Travel Information

Total Page:16

File Type:pdf, Size:1020Kb

Travel Information Travel Information 20th IEEE/ACIS International Conference on Computer and Information Science (ICIS 2021 Summer) June 23-24, 2021 Shanghai Development Center of Computer Software Technology Shanghai http://acisinternational.org/conferences/icis-2021/ Venue for the Conference Shanghai Development Center of Computer Software Technology (SSC) Full address: Technology Building, No. 1588 Lianhang Rd, Minhang District, 201112, Shanghai, China Host Contact: Ms. Yun Hu [email protected] Tel. 86-021-54325166-3313 Travel Information Taxi service: SSC is around 30 km (about 120 CNY) from Shanghai Hongqiao International Airport (SHA), Hongqiao Railway Station and 40 km (about 150 CNY) from Shanghai Pudong International Airport (PVG). Location of SSC from Shanghai Hongqiao International Airport Location of SSC from Shanghai Pudong International Airport Public Transportation: From Shanghai Hongqiao International Airport: From To Transportation Notes Hongqiao International Laoximeng Station Shanghai Metro Line 10 Airport Terminal 2 Direction: Jilong Road Laoximeng Station Lianhang Road Station Shanghai Metro Line 8 Transfer Direction: Shendu Highway inside the station Lianhang Road Station SSC Walk (about 10 min, 500m) From Hongqiao Railway Station: From To Transportation Notes Hongqiao Railway Laoximeng Station Shanghai Metro Line 10 Station Direction: Jilong Road Laoximeng Station Lianhang Road Station Shanghai Metro Line 8 Transfer Direction: Shendu Highway inside the station Lianhang Road Station SSC Walk (about 10 min, 500m) From Shanghai Pudong International Airport: From To Transportation Notes Pudong International Laoximeng Station Shanghai Maglev Airport Direction: Longyang Road Longyang Road Station Yaohua Road Station Shanghai Metro Line 7 Transfer out Direction: Meilan Road of the station Yaohua Road Station Lianhang Road Station Shanghai Metro Line 8 Transfer Direction: Shendu Highway inside the station Lianhang Road Station SSC Walk (about 10 min, 500m) Accommodation Ji Hotel (60~100 USD per night) Address: No. 1501, Lianhang Road, Minhang District Website(Chinese): http://hotels.huazhu.com/inthotel/detail/9001384 200m to the meeting venue Manhattan Hotel (60~100 USD per night) Address: No. 168, Zhuyuan Road, Minhang District Website(Chinese): https://hotels.ctrip.com/hotels/7251394.html 1km to the meeting venue .
Recommended publications
  • Link Real Estate Investment Trust
    The Securities and Futures Commission of Hong Kong, Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. Link Real Estate Investment Trust (a collective investment scheme authorised under section 104 of the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong)) (stock code: 823) ACQUISITION OF 50% INTEREST IN PRC PROPERTY QIBAO VANKE PLAZA The Board is pleased to announce that pursuant to the Framework Agreement and ETA dated 24 February 2021, Link (through the Buyer) has agreed to acquire the Equity Interest from the Seller. The Equity Interest represents 50% of the equity interest of the Target Company. Upon Completion, Link will through its ownership of the Equity Interest become the joint owner with the Other Shareholder, which holds the remaining 50% of the equity interest, of the Target Company. The Buyer has entered into the Joint Venture Agreement (which will take effect on the Completion Date) with the Other Shareholder to govern the relationship between the Buyer and the Other Shareholder as shareholders of the Target Company. The Target Company is the sole owner of the Property known as 七寶萬科廣場 (Qibao Vanke Plaza) located at 5/3 Qiu, 620 Block, Qibao Town, Minhang District, Shanghai, the PRC (中國上海市閔行區七寶鎮620街坊5/3丘). The Property is a 5-storey commercial development plus a 3-storey basement, together comprising a retail area of approximately 148,852.84 sqm offering shopping, leisure, tourism, dining, entertainment and cultural experiences and a car park with 1,471 parking spaces.
