1958 1958 the the Ing Ing

1958 1958 the the Ing Ing

Official Journal of the Division of Highways, Department of Public Works, State of California RICHARD WINK, Editor HELEN HALSTED, Assistant Editor STEWART MITCHELL, Assistant Editor MERRITT Ra NICKERSON, Chief Photographer Vol. 37 July-August, 195 Nos. 7-8 FRONT COVER Broom in bloom. State Route 93 winds its way Through patches of This colorful and prolific impor4 from Scot- land. This scene near Georgetown is typieal of a wide area of the Sierra foothills in the spring. —Photo by Bill Ruland BACK COVER The Mother Lode Highway (State Route 49) crosses the Stanislaus River over this bridge located at the Calaveras-Tuolumne county line between Sonora and Angels Camp. —Phofo by Robert Rose Table of Contents on Page 2 use Published in fhe interest of highway development in California. Editors are invited to photographs. information contained herein and fio request prints of any black and white Address communications to CALIFORNIA HIGFlWAYS AND PUBLIC WORKS P. O. Box 1499 SACRAMENTO, CALIFORNIA e or rom ~ s rocs By ALAN S. HART District Engineer ~isTxicT III is composed of 11 eoun- at the Sacramento-San Joaquin county ties (Butte, Colusa, El Dorado, Glenn, line and proceeds northward through Nevada, Placer, Sacramento, Sierra, Sacramento to Woodland and then Sutter, Yolo, and Yuba) lying in the generally parallels the present High- northern portion of the Great Valley way US 99W until it leaves the dis- of California and in the Sierra Nevada trict at the Glenn-Tehama county line. region north and south of Lake Ta- The second north-south interstate hoe. It contains 12,688 square miles route referred to connects the east- which is serviced by 1,374 miles of west interstate route near Vacaville state highways. with the north-south interstate route The district is faced with every type near Dunnigan. This connection is to of planning and construction problem, provide a more direct connection for except. a desert, found anywhere in the traffic between the Bay area and the State. It contains metropolitan areas Pacific Northwest. and small villages, rugged mountains Planning for the improvement of the and marshy lowlands, regions of ex- many miles of highway in the district, treme cold and regions of subtropical many of which will never be graced climate, large rivers (the largest in the with the title of freeway, is progress- State) and dry washes (that can be- ing satisfactorily. However, major come raging torrents in a matter of emphasis in planning matters is being hours), and, above all, it has demands directed to the two interstate routes. for increased highway capacity on its highways, caused by an unprecedented US 40 Progress population growth in the past decade. Primary emphasis has been placed in the past year, and is still being placed, Major Routes Lis3ed on the east-west interstate route, High- The state highway network provides way US 40. This highway enters two major north-south routes and three the district at the Sacramento-Solano east-west routes that cross the Sierra county line and leaves the district in Nevada Mountains within the district. Sierra County on the eastern slope of A fourth such trans-Sierran route the Sierra Nevada Mountains at the passes through the district and crosses Nevada state line. In addition to being the mountain chain just to the north an integral part of the Interstate High- in District II. One north-south and one way System, this route will also be re- east-west route have been designated quired to service the many thousands as a part of the Federal Interstate High- of motorists that plan to attend the way System. A short section of a sec- 1960 Winter Olympic Games to be ond north-south interstate route is also held in Squaw Valley, near Truckee. within the district. Every effort is being made, with fi- The main north-south interstate nancing available, to convert as many route in the district enters the district miles of this highway as possible to a four-lane freeway prior to February, UPPfR—The Camino Bypass on US 50 in EI 1960. It is realized that all of the route Dorado County. LOWER—State Route 93 in the vicinity of Georgetown, EI Dorado County. ...Continued on poge 2 REPORT FROM DISTRICY III Continued from page 1 cannot be completed by this time and that gaps will exist from one-half mile west of Monte Vista to Hampshire Public Works Building Rocks and from Soda Springs to the Twelfth and N Streets east end of Donner Lalce. All projects Sacramento —there are nine of them now under construction or advertised for bid dur- ing the 1958 construction season—will be placed in service prior to the games. Contracts presently under construc- tion, or offered for bid, and certain of completion before the end of the 1959 construction season, will provide 61 miles of uninterrupted four-lane di- vided highway (most of it to freeway standards) from Sacramento to one- half mile west of Monte Vista. The major gaps in the route occur in the next 40 miles where only six miles of freeway is currently under con- struction (Hampshire Rocks to Soda Page Springs). Twenty-one continuous Report From District III ____ 1 miles of four-lane freeway will be By Alan S. Hart, District Engineer available from the east end of Donner Grapevine __---_-_-__--_- 10 Lake to the Nevada state line with the By A. G. Fluter, District Design Engineer completion of the contracts now under _- Snow Removal ___-_-_---__-___ 1.3 way. These nine contracts ~~ith the ad- By A. C. Dildine, Senior Equipment Engineer dition of the construction of two major Public Works Job ___ 14 Fred Jacobson Named to detours, call for the expenditure of ap- ------ __ 15 New Highway Lab.