Construction Workers Registration System Application for Master

Total Page:16

File Type:pdf, Size:1020Kb

Construction Workers Registration System Application for Master Form No.: CWRB - CWRS 2 Rev 2 5-Jan-2016 Construction Workers Registration System Application for Master Administrator Account / Site Administration Account for Submission of Site Daily Attendance Record Please read the following notes carefully before completing and submitting this application form to the Construction Industry Council (the “CIC”). Notes: Please complete this form in black or blue ink. Please complete this form in English, except the Chinese name. For the purpose of submitting Daily Attendance Records ("DAR"), the Principal Contractor/Site Controller shall apply for a Master Administrator Account and register its contracts with the CIC using this form. The form must be submitted in person or by mail. The authentication details (user name and password) for the opening of the Master Administrator Account will be sent to the specified email address of the Company Representative. Please attach the certified copy of the following documents: i) "Letter of Acceptance", or equivalent & ii) "BA10" form or “MW03” form (for contracts where the Buildings Ordinance is applicable) or "letter from the client or the client's representative to contractor” stating the site commencement date” (for other contracts), to register the contract with the CIC. Please attach a copy of Business Registration Certificate to apply for a Master Administrator Account. The Principal Contractor/Site controller is required to notify the CIC in writing if there are any subsequent changes to the information provided in this form. The CIC may use the information provided in this form for the purposes relating to the administration of the Construction Workers Registration Ordinance (Cap. 583, Laws of Hong Kong) and its subsidiary legislation, and for dealing with other matters related to the application. The CIC may provide such information to government bureaux/departments, personnel or other organizations for purposes as required or authorized by law. The Principal Contractor/Site Controller shall ensure that the information provided in this form is true, correct and up to date. Such information shall supersede similar information submitted previously. The CIC will take into consideration only the information given in this form in processing the application. Please provide all information as required. The CIC may not be able to process application with incomplete or insufficient information. Please send your application to Registration Services Secretariat, Level 7a, 95 Yue Kwong Road, Aberdeen, Hong Kong. Personal Information Collection Statement 1. The information you provide to the Construction Industry Council (the CIC), including any personal data as defined in the Personal Data (Privacy) Ordinance (the Ordinance), will be used solely for purposes related to the activities of the CIC. 2. To keep you informed of CIC activities and industry developments which may be of interest, the CIC would like to use your personal data, including your name, phone number and correspondence and email addresses, to update you in relation to training courses, trade testing, registration, events and other aspects of its work and the construction industry. 3. You are free to decide whether you wish to receive such information. If you choose not to do so, please put a tick in the box below. 