Dana-Farber Chestnut Hill Map and Directions

Total Page:16

File Type:pdf, Size:1020Kb

Dana-Farber Chestnut Hill Map and Directions MAPS AND DIRECTIONS Dana-Farber Cancer Institute – Chestnut Hill is located in the Life Time Center (formerly the Atrium Mall) at 300 Boylston St., in Newton, Mass. It is less than five miles from Dana-Farber’s Longwood location and accessible from major highways and by public transportation. DRIVING DIRECTIONS TAXI AND RIDE-SHARE SERVICES If you use a smartphone app or navigation device for directions, Taxis and ride-share services (Lyft, Uber, etc.) pick up and drop enter this address: 300 Boylston St., Newton, MA. off passengers in the valet parking area on level P3 of the Life Time Center parking garage. • From the Mass Pike (I-90 East or I-90 South): Take Exit 127 (Newton/Watertown). As you exit, follow Washington Street PUBLIC TRANSPORTATION and then take a slight right onto Centre Street. Follow Centre Dana-Farber’s Chestnut Hill location is served by the MBTA’s Street for 1.8 miles. Just after you pass the CVS Pharmacy at Green Line D branch and route 60 bus service. There is a free the intersection of Centre and Pleasant Streets, take a sharp shuttle that runs between Dana-Farber and the closest Green left on Langley Rd. Go 1.1 miles to Boylston Street. Turn left Line stop. to reach 300 Boylston St. The Life Time Center and its parking garage will be on your right (enter off of Route 9 at the FIRST • SUBWAY, with free shuttle to Dana-Farber: A free shuttle entrance). runs between Dana-Farber’s Chestnut Hill location and the Chestnut Hill stop on the Green Line subway’s D branch. • From I-95 (North or South): Take Exit 36a (Brookline/Route 9 The Life Time Center operates the shuttle and it only serves East). Merge onto Route 9 East (Boylston St.) toward Brookline/ the Green Line’s Chestnut Hill stop; it is not available at the Boston and go 2.6 miles to reach 300 Boylston St. The Life Newton Center stop. Time Center and its parking garage will be on your right (enter off of Route 9 at the FIRST entrance). • BUS: The MBTA’s route 60 bus serves Chestnut Hill and • From Dana-Farber’s Yawkey Center for Cancer Care the Longwood Medical Area. In Chestnut Hill, the bus stops (Longwood Medical Area): Turn left when you exit Dana-Farber’s at 325 Boylston St. (outbound, Route 9 West) and at parking garage. At the light, turn left onto Brookline Ave. 280 Boylston St. (inbound, Route 9 East). The same bus and proceed one-half mile. Turn right onto Washington St., route stops on Brookline Ave. near Dana-Farber’s Longwood following signs for Route 9 West (Newton/Worcester). location. For schedule and route information, visit Continue on Route 9 West (Boylston St.) for 3.4 miles. Just www.mbta.com/schedules/60/line. after you pass the Life Time Center at 300 Boylston St., take a slight right onto Jackson St., following signs for Langley Rd. Turn left on Langley Rd., then left again onto Boylston St./ Route 9 East. The Life Time Center and its parking garage will be on your right (enter off of Route 9 at the FIRST entrance). Parking is free for patients and their companions on level P3 in the Life Time Center parking garage. When available, we encourage you to use the free valet parking service located outside the Boylston elevator. MAPS AND DIRECTIONS CAMBRIDGE WATERTOWN NONANTUM BOSTON 16 90 90 Massachusetts Turnpike 95 ike ALLSTON rnp s Tu sett achu WEST NEWTON Mass BACK BAY 30 AUBURNDALE 90 90 NEWTONVILLE BRIGHTON Dana-Farber Cancer Institute 450 Brookline Avenue SOUTH END 93 SOUTH BOSTON 20 NEWTON 9 CHESTNUT HILL BROOKLINE Dana-Farber - 16 Chestnut Hill 9 300 Boylston Street 28 95 NEWTON 9 HIGHLANDS ROXBURY NEWTON UPPERFALLS 93 NEEDHAM HEIGHTS 95 T Chestnut Hill Hammond Pond Star Market Hammond Park Parkway Hammond Park Langley Road Parkway Boylston Street Dana-Farber - Boylston Street Chestnut Hill Langley Road 300 Boylston Street Hammond Park Dana-Farber - Parkway Chestnut Hill Boylston Street 300 Boylston Street Wegmans Hammond Park Florence Street Parkway Boylston Street Wegmans For more information about Dana-Farber – Chestnut Hill, visit www.dana-farber.org/chestnuthill. Florence Street Parking is free for patients and their companions on level P3 in the Life Time Center parking garage. When available, we encourage you to use the free valet parking service located outside the Boylston elevator..