------------------------ proximately $48,500,000. Report From District X.____ __ __ 16 By J. G. Meyer, District Engineer Freeway Completed -EI Toro --- ----------- 23 Irvine ------ ------ - ---------- - --------- - the nine contracts will be By J. D. Hetherington, Resident Engineer Four of season. Monterey County ___ completed this construction By A. M. Nash, District Engineer Two of these were opened to traffic Crestmore Bridge ___ 33 on June 24, 1957, and were the first By Douglas Powell, Assistant Road Commissioner, Riverside County full freeways to be completed in Report From District L__________________ 35 Northern California under the Fed- By Sam Helwer, District Engineer eral Highway Act of 1956. One is 45 Fair-bound Motorists Will See New Highways 3.6-mile section from one mile 47 the Merit Award Board Winners Announced east of Newcastle to Elm Avenue in of Devoted Service' 47 CHC Vice Chairman Chester H. Warlow Cited for 'Years Auburn. The road was opened to traf- 48 Annual Bonneroo Awards Made in Los Angeles._ fic with appropriate ceremonies under ________________ 49 Frank Balfour Given Right-of-way Award.______________________ the sponsorship of the Auburn Area ____________________________________ 51 Nine Current US 40 Freeway Jobs Listed Chamber of Commerce. Baldwin Con- _______________________________ 52 Twenty-five-year Awards Announced__________________ tracting Company and H. Earl Parker, _____________________ 52 I. T. E. Holds Annual Confab in Sacramento Incorporated, of A~Iarysville were the _________ 52 Benicia-Martinez Bridge Construction Starts in April joint contractors on the project which ______________________ 53 San Francisco Will Have AASHO Meeting cost approximately $2,570,000. ______________________________. 54 State, Five Cities Receive I. T. E. Awards_______________ The second contract completed on Retirements this date was a 6.1-mile sect?on from 50 Lynn Latimer -------- ____--__-----___- --- Heather Glen to Colfax. The Colfax ________ 51 Basil Frykland ___ Chan7ber of Commerce held a dedica- Obituaries tory ceremony for the opening of this 46 AndrewJ. Meehan---------- ------ ------ ------ ------------------ -- - -- ---- - section the afternoon of June 24th. J. Frank Walsh -------- -- 50 ---- ----- - ----- ---- ------ - ----- --------- ----- Portions of this section were already Edward S. ----------------------------------- -- -- 51 GriPPer - ---- - --- -- - being used by traffic prior to comple- HallG. Williams - ----------------------------------------------------------------------------- 54 California Highwpys tion of the entire project. McCam- mon-Wunderlich Company and Wun- derlich Construction Company of Palo Alto are the joint venture con- tractors for this $3,842,000 project. The S.S-mile section of freeway from Colfax to the Magra Overhead crossing of the Southern Pacific east of Colfax, is planned for use by the traveling public some time in October of this year. Fredrickson and Watson Construction Company and Ransome Company of Oakland ire the joint contractors for the project. The final construction cost for this portion of the route will be approximately $4,- 035,000. Starting with this project, and continuing for the remainder of the route over the mountains the traveled way is to be of Portland ce- ment concrete. The fourth project to be completed on Highway US 40 this year will be from near Floriston to the Nevada state line. When completed in August, this section will provide 5.4 miles of four-lane freeway through the Truckee River Canyon. Gibbons and Reed Company of Salt Lake City are the prime contractors for this project that will cost approximately $5,420,- 000. Careful planning by the contrac- tor and the Resident Engineer for the Division of Highways avoided the an- ticipated long delays to traffic in the narrow canyon. Detours Constructed To avoid other anticipated major delays to traffic through particularly rugged terrain on this major transcon- tinental route during future freeway construction, two extensive detours were constructed. The first of these, from near Monte Vista to Alta, was This section of freeway on US 99-50 soufh of Sacramento will be complefed this summer. the Elk Grove completed in 1957 by Fredrickson and Road Interchange is in the foreground; fhe City of Sacramento on the horizon, Watson Construction Company of Oakland at a cost of $422,000.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    60 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us