4. You are also entitled to request access to and correction of any errors in your personal data. If you wish to do so please write to the CIC at 15/F, Allied Kajima Building, 138 Gloucester Road, Wanchai, Hong Kong. I do not wish to receive any information from the CIC in relation to its activities or developments in the construction industry For existing contractors, please provide CIC Contractor No.: __________________ and complete Part II and III only. PART I: Contractor Particulars Company Name(1) (English) : (中文) : Company Address(1): Tel. No.: Fax No.: Name of Representative (English)(2): *Mr. / Ms. / Miss Email: Tel. No.: Fax No.: (1) The Company Name and Address shall be the same as those shown in the Business Registration Certificate. (2) The CIC only allows registration of one Company Representative for all the contracts under the same CIC Contractor Number within the system, who will receive the Master Administrator Account authentication details and Late DAR Submission Reminders for all the relevant contracts, through the specified email address of this registered Company Representative. 1 Part II: Contract Information (Please “”the appropriate box(s)) Contract No.(3): Contract Description: Government Dept. / Client: Site Location: (Room / Flat) (Floor) (Block) (Name of Building) (4) (No. & Name of Street / Area / Lot No.) (District ) Multi-location: Site Commencement Date(5): Site End Date(6): (Day / Month / Year) (Day / Month / Year) Work Nature(1): □ RMAA(7) □ New Works Work Nature(2): □ Building (with E&M) □ Building (without E&M) □ Civil (with E&M) □ Civil (without E&M) □ E&M Only Name of Site Representative (English)(8): *Mr. / Ms. / Miss Email: Tel. No.: Fax No.: (3) Please provide Government Contract No., Housing Authority Contract No., BD Reference No., or Public Utility Term Contract No., as appropriate. (4) Please refer to Appendix 1 for selecting the district code. (5) Please refer to the site commencement date stated in the BA10 form (for non-government contracts) or the letter from client/client representative to contractor (for government contracts) for the contract. (6) Please submit (BA13/14/14A/MW03), as appropriate, (for contracts where the Buildings Ordinance is applicable), or the substantial completion certificate (for other contracts), to the CIC upon actual site completion of the contract. (7) RMAA: Repair, Maintenance, Addition and Alteration work. (8) DAR Submission Validation Reports will be sent to the specified email address of the Site Representative. This Site Representative will only receive Reports of this particular contract. Part III: Company Authorization Name of Authorized Person(10): *Mr. / Ms. / Miss Title: E-mail: Tel. No.: Fax No.: Signature of Authorized Person: Company Chop: Date: (9) The CIC only allows registration of one Authorized Person for all the contracts under the same CIC Contractor Number within the system, who is responsible for approval of all the information in this application form. (* Please delete as appropriate.) 2 Appendix 1 District District Areas included No. 1 Hong Kong Island East East Region of Aberdeen Tunnel, Causeway Bay, Happy Valley, North Point, Shau Kei Wan, Chai Wan, Siu Sai Wan, Jardine’s Lookout, Mount Parker, Tai Tam Country Park (Quarry Bay Extension), etc. 2 Hong Kong Island West West Region of Aberdeen Tunnel, Wan Chai, Central, Sai Wan, Pok Fu Lam, The Peak, Wong Chuk Hang, Ocean Park, Aberdeen, Ap Lei Chau, etc. 3 Hong Kong Island South Shouson Hill, Deep Water Bay, Wong Nai Chung, Repulse Bay, Stanley, Tai Tam Country Park, Shek O, Shek O Country Park, etc. 4 Kowloon East Wong Tai Sin, Kowloon Tong, Ho Man Tin, Hung Hom, To Kwa Wan, Kowloon City, Kai Tak Development Area, Kwun Tong, Ngau Tau Kok, Shun Lee, Shau Mau Ping, Lam Tin, Yau Tong, etc. 5 Kowloon West Yau Ma Tei, Tsim Sha Tsui, Mong Kok, Prince Edward, Tai Kok Tsui, Shek Kip Mei, Sham Shui Po, Cheung Sha Wan, Lai Chi Kok, Mei Foo, Stonecutter Island, etc. 6 Tseung Kwan O & Clear Tseung Kwan O, Tiu Keng Leng, Hang Hau, Tseung Kwan O Water Bay Industrial