Rejuvenation & Beautification of Dahisar River Project

Total Page:16

File Type:pdf, Size:1020Kb

Rejuvenation & Beautification of Dahisar River Project DAHISAR GAOTHAN 0+100 0+050 0+000 0+133 29.875 29.863 29.801 29.739 29.677 29.616 29.554 29.245 29.492 29.122 29.307 29.369 29.430 29.183 29.060 SCALE : 1:500 0+700 0+650 0+600 0+550 0+500 0+450 LEGEND - SCALE : 1:2000 DAHISAR RIVER RIVER BUFFER LINE PV - (2) NALLA SCALE: H 1:1000,V 1:200. DATUM: 25.000 EXISTING ROAD 0+132 0+000 0+100 0+050 PROPOSED SERVICE ROAD 30 Level 29 RETAINING WALL 28 27 26 25 ROAD DESIGN PROFILE NEW ROAD LEVEL 29.801 29.122 29.492 29.554 29.616 29.677 29.739 29.863 29.060 29.183 29.245 29.307 29.369 29.430 29.875 EXISTING GENERAL GROUND LEVEL 29.021 28.741 29.256 29.347 29.397 29.447 29.086 29.152 29.027 28.994 29.219 29.298 29.119 28.995 29.457 VERTICAL ALIGNMENT 0.617% HORIZONTAL ALIGNMENT STRAIGHT L =70.762 STRAIGHT L =61.253 CHAINAGE 20.000 40.000 30.000 50.000 60.000 70.000 80.000 90.000 00.000 10.000 133.000 100.000 110.000 120.000 130.000 NAME OF DRAWING PROJECT NAME NAME OF THE CLIENT NAME OF THE CONSULTANT PROPOSED SERVICE ROAD REJUVENATION & BEAUTIFICATION MUNICIPAL CORPORATION OF Tandon Urban Solutions Pvt. Ltd. PLAN & PROFILE FROM 701, HARBHAJAN, CST RD, OF DAHISAR RIVER GREATER MUMBAI VIDYANAGARI MARG, KALINA , CHAINAGE 0+00 TO 0+133 SANTACRUZ (E), MUMBAI - 400 098. FOR DAHISAR GAOTHAN TANDON Telefax : +91 22 26655335 [email protected]|www.tandonandassociates.com DRG NO SCALE DATE DRAWN BY SHEET MCGM/RR/DR/ PRP/SR/PP/01 AS SHOWN 10-11-2019 Tejas.K 1 LEGEND - EXISTING ROAD NALLA RIVER BUFFER LINE DAHISAR RIVER ROAD DESIGN PROFILE RETAINING WALL PROPOSED SERVICE ROAD FOR INDIRA NAGAR PLAN & PROFILE FROM PROPOSED SERVICE ROAD CHAINAGE 0+00 TO 0+256 0+000 NAME OF DRAWING 2+500 0+050 SCALE : 1:1000 0+100 0+132 32.785 32.891 0+000 2+550 32.998 33.105 33.211 HORIZONTAL ALIGNMENT NEW ROAD LEVEL EXISTING GENERAL GROUND LEVEL CHAINAGE VERTICAL ALIGNMENT 33.318 0+050 REJUVENATION & BEAUTIFICATION 33.424 2+600 33.531 OF DAHISAR RIVER PROJECT NAME 33.638 33.744 Level 33.851 STRAIGHT L =25.365 GRADIENT BREAK CH = 0+00.00 0+100 35 30 33 34 36 37 38 39 40 32 31 00.000 32.785 32.587 LEVEL = 32.785 2+650 33.957 10.000 32.891 32.719 20.000 32.998 32.850 34.064 30.000 33.105 32.897 40.000 STRAIGHT L =78.510 33.211 32.919 34.183 50.000 1.066% 33.318 32.941 1.07% 60.000 33.424 32.963 34.355 70.000 33.531 32.985 0+150 SCALE: H 1:1000,V 1:200. DATUM: 30.000 