Gujarat Earthquake Rehabilitation and Reconstruction Project

Total Page:16

File Type:pdf, Size:1020Kb

Gujarat Earthquake Rehabilitation and Reconstruction Project Completion Report Project Number: 35068 Loan Number: 1826 September 2008 India: Gujarat Earthquake Rehabilitation and Reconstruction Project CURRENCY EQUIVALENTS Currency Unit – Indian Rupee/s (Re/Rs) At Appraisal At Project Completion 14 March 2001 14 June 2007 Rs1.00 = $0.021478 $0.0226398 $1.00 = Rs46.56 Rs44.17 ABBREVIATIONS ADB – Asian Development Bank ADA – Area Development Authorities AIFC – Average Incremental Financial Cost AUDA – Ahmedabad Urban Development Authority BME – Benefit Monitoring and Evaluation COS – Country Operational Strategy DMMP – Disaster Management and Mitigation Program DSC – Design Supervision Consultant EA – Executing Agency EIA – Environmental Impact Assessment EMG – Extended Mission in Gujarat FIRR – Financial internal rate of return GEB – Gujarat Electricity Board GERI – Gujarat Energy Research Institute GSDMA – Gujarat State Disaster Management Authority GSDP – Gross State Domestic Product GUDC – Gujarat Urban Development Company GWIL – Gujarat Water Infrastructure Limited GWSSB – Gujarat Water Supply and Sewerage Board IA – Implementing Agency ICB – International competitive bidding IDA – International Development Association INRM – India Resident Mission JAR – Joint assessment report NCB – National Competitive Bidding NGO – Non-government organization OCR – Ordinary capital resources O&M – Operation and maintenance PRHD – Panchayats, Rural Housing and Rural Development Department PMC – Project Management Consultant RRP – Report and Recommendation of the President SGIA – Second Generation Imprest Account TA – Technical Assistance WACC – Weighted average cost of capital WEIGHTS AND MEASURES km – kilometer m – meter m2 – square meter m3 – cubic meter ppm – parts per million NOT ES (i) The fiscal year (FY) of the Government of India, and the Gujarat government and its agencies ends on 31 March. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2000 ends on 31 March 2000. (ii) In this report, "$" refers to US dollars. Vice President Xiaoyu Zhao, Vice-President, Operations 1 Director General K. Senga, South Asia Regional Department Director T. Kondo, Country Director, India Resident Mission (INRM) Team leader S. Muramoto, Head, Project Administration Unit, INRM Team members A. Srivastava, Project Implementation officer, INRM V. Vishal, Assistant Project Analyst, INRM CONTENTS Page BASIC DATA i MAP vi I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B. Project Outputs 3 C. Project Costs 6 D. Disbursements 7 E. Project Schedule 7 F. Implementation Arrangements 8 G. Conditions and Covenants 8 H. Related Technical Assistance 8 I. Consultant Recruitment and Procurement 9 J. Performance of Consultants, Contractors, and Suppliers 9 K. Performance of the Borrower and the Executing Agency 9 L. Performance of the Asian Development Bank 10 III. EVALUATION OF PERFORMANCE 11 A. Relevance 11 B. Effectiveness in Achieving Outcome 11 C. Efficiency in Achieving Outcome and Outputs 11 D. Preliminary Assessment of Sustainability 11 E. Impact 12 IV. OVERALL ASSESSMENT AND RECOMMENDATIONS 12 A. Overall Assessment 12 B. Lessons 13 C. Recommendations 14 APPENDIXES 1. Project Components and Outputs 16 2. Breakup of Foreign and Local Costs of ADB Financing 21 3. Allocation and/or Reallocation and Actual Disbursement 22 of ADB Financing By Category 4. Contract Awards and Disbursements 23 5. Summary of Contract Details 24 6. Project Implementation Arrangements 45 7. Status of Major Loan Covenants 47 8. Benefit Monitoring and Evaluation 49 9. Socio-cultural, Resettlement, and Environment Impacts 51 10. Technical Assistance Completion Report 52 11. Implementation Schedule: Appraisal–Ac tual 55 12. Selected Photographs 56 i BASIC DATA A. Loan Identification 1. Country India 2. Loan Number 1826 3. Project Title Gujarat Earthquake Rehabilitation and Reconstruction Project 4. Borrower India 5. Executing Agency Gujarat State Disaster Management Authority 6. Amount of Loan US$500 million. 