Estate, Clear Water Bay, Clear Water Bay Country Park, Fei Ngo Shan, Tseng Lan Shue, Hong Kong University of Science and Technology, etc. 7 Kwai Chung & Tsing Yi Lai King, Kwai Chung, Tsuen Wan, Chai Wan Kok, Tsing Yi, Ma Wan, Kam Shan Country Park, etc. 8 Sai Kung & Pak Tam Chung Sai Kung, Ho Chung, Pak Sha Wan, Tai Mong Tsai, Pak Tam Chung, Sai Kung East Country Park, Sai Kung West Country Park, Shap Sze Heung, Nai Chung, etc. 9 Sha Tin & Ma On Shan Sha Tin, Tate’s Cairn, Ma On Shan, Wu Kai Sha, Ma On Shan Country Park, Chinese University of Hong Kong, Pak Shek Kok, Science Park, Shing Mun Country Park, Lion Rock Country Park, etc 10 Tai Po & Shuen Wan Tai Po, Tai Po Kau Nature Reserve, Lam Tsuen Valley, Hong Lok Yuen, Shuen Wan, Ting Kok, Pat Sin Leng Country Park, Plover Cove Country Park, Yan Chau Tong Marine Park, etc. 11 Fanling & Sheung Shui Sheung Shui, Fanling, Wo Hop Shek, Lo Wu, Ping Che, Sha Tau Kok, Kwu Tung, Lok Ma Chau, 12 Kam Tin & San Tin Kam Tin, Shek Kong, Tai Mo Shan Country Park, Ngau Tam Mei, San Tin, Mai Po, Fairview Park, Lam Tsuen Country Park, etc. 13 Yuen Long & Tin Shui Wai Yuen Long, Tin Shui Wai, Lau Fau Shan, Hung Shui Kiu, Lam Tei, Tai Tong, etc. 14 Tuen Mun & Tai Lam Tune Mun, Lung Kwu Tan, Black Point, So Kwun Wat, Siu Lam, Tai Lam Country Park, Sham Tseng, Ting Kau, etc. 15 Lantau East Yam O, Penny’s Bay, Disneyland, Discovery Bay, Tai Ho, etc. 16 Lantau North Chek Lap Kok, Hong Kong International Airport, Tung Chung, Sha Lo Wan, Lantau North Country Park, etc. 17 Lantau South Mui Wo, Chi Ma Wan Peninsula, Pui O, Tong Fuk, Shek Pik, Ngong Ping, Tai O, Lantau North Country Park, etc. 18 Cheung Chau & Peng Chau Cheung Chau, Peng Chau 19 Lamma Island Lamma Island 20 Remote Islands Islands without public ferry services everyday, e.g. Ping Chau, Kau Sai Chau, Sharp Island, Ninepin Group, Tung Lung Chau, Poi To Islands Hei Ling Chau, Shek Kwu Chau, Soko Island, Lung Kwu Chau, etc. 21 All HKSAR Districts Including all the 20 districts as above in HKSAR 3 .
Recommended publications
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • TKO Bus Routes 2021-22 (Tentative)
    2021 - 2022 [FOR REFERENCE ONLY] FIS TKO Campus (Return Schedules for Primary Students) *Bus routes and stops are subjected to change based on number of applicants **All schedules are depending on actual traffic conditions Bus 1B HK Parkview, Happy Valley Return Point RETURN TIME TKO Campus (approximate time +/- 10min) 2:30 1 80 Kennedy Road 3:00 2 3 Repulse Bay Road 3:12 3 HK Parkview (Hotel) 3:14 4 Green Lane (Wendy Apartments) 3:20 5 Wong Nai Chung Road: near Market Place 3:23 Bus 2 Midlevel Return Point RETURN TIME TKO Campus (approximate time +/- 10min) 2:30 1 11 Maganize Gap Road 3:00 2 1, 3, 12 Tregunter Path 3:03 3 23 Old Peak Road 3:06 4 9 Old Peak Road 3:08 5 8 Kotewall Road 3:15 6 6 Park Road 3:20 7 80-82 Bonham Road 3:25 8 High Street / Bonham Road 3:28 Bus 3A Kornhill, Fortress Hill, Tai Hang Return Point RETURN TIME TKO Campus (approximate time +/- 10min) 2:30 1 Kornhill (Block D, K) 2:55 2 Mount Parker Residences (front gate) 2:58 3 The Orchards (before traffic light) 3:03 4 Nam Fung Sun Chuen Block 4 3:04 5 238 King's Road (MacDonald) 3:12 6 City Garden Hotel (on Electric Road) 3:15 7 111 Mount Butler Road 3:25 8 70 Tai Hang Road 3:30 Page 1 of 5 Bus 3B North Point, Taikoo, Sai Wan Ho Return Point RETURN TIME TKO Campus (approximate time +/- 5min) 2:30 1 Kwun Tong Police Station (bus stop) 2:40 2 Grand Promenade 2:50 3 Taikoo Shing (HSBC) 2:57 4 Healthy Road West (across of Yoshinoya) 3:03 5 35 Cloud View Road 3:10 6 26 -32 Tin Hau Temple Road (Fly Dragon Terrace) 3:12 7 6 Tin Hau Temple Road 3:12 8 Hing Fat Street (Victoria
    [Show full text]
  • Special Topics Report
