on on roadway roadway
completion completion
in
project project
County County the the Merced Merced and and
legisla- of of at at the the structure structure intersection intersection
the
with with
were were 12 12 Route Route improved improved
of of
1957
September September
in in
was was completed completed a a and and separation cule cule provide provide span span
% %
Sign 6 6
of of
1958, 1958, miles miles January, January,
County
Joaquin Joaquin San San in in The The
project project
and and bas- bridge bridge concrete concrete antiquated antiquated
project. bridge bridge River River ramento ramento
project. the the throughout throughout a a will will narrow replace replace River River ramento ramento
the the
Sac-
with with concurrently concurrently completed completed
sides both both on on provided provided were were Rio Rio roads roads the the Vista Vista Sac- Bridge Bridge across across the the
will will
be
work work anticipated anticipated is is It It load. load. fill fill
Frontage Overcrossing. Overcrossing. Road Road Jahant Jahant A A at bridge bridge and and contract contract approach approach
superimposed the the under under stable stable be be will will
and and the Overcrossing, Overcrossing,
Road Road Peltier Peltier
Andreas. San San
soils the the underlying underlying
ultimately ultimately that that
Overcrossing, Road Road
Acampo Acampo
crossing, crossing,
49 49 at to to Route Route Sign Sign County County
Calaveras Calaveras
point
the the to to consolidation consolidation of of rate rate the the
Road Road Ocer-
Woodbridge Woodbridge
Bridge, Bridge, River River
into east east continues continues it it Lodi Lodi From From Lodi. Lodi.
up
speeds speeds it it doing doing so so
by by and and pressed, pressed,
Mokelumne the the such such as as
structures structures of of
99 99 US US near to to Counties Counties Joaquin Joaquin
San San
com-
being being water water the the route route for for escape escape
number a a
included included
project project latter latter The The
and Solano, Solano, Sacramento Sacramento through through field field
an
providing providing by by mass mass underlying underlying the the
Road.
Jahant Jahant of of
north north mile mile -half -half one
from from Fair- continues continues It It Cordelia. Cordelia.
near near
assist assist draining to to in in drains drains sand sand inch inch
limits limits to
city city
north north Lodi Lodi from from County County
S. S. U. U. 40 Route Route to to Canyon. Canyon. Jamison Jamison
18- of of
feet feet lineal lineal of of 38,400 38,400 stallation stallation
Joaquin
San San
in in is is project project second second
County County through Solano Solano of of boundary boundary
the the in-
necessitating necessitating soil soil peat peat unstable unstable
The
County. County.
Merced Merced in in Atwater, Atwater, at at
west from from the the runs runs Highway Highway 12 12
the to to due due
relocation relocation the the by by presented presented
Avenue Grove Grove Creek Creek to to Canal Canal
from from
are problems problems
engineering engineering of of number number
Roufe Roufe
12 Sign Sign
roads frontage frontage and and interchange interchange with with
4%z 4%z freeway full full of of miles miles included included ect ect
Froj-
first first year. year. The The the the 99 99 during during US US to to left. fhe fhe highway highway is is
oId oId The The east east Oakdale. Oakdale. Curve, Curve, of of Jones Jones
►ion ►ion
highway highway at }he }he reloca of of showing showing County County 120 120 Stanislaus Stanislaus in in Sign Sign on on Route Route view view eastward eastward aerial aerial An An /a /a to freeway freeway full full of of 9' miles miles added added
$4,626,000, totaling totaling projects, projects, Two Two
Freeway. Westside Westside posed posed
the the gro- by by diverted diverted be be will will traffic traffic
its portion portion of of a a Ultimately, Ultimately, to to south. south.
north from from highway highway tremelyimportant tremelyimportant
ex- and and 99, 99, traveled traveled a a heavily heavily US US
us us 9q
Freeway. Westside Westside
of of the completion completion to to prior prior capacity capacity
traffic added added for for need need the the by by tated tated
dic- have have been been Stockton Stockton and and Tracy Tracy
50 50 near US US on on projects projects interim interim The The
completion. way way nearing nearing is is
high- undivided undivided -lane -lane four % % of of S S miles miles
and bridges bridges two two of of consisting consisting project project
interim an an Stockton, Stockton, in in Way Way Charter Charter
to Avenue Avenue Richards Richards From From Mossdale. Mossdale.
near 120 120 Route Route Sign Sign State State with with change change
inter- an an and and separation separation railroad railroad a a
involves project project ing ing The The completion. completion.
near- is is Camp Camp French French of of Avenue Avenue south south
Richards and and River River San San Joaquin Joaquin the the
at Mossdale Mossdale between between divided divided highway highway
-lane miles miles four % % of of on on 6 6 Work Work lanes. lanes.
to to four two the the -lane -lane existing existing highway highway
widening ect ect is is under under construction, construction, The US 50-Sign Rouie 120 interchange at Mossdale is nearing completion. The river in the background is fhe San Joaquin. relocation project near Mokelumne 8,600 feet and continues to the Ne- Lake and a point 1 %2 miles east of Hill replaced 2 %2 miles of winding, vada state line near Minden. It passes Blue Lake Road. The final cost was narrow grade with an all-paved 32- through Jackson, historic.. community $729,550. foot roadway at a cost of $327,000. which dates back before the Gold A second project on Sign Route 88 A second project between three and Rush. Two famous gold mines were in Amador County is currently in four miles northwest of Sonora, in- located near Jackson, the Argonaut progress. A portion amounting to 7 volving grading and surfacing, for a and Kennedy Mines, from which mil- miles between Lancha Plana Road and total cost of $131,000, is nearly com- lions of dollars were taken in the Martell is being graded and surfaced pleted. early days. at a cost of approximately $1,040,000. Sign Route 88 A section of Sign Route 88 in Al- It is estimated that work will be com- The Carson Pass Highway, Sign pine County was completed in Octo- pleted by September, 1958. Route 88, starts at Stockton and trav- ber, 1957. This improvement which is Also of interest is the construction erses Carson Pass at an elevation of 5% miles in length is between Red project now underway at Peddler Hill and Public Works ~~ under the supervision of the Federal Bureau of Public Roads. This work is an extension of two previously com- pleted projects by the bureau. The contractor is H. E. Parker.
Sign Roufe 108 The Sonora Pass Highway crosses Sonora Pass at an elevation of 9,600 feet. It follows the same route as Sign Route 49 between Yosemite Junction and Sonora. Four miles of Sign Route 108 is under construction from one mile west of Yosemite Junction to Monte- zuma Road in Tuolumne County. The project involves grading and surfacing on improved alignment at a cost of $606,650. It is estimated that work will be completed by September, 1958. The contractor is the Rockport Red- wood Company.
Sign Roufe 140 This route is known as the All-year Highway from Merced to Yosemite Park, inasmuch as it is not closed during the winter months as are other routes into the park. It passes through the Town of Mariposa, a community dating back to Gold Rush days, which is the southern terminus of the Mother Lode Highway. Worlc was completed in December, 1957, on a five-mile realignment of Sign Route 140 in Mariposa County between Acorn Inn and King Solo- mon's Mine. The cost of the work was $1,106,300, The project improved an important segment of the All-year Highway into Yosemite National Park. A second project, between Briceburg and Crane. Flat, was com- pleted in July, 1957. This project in- volved line changes, restoration of embankment protection along„ the Merced River, bridges and surfacing at a total cost of $828,200. Various other contracts have been completed on this route in recent years so that now the motorist has the advantage of nearly a continuous 32- foot all-paved roadway from Mari- posa county line to Briceburg. By the end of 1958 approximately 22 miles of full freeway will have UPPER—This section of Sign Route 88 in Amador County near Jackson is being improved. the Town of been completed by current projects in Martell is in the distance. LOWER—An aeriaB showing the newly constructed southbound lanes to the right District X. Interim projects will add on US 50 in San Joaquin County.
... Continued on page 48
22 California Highways s New Santa Ana Freeway Secfion ~ro I ~~ Completed in Orange County
By Jm D. HETFiERINGTON, Resident Engineer
To TxE motorist who remembers the narrow substandard over-hill-and-dale section of US 101 in Orange County between El Toro-Niguel Road and Laguna Canyon Road, news of the completion of this four miles to full freeway standards will be welcome.. The $2,400,000 contract for con- struction was awarded to Cox Bros. Construction Co. and J. E. Haddock Ltd., a joint venture, on January 30, 1957. Construction work started the first week of February, 1957, and was continuous except for time lost due to inclement weather until completion on April 21, 1958, approximately eight months ahead of the expiration of con- tract time. In addition to the construction on US 101, atwo-mile section of relo- cation of State Route 185 (Laguna Canyon Road) was included in the contract. This work was included primarily to provide a source of fill material needed for the freeway con- struction; however, construction of Looking wes} along Laguna Canyon Road showing a considerable portion of the this section has provided the motorist two miles of new roadway. with atwo-lane highway constructed to present-day standards with provi- In actuality,. the earthmoving was direction when needed for future in- sion made for ultimate improvement done using tractors and carryalls. for creased traffic. to a four-lane divided freeway sec- short hauls and tractor and scraper Since access is not permitted to the tion when traffic warrants. units for the long hauls. To speed up freeway, it was necessary to construct At one time the quantities of mate- loading of the scrapers, tractor push frontage roads from El Toro-Niguel rial and work involved in a contract cats were used in tandem. Due to the Road to provide access to the Irvine of this nature would have been quite hardness of the sandstone encountered Ranch and other holdings in this area. impressive. However, with present- in the excavation on the new align- In addition to the frontage roads, an day construction equipment, the ment of Laguna Road, it was found undercrossing and an overcrossing movement of huge amounts. of mate- necessary to use ripper-equipped trac- were constructed to provide access rial has become commonplace: Con- tors to break up the material prior to across the freeway for farm equip- verting the more than one-half million loading. ment. yards of road~~ay excavation involved Due to the substandard width and In addition to structures needed for to smaller units, such as the quantity alignment of the old highway, no at- access across the new freeway the a man could haul in a garden wheel- tempt was made to salvage any of it contract also provided for an inter- barrow, will perhaps give a better pc- other than utilizing a portion for sub- change for the new Laguna Canyon ture of the work required in chang- base for the new construction. In con- Road and the freeway. ing this farm and pasture land to a trast to the old narrow two-lane high- J. E. Haddock Ltd. was represented modern freeway. It would take one way, the motorist now has the use of on the contract by Superintendent wheelbarrow trip each by half of the two 12-foot concrete lanes in each di- George Wiggers. Duncan Manning 14,445,000 population of California to rection with a paved shoulder to his was superintendent for Cox Bros. move this quantity of earth. Each of right and a wide median between op- Construction Company with the au- these wheelbarrow trips would have posing traffic.. Provision has also been thor as resident engineer. to be almost a mile long. made to add an additional lane in each (Other photos on n~xT page.) and Public Works 23 toward UPPER—This photo, taken from the new Laguna Canyon Road traffic separation structure, shows the new section of the Santa Ana Freeway looking south San Juan Capistrano. LOWER-7he new traffic separation connecting Laguna Canyon Road with the Santa Ana Freeway. (Story on previous page.)
24, California Highways King City-North County Line
n of 101 Improved u Section US o n ere O
By A. M. NASH, District Engineer
ToDAY'S mangy modern business and down historic El Camino Real from right a sign directing us to a ramp pleasure travelers who drive on US the county line north of Salinas to leading us onto the Salinas freeway. 101 in Monterey County travel in in- King City, since this section of US We are leaving North Main Street and creasing comfort, ease and safety as 101 has been receiving preferred at- we shall now travel a distance of 6.2 they visit the many scenic resorts and tention for the elimination of its de- miles skirting the easterly edge of other fascinating points of historical ficiencies during the last several years. busy Salinas. The first section of this interest that abound in the county, or Entering Salinas Valley from the full freeway from North Main Street in making the many truck and passen- north we travel over a divided four- to youth Market Street was opened ger trips required to keep pace with lane highway constructed in 1943 but for tratfc in 1954 and eliminated a the ever-expanding industry and agri- no loner adequate. Plans are well great deal of the congestion at the culture much in evidence throughout under way for a full freeway develop- intersection of Nlain and Market in the area. ment westerly of the existing highway the Salinas business district as well as US 101 in Monterey County is rap- which will bypass the business and reducing the heavy volume of traffic idly changing from a heavily traveled, residential development that has been on North Main Street. The second to Suence two-lane country road into a modern built up on both sides of the existing section from Market Street Underpass and Hartnell Road was well-planned divided four-lane ex- highway, causing much of the traffic Much improve- completed and this entire six-mile Sa- pressway or freeway. congestion. Right-of-way is presently ment has been made, as will be seen, linas freeway was opened to traffic in being acquired for this freeway proj- but there is still much to do to provide 1956, considerably easing the local will be constructed as soon the traveling public with the modern ect which traffic problems throughout the City highways they need. as funds can be made available. of Salinas, as well as facilitating and To see what has been done and will After passing the Salinas Rodeo benefiting traffic to and from Los An- be done, let us take an imaginary trip grounds to our left, we notice on our geles and San Francisco.
The Salinas Bypass on US 101 in Monterey Counfy. As }he directional sign indicates, the in}erthange ahead connects US 701 with State Route 117 fo the Monterey Peninsula. and Public Works 25 A view of the depressed section of the US 101 freeway fhrough Chualar and the Main Sfreet overcrossing. The old highway is on fhe upper level to the rlghf along the line of buildings.
Separation structures were con- rolling hills of the Gabilan (Hawk) and Hartnell Road. Many road names structed at sufficient intervals to allow Range that separates the Salinas Valley honor original Spanish, Mexican, and free flow of crosstown traffic and pro- from. the valleys farther east. We are "Anglo" colonists who first settled in vide access to State Route 117 which actually entering a huge trough be- this rich valley. These particular road leads westerly from this point to his- tween these mountain ranges, a great, names honor two British citizens who toric and scenic old Monterey, the green plain from. 10 to 20 miles wide were, after the padres, among the first original capital of California, as well as and a hundred miles long. settlers here. to the report city of Carmel, the com- David Spence came to California munities of Seaside and Del Rey Oaks, Rieh Croplands from Scotland in 1824 to salt meat and and the large army facility at Fort Here ~~e see under intense cultiva- hides for shipment to Peru and other Ord, north of Monterey. tion and irrigation all types of vege- Latin American countries. He pros- For details of construction of„ this tables with lettuce obviously king of pered, married Adelaida Estrada, freeway, one may refer to the July- them all. Local people. refer to the daughter of the commandant of Mon- August 1953 and March-April 1954 Salinas Valley as the "Lettuce Bowl terey, and settled down to developing issues of California Highways and of America" and as we travel south the Rancho Buena Vista south of Public N~oYks. seeing the endless rows of vegetable the present-dav Salinas. Don William As we travel south on the Salinas and forage crops it is evident that the Hartnell, originally a young Lanca- freeway we see to the southeast rising Salinas Valley is one of the most pro- shire man, became a prosperous trader sharply from the green valley floor ductive agricultural valleys in the in Monterey, married 'Teresa de la the steep, craggy Santa Lucia Moun- United States. Guerra, ahigh-caste Spanish maiden tains. Looking across the valley to the Driving effortlessly we have quickly from Santa Barbara, and later owned east we see the green of the Salinas passed the southerly terminus of the and operated the Alisal Rancho. He Valley merging into the. dry, brown Salinas Freeway at Spence Underpass established a private college which
26 California Highways eventually failed due to depression sea level. The town varies from 300 Since construction of this section of times but which has been re-estab- population in off agricultural seasons highway parallels the existing high- lished as a two-year college in Salinas to 800 during peak harvest periods as way, and overlaps the existing four- named, in his memory, Hartnell Col- imported farm laborers crowd the lane divided expressways to the north lege. labor camps as they harvest the vege- and south, it was necessary to detour table crops produced in the rich land traffic at various stages of construc- Heavy Harvest iraffie for many miles around. tion, when the e~sting traveled way South of Hartnell Road we are trav- The land on which these crops are became involved in the construction eling on a divided four-lane express- grown lies in the yet distinct bound- procedures. Detouring was compli- way built in 1952 for a distance of aries of the old Chualar Rancho. This cated by a time element resulting 5.5 miles to the northern outskirts 8,890-acre rancho, an original land from construction of the prestressed of the little town of Chualar. This grant from the King of Spain to an concrete overcrossing at Main S*reet. section of expressway was constructed old Peruvian trader named Juan Ma- Setting up safe detours proved to be prior to other sections in this area larin, passed into the hands of a Scots- quite a problem since traffic ap- to facilitate the flow of agricultural man named David Jacks in 1850 when proached the project from the north produce from the. surrounding fields Juan's son, Mariano Malarin, could not and the south on long level sections to the market and shipping center in repay Jacks a loan on his rancho of of high-speed divided expressway. One Salinas. The old two-lane highway $3,000 which he had borrowed in a troublesome spot was greatly im- previously in existence was so con- vain attempt to save his cattle opera- proved by erecting an oversize 8-by- gested with large, slow vegetable prod- tions during a long drought. The 8-foot advance "SLOW" sign to warn uce trucks during the summer har- rancho is still owned by the David oncoming high-speed traffic. vest seasons that all vehicle traffic was Jacks Corporation, which he estab- Soil Problem forced to travel at greatly reduced lished before his death. material encountered speeds. M. J. B. Construction Company and Excavated roadway proved to be A one-mile freeway section through Lord and Bishop, Inc., of Stockton within the area Generally, moisture con- the Town of Chualar has just been worked on this project as a joint ven- expansive. a percent was required to completed. Completion of this free- ture with Lord and Bishop, Inc., doing tent of 20 moisture way has eliminated an annoying two- the structure work. obtain "no shrink, no swell" lane traffic bottleneck which formerly requirements. Subgrade samples were Work started in April 1957 and was existed between the divided four-lane taken early during the grading opera- completed approximately one }year expressway north of town, over tions. From tests on these samples, the thereafter. The project consisted of which we have just traveled, and the laboratory recommended that the constructing 1.5 miles of four-lane divided four-lane expressway from the structural section for the base materials divided freeway with a depressed southerly limits of Chualar to two and pavement be increased from two mainline section through Chualar, and miles north of Gonzales, some 3.8 feet to three feet to prevent detri- diamond-type interchange with an miles away, which was completed in a mental swell of the underlying base- overcrossing at Main Street. The new July, 1954. ment soils. This was done. alignment runs between and parallel to Construction of the depressed sec- Old Spanish Rancho the old highway and the Southern tion resulted in a surplus of excavation Pacific Railroad. The old highway Chualar is an unincorporated com- of approximately 75,000 cubic yards a frontage munity approximately 10 miles south through Chualar became out of a total of 124,000 cubic yards. of Salinas on El Camino Real approxi- road. An existing county road which This surplus was disposed of in areas mately two miles east of the Salinas intersected the highway just south of outside of the right-of-way, some of River, lying in the center of a level Chualar was realigned to connect to which were selected by the State and agricultural plain some 110 feet above the Main Street interchange. others by the contractor. Most of this,
snn 6enc+a.
