Statement of Recently Completed Works

Total Page:16

File Type:pdf, Size:1020Kb

Statement of Recently Completed Works ANNEXURE - I STATEMENT OF RECENTLY COMPLETED WORKS Sl. Contracting Date of Name of the work Agreement No. CA Value Remarks. No Agency completion Supply & Installation of Signal with Telecom work for Railway siding JSWCL/Salboni/35 Dated 0 1 pertaining to 2 x 1.2 MTPA Grinding unit at JSW Cement Ltd., Salboni JSW 13 Coreres Work Completed 1.03.2017 EI work. Design and Construction of Civil, Structures and Track Works for i) LOI No. : Double Line Railway involving Formation in Embankments/Cutting, GIL/DFCC/201/C&C/2016- Ballast on Formation, Track Works, Bridges, Structures, Buildings, 17/2752 Dated 06.03.2017 Yard, Integration with IR Existing Railway System and Testing & 2 ii) LOI No. : GMR 1.73 Corers Work Completed Commissioning on Design-Build Lump Sum Basis for Mughal Sarai to GIL/DFCC/201/C&C/2016- New Karchana Station (Including) of Eastern Dedicated Freight 17/2753 Dated 06.03.2017 Corridor (Contract Package 201) "Project" - Supply of material Outdoor S&T Works for Track works in DFCC CP 201 - LOI ("LOI") Supply, Erection, Modification, Testing & Commissioning of signaling & Telecommunication work for Phase 1 at new Railway siding for NBIC/Railway Siding 3 NOCCI Balasore Infrastructure Company siding taking off from (S&T)/2017-18/1727 dated NOCCI 2.43 Corers Work Completed Balasore Railway station under Kharagpur Division of South Eastern 07.12.2017 Railway. Work of trenching & laying of underground signaling cables/power CORE/S&T/Tender/Sig/KAN- Dy. CSTE/RE /KKK 5.10 Crores 23.08.2016 27 Stations Commissioned & Completed Final cable, casting of foundations, supply of certain equipment/materials, SNT-PKR/871 Bill under processes erection of apparatus cases & fixing of equipment, wiring, testing & dated 05-04-2011 4 commissioning in connection with modification of Central Panel at stations, modification of MACLS at L.C. Gates in Khana-Sainthia- Pakur and sainthia-Pandabeswar sections over Eastern Railway. Trenching & laying of underground signalling cables/ power cable, C.A No. Dy. CSTE/RE/ALD 3.50 Crores 30.06.2016 Work Completed & Station Commissioned casting of foundations, supply of certain equipment/ materials, CORE/S&T/Tender/Sig/VZM- Final Bill pending erection of apparatus cases & fixing of equipment, wiring, testing & SPRD/881 commissioning in connection with modification of Central Panel at Date 02.01.2013 stations and modification of MACLS at L.C.Gates in Vijayanagaram- Singapur Road section of East Coast Railway under Deputy Chief 5 Signal & Telecom Engineer, Railway Electrification, Kolkata working under Chief Project Manager, Railway Electrification, Bhubaneshwar to suit 25 K.V AC Traction with following details:- (i) RE modification of existing PI at 8 stations. (ii) Minor modification at 7 stations. (iii)RE modification of existing MACLS at 5 L.C. Gates. Work of trenching & laying of underground signalling cables/ power C.A. No. Dy. CSTE/RE 1.5 Crores March, 2016 Station commissioned & work Completed cable, casting of foundations, supply of certain equipment/ materials, CORE/S&T/Tender/Sig/UDL- /KKK erection of apparatus cases & fixing of equipment, wiring, testing & STN/887 Dated 24.01.2014 commissioning in connection with provision of Central Panel at station and provision of MACLS at L.C.Gate in Andal (excl.) – Sitrampur (excl.) section of Eastern Railway under Deputy Chief Signal & 6 Telecom Engineer, Railway Electrification, Kolkata working under Chief Project Manager, Railway Electrification, Bhubaneshwar to suit 25 K.V AC Traction with following details: (i)Provision of PI at 1 station. (ii)Provision of MACLS at 1 