    Social Data Collected by the General Household Survey _ .Special Topics__ Report No.VI • Country Parks • Heritage Preservation • Doctor Consultation • Expenditure on Public Transport to and from Work • Taxi Waiting Time • Domestic Helpers • Hong Kong Residents . Working in China Census and Statistics Department Hong Kong 這份刊物的 PDF 版本的文字是從印刷版掃描而成,再 利用光學字符識別軟 件轉換成電子格式。由於原印刷版本已印製並保存多年,光學字符識別技 術未必能準確地識別某些文字或數字。因此,搜索或複製此 PDF 檔案內的 文字時應加以注意。 The text of this PDF publication was scanned from its printed version and then converted to electronic text using Optical Character Recognition (OCR) software. Because of the age and condition of the original printed copy, the OCR may not recognise certain characters or figures accurately. Caution should therefore be taken when searching or copying text from this PDF publication. Social Data Collected by the General Household Survey ~,Special Topics~!~ Report No.VI I Social Analysis and Research Section Census and Statistics Department, Hong Kong 19/F., Wanchai Tower I, 12 Harbour Road, Wan Chai, Hong Kong. Tel: 8234691 Caution Figures given throughout this report are subject to sampling error which tends to be relatively large in the case of small .numbers estimated based on a few sample observations. i1 Contents page Introduction 1 TOPIC A. Country Parks 3 B. Heritage Preservation 15 C. Doctor Consultation 31 D. Expenditure on Public Transport to 39 and from Work E. Taxi Waiting Time 45 F. Domestic Helpers 57 G. Hong Kong Residents Working in China 67 Hi Introduction This is the sixth in a series of reports to present the results of supplementary enquiries on a variety of social topics conducted via the General Household Survey (GHS).
    [Show full text]
  • RDFC Paper No. 7/2020 Annex 4
    Annex IV Environmental Hygiene Problem in Stanley and Shek O During Holidays Responses by Relevant Government Departments (a) Agriculture, Fisheries and Conservation Department (AFCD) The Agriculture, Fisheries and Conservation Department (AFCD) has all along been committed to keeping country parks clean and promoting the protection of countryside to the public. AFCD launched the “Take Your Litter Home” publicity and education programme in 2015 in collaboration with a number of local partner organisations to encourage the public to nurture a good habit of taking away their own waste after hiking or visiting country parks, and all litter containers and recycling bins along the hiking trails within country parks have been removed by the end of 2017. Since the launch of the “Take Your Litter Home” publicity and education programme, it has been effective in enhancing the public awareness towards waste reduction and environmental conservation during their visit to the countryside. Noting that many members of the public visited the country parks recently, AFCD has agilely deployed manpower to step up site inspections and cleansing, and provided litter containers of large volume at specific sites for the use of visitors where necessary. Regarding the situation of Tai Tam Country Park and Shek O Country Park, AFCD has deployed staff and cleansing contractors for carrying out daily cleansing at recreational sites and hiking trails inside the concerned country parks. If serious litter problem is found at individual locations, AFCD also stepped up cleansing effort as appropriate. In addition, AFCD has also strengthened education and publicity efforts through various channels, including displaying banners and posters in country park areas with high visitor flow, urging visitors to maintain environmental hygiene through radio programmes and advertisements at MTR, further promoting “Take Your Litter Home” and good hiking manners, and publicising relevant messages through the networks of non-governmental organisations and partner organisations.