SOLE KING _CITY GONZALES SANTA
ALAR
LEGEND ~~COMPLETED 4LANE DIVIDED E%PRESSWAY PF20GRESS IN FOUR CANING FREEWAY COMPLETED4LANE DIVIDED U.S. IO~ IN MONTEREY COUNTY ~~~ UNDER CONSTRUCTION OR BUDGETED ..o.•••. UNDER FREEWAY RESOLUTION
and Public Works 27 The section of US 101 expressway between Soledad and Greenfield (upper) showing the Arroyo Seco overhead and frontage roads left and right is typical of the new divided, multilane consfruclion replacing such sections as the existing highway through Soledad (lower) with its slow-moving traffic
28 California Highways A view southward of the Salinas Bypass from the John Street overcrossing showing industrial development in the zoned area to the right disposal material was moved by the systems to drain the project. First of from the streets of Chualar and car- use of two-axle pneumatic-tired all, the depressed freeway section, ries it out the north end of the proj- scrapers and was hauled across the which is 15 feet below the surround- ect. It is on a 0.3 percent to 0.4 per- railroad tracks which paralleled the ing area, is being drained by a gravity cent grade and starts out with a job to the west. Considerable excite- storm drain. The depressed area storm 30-inch reinforced concrete pipe in- ment occurred on two different oc- drain consisted of an intricate system creasing to a 36-inch reinforced con- casions when a scraper accidentally of small box culverts which drain into crete pipe. All new pipe culverts on hooked into the rails and pulled the a 30-inch reinforced concrete pipe the project are of reinforced concrete Southern Pacific tracks out of line. which runs into a reservoir approxi- pipe. Trains were able to detour via an mately 1,100 feet west of the project. Prestressed Concrete e~sting siding without much delay. The 30-inch reinforced concrete pipe To meet limited clearances at the Part of the work under this contract was laid on a 0.3 percent grade and 92 Main Street overcrossing it consisted of constructing some fills for feet of it was jacked under the South- was neces- sary to construct a Southern Pacific Railroad siding re- ern Pacific Railroad tracks. a bridge with a mini- mum structural depth. A two-span location necessitated by the new iiigh- The second storm drain runs along continuous prestressed slab, 18 inches way construction. the old highway which will become thick, was constructed providing two The flat terrain in this area made it the frontage road through Chualar. 14-foot lanes and one five-foot side- necessary to set up two storm drain This storm drain picks up the' water walk. and Public Works 29
30 30 California California Highways
roadway. from from to hauling hauling adjacent adjacent farms farms the the
began began operations operations
in in June. June. New New highway highway lanes lanes will will
be be consfirucfed consfirucfed
on on
the the right, right, to to the the parallel parallel existing
the the
produce
summer summer when when months months
is is US US This This 701 701 north north of of Soledad Soledad the the entrance entrance at at
to to Soledad Soledad
Stafe Stafe Prison Prison
as as before before looked looked it it the the contractor
Congestion Congestion always always acute acute has has in been been
plicated plicated by by control. lack lack access access of of
development development Gonzales Gonzales through through com-
accident accident congestion congestion rate, rate, ribbon and and
Gonzales Gonzales side side either either of of its its high with with
isting isting two -lane -lane highway highway and and on in in
recognized recognized the the deficiencies deficiencies of of the the ex-
Our Our planning planning engineers engineers have have long
southerly.
north north Gonzales miles miles of of two two point point a a
now now to to from travel travel highway highway have have we we
stretch stretch two the the the the -lane of of east east to to
fora fora mile mile plans plans to to freeway freeway 5.6 5.6 bypass
engineers engineers are are now now even even completing
should should our our It It be be that that design noted noted
Deficiencies Deficiencies Recognized
the the Salinas Salinas River.
of of north north Gonzales Gonzales 0.3 0.3 to to south south mile mile of
highway highway extending extending two two from from miles
and and we we enter enter a a section section two -lane of of
Freeway, Freeway, the the expressway expressway wide wide ends,
of of travel travel south south of of the the new new Chualar
All All too too soon, soon, 3.5 3.5 a a brief brief after after miles
miles. 35 35 of of tance tance
Gonzales, Gonzales, miles miles two two of of north north a a dis-
Clara Clara Santa Santa county county the the a a line line to to point
on on four divided divided highways highways -lane -lane from
bottleneck bottleneck motorist motorist now now the the can can drive
With With elimination elimination the the of of the the Chualar
project.
west west direction direction the the
center center
of of town.
around around
Gonzales Gonzales are are and and generally was was Jorge Jorge Resident Resident Engineer Engineer
on on the
city city limits limits
and and crosses crosses roughly roughly in in
east- ficiencies ficiencies
here here are are the the as as same same cited Department Department representative representative
and and Al
merges merges into into
Street Street
Fifth Fifth the within within
a a point point
0.8 0.8 mile mile north north of of Soledad. Soledad. De- Wayne Wayne ser. ser. Louderback Louderback
was was
Bridge
at at Johnson Johnson
Canyon Canyon Road Road
County County that
two
-lane -lane highway highway from from this this point point to by by sented sented Superintendent Superintendent
L. L.
M. M.
Pur-
on on and and off off
ramps ramps
constructed will will
be be
remove remove the the deficiencies deficiencies of of existing the the The The prime prime contractors contractors
were were repre-
An An overpass overpass with with and and north north south struction struction has has just just begun begun is is designed designed to
the the
project.
limits.
Gonzales. Gonzales. This This project project on on which which con-
commercial commercial
plant plant
miles miles 29 29 north north of
subdivision subdivision
areas areas within within at at lying lying the the city approximately approximately one one mile mile south south of
mixed mixed
surfacing surfacing
was was obtained obtained from from a
limits limits
of of Gonzales, Gonzales, the the skirting skirting south south new tying tying in in with with the the above above project
at at a a
commercial commercial
plant plant in in Salinas. Salinas. Plant-
roughly roughly
parallels parallels the the project project easterly easterly is is city the the next next section section directly
the the concrete concrete
pavement pavement were were batched
Veering Veering
east, east, new new the the alignment An An intricately intricately part part related related of of this
from from
commercial commercial
plants. plants. Materials Materials for
highway highway traffic. local local available. for for
All All aggregates aggregates
used used were were obtained
Gonzales Gonzales on on existing existing two as as as as started started -lane the the funds funds soon soon be be made can can
elected elected
tractor tractor
this this
to to
use use
pit. provide provide begirming begirming -way -way sive sive to to to of of access access -of of of and and right will will be
provisions, provisions,
special special
in in the the
and and
the the
con- the the is is 2,000 2,000 feet feet project project of of estimated estimated south south cost cost point to to exclu- $2,200,000 $2,200,000
and and
base base subbase subbase
materials materials was was set set up interchange interchange started started approximately with with on on an an this this Construction project. project.
of of
suitable suitable
project project
the the
for for imported expressway expressway present present Gonzales -of -way -way of of Right north north acquisition acquisition has has been
A A
pit pit borrow borrow located located %Z %Z 1 1 mile mile south the the from from terminus terminus the highway highway the the off off existing existing easterly easterly of of again.
three three days. under under posed posed now now facility facility bypass bypass veer will will freeway freeway will will design design merge merge with
including including ern ern end end The The freeway grouting, grouting, of of new new -lane -lane four divided divided interchange interchange was was this this completed completed the the in pro-
means means grout. grout. entire entire The The of of stressing stressing an an interchange. interchange. At At operation, the the south- purposes.
rnately rnately and and inch inch one one grouted grouted then then south south mile mile of of a a town town with with by cement unsafe. unsafe. use use of of shoulders shoulders passing for for
meeting meeting tensioned tensioned to to the the existing existing 12,000 12,000 pounds pounds highway highway per per approxi- square has has congestion congestion considerable resulted resulted in in
new new prestressed prestressed alignment alignment The The were were will will slap. slap. rods rods veer veer westerly, post- moving moving produce produce This traffic. traffic. truck truck
From From were were used used Johnson Johnson the the in in Canyon Canyon construction construction Road Road of of the this results results in in a a high high slow- percentage percentage of of
Ninety -one -one 1 1 % % -inch -inch diameter diameter rods packing packing and and
shipping shipping Salinas points points in in Bypass Bypass Planned true throughout the rich agricultural ExisTing Highway Used River and one mile north of ~reen- portion of the Salinas Valley. The new alignment parallels the field. This project is a part of the Cali- railroad and westerly city limits until This overcrossing at the north end fornia Highway Commission's route it merges with the existing highway of the project diverts traffic to the adoption between Salinas River and just south of the existing highway Arroyo Seco district over the freeway two miles north of Gonzales in Au- railroad underpass by means of an in- lanes on a two-way reinforced con- gust, 1955, which was immediately terchange. The existing highway will crete, open beam bridge. followed by freeway agreement with be used for the southerly 700 feet of Grading was light over most of this the County of Monterey in October, the project as the freeway merges into 5.6-mile expressway project, with 1955. The Board of Supervisors of existing alignment at the Salinas River only 273,000 cubic yards of roadway Monterey County have been cogni- Bridge, south of Soledad. As part of excavation. zant of the great need for freeway de- this project a second bridge over the The contractor was hampered dur- velopment on this highway and have Salinas River will be constructed di- ing his grading operations by high- been very helpful and most co-opera- rectly west of and parallel to the exist- velocity winds that blew almost daily tive in working out the many prob- ing bridge. Right-of-way is presently from the north, creating a tremendous lems encountered by the state engi- being acquired and construction is dust nuisance because of the fine, neers in developing the necessary scheduled as soon as funds become silty, sandy quality of the local soils. freeway agreements. available. It became necessary to keep seven or eight water trucks steadily sprinkling As we cross the bridge over Salinas Work Will Begin the graded roadway 10 hours a day, River south of Soledad we can see on seven days a week, using three differ- This construction project initially both sides of the highway groves of develops afour-lane divided freeway ent sources of water. When grading old oak trees that once provided shade was for its entire length of 5.7 miles which completed and the left lanes for Don Gaspar de Portola, Padre paved, will be graded and paved with plant- dust palliatives were applied on Junipero Serra and their band of 20 an mixed surfacing or cement-treated experimental basis by our Mate- weary men as they camped here on rials and base with two grade separations struc- Research Department with their historic journey of exploration considerable tures to be constructed at the en- success, and the contrac- from San Diego to find a land route tor was trance to Soledad State Prison and at able to considerably reduce to the Bay of Monterey, a route his water Camphora railroad station and Gloria applicarion operations. which with slight deviation we now Base material was manufactured County Road. Approximately $1,780,- refer to as El Camino Real. 000 has been budgeted by the Cali- from a pit in the nearby Arroyo Seco Within the oak grove on our right fornia Highway Commission for con- River, located at midpoint of the job. an old struction. lies long rectangular adobe and Aggregates were trucked approxi- wood siding building that was once mately 60 miles by bottom dump Yet these projects in themselves do the ranch headquarters of Feliciano truck and trailers from Aromas. For- not solve our critical traffic problems Soberanes, a retired soldier of the King tunately, the necessary sand was ob- in this area. We must consider two of Spain who received the surround- tained from Metz, a short eight miles other projects presently being de- ing Los Coches Rancho as a land from the batch plant, and plant-mixed signed and readied for construction. grant from the King in appreciation surfacing was produced from an old The major of these two is the Sole- of his long and loyal service. existing plant set up in the Arroyo dad bypass freeway beginning at the Later the old adobe became a popu- Seco River just south of the base pit. terminus of the project just discussed lare stagecoach stop at the intersection Detour Necessary one mile north of Soledad. It is pro- of the well-traveled El Camino Real Traffic was maintained on the old posed to construct afour-lane free- and Paraiso Hot Springs Road. lanes and around the overcrossing site way on new alignment 2.8 miles in As with the Chualar Rancho, the by a 2,000-foot detour until the new length bypassing the City of Soledad Los Coches Rancho passed into the left lanes had been completed. Traffic David Jacks. very on the west, through cultivated por- hands of The pro- was then placed two-way on the new tion of the old San Vicente Rancho. ductive Los Coches Rancho is still concrete lanes and the existing two- owned by the David Jacks Corpora- The existing highway will be used lane roadway was completely resur- tion, who lease the land for vegetable faced. Two locations on the e~sting for 750 feet at the northern end of growing and operations, dairy and one lanes were reconstructed to meet the project in making the transition of the tenants on the rancho still lives to new alignment. A grade separation the high present-day highway design today in this old adobe. standards. structure will be constructed over the The only real traffic problem on the existing highway and Southern Pacific New interchange project was handling the flow of traf- Railroad approximately one-third mile Across the highway from this old fic to the Arroyo Seco and Mission north of town. An off-ramp farther adobe a new interchange has just been districts which had to pass through north will allow traffic access to town constructed as part of a four-lane ex- the overcrossing construction area. from the freeway. pressway project between the Salinas The problem was solved by dividing
and Pudic Works 31
32 32
California California Highways
occurring occurring
through through area area this this the during during Santa Santa Lucia Lucia Mountain Mountain Ranges. Ranges. ...Continued ...Continued page page Present on on 53
district. district. The The
present present traffic traffic
congestion
actually actually
connects connects
the the Gabilan Gabilan and and the the the Salinas Salinas River, River, and and on on the the west west
by
way way passes passes which which
the the through through business the the
main main east
-west -west county county road road which King King City, City, bounded bounded on on
the the east east
by
three three blocks blocks
the the from from existing existing
high- town, town,
and and
a a separation separation
at at Elm Elm Avenue vious vious highway highway from from Greenfield Greenfield
to
Greenfield, Greenfield,
this this time time to to the the
east, east, some
Walnut Walnut
Avenue Avenue
near near the the middle middle of ready ready nearly nearly forgotten forgotten that that the the
pre-
with with
-lane -lane afour end end freeway freeway
bypassing of of
the the
Greenfield Greenfield city city limits, limits, at cently cently been been completed completed
we we
have have al-
the the Towns Towns
of of Gonzales Gonzales
and and Soledad
Interchanges Interchanges
are are
proposed proposed at at each which which we we are are now now traveling traveling has has
re-
overall overall
plan plan developed developed for for
bypassing
1.5 1.5
mately mately miles miles south south of of Greenfield. Even Even though though the the expressway expressway
on
Generally Generally we we shall shall follow follow the the same
nearing nearing project project completion completion approxi- Clty.
town town
joining joining with with the the new new expressway Farm Farm Traffic bridge bridge the the across across Salinas Salinas River River at at King
alleling alleling
the the existing existing County. highway highway through pleted pleted 1956 1956 which which in in included included new the the
north, north, four- veering veering slightly slightly laning laning east east US US 101 101 and and par- in in Monterey the the short short expressway expressway com- section section
the the
Greenfield, Greenfield, recently recently
completed completed project project is is to to included included the in in plans plans for project project way way joins joins the the on on south south with
the the
project project Greenfield. Greenfield. will will a a make make transition transition This This too, too, section section from through terey terey County. County. This This particular particular express-
Beginning Beginning
highway highway a a as as mile mile north north we we of of the the the the enter enter Town Town city of chain chain of of freeway freeway projects projects in in Mon-
Once Once again again we we highway highway during during existing existing to to revert revert school school -lane two hours. other other completed completed newly newly link link in in our
Cost Cost work work pedestrian pedestrian the the was was of of $1,145,000. of of volume volume traffic traffic across across the On On leaving leaving town town we we ahead ahead see see an-
dent dent highway, highway, engineer engineer was was generating generating a a R. R. S. S. Scamara. considerable
Bridge Bridge Completed
William William H. H. Schooley, Schooley, which which adjacent adjacent to to lies lies and and the the the the resi- existing
Department Department Bridge Bridge from from Greenfield Greenfield the the Grammar Grammar representative representative was School necessary necessary funds funds the the become become available.
the the contract contract 1957. 1957. proposed proposed in in freeway freeway April, April, construction construction The stems scheduled scheduled this this project project on on as as as soon soon
Construction Construction that that Co., Co., field field was was will will who who be be eliminated eliminated awarded in in this rights -of of of -way. -way. Construction Construction will will be
The The contractor contractor was was added added the the hazard hazard An An traffic traffic Granite in in Green- $500,000 $500,000 required required of of acquisition for for
to to allow allow traffic traffic through. in in Salinas. dollars dollars additional additional with with an an expenditure
a a leaving leaving 200 -foot -foot gap gap construction in in farms farms to to packing packing and and shipping shipping centers structures, structures, approximately approximately 1.5 1.5 is is million
stages stages of of construction, construction, meanwhile from from produce produce hauling hauling adjacent 3.7 on on -mile -mile freeway freeway section, section, including
the the main main
area area of of into into work work three summer summer months months also also results results largely estimated estimated cost cost of of construction construction of of this
_~ _~ ~ ~ ,, ,,
, , .~ .~ ~t ~t ~~a~:~ ~~a~:~ _ _
.
~t
~ ~ ~~ -- --
a.~... a.~... a a . . d d . . . ♦ F. A. S. Project Completed re s more 1 I ~ Near City of Riverside By DOUGLAS POWELL, Assistant Road Commissioner, Riverside County
Irr MaY, 1958, a final field inspection plauding civic groups, and no speeches, The Santa Ana River crosses the was made by the State Division of but the event did culminate some 7'/z northwesterly corner of the county Riverside city limits. Highways and the Riverside County years of effort and the expenditure of adjacent to the some $650,000 on behalf of the State, It drains an area of approximately 790 Road Department to accept the Crest- the Federal Government, and the square miles, much of which lies in more Bridge, Federal-aid Secondary county in the realization of anew the rugged San Gabriel and San Ber- Project S-1177(3). There were no northwest access route to the down- nardino Mountains. The stream rises ribbon-cutting ceremonies, no ap- town area of the City of Riverside. in the mountains and is fed by nu-
An aerial view of the new Crestmore Road and Bridge with fhe Cify of Riverside in fhe distance. The bridge was lengthened by Riverside County under the Federal-aid Secondary program. the river is the Santa Ana. and Public Works 33
Highways California California 34 34
55 page page on on ...Continued ...Continued metropolitan metropolitan areas. the the for for ocean. bound bound the the to to source source its its from from River River
to to this this could double double length length sion sion traffic proposed proposed Crestmore Crestmore the the Road Road Ana Santa Santa entire entire the the for for project project trol trol
so so exten- eventual eventual designed designed that that serve to to connection connection an an con- interchange interchange flood flood proposed proposed a a on on Engineers Engineers of of
bridge
-foot -foot girder girder - 600 a a plate provided which which through through Bloomington Bloomington Corps 1943 1943 the the by by in in prepared prepared port port
of
construction construction consist consist
the the
of of
of of Bernardino Bernardino Freeway San San the the re- a a from from obtained obtained was was information information
work the the of of stage stage That That first first (2) (2) the the
the the was was by by centive centive completion added added extensive review, review, preliminary preliminary the the In In
a a in- and and would would serve serve route route further further
control.
vehicles. 500 500
of of
new a a such such Riverside Riverside that that west west access full full be be with with it it acquired acquired
of of
use use
nearly
daily daily average average an an showed showed
areas areas and and and
north north dential dential industrial industrial
that and and ultimate ultimate construction, construction,
wet wet weather during during impassibility impassibility its its
for for and and use use resi- land land the the population population
the
for for be be immediately immediately acquired. acquired.
of spite spite in in and and
years, years, some some
for for
point point
and and current current projected on on information information
facility, facility, that that -way
-of but but right
this
at at
county county the the and and city city the the both both
gave Planning Planning commission commission studies studies
an an four divided
-lane -lane eventual eventual
by maintained maintained been been had had level level stream stream
of
lanes lanes of of set set the the
northbound northbound
to to it. revive revive trict trict
at crossing° crossing° road road -type -type low A A way. way.
