Gansu Clean Energy Development Project

Total Page:16

File Type:pdf, Size:1020Kb

Gansu Clean Energy Development Project Performance People’s Republic of China: Evaluation Report Gansu Clean Energy Development Project Independent Evaluation Performance Evaluation Report December 2013 People's Republic of China: Gansu Clean Energy Development Project Reference Number: PPE:PRC 2013-15 Project Number: 34476 Loan No.: 2032 Independent Evaluation: PE-765 NOTES (i) In this report, “$” refers to US dollars. (ii) For an explanation of rating descriptions used in Asian Development Bank evaluation reports, see Asian Development Bank. 2006. Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations. Manila. Director General V. Thomas, Independent Evaluation Department (IED) Officer-in-Charge H. Hettige, Independent Evaluation Division 2, IED Team leader K. Hewitt, Evaluation Specialist, IED Team members M.O. Nuestro, Evaluation Officer, IED E. Li-Mancenido, Associate Evaluation Analyst, IED In preparing any evaluation report, or by making any designation of or reference to a particular territory or geographic area in this document, the Independent Evaluation Department (IED) does not intend to make any judgment as to the legal or other status of any territory or area. The guidelines formally adopted by IED on avoiding conflict of interest in its independent evaluations were observed in the preparation of this report. To the knowledge of the management of IED, there were no conflicts of interest of the persons preparing, reviewing, or approving this report. Abbreviations ADB – Asian Development Bank CER – certified emission reduction ICB – international competitive bidding IED – Independent Evaluation Department km – kilometer kV – kilovolt kWh – kilowatt-hour MW – megawatt PCR – project completion report PPER – project performance evaluation report PRC – People's Republic of China XHC – Xiaogushan Hydropower Company XHP – Xiaogushan hydropower plant Currency Equivalents Currency Unit – yuan (CNY) At Appraisal At Project Completion At Independent Evaluation (10 November 2003) (15 May 2009) (31 October 2013) CNY1.00 = $0.12 $0.15 $0.16 $1.00 = CNY8.3 CNY6.8 CNY6.2 Contents Acknowledgments vii Basic Data ix Executive Summary xi Map xv Chapter 1: Introduction 1 A. Evaluation Purpose and Process 1 B. Expected Results 2 Chapter 2: Design and Implementation 3 A. Formulation 3 B. Rationale 3 C. Cost and Financing 4 D. Implementing Arrangements, Procurement, Construction, and Scheduling 5 E. Design Changes 6 F. Outputs 6 G. Consultants 6 H. Loan Covenants 7 I. Policy and Sector Context 7 Chapter 3: Performance Assessment 8 A. Overall Assessment 8 B. Relevance 8 C. Effectiveness 9 D. Efficiency 10 E. Sustainability 10 Chapter 4: Other Assessments 12 A. Impact 12 B. ADB Performance 13 C. Borrower Performance 14 Chapter 5: Lessons 15 Appendixes 1. Appraisal and Actual Project Cost 18 2. Planned and Actual Implementation Schedule 19 3. Xiagushan Hydropower Plan Annual Generation Data, 2006–2010 20 4. Summary of Air Quality in Zhangye City, 2011 21 5. Economic Reevaluation 22 6. Financial Reevaluation 26 7. Environmental Impact Evaluation 30 8. Resettlement and Social Impact Evaluation 32 9. Status of Compliance with Loan Covenants 33 Acknowledgments This project performance evaluation report for the Gansu Clean Energy Development Project in the People's Republic of China was prepared by a team of staff and consultant from the Independent Evaluation Department. The team consists of Kelly Hewitt (team leader), Ma. Olivia Nuestro, and Elizabeth Li-Mancenido. Eugene McCarthy was the consultant, with overall guidance from Hemamala Hettige, Senior Advisor and Officer-in-Charge, Division 2; and Vinod Thomas, Director General, Independent Evaluation Department. Valuable inputs and comments at various stages were received from Kapil Thukral (peer reviewer). Basic Data Loan 2032-PRC: Gansu Clean Energy Development Project Project Preparatory and Institution Building Person- Amount Approval TA No. Technical Assistance Name Type Months ($) Date 3730 Gansu Hydropower PP 45 950,000 27 Sep 2001 Key Project Data ($ million) Appraisal Estimate Actual Total project cost 87.0 93.4 Foreign exchange cost 35.0 34.0 Local currency cost 52.0 59.3 ADB loan amount/utilization 35.0 35.0 Key Dates Fact-finding 15–24 January 2003 Loan negotiations 27–30 October 2003 Board approval 5 December 2003 Loan signing 27 April 2004 Loan effectiveness 4 August 2004 