    [Show full text]
  • St Michel – Brand-New, Luxury Living with an Exceptional Location and Connectivity
    Love・Home St Michel – Brand-new, luxury living with an exceptional location and connectivity Sun Hung Kai Properties' (SHKP's) meticulously planned project, St Michel Development, is located in the hills of Sha Tin South, fronted by bustling urban scenes∟ of Sha Tin and surrounded by lush green hills∟. The Development boasts natural geographical advantages, sitting near the expansive, 557-hectare Lion Rock Country Park^, and provides quiet and comfortable living in remarkable privacy. It enjoys close proximity to two MTR stations, so residents are able to reach both MTR Sha Tin Wai Station and City One Station on foot. Residents can also travel easily to and from the key financial and business districts in Hong Kong and Kowloon via the Lion Rock Tunnel and Tate's Cairn Tunnel. Furthermore, it is incredibly convenient to access Hong Kong International Airport and major Mainland cities from the Development. This will set a new standard for luxury living in the district. Excellent rail and road connectivity St Michel Development stands on the hills of Sha Tin South, with access to its very own exclusive road connecting to To Shek Street, creating a superior living environment with remarkable privacy. It establishes a new model for the luxury housing market in the region. The Development is about a 9.5-minute* walk from MTR Sha Tin Wai Station, and approximately an 11.5-minute* walk to MTR City One Station. It is situated close to both Tate's Cairn Tunnel and Lion Rock Tunnel – at just approximately a 4-minute-11- second∩ and 4-minute-53-second∩ drive to the Tate's Cairn Tunnel toll booth (Kowloon bound) and Lion Rock Tunnel toll booth (Kowloon bound) respectively.
    [Show full text]
  • Note for Public Works Subcommittee of Finance Committee
    For information PWSCI(2005-06)20 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Supplementary information on 340DS - Port Shelter sewerage stage 3 – Sai Kung Area 4 and Mang Kung Uk sewerage INTRODUCTION In considering the paper referenced PWSC(2005-06)31 on the above project on 23 November 2005, the Public Works Subcommittee (PWSC) requested the Administration to – (a) provide supplementary information to account for any discrepancy between the computer modeling predictions in planning for the Stonecutters Island Sewage Treatment Works (SCISTW), and the actual impact of the SCISTW on the water quality of the Tsuen Wan beaches; (b) provide information on computer modeling used for assessing the impact of the sewerage and associated facilities in Sai Kung on the water quality and that adopted for the SCISTW; (c) report the E. coli level in the surrounding marine waters and beaches after the completion of the project; and (d) provide the Administration’s information paper on the project to the Sai Kung District Council (SKDC) for SKDC Members’ comments before the relevant FC meeting. THE ADMINISTRATION’S RESPONSE Comparison between Water Quality Predictions and Actual Impact for SCISTW 2. The SCISTW was built as part of the sewerage facilities under the Harbour Area Treatment Scheme (HATS) Stage 1. It is now providing chemical /treatment ..... PWSCI(2005-06)20 Page 2 treatment for 1.4 million m3/day i.e. 75% of the sewage generated from both sides of Victoria Harbour. Treated effluent is discharged via an outfall at the western harbour without disinfection. When the scheme was first introduced, water quality assessments were conducted using the “Water Quality and Hydraulic Models” (WAHMO) computer model suite in 1996.