for of of basis basis providing providing the the
on on and and flood flood county county the the the the dis- control control
Rail- Electric Electric Pacific Pacific abandoned abandoned since since
be That That initial initial (1) (1) the the construction construction
of of spite spite on on of repeated repeated efforts efforts behalf behalf
long- the the on on bridge bridge trestle trestle a a carried carried
the the in in ensuing ensuing mant mant seven seven in years years
the the to to of of tions tions board board supervisors:
formerly had had which which point point a a at at 60 60 US US
1943, 1943, in in and and Congress Congress had had dor- lain lain
recommenda- the the following following submitted submitted
of northerly northerly miles miles two two some some crossing crossing
report report This This had had been been submitted submitted to
the the county county planning, planning, department road road additional an an providing providing of of feasibility feasibility
this this After After preliminary completing completing Use Use Land Land Studies the of of study study a a undertook undertook partment partment
de- road road county county the the 1950, 1950, in in Late Late
years. several several for for groups groups Riverside northwest northwest the the of of of of Ciiy Ciiy
of of Ana Ana aerial aerial channel channel Sanfa Sanfa An An recen}1y recen}1y fhe fhe the the for for constructed constructed the the Bridge Bridge and and River River located Cresimore Cresimore public various various from from criticism criticism siderable siderable
con- received received had had and and standpoint, standpoint, tary tary
mili- and and civilian civilian both both the the from from ment ment
inadequate inadequate arrange- an an was was this this say, say,
to Needless Needless Riverside. Riverside. of of City City the the ing ing
60, 60, Route Route serv- U. U. S. S. on on Bridge Bridge doux doux
Rubi- the the bridge, bridge, one one only only basically basically
miles, miles, and five five over over them them tween tween
be- distance distance average average the the with with County County
inside inside Riverside river river the the of of crossings crossings
five were were only only there there structure, structure, ent ent
of of pres- the the completion completion the the to to Prior Prior
crossings. bridge bridge any any ing ing
and and financ- planning planning in in problem problem erable erable
consid- a a pose pose flows flows such such and and realized, realized,
is is -feet -feet readily second 100,000 100,000 of of cess cess
in in runoff runoff ex- accumulated accumulated an an storms, storms,
possible the the of of magnitude magnitude the the and and
mountains, semidesert semidesert the the of of slopes slopes
barren and and steep steep the the basin, basin, drainage drainage
size size the the the to to of of due due However, However,
Problem Runoff Runoff
flood flood stage. in in river river
to to the see see opportunity opportunity an an had had never never
has World World II II War War influx influx since since ulation ulation
pop- of of extensive extensive the the most most and and forties forties
since since early the the dry dry cycle cycle protracted protracted
a undergone undergone has has California California Southern Southern
This This of part part watercourse. watercourse. visible visible
a is is it it and and rarely rarely gravels, gravels, placer placer nean nean
subterra- is is through through mostly mostly flow flow its its
as appearance, appearance, in in is is deceptive deceptive river river
most most the of of Riverside Riverside County, County, In In
Huntington Huntington Beach. of of
point point a a south at at just just the the Ocean Ocean Pacific Pacific
it it as as to small small runs runs tributaries tributaries merous merous or e
rom
is riC
By SAM HELWER District Engineer
Ix TxE first biennial report of the Other contracts followed in Dis- come internationally known as the California Highway Commission for trict Iand throughout the State, and "Redwood Highway." The cathedral- years 1917-18, which accompanied the it probably appeared that a sound like groves of ancient trees have con- sixth biennial report of the Depart- highway development program .was tinued to attract tourists in ever- ment of Engineering, we find the well under way, promising California increasing numbers from the four opening introductory paragraph: "In an adequate highway system commen- corners of the world. This has gen- 1910 the people of the State of Cali- surate with the thinking of the times. erated travel through and into the fornia adopted the `State Highways The people of California had vision, area to the extent that the tourist and Act' providing for the issuance of but who could visualize the tremen- vacationist expenditures have become bonds to the amount of $18,000,000 dous development of the "horseless an important segment of the area's for the construction and acquisition of carriage" and its utilization coupled economy. a system of state highways." with all developments—population, in- The early construction of the Red- miles was As a result of that forward step by dustry, etc.—would result in the present wood Highway for many wagon or the people of the State of California, transportation and highway problems? entirely remote from the areas. Such the record shows that Contract No. 2 In District I, the "main line" is US stage roads that served the Bell Springs, Har- was located in Mendocino County in 101, more commonly referred to and places as Sherwood, stations on District I. This contract provided for known worldwide as the Redwood ris, Alderpoint were way roads from the grading a 12.6-mile section of high- Highway. In Del Norte County the the original stage The groves of way between the Sonoma-Mendocino Redwood Highway changes to US south and into Eureka. traversed by the county line and Hopland. 199, connecting Crescent City and virgin redwoods as Grants Pass, Oregon, while US 101 present Redwood Highway were in The contract, dated July 23, 1912, a virgin state, sparsely settled. Construction continues northerly along the coast. was with the General After initiation of the California work was completed Corporation and Vaeafion Traffie state highway development program, cost of $93,280, plus $2,675 for at a It is doubtful if the early road- there was an orderly and constant or a total of $95,955. engineering, builders in District I, as they em- development of the state highways barked on the ambitious program in within District I. However, it became PHOTO ABOVE—US 101 between Phillipsville and 1912, realized that they were con- obvious, as result of continuing ad- Arden in Humboldt County, a scene typical of the Redwood country in District structing ahighway which would be- vancement of automobile design as to and Public Works 35
Highways California California 36 36
across across as as one one Salmon Salmon Creek this this structures structures such such by by modern modern have have replaced replaced Mendocino Mendocino coast coast been been the the on on 1 1 Route Route Sign Sign bridges bridges on on Old Old
a
to to supplemented supplemented was was being being in in ac- dustry dustry facility facility -lane -lane two old by by modern modern The The modernized. modernized. was was also also Ukiah Ukiah
in- replaced being being redwood redwood road road old old - long substandard substandard and established established tofore tofore Hopland Hopland between between highway highway The The
then of of miles miles many many with with prevailed, prevailed, Hopland. here- and and The The Counties. Counties. Cloverdale Cloverdale Mendocino Mendocino and and between between
pattern the the same same Eureka Eureka of of North North River Russian Russian the the along along grade grade Norte, level level Del Del Humboldt, Humboldt, in in resources resources
water new new entirely entirely an an of of construction construction fir fir Replaced timber Road Road Old Old untouched, untouched, vast, vast, virtually virtually
the by by Flats. eliminated eliminated was was 2, 2, No. No. tract tract the of of development development instigated instigated lumber lumber
across across Beatrice and and Con- old old Bluff Bluff that that over over Table Table was was which which of of portion portion a a demands demands for period, period, war war During During the the
new new relocation Grade, a a Hopland Hopland with with constructed constructed Cloverdale- old old The The
activities.
major major
re- completely completely was was traffic. Eureka Eureka tuna tuna and and industrial industrial and and commercial commercial
the
were were
structure structure pavement pavement of of
ing ing
of For- between between highway highway old old the the ville. ville. The The in in form form volume volume additional additional
and and
strengthen-
maintenance maintenance when when II, II,
at at Dyer- Fork Fork Eel Eel of of River River generated the the turn turn in in South South area area the the of of
Growth Growth
War
by by
World World
course, course, interrupted interrupted of of
at constructed constructed pronounced. was was realignment realignment and and more more became became fame fame
its its
was,
development development
This This continuing continuing
New New bridge as Creeks. Creeks. Highway Highway Cedar Cedar Dann Dann and and Redwood Redwood the the to to
volumes volumes
of of
funds.
the the
availability availability
at at Big constructed constructed traffic were were greater greater alignment alignment inducing inducing
undoubtedly undoubtedly
with
again again
commensurate commensurate
replaced, replaced,
re- considerable considerable New New bridges bridges and and thirties and and twenties twenties
late late the the in in
pleted pleted
or
being being reconstructed reconstructed bridges bridges
were were
Creek. Rattlesnake Rattlesnake com- of of were were projects projects canyon canyon notable notable
Many Many
sections sections or
most most deficient deficient the the
wherein wherein
the in in Summit Summit and and
Rattlesnake Rattlesnake over over
Begins Modernization Modernization
attention receiving receiving
district district were were
the the
road narrow narrow and and the the of of tortuous tortuous
tion tion
in
routes routes
route. route. Other Other that that
to to
fined fined
a a por- replaced replaced This This limited limited reconstruction reconstruction funds. stringently stringently
con- no no
by by
means means this this were were era era
during during
to to with Inn. Farmhouse Farmhouse Summit Summit commensurate commensurate -lane -lane Rattlesnake Rattlesnake basis basis on on
two a a
improvements
but but
101, 101, US US
or or
line," line,"
School School over was Pepperwood Pepperwood from from old old development development constant constant This This
way. way.
"main the the been been
discussing discussing
have have
We We
was was new new High- construction Redwood Redwood the the of of part part noteworthy noteworthy become become
Highway. the the to to Redwood Redwood Especially and and line line grade. grade. had and and routes routes that that modern modern stage stage or or original original wagon wagon
in in improvements vast vast new resulted resulted with with that that ects ects the replaced replaced road road was was old old the the of of portions portions replacing replacing still still were were
proj- names names of of City, City, were were Crescent Crescent Laytonville, North North of of future. future. the the way into into under under projects thirties thirties highway highway
of south south Flanagans Flanagans to to Slide Slide needs needs long Chance Chance of of fulfillment fulfillment the the and and be be early to to twenties twenties the the late late In In ging. ging.
Last county county line, line, the the to to Orick Orick appeared erly, erly, the the of of time time and and lag- standards standards was was highways highways of of the the development development
north- Trinidad Trinidad times. times. adequate the the of of standards standards to to was was reconstructed reconstructed lits lits that volumes, volumes, traffic traffic increasing increasing with with
design with with acceptable acceptable of of Wil- cordance cordance north north Hill Hill grade grade Well Well Oil Oil power power coupled and and speed, speed, roadability, roadability, products went to unprecedented heights, resulting in a similar expan- sion of the lumber industry in the area. Since the counties in District I contained one of the major stands. of timber in the United States, Humboldt County became the largest lumber producing county in the United States. Douglas Fir production, which com- prised approximately 11 percent of the county's timber production prior to 1940, increased to more than 60 percent of the total after 1948, In 1941 Humboldt County had 24 lumber mills with a "rough green" value of production amounting to about $16,000,000. In 1952 the county had 262 mills with a "rough green" value of the timber cut being about $86,000,000. This same change in pro- portionate amounts took place in Men- docino and Del Norte Counties.
Population Growth The population of Humboldt County went from 45,812 in 1940 to an estimated 89,000 in 1955, and esti- mated at 90,000 to 100,000 at present, also indicative of the population growth throughout the District I area. It is obvious that with such growth the transportation of people, goods, and services became a problem of greater magnitude, and highway ob- solescence was accelerated. Contrib- uting further to the increasing traffic Heavy gradeng operations on }he first unit of the Redwood Freeway. This aerial view soufhward was taken over High Rock Hill. The river in the upper left is the Eel. volumes were increased numbers of tourists and vacationists as a result of the tremendous population growth in rapidly increasing extent by the fir The logging and lumber trucks be- California and the Pacific Coast States. industry. came an important segment of the This whole problem, painfully man- This spectacular expansion of the traffic stream. The necessary services ifest in terms of congestion and acci- lumber industry within District I re- to these far-flung timber enterprises dents, necessitated a complete new sulted in a somewhat suddenly added and immigration of people to man planning approach. It had already been importance of the highways and roads the expanding industry gave impetus assumed that US 101 in the Fortuna- in the counties. to the importance of highways, and Eureka-Arcata area would need four- made the deficiencies more glaring. laning, and planning and design was Lumber IndusTry Expands The Redwood Highway with recrea- underway on that basis. Now it be- The long-established redwood in- tional and tourist traffic consistently came necessary to revise the design dustry generally utilized logging rail- recording the high traffic volumes standards upward for the entire roads for their forest-to-mill transport, during the summer months, had sud- length of the Redwood Highway in and used railroad and water for trans- denly changed to a more important the district. port of finished products to market. adjunct to the economy of the area, Design standards were set nn a four- Logging techniques changed with the by servicing this greatly expanded lane controlled access basis for all fu- accelerated development of the fir in- lumber industry throughout the year. ture improvements of the Redwood dustry. New areas were opened and As we all know, the postwar "boom" Highway from the Sonoma-Mendo- mills of all sizes and production ca- started in the late forties at ternuna- cino county line to Crescent City pacities were developed in areas only tion of World War II and went into and northerly as justified by traffic served by state and county highways. the fifties. The demand for timber demands. This new basis of design and Public Works 37 The Scotia Freeway Bypass in Humboldt County. Buildings of fhe town are seen an fhe left. standards, four-lane roadbed versus available funds with better traffic higher four-lane roadbed standards two-lane, posed entirely new prob- movements and increased ease and have enlarged this problem. The prev- lems throughout the district. Rugged safety as each project was completed. alence of rugged and unstable terrain and unstable terrain, tight location Reconstruction has been on a logical results in expansive highway construc- controls by streams and mountains, basis, starting improvements on those tion costs, which decrease the length provision of adequate access to and sections of highway having the great- of improvements obtainable by the from afour-lane freeway ar express- est degree of deficiencies, highest District I highway dollar. way, and construction of these new traffic volumes, and a consideration of facilities within reasonable economic all the factors essential to a proper Projects Reviewed limits posed problems to challenge the planning program. Starting at the southerly end of ingenuity and abilities of the highway the district and proceeding northerly engineers. Rainfall a Prablem along the Redwood Highway, we Early Expressways Improvements in the three counties might review the more recently com- improvements, those under Some of the first multilane con- of District I on the Redwood High- pleted planned for the struction in District I, although not to way have served to expedite traffic way, and projects freeway or expressway standards, was movements, in that modern standards future. completed before the full impact of with sight distance commensurate with In the Ukiah-Willits area the major the tremendous growth in "Red~~ood design speed, four lanes, etc., permit- improvements have been over the Land" was felt. These were within the ted breaking up long lines of slow- Ridgewood Summit. This relocation Cities of Ukiah and Fortuna, and the moving traffic resulting from leading and improvement between 1.5 miles unincorporated community of Rio slow-moving vehicles. south of Forsythe Creek and 0.5 mile Dell. The advent of four-lane design northerly of the Northwestern Pacific almost been con- The first rural four-lane expressway standards on the Redwood Highway Railroad crossing has im- construction in the district was under- multiplied the problem of providing tinuous since 1950. The 5.2-mile expressway in taken in 1950 and completed in 1952. a stable roadbed in an area of heavy provement to two-lane of the This project was in Humboldt County rainfall and unstable rough terrain. 1950 at the southerly end from Robinson Ferry Bridge just The elimination of possible slides and Ridgewood Grade north of Calpella, section north of Scotia to Alton, a project slipouts is a major factor considered was extended with a 4.9-mile length of 4.4 miles. This was a pre- in design. These problems were of of four-lane expressway in 1954, over view of the future improvements of serious concern to the highway con- which carried the modernization remain- the Redwood Highway within Dis- structors on the Redwood Highway Ridgewood Summit The last trict I. Since that time, development when originally constructing and then ing section of the originally con- has progressed to the full extent of modernizing on a two-lane basis; structed two-lane highway on this
38 California Highways At freshwafer Lagoon south of Orick, US 101 was rerouted along the sandspit and Public Works 39
40 40
California California Highways
freeway freeway construction construction north north of of Willits. north north Laytonville, Laytonville, work work of of is is under
This This -lane -lane sfruciure sfruciure four over over Creek Creek Ouflet Ouflet and and the the Northwestern Northwestern
Pacific Pacific
Railroad Railroad
is is part part US US of of the the 101 to to Farmhouse Farmhouse about about miles Inn, Inn, 12 12
tlesnake tlesnake Laytonville Summit Summit of of north north
proceed proceed As As we we northerly northerly over over Rat-
wood wood Road Road south south Laytonville. of of
Valley Valley Creek Creek to to Canyon Canyon old old Sher-
mainder mainder of of the the through through section section Long
have have sition sition been been allocated allocated the the re- for for
funds funds for for some some rights -of -way -way acqui-
mer. mer. Plans Plans are are complete, complete, almost almost and
completion completion scheduled scheduled this this for for sum-
currently currently construction construction under under with
Irvine Irvine Lodge, Lodge, of of north north Longvale, Longvale, is
extension extension Hilvilla Hilvilla from from northerly northerly to
was was 1955. 1955. completed completed in in 4.2 -mile A A
Creek Creek and and one one mile mile north north of of Hilvilla
2.1 2.1 miles miles in in length length between between Reeves
ects. ects. -lane -lane A A four expressway expressway project
being being eliminated eliminated by by a a series series of of proj-
wood wood Road Road south south Laytonville Laytonville of of is
tween tween Reeves Reeves Creek Creek and and the the old old Sher-
tion tion of of the the Redwood Redwood Highway Highway be-
The The old old and and very very substandard substandard sec-
of of north north Willits. Creek Creek
Ridgewood Ridgewood of of slope slope to to Summit Summit Reeves
improvement improvement
lane lane
the the
northerly on on
completed completed was was 1955 1955 Red Red Moun- at at in in sign sign were were covered covered in in article article an an in in the
the the end end recently recently completed completed
of of
four-
short short length length A A facility -lane -lane of of four Works. Works. Public Public The The problems problems of of de-
future future
project project
extend extend will will from from
the
issue issue of of the the California California Highways Highways and access access facility.
pass pass
Willits. Willits.
central central
of of the the This area area
the the neer, neer, in in September 1957, - October, October, lane lane with with road road afour controlled -lane -lane
in in
the the planning planning of of
a a
freeway freeway to to by-
H. H. W. W. by by Benedict, Benedict, Resident Resident Engi- 2S 2S of of this this ment ment sinuous sinuous two- miles miles of of
Preliminary Preliminary
studies studies
also also are are active
"Big "Big on on Cut" Cut" this this project project was was given studies studies have have for for initiated initiated replace- been been
Willits Willits Bypass
approach approach $7,000,000. $7,000,000. The The story story of of the Humboldt Humboldt Creek Creek the the and and county county line,
this this unit, unit, and and final final cost cost closely units. will will the the Rattlesnake between between portion portion On On
Francisco, Francisco, San San
is is
the the contractor contractor struction struction on be be undertaken undertaken will will in in three a a $39,000. cost cost of of
Guy Guy wood. wood.
F. F. Atkinson, Atkinson,
of of South
when when the the project project is is financed, financed, con- Company Company Fraser Fraser Mercer - of of Eureka Eureka at
one one mile mile of of
south south Dyerville Dyerville
to to Engle- 14 14 imately imately miles miles and and probability in in all all was was tunnel tunnel long long constructed constructed by
now now
under under
construction, construction,
from total total extends extends length length this this planning planning of of is is approx- 136 original original channel. channel. creek creek This This -foot-
The The
first first 4.4 4.4 unit, unit,
miles miles
in in
length, Forsythe Forsythe Creek Creek on on the the The north. north. embankment embankment infringe infringe way way will will the on on
south south of of to to Ukiah Ukiah
just just
southerly southerly of
Rattlesnake Rattlesnake new new where where Creek Creek high- The The Big Big Cut
Crawford Crawford Ranch Ranch about about seven seven miles way. divert divert Park Park Oak Oak to to Tan Tan course course the the of
for for such such
construction construction
to to extend extend from constructed constructed through through a a miles miles rock rock shorter shorter at than than point point by by existing existing high-
area area
to to the the
east. east. are are Plans Plans under under way 1956 1956 The The when when section section a a in in tunnel tunnel routing routing was is is appro~umately appro~umately seven
freeway freeway to to
skirt skirt the the Ukiah Ukiah central boldt boldt was was Work Work started started actually actually county county on on this line line to to Jordan Jordan Creek.
