ANNEXURE - I STATEMENT OF RECENTLY COMPLETED WORKS

Sl. Contracting Date of Name of the work Agreement No. CA Value Remarks. No Agency completion

Supply & Installation of Signal with Telecom work for Railway siding JSWCL/Salboni/35 Dated 0 1 pertaining to 2 x 1.2 MTPA Grinding unit at JSW Cement Ltd., Salboni JSW 13 Coreres Work Completed 1.03.2017 EI work.

Design and Construction of Civil, Structures and Track Works for i) LOI No. : Double Line Railway involving Formation in Embankments/Cutting, GIL/DFCC/201/C&C/2016- Ballast on Formation, Track Works, Bridges, Structures, Buildings, 17/2752 Dated 06.03.2017 Yard, Integration with IR Existing Railway System and Testing & 2 ii) LOI No. : GMR 1.73 Corers Work Completed Commissioning on Design-Build Lump Sum Basis for Mughal Sarai to GIL/DFCC/201/C&C/2016- New Karchana Station (Including) of Eastern Dedicated Freight 17/2753 Dated 06.03.2017 Corridor (Contract Package 201) "Project" - Supply of material Outdoor S&T Works for Track works in DFCC CP 201 - LOI ("LOI")

Supply, Erection, Modification, Testing & Commissioning of signaling & Telecommunication work for Phase 1 at new Railway siding for NBIC/Railway Siding 3 NOCCI Balasore Infrastructure Company siding taking off from (S&T)/2017-18/1727 dated NOCCI 2.43 Corers Work Completed Balasore Railway station under Kharagpur Division of South Eastern 07.12.2017 Railway. Work of trenching & laying of underground signaling cables/power CORE/S&T/Tender/Sig/KAN- Dy. CSTE/RE /KKK 5.10 Crores 23.08.2016 27 Stations Commissioned & Completed Final cable, casting of foundations, supply of certain equipment/materials, SNT-PKR/871 Bill under processes erection of apparatus cases & fixing of equipment, wiring, testing & dated 05-04-2011 4 commissioning in connection with modification of Central Panel at stations, modification of MACLS at L.C. Gates in Khana-Sainthia- Pakur and sainthia-Pandabeswar sections over Eastern Railway.

Trenching & laying of underground signalling cables/ power cable, C.A No. Dy. CSTE/RE/ALD 3.50 Crores 30.06.2016 Work Completed & Station Commissioned casting of foundations, supply of certain equipment/ materials, CORE/S&T/Tender/Sig/VZM- Final Bill pending erection of apparatus cases & fixing of equipment, wiring, testing & SPRD/881 commissioning in connection with modification of Central Panel at Date 02.01.2013 stations and modification of MACLS at L.C.Gates in Vijayanagaram- Singapur Road section of East Coast Railway under Deputy Chief 5 Signal & Telecom Engineer, Railway Electrification, Kolkata working under Chief Project Manager, Railway Electrification, Bhubaneshwar to suit 25 K.V AC Traction with following details:- (i) RE modification of existing PI at 8 stations. (ii) Minor modification at 7 stations. (iii)RE modification of existing MACLS at 5 L.C. Gates. Work of trenching & laying of underground signalling cables/ power C.A. No. Dy. CSTE/RE 1.5 Crores March, 2016 Station commissioned & work Completed cable, casting of foundations, supply of certain equipment/ materials, CORE/S&T/Tender/Sig/UDL- /KKK erection of apparatus cases & fixing of equipment, wiring, testing & STN/887 Dated 24.01.2014 commissioning in connection with provision of Central Panel at station and provision of MACLS at L.C.Gate in Andal (excl.) – Sitrampur (excl.) section of Eastern Railway under Deputy Chief Signal & 6 Telecom Engineer, Railway Electrification, Kolkata working under Chief Project Manager, Railway Electrification, Bhubaneshwar to suit 25 K.V AC Traction with following details: (i)Provision of PI at 1 station. (ii)Provision of MACLS at 1 L.C.Gate. (iii)Minor modification at 2 stations & 2 L.C.Gates.