7. Project Completion Report Number PCR:IND 1061 B. Loan Data 1. Appraisal – Date Started 12 February 2001 – Date Completed 28 February 2001 2. Loan Negotiations – Date Started 15 March 2001 – Date Completed 16 March 2001 3. Date of Board Approval 26 March 2001 4. Date of Loan Agreement 26 April 2001 5. Date of Loan Effectiveness – In Loan Agreement 24 July 2001 – Actual 17 May 2001 – Number of Extensions Nil 6. Closing Date – In Loan Agreement 30 June 2004 – Actual 06 November 2007 – Number of Extensions three 7. Terms of Loan – Interest Rate began as pool-based single currency with variable lending rate and changed to LIBOR-based lending from 02 April 2002 – Maturity (number of years) 30 years – Grace Period (number of years) 7 years ii 8. Disbursements a. Dates Initial Disbursement Final Disbursement Time Interval 17 May 2001 06 November 2007 77 months Effective Date Original Closing Date Time Interval 17 May 2001 30 June 2004 37.5 months b. Amount ($ million} Category or Last Net Sub loan Original Revised Amount Amount Amount Undisbursed Allocation Allocation Canceled Available Disbursed Balance Part A: 200 12.50 187.50 12.50 12.35 0.15 Housing Part B: 173 248.74 (75.74) 248.74 238.38 10.36 Urban & Rural Infrastructure Part C: 67 31.00 36.00 31.00 30.90 0.10 Power Part D: 20 6.49 13.51 6.49 6.41 0.08 Livelihood Restoration Part E: 15 18.75 (3.75) 18.75 17.92 0.83 Consulting Services & Incremental Administrative Support Part F: Multi- 20 5.50 14.50 5.50 4.18 1.32 hazard Disaster Preparedness & Mitigation Front -End Fee 5 5.00 0.00 5.00 5.00 0.00 Total 500 327.98 172.02 327.98 315.14 12.84 9. Local Costs (Financed) - Amount ($ million) 209.58 - Percent of Local Costs 78.92 - Percent of Total Cost 66.50 LIBOR = London Interbank Offer Rate C. Project Data 1. Project Cost ($ million) Cost Appraisal Estimate Actual Foreign Exchange Cost 112 56.73 Local Currency Cost 513 258.41 Total 625 315.14 iii 2. Financing Plan ($ million) Cost Appraisal Estimate Actual Implementation Costs Borrower Financed 125 75.48 ADB Financed 500 315.14 Other External Financing 0 0 Total 625 391.62 IDC Costs Borrower Financed ADB Financed Other External Financing Total ADB = Asian Development Bank, IDC = interest during construction. 3. Cost Breakdown by Project Component ($ million) Component Appraisal Estimate Actual A. Housing 250 16.75 B. Urban and Rural Infrastructure 217 293.30 0 1. Urban 86 147.18 a. Equipment and Materials 16 3.12 b. Civil Works 70 144.06 2. Rural (Water Supply and Sanitation) 132 146.12 a. Equipment and Materials 28 103.50 b. Civil Works 104 42.62 C. Power 98 45.62 a. Equipment and Materials 86 41.82 b. Civil Works 12 3.80 D. Livelihood Rehabilitation 20 6.32 E. Consulting Services and Incremental Administrative 15 Support 19.36 F. Multi-hazard Disaster Preparedness and Mitigation 20 4.26 Front -End Fee 5 5.00 625 Total 390.61 iv 4. Project Schedule Item Appraisal Estimate Actual Date of Contract with Consultants (18 consultancies) First consultancy contract on 17 May 2001 and the last one on 8 September 2003 Completion of Engineering Designs Civil Works Contract Date of Award Retroactive contracts First—18 Jan 2002 from 12 Feb 2001 Completion of Work Last—Dec 2003 Last—14 June 2007 Equipment and Supplies Dates First Procurement Retroactive contracts 27 June 2002 from 12 Feb 2001 Last Procurement Last—Dec 2003 14 March 2005 Completion of Equipment Installation Dec 2003 Dec 2005 Start of Operations Completion of Tests and Commissioning Jan 2006 Beginning of