First disbursement 4 August 2004 Loan closing 2 September 2008 Borrower People’s Republic of China Executing Agency Gansu Provincial Government Implementing Agency Xiaogushan Hydropower Company Mission Data Type of Mission No. of Missions No. of Person-Days Fact-finding 1 48 Appraisal Waived Inception mission 1 12 Loan review 5 157 Project completion 1 31 Independent evaluation 1 9 ADB = Asian Development Bank, PP = project preparatory, PRC = People's Republic of China, TA = technical assistance. Source: Asian Development Bank database. Executive Summary During the 2001 country programming mission, the People's Republic of China (PRC) requested Asian Development Bank (ADB) assistance for a clean energy development project in Gansu province. This request reflected the evolving priorities of the government’s own strategy in the energy sector, which emphasized improved efficiency, development of renewable energy sources such as hydropower to reduce a heavy dependence on coal-fired power plants, and the need to address severe air pollution in the country’s urban centers. The investment chosen for ADB support was a 98-megawatt (MW), later upgraded to 102 MW, run-of-the-river hydropower development that formed part of a larger, cascade, hydropower development scheme (700 MW) along the Heihe River in the northwest PRC. The main project objective was to contribute to environmental improvement in Zhangye City in Gansu province by improving access to clean energy. The environmental classification of the hydropower development was category A. The expected benefits were the supply of a clean, low-cost, source of electricity that would reduce load shedding; improve air quality; and provide a secure electricity supply to small, local townships in the project area. A special feature of the project was its potential to receive significant financial benefits from the Clean Development Mechanism administered under the United Nations Framework Convention on Climate Change. Project preparatory technical assistance of $0.95 million helped prepare the inputs needed to appraise the project for ADB financing. ADB provided a loan of $35.00 million toward an estimated project cost of $87.00 million. The government asked ADB to approve advance action to expedite the recruitment of consultants and procurement for civil works and critical equipment. ADB Management approved this request in May 2003, and on 11 September 2003 approved the government’s request for up to $3.50 million in retroactive financing for equipment and civil works for the period from 1 October 2003 until the time the loan would take effect. The ADB loan was approved in December 2003. By then, implementation was under way; it was later completed more than 6 months ahead of schedule, which enabled the plant to start generating electricity in June 2006. Overall, implementation arrangements were very successful. The project is rated highly successful. It was completed ahead of schedule, within budget, and the main goals were met. A low-cost, clean source of energy has been developed, which has helped improve the dependability of electricity supply in Gansu province. It has also made an important contribution to improving air quality in nearby urban centers by developing a new, clean energy source, which enabled the closure of two heavily polluting, coal-fired generating units. Finally, it provided significant socioeconomic benefits to the small townships affected by the hydro development. Based on the operational performance and related benefits during the first 6 years of operation, the sustainability of the project is rated most likely. In terms of the specific evaluation criteria, the ratings are as follows: xii People's Republic of China: Gansu Clean Energy Development Project (i) Relevance: highly relevant, based on a close alignment of the project objectives and design with the government’s own development objectives in Gansu province as well as with ADB’s country strategy in the PRC, which gave priority to regional development in poorer provinces, development of clean energy sources, and improved sector efficiency. The project design was sound and took into account lessons learned in past projects. A comprehensive feasibility study was also prepared during the study process, and project implementation issues were given special emphasis. Technical aspects were carefully reviewed and project alternatives were examined prudently. Project design has carefully