Northern Highways Program 2015-2019

Ministry of Northern Development and Mines TABLE OF CONTENTS

Northern Regional Map ...... 1

Introduction ...... 2

Northern Expansion 2015 – 2019 ...... 3

Northern Rehabilitation 2015 – 2019 ...... 5

NORTHERN REGIONAL MAP

1

NORTHERN HIGHWAYS PROGRAM 2015-2019

INTRODUCTION

Creating Jobs and Building a Stronger

In 2015/16, the Ontario government will be investing more than $2.4 billion to repair and expand provincial highways and bridges. This includes $560 million for creating or sustaining approximately 5,600 direct and indirect jobs. Improving Ontario's transportation network is part of the government’s plan to strengthen the economy.

2015 Planned Accomplishments Northern Ontario

New highways 43 lane km

New bridges 10

Highways rehabilitated 630 centreline km

Bridges rehabilitated 33

The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

2

NORTHERN EXPANSION 2015 – 2019

NORTHEASTERN ONTARIO EXPANSION 2015-2019† Target Completion Hwy Status Location Type of Work Date Highway Realignment at 66 Planned Realignment 2017 Virginiatown Hwy 69 connection to Sudbury Beyond 69 Planned Four-laning widening southeast bypass 2019 North of Hwy 64 northerly, north Four-laning widening / 69 Underway 2015 of Alban new four-lane highway North of Hwy 607 northerly, north 69 Underway Four-laning widening 2016 of French River North of Hwy 522 northerly, Beyond 69 Planned Four-laning widening French River 2019 Four-laning widening / Beyond 69 Planned Hwy 526 northerly, Britt new four-lane highway 2019 CNR Realignment, south of Hwy Four-laning widening / 69 Underway 2017 522 new four-lane highway South of north junction of Hwy Beyond 69 Planned 529 northerly, Pointe au Baril Four-laning widening 2019 Station South junction of Hwy 529 Beyond 69 Planned Four-laning widening northerly, Pointe au Baril 2019 North Hwy 7182 (Shebeshekong Beyond 69 Planned Four-laning widening Rd.) northerly, north of Nobel 2019

69 Planned Hwy 7182 (Shebeshekong Rd.) Reconstruction 2016

Beyond 69 Planned South of Hwy 7182 northerly Four-laning widening 2019 Beyond 69 Planned North of Hwy 559 northerly Four-laning widening 2019

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

3

EXPANSION 2015-2019

Target Completion Hwy Status Location Type of Work Date River Bridge and 11/17 Underway Four-lane widening 2017 Approaches

Black Sturgeon River to 11/17 Planned Four-lane widening 2019 Red Rock

Beyond 11/17 Planned Hwy 587 to Pearl Creek Four-lane widening 2019

Stillwater Creek Nipigon Beyond 11/17 Underway Four-lane widening westerly 2019

5.0 km west of Hwy 587 11/17 Underway Four-lane widening 2017 easterly

Four-lane widening / Beyond 17 Planned Manitoba border easterly new four-lane highway 2019

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

4

NORTHERN REHABILITATION 2015 – 2019

NORTHEASTERN ONTARIO REHABILITATION 2015† Project Target Length Completion Hwy Status Location Type of Work (km) Date Resurfacing / new Northbound lanes, south of Hwy bridge 11 Planned 5 2017 534 interchange, Powassan / culvert replacement and rehabilitation Meadow Creek, south of Hwy 11 Underway Culvert rehabilitation n/a 2015 579, Cochrane Mondor Creek, south of Hwy 579, 11 Underway Culvert replacement n/a 2015 Cochrane Resurfacing / bridge and 11 Underway Mattice to Hearst 31 2015 culvert replacements 11 Underway Bradburn Creek, west of Hearst Culvert replacement n/a 2015 Valentine River Bridge, west of 11 Underway Bridge replacement n/a 2015 Hearst West of Hwy 631 easterly, west 11 Planned Resurfacing 21 2015 of Calstock Resurfacing / bridge 11 & Ontario/Quebec boundary Underway rehabilitation and 22 2015 65 westerly, east of New Liskeard culvert replacement 11 & Englehart River, Aidie Creek Underway Bridge rehabilitations n/a 2015 573 Bridges, Earlton northerly 11 & South, east, west of Hwy 579, Culvert replacements / Underway n/a 2016 652 Cochrane rehabilitations Coldwater River Bridge, north of 17 Underway Bridge rehabilitation n/a 2015 Montreal River Aux Sables River Bridge, east of 17 Underway Bridge rehabilitation n/a 2015 Hwy 553, Massey CPR overhead, west of Hwy 6, 17 Underway Bridge replacement n/a 2015 Webbwood Resurfacing / culvert Hwy 539, Warren to Hwy 64, 17 Underway rehabilitations and 15 2015 Verner replacement