L.C.Gate. (iii)Minor modification at 2 stations & 2 L.C.Gates. Signalling (Panel Interlocking) work in connection with “Doubling work CSTE/Con/314 dated 16- CSTE/CON/E. Rly. 5.40 Crores 22.06.2015 5 Stations Commissioned & Completed Final 7 from Ambikakalna to Nabadwipdham section in Howrah division of 09-2011 Bill under processes Eastern Railway. Provision of Outdoor and Indoor Signaling System for Panel “C” (MGR RITES/S&T/NCPP/DADRI/200 M/s NATIONAL 2.79 Crores 05.09.2014 Work completed and commissioned in due Yard) & Alternation for Panel “A” (R&D Yard) In connection with 9-Package-1,3&4 CAPITAL POWER Variation 3.79 time 8 Addition/Modification of Rail Transport System of M/s NATIONAL dated 11-10-11 PLANT, DADRI. Crores CAPITAL POWER PLANT, DADRI. Order for Panel Interlocking with MACL Signaling work in connection SBC/RNJ/2012-13/2294 Dated Sonar Bangla 8.10 Crore 30.04.2015 Work completed and commissioned in due with construction of Railway Siding from existing Rail head at Gankar 03.02.2014. Cement time Railway Station of Eastern Railway for connecting the Cement under supervision of 9 Grinding unit of M/s. Sonar Bangla Cement (A Division of Century RITES Textiles and Industries Ltd.) at Gankar, Dist. Murshidabad, West Bengal. Work for CIVIL, Engineering & OHE work turnkey basis including 15.46 W.O. NO. GEN/RLY- Ramsarup Lohh 10 drawing & designing as per Railway System at Gokulpur-Nimpura with Crores 26.04.10 Work Completed Siding/90002 dt. 08.08.2008 Udyog Central Panel Interlocking of Kharagpur Div. S.E. Rly. Rashmi Metaliks Ltd & Ramsarup Lohh Udyog Ltd Private Siding at RLUL/SER/112 dated 07-05- Private Siding Rs.6.55 Crore 12-02-2009 Work completed in due time. 11 Gkulpur-Nimpura 2008 NSPCL-SAIL : Provision of Signalling & Telecommunication facilities RITES/CO/S&T/ NSPCL/7655 5.93 Crores Work completed and commissioned 12 in New Coal Complex Yard at Bhilai Steel Plant. dated 07-07-2008 Installation, testing commissioning of the S&T works of Rajgoda- i) A93/CPDC-10504/…../Rly- KEC International 3.8 Crores Work completed and commissioned Tamluk in connection with the doubling work between Rajgoda-Tamluk S&T/RGD-TMK Jn. Cabin in KGP division of S. E. Railway. Dt. 18.04.12 13 ii) A93/CPDC-..../Rly-S&T/RGD- TMK dt. 16.08.2012. Temporary connection from Sonar Bangla Cement Siding at Gankar. SBC/RNJ/2013-14/014 Dated Sonar Bangla 1.84 Crores 21.06.2013 Work completed 02.04.2013 Cement 14 under supervision of RITES Introduction of Panel Interlocking to be done in connection with CSTE/CON/254 dt.02-12-2008 CSE/CON/E. Rly. 2.97 Crore 07.01.2013 Completed and commissioned conversion of Halt station in to Block Station at Lebutala, Malatipur, Kolkata 15 Madhyampur and full rake capacity at Aranghata station in Sealdah division of Eastern Railway Execution of work and part supply of materials for provision of Panel S&T/ Con/PI/Jn. Cabin- Dy. CSTE/Con/S.E 1.91 Crores 10.04.2011 Work completed Interlocking at Nandakumar, Deshpran, Ramnagar & Digha stations Digha/09-10/05 dated Railway, and interlocking of different L.C. Gates in between different stations in 09.03.2010 KGP 16 Jn. Cabin – Digha section and additional Loop Lines at Kanthi & Digha stations over Kharagpur Division in South Eastern Railway. Design and Construction of Civil, Structures and Track Works for i) LOI. No. : GMR 48 Lacs Work completed Double Line Railway involving Formation in Embankments/Cutting, GIL/DFCC/202/C&C/2016- Ballast on Formation, Track Works, Bridges, Structures, Buildings, 17/2754 Dated 06.03.2017 Yard, Integration with IR Existing Railway System and Testing & ii) P.O. No. : Commissioning on Design-Build Lump Sum Basis for New Karchana GIL/DFCC/202/C&C/2016- 17 Station (Excluding) to New Bhaupur (Excluding) of Eastern Dedicated 17/2755 Dated 06.03.2017 Freight Corridor (Contract Package 202) "Project" - Supply of material Outdoor S&T Works for Track works at Ramwa Depot in DFCC CP 202 - Purchase Order ("PO") Execution of work and part supply of materials for provision of Block S&T/Con/KGP/PI/Kanthi- Dy. CSTE/Con/S.E 33.70 Lacs 10.07.2011 Work completed working between Jn. Cabin – Kanthi & Kanthi – Digha and Panel Digha/160/1635 dt. 01-07-2009 Railway, 18 Interlocking work at Kanthi & Digha stations in Tamluk – Digha KGP sections over Kharagpur Division in South Eastern Railway. Panel Interlocking work at Khana Junction & Chandanpur Station of SGW272/252/T1/23A CSTE/Projects/Kolk 21360313.23 Cr. Work completed. 19 Eastern Railway Dated 31.12.2007 ata Work of replacement of existing lower quadrant semaphore signals to CORE/S&T/TENDER/ SIG/KNJ- CSTE/CORE/ Rs.3,06,04,654.00 Work completed. 15 Stations & MACLS LGL/827 DT.01.8.2006. ALLAHABAD 29 No. L.C. Gate commissioned. 20 Inaugurated by Hon‟ble Railway Minister Provision of Panel Interlocking works at 8 stns between Canning and SGW/272/243 /T1/1 dt. CSTE/Con Kolkata Rs.30050748.87 Work completed. 21 Dum Dum Cantt. In Sealdah Divn. In Eastern Railway. 06.9.2001 Panel Interlocking at Keshabpur Jn. Cabin., Nandakumar & Bajkul S&T/Con/KSBP,N.Kumar & Railway/ GRC 2,05,21,999/- Work completed. 22 Station in Digha-Tamluk section of Kharagpur Division of S.E.Rly. Bajkul/99-00/04 dt.02.6.2006 Provision of Panel Interlocking at 4 stns.bet Akra-Newalipur stns of CSTE(Con)/ 132 dt. CSE/Con/E Contract value Work completed in due time. Sealdah divn of E.Railway. 20.09.2000 Railway, Rs.10423190/- 23 Kolkata Revised value 1,06,31,173/- MACLS work in section Amarda Raod Bhadrak Section of S.E.Rly. Core/S&T/TENDER/SIG/BNDM- CSTE/RE/ ALD 1,91,38,945/- Work completed in due time. 24 BKPR/759 dt.02.5.1997 Signaling work for siding at Hirmi cement work 011 dt. 07.5.1999 LARSEN & 1,04,26,944 Oct‟99 Work completed in due time. 25 TOUBRO Ltd.
Recommended publications
  • Lok Sabha ___ Synopsis of Debates
    LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Monday, March 11, 2013 / Phalguna 20, 1934 (Saka) ______ OBITUARY REFERENCE MADAM SPEAKER: Hon. Members, it is with great sense of anguish and shock that we have learnt of the untimely demise of Mr. Hugo Chavez, President of Venezuela on the 5th March, 2013. Mr. Hugo Chavez was a popular and charismatic leader of Venezuela who always strived for uplifting the underprivileged masses. We cherish our close relationship with Venezuela which was greatly strengthened under the leadership of President Chavez. We deeply mourn the loss of Mr. Hugo Chavez and I am sure the House would join me in conveying our condolences to the bereaved family and the people of Venezuela and in wishing them strength to bear this irreparable loss. We stand by the people of Venezuela in their hour of grief. The Members then stood in silence for a short while. *MATTERS UNDER RULE 377 (i) SHRI ANTO ANTONY laid a statement regarding need to check smuggling of cardamom from neighbouring countries. (ii) SHRI M. KRISHNASSWAMY laid a statement regarding construction of bridge or underpass on NH-45 at Kootterapattu village under Arani Parliamentary constituency in Tamil Nadu. (iii) SHRI RATAN SINGH laid a statement regarding need to set up Breeding Centre for Siberian Cranes in Keoladeo National Park in Bharatpur, Rajasthan. (iv) SHRI P.T. THOMAS laid a statement regarding need to enhance the amount of pension of plantation labourers in the country. (v) SHRI P. VISWANATHAN laid a statement regarding need to set up a Multi Speciality Hospital at Kalpakkam in Tamil Nadu to treat diseases caused by nuclear radiation.