80.000 33.638 33.035 2+700 34.583 90.000 33.744 33.091 STRAIGHT L =43.453 MUNICIPAL CORPORATION OF 100.000 33.851 33.147 34.869 110.000 33.957 33.174 PV - (3) NAME OF THE CLIENT 120.000 34.064 33.183 35.199 GREATER MUMBAI L =40.000 130.000 34.183 33.249 40.000VC 140.000 34.355 33.321 35.532 150.000 STRAIGHT L =56.738 34.583 33.400 160.000 34.869 33.495 35.865 170.000 35.199 33.591 0+200 180.000 35.532 33.686 2+750 36.199 190.000 35.865 33.747 3.334% 200.000 36.199 33.735 3.33% STRAIGHT L =48.780 36.532 210.000 36.532 33.721 220.000 36.865 34.008 36.865 230.000 37.199 35.211 240.000 37.532 36.414 37.199 250.000 37.865 37.618 GRADIENT BREAK CH = 2+52.85 256.000 37.960 37.960 LEVEL = 37.960 MCGM/RR/DR/ PRP/SR/PP/02 [email protected]|www.tandonandassociates.com 37.532 0+250 37.865 0+256 DRG NO 2+800 37.960 TANDON NAME OF THE CONSULTANT Tandon Urban Solutions Pvt. Ltd. SANTACRUZ (E), MUMBAI - 400 098. 701, HARBHAJAN, CST RD, VIDYANAGARI MARG, KALINA , Telefax : +91 22 26655335 AS SHOWN SCALE 10-11-2019 DATE 2+850 SCALE : 1:2000 DRAWN BY Tejas.K SHEET 2 LEGEND - EXISTING ROAD NALLA RIVER BUFFER LINE DAHISAR RIVER ROAD DESIGN PROFILE RETAINING WALL PROPOSED SERVICE ROAD SCALE : 1:1000 FOR LEOPROSY COLONY, NEAR RAILWAY CROSSING PLAN & PROFILE FROM PROPOSED SERVICE ROAD CHAINAGE 0+00 TO 0+214 0+000 NAME OF DRAWING 0+050 0+100 2+850 0+132 0+050 2+900 36.405 0+000 36.516 36.627 Horizontal Geometry NEW ROAD LEVEL EXISTING GENERAL GROUND LEVEL CHAINAGE VERTICAL ALIGNMENT REJUVENATION & BEAUTIFICATION 2+950 36.738 OF DAHISAR RIVER 36.849 0+050 PROJECT NAME 36.960 Level 37.071 L =2.508 35 36 37 38 39 40 37.182 00.000 36.405 36.228 R: 40.071 L: 23.528 10.000 36.516 36.157 3+000 37.293 20.000 36.627 35.895 30.000 L =34.948 36.738 35.950 40.000 36.849 36.001 37.404 0+100 50.000 36.960 36.053 60.000 37.071 36.606 SCALE: H 1:1000,V 1:200. DATUM: 35.000 R: 90.000 L: 26.680 37.515 70.000 37.182 37.355 80.000 37.293 37.354 37.626 MUNICIPAL CORPORATION OF 90.000 L =29.027 37.404 37.366 PV - (4) 100.000 1.110% 37.515 37.382 NAME OF THE CLIENT 37.737 110.000 37.626 37.398 R: 150.000 L: 19.261 GREATER MUMBAI 120.000 37.737 37.413 3+050 130.000 L =9.022 37.848 37.423 37.848 140.000 37.959 37.424 150.000 38.070 36.902 R: 39.497 L: 38.770 37.959 160.000 38.181 36.945 170.000 38.292 37.078 0+150 180.000 38.404 37.448 38.070 L =30.165 190.000 38.515 37.892 200.000 38.626 38.333 38.181 210.000 38.737 38.490 214.000 38.780 38.752 38.292 38.404 3+100 MCGM/RR/DR/ PRP/SR/PP/03 [email protected]|www.tandonandassociates.com 38.515 DRG NO 38.626 TANDON NAME OF THE CONSULTANT 38.737 0+200 38.780 Tandon Urban Solutions Pvt. Ltd. SANTACRUZ (E), MUMBAI - 400 098. 