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

5

NORTHEASTERN ONTARIO REHABILITATION 2015† Project Target Length Completion Hwy Status Location Type of Work (km) Date Resurfacing / culvert 17 Underway Hwy 64 easterly, Verner 5 2015 rehabilitation Resurfacing / passing lanes / 17 Underway Sturgeon Falls westerly 10 2016 culvert rehabilitation Resurfacing / passing lanes / Hwy 94 easterly to Hwy 531, 17 Underway bridge rehabilitation / 12 2015 Corbeil culvert replacements 17 & Shewfelt Creek, Kaskawan Culvert replacement / Underway n/a 2015 548 River, Bruce Mines rehabilitation 17 & Underway South and north of Hornpayne Culvert replacements n/a 2015 631 Norway Creek and Opeongo 60 Underway Culvert replacements n/a 2015 Lake, west of Whitney Resurfacing / bridge and Hwy 127 easterly, east of 60 Underway culvert rehabilitation / 19 2017 Whitney culvert replacements French River Bridge at French 69 Underway Bridge rehabilitation n/a 2016 River 101 Underway Borden Lake, east of Chapleau Culvert replacement n/a 2015 Shawmere River Bridge Resurfacing / bridge 101 Underway 48 2015 easterly, Foleyet rehabilitation 101 Underway East of Foleyet easterly Culvert replacements n/a 2015 West of Hwy 144 easterly, Resurfacing / bridge 101 Underway 31 2015 west of rehabilitations 108 Planned Hwy 17 northerly to Elliot Lake Resurfacing 23 2016 112 Hwy 11 northerly, Kirkland & Underway Resurfacing 21 2015 Lake 650 Storm sewer replacement in 124 Planned Drainage realignment n/a 2015 Dunchurch

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

6

NORTHEASTERN ONTARIO REHABILITATION 2015† Project Target Length Completion Hwy Status Location Type of Work (km) Date 129 North of Iron Bridge, north of Culvert replacement / & Underway n/a 2015 Thessalon rehabilitation 546 141 Planned Rosseau Culvert replacement n/a 2015 North of Hwy 17 northerly, 144 Underway Resurfacing 24 2015 Chelmsford Resurfacing / culvert 144 Underway Onaping northerly to Cartier 18 2015 rehabilitations Half Way Lake northerly, north of 144 Underway Resurfacing 26 2015 Cartier 518 Haines Creek east of Orrville, & Underway Culvert replacement n/a 2015 Jenkins Creek at Magnetawan 520 Distress River Bridge, 520 Underway Bridge rehabilitation n/a 2015 Magnetawan 531 Hwy 533 Mattawa northerly and & Underway Resurfacing 7 2015 Hwy 531 southerly, Bonfield 533 540, Resurfacing / bridge 542 East junction Hwy 542 northerly, replacement and Underway 14 2016 & Mindemoya rehabilitations / culvert 551 rehabilitations 552 Planned Hwy 17 westerly, Goulais River Resurfacing 5 2015 583 Planned Obijou River, south of Hearst Culvert replacement n/a 2016 Jessie River, Prune Creek, south 583 Underway Bridge replacements n/a 2015 of Hwy 11, south of Hearst Resurfacing / bridge rehabilitation / culvert 631 Underway Hwy 17 northerly, White River 51 2015 rehabilitations / culvert replacement 638 Underway Rydal Bank Creek at Rydal Bank Culvert rehabilitation n/a 2015

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

7

NORTHWESTERN ONTARIO REHABILITATION 2015† Project Target Length Completion Hwy Status Location Type of Work (km) Date Kabaigon River Bridge, west of 11 Underway Bridge replacement n/a 2015

11 Underway Fort Frances westerly Resurfacing 26 2015

11 Atikokan easterly and Hwy 11B to Underway Resurfacing 17 2015 11B Atikokan

11 Underway Longlac easterly Resurfacing 21 2015

11 Underway Beardmore easterly Resurfacing 23 2015

Pagwachuan River, east of 11 Underway Culvert replacement n/a 2015 Longlac

11 Planned Fort Frances easterly Resurfacing 27 2016

Noden Causeway, east of Fort 11 Planned Bridge rehabilitation n/a 2017 Frances

17 Underway Corners westerly Resurfacing 13 2015

West of Ignace westerly to Hwy 17 Underway Resurfacing 31 2015 622 Cedar Creek Bridge, west of Hwy 17 Underway Bridge rehabilitation n/a 2015 614 Gravel River Bridge, east of 17 Underway Bridge replacement n/a 2015 Nipigon