Signalling (Panel Interlocking) work in connection with “Doubling work CSTE/Con/314 dated 16- CSTE/CON/E. Rly. 5.40 Crores 22.06.2015 5 Stations Commissioned & Completed Final 7 from Ambikakalna to Nabadwipdham section in Howrah division of 09-2011 Bill under processes Eastern Railway. Provision of Outdoor and Indoor Signaling System for Panel “C” (MGR RITES/S&T/NCPP/DADRI/200 M/s NATIONAL 2.79 Crores 05.09.2014 Work completed and commissioned in due Yard) & Alternation for Panel “A” (R&D Yard) In connection with 9-Package-1,3&4 CAPITAL POWER Variation 3.79 time 8 Addition/Modification of Rail Transport System of M/s NATIONAL dated 11-10-11 PLANT, DADRI. Crores CAPITAL POWER PLANT, DADRI. Order for Panel Interlocking with MACL Signaling work in connection SBC/RNJ/2012-13/2294 Dated Sonar Bangla 8.10 Crore 30.04.2015 Work completed and commissioned in due with construction of Railway Siding from existing Rail head at Gankar 03.02.2014. Cement time Railway Station of Eastern Railway for connecting the Cement under supervision of 9 Grinding unit of M/s. Sonar Bangla Cement (A Division of Century RITES Textiles and Industries Ltd.) at Gankar, Dist. Murshidabad, .

Work for CIVIL, Engineering & OHE work turnkey basis including 15.46 W.O. NO. GEN/RLY- Ramsarup Lohh 10 drawing & designing as per Railway System at Gokulpur-Nimpura with Crores 26.04.10 Work Completed Siding/90002 dt. 08.08.2008 Udyog Central Panel Interlocking of Kharagpur Div. S.E. Rly. Rashmi Metaliks Ltd & Ramsarup Lohh Udyog Ltd Private Siding at RLUL/SER/112 dated 07-05- Private Siding Rs.6.55 Crore 12-02-2009 Work completed in due time. 11 Gkulpur-Nimpura 2008 NSPCL-SAIL : Provision of Signalling & Telecommunication facilities RITES/CO/S&T/ NSPCL/7655 5.93 Crores Work completed and commissioned 12 in New Coal Complex Yard at Bhilai Steel Plant. dated 07-07-2008

Installation, testing commissioning of the S&T works of Rajgoda- i) A93/CPDC-10504/…../Rly- KEC International 3.8 Crores Work completed and commissioned in connection with the doubling work between Rajgoda-Tamluk S&T/RGD-TMK Jn. Cabin in KGP division of S. E. Railway. Dt. 18.04.12 13 ii) A93/CPDC-..../Rly-S&T/RGD- TMK dt. 16.08.2012. Temporary connection from Sonar Bangla Cement Siding at Gankar. SBC/RNJ/2013-14/014 Dated Sonar Bangla 1.84 Crores 21.06.2013 Work completed 02.04.2013 Cement 14 under supervision of RITES Introduction of Panel Interlocking to be done in connection with CSTE/CON/254 dt.02-12-2008 CSE/CON/E. Rly. 2.97 Crore 07.01.2013 Completed and commissioned conversion of Halt station in to Block Station at Lebutala, Malatipur, Kolkata 15 Madhyampur and full rake capacity at Aranghata station in Sealdah division of Eastern Railway Execution of work and part supply of materials for provision of Panel S&T/ Con/PI/Jn. Cabin- Dy. CSTE/Con/S.E 1.91 Crores 10.04.2011 Work completed Interlocking at Nandakumar, Deshpran, Ramnagar & stations Digha/09-10/05 dated Railway, and interlocking of different L.C. Gates in between different stations in 09.03.2010 KGP 16 Jn. Cabin – Digha section and additional Loop Lines at Kanthi & Digha stations over Kharagpur Division in South Eastern Railway.

Design and Construction of Civil, Structures and Track Works for i) LOI. No. : GMR 48 Lacs Work completed Double Line Railway involving Formation in Embankments/Cutting, GIL/DFCC/202/C&C/2016- Ballast on Formation, Track Works, Bridges, Structures, Buildings, 17/2754 Dated 06.03.2017 Yard, Integration with IR Existing Railway System and Testing & ii) P.O. No. : Commissioning on Design-Build Lump Sum Basis for New Karchana GIL/DFCC/202/C&C/2016- 17 Station (Excluding) to New Bhaupur (Excluding) of Eastern Dedicated 17/2755 Dated 06.03.2017 Freight Corridor (Contract Package 202) "Project" - Supply of material Outdoor S&T Works for Track works at Ramwa Depot in DFCC CP 202 - Purchase Order ("PO")

Execution of work and part supply of materials for provision of Block S&T/Con/KGP/PI/Kanthi- Dy. CSTE/Con/S.E 33.70 Lacs 10.07.2011 Work completed working between Jn. Cabin – Kanthi & Kanthi – Digha and Panel Digha/160/1635 dt. 01-07-2009 Railway, 18 Interlocking work at Kanthi & Digha stations in Tamluk – Digha KGP sections over Kharagpur Division in South Eastern Railway.

