East Avenue Multi-Family • Investment Opportunity • 4 Units • 3,652 ± Sf Multifamily Team

Total Page:16

File Type:pdf, Size:1020Kb

East Avenue Multi-Family • Investment Opportunity • 4 Units • 3,652 ± Sf Multifamily Team HORVATH& TREMBLAY NORWALK, CONNECTICUT 265 EAST AVENUE MULTI-FAMILY • INVESTMENT OPPORTUNITY • 4 UNITS • 3,652 ± SF MULTIFAMILY TEAM THOMAS CONNOR ADAM MANCINONE Senior Associate Senior Vice President Direct: (203) 486-9039 Direct: (203) 486-9037 Mobile: (203) 243-8785 Mobile: (203) 982-7337 [email protected] [email protected] BLAKE BARBARISI DENNIS KELLEHER Senior Vice President Senior Vice President Direct: (203) 486-9038 Direct: (781) 776-4002 Mobile: (203) 982-0240 Mobile: (978) 702-7032 265 [email protected] [email protected] JOHN PENTORE JASON KULIK EASTEAST AVENUEAVENUE Vice President Associate Tel: (781) 776-4004 Direct: (781) 776-4016 Mobile: (617) 945-6915 Mobile: (781) 264-5877 NORWALK | CONNECTICUT [email protected] [email protected] STEPHEN GIROLAMO MICHAEL ALVAREZ Associate Associate Direct: (781) 776-4014 Tel: (781) 776-4007 Mobile: (978) 406-1789 Mobile: (978) 702-7171 [email protected] [email protected] CONNOR BRIMLEY KEVIN DARLING Associate Senior Financial Analyst Direct: (781) 776-4018 Direct: (781) 776-4015 Mobile: (978) 815-0351 Mobile: (617) 875-8565 [email protected] [email protected] LEIGH BARCAMONTE JOSHUA VELEZ HORVATH TREMBLAY Marketing Director Financial Analyst & Direct: (781) 776-4008 Direct: (781) 776-4009 600 Market Street – Suite 686 [email protected] [email protected] Lynnfield, MA 01940 Main: 781-776-4000 Fax: 781-823-0245 www.htapartments.com EXECUTIVE SUMMARY HORVATH& TREMBLAY OFFERING Horvath & Tremblay is pleased to present the exclusive opportunity to purchase the multi-family investment property located 265 East Avenue in Norwalk, Connecticut (the “Property”). The Property contains (4), 2-bedroom units in 3,652 rentable square feet on a 0.23-acre lot. The Property offers 8 off-street parking spaces, in-unit laundry and two, income producing storage units in the basement. The Property is currently 100% leased. 265 East Ave is located in an attractive, tree-lined, residential neighborhood around Mill Pond in the East Norwalk neighborhood. The Property benefits from its proximity to the East Norwalk Train Station, just 0.2 miles away on East Ave. The East Norwalk train station is on the Metro-North Railroad’s New Haven line that provides service to New York’s Grand Central Station in just over an hour. The location also offers easy access to the interchange at Exit 16 on I-95, located 0.5 miles from the Property, as well as walkable access to area shopping and restaurants. Nearby outdoor recreation is located at Mill Pond Park, Shady Beach and the 35-acre Veterans Memorial Park that includes a marina and boat launch site, a playground, bicycle and jogging paths, basketball courts, soccer, hockey, and football fields, baseball diamonds, visitor docks with full power available, a boating center and marina. The park also includes a walking esplanade overlooking scenic Norwalk Harbor. Norwalk is a city of 88,000 residents located in southwestern Connecticut, in Fairfield County, on the shore of Long Island Sound. Norwalk is included statistically within New York Metropolitan Statistical Area, the most populous in the United States with over 20 million residents, as well as the Bridgeport-Stamford-Norwalk Metropolitan Statistical Area with approximately 1 million residents. The City of Norwalk is bounded by New Canaan and Wilton to the north, Westport to the east, Long Island Sound to the south and Darien to the west. Norwalk has seen significant new development in recent years which will be highlighted by the completion of the 700,000 square foot “SoNo Collection” development located just a mile from the Property across the Norwalk River. The SoNo Collection will include streetscape, landscape and pedestrians enhancements in concert with the City’s revitalization efforts to stitch together the neighborhoods of Downtown Norwalk, South Norwalk (“SoNo”), East Norwalk and The Waterfront. Expected to open in the fourth quarter of 2018, The SoNo Collection will be an unparalleled shopping destination that will also serve as a community gathering place and provide additional visibility and revenue to the City of Norwalk. Centrally located at I-95 and Route 