17 Planned Marathon westerly Resurfacing 27 2016

17 Underway CPR overhead at Schreiber Bridge replacement n/a 2015

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

8

NORTHWESTERN ONTARIO REHABILITATION 2015† Project Target Length Completion Hwy Status Location Type of Work (km) Date 17 Underway Pic River Bridge, east of Marathon Bridge replacement n/a 2016

17 Underway Rock removal, west of Rossport Safety improvement n/a 2015

17 Underway CPR overhead at Rossport Bridge replacement n/a 2015

17, Abram and Raleigh Lake, east of Underway Culvert replacements n/a 2015 72 Wabigoon

61 Underway / US boundary northerly Resurfacing 21 2015

Pine River Bridge south of 61 Underway Bridge replacement n/a 2015

71 Underway Nestor Falls Bridge northerly Resurfacing 28 2015

Log River Tributary, Pine Lake, 71 Underway Culvert replacements n/a 2016 Black River, north of Hwy 11 Pelican River Bridge at Sioux 72 Underway Bridge rehabilitation n/a 2015 Lookout Strawberry Creek Bridges west of 102 Underway Bridge rehabilitations n/a 2015 Thunder Bay North of Hwy 609 northerly, north 105 Underway Resurfacing 31 2015 of Vermilion Bay Trout Lake River Bridge north of 105 Underway Bridge replacement n/a 2015 Ear Falls North Hwy 11/17 northerly, north 527 Underway Reconstruction 18 2015 of Thunder Bay Kabitotikwia, Gull, and Kopka 527 Underway River Bridges north of Hwy 811, Bridge rehabilitations n/a 2015 north of Thunder Bay McConnell Creek, north of Hwy 527 Underway Culvert replacement n/a 2015 811, north of Thunder Bay

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

9

NORTHWESTERN ONTARIO REHABILITATION 2015† Project Target Length Completion Hwy Status Location Type of Work (km) Date Surprise Lake Narrows Bridge 589 Underway Bridge rehabilitation n/a 2015 north of Lappe

594, Underway Hwys 594 and 601 near Dryden Resurfacing 9 2015 601

Elbow Creek and Sturgeon River 599 Underway Bridge rehabilitations n/a 2015 Bridges north of Silver Dollar

English River Bridge north of Hwy 599 Planned Bridge rehabilitation n/a 2015 17, north of

602 Planned Locking Creek, east of Emo Culvert replacement n/a 2016

Slate River Bridge south of 608 Underway Bridge rehabilitation n/a 2015 Thunder Bay

Hastie and Munro River Bridges 613 Underway Bridge rehabilitation n/a 2015 north of Hwy 11, Devlin

627 Planned North of Heron Bay Culvert replacement n/a 2016

Big Trout Creek, north of Red 628 Underway Culvert replacement n/a 2015 Rock

Hwy 17A northerly, north of 658 Planned Resurfacing 21 2016 Kenora

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

10

† NORTHEASTERN ONTARIO REHABILITATION 2016 Project Target Length Completion Hwy Location Type of Work (km) Date 6 South of Whitefish Falls northerly Resurfacing 12 2016

6 & West of Hwy 6 easterly to Nairn Resurfacing / bridge 22 2017 17 Centre rehabilitations North of south junction Hwy 592 11 Resurfacing 8 2016 interchange at Novar northerly North of north junction Resurfacing / bridge 11 Hwy17/11B northerly, north of 7 2016 replacement North Bay Chippewa Creek, north of North 11 Culvert rehabilitation n/a 2016 Bay South of Lakeshore Dr. southerly, Resurfacing / culvert 11 11 2016 Temagami rehabilitations Resurfacing / bridge 11 to Opasatika rehabilitation / culvert 32 2017 replacements Nagagami River to Shekak River, Resurfacing / bridge 11 10 2017 west of Calstock replacements South junction Hwy 11B 11B Resurfacing 7 2016 northerly to Haileybury 17 & South of Hwy 101 northerly, Resurfacing / culvert 33 2017 101 Wawa rehabilitation Resurfacing / bridge North of Harmony Lake Bridge 17 rehabilitations / culvert 27 2016 northerly, Sault Ste. Marie rehabilitation Resurfacing / bridge Municipal Rd. 55 interchange 17 rehabilitations / culvert 22 2018 westerly, Sudbury replacement CPR overhead, west of Hwy 537, 17 Bridge rehabilitation n/a 2016 Coniston West of Hwy 17B, west of North 17 Culvert replacement n/a 2016 Bay

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

11

† NORTHEASTERN ONTARIO REHABILITATION 2016 Project Target Length Completion Hwy Location Type of Work (km) Date South of Hwy 66 northerly, north Resurfacing / culvert 65 16 2016 of Englehart rehabilitation Still River Bridge, north of Hwy 69 Bridge rehabilitation n/a 2016 529, Britt Jackpine River Bridge, west of 101 Bridge coating n/a 2016 Hwy 651