    [Show full text]
  • The Operator's Story Case Study: Guangzhou's Story
    Railway and Transport Strategy Centre The Operator’s Story Case Study: Guangzhou’s Story © World Bank / Imperial College London Property of the World Bank and the RTSC at Imperial College London Community of Metros CoMET The Operator’s Story: Notes from Guangzhou Case Study Interviews February 2017 Purpose The purpose of this document is to provide a permanent record for the researchers of what was said by people interviewed for ‘The Operator’s Story’ in Guangzhou, China. These notes are based upon 3 meetings on the 11th March 2016. This document will ultimately form an appendix to the final report for ‘The Operator’s Story’ piece. Although the findings have been arranged and structured by Imperial College London, they remain a collation of thoughts and statements from interviewees, and continue to be the opinions of those interviewed, rather than of Imperial College London. Prefacing the notes is a summary of Imperial College’s key findings based on comments made, which will be drawn out further in the final report for ‘The Operator’s Story’. Method This content is a collation in note form of views expressed in the interviews that were conducted for this study. This mini case study does not attempt to provide a comprehensive picture of Guangzhou Metropolitan Corporation (GMC), but rather focuses on specific topics of interest to The Operators’ Story project. The research team thank GMC and its staff for their kind participation in this project. Comments are not attributed to specific individuals, as agreed with the interviewees and GMC. List of interviewees Meetings include the following GMC members: Mr.
    [Show full text]
  • Toward a Sustainable Transportation Network in the Northeast Corridor
    Toward A Sustainable Transportation Network in the Northeast Corridor Paul Haven, EESI Transportation & Energy Policy Fellow Maryland Planning Association 4/28/2016 Overview • Transportation network • Sustainable transportation • Rail • High-speed passenger rail • Northeast Corridor • NEC FUTURE • Q & A • Bipartisan Congressional caucus founded an independent non-profit in ‘84 ($0) • Non-partisan information for policymakers • Focused on win-win solutions to climate change in the energy, buildings, sustainable biomass, and transportation sectors • Climate change: one of the most serious problems facing civilization today ― impacts infrastructure, water, food, health, ecosystems, … • EESI Approach: • Non-partisan • Holistic & Interconnected • Solutions Oriented, Problem-Solving • Coalition & Consensus Building, Education • Benefits: • Environment, Health, Economy, Development, Justice • Policy is Crucial Transportation Network • Maps: Freight rail, intercity passenger rail, interstate highway system, inland waterways • Airports: 540 Commercial Service & 2,764 General Aviation • Inland Waterways: 12,000 miles of commercially navigable, 240 locks in 38 states; moved 604 million tons of cargo worth $232B, 14% of intercity freight, 60% of grain exports • Walking, bicycling, airplane, bus, rail transit, commuter rail • American Society of Civil Engineers 2013 Report Card – U.S. infrastructure D+ (B=state of good repair) • Intermodal connections? • “The return on investment in transportation … is not just measured in how many people physically
    [Show full text]
  • CRAC Brochure
    Shanghai | Oct 13-14, 2014 European Chemicals Agency | EPA US | MOE China | MOE Korea | EPA Taiwan | METI Japan | SAWs-NRCC | Local CIQ China | ICAMA | CtGB, the Nethalands Organizer: REACH24H Consulting Group (a member company of CTI Group) / Supported by ChemLinked Co-organizer: Zhejiang Institute of Standardization (ZIS) Zhejiang WTO/TBT Research & Response Center Technical support: Chinese Industry Association for Antimicrobial Materials & Products (CIAA) With the unprecedented success of last year’s CRAC 2013, REACH24H have set the bar even higher for 2014. We are committed to providing an even better platform for exchange and dissemination of the most important cross boarder regulatory and practical compliance information for enterprises operating in China and Europe, the US and the wider Asian Pacific region. This year's CRAC is to be held at InterContinental Shanghai Puxi on Oct 13-14 (Mon & Tue)2014. Since last year’s conference the industry and regulatory environment has moved forward, legislations have been amended and new regulations implemented in our collective global efforts to ensure a safer and more efficient management of Chemicals throughout the entire supply chain. What hasn’t changed is REACH24H’s commitment to host a meaningful event with an industry focus. CRAC is an event where practical issues facing industry are discussed and presented to policymakers, NGO’s and leading industrial players alike. CRAC is an event where genuine constructive dialogue converts into take-home information which help attendees come to terms with the most important developments in the Sino-global regulatory environment. YOUR GATEWAY TO CHINESE AND GLOBAL REGULATORY AFFAIRS Professional Gathering in China to address concerns raised by regional and international stakeholders in regard to changes in chemical management frameworks and implementation of regulations.