    [Show full text]
  • Minutes of 1085Th Meeting of the Town Planning Board Held on 15.5.2015 Present Permanent Secretary for Development Chairman
    Minutes of 1085th Meeting of the Town Planning Board held on 15.5.2015 Present Permanent Secretary for Development Chairman (Planning and Lands) Mr Thomas T.M. Chow Mr Stanley Y.F. Wong Vice-Chairman Mr Roger K.H. Luk Professor S.C. Wong Professor P.P. Ho Professor Eddie C.M. Hui Dr C.P. Lau Ms Julia M.K. Lau Ms Anita W.T. Ma Dr W.K. Yau Ms Bonnie J.Y. Chan Professor K.C. Chau Mr H.W. Cheung Dr Wilton W.T. Fok - 2 - Mr Ivan C.S. Fu Mr Lincoln L.H. Huang Ms Janice W.M. Lai Mr Patrick H.T. Lau Ms Christina M. Lee Mr H. F. Leung Mr Stephen H.B. Yau Mr F.C. Chan Mr Frankie W.C. Yeung Mr David Y.T. Lui Mr Peter K.T. Yuen Mr Philip S.L. Kan Dr Lawrence W.C. Poon Deputy Director of Environmental Protection (1) Mr C.W. Tse Assistant Director (2), Home Affairs Department Miss Charmaine H.W. Wong Principal Assistant Secretary (Transport) Transport and Housing Bureau Miss Winnie M.W. Wong Director of Lands Ms Bernadette H.H. Linn Director of Planning Mr K.K. Ling - 3 - Deputy Director of Planning/District Secretary Mr Raymond K.W. Lee Absent with Apologies Mr Clarence W.C. Leung Mr Laurence L.J. Li Mr Sunny L.K. Ho Mr Dominic K.K. Lam In Attendance Assistant Director of Planning/Board Miss Fiona S.Y. Lung Chief Town Planner/Town Planning Board Ms Lily Y.M. Yam (Items 1 to 8) Mr Louis K.H.
    [Show full text]
  • G.N. 4267 TOWN PLANNING ORDINANCE (Chapter 131
    G.N. 4267 TOWN PLANNING ORDINANCE (Chapter 131) AMENDMENTS TO THE APPROVED TAI TAM AND SHEK O OUTLINE ZONING PLAN NO. S/H18/2 Under section 12(1)(b)(ii) of the Town Planning Ordinance (the Ordinance), the Chief Executive in Council has on 30 November 1999 referred the approved Tai Tam and Shek O Outline Zoning Plan No. S/H18/2 to the Town Planning Board (the Board) for amendment. The Board has made amendments to the Plan. The amendments are set out in the Schedule of Amendments. Pursuant to section 12(3) of the Ordinance, the draft Plan No. S/H18/3 showing the amendments is exhibited under section 5 of the Ordinance for public inspection for a period of two months from the date of the first publication of this notice, that is until 7 September 2000, during normal office hours at the following locations:— ii(i) the Secretariat of the Town Planning Board, 15th Floor, North Point Government Offices, 333 Java Road, North Point, Hong Kong; i(ii) the Hong Kong District Planning Office, 14th Floor, North Point Government Offices, 333 Java Road, North Point, Hong Kong; and (iii) the Southern District Office, Ground Floor, Ocean Court, 3 Aberdeen Praya Road, Aberdeen, Hong Kong. In accordance with section 6(1) of the Ordinance, any person affected by the amendments so exhibited may object within the said period of two months by sending to the Board a written statement of his objection to the amendments and address it to the Secretary, Town Planning Board, 15th Floor, North Point Government Offices, 333 Java Road, North Point, Hong Kong.