    [Show full text]
  • Digha Railway Station
    SOUTH EASTERN RAILWAY KHARAGPUR DIVISION DIGHA RAILWAY STATION About Digha Digha is a seaside resort town in the state of West Bengal, India. It lies in Purba Medinipur district and at the northern end of the Bay of Bengal. It has a low gradient with a shallow sand beach. It is the most popular sea resort in West Bengal. Digha is a terminal railway station on the Tamluk-Digha branch line. The railway station is near New Digha beach. Country : India State : West Bengal Location : Digha - Chandaneswar Road, Digha, Purba Midnapur Languages [Official] : Bengali, Hindi, English Time zone : IST (UTC+5:30) Elevation : 6 m (20 ft) Co-ordinates : 21° 37' 22'' N Owned by : Indian Railway Operated by : South Eastern Railway Division(s) : Kharagpur Division Line(s) : Tamluk-Digha Branch Line Platforms : 03 (Three) Tracks : 03 (Three) Station Code : DGHA Zone(s): Kolkata Suburban Railway History Originally, there was a place called Beerkul, where Digha lies today. This name was referred in Warren Hastings's letters (1780) as Brighton of the East. An English businessman John Frank Snaith started living here in 1923 and his writings provided a good exposure to this place. He convinced West Bengal Chief Minister Bidhan Chandra Roy to develop this place to be a beach resort. An old Church is well famous in Digha, which can be seen near the Old Digha Main gate this place is also known as Alankarpur Digha. A new mission has been developed in New Digha which is known as Sindhur Tara which is beside Amrabati Park its a Church where you can wish for the welfare of your family and loved ones.
    [Show full text]
  • Speech of Mamata Banerjee Introducing the Railway Budget 2011-12 25Th February 2011
    Speech of Mamata Banerjee introducing the Railway Budget 2011-12 25th February 2011 1. Madam Speaker, I rise to present before this august House the Revised Estimates for 2010-11 and the estimated receipts and expenditure for 2011-12. I deem it an honour to present the third Railway Budget under the kind guidance of the hon'ble Prime Minister. I profusely thank the Finance Minster for his continued support and encouragement to the railways. 2. As the hon’ble members are aware, the wheels of the railways continue to move 24 hours, all 365 days. Railway’s services are comparable to emergency services, required all the time. I am proud of the 14 lakh members of my railway family, who toil day and night with unparalleled dedication. I am also grateful to all passengers without whose cooperation and consideration, we could not have run this vast system. I have also received unstinted support from our two recognised federations and staff and officers’ associations. 3. Madam, rail transportation is vitally interlinked with the economic development of the country. With the economy slated to grow at a rate of 8-9%, it is imperative that the railways grow at an even faster pace. I see the railways as an artery of this pulsating nation. Our lines touch the lives of humble people in tiny villages, as they touch the lives of those in the bustling metropolises. 4. We are taking a two-pronged approach, scripted on the one hand, by a sustainable, efficient and rapidly growing Indian Railways, and on the other, by an acute sense of social responsibility towards the common people of this nation.