Recommended publications
  • Public Comments
    Arborway Parkways Improvement Project Public Comments Submitted via DCR Online Comment Portal deadline 11/6/2020 Time Comment First Last Address (City) State Zipcode 10/21/20 3:27 PM The 2 circles alternative is the one that I prefer (followed by the 1 circle, then no circle designs). Roundabouts are a safer intersection design compared to a signalized intersection and should be used to Domenic Privitera Boston MA 02120 improve the safety of the Arborway. 10/22/20 10:18 AM 1. The paths should not be shared use. With E‐bikes, micro mobility, cargo bikes, accessible conveyances, and pedestrians wearing ear buds and not able to hear an approaching bicyclist, there will be crashes if Anne Lusk Brookline MA 02445‐6756 it is shared use due to speed differentials and widths of cargo/Fun2Go/child carrier bikes. 2. Bicyclists should not be on a path beside the traffic while the pedestrians have paths with wide green spaces by the homes, trees, and lawns. Riding beside the sound, mobile source air pollution, and dust from fast moving vehicles is not pleasant or healthy, Also, on a two way path, bicyclists riding with approaching vehicular traffic on their right would not be comfortable. At night, the intense and direct‐beam LED bike lights would be confusing to drivers who would see a beam of light approaching on their right. 3. The bicyclists should be shaded by trees, especially with hot summers, and for 24 hour riding, have continuous lighting directly over the two way bike path. The lighting should not be from the tall cobra head for the road because tree limbs obstruct the light from reaching the bike path, creating light and dark sections on the pathway.
    [Show full text]
  • How to Find Us: by Car
    HOW TO FIND US: BY CAR Tufts Medical Center is easily accessible by car from the Massachusetts Turnpike (Route 90), the Central Artery and the Southeast Expressway (Route 93). The hospital is located in downtown Boston—in Chinatown and the Theater District—and within walking distance of the Boston Common, Downtown Crossing and many hotels and restaurants. The main entrance for patients and visitors at Tufts Medical Center is 800 Washington Street, Boston, MA 02111. Floating Hospital for Children is located at 755 Washington Street. Emergency services for adult as well as pediatric patients are located at the North Building, 830 Washington Street. Telephone driving directions are available by calling 617-636-5000, ext. 5 or visit www.tuftsmedicalcenter.org/directions. By cab and train: The hospital is a 15-to-20-minute cab ride from Logan Airport and within walking distance of South from from New Hampshire 93 95 New Hampshire Station. 128 and Maine 2 From the north (I-93 southbound): from 95 Western MA » 1 Take Exit 20 A (South Station) onto Purchase Street. Continue along Purchase Street (this becomes the Logan International TUFTS MEDICAL CENTER Airport Surface Artery). & FLOATING HOSPITAL from New York FOR CHILDREN » Turn right onto Kneeland Street. Go straight several blocks. » Turn left onto Tremont Street. The hospital’s garage is on 90 Boston Harbor your left, just past the Wang Theatre/Boch Center. 95 From the south (I-93 northbound): 93 128 » Take Exit 20 (Exit 20 is a two-lane ramp for I-90 East & from West, and South Station). 3 Cape Cod from Providence, RI » Stay left, following South Station/Chinatown signs.