7, the development will both fill a retail void and connect the Norwalk neighborhoods together into a vibrant, pedestrian and bike friendly district designed to complement existing businesses and create a larger, better connected community. Horvath & Tremblay has been engaged by the owner of the property to market it for sale. Information concerning the property described herein has been obtained from sources other than Horvath & Tremblay and we make no representations or warranties, express or implied, as to the accuracy or completeness of such information. Any and all references to age, square footage, income, expenses and any other property specific information are approximate. Any opinions, assumptions, or estimates contained herein are projections only 265 EAST AVENUE and used for illustrative purposes and may be based on assumptions or due diligence criteria different from that used by a buyer. Buyers should conduct their own independent investigation and rely on those results. The information contained herein is subject to change. 3 EXECUTIVE SUMMARY HORVATH& TREMBLAY INVESTMENT HIGHLIGHTS THE PROPERTY ■ A 4-unit, multifamily investment property featuring in-unit laundry, off-street parking and income producing storage units in the basement. THE LOCATION ■ 265 East Street is very well-located in the attractive, densely populated, residential neighborhood of East Norwalk on Mill Pond. The location benefits from its convenient access to I-95 for and easy walking distance to the East Norwalk Train Station with service to New York’s Grand Central Station. ■ East Norwalk Train Station: 0.3 miles ■ Interstate 95: 0.5 miles ■ Shady Beach: 1.5 miles ■ Stamford, CT: 8.0 miles ■ New York City: 35 miles PUBLIC TRANSPORTATION ACCESS: ■ Train: The East Norwalk Train Station is located approximately 0.2 miles from the Property and provides Commuter Train service to New York’s Grand Central Station on the Metro-North railway. ■ Bus: Local bus service, provided by the Norwalk Transit and known as “Wheels”, is available 0.2 miles from the property. ■ Route 8 provides north-south service between Downtown Norwalk and Shady Beach Park. ■ Route 11 provides east-west service between Downtown Norwalk and Norwalk Community College. Horvath & Tremblay has been engaged by the owner of the property to market it for sale. Information concerning the property described herein has been obtained from sources other than Horvath & Tremblay and we make no representations or warranties, express or implied, as to the accuracy or completeness of such information. Any and all references to age, square footage, income, expenses and any other property specific information are approximate. Any opinions, assumptions, or estimates contained herein are projections only 265 EAST AVENUE and used for illustrative purposes and may be based on assumptions or due diligence criteria different from that used by a buyer. Buyers should conduct their own independent investigation and rely on those results. The information contained herein is subject to change. 4 PROPERTY SPECIFICATIONS HORVATH& TREMBLAY 265EAST AVENUE 4 residential units PRICING INFORMATION PRICE $725,000 CAP RATE 6.61% PRICE PER UNIT $181,250/ UNIT PRICE PER FOOT (GLA) $198 / PSF PROPERTY DETAILS PROPERTY ADDRESS 265 East Avenue Norwalk, CT 06855 NUMBER OF UNITS 4 VALUE ADD OPPORTUNITY | DESIRABLE LOCATION YEAR BUILT SEPARATE UTILITIES | WALKING DISTANCE TO TRAIN STATION 1890 LAND AREA 0.23 Acres GROSS LIVING AREA 3,652 ± SF TOTAL GROSS AREA 5,943 ± SF PARKING 8 - Off-Street BUILDING CONSTRUCTION EXTERIOR Vinyl ROOF Asphalt BUILDING UTILITIES RESPONSIBILITY HEATING Forced Hot Water- Gas Tenant Responsible HOT WATER Gas Tenant Responsible ELECTRIC Separately Metered Tenant Responsible WATER City of Norwalk Landlord Responsible SEWER City of Norwalk Landlord Responsible Horvath & Tremblay has been engaged by the owner of the property to market it for sale. Information concerning the property described herein has been obtained from sources other than Horvath & Tremblay and we make no representations or warranties, express or implied, as to the accuracy or completeness of such information. Any and all references to age, square footage, income, expenses and any other property specific information are approximate. Any opinions, assumptions, or estimates contained herein are projections only 265 EAST AVENUE and used for illustrative purposes and may be based on assumptions or due diligence criteria different from that used by a buyer. Buyers should conduct their own independent investigation and rely on those results. The information contained herein is subject to change. 