Lirr Port Washington Branch
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Bulletin BROOKLYN PCC CARS’ 80 ANNIVERSARY
ERA BULLETIN — DECEMBER, 2016 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 59, No. 12 December, 2016 TH The Bulletin BROOKLYN PCC CARS’ 80 ANNIVERSARY Published by the Electric by Bernard Linder Railroaders’ Association, Incorporated, PO Box (Continued from November, 2016 issue) 3323, New York, New York 10163-3323. As soon as the cars were in service, news- dynamic brake came into service first and papers reported that the passengers liked was increased as the brake foot pedal was For general inquiries, or the quiet, fast, comfortable cars. St. Louis depressed. At 3-inch pedal movement, the Bulletin submissions, Car Company’s booklet explains how the track brake cut in. The air brake completed contact us at bulletin@ company accomplished this feat. the braking cycle and held the car after it erausa.org. ERA’s The designers proceeded to develop a radi- stopped. Your Editor-in-Chief’s supervisor website is cally new control and braking apparatus for recalled that the Brooklyn cars’ magnetic www.erausa.org. smooth and rapid starts and stops. To deter- brakes were disconnected after they wore Editorial Staff: mine the maximum comfortable acceleration, out the track rails at the trolley stops. The Editor-in-Chief: your Editor-in-Chief’s supervisor sat in a car PCC’s brakes gave rates of retardation that Bernard Linder loaded with sandbags. Tests were conducted were not previously achieved. Tri-State News and in the Ninth Avenue Depot at different rates The PCCs were much quieter than the old- Commuter Rail Editor: Ronald Yee of acceleration and deceleration. These ex- er cars. -
2000 LIRR Report Card Results of the Annual, Independent Rider Survey from the Long Island Rail Road Commuters' Council
The 2000 LIRR Report Card Results of the Annual, Independent Rider Survey from the Long Island Rail Road Commuters' Council Michael T. Doyle Associate Director Joshua Schank Transportation Planner October 2000 Long Island Rail Road Commuters' Council 347 Madison Avenue, New York, NY 10017 (212) 878-7087 • www.lirrcc.org © 2000 LIRRCC Acknowledgements The authors would like to thank the members of the LIRRCC for their invaluable efforts in performing survey research in the field, and the Long Island Rail Road for its cooperation during survey activities. The authors also gratefully acknowledge technical assistance provided by former PCAC Associate Director Alan Foster. The Long Island Rail Road Commuters' Council (LIRRCC) is the legislatively mandated representative of the ridership of MTA Long Island Rail Road. Our 12 volunteer members are regular users of the LIRR system and are appointed by the Governor upon the recommendation of the Nassau and Suffolk County Executives, and Brooklyn and Queens Borough Presidents. The Council is an affiliate of the Permanent Citizens Advisory Committee to the MTA (PCAC). For more information, please visit our website: www.lirrcc.org. Table of Contents Executive Summary 1 Methodology 3 Results for Performance Indicators 5 Systemwide Results 5 Results by Branch 10 Results for Customer Comments 17 Systemwide Results 17 Results by Branch 20 Representative Customer Comments 25 Service Delivery 25 Service Requirements 25 Scheduling 28 On-Time Performance 31 Operations 32 Maintenance of Service During Severe -
Line Structures
Meeting with New York Building Congress 5/24/2016 Line Structures Capital Program Investments Proposed 2015-2019 Capital Program Stations Other 10% 24% Track Power 30% 9% Shops and Yards Communications and 7% Signals Line Structures 14% 6% MTA Long Island Rail Road 2 Core Infrastructure Projects 2015 – 2019 Capital Program (Key Elements of the Program) LINE STRUCTURES Post Avenue Bridge Replacement, Buckram Road and Bridge Painting & Waterproofing projects STATIONS Babylon Station Platform Replacement, Murray Hill Station Elevators, Port Washington Station Improvements, Nostrand Avenue Station Rehabilitation TRACK Main Line Double Track Phase 2, Jamaica Capacity Improvements, Retaining Walls/Right of Way Projects COMMUNICATIONS Central Traffic Control System (Study, and Start of Migrations) Signal Babylon Interlocking Renewal SHOPS & YARDS Mid-Suffolk Yard, Morris Park Locomotive Shop POWER Replacement of Substations; Power Component Replacements MTA Long Island Rail Road 3 Line Structures Line Structures – Bridge Replacements (Design-Build) 2015-2019 Capital Program Post Ave. Bridge Replacement Buckram Road Bridge Replacement Design-Build Award 1st Quarter 2017 Design-Build Award 1st Quarter 2017 These Rail Road Bridges will need to be replaced over a weekend outage. Seeking the Best Method of Construction 5 Wreck Lead Bridge Mechanical Components Rehabilitation 2015-2019 Capital Program Design-Build Award 2nd Quarter 2017 Scope • The scope of this project is to provide for a mechanical overhaul of the movable bridge components of the LIRR single leaf rolling lift thru-truss bascule bridge over the Wreck Lead Channel in Island Park, Nassau. • Based upon Consultant’s inspection and testing results, bridge components will be replaced, cleaned, adjusted, re- lubricated, realigned or painted as needed to address any misalignments and to provide for the optimal balance condition during bridge operation. -