    [Show full text]
  • Enchanting Hospitality
    enchanting hospitality The Langham, Shanghai, Xintiandi is located at the gateway to the vibrant Xintiandi entertainment area surrounded by fashionable dining, luxury retail shopping and also adjacent to key businesses situated along Huai Hai Road. The Hotel offers enchanting hospitality in an ambience of modern luxury and elegance along with up-to-date technology suitable for both business and leisure travellers. refreshing accommodation Since 1865, exceptional service, luxury and innovative design have been the hallmarks of the Langham legacy. Those traditions continue today at The Langham, Shanghai, Xintiandi. The luxurious rooms feature the following amenities: Signature Blissful Bed Floor to ceiling windows Wired and wireless broadband Nespresso coffee machine and mini bar Internet access 2 washbasins with adjustable mirrors 40” LCD television Electric toilet Smart phone docking station Separate rain shower Iron and ironing board Heated bathroom floor Room Type No.of Rooms Size(sqm) Size(sqft) Superior Room 126 40 430 Deluxe Room 117 40~43 430~460 Deluxe Studio 9 48 515 Executive Room* 54 40 430 Executive Studio* 10 48 515 Junior Suite* 19 55 590 One Bedroom Suite* 18 55 590 Executive Suite* 2 90 970 Presidential Suite*(duplex) 1 180 1,940 Chairman Suite*(duplex) 1 345 3,715 Total 357 - - the langham club Located on Level 27, The Langham Club offers an intimate Club Lounge experience for guests looking to relax or catch up on the day’s business. Guests staying in Club guestrooms and suites can enjoy complimentary access to The
    [Show full text]
  • Major Development Properties
    1 SHANGHAI INDUSTRIAL HOLDINGS LIMITED Set out below is a summary of the major property development projects of the Group as at 31 December 2016: Major Development Properties Pre-sold Interest Approximate Planned during Total attributable site area total GFA the year GFA sold Expected Projects of SI Type of to SI (square (square (square (square date of City Development property Development meters) meters) meters) meters) completion 1 Kaifu District, Fengsheng Residential and 90% 5,468 70,566 7,542 – Completed Changsha Building commercial 2 Chenghua District, Hi-Shanghai Commercial and 100% 61,506 254,885 75,441 151,644 Completed Chengdu residential 3 Beibei District, Hi-Shanghai Residential and 100% 30,845 74,935 20,092 – 2019 Chongqing commercial 4 Yuhang District, Hi-Shanghai Residential and 85% 74,864 230,484 81,104 – 2019 Hangzhou (Phase I) commercial 5 Yuhang District, Hi-Shanghai Residential and 85% 59,640 198,203 – – 2019 Hangzhou (Phase II) commercial 6 Wuxing District, Shanghai Bay Residential 100% 85,555 96,085 42,236 76,966 Completed Huzhou 7 Wuxing District, SIIC Garden Hotel Hotel and 100% 116,458 47,177 – – Completed Huzhou commercial 8 Wuxing District, Hurun Commercial Commercial 100% 13,661 27,322 – – Under Huzhou Plaza planning 9 Shilaoren National International Beer Composite 100% 227,675 783,500 58,387 262,459 2014 to 2018, Tourist Resort, City in phases Qingdao 10 Fengze District, Sea Palace Residential and 49% 381,795 1,670,032 71,225 – 2017 to 2021, Quanzhou commercial in phases 11 Changning District, United 88 Residential
    [Show full text]
  • Set out Below Is a Summary of the Major Property Development Projects of the Group As at 31 December 2019: Major Development
    1 Set out below is a summary of the major property development projects of the Group as at 31 December 2019: Major Development Properties Pre-sold Interest Approximate Planned during Total attributable site area total GFA the year GFA sold Expected Projects of Type of to SI (square (square (square (square date of City SI Development property Development meters) meters) meters) meters) completion 1 Kaifu District, Fengsheng Building Residential and 90% 5,468 70,566 6,627 30,870 Completed Changsha commercial 2 Chenghua District, Hi-Shanghai Residential and 100% 61,506 254,885 4,996 190,153 Completed Chengdu commercial 3 Beibei District, Hi-Shanghai Residential and 100% 30,845 74,935 3,301 57,626 Completed Chongqing commercial 4 Yuhang District, Hi-Shanghai (Phase I) Residential and 85% 74,864 230,484 27,758 150,289 Completed Hangzhou commercial 5 Yuhang District, Hi-Shanghai (Phase II) Residential and 85% 59,640 198,203 56,539 – Completed Hangzhou commercial 6 Wuxing District, SIIC Garden Hotel Hotel and 100% 116,458 47,177 – – Completed Huzhou commercial 7 Wuxing District, Hurun Commercial Commercial 100% 13,661 27,322 – – Under Huzhou Plaza planning 8 Wuxing District, SIIC Tianlan Bay Residential and 100% 115,647 193,292 26,042 – Completed Huzhou commercial 9 Wuxing District, SIIC Yungjing Bay Residential 100% 68,471 207,906 28,953 – 2020 Huzhou 10 Shilaoren National International Beer City Composite 100% 227,675 806,339 – 333,798 2014 to 2022, Tourist Resort, Qingdao in phases 11 Fengze District, Sea Palace Residential and 100% 170,133