Start-Up Jan 2006 5. Project Performance Report Ratings Ratings Development Implementation Implementation Period Objectives Progress 01 March 2002 to 31 December 2002 S S 01 January 2003 to 30 June 2003 S HS 01 July 2003 to 28 February 2004 S S 01 March 2004 to 30 November 2006 S PS 01 December 2006 to 31 January 2008 S S S= satisfactory, HS= highly satisfactory, PS= partially satisfactory D. Data on Asian Development Bank Missions Mission Type Staff Mission Start Date Mission End Date Actual Field Days Planned Days Review PS 05-02-2001 05-02-2001 1 0 Inception SC 28-05-2001 30-05-2001 6 3 Inception PS 28-05-2001 30-05-2001 6 3 Inception 29-05-2001 0 2 Review PS 21-06-2001 22-06-2001 4 2 Review SC 27-06-2001 0 0 Review PS 07-09-2001 07-09-2001 2 1 Disbursement PS 07-09-2001 07-12-2001 4 4 Review PS 09-12-2001 13-09-2001 2 2 Review PS 09-12-2001 13-09-2001 4 0 Review PS 18-10-2001 19-10-2001 2 2 Review PS 28-11-2001 29-11-2001 4 2 Review PS 15-01-2002 17-01-2002 3 3 v Mission Type Staff Mission Start Date Mission End Date Actual Field Days Planned Days Review PS 04-02-2002 04-02-2002 1 1 Review PS 13-05-2002 13-05-2002 1 1 Disbursement PS 06-10-2002 15-06-2002 6 6 Review PS 09-02-2002 09-02-2002 1 1 Review PS 10-07-2002 10-07-2002 1 1 Review PS 26-11-2002 26-11-2002 1 1 Disbursement SC 17-02-2003 27-02-2003 22 0 Disbursement NO 17-02-2003 27-02-2003 11 0 Disbursement AS 17-02-2003 27-02-2003 11 0 Review PS 14-05-2003 16-05-2003 3 0 Review SC 14-05-2003 16-05-2003 6 0 Review SC 09-01-2003 09-01-2003 2 1 Review PS 22-10-2003 22-10-2003 1 1 Review PS 15-03-2004 27-03-2004 26 13 Review SC 15-03-2004 27-03-2004 26 13 Review PS 31-03-2004 04-01-2004 4 2 Review AS 31-03-2004 04-01-2004 2 2 Disbursement NO 07-12-2004 21-07-2004 10 10 Review AS 07-12-2004 21-07-2004 10 0 Review PS 09-07-2004 09-08-2004 2 1 Review PS 11-02-2004 11-03-2004 2 1 Review SC 11-02-2004 11-03-2004 4 0 Review PS 04-04-2005 04-08-2005 5 0 Review AS 04-04-2005 04-08-2005 5 0 Disbursement NO 13-06-2005 21-06-2005 9 0 Disbursement
Recommended publications
  • Women's Collective Venture Towards Revival of Animal Husbandary For
    Women’s Collective Venture towards Revival of 6 Animal Husbandary for Livelihood Security - CASE STUDY A Case Study from a Village of Kutch District Meghadeepa Chakraborty How a women’s collective in drought-stricken Dador scripted a new phase in liveli- hood security through a judicious mix of watershed development, fodder banks and cow-milk production. Traditionally, livestock rearing or animal husbandry is considered one of the major sources of livelihood for the rural poor, especially in the semi-arid regions of the country. It contributes towards household income significantly and also supports food security, improved nutrition, and insurance at the household level. However, sustaining animal husbandry has become challenging for communities in arid and semi-arid zones due to a precarious water situation, inaccessibility of fodder, inadequate health facilities, lack of market and appropriate technology. A combination of all these factors often force poor households to look for alternative livelihood options such as migration, local wage labour etc, leaving behind their traditional occupations. Moreover, in such situations, women are the worst affected, posing a greater challenge. This case study gives a picture of a women’s collective, Sairi Jo Sangathan, in the Nakhatrana taluka of the Kutch district of Gujarat, and highlights the efforts made for the revival of the traditional occupation of animal husbandry and the changes it has brought about in the community. In analysing the case, an effort has been made to bring forth the initiatives taken by the women for forming a community- level institution and the arrangements that have been made surrounding the resource use.