101 Foleyet easterly Resurfacing 21 2016

Blanche River Bridge, north of Bridge rehabilitation / 112 n/a 2016 Hwy 11, south of Kirkland Lake culvert replacement Phillips Creek, Sharpsand River, 129 Culvert replacements n/a 2016 Thessalon northerly Regional Rd. 12 northerly, Resurfacing / culvert 144 12 2017 Dowling replacement Resurfacing / bridge 540 & West of Hwy 551, Kagawong replacement / culvert 18 2016 540B westerly replacements / culvert rehabilitations Hawk Creek and McVeigh Creek 547 Bridge rehabilitations n/a 2016 Bridges, east of Wawa 552 & Hwy 556 and Hwy 552 east of Resurfacing 11 2016 556 Hwy 17, Heyden Bridge rehabilitation / 6 Mile Creek, Tamarac Creek, and 560 culvert replacements / n/a 2016 Lost Lake Bridge, west of Elk Lake culvert rehabilitations Christian Creek and Boland Creek Bridge rehabilitation / 639 n/a 2016 Bridge, north of Elliot Lake culvert replacement Hwy 534 easterly to Hwy 11, Resurfacing / bridge 654 23 2017 Nipissing rehabilitations Jocko Creek, north of Hwy 101, 655 Culvert replacement n/a 2016 north of Timmins

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

12

NORTHWESTERN ONTARIO REHABILITATION 2016†

Project Target Length Completion Hwy Location Type of Work (km) Date Pickle Crow River (July Falls) Bridge, Lake Bridge replacement n/a 2016 north of Pickle Lake Rd. Mineral Lake, Fish, Suckle, and 11 Culvert replacements n/a 2016 Sandlink Creeks, near Longlac River Bridge at 11 Bridge rehabilitation n/a 2016 Kakabeka Falls Westovers and Dilke Creeks, west 11 Culvert replacements n/a 2016 of Fort Frances Helen Lake and East Shamrock 11 Culvert replacements n/a 2016 Lake, north of Nipigon Brule Creek and Oskondaga River, 17 Culvert replacements n/a 2017 west of Thunder Bay Pays Plat River Bridges, east of 17 Bridge replacements n/a 2017 Nipigon 17 CPR overhead, west of Schreiber Bridge rehabilitation n/a 2016 Ozone Creek Bridge, east of 17 Bridge rehabilitation n/a 2016 Nipigon CPR overhead and Little Firesteel 17 Bridge rehabilitations n/a 2016 River Bridges, west of Upsala Rae Lake and Pickerel Creek, east 17, 105 Culvert replacements n/a 2016 of Kenora Park Road overhead, near U.S. 61 Bridge removal n/a 2016 border Jarvis River and Slate River 61 Culvert replacements n/a 2016 Tributary, south of Thunder Bay Neebing River Bridge in Thunder 61 Bridge rehabilitation n/a 2016 Bay 71 Hwy 17 southerly, east of Kenora Resurfacing 21 2016

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

13

NORTHWESTERN ONTARIO REHABILITATION 2016†

Project Target Length Completion Hwy Location Type of Work (km) Date Moose Creek Bridge, south of 72 Bridge rehabilitation n/a 2016 Sioux Lookout

105 Vermilion Bay northerly Resurfacing 31 2016

66 km north Hwy 11 northerly, 502 Resurfacing 37 2016 south of Dryden

502 Hwy 594 southerly, Dryden Resurfacing 12 2016

516, Deception Lake, Minnikau River, Culvert replacements n/a 2018 642 Mills Creek, east of Sioux Lookout 527, East Dog, Mcintyre, and 589, Kabitotikwia Rivers, north of Culvert replacements n/a 2016 811 Thunder Bay Sitch and Cedar Creeks, west of 595 Culvert replacements n/a 2017 Thunder Bay

Black River Bridge, north of Hwy 614 Bridge rehabilitation n/a 2016 17,

Sturgeon River Bridge, east of 642 Bridge rehabilitation n/a 2016 Sioux Lookout

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

14

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) Resurfacing / passing lane / 6 Little Current southerly 19 culvert rehabilitation South of Hwy 654 interchange, south of 11 Wildlife fencing 4 Callander Hwy 11B interchange northerly to south 11 Resurfacing 6 junction Hwy 17 interchange, North Bay Lavase River / CPR overhead, CNR 11 Bridge rehabilitations n/a overhead, south of North Bay Hwy 11/17 Algonquin Ave. to Airport 11 Drainage improvements 1 Rd./McKeown Ave., North Bay North junction Hwy 17/11B northerly, 11 Resurfacing n/a North Bay