    [Show full text]
  • Boston Redevelopment Authority D/B/A Boston Planning & Development Agency
    BOSTON REDEVELOPMENT AUTHORITY D/B/A BOSTON PLANNING & DEVELOPMENT AGENCY SCOPING DETERMINATION 560-574 COMMONWEALTH AVENUE / 645-665 BEACON STREET (KENMORE HOTELS) SUBMISSION REQUIREMENTS FOR DRAFT PROJECT IMPACT REPORT (“DPIR”) PROPOSED PROJECT: 560-574 COMMONWEALTH AVENUE / 645-665 BEACON STREET (KENMORE HOTELS) PROJECT SITE: 1.07 ACRE AREA BOUNDED BY COMMONWEALTH AVENUE TO THE NORTH, BROOKLINE AVENUE TO THE SOUTHEAST, AND THE MASSACHUSETTS TURNPIKE TO THE SOUTH PROPONENT: MARK KENMORE LLC AND BUCKMINSTER ANNEX CORPORATION DATE: JUNE 20, 2018 The Boston Redevelopment Authority (“BRA”), d/b/a the Boston Planning & Development Agency (“BPDA”) is issuing this Scoping Determination pursuant to Section 80B-5 of the Boston Zoning Code (“Code”), in response to a Project Notification Form (“PNF”), which Mark Kenmore, LLC, and Buckminster Annex Corporation (the “Proponents”) filed on March 12, 2018 for the proposed 560-574 Commonwealth Avenue/645-665 Beacon Street project (the “Proposed Project”). Notice of the receipt by the BPDA of the PNF was published in the Boston Herald on March 12, 2018, which initiated a public comment period with a closing date of April 18, 2018. Pursuant to Section 80A-2 of the Code, the PNF was sent to the City’s public agencies/departments and elected officials on March 13, 2018. Hard copies of the PNF were also sent to all of the Impact Advisory Group (“IAG”) members. The initial public comment period was subsequently extended until May 1, 2018, through mutual consent between the BPDA and the Proponent to allow more time for the general public to provide comments and feedback. On May 30, 2017, in accordance with the BRA’s policy on mitigation as outlined in the Mayor’s Executive Order Relative to the Provision of Mitigation by Development Projects in Boston, Mark Development and Buckminster Annex Corporation submitted a Letter of Intent to redevelop properties at 560-574 Commonwealth Avenue and 645-665 Beacon Street.
    [Show full text]
  • Chapter 3—Existing Conditions: Bowker Overpass
    Massachusetts Turnpike Boston Ramps and Bowker Overpass Study December 2015 Chapter 3—Existing Conditions: Bowker Overpass 3.1 INTRODUCTION This chapter describes the analysis of the Bowker Overpass sub-area of the Massachusetts Turnpike — Boston Ramps Study. As in Chapter 2, which discusses the larger study area, this section summarizes existing transportation conditions during a typical workday, emphasizing the peak-commuting hour. This section also reviews crash data and land use conditions. The Transit Data and Environmental Conditions provided in Chapter 2 apply to the Bowker Overpass sub-area of the study. 3.2 TRAFFIC CONDITIONS Developing a base knowledge of current traffic conditions fosters an understanding of where congestion occurs now and where it likely would occur in the future. The first step in calculating traffic congestion requires using current or recent turning- movement and traffic counts. Traffic counts were obtained along the Massachusetts Turnpike between the Allston Tolls and Ted Williams Tunnel, and at specific intersections throughout the study area. The volumes used in this analysis are presented in Section 3.2.1. Section 3.2.2 summarizes system performance. 3.2.1 Existing (2010) Traffic Volumes The Bowker Overpass delineates the Back Bay and Fenway/Kenmore neighborhoods, and runs roughly along the Muddy Brook between the Emerald Necklace/Back Bay Fens and the Charles River Esplanade. It connects Boylston Street and Fenway with Storrow Drive over the Massachusetts Turnpike, Commonwealth Avenue, and Beacon Street (Figure 3-1). The Bowker is also known as the Charlesgate Overpass, as Charlesgate is the name of the roadway that the overpass carries.