Panel Interlocking work at Khana Junction & Chandanpur Station of SGW272/252/T1/23A CSTE/Projects/Kolk 21360313.23 Cr. Work completed. 19 Eastern Railway Dated 31.12.2007 ata Work of replacement of existing lower quadrant semaphore signals to CORE/S&T/TENDER/ SIG/KNJ- CSTE/CORE/ Rs.3,06,04,654.00 Work completed. 15 Stations & MACLS LGL/827 DT.01.8.2006. ALLAHABAD 29 No. L.C. Gate commissioned. 20 Inaugurated by Hon‟ble Railway Minister

Provision of Panel Interlocking works at 8 stns between Canning and SGW/272/243 /T1/1 dt. CSTE/Con Kolkata Rs.30050748.87 Work completed. 21 Dum Dum Cantt. In Sealdah Divn. In Eastern Railway. 06.9.2001

Panel Interlocking at Keshabpur Jn. Cabin., Nandakumar & Bajkul S&T/Con/KSBP,N.Kumar & Railway/ GRC 2,05,21,999/- Work completed. 22 Station in Digha-Tamluk section of Kharagpur Division of S.E.Rly. Bajkul/99-00/04 dt.02.6.2006

Provision of Panel Interlocking at 4 stns.bet Akra-Newalipur stns of CSTE(Con)/ 132 dt. CSE/Con/E Contract value Work completed in due time. Sealdah divn of E.Railway. 20.09.2000 Railway, Rs.10423190/- 23 Kolkata Revised value 1,06,31,173/- MACLS work in section Amarda Raod Bhadrak Section of S.E.Rly. Core/S&T/TENDER/SIG/BNDM- CSTE/RE/ ALD 1,91,38,945/- Work completed in due time. 24 BKPR/759 dt.02.5.1997 Signaling work for siding at Hirmi cement work 011 dt. 07.5.1999 LARSEN & 1,04,26,944 Oct‟99 Work completed in due time. 25 TOUBRO Ltd. Designing, preparation of drawing et. For CLS. Works in S&T/Core/TENDER/SIIG/BNDM- CSTE/Core/ ALD 18198851/-Work 02.03.2002 Work completed on March, 2002 26 Bandamunda-Hatia section BKPR/759 dt.02.5.1997 Done Amount 1,59,52,917/- Panel Interlocking work at Barakar & Panagarh in Asansol Divn. Of CSTE/Con/93 dt. 03.04.1997 CSTE/ Con/Kol. 92,10,240.00 Work completed in due time. 27 E.Railway Supply/laying of signaling cables for supply and installation of lower SGW.272/120 & 121/T1/1 CSTE/CON/CAL 1,07,24,635/- 30.1.01 Work completed in due time. quadrant Semaphore as well as MACLS system And modification of dt.18.3.1997 28 existing signalling gears to suit doublig works in Khana – Sainthia section of E.Rly. Trenching , Laying, Termination of Signaling/Power Cable along with MRTS/SG-515/682(192) CSTE/Metro 43.86 Lacs Work completed in due time. supply and erection of MACL Signal Post, Apparatus case etc. in Dt. 17.03.2009 Kolkata 29 connection with Panel interlocking work at Tollygunje-Garia section of Metro Railwat,Kolkata. Construction of Buildings for Panel Interlocking work at Canning Taldi SGW/272/243/T1/1 3.63 Work completed Ghutiarisharif, Champahati, Gocharan, Habra Machlandapur and Dum Dt.06.09.2001 Lakhs 30 Dum Cant. Station in Sealdah Division of Eastern Railway.

Construction of Buildings for Panel Interlocking work at Chandanpur & SGW272/252/T1/ 16.15 Work completed Khana Jn. Station in Howrah Division of Eastern Railway. 23A Lakhs 31 Dated 31.12.2007 STATEMENT OF EARLIER COMPLETED WORKS

1 Execution of miscellaneous signaling works in connection with addition S&T/CKP/OT/25/2008/LOA Dy. CSTE/ 59.92 Lacs 31.07.2011 Work completed in due time. & alteration to the existing structures special repair work, ordinary dated 29-12-2008 S.E Railway, repair & maintenance work in the jurisdiction of ADSTE/DPS i.e. Rajkharswan– Gua, Padapahar – Jaruli & Barajamda – Barbil – CKP Bolanikhadan of Chakradharpur Divn. Of South Eastern Railway.

