Document.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
425 Park Avenue | Lobby & Retail Space | Soaring 45’ tall lobby atrium with floor-to-ceiling glass. 2 425 Park Avenue | Interior Lobby 3 425 Park Avenue | Restaurant | Premier restaurant from Michelin-starred restauranteurs Chef Daniel Humm and Will Guidara. 4 425 Park Avenue | Avenue Floor | 14’6” finished ceiling heights with incredible light across an efficient 28,900 sf floorplate. 5 425 Park Avenue | Diagrid Floor | 33,700 sf across two floors including specialty space boasting 38’ heights and private gardens facing both north and south. 6 425 Park Avenue | Diagrid Floor 7 425 Park Avenue | Club Floor | Exclusive 26th floor tenant space with food and wellness programming and exterior terraces overlooking Central Park and Midtown. 8 425 Park Avenue | Club Floor 9 425 Park Avenue | Park Floor | 9’6” finished ceiling heights and column free light-flooded floors with soaring views of Central Park and Midtown. 10 425 Park Avenue | Park Floor 11 425 Park Avenue | Park Floor 12 Availabilities Available Leased Club Floor Daniel Humm and Will Guidara Availabilities Operated Restaurant Available 47 Leased 46 45 44 Club Floor 43 42 Daniel Humm and Will Guidara 41 40 Operated Restaurant 39 38 37 Park Floors (28-47) 36 13,900 RSF Each 35 34 9’6” Finished Ceiling Height 47 33 46 32 45 31 44 30 43 29 42 28 41 40 26 39 Club Floor (26) 38 25 37 24 Park Floors (28-47) 36 23 13,900 RSF Each 35 22 9’6” Finished Ceiling Height 34 21 33 20 32 19 Skyline Floors (15-25) 31 18 20,400 RSF Each 30 17 29 16 9’6” Finished Ceiling Height 28 15 14 26 12 Club Floor (26) Diagrid Floors (12 and 14) 25 11 24 33,700 RSF 23 10 22 21 9 20 Avenue Floors (8-11) 8 19 Skyline Floors (15-25) 28,900 RSF Each 18 20,400 RSF Each 14’6” Finished Ceiling Height Daniel Humm 17and Will Guidara Operated16 Restaurant 9’6” Finished Ceiling Height 15 14 12 Diagrid Floors (12 and 14) 11 33,700 RSF 10 425 Park Avenue | Stacking Plan 9 13 Avenue Floors (8-11) Contact 8 28,900 RSF Each 14’6” Finished Ceiling HeightDavid C. Berkey Daniel Humm and Will Guidara 212 920 3388 Operated Restaurant [email protected] Contact David C. Berkey 212 920 3388 [email protected] 39'-4" 15'-11" 26'-10" 44'-4" 425 Park Avenue | Avenue Floor | 29,000 sf | 14’6” finished ceiling heights | No corner columns and all exterior columns are outboard. 14 Avenue Floor | Floors 8-11 | 28,900 rsf 153'-8" 30' 68'-8" 425 Park Avenue | Skyline Floor | 20,400 sf | 9’6” finished ceiling heights | No corner columns and all exterior columns are outboard. 15 Skyline Floor | Floors 15-25 | 20,400 rsf 123'-8" 53'-8" 425 Park Avenue | Park Floor | 13,900 sf | 9’6” finished ceiling heights | Column-free floors with soaring views of Midtown and Central Park. 16 Park Floor | Floors 28-46 | 13,900 rsf Developer Building Access Total Floors Column Spacing L&L Holding Company LLC Seven Days / Twenty-Four Hours 41 Park Floors 28–47 Column free Team Building Area Floor Sizes Skyline Floors 15–25 Architect Office Park Floors, 28-47 5 total columns on the floor; Foster + Partners 670,080 RSF (13,900 RSF) 30’ center to center of columns Skyline Floors, 15-25 Architect of Record Retail (20,400 RSF) Avenue Floors 8–11 Adamson Associates Architects 9,552 RSF (Ground) Avenue Floors, 8-11 6 total columns on the floor; 8,829 RSF (Mezzanine) (28,900 RSF) 30’ center to center of columns Structural Engineer Diagrid Floor 12 & 14 WSP Parking (33,700 RSF) On All Floors North & South Parking garage private for the Column Centerlines Are MEP Engineer tenants in the building with a 17’6” from curtain wall glass WSP capacity of 52 cars access via Slab Heights / Finished a car lobby on 55th street Ceiling Heights Construction Manager Retail Outdoor Terraces Tishman