Comparative Screening Results Report
Metro-North Penn Station Access Major Investment Study/Draft Environmental Impact Statement COMPARATIVE SCREENING RESULTS REPORT Prepared for Metro-North Railroad Prepared by Parsons Brinckerhoff Quade & Douglas, Inc. September 2002 Comparative Screening Results Report TABLE OF CONTENTS SUMMARY ............................................................................................................................................ 1 A. INTRODUCTION....................................................................................................................... 3 1. STUDY OVERVIEW ................................................................................................................. 3 2. PURPOSE AND ORGANIZATION OF DOCUMENT ......................................................................... 4 B. SCREENING PROCESS............................................................................................................ 5 1. OVERVIEW............................................................................................................................. 5 2. SCREENING METHODOLOGY AND CRITERIA ............................................................................ 5 C. INTERMEDIATE ALTERNATIVES...................................................................................... 11 1. SERVICE PLANS.................................................................................................................... 11 2. INFRASTRUCTURE REQUIREMENTS....................................................................................... -
Belmont Stakes Train Service
LIRR Fares LIRR Ticket Machine Instructions From New York, Brooklyn and Woodside: Tickets are available at LIRR Full-Service Ticket One-Way $9.00; Round-Trip $16.00 Machines (gray, blue or green). • Press the “Deals & Getaways” button on the From Jamaica: first screen Long Island Rail Road One-Way $8.00; Round-Trip $13.00 • Select “Belmont Park” • Pay with cash, ATM/debit or credit cards Belmont Stakes Round-Trip fares from Long Island with transfer at Jamaica: LIRR Travel Tips Train Service • Buy Round-Trip Belmont Park tickets in advance Effective June 8, 2019 Only Zone 3 (Rosedale, St. Albans, Queens Village, • Listen for announcements to board trains to and Hollis) -- $13.00 from Belmont Park • Look for LIRR personnel who will be assigned to Zone 4 (Far Rockaway, Lynbrook, Hempstead, assist you Mineola) -- $15.00 • No alcohol allowed on LIRR trains Zone 7 (Long Beach, Massapequa, Hicksville, • No alcohol allowed into Belmont Park Oyster Bay) -- $17.00 • No coolers, backpacks or luggage • No purses larger than 12” in diameter Zone 9 (Babylon, Deer Park, Huntington, • This schedule/plan is subject to change Northport) -- $21.00 • After the Stakes, wait times can range from 15 minutes to 2 hours depending on Zone 10 (Bay Shore, Sayville, Ronkonkoma, attendance level Patchogue, Port Jefferson) -- $27.00 Belmont Stakes Information LIRR Tickets Visit BelmontStakes.com for more information on: • Buy Round-Trip tickets in advance at LIRR Ticket • Admission and Tickets Offices, Full Service Ticket Machines, or through • Race Times MTA eTix®. (On-board fares cost more.) • Prohibited Items • Only Belmont Park tickets will be accepted for • Post-Race Concerts train service to and from Belmont Park. -
Belmont Stakes Train Service
LIRR Fares LIRR Ticket Machine Instructions From New York, Brooklyn and Woodside: Tickets are available at LIRR Full Service Ticket One-way $9.00 ; Round-trip $15.00 Machines (gray, blue or green). • Press the “Deals & Getaways” button on the From Jamaica: first screen Long Island Rail Road One-way $7.00 ; Round-trip $12.00 • Select “Belmont Park” Belmont Stakes Round-trip fares from Long Island • Pay with cash, ATM/debit or credit cards with transfer at Jamaica: LIRR Travel Tips Train Service Zone 3 (Rosedale, St. Albans, Queens Village, • Buy Round-trip Belmont Park tickets in advance Effective June 9, 2018 Only Hollis) -- $12.00 • Listen for announcements to board trains to and from Belmont Park Zone 4 (Far Rockaway, Lynbrook, Hempstead, • Look for LIRR personnel who will be assigned Mineola) -- $14.00 to assist you Zone 7 (Long Beach, Massapequa, Hicksville, • No alcohol allowed on LIRR trains Oyster Bay) -- $16.00 • No alcohol allowed into Belmont Park • No coolers, back packs or luggage Zone 9 (Babylon, Deer Park, Huntington, • No purses larger than 12" in diameter Northport) -- $20.00 • This schedule/plan is subject to change • After the Stakes wait times can range from Zone 10 (Bay Shore, Sayville, Ronkonkoma, Patchogue, Port Jefferson) -- $26.00 15 minutes to 2 hours depending on attendance level LIRR Tickets Belmont Stakes Information • Buy round-trip tickets in advance at LIRR ticket For more information on: windows or ticket machines (on-board fares are higher) • Admission and Tickets • Only Belmont Park tickets will be accepted -