    [Show full text]
  • Digha-Mandarmani Tour 2018
    CIRCULAR LETTER DATED 18.08.2018 SHORT TOUR FOR VISITING DIGHA-MANDARMANI The Association has decided to organize a Short Tour Programme for visiting Digha- Mandarmani commencing from Wednesday, the 19th September 2018. Tour Operator M/S Ananya Special, Kolkata will conduct the Programme as under :- 19.09.2018: Departure from Howrah Railway Station by Tamralipta Express (Train No. 12857) at 6.35 AM for Digha. Breakfast will be given in the Train. 19.09.2018: Arrive Digha at 9.57 AM and transfer to Hotel. Have Lunch and take rest. In the afternoon enjoy the beautiful Sea-beach at your own and stay at Hotel. 20.09.2018: After breakfast start for Half-day Mandarmani Sight Seeing by Bus/Car and return back to Digha for Lunch. Use the afternoon at your own and rest at Hotel. 21.09.2018: Full Day rest and use the day at your own. Enjoy the Sun-rise and Sun- set beauty from the Sea-beach. In the evening participate the Most Colorful Cultural Programme/Get-together in the Hotel Premises. 22.09.2018: Early morning have a Sea-beach walk and back to Hotel and get your luggage ready for departure. After Breakfast, start for Tamralipta Express (Train No. 12858) from Digha Railway Station at 10.25 AM. Lunch will be served in the Train. 22.09.2018: Arrive Howrah Railway Station at 1.50 PM. PARTICULARS OF TOUR : 1) Package Cost is Rs.4,300/-per head (twin sharing room) travelling UP & DN by Tamralipta Express Chair Car. 2) Full & Final Payment should be made by A/C Payee Cheque in favour of ‘PNB Retirees’ Welfare Association’ latest by 21.08.2018.
    [Show full text]
  • 4 Years Achievement Booklet
    VIBRANT RAILWAYS STRENGTHENING BENGAL Page -2 VIBRANT RAILWAYS STRENGTHENING BENGAL Shri Narendra Modi Hon'ble Prime Minister Indian Railways the growth engine of the nation's vikas yatra Page - 3 VIBRANT RAILWAYS STRENGTHENING BENGAL PREFACE Shri Harindra Rao General Manager, Eastern Railway Indian Railways is the principal catalyst in bringing socio-economic development of the Nation. The Railway network at every nook & corner of India helps connect person to person, resources to regions and inputs to industries. The Railway network in Eastern India was first set up from Howrah to Hooghly in Eastern Railway jurisdiction in 1854, which at that time was known as East Indian Railway. Since the beginning of the journey Eastern Railway has gone through stages of metamorphosis with the passage of time and developed as a principal transporter of passengers & freight in Eastern India. Eastern Railway at present has a route kilometre of 2686 with four divisions viz. Howrah, Sealdah, Asansol & Malda. The Zonal headqarter as well as all the divisional headquarters of Eastern Railway are in West Bengal. Eastern Railway is a pre-dominantly passenger carrying Railway. It has India's second largest suburban rail network. Eastern Railway also provides long-distance passenger traffic service by running large number of Mail/ Express trains. Coal is the main freight traffic of ER as it occupies 60% of the volume of freight commodities. Apart from coal, this Railway also transports iron and steel products from Durgapur & Burnpur, stones from Pakur & Jamalpur, cement from Durgapur and a lot of other merchandise including jute, tea, automobile, agricultural products etc.
    [Show full text]
  • List of Roads Maintained by Different Divisions in Alipurduar District
    LIST OF ROADS MAINTAINED BY DIFFERENT DIVISIONS IN ALIPURDUAR DISTRICT DIVISION: ALIPURDUAR CONSTRUCTION DIVISION, PWD Sl. Name of the Road No. Length (in km) Category 1 Alipurduar Patlakhowa Road (Sonapur to Alipurduar) SH 17.60 2 Alipurduar Volka Road SH 21.25 3 Buxa Forest Road (0.00 kmp to 16.00 kmp) (Alipurduar to Rajabhatkhawa) SH 16.00 4 Buxa Forest Road (16.00 kmp to 25.50 km) MDR 9.50 5 Buxirhat Jorai Road (10.65 km to 17.80 km) MDR 7.15 6 Cross Road Within Town MDR 8.91 7 Kumargram Jorai Road MDR 25.00 TOTAL 105.41 DIVISION: ALIPURDUAR HIGHWAY DIVISION, P.W (Roads) Dtte. Sl. Name of the Road No. Length (in km) Category 1 Alipurduar Kumargram Road MDR 20.00 2 Buxa to Jayanti Road MDR 5.20 3 Dalgaon Gomtu (Bhutan) Road MDR 10.00 4 Dalgaon Lankapara Road MDR 18.00 5 Dhupguri Falakata Road (15.23 km to 21.70 km) MDR 6.47 6 Ethelbari to Khagenhat Road MDR 10.00 7 Falakata Madarihat Road SH 22.70 8 Ghargharia to Salbari Road VR 4.10 9 Hantapara to Totopara Road VR 7.00 10 Hatipota to Samuktala Road MDR 16.05 11 Jayanti Dhawla Road MDR 15.00 12 Kalchini to Jaygaon Road MDR 9.25 13 Kalchini to Paitkapara Road MDR 17.84 14 Link Road From Falakata P.S to Falakata Petrol Pump MDR 0.80 15 Madarihat to Hantapara Road MDR 7.00 16 Rajabhatkhawa Joygaon Road (upto Old Hasimara) SH 24.50 17 Silbari to Salkumarhat Road MDR 10.85 18 Sinchula Hill Road ODR 5.00 19 Sonapur More of NH-31 to Hasimara on NH-31 via Chilapata Forest MDR 25.40 20 Tapsikhata to Salbari Road MDR 3.60 21 Telipara to Tiamarighat Road MDR 13.84 22 Union Academy to Godamdabri Road(Via Hamiltonganj Bazar) MDR 2.50 TOTAL 255.10 1 LIST OF ROADS MAINTAINED BY DIFFERENT DIVISIONS IN COOCHBEHAR DISTRICT DIVISION: COOCHBEHAR DIVISION, PWD Sl.