    [Show full text]
  • 350 Boylston Street
    Project Notification Form 350 BOYLSTON STREET Submitted to: BOSTON REDEVELOPMENT AUTHORITY City Hall Square, 9th Floor Boston, MA 02201 Submitted by: THE DRUKER COMPANY, LTD. 50 Federal Street Boston, MA 02110 December 18, 2007 Project Notification Form 350 Boylston Street Submitted to: BOSTON REDEVELOPMENT AUTHORITY One City Hall Square Boston, MA 02201 Submitted by: THE DRUKER COMPANY, LTD. Prepared by: In Association with: EPSILON ASSOCIATES, INC. Pelli Clarke Pelli Architects 3 Clock Tower Place CBT Architects, Inc. Suite 250 Goulston & Storrs, P.C. Maynard, MA 01754 Vanasse Hangen Brustlin, Inc. Haley & Aldrich, Inc. Nitsch Engineering, Inc. Weidlinger Associates, Inc. Cosentini Associates, Inc. Moriarty & Associates December 18, 2007 TABLE OF CONTENTS PAGE 1.0 SUMMARY 1-1 1.1 Project Identification 1-1 1.2 Project Summary 1-3 1.2.1 Project Site 1-3 1.2.2 Proposed Development 1-3 1.2.3 Design Objectives 1-3 1.2.4 Public Review 1-7 1.2.5 Public Benefits 1-7 1.3 Consistency with Zoning 1-8 1.4 Legal Information 1-9 1.4.1 Legal Judgments Adverse to the Proposed Project 1-9 1.4.2 History of Tax Arrears on Property 1-9 1.4.3 Evidence of Site Control/Nature of Public Easements 1-9 1.5 Public Agencies 1-9 2.0 PROJECT DESCRIPTION 2-1 2.1 Existing Site 2-1 2.2 Proposed Development Program 2-1 2.2.1 Building Program 2-1 2.2.2 Approximate Dimensions 2-1 2.3 Determination of Alternative Considered / Project History 2-2 2.4 Schedule 2-2 3.0 ASSESSMENT OF DEVELOPMENT REVIEW COMPONENTS 3-1 3.1 Transportation 3-1 3.1.1 Introduction 3-1 3.2 Environmental Protection 3-4 3.2.1 Wind 3-4 3.2.2 Shadow 3-4 3.2.3 Daylight 3-5 3.2.4 Solar Glare 3-5 3.2.5 Air Quality 3-5 3.2.6 Stormwater/Water Quality 3-5 3.2.7 Flood Hazard Zones/Wetlands 3-6 3.2.8 Geotechnical/Groundwater 3-6 3.2.8.1 Existing Site Conditions 3-6 3.2.8.2 Subsurface Soil and Bedrock Conditions 3-6 3.2.8.3 Groundwater 3-7 3.2.8.4 Proposed Foundation Construction 3-8 2099/PNF/350 Boylston Street Page i Table of Contents Epsilon Associates, Inc.