Design Design work work
is is under under way way on on a a new
43 43
miles miles from from the the Mendocino -Hum-
Creek Creek
Diversion
1956. been been officially officially adopted adopted for for a a length length of
north north Ford Ford mile mile to to of of Road Road 0.2 0.2 in embankment. and and park park areas. areas. Freeway Freeway routing routing has
Low Low from from tended tended northerly northerly Gap Gap Road Creek Creek snake snake with with culvert culvert a a large large and minimum minimum disturbance disturbance the the groves to to
This This -lane -lane 1951. 1951. four was was section section ex- old old across across bridge bridge timber timber an an Rattle- world- famous famous redwood redwood groves groves with
widened widened Road Road four four was was lanes lanes to to in a a $570,000, $570,000, which which cost cost at at of of replaced lane lane freeway freeway through through or or near near the
Street Street between between Smith Smith Low Low and and Gap connect connect 1953 job job with with completed completed a a in in ance ance with with to to plans plans provide provide a a four-
the the of of Ukiah, Ukiah, City City In In highway the the $1,814,527. $1,814,527. This This -lane -lane four project project will wood wood Freeway Freeway 1957, 1957, in in in in conform-
standing. crossing crossing of of long long the the contractors contractors are are with with a a of low low bid bid the the of of start start construction construction Red- of of the the
road road eliminating eliminating a a grade hazardous hazardous and and Ball Ball Simpson, Simpson, ity. ity. Berkeley, of of southern southern in in Humboldt Humboldt County, County, was
included included an an overcrossing overcrossing of of the the rail- highway highway to to a a modern modern -lane -lane four facil- way way through through the the state state redwood redwood parks
Railroad Railroad crossing. crossing. This This project latter latter constructed a a of of portion portion originally originally development development the the of of Redwood Redwood High-
northerly northerly of of the the Northwestern Northwestern Pacific 2.8 2.8 This This miles. miles. work work of of is is transforming The The outstanding outstanding recent recent in in the event event
Ridgewood Ridgewood from from Summit Summit 0.5 0.5 to to mile just just Tan Tan north north Oak Oak a a of of distance Park, Park, culvert culvert and and fill.
extension extension -lane -lane of of four expressway struction struction between between and Farmhouse Farmhouse Inn Inn at at that that crossing crossing was was replaced replaced with with a
was was section section eliminated eliminated in in 1957, 1957, with on on way way four -lane -lane con- expressway expressway tain tain Creek Creek the the when when old old bridge timber timber A four-lane fill between Patricks Poinf Park and the norfh shore of Big Lagoon will replace fhe 4,000-foot fim6er trestle (left)
May-June issue by Norman G. Lar- scenic freeway which will provide traffic since the former highway route sen, Project Designer. convenient connections to the old road was "Main Street" of Scotia. The Work on the second unit between remaining through the redwood four-lane expressway between Robin- Myers and one mile south of Dyer- groves where they may then be son Ferry bridge and Alton grade ville, adistance of 6.7 miles, is sched- viewed and enjoyed at a leisurely crossing, a distance of 4.5 miles, uled to start this summer under two pace. started serving the increasing traffic separate contracts. One contract will demands during the previous year. provide for clearing the right-of-way Heavy Traifie Areas From Alton grade crossing to the and the other will be the construction Since 1950 the major expenditure northerly city limits of Fortuna, four- of a 540-foot-long reinforced con- of state highway funds in Humboldt lane freeway plans have almost been crete arch culvert in Mowry Creek. County has been on that portion of completed and some .rights-of-way The 1958-59 Budget provides $730,- the Redwood Highway between South have been acquired. 000 for this preliminary construction Scotia Bridge and Mad River north of From the northerly city limits of work on the second unit. Additional Arcata. This section of highway serves Fortuna to 0.4 mile north of Fern- contracts will provide for grading the Humboldt Bay metropolitan area, bridge, construction is in progress on and surfacing estimated to cost an- and records the highest traffic density a 3.2-mile length of four-lane freeway. other $5,700,000. in the district. The continuing pro- Work is being done under two con- The ultimate completion of this 43- gram of development within these tracts, one providing for interchange mile length of Redwood Freeway limits has resulted in the completion of structures and the other for grading promises to add to the renown of the many important projects. and surfacing. This project connects Redwood Highway by adding new On a sidehill location fringing with a recently completed project vistas to the traveler and providing Scotia to the east, 1.4 miles of four- which provided afour-lane express- greater safety, comfort, and conven- lane expressway were completed in wayfrom 0.4 mile north of Fernbridge ience. In all probability, greater vol- 1952. This improvement eliminated to 0.7 mile north of Hookton Road on umes of traffic will be induced as a traffic congestion in Scotia as well as Beatrice Flat, a distance of 4.6 miles. result- of the new spectacular and conflict between highway and local The new expressway created consider- and Public Works 41 UPPER—In Lake County, Sign Route 53 is being constructed as a modern two-lane freeway. This aerial is looking southward toward Clearlake Highlands and Clear Lake (right background). LOWER—Heavy sidehifl construction in the canyon of the East Branch of the Russian River ~n Mendacino County featured the relocation of Sign Route 20 between Calpella and Potter Valley Road.
42 California Highways able interest in the area as it eliminated the old two-lane road over Table Bluff Hill near Loleta, which was a source of traffic delays and accidents. From Beatrice Flat through Fields Landing and to Elk River just south of Eureka city limits, the freeway rout- ing has been adopted and detailed planning is underway for afour-lane freeway. One-way Couplet In the Eureka area, 1956 saw the completion of improvements from 0.2 mile south of Elk River through Eu- reka and Arcata to the intersection of the Redwood Highway with US 299. The improvements resulted in multiple lanes for approximately 13 %Z miles, including afour-lane street section, a one-way couplet through Eureka, and four-lane divided expressway, the total investment being approximately $8,097,000. The continuation of a four-lane ex- pressway from the US 101-299 inter- Reconstruction of US 101 north of Arcata resulted in a new trumpet-type interchanye connecting US 101 section to 0.3 mile north of Mad River and US 299. This aerial is looking eastward along US 299. is under construction with the first contract providing a parallel bridge and approaches at Mad River. Bids for limit for large trucks for quite some of new highway has fulfilled a long- grading and surfacing of this 1.5-mile time. standing need by eliminating a stretch improvement will be called for at an In Del Norte County, from just of obsolete highway with serious de- early date. south of the Humboldt-Del Norte ficiencies in alignment and grade, county line to Minot Creek just north- coupled with a narrow bridge across River to From Mad Trinidad the erly of Klamath, freeway rouring has Wilson Creek. freeway route thas been adopted and been adopted. This future project ap- The old circuitous highway route underway. detailed design work is On proximately nine miles long, will in- through Crescent City will soon be a portion between Little the River and volve anew bridge across the Klamath thing of the past. Construction is Trinidad, -of-way are being rights ac- River, and the eventual costs of pro- under way from 0.7 mile south of quired. viding a four-lane facility within these Elk Valley Road through Crescent From Trinidad to Patricks Point limits is estimated at $12,000,000. City and to 0.4 mile north of North- State Park, preliminary studies have Freeway routing has also been crest Drive, a distance of 2.1 miles. been started and aerial mapping has adopted from Minot Creek to one This new routing through Crescent been completed. mile north of Wilson Creek, and two City includes aone-way couplet, with projects have been completed on the L Street serving southbound traffic Trestle Replaced adopted line. New bridges and ap- and M Street northbound traffic. The From Patricks Point State Park to proaches were recently completed at typical sections include improvement 0.3 mile north of Big Lagoon, a four- Minot and High Prairie Creeks, re- of two-lane existing highway, four- lane expressway is being constructed placing old timber structures. The lane street section, and four-lane di- at a construction cost of about $1,740,- new bridges were positioned to allow vided highway, together with chan- 000. The work is being done under for future expansion of the route to nelized intersections. Work is being two contracts. Clearing and grading four lanes. done by Mercer-Fraser Company, of were done under the first contract, Eureka, resulting from low bid of and the second contract provides for Obsolete Highway $529,955. surfacing and construction of a 400- At Wilson Creek the year 1957 re- On the Redwood Highway (US foot bridge across the Maple Creek corded completion of the first section 199) northeasterly of Crescent City outlet into Big Lagoon. This project of four-lane highway in Del Norte in the Smith River Canyon, prelim- eliminates the old 4,000-foot Big La- County. This 1.1-mile project includes inary studies for relocation and im- goon timber trestle. Deterioration in anew four-lane bridge across Wilson provement are progressing involving this structure has required a speed Creek on new alignment. This portion the portion of highway from Gasquet and Public Works 43 to Hazelview Summit. Anyone famil- In the St. Helena Canyon, Sign the intersection with Sign Route 20 iar with this area will realize that pro- Route 5 3 south of Middletown has east of Clearlake Oaks by 6.3 miles vision of a modern design highway been reconstructed from the Napa of two-lane limited access facility.. in this mountainous country will pose county line down to the flat. Further This $800,000 project will eliminate a some real engineering problems. improvement of the route on into seriously substandard section in Burns Middletown is in the planning stage. Valley, including the old Seven Creelcs OTher Routes Improved This future project will eliminate a open fords. During this period of development portion of substandard facility by re- In the Blue Lake-Upper Lake area, of the Redwood Highway, other location. Sign Route 20 has been reconstructed routes have had improvements applied Farther .north on Sign Route 53 and realigned for the entire distance with resultant benefits to traffic and between Putah Creek and Lower Lake, between the Mendocino County line transportation needs of areas served there remain several miles of old high- and Bachelor Valley Road just west- by state highways. way on which design work is under erly of Upper Lake. The last project, In Lake County, in recognition of way, especially on the longer sections completed in 1956, was a five-mile the importance of Sign Routes 29, 53, of old highway between Harris Creek improvement at the Mendocino and 20 in the county's transportation and Lower Lake. county line with the project partially picture, development of these routes Sign Koute 53 was relocated and re- in both counties. has been a continuing effort for a constructed in 1953 between Lower In Mendocino County, Sign Route number of years resulting in major Lake and Cache Creek. This reloca- 20 between US 101 and Potter Valley expenditure of state highway funds. tion is currently being extended to Road has undergone a complete
This expressway section on US 101 is between Robinson Ferry Bridge and Alton. It was fhe first long section of four-lane, divided roadway to be cons4ructed in District I.
4a~ California 1-lighways Fair-bound Motorists Will See New Highways The State Fair in Sacramento is a summer season highlight for thousands of Californians each year, and recent improvements on highways leading to the state capital will make this year's trip to the fair even more. pleasant than in the past. The 104th California State Fair :and Exposition will open August 27th and continue through September 7th. Fair officials predict the 1958 event will be the "biggest and best ever" with new entertainment features added to the US 701 in Arcata was reconstructed on a new routing east of the central business area. This view usual long list of topnotch attractions.. northward shows the Ninth and 74th Street overcrossings. Motorists who make the trip to the fair this summer will find that every change. The Coyote Dam on the East Dry Creek southeasterly of Boonville. main state highway route to Sacra- Branch of Russian River will result Improvements have ranged from mento has been improved in the past in inundation of existing Sign Route strengthening the pavement structure year, with new sections of freeway ZO within the Coyote Valley reservoir and resurfacing to relocation and available in several places. area and necessitated rerouting the bridge replacements. Emphasis was Between the San Francisco Bay area affected portion of the highway. Con- placed on replacing structurally de- and Sacramento, US 40 is now nearly struction was completed in June on ficient bridges. Old timber bridges at all freeway or expressway, with only the new highway routing making it a North Fork of Navarro River, Flynn short gaps remaining to be closed. modern two-lane expressway between Creek, Indian Creek, and Anderson From the East Bay Distribution a new connection with the Redwood Creek ?lave been recently replaced by Structure to the Carquinez Strait, most Highway at Calpella and Potter Valley new structures and approaches. Fur- of this route has been constructed as Road, a distance of 4.2 miles. This ther improvement of the route be- full freeway, including a 10-mile sec- project was financed in the main by tween 1~I11 Creek and Boonville is in tion recently opened through the hills federal funds on a replacement basis. the planning stage, and. an aerial map- between Richmond and Rodeo. The Guy F. Atkinson Company, of ping district has been completed. East of Rodeo work is entering its South San Francisco, performed the In 1933, Sign Route 1 along the final phases on the "Big Cut" freeway work on the $3.,081,000 project. coast was taken into the State High- approach to the ne~v parallel Carqui- In 1957 an additional length of Sign way System. In District I this included nez Bridge. The 2.9-mile freeway ap- Route 20 was included in the State 80 miles of the route in Mendocino proach aid the new bridge are both Highway System. This section is be- County between the Sonoma county scheduled for completion in Decem- tween Sign Route 1 just south of Fort line and Westport. Within the 80 ber. Bragg and Willits on the Redwood miles there were 84 bridges, mostly Signals Eliminated Highway, a distance of 3 3 miles. Prior timber structures in poor condition. By the time the fair opens, con- to the inclusion of this section of high- Replacement of these deteriorated struction crews will be into the final way into the State Highway System, structures started almost immediately phases of converting the present four- it was improved considerably over and has been a continuing program lane divided stretch through Vallejo its original condition by Mendocino ever since, with only five of those to a six-lane freeway. The traf~ie County under the federal aid secand- original structures remaining in use at signals on that stretch will no longer ary program. To bring pavement this writing. be in operation. Work will he in markings, signing, and safety devices This replacement of deficient struc- progress on the two remaining lanes, up to state highway standards, the tures is continuing, as evidenced by a but traffic will move smoothly through route has been striped and a contract current construction project for a new the area. is under way providing signs, guide bridge and approaches across Gualala From Vallejo to Sacramento, US 40 posts, and guard rail. River at the Sonoma - Mendocino is completed expressway, except for Counties line. The 1.1-mile project short four-lane undivided sections Bridges Replaced involving an expenditure of $565,000 north of Vallejo and west of Sacra- On Sign Route 128 in Mendocino will realign the highway routing and mento (Polo Causeway). County there has been consistent will result in a vastly improved section Another long stretch of freeway- improvement of the route between of Sign Route 1. expressway which will make a trip to its terminus with Sign Route 1 and . .Continued on page 56 a .Continued on page 44 and Public Works 45
46 46 California California Highways
. . page page on on 48 .Continued .Continued is is is ect, ect, this largest largest project project The The for for advertised advertised very very completion completion is is great. great.
Cather Cather an Report Report has has permitted permitted also also route proj- this this who who and and use use surfacing surfacing public public traveling traveling widening widening $250,000 $250,000
The The
of of DeLeuw- the the presentation presentation a in in its its its its and and the the value value the after after inclusion inclusion to to system system but but such such routes, routes, other other
freeway freeway Sacramento. routing routing to to done done the and and on on on on treatments treatments being being sealcoat sealcoat sections work work by by shadowed shadowed
of of the of of remainder remainder the the consideration consideration Road Road to to oiling been been Sacramento, Sacramento, over- has has receiving receiving district, district, the the within within
now now made made mento mento has has the possible possible as as This This route, route, the the known known Sierran Sierran route Forty Forty Mile trans- 49, 49, the the third third Route Route
and and needs needs in in tion tion near near facility facility Sacra- and and tween tween State State Sign Marysville. of of Sacramento Sacramento improvement improvement The The
Report Report on on Leuw- Cather Cather transporta- The The first first is is of of be- these these Route Route
232 232
Highway
Lode Lode
Mother Mother
The The the the route. route. of of presentation presentation De- the the System System within within Highway Highway district.
US US
99E 99E for for previously previously adopted adopted this highway highway added added to to State were were the the $450,000. of of cost cost approximate approximate
East East between between and and Nicolaus Nicolaus Highway the the two two past past During During year year of sections sections an at at Watsonville Watsonville of of Company Company tion tion
of of in in
the the alignment alignment freeway freeway routing
Construc-
Granite Granite by by
constructed constructed
was was
New New Highways Highways Added
to to 1st 1st for for
a a uled uled July July consider consider
change length, in in 5.9 5.9 miles miles roadway, roadway,
paved paved
budget.
A A summer. summer. public public
meeting meeting is is
sched- all- 40 -foot -foot This This Robbins. Robbins.
of of
north north
is is Placerville Placerville the the in in contained contained current
to Landing Landing Knights Knights from from
widened widened
the the route route between between and Georgetown Georgetown
was County County of of and and Sutter Sutter five five Sacramento, Sacramento, in in
Alternate Alternate
grandchildren.
40 40
of of ening ening of and and the the realigning realigning section section
US Highway Highway of of of of State State Division Division
1957, 1957, Architecture, Architecture, portion portion
both
a a
In In
for for wid- the the Money Money $112,500. $112,500. further further
improvement. this this structural structural Meehan, Meehan,
with with
engineer engineer
make make the
to to
$500,000 $500,000
at at a a Grade Grade of were were improved improved cost cost
contains -59 -59 Budget Budget and and and and John John
physician physician 1958 F.
surgeon, surgeon,
The The
mento. mento.
the the of of and and top top Morgan Georgetown Georgetown
Sacra- at at River River W. W. two two Carl Carl
sons, sons, are are
Dr. Dr.
Sacramento Sacramento
Meehan,
the the over over
2.6 2.6 of of miles miles total total of of route route between the the
Bridge Street Street to to the I I the in in
Survivors, Survivors,
to to
his his addition addition
widow,
approach approach
erly erly
a a a range range long long program program continuing continuing
west- the the of of
realignment realignment
the the
for for calls calls and and engineer. registered registered structural structural
2.4 2.4 of As As part part a a Auburn. Auburn.
miles miles
toward toward
This budget. budget. current current
the the
in in included included a a was was civil civil registered registered He He engineer
for the the from from road road widen widen Georgetown Georgetown
is route route this this
for for
project project
Another Another
1921.
~ ~ of of at at 184,000, 184,000, to cost cost the the contract, contract,
Lakeport.
on on state state 1, he he service service entered entered August August
a of of Company Company completed completed Sacramento Sacramento
of Brothers Brothers
Lange Lange
and and
Watsonville, Watsonville,
Bureau Bureau of of Public Public for for Roads Roads until the the
1957, 1957, L. L. Youngs Youngs Construction Claude Claude
of Company Company
Construction Construction
Granite Granite
ofrice ofrice assistant assistant as as and and later later engineer
In has has ber ber greatly greatly increased. increased. industry industry
Sacramento,
of of
Son Son
and and
Teichert Teichert
Gas Gas and and Pacific Pacific Electric Electric Company the the
lum- the the by by and and use use recreationists recreationists its its
A. are are
involved involved
contractors contractors
The The
a a as as for draftsman draftsman structural structural worked worked
years In In the the of of the the area. area. recent recent people people
$490,000.
approximately approximately
of of
penditure penditure
to to where where he California California came came he he
to is is it it tain tain
vitally vitally important important routes, routes,
ex-
total total
a a
represent represent
projects projects
These These
in in in in 1918, Arkansas Arkansas Roads Roads Public Public of of
of of of of other other
moun- the the some some pressure pressure
Rumsey.
of of
north north
mile mile
0.4 0.4
to to south south
United United States States Bureau the the with with period period
to to traffic not not is is the the this this subject subject
route route
mile 0.8 0.8
from from
realignment realignment
the the and and
a a States. States. After After short various various Eastern Eastern in in
to to
Although Georgetown Georgetown
Placerville. Placerville.
Woodland;
of of west west
Club Club
Flyers Flyers the the
office office as as and and field field years years engineer eral eral
from from Auburn Auburn through the the is is
highway highway
at
realignment realignment the the
Broderick; Broderick;
to to Bryte Bryte
sev- for for he he graduation graduation worked worked After After
available as as can can made made be be funds funds
rapidly rapidly
from
route route this this
of of
widening widening
the the and and
of of Technology. Institute Institute Rochester Rochester the the
as
route route Another Another being being improved improved
Kiesel of of north north
mile mile
-half -half
one to to pass pass from
was was and and graduated graduated school school tended tended
route.