    [Show full text]
  • Howrah District ……………………
    1 Contents Sl. No. Page No. 1. Foreword ………………………………………………………………………………………….. 4 2. District overview ……………………………………………………………………………… 5-17 3. Hazard , Vulnerability & Capacity Analysis a) Seasonality of identified hazards ………………………………………………… 19 b) Prevalent hazards ……………………………………………………………………….. 20-21 c) Vulnerability concerns towards flooding ……………………………………. 21-22 d) List of Vulnerable Areas (Village wise) from Flood ……………………… 23-26 e) Map showing Flood prone areas of Howrah District ……………………. 27 f) Inundation Map for the year 2017 ……………………………………………….. 28 4. Institutional Arrangements a) Departments, Div. Commissioner & District Administration ……….. 30-31 b) Important contacts of Sub-division ………………………………………………. 32-34 c) Contact nos. of Block Dev. Officers ………………………………………………… 34 d) Disaster Management Set up and contact nos. of divers ………………… 35 e) Police Officials- Howrah Commissionerate …………………………………… 36-37 f) Police Officials –Superintendent of Police, Howrah(Rural) ………… 37-39 g) Contact nos. of M.L.As / M.P.s ………………………………………………………. 40 h) Contact nos. of office bearers of Howrah ZillapParishad ……………… 40 i) Contact nos. of State Level Nodal Officers …………………………………….. 41 j) Health & Family welfare ………………………………………………………………. 42-44 k) Agriculture …………………………………………………………………………………… 45 l) Irrigation-Control Room ………………………………………………………………. 46 5. Resource analysis a) Identification of Infrastructures on Highlands …………………………….. 48-49 b) Status report on Govt. aided Flood Shelters & Relief Godown………. 50 c) Map-showing Govt. aided Flood shelters ………………………………………
    [Show full text]
  • Railway Budget 2012-2013
    Budget 2012-2013 Speech of Dinesh Trivedi Minister of Railways March 14, 2012 Madam Speaker, 1. I rise to present the Railway Budget for 2012-13. 2. I consider it a great privilege for me to head the strong and vibrant railway family and present my maiden Railway Budget which is also the first year of the 12th Five Year Plan. I am grateful to the Hon'ble Prime Minister for his inspiring guidance and support in formulating the Budget. 3. I am also grateful to the Hon’ble Finance Minister and the UPA Chairperson, Smt. Sonia Gandhi for their support. It would not have been possible for me to present this budget had I not received the support and confidence of my party, All India Trinamool Congress, and its chairperson, Mamata Banerjee, to whom I shall always remain grateful. Above all, I am grateful to as it is only because of their blessings that I have been able to make it to this Parliament. , . 4. Madam Speaker, when I look at the list of illustrious leaders of this country who had donned the mantle of Indian Railways right from Sh. Asaf Ali to Sh. Lal Bahadur Shastri, to Sh. Jagjivan Ram ji, to Sh. Gulzari Lal Nanda, Sh. Kamalapati Tripathi, Sh. Madhu Dandavate to Mamata Banerjee, I find myself nowhere near their stature. But I have certainly tried to take lessons from the pages of history and from their contribution to this great institution. I am grateful to Mamata Banerjee for giving vision to railways in her Vision 2020 document, which has guided me immensely in framing the roadmap for carrying forward the task.