considered environmental and social aspects, including resettlement, and has ensured that the project is consistent with ADB’s energy, safeguards, and environment policies. (ii) Effectiveness: highly effective, based on (a) much improved electricity supply to nearby consumption centers, reflected in the absence of blackouts or load shedding; (b) a sharp reduction in air pollution in urban areas, reflected in the 2011 indices of key pollutants, which are now within grade II air quality standards; and (c) the provision of a reliable electricity supply to small, poor communities in the vicinity of the plant, enabling improvements in their health and education facilities. (iii) Efficiency: highly efficient, based on a higher
Recommended publications
  • Out of the Ord Ary Tours for Everyone
    Explore Asia 2017 - 2018 Out of the ordary Tours for everyone Great Outdoors · Local Customs · Charming Hospitality · Traditional Cooking · Stimulating Art · Intriguing Architecture 2 map asia & content Beijing 1 The Bayan Atu Eco Trail >> pages 4–5 Zhangye 6 CHINA 2 The Colours of Mekong Culture Mekong (Lancang) River >> pages 6–7 3 The Banyuwangi Explorer >> pages 8–9 MYANMAR 4 The Magic of Southern Laos Bagan philippine sea >> pages 10–11 LAOS 8 5 LuangPrabang Hanoi 5 Community-Based Tourism at Loei 2 Tamarind Lake Village Yangon 4 >> pages 12–13 THAILAND Pakse 7 vietnam Bangkok 6 The Brilliance of Danxia Siem Reap south Geographic Park china CAMBODIA sea >> pages 14–15 Ho Chi Minh City 7 Glamping in the Lost City of Mahendraparvata >> pages 16–17 MALAYSIA Kuala Lumpur MALAYSIA 8 The Secrets of Ha Giang Kuching 1 >> page 18–19 indian ocean INDONESIA INDONESIA Jakarta 3 Banyuwangi introduction 3 OUT OF THE OR DINA RY TOURS FOR EV ERYONE Our programmes take individuals and small groups in an exciting new travel direction and provide unique, out of the ordinary experiences. Our guests can achieve a truly authentic and sustainable travel experience in the great, wide outdoors. We cater for those with a passion for indigenous customs and culture; charming hospitality; flavoursome and traditional cooking; stimulating ethnic art; and intriguing architecture. come explore with us. 4 malaysia • 2017 - 2018 The Bayan Atu Eco Trail Highlights › Set foot into unchartered rainforest territory within easy distance of Kuching › Hike to amazing waterfalls through lush jungles directed by expert local guides › Kayak to hidden off-the-beaten track beauty spots Hidden deep in the Malaysian state day 1, Kuching – Bengoh Dam dip in one of these pools.
    [Show full text]
  • 2.20 Gansu Province
    2.20 Gansu Province Gansu Provincial Prison Enterprise Group, affiliated with Gansu Provincial Prison Administration Bureau,1 has 18 prison enterprises Legal representative of the prison company: Liu Yan, general manager of Gansu Prison Enterprise Group2 His official positions in the prison system: Deputy director of Gansu Provincial Prison Administration Bureau No. Company Name of the Legal Person Legal Registered Business Scope Company Notes on the Prison Name Prison, to which and representative/ Title Capital Address the Company Shareholder(s) Belongs 1 Gansu Gansu Provincial Gansu Liu Yan 803 million Wholesale and retail of machinery 222 Jingning The Gansu Provincial Prison Provincial Prison Provincial Deputy director of yuan and equipment (excluding sedans), Road, Administration Bureau is Gansu Province’s Prison Administration Prison Gansu Provincial building materials, chemical Chengguan functional department that manages the Enterprise Bureau Administration Prison products, agricultural and sideline District, prisons in the entire province. It is in charge Group Bureau Administration products (excluding grain Lanzhou City of the works of these prisons. It is at the Bureau; general wholesale); wholesale and retail of deputy department level, and is managed by manager of Gansu daily necessities the Justice Department of Gansu Province.4 Prison Enterprise Group3 2 Gansu Dingxi Prison of Gansu Qiao Zhanying 16 million Manufacturing and sale of high-rise 1 Jiaoyu Dingxi Prison of Gansu Province6 was Dingqi Gansu Province Provincial Member of the yuan and long-span buildings, bridges, Avenue, established in May 1952. Its original name Steel Prison Communist Party marine engineering steel structures, An’ding was the Gansu Provincial Fourth Labor Structure Enterprise Committee and large boiler steel frames, District, Dingxi Reform Detachment.