By-
Yolo Yolo
the the from from
route route
the the
of of ment ment
at- he he
New New York, York, where where Rochester, Rochester,
the of of
portion portion
this this of of provement provement
realign- the the
Kiesel; Kiesel;
and and
Weir Weir
ramento ramento
1895, 1895,
10, 10, in August August on on was was born born He He
im-
the the
continuing continuing
for for
funds funds contains contains
Sac-
the the
between between
section section 1.4 -mile -mile a a of of
-59 -59
1958 Budget
the the ministration.
and and
section section this this
relocation
levee levee a a of of
surfacing surfacing the the are: are:
ad- in design design of of Creek Creek
charge charge Fiddle Fiddle in in 10 10 over over
years, years, bridge bridge last last
new new a a of of
They route. route. this this
on on awarded awarded ently ently
the
for for construction and and the the Department Department
Bridge Bridge for for the the
opened opened
recently recently
pres-
are are
contracts contracts Four Four route. route. the the
of office office were Bids Bids the the
in in Sacramento Sacramento $100,000. $100,000. of of designer designer
cost cost 1957 1957
a a at at
in
deficiencies deficiencies
critical critical most most the the rect rect
bridge in Oakland Oakland Bay Bay completed completed Bridge, Bridge, was was -
Francisco work work
this this of of tion tion
cor-
to to intended intended
is is work work This This tracts. tracts.
San the the por- on on A A
designer designer engineer, engineer,
realigned. realigned. and and resident resident
widened widened being being
con- small small
several several under under improved improved
Creek Creek
is including assignments assignments Ramshorn Ramshorn various various
had had and and to to
River River
Yuba Yuba
is is being
Counties, Counties, Colusa Colusa and and Yolo Yolo
section the the the of of in in design design
Fork Fork draftsman draftsman a a North North as as
the the
from from route route
through
Sacramento Sacramento from from northwest northwest
1921
in in this 37 37
started started years. years. He He section section of of for for
a a ways ways County, County,
Sierra Sierra
In In
extending 16, 16,
Route Route Sign Sign State State
High- of of the the of of Division Division Department Department December. of of part part
Chico.
of of
section section
northern northern
the the
in in lanes lanes Bridge the the with with been been the the in in Meehan Meehan had had latter use use public public and and completion completion
four provide provide
to to
Esplanade Esplanade
the the
along along
for scheduled scheduled is is section section -mile -mile 7.3 This This
Anna. wife, wife,
route the the
of of improvement improvement
the the
for for
ing, ing,
contract. $1,283,000 $1,283,000 a a under under Reno Reno his
with with cruise cruise a a
on on vacation vacation while while
financ-
available available
pending pending
developed, developed,
of Company Company Construction Construction Isbell Isbell
Alaska, by by
in in 27, 27, 1958, 1958, Anchorage, Anchorage,
June June
are are being
Plans Plans
year. year.
budget budget
current current
started been been just just has has work work This This way. way.
on suddenly suddenly died died
Engineer, Engineer,
Bridge Bridge
the during during
signalization, signalization,
and and
nelization nelization
express- -lane -lane ultimate ultimate four an an lanes lanes of of
Supervising
Meehan, Meehan, J. J.
Andrew Andrew
chan- attendant attendant
with with
Way, Way,
Memorial Memorial
two of of construction construction the the of of consists consists
to Street Street 11th 11th
from from
couplet couplet
-way -way
one
and County County Nevada Nevada in in Creek Creek snake snake
Meehan J. J. Andrew Andrew
. .. .. 9 9 page page from from Rattle- Continued Continued near near to to line line county county Placer Placer the the
from route route the the of of 111 improvement improvement the the DISTRICT DISTRICT Merit Award Board CHC Vice Chairman Chester H. Warlow Winners Announced Cited for 'Years of Devoted Service' Employees of the Department of Chester H. Warlow, Vice Chairman tion to the objectives of California's Public Works receiving certificates of of the California Highway Commis- highway program" and his "dedication commendation and cash awards since sion, was honored in his home city of to the service of the people of Cali- the last list was published in the mag- fornia." azure are: C. M. Gillis, State Director of Pub- Kenneth Y. Lee, Architecture, Los An- lic Works and Chairman of the Cali- geles. Certificate of award and $10 for rec- fornia Highway Commission, sent a ommending the size of the original tracing message crediting Warlow's "wisdom sheet be printed on that sheet at the time the title block is printed. and judgment" with "great help to the Warren A. Johnston, Highways, Marys- commission in reaching sound deci- ville. Certificate of award and $25 for rec- sions." Gilliss' message continued: ommending that tracing paper forms for "So many have depended on you plan sheets be supplied in "fadeout" grid commissioner paper as ~~ell as plain. during your 15 years as Gilbert E. Tolberg, Highways, Oakland. —during the 15 years that have seen Certificate of award and $30 for recom- California's freeways grow from an mending that sand pots, used by the paint- adventurous innovation to an estab- ing crews on the bay bridges, be lowered lished system that is the envy of the 12 inches to reduce accident hazard of back and hand injuries. world. George D. Mahl~neister, Highways, San "Your contribution to California's Diego. Certificate of award and $25 for highway program cannot be measured recommending that position markers be in prosaic terms—in dollars, or miles, placed on rollback type buckets used on or statistics. The best way to express new TL-10-L loaders. greatness of your continuing part Miss Ramona S. Kaplan, Highways, Red- the ding. Certificate of award and $10 for rec- in our highway program is to para- ommending discontinuance of the water phrase the poet and say— service meter at the Cypress Street Yard. CHESTER H. WARLOW "You are truly a man to match our Frank T. Myers, Highways, Sacramento. mountains!" Certificate of award and $50 for recom- Fresno June 30th as "Mr. High`vays James A. Guthrie, only other mem- mending a positive mechanical locking of the San Joaquin Valley." device for use on highway dump body ber of the California Highway Com- maintenance trucks. He was praised for his years of de- mission beside Warlow to serve since Robert C. Warriner, Frank C. Woehl, votion to state highway problems and 1943, told the luncheon audience that and David Hartley, Highways, San Jose. his decades of leadership in community no commissioner could match War- Certificates of award and $150 to be divided activities by speakers at two ceremo- low's "record of familiarity with equally for designing and building culvert nies—the opening of Fresno's Stanis- invert paving sleds in three sizes to accom- every mile of the California Highway modate and pave the bottom of culvert laus Street overpass and a testimonal System." pipes. luncheon. Officials of the City and County of Ralph V. Bane, and members of the Paint Hundreds attended the two ceremo- Fresno, the Fresno County Bar Asso- Striping Crew, Highways, San Francisco. nies. National and state leaders sent ciation, the Fresno Chamber of Com- Certificate of commendation for recom- messages of greetings. mending the use of grease on traffic stripes merce, and the Fresno Rotary Club prior to seal-coating to serve as the pilot The occasion was Commissioner paid tribute to Warlow, who entered line for restriping after the seal coat has Warlow's sixty-ninth birthday. It was law practice in Fresno in 1912, served been placed. proclaimed "Chester H. Warlow Day" as president of the Fresno Chamber Gray, Highways, San Ber- George E. by both the City and County of of 1922, and has been a nardino. Certificate of commendation for Commerce in recommending a drawing of culvert markers Fresno. director of the Rotary Club. with reflectors be included on standard sheet Chief Justice Earl Warren of the Commissioner Warlow, in a re- A-51. United States Supreme Court tele- sponse to the praise, said he would ac- Mrs. Rosemary Lahey, Architecture, Sac- graphed amessage pointing to War- cept approbation only "for what we award and X40 for ramento. Certificate of low's "invaluable contribution to the community have done to- recommending discontinuance of preparing of the supplemental agreements to construction development of California highways." gether." contracts covering additional or deductional Warren told Warlow that California's "No man," he said, "accomplishes amounts in excess of $500. "tremendous growth ~ '* ~ called for things by his own efforts. When some- Jack Roy, Architecture, Long Beach. Cer- exceptional leadership such as yours thing was achieved, it was not because recommending tificate of award and $25 for to make certain growth meant prog- of me, but because the goodness of for construction con- that the specifications ress." tracts include a requirement that shop draw- the undertaking recommended itself to ings must be adequately identified with Governor Goodwin J. Knight wrote many men. ~ ~` '~ Circumstances have . Continued on page 54 in praise of Warlow's "notable devo- let me give more time than most." and Public Works 47
Highways California California 48 48
will will needs needs met. be be and and Covina Covina these these Avenue. all all Citrus Citrus trict trict during during year. past past this this
is is eventually available, available, that that Bernardino Bernardino financing financing proved proved West between between in in Freeway Freeway the the counties counties several several dis- of of
most most the with with can, can, we we the the do do will will Resident Resident federal San Brinkmeyer, Brinkmeyer, Engineer; Engineer; im- -aid -aid were were roads roads secondary secondary
we of of that that public public motoring motoring tion tion the the help help 13 13 C. In In Company, Company, N. N. contractor; contractor; miles miles approximately approximately of addition, addition,
With With understanding the the 6— No. No. Brothers Brothers eventuality. eventuality. Winston Winston have have or or Construc- replaced replaced been been reconstructed.
solve solve this to to plans plans the the preparing preparing -lane -lane substandard substandard highways highways two will. Street Street Gardendale Gardendale Hall Hall and and Road.
We We increase. increase. will will are district district the the 44 44 tion tion of of miles miles of of and some some outmoded outmoded gineer; gineer; Lakewood Lakewood Boulevard Boulevard between
areas remote remote the the most most point point even even in in facilities facilities traffic traffic of of in in and and friction; friction; addi- D. D. R. R. tractor; tractor; Siefried, Siefried, Resident Resident En-
traffic adequate adequate more more for for demand demand Joaquin Joaquin will will the the River, River, a a eliminate eliminate major —J. —J. 5 E. E. No. No. Haddock, Haddock, Ltd., Ltd., con-
year each each With With increase. increase. will will Sign Sign and and meet meet 120 120 vehicles vehicles Route Route the the near near San Santiago Santiago and and Boulevard Boulevard Drive. Mohler Mohler
of of number number The The grow. grow. motor to to at at L?S L?S structure structure where where Mossdale, Mossdale, tinue tinue SQ• Freeway, Freeway, County, County, Orange Orange between
con- will will population population The The miles miles 12 12 California. California. of of a a expressway; expressway; separation ington, ington, Engineer; Engineer; Resident Resident Riverside
come come of portion portion
this this to to to to
continue continue
Con►inued Con►inued
Company, Company, D. D. J. J. contractor; contractor; Hether-
from from
. .. .. 22 22 page page
Industry Industry the the will district. district. of of ahead ahead 4—
No. No. Miller Miller - Sully Contracting
X DISTRICT DISTRICT job tremendous tremendous a a still still is is there there
needs, needs, and and Road Road son son Clara Clara Santa Santa River.
and wants, wants, public public traveling traveling
the the that that near near Road, Road, Fillmore, Fillmore, between between Guiber-
facilities highway highway the the provide provide
to to
aim aim
Resident Resident Engineer; Engineer; Chambersburg
in in the the our year year past past during during
plished plished
Company, Company, D. D. contractor; contractor; Frischer,
line. county county
accom-
been been has has much much
Although Although
3— No. No. Wonderly Wonderly Construction
Boulevard Boulevard
Orange and and
Washington Washington winter. -56 -56 1955
the the
Ganesha Ganesha and and Boulevard.
Boulevard Boulevard Whittier Whittier
between neer; neer;
of storm storm severe severe the the of of result result
the the
were were
Freeway Freeway dino dino Citrus Citrus between between Avenue
Sixt, Sixt,
W. W. L. L.
Engi- tractor; tractor; Resident Resident
projects projects that
repair repair damage damage
storm storm
nis, nis, Resident Resident San San Engineer; Engineer; Bernar-
—J. —J.
10 No. No. Ltd., Ltd., Haddock, Haddock,
E. E.
con-
of dollars dollars of of thousands thousands of of
hundreds hundreds
tion tion
Company, Company, M. M. R. R.
contractor; contractor; In-
Boulevard. Atlantic Atlantic as as the were were office, office, district district the the
through through
2— No. No. Brothers Brothers
Winston Winston
Construc-
way way Avenue Avenue
Southern Southern
and between between
handled also also were were System System ondary ondary
winners winners Other Other were:
Long Long Engineer; Engineer; Free- Resident Resident Beach Beach Sec- Aid Aid Federal Federal in in the the roads roads county county
of of charge charge
VII.
District District
C. C. C. C. contractor; contractor; French, Ukropina, Ukropina, of miles miles many many of of improvement improvement The The
Assistant Assistant Highway Highway State State in Engineer Engineer
9— Ukropina, Ukropina, and No. No. Kral Kral Polich, Polich, locations.
many many
ner's ner's trophy trophy T. T. Edward Edward from from
Telford,
at provided provided were were lighting lighting and and zation zation Broadway.
and and Street Street
company. company. Patterson Patterson his his received received
win-
signali- channelization, channelization, and and corrected, corrected, Freeway Freeway Ana Ana Lewis Santa Santa between between
Galbreath, Galbreath, the the representing representing Kiewit
were problems problems drainage drainage routes, routes, Resident Resident
Needham, Needham, J. J. ious ious Engineer; tor; tor;
sented sented winner's winner's the the to to trophy trophy
Alvin
var- the the on on intersections intersections at at 8— complished complished Company, Company,
Grifrith Grifrith
contrac- No. No.
Highway Highway fornia fornia
Commission, Commission,
pre-
ac- were were improvements improvements minor minor
many many
Gage Gage Avenue. and and Street Street 92d 92d
Works Works lic lic and and
Chairman Chairman
the the of of Cali-
projects, major major these these to to
addition addition
In In
Freeway Freeway Harbor Harbor between gineers; gineers;
C. C. Gilliss, Gilliss, M. M.
of of
Director Director
State State Pub-
River.
E. E. Gould, Gould, Resident Resident Kenan, Kenan, J. J. and and En-
Creek. Calleguas Calleguas
and and
Street Street Date Date
Sacramento the the paralleling paralleling mately mately
A. A. R. R. L. M. M. Collins, Collins, contractor; contractor;
between Oxnard, Oxnard,
near near Freeway, Freeway,
Coast Coast
appro~- Sacramento Sacramento through through pass pass will will
7 No. No. Atkinson Atkinson F. F. —Guy —Guy Company,
Pacific on on project project
a a on on engineer, engineer,
dent dent
which Grapevine, Grapevine, the the to to Woodland Woodland
Patterson, Patterson,
resi- L. L. T. T.
and and contractor, contractor,
from Freeway Freeway Side Side West West proposed proposed
Bonneroo.
Company,
Sons' Sons'
Kiewit Kiewit Peter Peter
the the
is is time time present present the
the the at at
studied studied
being being
VIPs VIPs Diriricfi Diriricfi in in winners winners place place seventh seventh annual
1957 1957
were for for
winners winners place place
First First
resident resident first- (right) (right) the the are are PaNerson PaNerson engineer, engineer, freeway freeway route interstate interstate Another Another
by by resented resented (left), (left), Galbreath Galbreath Alvin Alvin L. T. T. and and banquet.
Studied Routes Routes Other Other
Sons' Sons' Kiewit Kiewit rep• Peter Peter
The The
Company, Company,
contractor, contractor,
annual the the at at honored honored are are
jobs jobs rated rated
studied.
10 10 the the on on
highest- engineer engineer
resident resident
being is is Sacramento Sacramento through through Freeway Freeway
State's
the the and and contractor contractor
The The factors. factors.
-West East the the routing routing exact exact of of The The
other and and safety, safety,
job job complexity, complexity, ship, ship,
area.
of of
basis basis
workman- a a on on
year year a a of of ects ects
this in in acquired acquired being being are are of -way -way
proj- highway highway its its rates rates VII VII
District District
Streets. Streets. C C to to Broadway Broadway Rights- from from
in in
program program
which a a
"Bonneroo," "Bonneroo," nual nual
Streets 30th 30th and and 29th 29th between between lie lie will will
seventh seventh the the was was
an- occasion occasion The The
This This city. city. the the of of route portion portion east east
1957. during during
Highway Highway north- the the in in 40 40 US US and and way way
of of of of
VII VII Highways Division Division the the trict trict
Broad- and and Road Road Florin Florin between between done done
Dis- in in done done projects projects on on workinanship workinanship
work work being presently presently the the connect connect
their of of superiority superiority the the for for lected lected
has has and and adopted adopted been been will Freeway Freeway
se- contractors contractors engineers engineers resident resident and and
cross the the -South North -city -city for for route route
to was was honor honor as as May May paid paid in in banquet banquet
area. area. this this to to The highways highways service service
Angeles Los Los a a at at cheered cheered men men tion tion
for for plans plans the the in in state acceleration acceleration
construc- highway highway hundred hundred Seven Seven
. .. .. 46 46 page page from from Continued Continued
Angeles Los Los Awards Awards in in Made Made Bonneroo Bonneroo Annual Annual
111 DISTRICT DISTRICT FAltt-BOUND MOTORISTS Motorists heading for the fair from Frank Balfour Given points north of Sacramento will find Right-of-way Award Continued from page 45 . . . that realignment, widening or resur- the fair more enjoyable is the 51-mile facing jobs have improved travel con- section from Oakland to Tracy. The ditions on several routes. final gap in this route (Nimitz Free- way, State Highway Route 228, and On State Sign Route 16 four proj- US Highway 50) was closed last fall ects will be finished or near comple- with the completion of a section be- tion when the fair opens. tween Castro Valley and west of Realignment for 1.2 miles on this Dublin. route through the Town of Rumsey Between Tracy and Stockton three is scheduled to be completed around projects covering about 15 miles of the end of August. Another realign- Before approxi- US 50 are now under construction. ment job, eliminating sharp turns be- mately 600 right- One_ of these jobs, which will pro- tween Madison and US 99W, will also be nearing of-way leaders vide 6.8 miles of four-lane expressway completion.. from all parts of between 1~~ossdale and Richards Anew 1.4-mile stretch on a relo- the Nation, Frank Avenue, is scheduled to be open to cated levee section south of Kiesel, C. Balfour, Chief traffic by fair time. between Woodland and Sacramento, Right - o f - W a y On US Highway 99-50 a 4%2-mile is expected to be available to fairgoers FRANK C. BALFOUR Agent of the Divi- stretch of freeway north of Lodi was with the present detour no longer in sion of Highways, was presented with completed last year. Slated for com- use. Realignment and widening north a resolution paying tribute to his pub- pletion before the fair starts is 7.2 of Kiesel and resurfacing and widen- lic service. miles of new freeway now under con- ing between Bryte and Broderick will struction between seven-tenths of a be almost finished. Balfour has been associated with the mile south of Galt and 1.6 miles south government of the State of California In addition, sections of US 99W of the Cosumnes River. From there north of Yolo and of US 99E north for approximately 27 years; he has to south of Elk Grove Road new been Chief Right-of-Way Agent since of Yuba City have recently been re- northbound freeway lanes, now being surfaced. 1942. For 11 years Balfour served as built, are also expected to be com- Chairman, Committee on Right of pleted. Way, American Association of State Motorists who take US Highway GREMLIN CORNER Highway Officials; he has served as 4Q or 50 to Sacramento from the Editor, California Highways National Chairman of the Board of mountain and foothill regions to the and Public Woyks encounter Directors, American Right of Way east will new sections of Six: In the May-June issue of your Association. freeway and improved highway at magazine you have on the front cover several locations. The resolution commends Balfour a picture which you refer to as Bridges for "leading the cause of profession- Qfher Jobs Listed Creek. Actually, it is Bridge Creek in Humboldt County. There is a Bridges alism of right-of-way practices and On US 40 east of Sacramento two Creek in Mendocino County, but this procedures throughout the United of the current series of nine major is not it. States" and for his "major contribu- freeway projects will be completed. tions to the outstanding success of the These two jobs will provide four-lane Also, on page 40 of the same issue, American Right of Way Association." freeway for 6.1 miles between Heather you have a picture of a bridge. This Glen and Colfax, and 3.6 miles from bridge is not across the South Fork of The tribute to Balfour highlighted Auburn to Newcastle. the Eel River at Dyerville, as you say. the two-day national seminar spon- Several major improvements will It is across the main Eel River at the sored in San Francisco May 28th and also serve fairgoers on US 50. The old Robinson Ferry Crossing just north 29th by the American Right of Way United States Bureau of Public Roads of Rio Dell on US 101. Association. has completed the four-laning of a I enjoy your magazine very much. short section on this route between Very truly yours, Pacific House and Riverton in El ROBERT W. HEFLIN Dorado County. The Division of NEW TRAFFIC RECORD Highways last fall completed four the Another new traffic record on miles of expressway near Camino. The photographer who took the San Francisco-Oakland Bay Bridge From Nimbus to Brighton about 14 back cover photo of the Feather River was set Friday, June 13th, with a total miles of US 50 have been widened to Highway on the May-June issue of of 120,513 vehicles. The previous four lanes, relieving previous conges- the magazine was wrongly identified record was 118,001 vehicles, set on tion on this section just east of Sacra- in the magazine. It was taken by Bill Friday, June 6th. mento. Ruland.—The Editor.
and Public Works 49
50 50 Highways California California
structure's structure's mechanical mechanical fixtures, fixtures, such such as eration eration work. DALANC: J. J. L. L.
block block with with natural natural finish. finish. Many Many of of the heating, heating, yours, Sincerely Sincerely air air conditioning conditioning refrig- and and
interior interior are are
walls walls
mostly mostly
concrete
Company Company of of Bakersfield Bakersfield handled handled
the
position position
will will
cease.
ing ing has has a a level level composition composition roof. roof.