    [Show full text]
  • M / SP / 14 / 146 Tsuen 400 Shek Tong 2 a …D 5.4.1 O 6.1 Mo Fan ‡¿«⁄⁄§⁄S…‘†·“ 6 1 340
    y¬B¯ Tin Yan Tin Ching Estate 5 6 4 1 170 F¨¿¦ Estate ⁄fi 5.1.6 j¤« 500 ·¥ ±²Î 7 5.4.4 Sha Kong Tin Yuet Estate Tai Tseng a” Ta Shek Wu 2 Shing Uk 3 5 Wai Tsai ⁄ Wai 5.1.4 TIN WAH ROAD Tsuen Wing Kei Tsuen 4 12 2 ‚⁄fiu 1 F¨¿ ⁄⁄‡§⁄ TIN TSZ ROAD Yuen Long Industrial Estate N A M S A N G W A I 5 3 – 200 ·¥¥ Sha Kong 8 5.4 5.4.4 11 Wah Shing 15 Ta Shek Wu Tsuen 1 \ˇ„ D M / SP / 14 / 146 Tsuen 400 Shek Tong 2 A …d 5.4.1 O 6.1 Mo Fan ‡¿«⁄⁄§⁄s…‘†·“ 6 1 340 R 100 40 Heung SEE PLAN REF. No. M / SP / 14 / 146 100 K 121 Lªø§¥­ A 6.1.0 W g E FOR TIN SHUI WAI STREET BLOCK SAN TIN HIGHWAY 2 ` æ» KAI SHAN 9 û¤º 11 P 9 ‰ KAM TIN RIVER LAM TSUEN COUNTRY PARK Fung Kong ⁄ 4 ¶a E {³N NGAU KWU KOK BOUNDARIES CHU WONG L Tsuen TIN YING ROAD 6 Fung Ka Wai T TIN SHUI WAI 8 LING Fung Kat Heung 108 ⁄ S 7 ROAD A Tin Shui Estate 52 ⁄⁄ 3 C 50 2 łfi¤V Tin Shui Wai Park 300 10 TAM ⁄O 3 32 85 Fire Services 6 ”y DEEP BAY ROAD 118 F“Y F¯f¤®º Training School Ȩ½ 5.1.7 Fuk Hing Tung Tau Wai Chung Hau SAN 100 WANG CHAU A Kung Tin Tsuen San Tsuen dªY 29 Yu Man San Tsuen 1 …‰§ 200 Lai Tau Tsim ⁄R 1 ½ 4 76 ' s¤©¨F 16 F¨H ·' Tin Oi ‰ Ha Mei Chung Sam Wai 17 7 FªY Shan Pui A 5 ¯„· Sherwood Sha Po ³²H 100 Ngau Hom Shek 6 Court San Tsuen Tung Tau Wai 3 FªY Kingswood Court Chung Hau Tsuen Tsuen Chung Yan Pei 200 ⁄v s• è¦Y » ⁄ Tung Tau Villas « ⁄O Sai Tau Wai LªÎ Shui Kan Shek Tsuen 2 Tin Tsz 53 Lam Uk s¤ 4 5.3.2 Hong Mei … ⁄£ ¨·Î s· 5 Estate Yeung Uk Tsuen Shan Pui Tsuen 4 9 100 San Wai Tin Yiu Tsuen é¶ ¹ÃÎ Locwood LIGHT RAIL Estate YUEN SHAN ¿ Lo Uk Court ⁄§ ˆ¥ 300 5.1.1 L 7 s¤©¨x
    [Show full text]
  • TSG Heritage and Culture Task Group Broad Stock List of Heritage and Culture Items in Hong Kong Sightseeing: Culture & Herit
    Annex A2 TSG Heritage and Culture Task Group Broad Stock List of Heritage and Culture Items in Hong Kong * Cross Category Item Frequency # With Additional Information (no. of times the item is named in entries + Not An Officially Declared Mounment to the "Enjoy HK" Competition * ) Sightseeing: Culture & Heritage (Museum) cmu01 Art Museum, The Chinese University of Hong Kong 香港中文大學文物館 1 cmu02 Flagstaff House Museum of Tea Ware / Flagstaff House* 茶具文物館 / 舊三軍司令官邸 193 cmu03 Hong Kong Film Archive 香港電影資料館 9 cmu04 Hong Kong Heritage Museum 香港文化博物館 270 cmu05 Hong Kong Museum of Art 香港藝術館 243 cmu06 Hong Kong Museum of Coastal Defence 香港海防博物館 188 cmu07 Hong Kong Museum of History 香港歷史博物館 197 cmu08 Hong Kong Museum of Medical Science / Old Pathological Institute 香港醫學博物館 / 舊病理學院 18 cmu09 Hong Kong Racing Museum 香港賽馬博物館 30 cmu10 Hong Kong Railway Museum / Old Tai Po Market Railway Station 香港鐵路博物館 / 舊大埔墟火車站 71 cmu11 Hong Kong Science Museum 香港科學館 130 cmu12 Hong Kong Space Museum 香港太空館 502 cmu13 Hong Kong Visual Arts Centre 香港視覺藝術中心 8 cmu14 Law Uk Folk Museum 羅屋民俗館 8 cmu15 Lei Cheng Uk Han Tomb Museum 李鄭屋漢墓博物館 15 cmu16 Lions Nature Education Centre Insectarium 獅子會自然教育中心昆蟲館 cmu17 Lions Nature Education Centre Shell House 獅子會自然教育中心貝殼館 cmu18 Police Museum 警隊博物館 16 cmu19 Sam Tung Uk Museum / Sam Tung Uk Village* 三棟屋博物館 / 三棟屋村 202 cmu20 Sheung Yiu Folk Museum / Sheung Yiu Village* 上窯民俗文物館 / 上窯村 13 cmu21 University Museum & Art Gallery, The University of Hong Kong 香港大學美術博物館 1 cmu22 Others 其他 # Total 2115 * "Enjoy Hong Kong" was an open competition to design travel itinearies to showcase the best of Hong Kong.