5 PROPERTY PHOTOGRAPHS HORVATH& TREMBLAY Horvath & Tremblay has been engaged by the owner of the property to market it for sale. Information concerning the property described herein has been obtained from sources other than Horvath & Tremblay and we make no representations or warranties, express or implied, as to the accuracy or completeness of such information. Any and all references to age, square footage, income, expenses and any other property specific information are approximate. Any opinions, assumptions, or estimates contained herein are projections only 265 EAST AVENUE and used for illustrative purposes and may be based on assumptions or
Recommended publications
  • Green's Farms URBITRANR EPORT
    Individual Station Report Green's Farms URBITRANR EPORT CONTENTS: Stakeholder Interview Customer Opinion Survey Parking Inventory & Utilization Station Condition Inspection Lease Narrative and Synopsis Station Operations Review Station Financial Review URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. July 2003 June 2003 June 2003 June 2003 June 2003 June 2003 June 2003 Stakeholder Interview URBITRANR EPORT URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. Westport According to those at the meeting, which included the First and Second Selectmen and a representative from the Police Department, who run the station, Harry Harris wants CDOT to take control of the stations and parking. This was the first issue brought up by the town representatives – that the State wants to run the stations to provide better quality control, and that the State feels that this is the only solution to improve the supply of parking along the entire line. Furthermore, the feeling was that CDOT would be exempt from local zoning and would therefore be in a position to deck parking lots without local permission. Westport feels that they do a good job with the two town stations, and that they have an excellent relationship with Carl Rosa regarding maintenance and operations and with Harry Harris regarding policy. They feel strongly that if other towns ran their stations and parking like they do CDOT would have far fewer issues to contend with. Westport understands the desire for uniformity among the stations and supports that policy, albeit with concern regarding home rule issues. Westport, ultimately, is satisfied with the status quo, and feels the working relationship is excellent, the division of responsibilities clear, and their ability to have input into the ADA design process excellent.
    [Show full text]
  • CT2030 2020-2030 Base SOGR Investment $10.341 $0.023 $5.786
    Public Transportation Total Roadway Bus Rail ($B) ($B) ($B) CT2030 2020-2030 Base SOGR Investment $10.341 $0.023 $5.786 $16.149 2020-2030 Enhancement Investment $3.867 $0.249 $1.721 $5.837 Total $14.208 $0.272 $7.506 $21.986 Less Allowance for Efficiencies $0.300 CT2030 Program total $21.686 Notes: 2020-2030 Base SOGR Investment Dollars for Roadway also includes funding for bridge inspection, highway operations center, load ratings 2020-2030 program includes "mixed" projects that have both SOGR and Enhancement components. PROJECT ROUTE TOWN DESCRIPTION PROJECT COST PROJECT TYPE SOGR $ 0014-0185 I-95 BRANFORD NHS - Replace Br 00196 o/ US 1 18,186,775 SOGR 100% $ 18,186,775 0014-0186 CT 146 BRANFORD Seawall Replacement 7,200,000 SOGR 100% $ 7,200,000 0015-0339 CT 130 BRIDGEPORT Rehab Br 02475 o/ Pequonnock River (Phase 2) 20,000,000 SOGR 100% $ 20,000,000 0015-0381 CT 8 BRIDGEPORT Replace Highway Signs & Supports 10,000,000 SOGR 100% $ 10,000,000 0036-0203 CT 8 Derby-Seymour Resurfacing, Bridge Rehab & Safety Improvements 85,200,000 SOGR 100% $ 85,200,000 0172-0477 Various DISTRICT 2 Horizontal Curve Signs & Pavement. Markings 6,225,000 SOGR 100% $ 6,225,000 0172-0473 CT 9 & 17 DISTRICT 2 Replace Highway Signs & Sign Supports 11,500,000 SOGR 100% $ 11,500,000 0172-0490 Various DISTRICT 2 Replace Highway Signs & Supports 15,500,000 SOGR 100% $ 15,500,000 0172-0450 Various DISTRICT 2 Signal Replacements for APS Upgrade 5,522,170 SOGR 100% $ 5,522,170 0173-0496 I-95/U.S.