Its
forts forts Sacramento. Sacramento.
and and
ridiculous ridiculous The The
this this Hopkins initiative, initiative,
Jackson op- -
The The new new concxete concxete and and steel steel build-
Perhaps Perhaps constant constant
through through ef- your your lins lins Electrical Electrical Company, Company, Inc., Inc., also also of
ment.
ment ment of of
the the California. State State of of
and and
the the electrical electrical contractor contractor was was Col-
cial cial cameras cameras
and and
magnifying magnifying
equip-
absolutely absolutely the the
develop- for for essential essential
pen pen &Hawley, &Hawley, Inc., Inc., of of Sacramento,
uring uring and and weighing weighing
devices, devices,
and and
spe-
which which life life
circulates circulates
and and that that
they they are
mento. mento.
Plumbing Plumbing contractor contractor Lup-
was was
chambers, chambers,
photometers, photometers, intricate intricate
meas-
ways ways the the
are are main main arteries arteries
through
Construction Construction
Company Company
Sacra-
of of chines, chines, refrigeration refrigeration
and and humidity
The The public public should should realize realize
that that free-
General General contractor contractor was was Cal - Central pounds pounds pressure, pressure, compression compression ma-
afast-
ble ble State. growing growing in in
giant giant press press which which can can exert exert 440,000
studies.
architectural architectural design design the the
and and
portation portation life life be be would would
intolera-
used used by by the the department department include include a
research research connection connection and and staff staff in in with
Without Without
these these superhighways, superhighways,
trans-
tools. tools. Testing Testing
equipment equipment and and facilities
by by originally originally prepared prepared the the
materials
built.
Work Work of of this this kind kind requires requires precise
to to as as
a a visitors. visitors. guide guide
model model
This This time time arise arise was a a each each new new freeway freeway to to be is is
heavy heavy under under traffic.
displayed displayed
main main
in in entrance the the -lobby protests protests
many many
and and controversies controversies which
and and ments, ments, the the durability durability of of roadways
of of the the
will will building building be be permanently
continued continued
and and progress progress spite spite of of in in the
resistance resistance the the skid skid of of various various pave-
the the
terior terior A A structure. structure. of of model scale scale
Commission Commission
for for their their work splendid splendid
of of temperature temperature changes changes on on pavements,
add add a a tions tions
modern modern
touch touch
to to the the
ex-
Highway to to occasion occasion commend commend the the
ciency ciency of of highway highway lighting, lighting, the the
effect
window window Louvered Louvered
and and boards boards parti-
DEax DEax Six: Six: like like I I would would to to take take this
the the paints, paints, stability stability of of
the the
soils, soils,
effi-
expensive expensive and and Public Public ductwork. Works
on on such such as as things things
the the
durability durability
of
on on roof roof Editor, Editor, to to the the Highways reduce reduce California California the the
need need
for
met, met, being being the the
department department also also
checks
ventilation ventilation
equipment, equipment, SAN SAN
FRANCISCO were were
installed
State's State's standards standards high high for for materials materials are
In In to to addition addition making making sure sure the
sea sea fishing. deep deep and and travel travel
Leo Leo had had Walsh Walsh headed headed of of Angeles. the the Los Los laboratory laboratory 1928. since since
plans plans
retirement retirement include His His after after
1951, 1951, Walsh Walsh succeeding succeeding is is survived survived T. T. by by E. E. Stanton, Stanton, his his brother, who
and and Freeways. Harbor Harbor Bernardino Bernardino
Materials Materials
and and Research Research Engineer Engineer in
cial cial magazine, magazine, Right Right o o f f Way.
bridges bridges San on on the the major major on on many many
ployee ployee 1917, 1917,
since since
and and was was appointed
editor editor former former of of association's association's the the offi-
Angeles, Angeles, well well in in structure structure Los Los as as as
has has
been been
a a
Division Division
of of
Highways Highways em-
Right Right of of Way Way Association Association and and a
later later four on on -level worked worked He He the the
thority thority
on on
research. research. highway highway
Hveem
ber ber of of Chapter Chapter No. No. 1 1 of of the the American
by by the the aged aged flood.
N. N.
Hveem, Hveem,
internationally internationally
au- known known
10, 10, 1956. 1956. April April He He was was mem- a a charter charter
were were structures structures bridge bridge dam- which which
Head Head of of
the the
department department
is is
Francis
his his retirement retirement from from service service state state on
investigation investigation worked worked and and on on of the the
ment ment makers makers
and and
photographers.
tion tion through through the the years years to to the the time time of
1938 immediately immediately flood flood after after of of the the
ing ing specialists specialists
chemists chemists
and and instru-
to to
Highways Highways and and supervised supervised its its opera-
Department joined joined Bridge Bridge He He the the
range range
from from several several
types types
of of engineer-
trict trict VII VII of of the the State State Division Division
of
Angeles. Los Los of of City City
ment's ment's
highly highly
trained trained
staff. staff. These
Right -Way -Way -of
Department Department for for
Dis-
the and and Angeles, Angeles, of of Los Los the the County County
tions tions are are
required required
to to cover cover
the the
depart-
Title Title and and Escrow Escrow
of of Section Section
the
Engineers, Corps Corps of of the the with with worked worked
About About 60 60
civil civil service service job job
classifica-
Walsh Walsh organized organized developed developed and and
the
15 15 years years he next next the the During During I. I. War War
districts.
way way
World close close of of
4 4 years. %Z %Z for for
1. 1. LATIMER LYNN LYNN
oratories oratories
of of in in the the
each each 11 11
state state
high-
the from from at at France France Department Department State State of of of of the the Oregon
technical technical maintains maintains
over over
control control
lab-
returning after after had had been been the the he he to to State with with that that
and and Bakersfield. Bakersfield. The The department department
also
California California shortly and and Trust Trust Insurance Insurance Company. Company. Prior
Angeles, Angeles, at at
Los Los Santa Santa Berkeley, Berkeley,
Nlaria
to moved moved Latimer Latimer perience perience field field the the with with this this in in Title
specialized specialized cludes cludes branch branch laboratories
County. previous previous had had years' years' having having seven seven ex-
testing testing and and organization organization which which
in-
Gordo Cerro Cerro researcher researcher February, February, 1931, 1931,
after in in
headquarters headquarters a a statewide statewide for for
research
with training training ing ing Highways Highways of of Division Division title a a
as as
The The Boulevard Boulevard Folsom Folsom structure structure is
engineer- his his early early work work
came came He He State for for first first to to the the
economy."
He He received Iowa. Iowa. his his most most of of in in
Salem, Salem, youth youth
Oregon.
ments ments operating operating in in efficiency efficiency and
1893, 1893, Lake, in in Clear Clear 1899, 1899, on on 9, 9, Oregon, Oregon, August August
and and
spent
possible possible makes makes substantial substantial improve-
ment. ment. Latimer Latimer June June born born 6, on on was was
was was Walsh Walsh
born born
in in Grove,
Cottage Cottage
way way G. G. Engineer Engineer T. T. McCoy, McCoy, "and
ways, ways, retire- the the of of occasion occasion on on his his
22, 22,
1958, 1958, April April
department's department's after after illness. a a lengthy lengthy work," work," State State said said High-
Bridge Bridge Department, Department, High- of of Division Division
Highways, Highways, vision vision of of away away passed passed on "The "The building building new new centralizes centralizes the
Latimer, Latimer, Engineer, Bridge Bridge Assistant Assistant
-way -way
-of
right rary rary the the agent agent buildings buildings State State for for trailer trailer and and three three offices. Di-
on on 15th 15th May May to to Lynn Lynn honor honor L.
Frank Frank
its its
J. J. facilities facilities
have have Walsh, Walsh, included included senior former former nine nine tempo-
was was A A dinner dinner held held Angeles in in Los Los
eral eral different different locations locations city, city, in in the the
and
Joined Joined State State 1938 in in
Continued Continued
from from page page
J. J. 15 15 .. .. . Frank Frank Walsh
Lynn Lynn Latimer Latimer Retires; HIGHWAY HIGHWAY LAB Basil Frykland Edward S. Gripper Nine Current US 40 Retirement Marked Freeway Jobs Listed Edward S. Gripper died after a Basil N.Frykland, District VII Con- Four-laving of another 11 miles of short illness on April 15, 1958. dripper struction Engineer for the California US 40 in Placer County was scheduled retired from state service on October Division of Highways, retired on June to start in August, bringing to nine the 7, 1949, at which time he was City 1st after 30 years in state service. number of current freeway jobs east and County Co=operative Projects En- Basil Frykland was born of Swedish of Sacramento on this interstate route. gineer for District VII. immigrant parents in Santa Cruz, This latest project involves grading Gripper was born in Pasadena, ~ California, on Au- and paving of 11.5 miles of four-lane, March 3, 1884. His service with the ~~ gust 23, 1897. He divided roadway and 12 bridges be- State Division of Highways dated attended public tween one-half mile east of Roseville back to February 15, 1912, when his ~' f ~ schools in Santa and a mile east of Newcastle. name appeared as the Chief of Survey Cruz and studied Located on new alignment south of Part}T No. 3 on the first payroll for engineering at the present highway, the new route Division VII, as it was then called. He Polytechnic Col- will bypass the Towns of Rocklin and spent considerable time in making sur- lege in Oakland and Loomis. Interchanges and access con- veys in San Diego County for the the University of nections will be provided for traffic Coast Highway, the San Diego and EI California. He went service to these communities. Centro Highway, and the old original BASIL N. FRYKLAND to work as resident The Roseville-Newcastle project is Ridge Koute in Los Angeles County. engineer with the Southern Pacific one of five large-scale freeway proj- Although Gripper's service with the Railroad in 1925. In September of 1927 ects on US Highway 40 east of Sacra- State was not continuous he did par- he entered state service in a classifica- mento which are included in the 1958- ticipate in all phases of the work, tion equivalent to junior civil engi- 59 State Highway Budget. It was the being at various times superintendent neer. Until 1932 he worked in District last of five to be advertised. of day labor operations and resident II, after which he came to District These 1958-59 projects, together engineer on important grading and VII, where he has been ever since. with four other previously budgeted paving projects. Basil Frykland is a veteran of both jobs, make a total of nine freeway projects In October, 1933, he was appointed World Wars. In World War I, 1918- under construction or ad- District City and County Projects En- 1919, as a second lieutenant he gave vertised for bids on this portion of gineer. US 40. He vas in responsible charge instruction in pursuit flight. In 1942 Estimated total construction cost of administering and co-ordinating the he joined the Army and was stationed of these projects is $48,500,000. '/ -cent expenditure by cities from in Phoenix, Arizona, Washington, When these projects are completed allocated state funds and also for the D. C., and Tucson, Arizona. He there will be 88 miles of freeway and federal aid secondary projects expressway on the 122 as served as battalion commander of the miles of US 40 carried out by counties. At the time from Sacramento to Nevada. This will 869th Aviation Engineering Battalion of his retirement Ned had xesponsi- include 61 continuous miles between in the Philippines. He holds four bility for administering the state funds com- Sacramento and east of Gold Run and bat stars and for 64 cities. the Purple Heart. 21 miles from the east end of Donner He is survived by his wife, Mrs. Basil Frykland and Mrs. Frykland Lake to Nevada. Ethel S. Gripper of Sierra Madre, his (nee Hazel Blewett) intend to travel, The freeway projects now under daughter, Eunice Pitzer, and a grand- fish and relax after his retirement. He construction on US 40 east of Sacra- son, Edward Pitzer of Arcadia. is homesteading a 40-acre ranch near mento are as follows: Mt. Palomar. Newcastle to Auburn, 3.6 miles (to be completed this summer). SAN MATED, CALIF. Heather Glen to Colfax, 6.1 miles this highway, so can fully appreciate Editor, California Highways and (to be completed this summer). every bit of what you have to Public Works contend Colfax to Magra (west of Gold' with in that area. Run), 5.8 miles (due for completion Six: I have from time to time The information and pictures are this fall). thought of writing to you and ex- outstanding and unless an opportunity Magra to west of Monte Vista (east pressing my appreciation for the presents itself to of Gold Run), four miles. pleasure and information derived read this last issue, I Hampshire Rocks to Soda Springs, from your the motorist has not the slightest con- magazine. six miles. The last ception of what takes place to make issue having had to do with East end of Donner Lake to Boca, Highway 101 therefore prompts these his traveling comfortable and con- venient. nine miles. few lines. Boca to Floriston, 6 %Z miles. I was reared in Eureka and make Sincerely, Floriston to state line, 5.4 miles (to frequent trips back and forth over RUSSEL PETTIN~TLL be completed late this summer).
and Public Works 5~
52 52 California California Highways
Hatton, Hatton, R. Arthur Arthur tentative tentative and and subject subject to to revision revision as neous neous completion completion the the bridge. with with
Headquarters Headquarters rent rent plans. plans. Shop The The schedule schedule is, is, of of course, way way work work will will be be simulta- timed timed for for
may may be be accurately accurately informed informed as as to to state state cur- highway highway This This funds. funds. state state high-
Leisure, Leisure,
James James
R. dents dents of of the the Benicia - Martinez Martinez area Martinez Martinez Bridge Bridge be be built built will will with
Shop Shop 11 nounced," nounced," Gilliss Gilliss said, said, "so "so that that leading leading resi- to to either either end end Benicia- of of the the
"These "These target target dates dates are are being being Three an- -mile -mile sections sections of of freeway
Duclo, Duclo, Alma Alma A. Martinez Martinez Ferry.
traffic.
Shop Shop 5 will will replace replace the the
state
-owned -owned
Benicia-
pletion pletion in in
December, December,
is is
opened opened
to
will will be be operated operated
a a as as
toll toll
bridge bridge and
after after
the the parallel parallel
bridge, bridge,
due due for for com-
Cates, Cates,
Clyde Clyde
G.
bridge bridge across across the the
Carquinez Carquinez
Strait. Strait. It
will will start start
on on the the Carquinez Carquinez
Bridge
Materials Materials and and Research just just downstream downstream
from from
the the
railroad
ing ing the the
Carquinez Carquinez Bridge. Bridge.
Collections
The The bridge bridge
will will
be be
parallel parallel
to to
and
25 -cent -cent toll toll rate rate
for for
passenger passenger
cars cars
us-
Langenbach, Langenbach,
O.
W. W.
tion tion contract contract
in in
April, April,
1959.
The The Toll Toll Bridge Bridge
Authority Authority
has has
set set a
Cordero, Cordero, Fernando Fernando
P.
bonds bonds
and and the the
of of award award
the the
construc-
toll toll collections collections
on on the the
two two
bridges.
Bridge Bridge
Department
months months of of
next next
year, year, and and
for for sale sale of
The The bonds bonds will will
be be
redeemed redeemed
from
enue enue bonds bonds
during during
the the
first first two
Israel, Israel, Rudolph Rudolph Martinez.
J. connection connection to to
the the sale sale of of the the
Bridge Bridge
Authority's Authority's rev-
the the including including proaches, proaches, Escobar Escobar Street
Headquarters Headquarters
Office
ing ing the the bridge bridge construction construction
work work
and
Benicia
the the - Bridge Bridge Martinez Martinez ap- and and
tentative tentative
schedule schedule calls calls
for for
advertis-
Casey, Casey, Eugene Eugene A. available available nue nue will will bonds bonds be be to to
finance
Benicia Benicia
Arsenal Arsenal by by
1st. 1st. October October
The
District District XI remaining remaining
The The $34,000,000 $34,000,000 in in
reve-
for for rights -way -way -of through through the the Army's
quinez quinez
project. Bridge Bridge
tiations tiations with with the the Federal Federal Government
Hull, Hull, Archie Archie J.
ready ready sold sold been been to to
cover cover lic lic the the Car- Works Works
expects expects to to complete complete nego-
X
District District
amount amount bonds bonds $46,000,000 $46,000,000 have have in in al- Gilliss Gilliss said said the the Department Department of of Pub-
approaches. approaches. Of Of the the total total authorized Bridge Bridge Authority.
DeGroff, DeGroff, Ray Ray
E.
and and the the Martinez Martinez Benicia- Bridge Bridge and Secretary Secretary of of the the California California Toll
Barnes, Barnes, John John E.
approaches, approaches,
now now nearing nearing completion,
State State llirector llirector Works Works of of Public Public and
District District VII
parallel parallel of of the the Carquinez Carquinez Bridge Bridge and dates dates was was announced announced by by C. C. Gillis, M. M.
Legislature Legislature in in for for 1955 1955 construction This This tentative tentative schedule schedule target of of
Franklin, Franklin, Howard Howard J.
bonds bonds authorized authorized by by the the California
March, March,
1962.
Dito, Dito, L. Peter Peter
of of portion portion the the
revenue $80,000,000 $80,000,000 in in traffic traffic open open completed completed and and to to in
V
District District
The The bridge bridge will will financed financed be be from from a expected expected project project The The is is to to April. April. be
scheduled scheduled continue." next is is to to Bridge Bridge begin begin tions tions tinez tinez Welch, Welch, Elwood Elwood B.
preconstruction preconstruction Construction Construction Benicia planning planning negotia- the the -Mar- and and of of Hayler, Hayler,
Richard Richard
Arthur
DeLainey, DeLainey, Willis Willis T.