701, HARBHAJAN, CST RD, VIDYANAGARI MARG, KALINA , Telefax : +91 22 26655335 0+214 AS SHOWN SCALE 10-11-2019 DATE SCALE : 1:2000 DRAWN BY Tejas.K SHEET 3 LEGEND - EXISTING ROAD NALLA RIVER BUFFER LINE DAHISAR RIVER ROAD DESIGN PROFILE RETAINING WALL PROPOSED SERVICE ROAD HANUMAN NAGAR, FOR SANJAY NAGAR, DAULAT NAGAR PLAN & PROFILE FROM PROPOSED SERVICE ROAD CHAINAGE 0+00 TO 0+228 0+000 NAME OF DRAWING 0+050 SCALE : 1:1000 0+100 35.300 0+132 35.408 35.515 35.623 35.730 0+000 35.838 35.945 0+050 REJUVENATION & BEAUTIFICATION Horizontal Geometry EXISTING GENERAL GROUND LEVEL NEW ROAD LEVEL CHAINAGE VERTICAL ALIGNMENT 2+900 36.053 OF DAHISAR RIVER 36.160 PROJECT NAME 36.268 36.375 0+100 2+950 Level L =5.509 35 GRADIENT36 37 38 39 40 BREAK CH = 0+00.00 36.483 00.000 35.300 35.230 LEVEL = 35.300 10.000 35.408 35.348 36.590 20.000 35.515 35.356 R: 70.191 L: 62.431 30.000 35.623 35.201 36.698 40.000 35.730 35.391 50.000 35.838 35.576 36.805 0+150 1.075% L =8.178 1.08% 60.000 35.945 35.751 SCALE: H 1:1000,V 1:200. DATUM: 35.000 70.000 36.053 35.953 3+000 80.000 36.160 36.158 36.937 MUNICIPAL CORPORATION OF 90.000 36.268 36.274 R: 150.000 L: 62.688 37.115 100.000 36.375 36.390 PV - (6) NAME OF THE CLIENT 110.000 36.483 36.506 GREATER MUMBAI 120.000 36.590 36.597 37.339 130.000 36.698 36.657 140.000 36.805 36.685 37.608 L =40.000 40.000VC 150.000 L =48.803 36.937 36.702 0+200 160.000 37.115 36.718 37.899 170.000 37.339 36.734 38.190 3+050 180.000 37.608 36.750 38.481 190.000 2.908% 37.899 36.800 2.91% R: 13.844 L: 19.235 200.000 38.190 37.051 38.772 38.850 210.000 38.481 37.486 GRADIENT BREAK CH = 2+22.69 220.000 38.772 38.497 228.000 38.850 38.797 LEVEL = 38.850 0+228 MCGM/RR/DR/ PRP/SR/PP/04 [email protected]|www.tandonandassociates.com DRG NO 3+100 TANDON NAME OF THE CONSULTANT Tandon Urban Solutions Pvt. Ltd. SANTACRUZ (E), MUMBAI - 400 098. 701, HARBHAJAN, CST RD, VIDYANAGARI MARG, KALINA , Telefax : +91 22 26655335 AS SHOWN SCALE 10-11-2019 DATE SCALE : 1:2000 DRAWN BY Tejas.K SHEET 4 0+214 LEGEND - EXISTING ROAD NALLA RIVER BUFFER LINE DAHISAR RIVER ROAD DESIGN PROFILE RETAINING WALL PROPOSED SERVICE ROAD 38.737 38.780 SCALE : 1:1000 0+000 38.810 PLAN & PROFILE FROM PROPOSED SERVICE ROAD CHAINAGE 0+00 TO 0+334 AMBAWADI.