    [Show full text]
  • Kutch District Disaster Management Plan 2017-18
    Kutch District Disaster Management Plan 2017-18 District: Kutch Gujarat State Disaster Management Authority Collector Office Disaster Management Cell Kutch – Bhuj Kutch District Disaster Management Plan 2016-17 Name of District : KUTCH Name of Collector : ……………………IAS Date of Update plan : June- 2017 Signature of District Collector : _______________________ INDEX Sr. No. Detail Page No. 1 Chapter-1 Introduction 1 1.01 Introduction 1 1.02 What is Disaster 1 1.03 Aims & Objective of plan 2 1.04 Scope of the plan 2 1.05 Evolution of the plan 3 1.06 Authority and Responsibility 3 1.07 Role and responsibility 5 1.08 Approach to Disaster Management 6 1.09 Warning, Relief and Recovery 6 1.10 Mitigation, Prevention and Preparedness 6 1.11 Finance 7 1.12 Disaster Risk Management Cycle 8 1.13 District Profile 9 1.14 Area and Administration 9 1.15 Climate 10 1.16 River and Dam 11 1.17 Port and fisheries 11 1.18 Salt work 11 1.19 Live stock 11 1.20 Industries 11 1.21 Road and Railway 11 1.22 Health and Education 12 2 Chapter-2 Hazard Vulnerability and Risk Assessment 13 2.01 Kutch District past Disaster 13 2.02 Hazard Vulnerability and Risk Assessment of Kutch district 14 2.03 Interim Guidance and Risk & Vulnerability Ranking Analysis 15 2.04 Assign the Probability Rating 15 2.05 Assign the Impact Rating 16 2.06 Assign the Vulnerability 16 2.07 Ranking Methodology of HRVA 17 2.08 Identify Areas with Highest Vulnerability 18 2.09 Outcome 18 2.10 Hazard Analysis 18 2.11 Earthquake 19 2.12 Flood 19 2.13 Cyclone 20 2.14 Chemical Disaster 20 2.15 Tsunami 20 2.16 Epidemics 21 2.17 Drought 21 2.18 Fire 21 Sr.
    [Show full text]
  • Annual Report 2012 This Is an Indicative Map /Artist’S Representation - Not to Scale
    ANNUAL REPORT 2012 THIS IS AN INDICATIVE MAP /ARTIST’S REPRESENTATION - NOT TO SCALE PROGRAMME AREAS OF AKRSP (INDIA) GUJARAT BHARUCH, SURAT, NARMADA, TAPI, NAVSARI and DANG districts are some of the poorest areas in the state of Gujarat. A very poor tribal community lives on undulating and degraded land that was once heavily forested. Primitive Tribal Groups, largely landless, eke out a livelihood through labour and bamboo work. JUNAGADH and PORBANDAR districts face problems of groundwater depletion and salinity ingress on the coast and over-exploitation of the Gir Forest. Multi-caste and multi-religious communities are struggling to maintain their livelihoods. SURENDRANAGAR and RAJKOT districts are amongst the most drought-prone districts of Gujarat. Most of the villages in these districts face an acute scarcity of water. MADHYA PRADESH KHANDWA, BARWANI, BURHANPUR and KHARGONE districts in Madhya Pradesh are home to marginalized tribal populations who live in poverty despite the rich natural resource base. BIHAR MUZAFFARPUR and SAMASTIPUR districts in fl ood-prone Bihar are low in Human Development Indices (HDI), have very low literacy rates and migration to the urban areas is key source of livelihood. CONTENTS ANNUAL REPORT 2012 STATISTICAL ABSTRACT INNOVATIONS THROUGH THE AGES 07 STATE REPORTS FIELD IMPLEMENTATION 13 Empowering Communities 15 Enhancing Livelihoods - On Farm 20 Enhancing Livelihoods - Off Farm 23 Providing Access To Education 25 Reducing Drudgery And Improving Health 30 Working With The Poorest 33 Reaching Out 37 Financial
    [Show full text]