    [Show full text]
  • Bridging the Gaps in the Emerald Necklace: Route 9 to Brookline Avenue
    Bridging the Gaps in the Emerald Necklace: Route 9 to Brookline Avenue G.R.8 Engineers Inc. Tony Cennamo Allison Goulet Zach Shapiro Ryan St.Martin 1 BRIDGING THE GAPS IN THE EMERALD NECKLACE: Route 9 to Brookline Avenue Presented to: Peter Furth, Senior Design Project Professor April 2008 From: G.R.8. Engineers Inc. Tony Cennamo [email protected] Allison Goulet [email protected] Zach Shapiro [email protected] Ryan St.Martin [email protected] 2 Table of Contents List of Figures ........................................................................................................... ii Preface .....................................................................................................................1 1. Introduction .........................................................................................................3 2. Route Alternatives ...............................................................................................6 2.1 Netherlands Road.................................................................................................................. 6 2.2 Brookline Avenue................................................................................................................... 8 2.3 River Road ............................................................................................................................. 9 2.4 Route 9 ................................................................................................................................ 11 3. Netherlands Road ..............................................................................................13
    [Show full text]
  • G Vp How to Find Us: Public Transportation (Mbta)
    HOW TO FIND US: PUBLIC TRANSPORTATION (MBTA) STATE HOUSE PARK STREET BEACON STREET 93 SUMMER STREET RY TE DOWNTOWN CROSSING BOSTON CHARLES STREET T COMMON STREE TREMONT CENTRAL AR SOUTH WASHINGTON STREET STATION ESSEX STREET 90 BOYLSTON CHINATOWN PUBLIC GARDENS MASS TURNPIKE YLSTON STREET STREET CENTRAL AR BO KNEELAND HARRISON T STREET STUAR TREMONT STREET FLOATING HOSPITAL AVENUE TERY ARLINGTON STREET G TUFTS VP MEDICAL CENTER OAK STREET 93 90 MASS TURNPIKE The Tufts Medical Center Orange Line stop is located across from the main Tufts Medical Center entrance at 800 Washington Street. Other nearby MBTA stops are Downtown Crossing or South Station (Red Line) and Boylston (Green Line). We are also conveniently located within walking distance to bus lines 9, 11, 43, 55, and the Silver Line. By cab + train For transportation information online, Tufts Medical Center is a 15- to- 20-minute visit any of the following web sites: cab ride from Logan Airport and within • www.mbta.com : Complete listing of walking distance of South Station and the public transportation resources, including Back Bay train stations. Subway maps, bus schedules and maps or call Customer and commuter rail schedules are available Service at 617-222-3200. online at www.mbta.com. • www.smartraveler.com : Real-time traffic and transit information. 10714 012317 GETTING AROUND THE HOSPITAL CAMPUS CHINATOWN T T To South Station, Route 93 and Mass Pike Stuart Street T Kneeland Street To 75 Kneeland Street THEATRE DISTRICT Tufts 7th TUPPER 10th 35 KNEELAND University 15 KNEELAND et d e Dental R re eet Wilbur Theatre HNRC Av 711 WASHINGTON School St.
    [Show full text]
  • FENWAY Project Completion Report
    BOSTON PUBLIC LIBRARY Digitized by the Internet Archive in 2011 with funding from Boston Public Library http://www.archive.org/details/fenwayprojectcomOObost 1983 Survey & Planninsr Grant mperty Of bGblu^ MT A.nTunKifv PART I -FENWAY Project Completion Report submitted August 31, 1984 to Massachusetts Historical Commission Uteary Boston Landmarks Commission Boston Redevelopment Authority COVER PHOTO: Fenway, 1923 Courtesy of The Bostonian Society FENWAY PROJECT COMPLETION REPORT Prepared by Rosalind Pollan Carol Kennedy Edward Gordon for THE BOSTON LANDMARKS COMMISSION AUGUST 1984 PART ONE - PROJECT COMPLETION REPORT (contained in this volume) TABLE OF CONTENTS I. INTRODUCTION Brief history of The Fenway Review of Architectural Styles Notable Areas of Development and Sub Area Maps II. METHODOLOGY General Procedures Evaluation - Recording Research III. RECOMMENDATIONS A. Districts National Register of Historic Places Boston Landmark Districts Architectural Conservation Districts B. Individual Properties National Register Listing Boston Landmark Designation Further Study Areas Appendix I - Sample Inventory Forms Appendix II - Key to IOC Scale Inventory Maps Appendix III - Inventory Coding System Map I - Fenway Study Area Map II - Sub Areas Map III - District Recommendations Map IV - Individual Site Recommendations Map V - Sites for Further Study PART TWO - FENWAY INVENTORY FORMS (see separate volume) TABLE OF CONTENTS I. INTRODUCTION II. METHODOLOGY General Procedures Evaluation - Recording Research III. BUILDING INFORMATION FORMS '^^ n •— LLl < ^ LU :l < o > 2 Q Z) H- CO § o z yi LU 1 L^ 1 ■ o A i/K/K I. INTRODUCTION The Fenway Preservation Study, conducted from September 1983 to July 1984, was administered by the Boston Landmarks Commission, with the assistance of a matching grant-in-aid from the Department of the Interior, National Park Service, through the Massachusetts Historical Commission, Office of the Secretary of State, Michael J.