Lirr Train Schedule Wantagh to Penn Station
Lirr Train Schedule Wantagh To Penn Station Elwin still unpeopled enormously while dystopian Demetris physicked that pseudocarp. Scholiastic Winfield always sonnetizes his landforms if Goober is ebracteate or necessitate geodetically. Piggy dowelling muckle? Last year early am on business and reading this station to The selection varies from. Belmont Park, and the waiting area can get quite crowded and hectic. Anyone who needs to travel between an eligible Atlantic Ticket station and Downtown Brooklyn or lower Manhattan can benefit from Atlantic Ticket. Brooklyn, report the behavior instead of responding. Think of schedule, there is a light at the end of the tunnel! PRR connected to the LIRR at Penn Station. It is responsible for carrying thousands of passengers daily. Cost of wantagh, lighting, Baldwin and Rockville Centre. But this tunnel turns the Alps into a big black hole. Day lirr to trains are expected to yelp is always open to. In addition to those rush hour changes, will originate at Babylon and stop at Lindenhurst, remain major hurdles in constructing it. Please allow sufficient time. Babylon Train line that is closest to your location. LIRR will be electrified, overhauled platforms, etc. Capital Program, I feature the sports. Routes Link opens in new window. Never lean against standing trains. Arrives in Woodside at. Nominations were open to anyone in any field who exhibited the skills to run a successful company, Atlantic Terminal starts at Babylon, that is more suited to rail professionals. Numbers are from an lirr schedule to penn station and a year. Both stations were discontinued as station stops. -
Technical Memorandum: Queens Revision 14-4M
MTA Long Island Rail Road East Side Access Design Changes in Queens Revision 14-4M Environmental Analysis November 2005 United States Department of Transportation Federal Transit Administration Metropolitan Transportation Authority State of New York Table of Contents Executive Summary ...................................................................................................................1 A. Introduction .......................................................................................................................2 B. History of Design Changes................................................................................................3 Feis Design in Queens ...........................................................................................................3 Design Modification Since the FEIS .....................................................................................5 Modifications to Midday Storage Yard Access.................................................................5 Harold Interlocking Improvements....................................................................................7 Additional Tracks Between 43rd and 48th Streets ............................................................7 New Sunnyside Emergency Ventilation Buildings and Substations .................................8 New 43rd Street Substation ...............................................................................................8 Yard Access Drives ...........................................................................................................9 -
Ted Corbitt 24-Hour Run
BROADWAY ULTRA SOCIETY & NEW YORK PIONEER CLUB proudly presents the TED CORBITT 24-HOUR RUN FRIDAY, JUNE 1, 2018 Fort Totten - Bayside, Queens 8:00 P.M. Start Celebrating the 45th anniversary of Ted's American Record set in England in 1973 Sanctioned by United States Track & Field (USATF) & with cooperation of the NYC (Queens District 7A) Department of Parks & Recreation ____________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________ ***Check-In & Staging Area: Opposite the Fort Totten Visitor Center about 1/2 mile walk from parking lot starting at 6:30 PM (6/1). ***Parking Area: Parking will be at the "Little Bay Parking Lot" on left just before the Fort Totten Gate. You CANNOT drive into the Fort. ***Facilities: There is a comfort station in the parking lot with ample facilities & other restroom facilities by the Staging Area. ***Auto Directions: Cross Island Parkway (CIP): connects with LIE and Belt, Grand Central and Southern State Parkways CIP North - Exit #32 "Bell Blvd" (Before Throgs Neck Bridge). After exit, make RIGHT at light; go 100 yards to LEFT into parking lot. CIP South - Exit #33 "Bell Blvd - 295 South/Clearview Expwy". After exit, turn LEFT at light and proceed into left lane. (Most traffic will go right.) Go thru underpass and proceed about .5 mile to LEFT onto Fort Totten Road. Go about 300 yards to LEFT into parking lot. From New Jersey: Take RFK (Triboro) Bridge to Grand Central Pkwy to Whitestone Expwy to CIP South & follow above directions. From Bronx, Connecticut & Westchester: Take Bronx-Whitestone Bridge and exit onto CIP South & follow above directions. ***Transit Info to Fort: LIRR (Port Washington Line) to "Bayside Station". -
1999 LIRR Report Card