11 Whitney Creek, south of Latchford Culvert replacement n/a

11 South limits of Latchford southerly Resurfacing 14

Calamity Creek, north of Hwy 11B, New 11 Culvert replacement n/a Liskeard

11 ONR overhead at Earlton Bridge rehabilitation n/a

Crooked Creek Bridge, south of Kenogami 11 Bridge rehabilitation n/a Lake North of Hwy 570 to east junction Hwy 101, Resurfacing / culvert 11 24 Ramore replacement West junction Hwy 101 northerly, Nellie Resurfacing / culvert 11 34 Lake southerly rehabilitations

11 South of Hwy 579, south of Cochrane Resurfacing 17

11 West of Hwy 636, west of Cochrane Culvert replacements n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

15

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 11 Mattagami River Bridge at Bridge rehabilitation n/a

11 Moonbeam Creek, east of Moonbeam Culvert replacement n/a

11 Bridge, Fauquier Bridge / culvert replacement n/a

Resurfacing / culvert 11 Opasatika River Bridge westerly, Opasatika 32 replacements

11 Holland Creek, west of Hearst Culvert replacement n/a

Resurfacing / culvert 11 & East of Hwy 631 to Hwy 663, Calstock rehabilitation / culvert 21 663 replacements Bridge rehabilitation / culvert Fraser River Bridge and various culverts, west 11 replacements / culvert n/a Hwy 631, west of Hearst rehabilitation

11 West of Hwy 631, west of Calstock Culvert replacements n/a

Resurfacing / bridge 11 & Hwy 654 westerly, South CNR overhead, Hwy replacement / bridge 3 94 94/CNR underpass, Burford Creek, Callander rehabilitation / culvert rehabilitation 11 & Resurfacing / culvert South River to Trout Creek 9 124 rehabilitation 11 & East Lilly Creek Bridge and Culvert, west and Bridge replacement / culvert n/a 581 north of Moonbeam replacement

17 Hwy 631 easterly, White River Resurfacing 59

Sand River and Barrett River Bridges, south of 17 Bridge rehabilitations n/a Wawa

17 Garden River to Echo Bay Resurfacing 13

17 Walker Creek, Desbarats Culvert rehabilitation n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

16

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 17 & Resurfacing / culvert Bruce Mines easterly 18 638 replacement Resurfacing / culvert 17 Thessalon to Iron Bridge rehabilitation / culvert 34 replacements 17 & Resurfacing / culvert Hwy 546 easterly, Iron Bridge to Blind River 24 546 replacements

17 Serpent River easterly to Cutler Resurfacing 10

17 Birch Creek, west of Hwy 6, Webbwood Culvert rehabilitation n/a

Resurfacing / culvert 17 East of Hwy 6 easterly, Nairn Centre easterly 20 replacement

17 Hwy 69 interchange westerly, Sudbury Resurfacing 12

East junction Municipal Rd. 55 easterly to Resurfacing / bridge 17 39 Hwy 535, Sudbury to Hagar rehabilitations

17 Hwy 17 and Hwy 94, Corbeil Intersection improvement 4

Bar River Road to Sault Ste Marie southeast 17B Resurfacing 21 limits Resurfacing / bridge Duchesnay Creek Bridge, CNR overhead, 17B replacement / bridge 1 North Bay removal

60 Station Road easterly, Algonquin Park Resurfacing 14

60 Hwy 127 westerly, Whitney Resurfacing 27

Resurfacing / bridge 60 Hwy 523 easterly, east of Madawaska 14 rehabilitations Reconstruction / culvert 64 Hwy 69 easterly to Hwy 528, west of Noelville replacement / culvert 18 rehabilitation

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

17

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) Northwest Arm Narrows Bridge, Lake 64 Bridge rehabilitation n/a Nipissing, north of Noelville

64 Riberdy Tributary, south of Verner Culvert replacement n/a

64 South of Field Culvert rehabilitation n/a

64 Hwy 539 northerly, Field Resurfacing / bridge removal 12

North of Hwy 539 to Hwy 11, Marten River Resurfacing / bridge 64 23 southerly rehabilitations

65 Makobe River Bridge, east of Elk Lake Bridge replacement n/a

66 Hwy 566 easterly, east of Matachewan Resurfacing 16

67 North junction Hwy 11 easterly, Iroquois Falls Resurfacing 10

101 Sideburned, Nemegosenda, Nebskawash Bridge rehabilitation / bridge n/a &129 Bridges, Chapleau replacements

101 Jackpine Creek, west of Foleyet Culvert rehabilitation n/a

101 West of Hwy 144 easterly, east of Foleyet Resurfacing 11

Anthony Creek, Unknown Creek, Shillington 101 Culvert replacements n/a Creek, west of Hwy 11, Shillington Resurfacing / culvert 124 Hwy 400 easterly, Parry Sound to McKellar 20 rehabilitation Cummings Creek and Stoney Creek, north of Culvert replacement / 129 n/a Warncliffe Culvert rehabilitation Gravel River, Snowshoe Creek and Mississagi Bridge rehabilitations / 129 n/a River Bridges, east of Ranger Lake culvert replacement