    [Show full text]
  • Customer Opinion Survey Final Report
    Task 1.2: Customer Opinion Survey Final Report URBITRANR EPORT URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. May 2003 Task 1.2:Technical Memorandum Customer Opinion Survey TABLE OF CONTENTS INTRODUCTION AND SUMMARY OF FINDINGS ............................................................................................1 BACKGROUND AND PURPOSE ....................................................................................................................................1 METHODOLOGY.........................................................................................................................................................1 FINDINGS ..................................................................................................................................................................1 EXHIBIT 1: SURVEY SAMPLE.....................................................................................................................................2 COMPARISON TO METRO-NORTH RAILROAD CUSTOMER OPINION SURVEY ...........................................................10 CHAPTER ONE: GENERAL PROFILE OF SURVEY RESPONDENTS.........................................................12 SYSTEM-WIDE ANALYSIS OF SURVEY QUESTIONS 1, 2, AND 3 .................................................................................13 SYSTEM-WIDE ANALYSIS OF SURVEY QUESTIONS 4, 5, 6, AND 7 .............................................................................15 SYSTEM-WIDE ANALYSIS OF SURVEY
    [Show full text]
  • Annual Report - 2007
    ANNUAL REPORT - 2007 CONNECTICUT METRO NORTH / SHORE LINE EAST RAIL COMMUTER COUNCIL www.trainweb.org/ct CT Rail Commuter Council Page 1 2007 Annual Report 15 January 2008 Governor M. Jodi Rell Interim CDOT Commissioner Emil Frankel Senator Donald DeFronzo Rep. Antonio Guerrera CT Public Transportation Commission NY Metro-North Rail Commuter Council Inspector General – MTA Lee Sander – MTA Exec. Director & CEO Dear Ladies and Gentlemen: Pursuant to Connecticut Public Act 85-239 (now Sections 13b-212b and 13b -212c of the Connecticut General Statutes), The Connecticut Metro-North Rail Commuter Council is pleased to share with you our Annual Report for 2007. As you know, our legislative mandate is to be advocates for the interests of the more than 55,000 daily riders of Metro-North in Connecticut. Toward that end, we meet monthly with railroad officials… testify regularly before the legislature… speak before civic groups and share with the media our work on behalf of riders. Our report’s narrative highlights the important issues of the past year with embedded internet links for further information. Also attached are the Minutes of our meetings and monthly Operational Reports from Metro-North. We hope you find this report useful in understanding the challenges and opportunities facing rail commuters in Connecticut. Respectfully submitted, Jim Cameron Terri Cronin / Jeffrey Steele S. Robert Jelley Jim Cameron Terri Cronin / Jeffrey Steele S. Robert Jelley Chairman Co-Vice Chairmen Secretary CT Rail Commuter Council Page 2 2007 Annual Report COUNCIL VICTORIES ON BEHALF OF COMMUTERS: True to its legislative mandate to represent the interests of rail commuters in Connecticut, the Commuter Council helped change several policy decisions in 2007 for the benefit of commuters: ¾ Halt in plans to require commuters to use “opposite platforms” during winter.
    [Show full text]
  • East Norwalk Neighborhood TOD Plan Prepared for the City of Norwalk Prepared by Harriman | NV5 | RKG Draft Report: April 2020 Last Updated: 06.16.2020
    East Norwalk Neighborhood TOD Plan Prepared for the City of Norwalk Prepared by Harriman | NV5 | RKG Draft Report: April 2020 Last Updated: 06.16.2020 1 Acknowledgments City of Norwalk Planning Team Mayor Harriman Harry Rilling Lead - Urban Planning and Design NV5 Planning Department Subconsultant - Transportation and Infrastructure Steven Kleppin, Planning and Zoning Director RKG Subconsultant - Market Analysis Oversight Committee Brian Baxendale, Planning Commission Deb Goldstein, Zoning Commission / Third Taxing District until 11/19 Diane Cece, East Norwalk Neighborhood Association (ENNA) Pam Parkington, Third Taxing District as of 11/19. Stephanie Thomas, Zoning Commission John Kydes, Common Council Judith Dominguez, East Norwalk Business Association (ENBA) Vanessa Valadares, Department of Public Works 2 Contents EXECUTIVE SUMMARY EAST NORWALK TOD PLAN: RECOMMENDATIONS 7 INTRODUCTION 1 Economic Development 7.1 Land Use and Urban Design 7.2 VISION AND GOALS 2 Multi-modal Connectivity and Access 7.3 7.4 PLANNING CONTEXT Parking 3 Open Space and Recreation 7.5 COMMUNITY ENGAGEMENT Utilities and Infrastructure 7.6 4 Implementation 7.7 March Visioning Workshop 4.1 July Choices Workshop 4.2 November Open House 4.3 Online Surveys 4.4 Stakeholder Interviews 4.5 EXISTING CONDITIONS ANALYSIS 5 APPENDICES Land Use and Current Projects 5.1 Market Analysis - RKG A Existing Zoning 5.2 Transportation Analysis -NV5 B Parcel Sizes 5.3 Community Engagement - Harriman C Property Ownership 5.4 Recommended Zoning - Harriman D Circulation and Access 5.5