    [Show full text]
  • Annex I Supplementary Information of 2018 UNCCD Reporting, China
    Annex I Supplementary Information of 2018 UNCCD Reporting, China SO4 Voluntary targets .............................................................................................................................. 2 SO 5-1 – Table1 ........................................................................................................................................ 3 SO 5-2 - Table 1 ........................................................................................................................................ 5 SO 5-3 - Table 1 ...................................................................................................................................... 12 SO 5-4 - Table 1 ...................................................................................................................................... 16 Implementation Framework - Table 1 .................................................................................................... 19 SO4 Voluntary targets Objectives Year Level applied Forest coverage rate By 2020 National Forest stock volume By 2020 National Area of new desertified land to be controlled By 2020 National SO 5-1 – Table1 Unit:RMB 10,000 Name or content of assistance program 2012 2013 2014 2015 2016 Source of information Assisting Republic of Mongolia in building three 5 5 5 5 5 CMA sandstorm observatories Sino-Arab League cooperative research on 289 CAS desertification control technology China-Kazakhstan cooperative research on ecological barrier construction technology of 120 CAS emerging cities
    [Show full text]
  • View / Download 7.3 Mb
    Between Shanghai and Mecca: Diaspora and Diplomacy of Chinese Muslims in the Twentieth Century by Janice Hyeju Jeong Department of History Duke University Date:_______________________ Approved: ___________________________ Engseng Ho, Advisor ___________________________ Prasenjit Duara, Advisor ___________________________ Nicole Barnes ___________________________ Adam Mestyan ___________________________ Cemil Aydin Dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in the Department of History in the Graduate School of Duke University 2019 ABSTRACT Between Shanghai and Mecca: Diaspora and Diplomacy of Chinese Muslims in the Twentieth Century by Janice Hyeju Jeong Department of History Duke University Date:_______________________ Approved: ___________________________ Engseng Ho, Advisor ___________________________ Prasenjit Duara, Advisor ___________________________ Nicole Barnes ___________________________ Adam Mestyan ___________________________ Cemil Aydin An abstract of a dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy, in the Department of History in the Graduate School of Duke University 2019 Copyright by Janice Hyeju Jeong 2019 Abstract While China’s recent Belt and the Road Initiative and its expansion across Eurasia is garnering public and scholarly attention, this dissertation recasts the space of Eurasia as one connected through historic Islamic networks between Mecca and China. Specifically, I show that eruptions of
    [Show full text]
  • Mammalia: Bovidae) from the Late Miocene Qingyang Area, Gansu, China
    Palaeontologia Electronica palaeo-electronica.org “Gazella” (Mammalia: Bovidae) from the late Miocene Qingyang area, Gansu, China Yikun Li, Qinqin Shi, Shaokun Chen, and Tao Deng ABSTRACT The rich collection from the late Miocene sediments from the Qingyang area, Gansu, China was discovered by E. Licent in the 1920s, and previous studies focused on the equids and hyaenids whereas little attention was given to the accompanying bovid material. The collection of Bovidae dug up from the Qingyang area and pre- served at Musée Hoangho Paiho, Tianjin, China, is dominated by “Gazella”. We describe and identify two species: “Gazella” paotehensis and “G.” dorcadoides. The nomenclatural issues surrounding those two species of gazelles are reviewed in this paper, and although the questionable mandible illustrated by Teilhard de Chardin and Young in 1931 may be excluded from “G.” paotehensis metrically and morphologically, the species is still considered valid. The subcomplete cranium M 3956, kept at Uppsala Universitet Evolutionsmuseet and studied by B. Bohlin, is selected here as the neotype of “G.” paotehensis, and emended diagnoses are given. Based on previous studies and insights from new material from the Qingyang area, we provide a table summarizing diagnostic morphological characters of “G.” paotehensis and “G.” dorcadoides. Yikun Li. Key Laboratory of Vertebrate Evolution and Human Origins of Chinese Academy of Sciences, Institute of Vertebrate Paleontology and Paleoanthropology, Chinese Academy of Sciences, Beijing 100044, China; University of Chinese Academy of Sciences, Beijing 100049, China; Museum für Naturkunde, Leibniz Institute for Evolution and Biodiversity Science, Berlin 10115, Germany. [email protected] Qinqin Shi. Key Laboratory of Vertebrate Evolution and Human Origins of Chinese Academy of Sciences, Institute of Vertebrate Paleontology and Paleoanthropology, Chinese Academy of Sciences, Beijing 100044, China.