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

18

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 129 Wenebegon River, north of Hwy 556 Culvert rehabilitation n/a

129 Buttonshoe Creek, south of Chapleau Culvert replacement n/a

South of Hwy 667 southerly, south of 129 Resurfacing 22 Chapleau North of Hwy 556 to Hwy 101, south of 129 Culvert replacements n/a Chapeau South junction Hwy 101 southerly, south of Resurfacing / culvert 129 27 Chapleau replacement Shadow River Bridge, west of Hwy 632, west 141 Bridge rehabilitation n/a of Rosseau Municipal Roads 35 and 15 northerly, 144 Resurfacing 6 Chelmsford Bridge rehabilitation / bridge Whitson Creek, Vermillion River, CPR 144 replacement / culvert n/a Overhead, Chelmsford northerly replacement Lord's Creek and Swamp Creek, north of 144 Culvert rehabilitations n/a Onaping

144 Creek north of Hwy 661, Gogama Culvert rehabilitation n/a

144 Hwy 101 southerly, west of Timmins Resurfacing 22

518 Bear Creek and Sequin River, Bear Lake Culvert rehabilitations n/a

Resurfacing / culvert 519 Hwy 17 easterly, Dubreuilville 31 rehabilitation

520 North Creek Bridge, west of Burk's Falls Bridge rehabilitation n/a

520 Ontario St. westerly, Burk's Falls Resurfacing 3

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

19

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 522 & Hwy 11 and McFadden Line interchange Resurfacing / bridge 5 522B westerly, Trout Creek replacement

523 Moore Creek Bridge, south of Madawaska Bridge rehabilitation n/a

Commanda Creek Bridge, northwest of 524 Bridge replacement n/a Commanda

526 Hwy 69 westerly, Britt Resurfacing 4

Naiscoot River culverts and bridge, CPR Bridge rehabilitations / culvert 529 n/a overhead, north of Pointe au Baril replacements Bridge rehabilitations / bridge Achigan Creek, Aubinadong River, Mississagi 532 & replacement / culvert River Bridges and Various Culverts, West of n/a 556 rehabilitations / culvert Glendale and east of Ranger Lake replacement / culvert removal

535 North of Hwy 64 northerly, north of Noelville Resurfacing 6

Jumbo Creek, south of Hwy 17, south of Reconstruction / culvert 537 1 Wahnapitae replacement 538 & CPR Subway and Lauzon Creek, east of Blind Bridge rehabilitation / culvert n/a 17 River replacement 539 & McCarty Creek Bridge and Sturgeon River Bridge rehabilitations / culvert n/a 805 Bridge, Silver Creek, River Valley rehabilitations

539A Temagami River Bridge, River Valley Bridge replacement n/a

540 & Indian Point Bridge, Manitou River Bridge, Bridge rehabilitations n/a 542 Manitoulin Island

540 West of Hwy 551 easterly, Kagawong easterly Resurfacing 27

540 Little Current westerly Resurfacing 18

542 Bluejay Creek, south of Sandfield Culvert replacement n/a

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

20

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) Little White River Bridge, north of Hwy 554, 546 Bridge replacement n/a Iron Bridge Richard's Landing west limits easterly, St. 548 Resurfacing 1 Joseph Island

548 St. Joseph Island Skyway, St. Joseph Island Bridge rehabilitation n/a

550 & Sault Ste. Marie westerly to Gros Cap Resurfacing 11 565

551 Mindemoya Creek Bridge at Providence Bay Bridge replacement n/a

553 & Sauble River Bridges and Cameron Creek Bridge replacements / Bridge n/a 810 Bridge, north Hwy 17, Massey rehabilitations Opikinimika River Bridge,west of Hwy 560A, 560 Bridge rehabilitation n/a Westree

564 Boston Creek Bridge, Boston Creek Bridge replacement n/a

Latour Creek and un-named creek, south of 567 Culvert rehabilitations n/a North Cobalt

569 Blanche River Bridge at Hilliardton Bridge replacement n/a

Bridge replacement / culvert 572 Pike River Bridge, north of Holtyre n/a replacement Bridge rehabilitation / bridge 577 Driftwood River Bridges, north of Shillington n/a replacement

583 North of Hearst Culvert rehabilitation n/a

Little East River Bridges, north of Hwy 11, 592 Bridge replacements n/a Novar CNR overhead and Ragged Creek Bridge, 592 Bridge replacements n/a north of Novar

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

21

NORTHEASTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 631 Hornepayne Creek, south of Hornepayne Culvert rehabilitation n/a