  • BA REG. POST DATA.Xlsx
    FACULTY -BACHELOR OF ARTS (REGULAR) 10TH CONVOCATION DEGREE DATE - 29-07-2021 SR.N DEGREE NAME SEAT NO. ADDERES PINCODE MOB BARCODE AMOUNT O. SR.NO. Jakhau City: Jakhau Abdasa District: Kachchh State: Gujarat 1 1 Abda Vijaysinh Rupsangji *200950 370640 919998722671 EG779368059IN 41.3 Pincode: 370640 Parmeshwar Gali Bhuj Nagor Society, Nagor, Bhuj Kutch 2 2 Ahir Archana Mahendrabhai 121199 370001 919909072954 EG779368062IN 41.3 Pincode: 370001 3 5 Ahir Manish Dhanji *120147 Jagruti Society Village - Kukma Ta - Bhuj Pincode: 370105 370105 919974326940 EG779368181IN 41.3 Ratnal City: Ratnal Anjar District: Kachchh State: Gujarat 4 7 Ahir Natvar Ruda Arjan 180044 370105 919913186348 EG779368178IN 41.3 Pincode: 370105 Vill- Kathda, Gurumukhdas, Vadi Vistar Tal- Mandvi- 5 9 Amarnani Jyoti Maheshbhai 121042 370465 919825808265 EG779368218IN 41.3 Kachchh Pincode: 370465 Dharm K Antanni Tenament 18 Jaynagar Bhuj Kutch 6 14 Antani Dharm Kinnarbhai *120077 370001 919737204263 EG779368195IN 41.3 Pincode: 370001 Balkrushn Nagar Vill Gadhsisa Ta Mandvi Kutch Pincode: 7 15 Anthu Varshaben Vinod 120389 370445 919979334783 EG779368204IN 41.3 370445 8 16 Ashar Bhavika Bipinbhai 120303 34 G Shree Hari Nagar 3 Mirzapar Tal Bhuj Pincode: 370001 370001 919687731710 EG779368297IN 41.3 Ahir Vas Village - Jaru Ta - Anjar Kachchh Gujarat Pincode: 9 18 Avadiya Dinesh Shamajibhai 120494 370110 919106579704 EG779368306IN 41.3 370110 Near Hanuman Temple, Uplovas , Baladiya,Bhuj.Kachchh 10 19 Ayadi Sachin Nanjibhai 120455 Near Hanuman Temple,Uplovas,Baladiya,Bhuj ,
    [Show full text]
  • Socio-Political Condition of Gujarat Daring the Fifteenth Century
    Socio-Political Condition of Gujarat Daring the Fifteenth Century Thesis submitted for the dc^ee fif DOCTOR OF PHILOSOPHY IN HISTORY By AJAZ BANG Under the supervision of PROF. IQTIDAR ALAM KHAN Department of History Aligarh Muslim University, Aligarb- 1983 T388S 3 0 JAH 1392 ?'0A/ CHE':l!r,D-2002 CENTRE OF ADVANCED STUDY TELEPHONE SS46 DEPARTMENT OF HISTORY ALIGARH MUSLIM UNIVERSITY ALIGARH-202002 TO WHOM IT MAY CONCERN This is to certify that the thesis entitled 'Soci•-Political Condition Ml VB Wtmmimt of Gujarat / during the fifteenth Century' is an original research work carried out by Aijaz Bano under my Supervision, I permit its submission for the award of the Degree of the Doctor of Philosophy.. /-'/'-ji^'-^- (Proi . Jrqiaao;r: Al«fAXamn Khan) tc ?;- . '^^•^\ Contents Chapters Page No. I Introduction 1-13 II The Population of Gujarat Dxiring the Sixteenth Century 14 - 22 III Gujarat's External Trade 1407-1572 23 - 46 IV The Trading Cotnmxinities and their Role in the Sultanate of Gujarat 47 - 75 V The Zamindars in the Sultanate of Gujarat, 1407-1572 76 - 91 VI Composition of the Nobility Under the Sultans of Gujarat 92 - 111 VII Institutional Featvires of the Gujarati Nobility 112 - 134 VIII Conclusion 135 - 140 IX Appendix 141 - 225 X Bibliography 226 - 238 The abljreviations used in the foot notes are f ollov.'ing;- Ain Ain-i-Akbarl JiFiG Arabic History of Gujarat ARIE Annual Reports of Indian Epigraphy SIAPS Epiqraphia Indica •r'g-acic and Persian Supplement EIM Epigraphia Indo i^oslemica FS Futuh-^ffi^Salatin lESHR The Indian Economy and Social History Review JRAS Journal of Asiatic Society ot Bengal MA Mi'rat-i-Ahmadi MS Mirat~i-Sikandari hlRG Merchants and Rulers in Giijarat MF Microfilm.