    [Show full text]
  • LOK SABHA DEBATES (English Version)
    Eighth Series, Vol. VI, No. 4S lkwrW.v,' May 16, 1985' Vaisakha 26. 1907 (Saka) LOK SABHA DEBATES (English Version) Second Session (Eigbtb Lok Sabba) (Vol. VI contains Nos. 41 to 48) LOI: ,SABHA SECRETARIAT NEW DELIU Price : Rs. 4.00 [Original English proceedings included in English Version and original Hindi proceedings included in Hindi Version will be treated as authoritative and not the translation 'hereof.] CONTENTS No. 45, Thursday. May 16, 1985/ Vaisalcha 26, 1907 (Stika) Columns Oral Answers to Questions : 1-29 ·Starred Question Nos. 875 to 880, 882, 884 and 885 Short Notice Question No.2 29-38 Written Answers to Question: 38-235 Starred Questions Nos. 881, 883 and 886 to 894 38-44 Unstarred Question Nos. 6833 to 7026, 7026 ... A, 7026-B, 44-235 7026-C Papers Laid on the Table 238-245 BiU Introduced- " 238-245 Arms (Amendment) BiU, 1985 Matters under rule 377- 246-251 (0 Need to reopen the Bhaskar Textile Mills, Jharsuguda, Orissa Shri SribaUav Panigrahi 246 (ii) Need to improve irrigation facilities in drought affccted districts of Andhra Pradesh and Kamataka Shri K. Ramachandra Reddy 247 (iii) Need to take stringent steps to ensure safe delivery of money sent by insured covers through Post Offices 247 Dr. Chandra Sbekhar Tripathi ·Tbe'ian + marked above tbe name of a Member indicates tbat the question actually .,ked on tho floor of the House by that Member. (ii) Columns (Iv) Need to protect the city of Ban,alore from pollution Shri S. M. Ouraddi 248 (v) Need to introduce an express train from Tamkur to Banaalore Shri G.
    [Show full text]
  • Identification of Infrastructure Demand to Enhance the Tourism Potential of Tajpur, West Bengal
    Journal of Civil Engineering and Environmental Technology p-ISSN: 2349-8404; e-ISSN: 2349-879X; Volume 4, Issue 6; October-December, 2017, pp. 451-454 © Krishi Sanskriti Publications http://www.krishisanskriti.org/Publication.html Identification of Infrastructure Demand to Enhance the Tourism Potential of Tajpur, West Bengal Ar. Ankita Baksi1 and Ar. Sougata Dhara2 1Dept. of Architecture T & R.P IIEST Shibpur 2Architect, Dform, Salt lake, Kolkata E-mail: [email protected], [email protected] Abstract—Digha is one of the popular tourist spots in West surrounded with patches of forests of casuarina trees. Tajpur is Bengal,India. But due to vast growth of tourist population in Digha it located in Purba Medinipur, West Bengal, India, on the shore has already become too much congested place which is hampering of Bay of Bengal. Tajpur is situated between Mandarmani and the recreational activities of tourists. Tajpur, a beachside village Shankarpur. Tajpur is 170 km from Kolkata. Summer, near Digha, is calm and peaceful place and nowadays people are monsoon and winter are the main seasons in Tajpur. April to attracted to Tajpur more than Digha for its serenity. The tourism potential of Tajpur will augment if sufficient infrastructure facilities June consists summer with maximum temperature of 37 °C. are provided. The paper aims to identify infrastructure requirements Although cold wind from sea keeps the weather pleasant in to expand the tourism potential of Tajpur so that it can sustain future this time. July to September includes monsoon. Tajpur population pressure. To find the tourism infrastructure demand of generally experiences an average rainfall with high humidity Tajpur, some parts are identified to study, that includes Chandapur, in the monsoon season.