Recommended publications
  • Mumbai-Marooned.Pdf
    Glossary AAI Airports Authority of India IFEJ International Federation of ACS Additional Chief Secretary Environmental Journalists AGNI Action for good Governance and IITM Indian Institute of Tropical Meteorology Networking in India ILS Instrument Landing System AIR All India Radio IMD Indian Meteorological Department ALM Advanced Locality Management ISRO Indian Space Research Organisation ANM Auxiliary Nurse/Midwife KEM King Edward Memorial Hospital BCS Bombay Catholic Sabha MCGM/B Municipal Council of Greater Mumbai/ BEST Brihan Mumbai Electric Supply & Bombay Transport Undertaking. MCMT Mohalla Committee Movement Trust. BEAG Bombay Environmental Action Group MDMC Mumbai Disaster Management Committee BJP Bharatiya Janata Party MDMP Mumbai Disaster Management Plan BKC Bandra Kurla Complex. MoEF Ministry of Environment and Forests BMC Brihanmumbai Municipal Corporation MHADA Maharashtra Housing and Area BNHS Bombay Natural History Society Development Authority BRIMSTOSWAD BrihanMumbai Storm MLA Member of Legislative Assembly Water Drain Project MMR Mumbai Metropolitan Region BWSL Bandra Worli Sea Link MMRDA Mumbai Metropolitan Region CAT Conservation Action Trust Development Authority CBD Central Business District. MbPT Mumbai Port Trust CBO Community Based Organizations MTNL Mahanagar Telephone Nigam Ltd. CCC Concerned Citizens’ Commission MSDP Mumbai Sewerage Disposal Project CEHAT Centre for Enquiry into Health and MSEB Maharashtra State Electricity Board Allied Themes MSRDC Maharashtra State Road Development CG Coast Guard Corporation
    [Show full text]
  • Jul-Sep 2016] N Line with General Lack of Activity in the the Worst Performer Was the North Region, 2016 Quarter, As Three Years Ago
    FOREWORD Mild tapering of inflation and a normal monsoon finally paved the way for lowering of REPO rate by 25 basis points, taking it to its lowest level in the last 5 years. The continued fall in both imports and exports, coupled with tepid investment demand has led RBI to pass on the cut. The Y-o-Y GDP growth rate also slowed down from 7.9% in the JFM quarter to 7.1% this quarter. The expected rise in oil prices from next year is also a major concern for the economy, which imports most of the oil it needs. High NPAs in the banking sector and construction delays in infrastructure and real estate also remain as major concerns. However, the economy remains strong despite headwinds facing the world economy and geopolitical turmoil across Asia and Europe. The Manufacturing Purchasing Managers’ Index (PMI) is still above 52 level and GDP growth forecasts till 2020 by various multilateral agencies, remain above 7%. The lowering of Repo rate is expected to bring down both project finance as well as home loan costs, lowering the overall cost of buying a house. The inevitable implementation of Real Estate Regulation and Development (RERA) Act, 2016 has led developers to hasten the delivery of their projects. This trend was clearly evident in the quarterly average prices data of Under Construction (UC) vs Ready-to- Move-in (RM) stock, where the premium commanded by RM properties came down due to increase in RM stock, as a portion of UC projects were delivered over the quarter. RERA is a step in the right direction but will bear fruit only in 2-3 years, and till then the Indian real estate sector remains in turbulent waters, and its health can only be gauged through inferential means like pricing and inflation in the sector.
    [Show full text]
  • Vulnerability to Environmental Hazards: Deluge in Mumbai on 26/7
    Mumbai after 26/7 Deluge: Some Issues and Concerns in Regional Planning R. B. Bhagat1, Mohua Guha2 and Aparajita Chattopadhyay3 Abstract The complex processes of urbanization along with the rapid expansion of urban population have changed the traits of natural hazards and cities have now become ‘crucibles of risk’. Sometimes, even the location of cities place them at greater risk from climate hazards such as cyclones, flooding, etc. These events underscore the vulnerability to natural hazards faced by the urban people, in general, and the poor, in particular, especially those living in sub-standard housing in the most vulnerable locations. Among the recent incidents of such kind, the incessant and torrential rains in the afternoon of July 26, 2005, not only caused deluge in Mumbai, but wrought equal havoc on the weak and the powerful. Why did Mumbai, the commercial capital of India, could not avert such an environmental disaster? In this paper, an attempt has been made to examine the role of various factors, which either in isolation or in conjugation with other factors might have made the circumstances more vulnerable for this urban deluge. Coupled with this, the paper discusses the need for a planning document which is prepared in the context of demographic dynamics and its significance to city planners and managers. Introduction Cities, being centres of population concentration and growth, serve as engines of economic development and innovation for the global economy and also places of refuge at times of crises such as drought or flood in the countryside. The foundations of prosperity and prominence for most cities lie in their long-standing commercial relationships with the rest of the world (Sherbinin et al 2007).