    [Show full text]
  • List of Volcanoes in India
    List of Volcanoes in India Sl Name Coordinates Location Type Last eruption Details No Barren Island is an island located in the Andaman Sea, dominated by Barren Volcano, the only confirmed active 12°16′41″N volcano in South Asia, and the only active Barren 93°51′29″E / Andaman Active volcano along a chain of volcanoes from 1 2017 Island 12.278°N Islands Volcano Sumatra to Myanmar. The first recorded 93.858°E eruption of the volcano dates back to 1787. Since then, the volcano has erupted more than ten times, with the most recent one being in 2017. Narcondam is a small volcanic island located in the Andaman Sea. The island's peak rises to 710 m above mean sea level, and it is formed 13°26′N of andesite. It is part of the Andaman Islands, 94°17′E / Andaman dormant 2 Narcondam 560 kyrs BP the main body of which lie approximately 13.43°N Islands volcano 124 km (77 mi) to the west. The name 94.28°E Narcondam could have been derived from the Tamil word naraka-kundam, meaning "a pit of Hell" The Deccan Trapsare a large igneous province located on the Deccan Plateau of west- central India (17°–24°N, 73°–74°E) and are one 18°31′N of the largest volcanic features on Earth. The Deccan 73°26′E / 3 Maharashtra - 66 mya term "trap" has been used in geology since Traps 18.51°N 1785–1795 for such rock formations. It is 73.43°E derived from the Scandinavian word for stairs ("trappa") and refers to the step-like hills forming the landscape of the region.
    [Show full text]
  • District Census Handbook, 7 Kutch
    CENSUS 1961 GUJARAT DISTRICT CENSUS HANDBOOK 7 KUTCH DISTRICT R. K. TRIVEDI Superinttndem oj Census Operations, Gujaraf PRICE Rs, 9.60 nP. DISTRICT: KUTCH , I- ~ !i; ts 0:: '( <.!> '( «2: ~ 2: UJ '":::> "' li ,_ I IJ IX I- J 15 i! l- i:! '-' ! iii tii i5 CENSUS OF INDIA 1961 LIST OF PUBLICATIONS CENTRAL GOVERNMENT PUBUCATIONS Census of India. 1961 Volume V-Gujarat is being published in the following parts: I-A General Report I-B Report on Vital Statistics and Fertility Survey I-C Subsidiary Tables II-A General Population Tables II-B(l) General Economic Tables (Tables B-1 to B-IV-C) I1-B(2) General Economic Tables (Tables B-V to B-IX) U-C Cultural and Migration Tables 111 Household Economic Tables (Tables B-X to B-XVII) IV-A Report on Housing and Establishments IV-B Housing and Establishment Tables V-A Tables on Scheduled Castes and Scheduled Tribes V-B Ethnographic Notes on Scheduled Castes and S~heduled Tribes (including reprints) VI Village Survey Monographs {25 Monogra~hsf i " VII-A Selected Crafts of Gujarat VII-B Fairs and Festivals VIII-A Admi nistra tion Report-EnumerationI Not for Sale VIII-B Administration Report-Tabulation IX A tlas Volume X Special Report on Cities STATE GOVERNMENT PUBUCATIONS 17 District Census Handbooks in English 17 District Census Handbooks in Gujarati CONTENTS Pages PREFACE vii-xi ALPHABETICAL LIST OF VILLAGES xiii-xxii PART I (i) Introductory Essay . 1-37 (1) Location and Physical Features, (2) Administrative Set-up, (3) Local Self Government, (4) Population, (5) Housing, (6) Agriculture, (7) Livestock, (8) Irrigation, (9) Co-operation, (10) Economic Activity, (11) Industries and Power, (12) Transport and Communications, (13) Medical and Public Health, (14) Labour and Social Welfare, (15) Price Trends, (16) Community Development.