    [Show full text]
  • Individual Station Report
    Individual Station Report South Norwalk URBITRANR EPORT CONTENTS: Stakeholder Interview Customer Opinion Survey Parking Inventory & Utilization Station Condition Inspection Lease Narrative and Synopsis Station Operations Review Station Financial Review URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. July 2003 June 2003 June 2003 June 2003 June 2003 June 2003 June 2003 Stakeholder Interview URBITRANR EPORT URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. Westport According to those at the meeting, which included the First and Second Selectmen and a representative from the Police Department, who run the station, Harry Harris wants CDOT to take control of the stations and parking. This was the first issue brought up by the town representatives – that the State wants to run the stations to provide better quality control, and that the State feels that this is the only solution to improve the supply of parking along the entire line. Furthermore, the feeling was that CDOT would be exempt from local zoning and would therefore be in a position to deck parking lots without local permission. Westport feels that they do a good job with the two town stations, and that they have an excellent relationship with Carl Rosa regarding maintenance and operations and with Harry Harris regarding policy. They feel strongly that if other towns ran their stations and parking like they do CDOT would have far fewer issues to contend with. Westport understands the desire for uniformity among the stations and supports that policy, albeit with concern regarding home rule issues. Westport, ultimately, is satisfied with the status quo, and feels the working relationship is excellent, the division of responsibilities clear, and their ability to have input into the ADA design process excellent.
    [Show full text]
  • CP243 Interlocking Historic Resources Evaluation Report
    Archaeological and Historical Services, Inc. Historic Resources Evaluation Report CP-243 Interlocking Norwalk and Westport, Connecticut State Project No. 0301-0181 Prepared for HNTB Corporation Boston, Massachusetts by Archaeological and Historical Services, Inc. Storrs, Connecticut for submission to The Connecticut Department of Transportation Authors: Bruce Clouette Stacey Vairo October 2016 ABSTRACT AND MANAGEMENT SUMMARY The State of Connecticut, through the Connecticut Department of Transportation (CTDOT), is constructing a new universal interlocking along the Metro-North New Haven Railroad Line (NHL) east of the East Norwalk Station in Norwalk and Westport, Connecticut. The proposed project, known as the CP-243 Interlocking Project, will improve operations along the NHL, including the ability of the Metro-North system to accommodate Express-Local train overtakes and limited headways between trains. The CP-243 project will help facilitate the construction of rail infrastructure projects on the NHL, particularly related to track outages, while maintaining rail service through the area. In addition to the interlocking, the project includes signaling system upgrades from the South Norwalk Station to a point just east of the Saugatuck River in Westport. The project will receive state funding, requiring it to comply with the Connecticut Environmental Policy Act (CEPA), which mandates consideration of possible impacts to significant historic and archaeological resources. Additionally, the project will receive funding from the Federal Transit Administration (FTA), requiring consultation with the State Historic Preservation Office (CTSHPO) regarding possible impacts to significant historic and archaeological resources under Section 106 of the National Historic Preservation Act and Section 4(f) of the Department of Transportation Act. This report presents the results of research, field inspection, and analysis for the historic resources that may be affected by the project.