    [Show full text]
  • Landmark Center Redevelopment 201 Brookline Avenue
    Landmark Center Redevelopment 201 Brookline Avenue Boston, Massachusetts Submitted to: Boston Civic Design Commission September 5, 2017 Proponent: Fenway Enterprises LLC on behalf of Landmark Center Ventures LLC Samuels & Associates 136 Brookline Avenue Boston, MA 02215 Prepared By: Elkus Manfredi Architects 25 Drydock Avenue Boston, MA 02210 Phase II Building Summary • Site Area: 383,072 sf • Gross Floor Area: 480,251 sf • Total Project Area: 1,896,507 sf (Includes above grade garage) • FAR: 4.95 • Building Height: 208’-6” • No. of Stories: 14 Stories • Shared Total Parking Spaces: Up to 1,500 +/- (Also serving 308,000 sf of retail and office in Landmark Center) SAMUELS & ASSOCIATES | ELKUS MANFREDI ARCHITECTS | SEPTEMBER 5, 2017 Back Bay Back Bay Site FULLERTON STREET PARK DRIVE BOYLSTON STREET Fenway/Kenmore South End BROOKLINE AVENUE Longwood Medical Area SAMUELS & ASSOCIATES | ELKUS MANFREDI ARCHITECTS | SEPTEMBER 5, 2017 BROOKLINE AVE. Site PARK DRIVE FULLERTON STREET SAMUELS SAMUELS & &ASSOCIATES ASSOCIATES | |ELKUS ELKUS MANFREDI MANFREDI ARCHITECTS ARCHITECTS | |SEPTEMBER SEPTEMBER 5, 5, 2017 2017 PAGE 3 Project History and Overview The Landmark project was previously reviewed and approval was granted in January 2014. Market conditions have changed considerably since 2014, prompting the proponent to reevaluate the previously approved project and propose changes to both the program and development plan. Portions of the project are moving forward as previously approved and are referred to as Phase I. The changes to the previously approved project being presented to BCDC in this submission are referred to as Phase II. A continuing main goal of the project is to enhance existing and create new pedestrian connections and experiences for the public.
    [Show full text]
  • Map and Directions
    Map and Directions 800 Huntington Avenue • Boston, MA 02115 • 617-936-6100 • MassEyeAndEar.org/Longwood Boston Children’s Valet Parking Massachusetts Hospital Longwood Avenue Valet parking is available in our garage College of Art off Frawley Street. and Design Harvard Shattuck Street Medical Brigham & Women’s School Hospital Shapiro Harvard Cardiovascular School of Center Francis Street Directions to Parking Garage Public Longwood Health Medical Area From Huntington Avenue: Fenwood Road HuntingtonGreen Line “E” (Arborway) Avenue Driving West: Turn left on Frawley Street, then turn left into our garage. Driving East: Turn right on Frawley Turn down Frawley Huntington Avenue Street, then turn left into our garage. Street to access Mission parking garage Hill Brigham Mission Mass. Eye Circle Park and Ear, Fenwood Tremont Street Garage Parking Longwood Road All parking tickets must be processed at Huntington Avenue the reception desk before returning to X your vehicle. Do NOT leave your ticket in your car. Kevin W. Fitzgerald Park Frawley Street Mission Street Parker Hill Avenue 10/05/12 Parking Garage MBTA Stops Directions to Mass. Eye and Ear, Longwood Driving Directions Driving Directions Subway Directions From the North (via I-93 S) From the West (via I-90 E) (via MBTA) • Take Exit 26 (Storrow Drive West). • Take Exit 18 (Brighton/Cambridge) Stay in right Green Line • Take Kenmore Square/Fenway exit (on left ). lane aft er toll. D Line (Riverside) - Stop: Kenmore Station. • Bear left at fork and follow signs for Fenway. (Stay • Bear right towards Doubletree Guest Suites Hotel. Connect with bus service (65). in right lane on exit ramp.) • At traffi c light, take right toward Downtown E Line (Heath Street) - Stop: Fenwood Road • Bear right towards Boylston Street Outbound.