    [Show full text]
  • Fauna of Sanjay Gandhi National Park, Bombay (Vertebrates)
    B'D_ 1001. Surv. India, 92 (1-4) : 225~251, 1992 FAUNA OF CONSERVATION AREAS: FAUNA OF SANJAY GANDHI NATIONAL PARK, BOMBAY (VERTEBRATES) G. M. YAZDANI, M. S. PRADHAN & D. F. SINGH Zoological Survey of India, Western Regional Station, Pune. INTRODUCTION Among the four National Parks in the State of Maharashtra, Sanjay Gandhi National Park is a beautifully preserved green oasis within the confines of Bombay metropolis. The park exhibits an amazing diversity of terrain-beginning at just 30 meters above sea level, to almost SOO m and displays coastal, dry and mixed deciduous, and typical western ghat plateau habitats. It boasts of two big lakes and 2000 years old Kanheri caves. Due to its proximity to Bombay city, a lot of people have visited, studied and written about this Park, but unfortunately this information is all scattered and most of it deals with the bird fauna, as indeed it is a bird watcher's paradise (Abdulali 1981, Naik 1986, Monga 1986, Singh & Yazdani 1988). In this paper we have tried to present as a consolidated work, the vertebrate fauna of this Park. after an intensive survey from 1987 to 1989 under the special conservation area survey programme of the Zoological Survey of India. The groups were worked out as per the following: Pisces (GMY & DFS); Amphibia, Reptilia (DFS & MSP); Aves (DFS) & Mammalia (MSP). Tbe Park (Fig. 1 & lA) Sanjay Gandhi National Park (previously known as Krishnagiri Upawan and l~ter as Borivli National Park) is situated about 25 kms north from the heart of ,Bombay city and is only 8 kms from the shores of the Arabian Sea.
    [Show full text]
  • High Water Ingress During TBM Tunneling Under Andheri Kurla Road, Marol Naka, Mumbai, India
    EJERS, European Journal of Engineering Research and Science Vol. 4, No. 11, November 2019 High Water Ingress during TBM Tunneling under Andheri Kurla Road, Marol Naka, Mumbai, India Vinay Kumar Pandey, and Satya Prakash TABLE I: CHALLENGES DURING THE TUNNELING IN URBAN AREA [1]. Abstract—For surface space limitations in metro cities, Challenges during tunnelling in Urban area tunnel is the best option worldwide for the development of Surface Sub surface modern transport system, utilities and other infrastructures. Safet Floo Tunn But tunneling is full of surprises depending on geological and Finali y of Disp Space d & el Geolo Utiliti hydrological factors. Underground Mumbai Metro line -03 is zation prese osal for Wat groun gical es & also full of surprises. In this paper we are going to discuss the of nt of Constr er d struct Overb encountered high water pressure during the Up line mining Align civil Muc uction See settle ures urden ment struct k underneath the Andheri – Kurla road & elevated Mumbai page ment Metro line -01 at Marol Naka. Pressure of water was observed ures to be 4.5 bars to 5 bars, geotechnical instruments showing no settlement but tunnel always filled with muck and progress In this paper we will discuss the challenges faced during were affected badly apart from taking precautions during the the Mumbai Metro line -03 (MML-03) underground mining. As per geology, grade III basal and breccia were projects tunneling underneath the Andheri – Kurla road at encountered. Team tried to find out the source/causes of this high water ingress but even after searching various options Marol Naka, Andheri (East), Mumbai.