2 Supply, Transportation, Installation & Commissioning of S&T Works S&T/CKP/OT/26/2008/LOA Dy. CSTE/ 41.0 Lacs 31.07.2011 Work completed in connection with Replacement of defective Panels and related dated 19-09-2008 S.E Railway, accessories at Jaruli station of Chakradharpur Division on South Eastern Railway. CKP 3 Execution of Signalling & Telecommunication works for the proposed i) Rungta Mines Ltd. W.O. No: Rungta Mines Ltd. 2.17 Crores Work completed awaiting for commissioning Private Railway siding at GUA Station RML/08-09 /3955 & dated26-07-2008 Usha Martin Ltd. ii) Usha Martin Ltd. P.O.No: 111959/08- 09 dated 08-07- 2008 4 Interlocking of L.C. Gates of 23/A/C/E (KM. 120/9-10 in between SDSTE-TNDR-E-ROUTE-L.C. Sr. DSTE/ HWH 20.20 Lacs 30.11.2006 Work completed. GGLE-SALE), 33/C/T (KM. 179/12-12 at AJLE) in none RE area and GATE-INTERLOCK L.C. Gate No.22/1/C/E (KM. 105/10-11 at KWAE) in RE area of 'E' Dated 06.12.2006 Route of HWH division. 5 Trenching, Laying, Termination of Signalling/Power Cable along with MRTS/SG-515/682(329) Dy. CSTE/Con/ 95.0 Lacs 30.06.2011 Work completed in due time. supply and erection of MACL, Signal Post, and Apparatus Case etc. in date 15.06.2009 Metro Railway, connection with Panel Interlocking work at Tollygunge - Garia Section of Metro Railway, Kolkata. 6 Supply, Installation and Panel Interlocking with single line tokenless L.O.A.No. MRTS/SG- Metro Railway, Contract value 22.06.2006 Work completed. Inaugurated by Hon‟ble Block Instrument and axle Counter for Block Proving in connection 515/615(39) Dt. 12.01.2006 Kolkata Rs. 20,18,089/- Railway Minister with extension of Circular Railway from D.D. Cant. to NSCBose Airport. 7 Indoor modification work to the existing PI of Majerhat Stn. Under MRTS/SG-515/568(1415) Dt. CSTE(Con) Metro 1544750/- 22.06.2006 Work completed. Inaugurated by Honourable Metro Railway 12.10.2004 Railway Minister on January, 2006

8 RE-Bhadrak KBRE/S&T/ Sig./OT/BHC DSTE/RE/ BBS 1436057/- Work completed in due time. dt.6.7.2004 9 Signalling work for provision of Tokenless block instrument in CSTE/Con/137 dt. 23.07.2001 CSTE (Con)/ Kol 86,20,172.31 Work completed in due time. Sahibganj-Bhagalpur section in Malda Divn. Of Eastern Railway

10 Panel Interlocking works at 3stns. Viz, Khamargachi,Jirat & Balagarh SGW/272/252/T1/6 Dt. CSTE/ Con/ Kol 74,68,256.4 Work completed in due time. stations in Howrah Divn.Of E.Railway 04.7.2001

11 Supply installation, testing and commissioning of S&T works for M/S. RITES/S&T/209/ ACEL dt. GM & ST/ RITES 27,00,000/- 28.6.2001 Work completed in due time. ACEL Siding taking off from Abada station of Kharagpur Divn. In 12.01.2001 ltd. S.E.Railway. 12 Excavation of trenches, laying of signaling cables, casting of SG/42/Con/Tender/Doubling/BH CSTE/ Con/Cal 23,26,689/- Work completed in due time. foundation erection of lower quadrant wignalling system supply of P dt. 13.12.2000 materials and modification of existing signalling gears to doubling at Bolepur in HWH. Division. 13 MACLS works from Barasat to Hasnabad in Sealdaha Divn of Eastern CSTE/Con/131 dt. 12.12.2000. CSTE/ER/ Calcutta 60,54,805/- 03.12.2002 Work completed in due time. Inaugurated by Railway. Hon‟ble Railway Minister