    [Show full text]
  • World Bank Document
    Gansu Revitalization and Innovation Project: Procurement Plan Annex: Procurement Plan Procurement Plan of Gansu Revitalization and Innovation Project April 24, 2019 Public Disclosure Authorized Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: Gansu Revitalization and Innovation Project Loan/Credit No: Project ID: P158215 Project Implementation Agency (PIA): Gansu Financial Holding Group Co. Ltd (line of credit PPMO) will be responsible for microcredit management under Component 1. Gansu Provincial Culture and Tourism Department (culture and tourism PPMO) will be responsible for Component 2 and 3. The culture and Public Disclosure Authorized tourism PPMO will be centrally responsible for overseeing, coordinating, and training its cascaded PIUs at lower levels for subproject management. Both PPMOs will be responsible for liaison with the provincial PLG, municipal PLGs, and the World Bank on all aspects of project management, fiduciary, safeguards, and all other areas. The project will be implemented by eight project implementation units (PIUs) in the respective cities/districts/counties under the four prefecture municipalities. They are: Qin’an County Culture and Tourism Bureau, Maiji District Culture and Tourism Bureau, Wushan County Culture and Tourism Bureau, Lintao County Culture and Tourism Bureau, Tongwei County Culture and Tourism Bureau, Ganzhou District Culture and Tourism Bureau, Jiuquan City Culture and Tourism Bureau and Dunhuang City Culture and Tourism Bureau. Name of Components PIUs Gansu Financial Holding Group Co. Ltd (line of credit Public Disclosure Authorized PPMO). GFHG is designated as the wholesaler FI to handle Component 1. Under the direct oversight and Component 1: Increased Access to Financial management of the line of credit PPMO (GFHG), Bank Services for MSEs of Gansu is designated as the 1st participating financial institution (PFI) to handle micro- and small credit transactions.
    [Show full text]
  • Appendix Vii Statutory and General Information
    APPENDIX VII STATUTORY AND GENERAL INFORMATION 1. Further Information about the Bank A. Incorporation In light of the lack of provincial city commercial banks in Gansu province and to promote the economic development of Gansu province, the People’s government of Gansu decided to establish a provincial city commercial bank by building on the foundations of Baiyin City Commercial Bank and Pingliang City Commercial Bank. Therefore, on May 30, 2011, 25 legal entities (including large and medium-sized SOEs in Gansu province and private enterprises within and outside Gansu province) and representatives of all the shareholders of Baiyin City Commercial Bank and Pingliang City Commercial Bank jointly entered into a promoters agreement in respect of Dunhuang Bank Co., Ltd. ( ). Pursuant to the agreement, the 25 legal entities contributed cash and all the shareholders of Baiyin City Commercial Bank and Pingliang City Commercial Bank contributed the appraised net assets of Baiyin City Commercial Bank and Pingliang City Commercial Bank, respectively, to incorporate Dunhuang Bank Co., Ltd.. On August 24, 2011, the General Office of the People’s Government of Gansu Province approved the change to the name of the bank to be incorporated from the former “Dunhuang Bank Co., Ltd.” to “Bank of Gansu Co., Ltd.”. On September 27, 2011, the CBRC approved the establishment of the Bank. On November 18, 2011, the CBRC Gansu Office approved the commencement of business of the Bank and the conversion of Baiyin City Commercial Bank, Pingliang City Commercial Bank and their branches and sub-branches into Baiyin Branch, Pingliang Branch and sub-branches of the Bank.