    [Show full text]
  • District Human Development Report of Kachchh
    Gujarat Social Infrastructure Development Society (GSIDS) General Administration Department (Planning) Government of Gujarat, Gandhinagar DISTRICT HUMAN DEVELOPMENT REPORT KACHCHH District Human Development Report: KACHCHH Copyright : Gujarat Social Infrastructure Development Society (GSIDS) Published By : Gujarat Social Infrastructure Development Society (GSIDS) First Published : 2016 All rights reserved. No part of this publication may be reproduced, stored or transmitted in any form by any means without the prior permission from the publisher. This Report does not necessarily reflect the views of the Gujarat Social Infrastructure Development Society (GSIDS). While every care has been taken to reproduce the accurate data, oversights / errors may occur. If found convey it to the Gujarat Social Infrastructure Development Society (GSIDS). Cover Design : GSIDS, Gandhinagar Setting & Designed : HNGU, Patan The report is prepared by Hemchandracharya North Gujarat University (HNGU), Patan as part of Tripartite MoU among Member Secretary, Gujarat Social Infrastructure Development Society (GSIDS), District Collector, Kachchh and Vice Chancellor, HNGU-Patan MESSAGE Gujarat enjoys the reputation of being the most progressive and well- administered State in the country. The State Government is aware that although progress has been achieved in various sectors since the State’s inception much remains to be done in many fields. The Government is, therefore, making strenuous efforts to provide basic minimum services to the people, including drinking water, housing, health, education, livelihood opportunities, etc. The issues like securing peoples participation, poverty alleviation, social protection to the poor, removal of regional imbalances, good governance are also high priority areas of focus on the agenda of the Government. We are committed to the cause of Human Development.
    [Show full text]
  • The Shaping of Modern Gujarat
    A probing took beyond Hindutva to get to the heart of Gujarat THE SHAPING OF MODERN Many aspects of mortem Gujarati society and polity appear pulling. A society which for centuries absorbed diverse people today appears insular and patochiai, and while it is one of the most prosperous slates in India, a fifth of its population lives below the poverty line. J Drawing on academic and scholarly sources, autobiographies, G U ARAT letters, literature and folksongs, Achyut Yagnik and Such Lira Strath attempt to Understand and explain these paradoxes, t hey trace the 2 a 6 :E e o n d i n a U t V a n y history of Gujarat from the time of the Indus Valley civilization, when Gujarati society came to be a synthesis of diverse peoples and cultures, to the state's encounters with the Turks, Marathas and the Portuguese t which sowed the seeds ol communal disharmony. Taking a closer look at the nineteenth and twentieth centuries, the authors explore the political tensions, social dynamics and economic forces thal contributed to making the state what it is today, the impact of the British policies; the process of industrialization and urbanization^ and the rise of the middle class; the emergence of the idea of '5wadeshi“; the coming £ G and hr and his attempts to transform society and politics by bringing together diverse Gujarati cultural sources; and the series of communal riots that rocked Gujarat even as the state was consumed by nationalist fervour. With Independence and statehood, the government encouraged a new model of development, which marginalized Dai its, Adivasis and minorities even further.
    [Show full text]
  • Geology of Kutch (Katchchh) and Ahmedabad Basin
    ADS REPLY Point No. 1 District Survey Report as per the Ministry Notification S.O. No. 3611 (E) dated 25th July 2018. Reply District Survey Report has been prepared by district authorities in accordance with the MoEF Notification SO-141(E) dated 15th January 2016 on 04/08/2018, the same was submitted to MoEFCC and also enclosed herewith as AnnexureII. Ministry has amended SO-141(E) wherein the procedure for procedure for preparation of DSR for minor mineral was prescribed vide notification SO-3611(E) dated 25th July 2018 which is not availble with District Authorities. Point no.2 Status of the non-compliances of specific condition no. (ii), (xii) and (xv) and the general condition no. (VI) and (vii). Reply Status of the non-compliances of specific condition no. (ii), (xii) and (xv) and the general condition no. (VI) and (vii) is enclosed as Annexure III. 1 | Page M/s. UltraTech Cement Ltd (Unit: Sewagram Cement Works) M/s. UltraTech Cement Ltd. Index S. No. Annexures Documents Page No. 1. Annexure I Letter Issued by MoEFCC, Delhi on 6th March 2019 1-2 2. Annexure II District Survey Report as per the Ministry Notification S.O. 3-65 No. 3611 (E) dated 25th July 2018 3. Annexure III Status of the non-compliances of specific condition no. (ii), 66-128 (xii) and (xv) and the general condition no. (VI) and (vii) Annexure (a) - Wildlife compliance report. Annexure (b) - Greenbelt development/Plantation photograph. Annexure (c) – Rain water harvesting plan and Ground water study report. Annexure (d)- Water sprinkler photographs Annexure (e) - Noise level management report.