14 Excavation of trenches, laying of signaling cables for supply and CSTE/Con/127/ dt. 30.6.2000 CSTE/Con/CAL 16,24,160/- Work completed in due time. installation of lower quardrant Semaphore signaling system, supply of signaling material to suit doubling works bet Bhedia- Pichkundhal section in HWH Divn. 15 Excavation of tranches laying of signalling cable casting of foundation, CSTE/Con/115 dt.3.1.2000 CSTE/CON/CAL 64,91,520/- 04.01.2001 Work completed in due time. control-cum-indication panel from Aranghata to Gede Section for variation 75,00,000/- R.E.Work 16 Signalling work at Bandel - Katwa SGW/272/110/TI CSTE(Con)/Kol 1,01,55,885/- Work completed in due time. 17 Excavation of trenches, laying of signaling & power cables, casting of CSTE/Con/114 dt. 17.12.1999 CSTE/Con/Cal 18,96,694/- Work completed in due time. foundations etc. modification of existing signaling gears to suit doubling works at Pichkuridhal – Ghuskara sec. In HWH Divn.

18 Trenching and laying of under ground cable, supply and installation of SGW.272/185/T1/2 CSTE/Con/ CAL 33,41,171/- Work completed. track circuit etc. for provision of track circuit from bome signal to FM dt.28.5.1999 on „A‟ route at 10 stations of HWH divn.

19 Supply and installation of outdoor signalling work for provision of Panel SGW.272/152/T1/2 CST/Con/ ER 43,09,426/- 30.05.2002 Work completed and commissioned in Interlocking at Seoraphuli Stn. Of E.Railway. dt.25.2.1997 May,2002.

20 Supply and installation of track circuit and associated equipment etc. SGW/272/33/T1/1 dt. 23.9.1996 CSE/Con/Cal 16,24,155/- 23.6.97. Work completed in due time. for immediate putting back of starter signal to danger at 9 stations in SDAH Divn. 21 Laying of cables,supply and installation of associated materials for SGW/272/74 & 75/T1/15 dt. CSTE/Con/CAL 33,75,575/- 10.5.98 Work completed in due time. block working on HWH-BWN (Chord & Main sec) 20.9.1996. 22 Supply and laying of power cable, signaling cable etc.and modification SGW/272/110/T1 dt. CSTE/Con/CAL 1,01,56,885 22.3.96 Work completed in due time. of signaling gears at 9 stations in Bandel-Katwa section (RE) 16.10.1995

23 Installation of Lever frame and new elctro mechanical signaling S&T/RITES/Talcher- RITES/ CAL 27,96,766/- 23.03.97. Work completed in due time. equipment at Talcher-Ananta section of S.E.Railway Anantapur/1346 dt.20.9.1995

24 Track circuit commissioning, pt.Motor wiring, power supply DSTE/W/108/ 04.9.1995 DSTE/Con/SDAH 2,88,260/- Work completed in due time. arrangement etc.in DDJ RRI 25 S&T Work of 5 Station from Bandel to Katwa CSTE/Con/80 dt.17.8.1994 CSTE/Con 83,54,569/- 17.05.1995 Work completed in due time.

26 Laying of tail cable track crossing erection of CLS etc. at DDJ yard. DSTE/W/105 dt.11.5.1994 DSTE/Con/SDAH 14,56,189/- 10.5.95 Work completed in due time.

27 Orthodox doubling at Maheshi – Shahebganj Sig/W/Con9 DSTE/Con/MLDT 1,99,950/- 15.01.89 Work completed in due time.

28 Provision of Signal Motor at Katwa, Purbasthali, Kamargachi, Tribeni, Sr.DSTE/1053/Sig/Motor/BAKL Sr.DSTE/HWH 39,960/- 28.12.93 Work completed in due time. Azimgang & Bansberia. OOP dt. 28.12.1993 29 Fixing of location box diging of cable trenches etc. in connection with DSTE/W/97 dt.30.6.1993 DSTE/Con/SDAH 4,68,860/- 31.3.95 Work completed in due time. electrification of Rly line No 7 at DDJ 30 Boom locking arrangement of 2 nos level crossing gate at Rishra- Sr.DSTE/1053/Boom Sr.DSTE/HWH 38,600/- 25.9.93 Work completed in due time. Uttarpara Locking/RIS-UPA dt.20.04.1993