    [Show full text]
  • Flooding Mumbai
    Draft Report Identification of flood risk on urban road network using Hydrodynamic Model Case study of Mumbai floods Author Mr. Prasoon Singh Ms Ayushi Vijhani Reviewer(s) Dr Vinay S P Sinha Ms Neha Pahuja Ms Suruchi Bhadwal Dr M S Madhusoodanan Identification of flood risk on urban road network using Hydrodynamic Model Case study of Mumbai floods © The Energy and Resources Institute 2016 Suggested format for citation T E R I. 2016 Identification of flood risk on urban road network using Hydrodynamic Model Case study of Mumbai floods New Delhi: The Energy and Resources Institute. 105 pp. [Project Report No. ________________] For more information Project Monitoring Cell T E R I Tel. 2468 2100 or 2468 2111 Darbari Seth Block E-mail [email protected] IHC Complex, Lodhi Road Fax 2468 2144 or 2468 2145 New Delhi – 110 003 Web www.teriin.org India India +91 • Delhi (0)11 ii 4 Table of Contents Introduction ............................................................................................................................................. 8 Objectives ............................................................................................................................................... 9 Literature Review .................................................................................................................................. 10 Mumbai District Profile ........................................................................................................................ 11 Geography ........................................................................................................................................
    [Show full text]
  • Opportunities for Investment in the Societal Values Provided by Sanjay Gandhi National Park, India
    Opportunities for investment in the societal values provided by Sanjay Gandhi National Park, India Supplementary material The information in this Supplementary Material is substantially drawn from an unpublished study conducted jointly by Sanjay Gandhi National Park and Wildlife and We Protection Foundation (2019), Mumbai, supported also by Current Science (1997). S1. Principal ecosystem types in SGNP Field survey and review of secondary literature undertaken to identify the ecosystems in Sanjay Gandhi National Park has revealed that there are following types of major ecosystems in the Park. 1. 3B/C1 Moist teak-bearing forests 2. 3 B/C2 Southern moist mixed deciduous forest 3. 4B/TS1 Mangrove scrubs (coastal margin) 4. 8 A/C2 Western sub-tropical hill forests 5. Degraded forest 6. Plantations 7. Wetland and marshes (lake catchments) / large water bodies 8. Streams 9. Riparian areas – fringing forest adjacent to streams and rivers 10. Creeks 11. Rocky expanses and outcrops interspersed with grassy patches 12. Grasslands 13. Agriculture 14. Human settlements (encroachments) 15. Human settlements (enclaved in the forests) The listed ecosystems were identified and mapped using Arc GIS software (Figure S1). The map depicts the location of the principal ecosystems in the National Park, though some could not be depicted as the area they covered was too small. Figure S1: Map of Sanjay Gandhi National Park depicting location of various identified ecosystems Opportunities for investment in the societal values provided by SGNP, India, SOM 1; Page 1 Opportunities for investment in the societal values provided by SGNP, India, SOM 1; Page 2 S1.1. 3B/C1 Moist teak-bearing forests Moist teak-bearing forests occur in 3-5 % of the area of SGNP.
    [Show full text]
  • 'Clean Mumbai, Green Mumbai, Eco-Friendly Mumbai!'