    [Show full text]
  • Issues and Potential Solutions to the Clean Heating Project in Rural Gansu
    sustainability Article Issues and Potential Solutions to the Clean Heating Project in Rural Gansu Dehu Qv 1,* , Xiangjie Duan 1, Jijin Wang 2, Caiqin Hou 1, Gang Wang 1, Fengxi Zhou 1,* and Shaoyong Li 1,* 1 Department of Building Environment and Energy Application Engineering, School of Civil Engineering, Lanzhou University of Technology, Lanzhou 730050, China; [email protected] (X.D.); [email protected] (C.H.); [email protected] (G.W.) 2 School of Architecture, Harbin Institute of Technology, Key Laboratory of Cold Region Urban and Rural Human Settlement Environment Science and Technology, Ministry of Industry and Information Technology, Harbin 150090, China; [email protected] * Correspondence: [email protected] (D.Q.); [email protected] (F.Z.); [email protected] (S.L.); Tel.: +86-931-2973715 (D.Q.) Abstract: Rural clean heating project (RCHP) in China aims to increase flexibility in the rural energy system, enhance the integration of renewable energy and distributed generation, and reduce environmental impact. While RCHP-enabling routes have been studied from a technical perspective, the economic, ecological, regulatory, and policy dimensions of RCHP are yet to be analysed in depth, especially in the underdeveloped areas in China. This paper discusses RCHP in rural Gansu using a multi-dimensional approach. We first focus on the current issues and challenges of RCHP in rural Gansu. Then the RCHP-enabling areas are briefly zoned into six typical regions based on the resource distribution in Gansu Province, and a matching framework of RCHP is recommended. Then we focus on the economics and sustainability of RCHP-enabling technologies. Based on the medium-term assessment of RCHP in the demonstration provinces, various technical schemes and routes are analysed and compared in order to determine which should be adopted in rural Gansu.
    [Show full text]
  • Gansu Cultural and Natural Heritage Protection
    PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB3065 CN-Gansu Cultural and Natural Heritage Protection and Project Name Development Public Disclosure Authorized Region EAST ASIA AND PACIFIC Sector Other social services (57%); General transportation sector (30%); General water, sanitation and flood protection sector (10%); Solid waste management (3%) Project ID P091949 Borrower(s) PEOPLE’S REPUBLIC OF CHINA Implementing Agency Gansu Provincial Government Gansu Provincial Development and Reform Commission 319 Houlou, No. 1 Building Zhongyang Guangchang, Chengguan District Gansu Public Disclosure Authorized China 730030 Tel: +86 931 846 4760 Fax: +86 931 848 4190 [email protected] Environment Category [X] A [ ] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared July 25, 2007 Date of Appraisal June 20, 2007 Authorization Date of Board Approval TBD 1. Country and Sector Background Public Disclosure Authorized 1. Gansu Province, with its capital of Lanzhou and a total population of 26 million, is located in northwestern China. The economy has traditionally been based on agricultural production, mining of the province’s abundant mineral reserves, and heavy industrial development. Poor infrastructure and Gansu’s distance from the coast, have largely kept it isolated from the rapid development experienced by other provinces in China over the last two decades. As a result, Gansu is the second poorest province in the country, measured by per- capita GDP. Moreover, the province contains some of the country’s poorest communities, as listed on the Government’s national poverty register. 2. A major element of Gansu’s poverty alleviation and economic restructuring strategy is the development of a sustainable tourism industry.