Construction Ground, 45’ / 44’8” Floors 12 & 26 Building Height Mezzanine, 36’11”/ 25’0” More than 3,000 Total RSF on each Building Height to the Roof Avenue Floors, 22’6” / 14’6” floor. LEED Certification 724’6” Diagrid Floor, 43’ / 38’ Projected LEED Gold Diagrid Floor Mezzanine, Building Height to the Top of the 22’/ 14’2” Outside Air Glass Feature Skyline Floors 13’6”/ 9’6” Minimum outside air – 20 CFM Well Certification 860’6” Park Floors 13’6” / 9’6” / Person based on 7 people per Projected to be the first Well Penthouse 42’ / 36’ 1,000 SF of occupied office space Certified commercial office building in NYC. Building Services Feng Shui Environment & Geomancy Loading Dock On 55th St between Park and Lexington Mon. – Fri. 7 am to 6 pm 425 Park Avenue | Building Fact Sheet 17 Elevators Tenant Electrical Standby Generator Distributed Antenna System Destination Dispatch Load Capacity Standby generator power is (DAS) 12 Passenger Elevators (2 banks) 6 Watts per USF* available for tenant spaces at a to DAS system shall be designed 2 Car Elevators *additional power can be made available be determined fee. and installed with the capability of 1 Freight Elevator + 1 Passenger enabling cell phone carrier services, elevator that can be used for freight Space is available on the 50th Fire Department/ Emergency if needed HVAC floor for two (2) tenant natural gas services repeaters and a building Water Cooled DX system with generators sized at 200KW each management 2-way radio system. Avenue & Skyline Floors waterside economizer and variable (Low Rise) volume A/C units on each floor. Floors 8–25 Security System Private Wireless Network 6 elevator cabs Supplemental Extensive integrated security and L&L Holding Company, LLC owns 2 1/2” valved outlets will be provid- safety systems such as visitor and operates a proprietary digital Club Floor (26th Floor) ed on each floor for tenant use and management, remote monitoring, point to point emergency radio 4 Passenger Elevators the system will be available 24/7. digital network camera coverage communication network. This FCC 2 Low Rise + 2 High Rise Elevators The valved outlets have a capacity and a 24/7 security center housed licensed system allows properly of 30 tons and the overall condens- in the building. Upon request, equipped tenants to utilize wireless Park Floors (High Rise) er water capacity for tenant supple- L&L can provide to each tenant radio communications throughout Floors 28–47 mental use is 400 tons. a customized security suite. New York City regardless of 6 Passenger cabs extraneous factors, such as power outages and interruptions to main Subway Access Base Building HVAC Hours Life Safety stream data networks. Tenants in 4,5,6 at 59 St; Mon. – Fri. 8:00 am to 6:00 pm Fully automatic and manual fire 425 Park Avenue may be provided E,M at 53 St alarm system. Two fire protection with access to this private network services will be brought from based on equipment charges and Back Up Power adjacent streets and will be fee schedule yet to be determined. Electrical All office floors are connected to connected to the fire protection The electrical service will be emergency power. In addition each system. Combined sprinkler and provided by ConEd at 480/277V, tenant floor is provided with a 200A standpipe risers will be provided. 3 phase in a second contingency emergency disconnect that can be Life safety back up emergency configuration. used for partial emergency power. power distribution will be provided A total of 1,000KW is available for via (2) 200KW/2500kVA emergency tenant emergency power needs on diesel generators. a first come, first serve basis. 425 Park Avenue | Building Fact Sheet 18 David C. Berkey Executive Vice President 212 920 3388 [email protected].