    MUMBAI | FRIDAY, 6 SEPTEMBER 2019 5 COMMERCIAL FEATURE ‘Clean Mumbai, Green Mumbai, MCGM is committed to Mumbaikars for Eco-Friendly Mumbai!’ civic amenities 24x7 Vishwanath Mahadeshwar, Mayor of Mumbai, shares perspectives on initiatives Yashwant Jadhav, Chairman, taken and the strategic approach to make this city more citizen and commuter-friendly Standing Committee, MCGM, explains solutions to tackle key challenges faced this with several projects includ- ing the Goregaon-Mulund Link What are some of the unique Road (GMLR). Apart from this the aspects about Mumbai that set Mumbai Coastal Road project is it apart from other cities? What also poised to start off soon. So are the key challenges that this Mumbaikars can expect their opens up to a civic body like commute to be much smoother the MCGM? going forward with such projects. There are several unique aspects A 120-acre zoo will be set up at about Mumbai that set it apart Aarey Colony, Goregaon. from other cities. For instance, the area that the MCGM covers Transport facilitated makes it the largest civic corpo- To give BEST a revamp and ration in Asia. Due to the sheer rejuvenate its bus operations, size of the city and the extreme MCGM will give it ` 100 crore weather conditions that it faces, per month, which works out to managing the municipal corpora- ` 1200 crore per year. Shiv Sena tion work throws up multiple chal- Party Chief Uddhav Thackeray lenges in terms of aspects such and Yuva Sena President Aditya as the roads, water supply, nul- Thackeray recently handed over lahs, and bridges.
    [Show full text]
  • MALAD - DAHISAR Corridor Description and Rating Areas Included
    Corridor of growth MALAD - DAHISAR Corridor Description and Rating Areas Included: Malad (E), Malad (W), Kandivali (W), Kandivali (E), Borivali (W), Borivali (E), Dahisar (E) and Dahisar (W) Fig 1: Map of the corridor 02 Corridor of growth (COG) About the Corridor Historic development: The Malad-Dahisar The New Link Road and the Swami Vivekanand also broader here compared to Goregaon and a Corridor is broadly enclosed by the Goregaon- Road, running from north to south, have been number of residential and hotel developments Mulund Link Road in the south and the instrumental in the development of residential can be witnessed in the area. There are a Dahisar Toll Naka in the north. The corridor areas on the west of the Western Line. number of luxury residential projects with has Sanjay Gandhi National Park in the east most having completed more than 50% Unlike the Andheri-Goregaon Corridor, and the Manori and Malad Creeks in the west. construction. Rajesh Lifespaces and Sheth which required east-west connectivity, the This corridor was created due to a variety of Creators, are some of the key developers in Malad-Dahisar Corridor expanded in a narrow factors, including sky high prices of real estate this area. The stretch also has the 7 lakh sq ft north-south stretch and did not face such to the south as well as poor land availability. Infiniti Mall, along with well-developed areas problems. Hence, although the corridor does Proximity to the old city of Mumbai as well across it. not have any metro line running through it like as to the airport led to early development of the Ghatkopar–Versova Line in the Andheri- Malad East is a mass of rural developments areas south of the Malad-Dahisar Corridor, Goregaon Corridor, buyers still prefer this to a at the back and premium developments including the Andheri-Goregaon Corridor.
    [Show full text]
  • Assessment and Evaluation of Water Quality of Dahisar River
    ISSN (Online) 2393-8021 ISSN (Print) 2394-1588 IARJSET International Advanced Research Journal in Science, Engineering and Technology Conference on Advances in Civil Engineering 2018 (CACE-2018) Thakur College of Engineering and Technology, Thakur Vol. 5, Special Issue 3, February 2018 Assessment and Evaluation of Water Quality of Dahisar River Rutuja Hule 1, Salomie emos2 Dept. of Civil Engineering, Thakur College of Engineering and Technology, Mumbai, India1 Dept. of Civil Engineering, Thakur College of Engineering and Technology, Mumbai, India2 Abstract-Water is a prime natural resource, a basic human need and a precious national asset for any Country, and also belongs to a larger system. No life on earth can exist without water, and the Ceaseless flow of that water cannot exist without rain. The world’s fresh water resources are unequally distributed both in time and space. The available water is dwindling due to various reasons such as scanty rainfall, population growth, and increased per capita water use, ill management of water supply and distribution, improper reservoir operation policies. To face this situation, a holistic approach is needed. Dahisar River is a river on Salsette island that runs through Dahisar, a suburb of Mumbai, India. It originates at the spillway of the Tulsi Lake in the Sanjay Gandhi National Park in the northern reaches of the city. The River flows roughly North-West for a total of 12 kilometres through the localities of the National Park, Sri Krishna Nagar, Daulatnagar, Leprosy Colony, Kandar Pada, Sanjay Nagar, and Dahisar Gaothan before meeting the Arabian sea via the Manori Creek. Its total Catchment area is 3488 hectares.