Negagamisis Narrows Bridge,West Beaton Bridge rehabilitations / 631 River Bridge and Shekak River Bridge, north n/a bridge replacement and south of Hornepayne Hog Creek and three un-named creeks north Culvert replacement / culvert 634 n/a of Hwy 11, north of Smooth Rock Falls rehabilitations

Massey Creek, west of Hwy 69, south of Reconstruction / culvert 637 1 Estaire replacement

638 Thessalon River Bridge at Rydal Bank Bridge replacement n/a

Thessalon River Bridge, north of Hwy 670, 638 Bridge rehabilitation n/a Ophir South Branch Louis River and Louis River, 652 Culvert rehabilitations n/a east of Cochrane

Sucker Creek and Chin River Bridges, north of 652 Bridge rehabilitations n/a Cochrane

South of Hwy 11 southerly, south of 655 Resurfacing 14 Driftwood

Deception Creek, Smith Creek, Gilles Creek 668 Bridge replacements n/a Bridges, north of Cochrane 7289 Silver Lake and Blackstone River, south of & Culvert rehabilitations n/a Horseshoe Lake 7290

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

22

NORTHWESTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) Nungesser Bak Creek Bridge, north of Red Lake Bridge rehabilitation n/a Rd. Hewitson Hewitson Creek Bridge, east of Bridge replacement n/a Creek Bridge Rossport (Formerly Hwy 17) Pickle Lake Crow River Bridge, north of Pickle Bridge rehabilitation n/a Rd. Lake Lac La Croix Namakan River Bridge, south of Bridge rehabilitation n/a Rd. Hwy 11 (Lac La Croix Rd.) Nungesser Pinder and South Berens Creeks, Culvert replacements n/a Rd. north of Red Lake Lac La Croix Namakan River Bridge, south of Bridge rehabilitation n/a Rd. Hwy 11 (Lac La Croix Rd.) Kemuel, Niobe, and Lerome Lakes, 11 Culvert replacements n/a and Jackfish Creek, west of Atikokan West Caribus and Gagne Lakes, 11 Mills, Flood East and Kawaia Creeks, Culvert replacements n/a near Atikokan Keemle, Shamrock, Shamrock West 11 Culvert replacements n/a Lakes, north of Nipigon

11 Mine Centre easterly Resurfacing 21

West of Hwy 71 westerly including Resurfacing / culvert 11 26 Bunting and Rainy River replacements Sturgeon River Bridge, east of 11 Bridge rehabilitation n/a Kenora Baudette Rainy River International 11 Bridge replacement n/a Bridge to U.S. Phipps Lake and Rockyshore Creek 11 Culvert replacements n/a Culverts, east of Longlac

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

23

NORTHWESTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) Camproad and Gorge Creek, north of 11 Culvert replacements n/a Nipigon East of Hwy 11B Atikokan easterly and 11, 623, 622 Resurfacing 43 Hwys 623 and 622

11 Shabaqua westerly Resurfacing 31

11 West of Shebandowan westerly Resurfacing 27

11 Windy Point Bridge, east of Fort Frances Bridge rehabilitation n/a

Mignet Creek, Indian Bay, Mission Bay, 11 Culvert replacements n/a north of Nipigon Watson and Norami Creeks, Blackwater 11 Culvert replacements n/a and Postagoni Rivers, west of Jellicoe

11 Geraldton westerly to Longlac Resurfacing 33

Flynne Creek East, Flynne and Chowder 11 Culvert replacements n/a Creeks, east of Longlac Everett and Ramsdale Creeks, west of 11 Culvert replacements n/a Fort Frances Rossmere and Wawiag Creeks, west of 11 Culvert replacements n/a Shebandowan

17 Hwy 71 westerly, east of Kenora Resurfacing 7

17 West of Rossport westerly Resurfacing 16

English River, Sisson and Baker Creeks, 17 Culvert replacements n/a west of Upsala

17 Hwy 72 easterly, Dinorwic Resurfacing 25

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

24

NORTHWESTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 17 Kenora bypass Resurfacing 35

Raith Creek and Savanne River Tributary, 17 Culvert replacements n/a west of Shabaqua

17 West of Upsala westerly Resurfacing 19

17 Hwy 665 near Dryden westerly Resurfacing 19

White River Bridge, east of Hwy 614, 17 Bridge rehabilitation n/a east of Marathon

17 West of Shabaqua westerly Resurfacing 27

McKenzie and Moose Creeks, Dinorwic 17 Culvert replacements n/a and Chadwick Lakes, near Dryden Dunc Lake, and Dead Horse, Blackbird, 17 MacLean, Mink, and Angler Creeks Culvert replacements n/a culverts, west of Marathon Dublin and Fire Hill Creeks, east of 17 Culvert replacements n/a Nipigon Reconstruction / truck 17 Schreiber westerly 21 climbing lanes Revell curve realignment west of Hwy 17 Realignment 4 622, west of Ignace