    [Show full text]
  • The Following Scope of Work Has Been Prepared to Reflect the Request For
    TRANSIT ORIENTED DEVELOPMENT MASTER PLAN FOR SOUTH NORWALK RAILROAD STATION NEIGHBORHOOD EXISTING CONDITIONS REPORT Prepared for: The City of Norwalk Prepared by: The Cecil Group, Inc. TR Advisors Milone & MacBroom December 22, 2010 TABLE OF CONTENTS The Cecil Group – TR Advisors – Milone & MacBroom – Language Link Consortium Existing Conditions Evaluation Report i The Cecil Group – TR Advisors – Milone & MacBroom – Language Link Consortium Existing Conditions Evaluation Report ii SECTION 1: EXECUTIVE SUMMARY Overview The Existing Conditions Evaluation Report is a multidisciplinary review of the current elements that comprise the area surrounding the South Norwalk Railroad Station. This document has been assembled as part of the Transit Oriented Development Master Plan for South Norwalk Railroad Station Neighborhood Study Area for the purpose of accurately informing subsequent analyses and decisions related to constructing a Transit Oriented Master Plan for the South Norwalk Railroad Station Neighborhood. The purpose of the Transit Oriented Development Master Plan for South Norwalk Railroad Station Neighborhood Study Area is to provide The City of Norwalk with planning recommendations that can guide and manage future change in the area of the South Norwalk Railroad Station. The aim of the planning recommendations will be to capitalize on this area’s development potential, while providing benefits that will appropriately enhance the area neighborhoods and their component places. Project Goals and Objectives have been collaboratively prepared with members of the public, community stakeholders and City staff, to guide the planning recommendations associated with this project. The project Goals and Objectives are included as Appendix A of this Existing Conditions Evaluation Report. Transit Oriented Development (TOD) generally refers to land use and activities that are advantaged by proximity to and pedestrian access to public transit.
    [Show full text]
  • Draft 2021 Stip Projects by Facode 1
    DRAFT 2021 STIP PROJECTS BY FACODE Region FA Code Proj # TempP# AQCd Rte/Sys Town Description Phase Year Tot(000)$ Fed(000)$ Sta(000)$ Loc(000)$ 10 125 0165-0468 X7 CT20 @ CT75 WINDSOR LOCKS REALIGN CT 20 OFF-RAMP TO CT 75 ROW 2021 50 50 0 0 2021 Total 50 50 0 0 10 125 0165-0468 X7 CT20 @ CT75 WINDSOR LOCKS REALIGN CT 20 OFF-RAMP TO CT 75 CON 2022 425 425 0 0 2022 Total 425 425 0 0 70 BRX 0170-0BRX X6 VARIOUS STATEWIDE ON/OFF-SYSTEMS BRIDGE IMPROVEMENTS, BRX & BRZ (BRIDGE REPORT) ALL 2021 50,000 40,000 10,000 0 2021 Total 50,000 40,000 10,000 0 70 BRX 0170-0BRX X6 VARIOUS STATEWIDE ON/OFF-SYSTEMS BRIDGE IMPROVEMENTS, BRX & BRZ (BRIDGE REPORT) ALL 2022 50,000 40,000 10,000 0 2022 Total 50,000 40,000 10,000 0 70 BRX 0170-0BRX X6 VARIOUS STATEWIDE ON/OFF-SYSTEMS BRIDGE IMPROVEMENTS, BRX & BRZ (BRIDGE REPORT) ALL 2023 50,000 40,000 10,000 0 2023 Total 50,000 40,000 10,000 0 70 BRX 0170-0BRX X6 VARIOUS STATEWIDE ON/OFF-SYSTEMS BRIDGE IMPROVEMENTS, BRX & BRZ (BRIDGE REPORT) ALL 2024 50,000 40,000 10,000 0 2024 Total 50,000 40,000 10,000 0 01 BUILD(HIGHWAYS) 0102-XXXX PD US 7 NORWALK BUILD DISCRETIONARY GRANT-RECONFIGURE RT 7 EXPRESSWAY AT GRIST MILL RD WITH ONE 4 WAY INTERSECTION ALL FYI 13,400 10,720 2,680 0 FYI Total 13,400 10,720 2,680 0 07 CMAQ 0015-0376 X8 PARK AVENUE BRIDGEPORT TRAFFIC SIGNALS AT VARIOUS INTERSECTIONS CON 2021 2,686 2,686 0 0 10 CMAQ 0088-0192 X8 VARIOUS NEW BRITAIN UPGRADE SIGNALS AT VARIOUS INTERSECTIONS CON 2021 2,670 2,670 0 0 05 CMAQ 0151-0325 X8 VARIOUS WATERBURY TRAFFIC SIGNAL UPGRADE AT VARIOUS LOCATIONS CON 2021
    [Show full text]
  • 2018-2021 Public Transportation Transit Asset Management Plan
    2018-2021 Public Transportation Transit Asset Management Plan Tier I Plan in accordance with 49 CFR §625.5 September 2018 This page intentionally left blank CTDOT PT-TAMP This page intentionally left blank CTDOT PT-TAMP Message from the Commissioner It is my pleasure, as Commissioner of the Connecticut Department of Transportation (CTDOT), to present the State’s initial Public Transportation Transit Asset Management Plan (TAMP). This plan goes beyond federal mandates and demonstrates a strong commitment to achieving a State of Good Repair for our transportation system. Connecticut’s transportation system is multimodal and supports the economy by enabling the efficient movement of people, goods, and services. Connecticut is a vital transportation link between northern New England and New York, New Jersey