Work Work April; April; End End 1962 in in Starts Starts to i i n n
IV District District
Construction Benicia Martinez Martinez Bridge -
Wallace, Wallace, P. Malion Malion
Schiffmann, Schiffmann, C. Phillip Phillip
demands." meet meet not not lenge. its its to to fail fail Robinson, Robinson, E. Edwin Edwin
meet meet would would engineers engineers the the fic fic chal- Bernard, Bernard, E. Paul Paul concluded. concluded. know know you you talk talk will that that "I "I
assurance assurance expressed expressed the the both both traf- that that District District III Bugge's "The "The is is challenge challenge yours," yours,"
Highways, Highways, Washington, State State of of of of
department. highway highway
Raymond, Raymond, R. Charles Charles
William William sion, sion, Bugge, Bugge, and and Director A. A.
Washington's
of of engineer engineer
veteran veteran
Fslinger, Fslinger, M. Rolin Rolin
the the
Commis- California California
Highway Highway
of of
C. C. absence, absence, Herbert Herbert Higgins, in in his his by by
District District II Works Works and and Chairman Public Public rector rector of of
was was
him,
address address It It for for note note said. said. read read
California California State State Gillis, Gillis, Di-
C. C. M. M.
Mitchell, Mitchell, Archie Archie R.
profession," profession," key- Bugge's Bugge's gineering gineering
meetings.
Klein, Klein, Earl.
en- the the
trafFic trafFic upon upon
depends depends cessfully cessfully
speakers speakers keynote keynote the the at at to to both by by
Faulkner, Faulkner, Frank
suc-
"Whether "Whether eve eve future future meet meet the the engineers engineers pointed traffic traffic that that faces faces was was
District
highways, highways, of of I I am am sure." challenge magnitude magnitude of of the the The The
service better better the the to to Engineers. continually continually effort effort Traffic Traffic
are:
do do your of of well well you you Institute Institute one one in in section section Every Every the the western western of of of
and and
fornia fornia
Highways Highways
Works Public Public
achieve achieve results results want. the the annual annual you you eleventh eleventh will will of of the the meeting meeting the
the the
May
-June, -June, edition edition 1958, 1958,
of of Cali-
that program program action, action, row row a a into into seminar seminar operations operations afreeway afreeway into into ings, ings, and
five -year -year
since since listed listed
awards awards
those those
in
tomor- thoughts thoughts today today
two two the the and and of of professional professional gather- ing ing at at mid -June -June
Employees Employees
who who
twenty- received received
convert- Sacramento Sacramento problem problem said, said,
Gillis Gillis "the "the
of of in week week spent spent in in states states a a
Announced
Awards Awards
job," you you a a have have western from from engineers engineers "You "You before before 11 11 big big Traffic Traffic
Sacramento Annual Annual Confab Confab Holds Holds Twenty in in -yea -yea -five r E. E. I. I. T. T. iV10NTEREY COUNTY scraper combinations for the short hauls. Compaction equipment con- San Francisco Will Continued from pope 32 ... sisted primarily of standard sheepsfoot Have AASHO Meeting long rows of towering eucalyptus rollers and occasionally a compactor Plans and trees, consisted of two lanes, substand- or 50-ton pneumatic-tired roller. Satis- arrangements are well advanced for the Forty- ard in both horizontal and vertical factory results have been obtained fourth Annual Meeting of the American alignment in many locations, and the from all three types of compaction Association of State Highway deficiencies in sight distance that equipment. Officials, which will created a great deal of congestion as take place in San Francisco December heavy truck traffic entered the high- Drainage Difficult 1st through 5th. way from surrounding ranches at The rnajority of the drainage struc- An estimated 1,500 or more dele- numerous locations because of the lack tures consisted of reinforced concrete gates and visitors will be housed at 10 of access control. pipe ranging in size from 18 inches to hotels in downtown San Francisco. 60 inches. The only thing that ap- This will mark the first year since Existing Road Converted proached a major structure on the 1946 that California has been the host The project undertaken on this par- project was the construction of an state for the annual meeting of A. A. ticular portion of US 101 was the con- eight-foot concrete arch culvert which S. H. O. The association met in Los version of the existing two-lane facil- extended an existing concrete arch Angeles in 1946, and in San Francisco ity to a four-lane expressway and culvert. in 1936 and 1924. construction of nine crossovers at On the north end of the project The Host State Committee respon- grade. (Right-of-way has been pur- the land is uniformly flat and slopes sible for California's share of the ar- chased for future expansion to full slightly toward the Salinas River to rangements is headed by Director of freeway, at which time the crossings the northeast. There is so little fall, Public Works C. M. Gillis as chair- will be separated by means of struc- however, that proper surface drainage man, with State Highway Engineer tures.) is difficult. To eliminate the difficulty, G. T. McCoy, a past president of The contract was awarded to the vertical drains are being constructed A. A. S. H. O., as vice chairman. This Granite Construction Co. of Watson- at approximately 1,000-foot inter- committee, assisted by a staff com- ville, on February S, 1957, and pro- vals to divert the surface drainage mittee, is working in close collabora- vided for the construction of 7.9 ~riiles into porous subsurface strata which tion with A. E. Johnson of Washing- of highway between King City and underlie the area. ton, D. C:,: Executive Secretary of A. A. S. H. O. Greenfield. The work started on Feb- The contract required 134,000 tons All sessions of the five-day meeting ruary 15, 1957, and involved about 75 of imported base material and 81,000 will be held in the Sheraton-Palace percent new construction and 25 per- tons of imported subbase material; Hotel with the exception of an all-day cent resurfacing. the imported base material was used field trip scheduled for December 3d. The structural section for the new under shoulders, frontage roads, and This trip will cover current and recent construction was 0.67 foot of Class as aggregate for cement-treated base. highway construction projects in the "B" cement-treated base over imported This material was produced by a port- San Francisco Bay area. subbase material which ranged in able crushing and screening plant thickness from 6 inches to inches. 14 located in the Arroyo Seco River ap- The project was allotted 310 work- This was paved with 0.33 foot of proximately four miles from the proj- ing days and was completed in March, Type "A" plant-mixed surfacing and ect. Also produced in the Arroyo 1958. D. E. Connelly was resident en- 0.06 foot of open graded plant-mixed Seco was the mineral aggregate for gineer. surfacing. the various types of plant-mixed sur- Road Removal Necessary The resurfacing consisted of placing facing (69,600 tons). The imported As construction progressed approxi- 0.13 foot of Type Aplant-mixed sur- subbase material was obtained from a mately 50 percent of the e~usting high- facing and 0.06 foot of open graded pit on the bank of the Salinas River way was either removed. or resur- plant -mixed surfacing over the exist- adjacent to the project. faced. Therefore, it was not possible ing pavement. horizontal alignment to route traffic continuously over the The grading, which was relatively The of the lanes generally existing highway during the construc- light, was completed early in the con- expressway follows the existing alignment, although it does tion period. It was necessary to con- tract time. The contractor moved ap- struct the job in two stages. Traffic proximately 400,000 cubic yards in not parallel it. The existing lanes are utilized was routed over a portion of the exist- the first stage and 175,000 cubic yards being as one pair of lanes throughout portions of the project, ing highway and first stage construc- in the second stage with an average tion while second stage construction production excavation sometimes the left lane, and sometimes during heavy was in progress. We had to provide of from 9,000 cubic yards per the right. This switch from left to 8,000 to numerous detours to handle traf3'ic. As day. The roadway excavation was ac- right has been made at several loca- many as six construction detours were complished using three-axle pneu- tions to improve the horizontal align- by in use at one time during second stage ment in the existing lanes and to clear matic-tired scrapers for the long haul work. material, crawler tractor anti various obstructions. and ...Continued on page 56 and Public Works 53
54 54
California California Highways
of of tion tion money money jamming jamming in in the the coin coin
boxes. tests.
liams liams
of of El El Cajon.
the the
bridges bridges to to
permit permit
immediate immediate
observa-
fumes fumes when when
making making
ethylene ethylene
dichloride
La La
Mesa, Mesa,
and and
a a
brother, brother, W. W.
S. S. Wil- separators separators
and and counting counting machines machines
used used
on
duce duce
eliminate eliminate
or or
the the
possibility possibility
of of
inhaling
of of El El
Cajon Cajon
and and solid solid
Mrs. Mrs. metal metal
W. W. covers covers D. D. on on Standard King King - Johnson Johnson of coin
mending mending
adevice adevice
which which he he designed designed to to re-
the the
use use
of of clear clear Lucite Lucite two two
covers covers
in in place place daughters, daughters, of Mrs. Mrs.
Walter Walter L. L.
Hewitt
Certificate Certificate
of of
commendation commendation
for for
recom-
cate cate of of
award award
and and
$15 $15 for for
recommending
Williams Williams
is is
survived survived
by by
his his
wife,
Raymon Raymon
E. E.
Harden, Harden,
Highways, Highways,
Alhambra.
Leroy Leroy
R. R. Eglin, Eglin, Point Point Richmond. Richmond. Certifi-
ways ways
District District in in XI XI as as a a senior senior
aid. pieces.
concentration, concentration, volume volume low low
soil soil
sterilants.
of of
the the
of of California California
that that steel steel may may Division Division
have have of of been been cut cut High- from from constructing constructing larger a a spray spray
for for gun gun applying applying
high
all all
sheetmetal sheetmetal
shears shears
in in to to 1946, 1946, catch catch small small Williams Williams cate cate pieces of of award award became became and and an an $150 $150 for for employee
designing designing and
posing posing
that that
a a
steel steel
catch catch bin bin
be be placed placed
Sylvester Sylvester on Evans, Evans, after after San San
Francisco. Francisco. the the
Certifi- conclusion conclusion
of of
World World War War
II,
mento. mento. Certificate Certificate
of of commendation commendation
for for pro-
plotting plotting cross cross
sections.
Country's Country's
first first jet jet
fighters. fighters.
Shortly
Leonard Leonard
R. R.
Nelson, Nelson,
Highways, Highways,
Sacra-
slope slope cial cial
and and scale scale triangle triangle
to to be be used used
for
draftsman, draftsman,
working working
on on one one of of
the
from from
excess excess
Allis -
cate cate Chalmers Chalmers of of award award parts. and and $15 $15 for for designing designing
a a spe-
nautical nautical Company Company
as as
an an
engineering
signing signing and and building building Warren Warren ice ice
an an plant plant A. A. Johnston, Johnston, cutter
Marysville. Marysville.
Certifi-
Williams Williams
went went Diego. Diego. to to the the Certificate Certificate Ryan Ryan of of Aero- commendation commendation de- contract contract for for number number on on "as- originals. built" built"
Robert Robert
W. W. Apperson, Apperson, pany, pany, as as Highways, Highways, a a yard yard use use rubber rubber foreman. foreman. stamp stamp San a a to to of of hand hand From From stamp stamp the there,
is is
tificate tificate of of commendation commendation satisfactory satisfactory for for recommending to to by by all all a a concerned. large large San San Diego Diego lumber lumber com-
tion tion Alexis Alexis
A. A. of of Shimonauff, Shimonauff, Sacramento. Sacramento.
liability liability Cer- of of a a highway highway
permit permit bond For For four four
years years
was was Hall Hall
employed
in in the the method method and and of of highway highway lighting lighting plans. determining determining
if if the the termina-
health.
Certificate Certificate
of of contract contract design design award award
and and
and and plans plans $10 $10 for for traffic traffic for for a a signal revision
quit quit to to
come come
to to
California California
his his for for
wife's George George W. W. graphic graphic positives positives Havins, Havins, film film
the the Highways, Highways, in in preparation preparation San San
Diego.
of
stockyards stockyards of of
East East
St. St.
Louis, Louis,
when when use use
of of Diazo Diazo he developed, developed, enlarged, enlarged, photo- highway highway with with
the the construction construction
program.
award award
of of was was
and and $150 $150 employed employed for for recommending recommending as as the a a teamster teamster erty erty in in the of of the the division division acquired acquired in in connection
Gary Gary
E. E. Layton, Layton, Sacramento. Sacramento.
Certificate spective spective store. store. tenants tenants new new to to inspent inspent From From prop- rental rental 1934 1934 to to
1940 1940
Williams
column column for for the the
tare tare weights.
for for sheet sheet
setting setting
up up
appointments appointments
for for pro-
years years
as as
manager manager
of of
a a
chain chain grocery
Platform Platform Scale Scale
Weights, Weights, to to include include a a larger ommending ommending the the
use use of of a a as as form form
a a front
struction struction
projects projects
and and
worked worked
several
a a revision revision of of Form Form
-33, -33, R
Record Record Daily Daily
Certificate Certificate geles. geles. of award award
of of and and $15 $15
for for rec-
ployed ployed
as as
a a
surveyor surveyor
on on
tificate tificate several several
award award of of con- and and $15 $15 for for recommending Miss Miss Barbara Barbara j. j. Highways, Highways, Blair, Blair,
Los Los An-
Arthur Arthur Uwen, Uwen, On On K. K.
Luis Luis leaving leaving San San Obispo. Obispo.
college, college,
Cer- Hall Hall was was em-
stencils stencils
used used for for
pavement pavement markings.
of of the the
Right
-Way -Way
-of Department.
a a method method new new
ing ing at at of of cleaning cleaning
Chicago Chicago
sheet sheet
metal Technical Technical College.
"out" "out"
card card
front front
for for
use use
in in the the
file file
room
Certificate Certificate
of of
and and award
$25 $25 for for
proposing and and
later later
completed completed
his his
college college
train-
mending mending the the
use use
of of special special folders folders
with with
the
William William C. C.
Bastian, Bastian,
Highways, Highways,
Fresno.
attended attended
the the Missouri Missouri School School Certificate Certificate of of Mines, of of award award and and $15 $15 for for recom-
broken.
Mrs. Mrs. uating uating
Josephine Josephine from from M. M. Andino, Andino, high high San San Diego.
school school
in in he
1928, 1928,
tate tate
removal removal the the of of posts posts damaged damaged when when
or
the the stamp.
for for job job
Illinois, Illinois,
February February
23, 23,
1911. 1911. After After
grad-
on on
highways highways standard standard sheet sheet to to A facili- -51, -51,
Photograph Photograph ment ment
Form Form
to to include include
space
Williams Williams
the the
was was
horizontal horizontal reflector reflector born born in in East East unit unit St. St. W61R W61R as as Louis, shown
mending mending arevision arevision the the of of Bridge Bridge Depart-
posing posing
arevision arevision
in in
the the
structure structure
details details of
on on
after after 11th 11th June June
a a brief brief
illness. Certificate Certificate commendation commendation of of for for recom-
cisco. cisco.
Certificate Certificate of of award award
$40 $40 and and for for pro-
Thomas Thomas Royce, Royce, Highways, Highways, State State the the Division Division Sacramento.
of of Highways, Highways,
died
Edward Edward W. W.
Coble, Coble,
Highways, Highways,
San San Fran-
cement cement
testing.
Associate Associate gineering gineering District District in in
XI XI
of
photographic photographic
tive tive
enlarger.
tached tached to the the to hydraulic hydraulic of of face face the the
jack jack
for
G. G. Hall Hall Williams, Williams, Highway Highway En-
machines machines
be be could could
converted converted
into into effec-
an an
mending mending that that indicator indicator an an
needle needle
be be
at-
developing developing method method
a a
whereby whereby
photostat
Certificate Certificate of of commendation commendation
for for
recom-
and and
be be award award $25 $25 to to divided divided equally equally for
Orrin Orrin H. H. Rounds, Rounds, Highways, Highways,
Marysville.
Hall Hall Williams G. G.
Bernardino, Bernardino, San San
Highways. Highways. Certificates Certificates of Ozalid Ozalid or or machine.
C. C. Erickson Erickson Roy Roy and and
Calmer Calmer
Dickson, F. F. reproduce reproduce copies copies on on through through run run a a Bruning
granted. original original or or master master drawings drawings that that will will not
feet feet to to 12 12 in in length. length. award award An An of of was $100 $100 ommending ommending the the Riverside Riverside dena, dena, of of a a use use and and nonrepro nonrepro Stockton. pencil pencil on
from from
36
-inch -inch to to
-inch -inch width width 42 and and in in cisco. cisco.
6 6 feet Certificate Certificate commendation commendation of of rec- for for
were: were: tion tion
Modesto, Modesto, Pasa-
Oakland, Oakland,
made made
up up instead instead of of making making prints -size -size full Franklin Franklin Young, Young,
L. L. Highways, Highways,
San San
Fran-
California California cities cities recogni- receiving receiving
row row sepias sepias standard standard on on 19 -inch -inch paper paper carbon carbon sets. be
Texas, Texas, gon, gon, oped oped Washington. from from Virginia, Virginia, and and aerial aerial survey survey contour contour Report, Report, maps, maps, be be nar- made made up up in in individual individual snap -out
ommending ommending that that in in projects projects mending mending design design devel- that that Massachusetts, Massachusetts, Form Form land, land, R -24, -24, Michigan, Michigan, Extra Extra Daily Daily Ore- Work
Luis Luis
Obispo. Obispo.
Certificate Certificate Certificate Certificate award award
of of rec- for for award award of of and and $10 $10 for for recom-
Connecticut, Connecticut,
Delaware, Delaware, Illinois, Illinois, Mary-
Thomas Thomas E. E. Baumberger, Baumberger, Highways, Highways, Herman Herman R. R. San Jantzen, Jantzen, Highways, Highways,
Stockton.
States States
recognized recognized California,
were: were:
calculations calculations supplement supplement done done B. B. by by M. I. I. operate. to to
institute.
and and table table graph graph
which which
developed developed he he
to whether whether visible visible inspection inspection they they safe by by are are
performance performance of of
be be
will will
the issued issued by by recommending recommending use use of of athree- center center curve possible possible operator operator for for it it the the make make know to to to to
Certificate Certificate and and Obispo. Obispo. award award for for states states this this of of achieving achieving level and and high high $25 $25 for -use -use installed installed be be multiple on on booms crane crane to to
Gary Gary L. L. Simms, Simms, Highways, Highways, San San Luis suggestion suggestion which which proposed proposed a a safety safety device Certificates Certificates recognizing recognizing these these cities
cific cific items items
shown shown thereon. divided divided
equally, equally,
authorized authorized were were for for this
formance formance
during during
1957.
on on drawing drawing sheets sheets assist assist
to to in in locating locating spe- Certificate Certificate nance. nance. of of award award and and $50, $50, to to be
gineers gineers traffic traffic for for engineering engineering per-
recommending recommending a a
that that grid grid system system be be
used
now now member member Department Department a a the the of of of of Fi-
nized nized
by by
Institute Institute Traffic Traffic the the
En- of of Pasadena. Pasadena. Certificate Certificate commendation commendation of of for shared shared G. G. with with Burton Burton Beamer, Beamer, award, an an
john john among among Maxwell, Maxwell, 11 11 W. W. Architecture, Architecture, states states and and recog- cities cities South 53 53 now now ture, ture, Spokane, Spokane, of of Washington, Washington, who
and and details. Vernon Vernon
Messick, Messick, Division Division W. W. Architec- of of California California and and were cities cities five five its its of of
corresponding corresponding
contract contract drawings, drawings,
sections,
drafting drafting rooms. in in
Receive Receive Awards T. T. i. i. E. E.