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • World Bank Document
    RP707 Puxi Section Project of Southern Transportation Trunk V3 Perfecting Project of Bailonggang Area, Shanghai ——Funded by World Bank Public Disclosure Authorized Southern Transportation Trunk Perfecting Project for Sewage Treatment in Bailonggang Area, Shanghai Puxi Section Project Resettlement Action Plan Public Disclosure Authorized Public Disclosure Authorized Shanghai Urban Drainage Corporation August2008 Public Disclosure Authorized 1 Endorsement Letter for the Resettlement Plan Shanghai Municipal Government has applied for a loan from WB to finance Shanghai Southern Transportation Trunk Perfecting Project for Sewage Treatment Bailonggang Area. Therefore, the Project must be implemented in compliance with ADB safeguard requirements. This Resettlement Plan is prepared in accordance with the laws of the PRC, Shanghai Municipality, as well as WB’s Policy on Involuntary Resettlement and it constitutes the basis for land acquisition, house demolition and resettlement of the project. Shanghai Municipal Government hereby confirms the content of this Resettlement Plan and will guarantee the land acquisition, compensation and relocation budget being provided according to the provisions of this Resettlement Plan. This Resettlement Plan is based on the feasibility study report and the initial surveys. If the final implemented components are different from the contents described in the feasibility study report and that will cause the substantial impact on the Resettlement Plan, this Resettlement Plan should be future modified and approved by WB before its implementation. Shanghai Municipal People’s Government __________ (Signature) _____________ (Date) 2 Preface I. The objective of Resettlement Action Plan 1 This Resettlement Action Plan is formulated on the basis of the laws, regulations and policies of the People’s Republic of China, and Local Government as well as the Guidelines of the World Bank (Operational Directive for Involuntary Resettlement OP 4.12).
    [Show full text]
  • From Shanghai Pudong International Airport (PVG) to AOWEI Tech
    UNECE/WP.29/GRSP/EVS GTR/ 13th Informal meeting Shanghai China Shanghai, November 28 – December 2, 2016 __________________________________________________ MIIT __________________________________________________________________________________________________________________________________ EVS 13th INFORMAL MEETING SHANGHAI 1 Contents Schedule …… 3 Registration, Visa information …… 5 Task Force Meeting/Informal Meeting Map …… 6 Wide View Map of the area …… 7 Access from the Airports …… 8 Accommodations …… 9 Other information …… 10 __________________________________________________________________________________________________________________________________ EVS 13th INFORMAL MEETING SHANGHAI 2 Schedule Date Meeting Venue Optional working meetings for 2016/11/28 Mon. AOWEI Tech. contracting parties and IWG members 2016/11/29 Tue. Co-sponsors & IWG Meeting AOWEI Tech. 2016/11/30 Wed. IWG & Contracting party meeting AOWEI Tech. 2016/12/1 Thu. Contracting party & draft meeting AOWEI Tech. 2016/12/2 Fri. Draft meeting (if necessary) AOWEI Tech. IWG IWG IWG/Draft Mon,28-Nov Fri,2-Dec Tue,29-Nov Wed,30-Nov Thu,1-Dec Optional Co-sponsors TF4 9:00 working MTG Contracting meetings for party MTG Draft meeting 10:00 General contracting TF5 (if necessary) parties and IWG 11:00 TF2 General members 12:00 Lunch @ Lunch @ Lunch @ Lunch @ Lunch @ AOWEI AOWEI AOWEI AOWEI AOWEI 13:00 Optional TF2 14:00 working TF8 meetings for TF1 Draft meeting 15:00 contracting parties and IWG Contracting 16:00 members TF4 party MTG 18:30 Reception 20:00 The above schedule is subject to change. Time for adjustment (30 min.) is scheduled once in the morning and in the afternoon. In IWG, TF1 (1.5 hr), TF2(1.5 hr), TF4 (1.5 hr), TF5 (2.0 hr), TF8 (1.5 hr) are scheduled.