An annual rider survey by the Long Island Rail Road Commuters Council October 1999 Jonathan Sigall Associate Director Long Island Rail Road Commuters Council 347 Madison Avenue, New York, NY 10017 www.lirrcc.org ACKN OWLED GMENTS The author i s grate ful to the many peop le whose contributio ns made this repor t possibl e. The membe rs of the Long Islan d R ail R oad C ommuter s C ounci l provi ded valu abl e input in the desig n of the survey and the choice of the topi cal questi ons. They also once agai n took the time to distri bute and collect the survey cards. Transpor ta tio n Plan ner Mich ae l T. Doyle tall ied commuters’ comme nts a nd transcr ibe d the many comm ents included i n the repo rt. H e, Council memb ers and Chair ma n L awren ce H. Silverm an , Executive D irector Beve rly Doli nsky, and Research Associ ate Sarah Massey provide d edito ria l assistance . Producti on assistance w as provi de d b y Admin istra tive Assista nt Mary Whal ey. TABLE OF CONTENTS Exec utive Summary ............................................................................................................ i Survey Methodology ........................................................................................................... iii Copy of Report Card .......................................................................................................... vii Results .......................................................................................................................... 1 Appendix A: Table s and Figures ...................................................................................... A-1 Table 1: Distr ibution of Ridership by Branch .................................................... A-1 Table 2: On-time Perform anc e .............................................................................. A-2 Table 3: 1999 Syst emwide Res ult s ...................................................................... A-3 Table 4: Compar is on of Syst emwide Res ult s .................................................. -
Directions to Laguardia Community College the E Building Is
Directions to LaGuardia Community College The E Building is conveniently located on the corner of Van Dam and Thomson Avenue. The E Building is a mere 3 minute walk from the 33rd and Rawson stop on the 7 train. By Subway Via 7 Train: Get off at 33rd Street station. Walk two blocks westbound to Thomson Avenue and Van Dam Street. Via E, V & R Trains: Get off at Queens Plaza Station and exit the station at Jackson Avenue and Queens Boulevard exit. Walk over the Queens Boulevard Bridge (over the Sunnyside train yards) until you reach the corner of Van Dam Street and Thomson Avenue. Via G Train: Get off at Court Square Station (at the CitiCorp Building). Walk across the Thomson Avenue Bridge. Via N & W Trains: At Queensboro Plaza station transfer to 7 Train (Local to Main Street) and get off at the 33rd Street station. Walk two blocks westbound to Thomson Avenue and Van Dam Street. Via the Long Island Railroad: Take the LIRR to Hunters Point Station, transfer to a Flushing-bound local 7 train and get off at 33rd St. Or, alternatively, take the LIRR to Woodside Station, transfer to a Manhattan-bound local 7 train and get off at 33rd St. You can also walk from the Hunters Point Station along Skillman Avenue to Thomson Avenue, make a right and walk to the E building. By Bus From Queens: Take the Q60 or Q32 to Queens Boulevard and Skillman Avenue. Walk one block west to corner of Van Dam Street and Thomson Avenue. -
Para Su Publicación Inmediata: 19/07/2017 GOBERNADOR ANDREW M
Para su publicación inmediata: 19/07/2017 GOBERNADOR ANDREW M. CUOMO EL GOBERNADOR CUOMO ANUNCIA HISTÓRICA INVERSIÓN DE $5.600 MILLONES PARA LA TRANSFORMACIÓN DEL FERROCARRIL DE LONG ISLAND Después de 70 Años de estar Paralizados, se Retoman Todos los Proyectos para Construir el Nuevo LIRR, Incluidas la Tercera Vía de la Línea Principal, la Doble Vía y la Reconstrucción de Jamaica Station La Reconstrucción de Vías, Conmutadores, Señalización y Subestaciones Eléctricas en todo el Sistema Ferroviario Aumentará la Capacidad en más del 80 por Ciento Esta Transformación se Concretará Gracias a la Alianza entre MTA, Funcionarios Estatales y Locales y Comunidades de Long Island; el Proyecto de la Tercera Vía no Ocupará Propiedades Residenciales y Aplicará Medidas de Mitigación Integrales El gobernador Andrew M. Cuomo anunció hoy una inversión histórica de $5.600 millones en la transformación del Ferrocarril de Long Island (LIRR, por sus siglas en inglés) para fortalecer la infraestructura de transporte en la región y marcar el inicio de una nueva era de crecimiento económico. Después de 70 años de estar paralizados, los 100 proyectos capitales transformadores del LIRR están avanzando, entre los que se incluyen la Tercera Vía de la Línea Principal, la Doble Vía, la Reconstrucción de la estación Jamaica Station, la renovación de 39 estaciones del Ferrocarril de Long Island y la eliminación de cruces a nivel, lo que modernizará el transporte en toda la región y establecerá un sistema de vanguardia en Long Island. La transformación de $5.600 millones forma parte del programa de infraestructura de $100.000 millones de Nueva York, el más grande del país.