Continued Continued page page from from
-half 47 47 one . . drafttape drafttape -inch -inch . . .
instead instead of of inch one one
commendation commendation of of recommending recommending for for
use use of
State, State, Five Five Cities
MERIT MERIT AWARD AWARD WINNERS
William William J. J. Ziegler, Ziegler, Redding. Redding. Certificate CRESTMORE J. A. Payton of Riverside with a bid the piers on the new portion of the of $98,932.76. Work was completed bridge be skewed to coincide with Continued from page 34 ... on October 2, 1953. During the same their levee alignment rather than being be easily accomplished in the period, the City of Riverside had also made parallel with the existing piers. event the Corps of Engineers constructed the approaches and con- This resulted in a rather awkward levee project were built. Grade nection to Market Street, and the road "half-open venetian blind" appearance, and waterway clearances for was opened to through traffic immedi- but the model studies clearly demon- the first stage bridge were to ately upon acceptance. strated that erosion and flow char- 'ae established from the recom- Public comment on the new route acteristics under maximum flood con- mendations of the corps report. was most favorable and was reflected ditions would be much improved. (3) That the proposed road be in the traffic usage which built up These recommendations were ac- established as a federal-aid sec- rapidly. A count made at the bridge cordingly incorporated in the final ondary route, and that F. A. S. one year after opening showed 4,600 plans and the project was advertised funds be used in its construc- vehicles per day were using the new on September 28, 1956. tion. road. Fifteen bids were received on Oc- Late in 1955 the Corps of Engineers tober 25th, and Mr. C. B. Tuttle of Following route adoption, the desig- announced that allocations had been Long Beach was again low with a bid nation "FAS Route 1177" was estab- established which would allow it to of $221,810.'Construction was started lished for Crestmore Road, and the proceed with the preparation of the on December 3, 1956, and completed first stage bridge plans (Project S- final plans for the Riverside portion May 6, 1958. 1177(1)) were prepared by the county of the work. These plans were trans- road department with the assistance of mitted to the county in February, Channel Work the State Division of Highways Bridge 1956, together with advice to the Department in Sacramento. Most of the operations required co- effect that the contract could be ad- The proposed structure was to con- operation between the contractor and vertised in May. Extension of the sist of six spans of 100 feet each, a 28- the prime contractor for the corps Crestmore Bridge was not a part of foot-wide concrete deck; and a sub- levee project, Matich Bros. of Colton, the proposed work, and the county structure of concrete piers on timber who were simultaneously engaged in was requested to establish this as an or concrete piles. Spans the channel work above, below, and were to be independent project. riveted plate girders of 6% -foot depth. through the bridge site. This work Design was conventional in all aspects Extension Required was of considerable magnitude and in- except that the abutments were so volved extensive earthmoving opera- formed as to be similar in outward Review of the plans showed that a tions. It was begun in April, 1957, and appearance to the other piers follow- graded and lined channel with a bot- was completed in November, 1958. ing minor modification. This was done tom width of 930 feet was to pass Final cost of the original bridge and to provide for uniform appearance through the present bridge site. Align- its extension, including extra work upon future extension of the structure. ment was such that a skew length of and construction engineering was 1,200 This project was advertised in June, feet would be required to com- $495,817. Crestmore Road and ap- 1951, and seven bids were received, plete the crossing, and this would proaches cost $108,060 making a total mean the low bidder being C. B. Tuttle of that a 600-foot extension of the for the county portion of the route structure Long Beach, his bid being in the would be necessary. The $603,877 exclusive of right-of-way ac- amount of $266,184.00. Corps of Engineers policy required a quisition costs. positive commitment from the local Construction engineering was done Aeeess Limited agency to instigate such concurrent by the County of Riverside. Resident construction Second stage work was designated before they would com- Engineer for the county on Projects mence their Federal-aid Secondary Project own work on the levees. S-1177(1) and S-1177(2) was Paul E. S-1177(2) and was to consist of the In order to accommodate the new Stout, and on Project S-1177(3), construction of a two- and four-lane construction, it would be necessary to Robert L. Wilson. roadway extending from the bridge remove 600 feet of the west approach The completion of the third stage abutment north and west to an inter- fill, and it was proposed that this be of improvements of FAS Route 1177 section with FAS Route 706, Bloom- done by county forces prior to the has provided an adequate connection ington Boulevard. Construction was start of the work. for the present traffic; however, area to be on expressway standards with Following completion of the bridge development and the attendant high- access limited to three points along plans, they were transmitted to the way user increase clearly indicate that the route. Nearly 1,800 feet of the district office of the Corps of Engi- such adequacy is only temporary. alignment was to be approach fill for neers for comment. The corps had Latest traffic counts show vehicle the bridge. meanwhile constructed a 1/120th scale counts in excess of 5,600 per day, and The project was advertised on hydraulic model of the entire channel presage the not too distant day ~~hen March 13, 1953, and the low bidder project and from the observed results development of the route to full four- was the E. L. Yeager Company and of its operation, they requested that lane status will be necessary. and Public Works 55
56 56 California California Highways
west west mile mile Gulch Gulch Essex Essex of of Road 0.1 0.1 District District I, I, the the occurrence occurrence cata- the the of of have have area area corrected. been been
0.9 between project project way way -mile -mile under under a a development development During During this this period period in glaring glaring highway highway deficiencies deficiencies in in this
Proceeding Proceeding 299 299 easterly easterly on on there there is contracts. interchange interchange at at Canyon Canyon Road, Road, Pine Pine the
routing routing providing providing new new lanes. on on four four a a -mixed -mixed plant surfacing surfacing under under private of of expressway, expressway, addition addition the the and and of of an
and and River River Mad Mad section section developed was was length length the the of of 36 36 received miles miles has has Salinas Salinas northbound northbound used used the the for for lanes
299 299 and and structed, structed, the the znter- between between forces. forces. Subsequently, Subsequently, the the greater expressway, expressway, a a second second bridge bridge over over the
interchange interchange traffic traffic type type accomplished accomplished was was was was con- by by honor honor camp immediate immediate correction. correction. ~ ~ with with Now Now the
299 299 resulted. resulted. tracts, tracts, 101 101 US US and and trumpet- but but A A the the greater greater portion portion of of work were were major major deficiencies deficiencies that that required
Highway, Highway, wood wood some some a a connection connection new new work work of done done several several by by early early con- ervation ervation US US to to north north 101 101 of of the the bridge
a a modernized modernized pressway pressway development development the the two of of Red- facility facility -lane -lane with Antonio Antonio and and the the Hunter Hunter Liggett Liggett res-
a a distance distance portion portion a a of of the the -lane -lane As As 36 36 of of four US US miles, miles, ex- 299 299 is is now traffic traffic coming coming from from the the Mission Mission San
Creek, Creek,
Districts Districts the the Interchange Interchange I I and and II II boundary, Constructed tance, tance, particularly particularly as as it it pertained pertained to
through through Del Del Loma Loma and and Prairie to to capacity, capacity, severely severely restricted restricted sight sight Mad Mad the the ds= River. of of
From From Willow Willow Creek Creek easterly standard standard approaches. approaches. Inadequate Inadequate through through Lake Lake Blue Blue Tane to to and and Fork North North
the the
for for
10.4
-mile -mile
project. row row Salinas Salinas River River Bridge Bridge its its and and portion portion between between sub- Mad Mad the the River
Highways Highways
purchased purchased
all all rights -of -way to to improve improve the the deficiencies deficiencies of of the the tailed tailed is is covering nar- under under way way study, study,
sources; sources;
the the
California California
Division Division of 101 101 Monterey Monterey in in County County principally aerial aerial to to provide provide maps maps survey, survey, de- for for
Construction Construction
funds funds
were were
from from
federal planning planning for for the the laning laning four- of of Summit Summit has has US adopted adopted been been an and and
enhancing enhancing
highway highway
travel travel
the the in in area. project project This This originated originated early early intersection intersection in US US with with to to 101 101 Berry
modern modern highway highway a a
facility facility
greatly
of of King King City. improvement improvement 299 299 of of mate mate US US from from its
completion completion
of of
this this
work work
will will
provide which which bring bring will will us us the the into into city city limits ment ment The The 1940. 1940. since since routing routing for for ulti-
mixed mixed
surfacing surfacing
this this
summer. summer.
The 2.7 2.7 some some miles miles long long completed completed in in 1956 undergoing undergoing constant constant been been improve-
program program
provides provides
for for
placing placing
a a
plant- County, County, we we now now on on travel travel a a project Humboldt Humboldt and and Trinity Trinity Counties, Counties, has
the the
completed completed grade. grade.
Their Their
planning
to to our our expressways expressways in in Monterey 299 299 US US within within District District I, I, in both both
treatment treatment
to to the the
greater greater
portion portion of Passing Passing through through new new this this addition concrete concrete structures.
grading grading work work applied applied and and
penetration
have have replaced replaced already already modern been been by by
...Continued ...Continued
from from page page 53
ries ries of of contracts contracts have have
completed completed
all
toneva toneva Creek Creek northerly northerly Rockport of of
MONTEREY MONTEREY COUNTY Bureau Bureau of of Public Public Roads, Roads,
under under
a a
se-
Rockport Rockport at at North North and and of of Fork Fork Cot-
to to Willow Willow erly erly Creek, Creek,
U. U. the the
S.
timber timber structures structures Cottoneva Cottoneva at at Creek
From From Berry Berry Summit Summit 10 10 miles miles
east-
area. immediate immediate action action taken. taken. was was Old
ern ern transportation transportation
needs needs
of of a a growing deteriorated deteriorated badly badly the the to to extent extent that Federal Federal Used Funds Funds
plished plished to to adequately adequately fulfill fulfill the the mod-
included included miles, miles,
also also some some badges
a a
low low on on
bid bid
of of $169,350.
and and 1912, 1912, much much remains remains to to be be accom-
addition, addition,
This This tem. tem.
amounting amounting
28 to to
by by
Tom Tom
Hull, Hull,
contractor contractor of of Eureka,
pletion pletion of of that that Contract Contract old old No. No. of 2 2
placed placed was was the the in in
Highway Highway State State
Sys-
is is constructed constructed being being in in Lupton Lupton Creek
Much Much has has been been done done the the since since com-
Leggett Leggett
Redwood Redwood the the High~vay on on
this this activity, activity, a a concrete concrete arch arch culvert
ment ment program.
Route Route
1 1
northerly northerly from from Westport Westport to
Redwood Redwood
Creek. Creek. In In connection connection with
the the with with regularly regularly budgeted budgeted improve-
1957 1957 In In additional additional
mileage mileage S ?gn of of
Redwood Redwood
Summit, Summit,
Green Green Point, Point, and
construction construction will will be be under under way way along
approaches.
pended pended
on on the the
portion portion easterly easterly toward
Plans Plans this this for for work work complete, complete, are are and
progressing progressing
on on the the
new new structure structure and
County County
with with present present efforts efforts being being ex-
aggregate aggregate
cost cost of of about about $1,538,000.
waters waters of of River. River. Big Big
Design Design is work work
ernization ernization
of of
299 299 US US
in in Humboldt
contracts contracts
will will be be under under way way at at an
new new a a bridge bridge
crossing crossing the the
navigable
working working
the the on on relocation relocation and and mod-
was was
to to
the the extent extent
that that repair seven seven
proval proval of of location location and and clearance clearance
of
The The
honor honor camp camp forces forces are are now
abnormally abnormally heavy heavy
rainfall. rainfall. Damage
U. U. S. S. Engineers Engineers Army Army
given given have have ap-
Summit Summit
299 299
on on in in Humboldt Humboldt County.
damage damage
from from 1958 1958 early early
storms storms and
toward toward its its eventual eventual replacement. replacement.
The
42 42
at at
Preston Preston Ranch Ranch Lord Lord near near Ellis
district's district's The The
highways highways
suffered also also
Mendocino, Mendocino,
of of
receiving receiving is is attention
was was
moved moved and and re- established established as as Camp
1957. in in
structures, structures,
Big Big River River Bridge Bridge just just south
Ranch Ranch
US US
on on
299 299
in in Trinity Trinity County
damage damage
project project repair repair completed was was
Another Another these these of of
remaining remaining last last old
1956 1956
In In
Honor Honor Camp Camp 36 36 at at Burnt struction struction
programs, programs, and and
the the last last
flood
project project be be will will issued issued this this summer.
and and
contract. under under
pleted pleted
along along with with
the the
normal normal con-
Bragg. Bragg. is is expected expected It It
that that bids bids for for this
under under way way both both
by by
Honor Honor Camp Camp 42 damage damage
repair repair contracts contracts
com- were were
Bridge Bridge
the the ` ` at at north north limits limits of of Fort
Creek Creek
area, area,
construction construction activities activities are trict trict Ihighways. Ihighways.
Aseries Aseries
of of
flood
coast. coast. This This is is the the Pudding Pudding
Creek
the the
In In Lord Lord
Ellis Ellis Summit - Redwood manent manent repairs repairs
to to
flood - ravished ravished Dis-
on on Route Route Sign Sign the the 1 1 on on Mendocino
road.
to to make make emergency emergency
finally finally
and and
per-
of of the the last last remaining remaining timber timber structures
of of
old old
highway highway
serving serving as as a a frontage in in excess excess of of $5,000,000 $5,000,000
was was necessary
are are 000 000 provided provided to to replace replace
another
lanes, lanes,
this this with with
reconstructed reconstructed portion were were gains gains wiped wiped
out. out.
Work Work costing
budget budget
funds funds the the in in
amount amount
$325,- of of
the the with with
future future
development development to to four waters waters receded, receded, appeared appeared it it
that that all
-59 -59 1958 In In
highway highway
construction
as as line line to to and and grade. grade.
It It will will key key in
State State Highway Highway System. System. When When
flood-
Replacing Replacing Timber Timber Bridges
cially.deficient cially.deficient section section
of of old old highway rious rious damage damage
ever ever suffered suffered by by the
Continued Continued
from from
45 45
page page :. :.
.
is is This This a a project project to to correct correct
an an espe- sulted sulted in in the the most most extensive extensive and and se-
DISTRICT DISTRICT
1"
and and 0.2 0.2 mile mile east east of of Fieldbrook Fieldbrook Road. strophic strophic 1955, 1955, December, December, flood, flood, re- GOODWIN J. KNIGHT Governor of California
CALIFORNIA HIGHWAIP COMMISSION C. M. GILLISS Chairman and Director of Public Works CHESTER H. WARLOW, Vice Chairman Fresno JAMES A. GUTHRIE San Bernardino ROBERT E. McCLURE Santa Monica FRED W.SPEERS . Escondido ROBERT L. BISHOP Santa Rosa JOHN 0. BRONSON Sacramento C. A. MAGHETTI, Secretary Davis
DEPARTMENT OF PUBLIC WORKS C. M. GIIIISS Director A. H. HENDERSON . Depufy Director T. FRED BAGSHAW Auistant Director JOHN STANFORD . Management Analyst S. ALAN WHITE . Departmental Personnel Officer RICHARD WINN Departmental Information Officer
DIVISION OF HIGFIWAYS GEO. T. McCOY State Highway Engineer, Chief of Division !. W. VICKREY Deputy Stafe Highway Engineer CHAS. E. WAITE . Deputy Stafe Highway Engineer J. W. iRASK Assistant State Highway Engineer J. P. SINCLAIR District IV, San Francisco THOMAS MERET Construction Budgets Architect F. W. PAN40RST Assistant State Highway Engineer L. A. WEYMOUTH Distict IV, San Francisco WADE 0. HALSTEAD 1. C. WOMACK . Assistant State Highway Engineer R. A. HAYLER District IV, San Francisco Princi gal Estimator of Building Construction S. P. MURPHY Assistant State Highway Engineer A. M. NASH District V, San Luis Obispo STANTON WILLARD Principal Architect, Standards F. N. HVEEM Materials and Research Engineer W. L. WELCH District VI, Fresno LEAVITT M. POWERS Accounting Officer FRANK E. BAXTER Maintenance Engineer A. L. HIMELHOCH District VI I, Los Angeles W. F. PARKS Supervisor of Office Services GEO. LANGSNER Engineer of Design LYMAN R. GILLIS District VII, Los Angeles G. M. WEBB Traffic Engineer C. V. KANE District VIII, San Bernardino MILTON HARRIS Construction Engineer E. R. FOLEY . District IX, Bishop Design and Panning Service H. B. LA FORGE Engineer of Federal Secondary Roads JOHN G. MEYER District X, Stockton P. T. POA6E C. E. BOVEY Engineer of City and Co-operative Projects J. DEKEMA District XI, San Diego Assistant State Architect, Design and Planning EARL E. SORENSON Equipment Engineer HOWARD C. WOOD Bridge Engineer ROBERT M. LANDRUM Chief Architectural Co-ordinafor H. C. McCARiY . Office Engineer State-owned Toll Bridges ARTHUR F. DUDMAN Principal Architect, Sacramento J. A. LEGARRA . Planning Engineer A. F. M. REYNOLDS JAMES GILLEM Principal Architect, Los Angeles Planning Survey Engineer CHARLES PETERSON L. L. FUNK Photogrammetric Engineer DIVISION OF CONTRACTS AND SCOTT H. LATHROP Personnel and Public Information RIGHTS-OF-WAY Principal Structural Engineer, Las Angeles E. 1. SALDINE Industry Contact Engineer CARL A. HENDERLONG E. J. L. PETERSON Program and Budget Engineer Legal Principal Mechanical and Electrical Engineer A. L. ELLIOTi Bridge Engineer—Planning ROBERT E. REED . Chief Counsel CLIFFORD L.IVERSON I. 0. JAHLSTROM Britlge Engineer—Operations GEORGE C. HADLEY Assistant Chief Chief Architectural Draftsman, Sacramento R. R. ROWE Bridge Engineer—Special Studies HOLLOWAY JONES Assistant Chief RAYMOND CHEESMAN J. E. McMANON Bridge Engineer—Southern Area HARRY S. FENTON Assistant Chief Chief Architectural Draftsman, Los Angeles L. C. HOLLISTER Projects Engineer—Carquinez GUSTAV B. VEHN . Chief Specifications Writer E. R. HIGGINS Comptroller DIVISION OF SAN FRARlCISCO BAY Construction Service Righ6-of-way TOLL CROSSINGS FRANK BALFOUR Right-of-way Agent CHARLES M. HERD Chief Construction Engineer C. Chief NORMAN C. RAAB Chief of Division CHARLES H. BOCKMAN E. F. WAGNER Deputy Chief Right-of-way Agent BALALA Principal Bridge Engineer Assistant to Chief Construction Engineer RUDOLPH HESS Assistant Chief BEN R. S. J. PIANEZZI Assistant Chief E. M. MacDONALD Assistant Chief DIVISION OF ARCHITECTURE AREA CONSTRUCTION SUPERVISORS ANSON BOYD State Architect, Chief of Division THOMAS M. CURRAN Area I, Oakland B W. BOOKER Assistant State Highway Engineer HUBERi S. HUNTER Depufy Chief of Division J. WILLIAM COOK Area II, Sacramento ROBERT W.FORMHALS CLAR.ENCE T. TROOP Area III, Los Angeles District vll Administrative Assistant to State Architect Highway Engineer FRANK B. DURKEE, 1R. Information Officer E. T. TELFORD . Assistant State AREA STRUCTURAL ENGINEERS SCHOOLHOUSE SECTION District Engineers Budget and Fiseal Service SAM HELWER District I, Eureka EARL W. HAMPTON MANLEY W. SAHLBERG Area I, San Francisco H. S. MILES District II, Redding Assistant State Architect, budgets and Fiscal M. A. EWING . Area II, Sacramento ALAN S. HART District III, Marysville HENRY R. CROWLE Fiscal Officer ERNST MAAG Area III, Los Angeles
~Yt1t~¢t~ iYt C.I LI FORMA STAiE PRINiINC OFFICE ] 250 ~-58 46M SEC. 34.6G P. L. & R. California Hiyhways and Pu~lfc Works DIVISION OF HIGHWAYS U. S. POSTAGE P. O. Box 7499 PAID SACRAMENTO. CALIFORPIIA Sacramento, Cal.
RETURN POSTAGE GUARANTEED Permit No. 152