    [Show full text]
  • GR8-1202 Multitasking Battery and Electrical Diagnostic Station
    April 2013 167-000497EN-A GR8-1202 Multitasking Battery And Electrical Diagnostic Station INSTRUCTION MANUAL This page intentionally left blank. GR8-1202 Contents Contents Safety Guidelines 5 Chapter 2: Battery Test 17 General Safety Precautions 5 Test Requirements 17 Personal Precautions 5 Additional Test Requirements 18 Preparing To Charge The Battery 6 System Noise Detected 18 Grounding & Power Cord Connections 6 Unstable Battery Detected 18 Charger Location 7 Deep Scan Test 18 DC Connection Precautions 7 Battery Test Results 18 Installing The Battery 7 State of Health 19 Connecting To The Battery 8 State-of-Charge 19 Chapter 1: Introduction & Overview 9 Chapter 3: Diagnostic Charging 20 Safety Reminder 9 Charging Modes 21 Safety Precautions 9 Initial Analysis 21 Assembling the GR8 9 Deep Scan Test 21 Attaching the Control Module 9 Diagnostic Mode 21 Installing the Multitasker Module 10 Aborting a Charge Session 21 Front of GR8 11 Completing a Charge Session 22 Back of GR8 11 Diagnostic Charge Results 22 Control Module Keypad 12 Top-Off Mode 22 Data Entry Methods 13 Menu Icons 13 Chapter 4: System Test 23 Option Buttons 13 Starter Test 23 Scrolling Lists 13 Starter System Test Results 23 Alphanumeric Entry 13 Charging System Test 24 Value Boxes 13 Key-Off Draw 24 Main Menu 13 Charging System Test Results 25 Info Menu 14 Chapter 5: ECM Power Supply 26 DMM Menu 14 Setup Menu 14 Chapter 6: Jump Start 27 Setting User Preferences 15 Help Menu 15 Chapter 7: Manual Charging 28 Multitasking 15 Wireless Multitasking 15 Chapter 8: Info Menu 30 Procedure Example 15 View Test Battery 30 Inspecting the Battery 15 View Test Charger 30 Testing Out-of-Vehicle (Battery Test) 15 View Cable Test 30 Testing In-Vehicle (System Test) 16 View Inventory Test 30 Connecting to the Battery 16 Totals 30 Initial Power-up 16 Transfer 31 Selecting A Language 16 View Wireless 31 Version 31 www.midtronics.com 3 Midtronics Inc.
    [Show full text]
  • Transportation the Conference Will Be Held in North Zhongshan Road
    Transportation The conference will be held in North Zhongshan Road campus of East China Normal University (ECNU). The address is: No. 3663, North Zhongshan Road, Putuo, Shanghai. The hotel where all participants will stay is Yifu Building (逸夫楼) located on the campus. Arrival by flights: There are two airports in Shanghai: the Pudong Airport in east Shanghai and the Hongqiao Airport in west Shanghai. Both are convenient to get to the North Zhongshan Road campus of ECNU. At the airport, you can take taxi or metro to North Zhongshan Road Campus of ECNU. Taxi is recommended in terms of its convenience and time saving. Our students will be there for helping you to find the taxi. By taxi From Pudong Airport: about one hour and 200 CNY when traffic is not busy. From Hongqiao Airport: about 30 minutes and 60 CNY when traffic is not busy. Please print the following tips if you like “请带我去华东师范大学中山北路校区正门” in advance and show it to the taxi driver. The Chinese words in tips mean "Please take me to the main gate of North Zhongshan Road Campus of ECNU". By metro From Pudong Airport: 1. Metro Line 2 (6:00 - 22:00)->Zhongshan Park (中山公园) station (Note: exchange at Guanglan Road station(广兰路)), then take taxi for about 10 minutes and 14 CNY cost to North Zhongshan Road Campus of ECNU, or take the bus 67 for 2 stops and get off at ECNU station(华东师大站)instead. 2. Metro Line 2->Jiangsu Road (江苏路) station-> Metro Line 11->Longde Road (隆德路) station->Metro Line 13-> Jinshajiang Road (金沙江路) Station->10 minutes walk.
    [Show full text]