    [Show full text]
  • FRIENDS of the MUDDY RIVER No. 49 Fall 2020
    FRIENDS OF THE MUDDY RIVER No. 49 Fall 2020 A Muddy River Cruise down the Riverway 22. Bellevue Street Bridge 23 Chapel Street Bridge/Bridle Path 24. Round House We ended our Spring cruise down the Muddy River at the North end of Leverett Pond and now will be entering the Riverway section of the Emerald Necklace. Here, there is an extensive, tall granite headwall with a distinctive capstone topping that has a large arched opening. It carries the Muddy River underground for quite some distance and eventually under Boylston Street (Washington Street) where it immediately comes out at a much smaller curved granite headwall and into a 10’ wide cut stone water way. This section of the Muddy River is virtually hidden by a low 15“ wide patterned concrete wall that parallels River Road. On the other side of this small channel, a steep, heavily vegetated slope rises up to the overpass. This is the area of Brookline’s recently improved bike crossing park area. The narrow water course goes underground one more time to allow the on ramp from River Road to enter the outbound lane of the Jamaicaway. The Riverway ends and the Jamaicaway begins at the Curley Overpass. The final outlet is through an identical granite headwall where the Muddy River finally becomes a recognizable, natural flowing stream and parallels Brookline Avenue. Friends of the Muddy River Fall 2020 1 The area of the Curley Overpass is the narrowest point of the Riverway and one of the first significant alterations to accommodate the modern world of vehicular traffic.
    [Show full text]
  • Route 9 Corridor Study in Brookline
    Route 9 Corridor Study in Brookline Route 9 Corridor Study in Brookline Project Manager Chen-Yuan Wang Project Principal Mark Abbott Data Analysts Chen-Yuan Wang Benjamin Erban Graphics Kenneth Dumas Kate Parker-O'Toole Kim DeLauri Cover Design Jane Gillis The preparation of this document was supported by the Federal Highway Administration through MPO Planning Contract #105757 and MPO §5303 Contract #102694 and #106374. Central Transportation Planning Staff Directed by the Boston Region Metropolitan Planning Organization. The MPO is composed of state and regional agencies and authorities, and local governments. January 2020 (DRAFT) Route 9 Corridor Study in Brookline January 2020 To request additional copies of this document or copies in an accessible format, contact Central Transportation Planning Staff State Transportation Building Ten Park Plaza, Suite 2150 Boston, Massachusetts 02116 (857) 702-3700 (617) 570-9192 (fax) (617) 570-9193 (TTY) [email protected] ctps.org Page 2 of 92 Route 9 Corridor Study in Brookline January 2020 Abstract The Route 9 Corridor Study in Brookline is one in a series of studies supported by the Boston Region Metropolitan Planning Organization that address safety, mobility, and access on the Boston region’s roadways. This report identifies specific transportation issues and concerns in the Route 9 corridor in Brookline, Massachusetts; presents an in-depth analysis of multiple transportation-related factors, such as bicycle accommodation and safety at pedestrian crossings; proposes short- and long-term improvements to address the problems; and provides a vision for the corridor’s long-term development. Page 3 of 92 Route 9 Corridor Study in Brookline January 2020 TABLE OF CONTENTS PAGE Executive Summary .............................................................................
    [Show full text]