31 Signalling work in conection with proposed siding for Tribeni for coal Sr.DSTE/1053/ Tribeni dt. DSTE/HWH 38,065/- 24.3.93 Work completed in due time. loading facilities. 23.3.1993 32 Installation testing & commissioning of LC gate at Basae,Khnyan, Sr.DSTE/1053/LB Sr. DSTE/ HWH 87,530/- 30.9.93 Work completed in due time. Azimgang, Nawadwipdham etc dt.22.01.1993 33 Erection of signaling post foundation location box fixing etc. at Barasat DSTE/W/96 dt.30.6.1992 DSTE/C/SDAH 5,12,511/- 20.01.93 Work completed in due time. in SDAH Divn. 34 Provision of auto signaling between JDP-SPR section in SDAH DSTE/W/85 dt. 29.3.1991 DSTE/C/SDAH 2,75,985/- 7.4.91 Work completed in due time. Division 35 Supply and laying of power cable and telecom cable for automatic DSTE/W/84 dt. 8.01.1991 DSTE/C/SDAH 12,43,495/- 13.01.92 Work completed in due time. signaling bet.JDP-SPR in SDAH Divn. 36 Provision of automatic signaling on up Subarban line and up main line DSTE/W/79 dt.8.10.1990 DSTE/C/SDAH 11,66,573/- 25.6.91 Work completed in due time. at SDAH Divn. 37 Making of cable duct for laying of cables, apparatus case fixing at DSTE/W/75 dt. 12.7.1990 DSTE/C/SDAH 11,49,647/- 21.4.93 Work completed in due time. DDJ Jn in SDAH Divn 38 Supply, installation, replacement,testing Commissioning of lock bar DSTE/1053/Lock Bar/JTL-SNT DSTE/HWH 1,98,900/- 31.01.91 Work completed in due time. clip between JTL-SNT in HWH Divn. dt.12.6.1990 39 Renewal, replacement of worn out signaling gears at Jamalpur E & Sig/W/5/133/LTD dt. DSTE/C/MLDT 2,98,938/- 21.6.90 Work completed in due time. West cabin 29.12.1989 40 Orthodox doubling bet Maheshi-SBG Akbarnagar in MLDT Divn Sig/Con/2/LTD dt.22.12.1989 DSTE/C/MLDT 1,68,130/- 21.3.89 Work completed in due time.

41 Provision of LTC cabin in connection with LTC siding at Janai Road DSTE/C/HWH/LTC Sidg/JOX DSTE/Con/HWH 8,44,536/- 15.4.90 Work completed in due time. dt09.12.1988 42 Warning arrangement at Special class gates 1E & 6E in SDAH Divn DSTE/W/39/ dt. 05.10.1988 DSTE/Con/SDAH 1,30,224/- Dec‟88 Work completed in due time.

43 Boom locking of 12 lifting barrier gates from BHW to JMP section of Sig/W/5/125/limited DSTE/Con/MLDT 60,900/- Aug‟89 Work completed in due time. Malda Divn. Dt.27.9.1988 44 Installation of 50 lines auto exchange in the Dy.COS/LLH DSTE/C/50 Line /SAX/LLH DSTE/Con/HWH 1,56,405/- 30.4.89 Work completed in due time. dt.08.8.1988 45 Provision of 2nd. approach signal at 13 stations bet. Belanagar - DSTE©/HWH/Sig/W/MSAE- DSTE/Con/HWH 2,12,220/- 16.10.89 Work completed in due time. Shaktigarh JRAE dt.19.7.1988 46 Provision of 2nd approach signal at 13 stns. bet. Belanagar-Shaktigarh DSTE/C/HWH/SIG/W/Gurap DSTE/Con/HWH 2,18,852/- 31.3.89 Work completed in due time. dt. 19.07.1988 47 Fixing of trestle, pint roddings casting of „B‟ type foundations etc. bet. DSTE/W/133 dt. 13.07.1988 DSTE/Con/SDAH 18,220/- 25.9.88 Work completed in due time. Majherhat- Budge Budge section 48 Provision of 2nd. approach signal at 13 stns. bet Balnagar- Saktigarh DSTE/C/HWH/Sig./work/DKAE- DSTE/Con/HWH 3,62,250/- 27.10.89 Work completed in due time. BZL 06.5.1988 49 Laying of power cable from Konnagar to Sig NoA 15 at Hindmotor in Sr.DSTE/1053/ KOG Sr.DSTE/HWH 34,500/- 11.09.93 Work completed in due time. HWH Divn 50 Execution of Signalling & Telecommunication works for construction Khatau Narbheram & Co. Khatau Narbheram 2.86 Crores Work stopped by Railway for internal reason of the proposed Private Railway siding at Bolanikhadan in Orissa of W.Ono: KNR/ S&T/Bolani/09- & Co. & Feegrade & Chakradharpur Division 10 dated 15-05-2009 & Co (P) Ltd. Feegrade & Co (P) Ltd WO No:FCO/ Sales/09-10/688 dated 07-07-2009