    [Show full text]
  • CLUSTER 3- Constituency Numbers 1-52 R/N: Borivali, Dahisar R/C: Borivali R/S: Kandivali P/N: Malad P/S: Goregaon, Malad Don’T Just Vote
    The Informed Voter Project Don’t just Vote. Select! PROMISE and PERFORMANCE REPORT 2012-2015 Wards R/N, R/C, R/S, P/N, P/S WAS YOUR CORPORATOR THE RIGHT CHOICE? Don’t just Vote. Select! CONTENT BRIEF & DATA SOURCE Content Explanation Source Attendance Total of General Body Meetings and Committee • www.Praja.org Meetings. Average attendance of 227 corporators = 77% • RTI reply from BMC. Corporator Fund Each corporator is entitled to two funds annually- • Entitlement- http://bit.ly/1PLOq2N Expenditure Status (1) Corporator Fund, and • Corporator Fund Expenditure Data- (2) Development Fund. http://portal.mcgm.gov.in/irj/portal/anon Financial Corporator Fund Development Fund ymous/qlpurordcdetails. Average Year annual entitlement annual entitlement Expenditure of 227 corporators = 92.97% • Development Fund info not included in 2012-13 60 lakh 40 lakh this report. 2013-14 60 lakh 40 lakh 2014-15 60 lakh 1 crore Promise & Performance Each corporator was asked the following questions in Promise and Performance as declared by the One-liners the interview conducted by MumbaiVotes- corporator in a two minute video/audio (1) Performance: Major work done in term so far interview with MumbaiVotes. (2) Promises: Plans for remaining part of term. Contact Details Phone number provided. Find more on website. Affidavit filed for candidature Don’t just Vote. Select! PRIMARY RESPONSIBILITIES OF CORPORATORS (CITY LEVEL ISSUES) URBAN PLANNING ENVIRONMENT EDUCATION ROADS PUBLIC TRANSPORT ₹ POVERTY ALLEVIATION HEALTH ECONOMIC DEVELOPMENT WATER SUPPLY SLUM IMPROVEMENT Don’t just Vote. Select! MUMBAI = 227 WARDS = 227 CORPORATORS 90 80 77 70 60 53 50 40 30 30 28 NO.
    [Show full text]
  • That Sinking Feeling
    Mumbai Reader 2017 85 That Sinking Feeling — Nidhi Jamwal Republished from the Centre for Science and Environment’s book ‘Rising To The Call (2014)’ Book 17.indb 85 01/03/17 6:34 PM 86 That Sinking Feeling Being a heavily populated coastal city, extreme weather event killed 914 people Mumbai is highly vulnerable to impacts of and led to a conservative financial loss of climate change. Extreme weather events, Rs 450, 00, 00,000.1 The night of July 26-27, flooding, sea level rise, missing winter, urban 2005 is rightly considered the darkest night heat island effect, some of these effects of Mumbai. have already started to show up. Whereas the municipal corporation has undertaken Whereas the government pushed the blame projects to adapt the city to threats of climate on ‘natural’ disaster, God’s fury and one-in- change, most of these projects are disjointed a-hundred-years episode, experts claim the and lack a comprehensive plan. coastal city of Mumbai has every reason to expect more such extreme weather Mumbai is no stranger to flooding. Every events (see box 1: More floods, no winter). year during the monsoon season, low-lying Climate change is expected to increase areas of the city get submerged in knee- the severity and frequency of flooding deep water. Mumbaikars are habituated (see table 1: Estimated economic losses to such ‘regular’ flooding. However, July due to the impact of climate change in 26, 2005 is a watershed moment in the Mumbai). As per a 2007 study conducted history of Mumbai. On this fateful day, the by A S Unnikrishnan and D Shankar of Goa- metropolis received an unprecedented based National Institute of Oceanography, rainfall of 944 mm in 24 hours.