    [Show full text]
  • Traffic Audit
    Traffic Audit Local audits of station earnings (and establishment matters relating to station staff), local audit of the records of the office of the Chief Commercial Managers other than establishment matters including claim cases is done by the Traffic Audit Section.Auditee details are given in the separate sheet. Traffic Audit Name of Apex Name of Auditable Name of implementing units with name of unit units with division station or section or location (auditable unit name (apex unit wise) wise) Commercial (Headquarter) Pr. (PCCM) Chief Commercial Manager alongwith CCM/PS &catg, CCM/FM, Dy.CCM/Spl, Dy. CCM/PS, Dy.CCM/Refunds, Dy. CCM/FS, Dy.CCM/Claims GOODS (Units under Adra ASSTT. SDG BURRAGARH NO. 1A SERVED BY BURRAGARH , Division) [ABBS] ADRA JN. , [ADRA] Assited Siding to serve Kustore no-7A , Bhaga (VAA) [AKKK] Private Siding to serve Muruldih/Mohuda Coal Washery , Mohuda (MHQ) [AMWM] ANARA , [ANR] Private Siding to serve Chinakuri No-16(For pit no-3) , Radhanagar (RDR) [ASCR] BANDIDIH , [BDIH] BOKARO STEEL CITY , [BKSC] BANKURA , [BQA] Private Siding to serve Bokaeo Steel Plant of M/s SAIL , Bokaro Steel City (BKSC) [BSCS] BHOJUDIH WASHERY SIDING AT BHOJUDIH , [BWSB] CHANDRAKONA ROAD , [CDGR] CHANDIL JN. , [CNI] Private Siding to serve Damodar Cement & Slag co. Ltd , Madhukunda (MDKD) [DCSM] Assited Siding to serve JamadobaWashery , [JDWS] M/s JSW CEMENT LTD , [JSJB] K.K.C. (MAIN) (BENCDIH – 6) KHANOODIH , [KKBK] K.K.C.LINK SIDING – KHANOODIH KHANUDIH-KHARKHAREE- CHORD(LINK)COLLIERY , [KLSK] Private Siding to serve MadhubandhWashery , Khanoodih (KNF) [MBWK] Assited cum Private Siding to serve MunidihWashery , Mohuda (MHQ) [MWSD] Private Siding to serve M/s Dalmia Cement East ltd.(Formly: M/s BokaroJapee Cement Ltd.) , Tupkadih (TKD) [PBJT] Private Siding to serve BhelatandWashery of M/s TISCO , TISCO Bhelatand (TSBD) Tata Sijua (TSAH) [PBWB] PURULIA JN.
    [Show full text]
  • 27 Rule 377 JULY 20, 1991 Fd". Laxmi Narayan Pandeya] Liable to Be
    27 Rule 377 JULY 20, 1991 Rail Budget 1991-92—■Gan. 28 Discussion A Demands for Grunts (Rlys), 1991-92 fD". Laxmi Narayan Pandeya] This has been deliberately scuttled b> the interested oil lobbies within the liable to be cancelled any time on the country and outside who are interes- ground of below average production. ted in perpetuating India’s oil depen- Due to application of different unsci- dence on other. entific methods of average test in diff- erent states and inaccurate measure- I demand a statement from the ment, thousands of the farmers have Petroleum Minister on the subject. to face great difficulties. This matter is of public interest and of urgent na- ture as future of thousands of the 12.00 hrs. farmers depends on it. Some diffi- culty and crisis may occur in decid- RAILWAY BUDGET, 1991-92 - ing the policy and in the renewal of GENERAL DISCUSSION the licences of the farmers. So. I re- quest the Minister of Finance to make AND a statement about it. ♦DEMANDS FOR GRANTS— (v) Need for oil exploration in (RAILWAYS). 1991-92 North and Sooth 24 Parganati and Nadia districts in West [English] Bengal and Kaihana—Kafciro- MR. SPEAKER: The House will sar in Gujarat now take up the combined discussion [English] on (i) General Discussion on the SHRI CHITTA BASU (Barasat). Budget (Railways) for 1991-92 and It has been widely teported in the (n) Discussion and Voting on the De- Press that two large areas in West mands for Giants (Railways) for 1991- Bengal and Gujarat arc floating on 92 tor which 8 hours have been al- oil.
    [Show full text]