17 Hwy 614 westerly, east of Marathon Resurfacing 21

White Lake Narrows, Prairie, and 17 Bridge replacements n/a Hewitson Bridges, east of Schreiber Alder East, Angler Sawmill Creeks, and 17, 614 Culvert replacements n/a Chicken Farm Lake, east of Marathon

17 Schreiber westerly Resurfacing 19

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

25

NORTHWESTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 61 CNR Subway Bridges in Thunder Bay Bridge rehabilitations n/a

61 Rosslyn Road overhead in Thunder Bay Bridge rehabilitation n/a

61 Chippewa Road, Thunder Bay Intersection improvement n/a

Kaministiquia River Bridge in Thunder 61 Bridge rehabilitation n/a Bay

61 CPR overhead in Thunder Bay Bridge rehabilitation n/a

Kitchen, Maximillian, Toby Hill, Turner, 71, 11, 602 Culvert replacements n/a and Lyon Creeks, west of Fort Frances

71 South of Sioux Narrows southerly Resurfacing 24

71 Nestor Falls southerly Resurfacing 28

Dilke and Sims Creeks, Pinewood River, 71, 11, 617 Culvert replacements n/a west of Fort Frances Reed, Rushing, Berry Bridges, north of 71 Bridge rehabilitations n/a Sioux Narrows

72, 664 Sioux Lookout, south then west Resurfacing 32

72 South of Sioux Lookout southerly Resurfacing 25

Finlayson Creek, Sam and Aubrey Lakes, 72, 664, 642 Culvert replacements n/a south of Sioux Lookout McIntyre and Shebandowan Culverts, 102 Culvert replacements n/a west of Thunder Bay

105 Ear Falls southerly Resurfacing 40

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

26

NORTHWESTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 105 Ear Falls northerly Resurfacing 30

105 Sandy Creek, north of Ear Falls Culvert replacement n/a

130 Hwy 61 northerly, west of Thunder Bay Resurfacing 15

502 Hwy 11 northerly, northeast of Fort Frances Resurfacing 29

502 South of Dryden southerly Resurfacing 37

Marchington River Bridge, east of Sioux 516 Bridge rehabilitation n/a Lookout

527 Hwy 11/17 northerly, north of Thunder Bay Resurfacing 11

North Current, Eagle, and Grew Rivers, 527, 811 Trans Canada Pipeline, Little Max, and Culvert replacements n/a Heaven Creeks, north of Thunder Bay South Current River, Max and Wabikon 527 Creeks, Rousseau, Waweig and Rinker Culvert replacements n/a Lakes, north of Thunder Bay 72 km north of Hwy 11/17 northerly, north 527 Reconstruction 25 of Thunder Bay

584 Murky Creek Bridge, north of Geraldton Bridge rehabilitation n/a

North of Hwy 102 northerly to Hwy 591, 589 Resurfacing 8 Lappe Cedar, Whitewood, and Pitch Creeks, west Reconstruction / culvert 590, 588 28 of Thunder Bay replacements Pine River Bridge, north of Hwy 597, west 595 Bridge rehabilitation n/a of Thunder Bay Sitch and Whitewood Creeks, south of 595, 588 Culvert replacements n/a Kakabeka Falls

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

27

NORTHWESTERN ONTARIO REHABILITATION 2017-2019† Project Length Hwy Location Type of Work (km) 596 Alice Creek, south of Minaki Culvert replacement n/a

Kekwanzik Lake, Agimac, Pratt, Tug, 599 and Mile Creeks, Cobb Bay, north of Culvert replacements n/a Ignace Albany River (Osnaburg, Main, 599 Bridge rehabilitation n/a Overflow) Bridges, south of Pickle Lake Asinn and Wiggle Creeks, Graystone 599 and Savant Lakes, Low River, north of Culvert replacements n/a Ignace

602 LaVallee River Bridge south of Emo Bridge rehabilitation n/a

Wabigoon River, Shoshowae and 605, 601, 603 Melgund Creeks, north of Hwy 17 near Culvert replacements n/a Dryden Pinewood River Bridge, north of Hwy 617 Bridge replacement n/a 11, Thunder Bay

618 Hwy 105 southerly, Red Lake Resurfacing 12

Gerhard, Peterson, and Brusvine 619, 621 Culvert replacements n/a Creeks, east of Rainy River

622 Moose Creek, north of Atikokan Culvert replacement n/a

641 Louise Lake, north of Hwy 17, Kenora Culvert replacement n/a

Mooseland River Bridge west of Hwy 811 Bridge rehabilitation n/a 527, north of Thunder Bay

† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

28

Published August 2015 ISSN 1913-4568