    [Show full text]
  • Gansu Airport Group Co., Ltd. Main Contractor Local Company Main Consultant -
    Ex-Post Monitoring of Completed ODA Loan Project The People’s Republic of China Lanzhou Zhongchuan Airport Expansion Project External Evaluators: Tomoko Matsushita and Masahiro Yoshizawa, INGEROSEC Corporation 1. Project Description Kazakhstan Mongolia Gansu Province Beijing City Project Site The People's Republic of China Nepal Bhutan India Myanmar Project Location Map Terminal building of Lanzhou Zhongchuan Airport 1.1 Project Objective The project’s objective was to newly construct a runway except for the existing runway and a passenger terminal building in the former runway area of Lanzhou Zhongchuan Airport situated 70km northwest of the urban district of Lanzhou, Gansu Province in order to cope with the predicted increase in the demand for air transport, thereby contributing to activating economic activities in the northwestern region. At the same time, the project aims to grade up the aforesaid airport serve as an emergency or alternative airport, thereby contributing to the improvement of aviation safety in the northwestern region. 1.2 Outline of the Loan Agreement Approved Amount / Disbursed Amount 6,338 million yen / 6,299 million yen Loan Agreement Signing Date / December, 1996 / June, 2002 Final Disbursement Date Ex-post Evaluation 2004 Executing Agency Gansu Airport Group Co., Ltd. Main Contractor Local company Main Consultant - 1.3 Background of Ex-post Monitoring Gansu Province, which located in Northeastern China near Xinjiang Uygur Autonomous 4-1 Region and Central Asia, plays an important role in terms of politics and economics. Since the surrounding areas including the Tarim Basin are abundant in oil reserves, transportation of materials in the province was expected to increase when the development of oil fields started on a large scale.
    [Show full text]
  • 2. Ethnic Minority Policy
    Public Disclosure Authorized ETHNIC MINORITY DEVELOPMENT PLAN FOR THE WORLD BANK FUNDED Public Disclosure Authorized GANSU INTEGRATED RURAL ECONOMIC DEVELOPMENT DEMONSTRATION TOWN PROJECT Public Disclosure Authorized GANSU PROVINCIAL DEVELOPMENT AND REFORM COMMISSION Public Disclosure Authorized LANZHOU , G ANSU i NOV . 2011 ii CONTENTS 1. INTRODUCTION ................................................................ ................................ 1.1 B ACKGROUND AND OBJECTIVES OF PREPARATION .......................................................................1 1.2 K EY POINTS OF THIS EMDP ..........................................................................................................2 1.3 P REPARATION METHOD AND PROCESS ..........................................................................................3 2. ETHNIC MINORITY POLICY................................................................ .......................... 2.1 A PPLICABLE LAWS AND REGULATIONS ...........................................................................................5 2.1.1 State level .............................................................................................................................5 2.1.2 Gansu Province ...................................................................................................................5 2.1.3 Zhangye Municipality ..........................................................................................................6 2.1.4 Baiyin City .............................................................................................................................6
    [Show full text]
  • Gansu Heihe Hydropower Development Project
    Environmental Assessment Report Summary Environmental Impact Assessment Project Number: 39652 April 2006 People’s Republic of China: Gansu Heihe Hydropower Development Project Prepared by the Government of Gansu Province for the Asian Development Bank (ADB). The summary environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. CURRENCY EQUIVALENTS (as of 28 February 2006) Currency Unit – yuan (CNY) CNY1.00 = $0.124 $1.00 = CNY8.083 ABBREVIATIONS ADB – Asian Development Bank EIA – environmental impact assessment EMP – environmental management plan EMU – environment management unit EPB – environmental protection bureau GEPRI – Gansu Environmental Protection Research Institute GFB – Gansu Financial Bureau HHC – Heihe Hydropower Company HPP – hydropower plant PPTA – project preparatory technical assistance PRC – People’s Republic of China QNNR – Qilianshan National Natural Reserve SEIA – summary environmental impact assessment ZEMS – Zhangye Environmental Monitoring Station WEIGHTS AND MEASURES C – celsius ha – hectare kg – kilogram km – kilometer kV – kilovolt kWh – kilowatt-hour m – meter m3 – cubic meter m3/s – cubic meter per second mm – millimeter MW – megawatt S – second t – ton NOTE In this report, "$" refers to US dollars. CONTENTS Page MAPS I. INTRODUCTION 1 II. DESCRIPTION OF THE PROJECT 1 III. DESCRIPTION OF THE ENVIRONMENT 2 A. Physical Environment 2 B. Biological Environment 6 C. Sociocultural Environment 9 IV. ALTERNATIVES 10 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 11 A. Soil 11 B. Water 11 C. Air Quality 12 D. Noise 12 E. Solid Waste 12 F. Flora and Fauna 13 G.
    [Show full text]