and the Mid- Atlantic states. The transportation system also links our communities; helping connect neighborhoods, towns, and cities. In order for Connecticut’s economy to function properly and grow, the transportation system must be maintained and updated. This document presents a plan developed in partnership with CTDOT Public Transportations’ statewide service providers, to achieve a systematic and comprehensive asset management system for the State’s public transportation assets to provide safe and reliable service for the citizens of Connecticut. Implementation of this plan will align with the Department’s priority to maintain and preserve the transportation system. James P. Redeker Commissioner CTDOT PT-TAMP This page intentionally left blank CTDOT PT-TAMP Disclaimer The Connecticut Department of Transportation (CTDOT) has prepared this Transit Asset Management Plan (TAMP) in accordance with 49 CFR 625.5 and pursuant to the further guidance and direction of the Federal Transit Administration.
    [Show full text]
  • Report Archaeological Sensitivity Assessment
    REPORT ARCHAEOLOGICAL SENSITIVITY ASSESSMENT CP243 INTERLOCKING NORWALK AND WESTPORT, CONNECTICUT State Project No. 0301-0181 Prepared for HNTB Corporation Boston, Massachusetts By Archaeological and Historical Services, Inc. Storrs, Connecticut For submission to The Connecticut Department of Transportation Author: Sarah P. Sportman, Ph.D. June 2016 i ABSTRACT AND MANAGEMENT SUMMARY The State of Connecticut, through the Connecticut Department of Transportation (CTDOT), is constructing a new universal interlocking along the Metro North New Haven Railroad Line (NHL) east of the East Norwalk Station in Norwalk, Connecticut. CTDOT is constructing a new universal interlocking along the New Haven Line (NHL) east of the East Norwalk Station in Norwalk, Connecticut (CP-243; State Project No. 0301-081). Construction of a new universal interlocking at CP-243 and system upgrades from the South Norwalk Station to east of the Saugatuck River in Westport will improve operations along the NHL, including the ability of the Metro-North system to accommodate Express-Local train overtakes and limited headways between trains. The CP-243 project will help facilitate the construction of rail infrastructure projects on the NHL, particularly related to track outages, while maintaining rail service through the area. The new interlocking will include track realignment and crossovers and new track switches from approximately Strawberry Hill Avenue to the Norwalk-Westport town line [corresponding to Milepost (MP) 43.0-43.5]. New signals will be installed from the South Norwalk Station (including CP-241) in South Norwalk to approximately 500 feet east of the Saugatuck River in Westport, for a distance of approximately 3.5 miles and will include signal houses (two, each at approximately 10’ x 20’).
    [Show full text]
  • Individual Station Report
    Individual Station Report Rowayton URBITRANR EPORT CONTENTS: Stakeholder Interview Customer Opinion Survey Parking Inventory & Utilization Station Condition Inspection Lease Narrative and Synopsis Station Operations Review Station Financial Review URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. July 2003 June 2003 June 2003 June 2003 June 2003 June 2003 June 2003 Stakeholder Interview URBITRANR EPORT URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. The Parking Authority can issue bonds and therefore it would help if the revenues from the stations could be channeled through the authority, building a stronger revenue stream. This cannot be done under the current agreement, which requires that the revenues be allocated to individual station accounts. If CDOT would allow for a broader interpretation of the rules regarding revenue accounting, then the City would be in a better position to build more parking for both rail and non-rail use, and for building mixed use lots as well that could benefit both the rail customers and community. The Authority could still maintain separate line item accounts suitable for CDOT review. The City also thinks that the Merritt Seven station arrangements need to be looked at and considered in the long range planning for rail service. The station was privately built by the developer of Merritt Seven, and maintained by the developer with CDOT assistance. The city has no role there. Parking is free. The long-term vision for Norwalk calls for a station to be located in the East Avenue/Wall Street area, and another for Reed-Putnam; both would be on the Danbury branch.
    [Show full text]