    [Show full text]
  • M/S. Virabhai Devabhai Rabari Black TRAP MINING (AREA – 1.86.16 HECTARE)
    PRE FEASIBILITY REPORT FOR M/s. Virabhai Devabhai Rabari Black TRAP MINING (AREA – 1.86.16 HECTARE) OF APPLICANT Mr. Virabhai Devabhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali, Tal: Sayla, Dist: Surendranagar, Gujarat, India 1 | P a g e EXECUTIVE SUMMARY The application has been done for Black Trap for the Environment Clearance of lease area 1.86.16 hectare by M/s. Virabhai Devabhai Rabari is proprietor of the mining of mineral Black Trap. The project is located at Survey No: 194 Paikee in Thoriyali village Panchayat, Tal: Sayla, Dist: Surendranagar, Gujarat Some facts about the mining lease :- I. This is an Existing Black Trap mining project. II. The lease copy of Survey No: 194 paikee is attached as per Annexure-1 of Form- 1 application. III. Blasting shall be involved in this project. IV. Black Trap mining is done only in lease area as provided by the Geology and mining department. V. Approximately 40 Nos. of workers shall get employment opportunity. VI. Category of project – B VII. Sr. No. in the Schedule – 1(a) VIII. The existing Lease area – 1.86.16 hectare. IX. The production of Black Trap mineral is 42000 MT/Year. X. Water consumption is 2.5 KL/Day. Out of this, 1.2 KL/Day is used for Domestic purpose and 1.3 KL/Day is used for Sprnkling purpose. Source of Water is Bore well located at our stone crushing plant which is nearer to our mining activity. XI. There is no any industrial water consumption and wastewater generation from the project.
    [Show full text]
  • Gender and the Natural Resources – Experiences and Achievements of AKRSP(I) in Gujarat 55
    Gender and the Natural Resources – Experiences and Achievements of AKRSP(I) in Gujarat 55 Table of Contents Foreword iii Preface and acknowledgements v Abbreviations vii Glossary viii A. Executive Summary 1 B. Detailed Report 2 1. AKRSP(I) in India – an Introduction 2 1.1 Organisational goals and key strategies 2 1.2 The geographical areas 3 2. AKRSP(I)’s programmes and thrust areas 5 2.1 The nature programmes in brief 5 2.2 The ‘people’ programmes 5 2.3 Women focus and gender 6 3. The Study 12 3.1 Rationale and need for the study 12 3.2 Methodology 14 3.3 Some problems faced 14 4. Gender and NR – learning through case studies 15 4.1 Problem analysis 15 4.2 The quest for drinking water 17 4.3 Who tills these lands?: gender issues in agricultural 23 intensification and drought management 4.4 Greening the landscape – gender in forest 35 protection and regeneration 4.5 Micro-enterprise in natural resources 37 5. Narrowing the gender gap: major emergent trends and lessons 40 6. Conclusion 42 Annexes 45 Gender and the Natural Resources – Experiences and Achievements of AKRSP(I) in Gujarat 47 Foreword NGOs who work directly with rural communities often find it difficult to find an appropriate balance between the ‘joy of doing’ versus the need to reflect, document and disseminate ‘what has been done’. Field staff finds it difficult to find time for documenting and analysing with the result that the processes followed and lessons learnt are shared only when they interact directly with the staff or the communi- ties.
    [Show full text]