    [Show full text]
  • Agreement No. CE21/2012 (WS) Desalination Plant at Tseung Kwan O - Environmental Impact Assessment Report Feasibility Study 8901/B&V/0050
    Agreement No. CE21/2012 (WS) Desalination Plant at Tseung Kwan O - Environmental Impact Assessment Report Feasibility Study 8901/B&V/0050 11 LANDSCAPE AND VISUAL IMPACT ASSESSMENT 11.1 Introduction This section reports on the study to assess the potential landscape and visual impacts arising from construction and operation of any above ground structures and works areas associated with the Desalination Plant at Tseung Kwan O. In accordance with the criteria as stated in Annexes 10 and 18 of the Technical Memorandum on Environmental Impact Assessment Process (EIAO-TM), the landscape and visual impact assessment (LVIA) for this Project includes: 1. a list of the relevant environmental legislation, standards and guidelines; 2. a definition of the scope and contents of the Study; 3. a review of the relevant planning and development control framework; 4. a landscape impact assessment section, including: - landscape impact assessment methodology; - a landscape baseline study providing a description of the baseline landscape resources (LRs) and landscape character areas (LCAs) within the Study Area; - identification of potential landscape impacts (these are similar to the potential visual impacts and hence all potential landscape and visual impacts are contained within one section); - prediction of the nature of landscape impacts and the potential magnitude of change they will cause as well as the potential significance of impacts before the implementation of mitigation measures; - recommendation of appropriate mitigation measures and associated
    [Show full text]
  • Town Planning Board Paper No. 10304
    TPB Paper No. 10304 For consideration by the Town Planning Board on 21.7.2017 CONSIDERATION OF REPRESENTATIONS NO. R1 TO R7 AND COMMENT NO. C1 IN RESPECT OF THE DRAFT KOWLOON TONG OUTLINE ZONING PLAN NO. S/K18/20 Subject of Representations Representers Commenter (No. TPB/R/S/K18/20-R1 to R7) (No. TPB/R/S/K18/20-C1) Total: 7 Total: 1 Amendment Item A Oppose (7) Support R1, R3 and R6 (1) Rezoning a piece of land near R1: Green Sense C1: Individual the junction of Lung Cheung R2 to R7: Individuals Road and Lion Rock Tunnel Road from “Green Belt” (“GB”) to “Residential (Group C) 11” (“R(C)11”) Amendment Item B1 Rezoning of a strip of land abutting the northern kerb of Lung Cheung Road from “GB” to an area shown as ‘Road’ Amendment Item B2 Rezoning of a strip of land abutting the southern kerb of Lung Cheung Road from “GB” to an area shown as ‘Road’ Amendments (a) and (b) to Oppose (1) the Notes of the Plan R6: Individual Revision to the Remarks of the Notes for the “R(C)” zone to incorporate plot ratio (PR) and building height (BH) restrictions for the “R(C)11” sub-zone and allow for minor relaxation of the BH restriction 1. Introduction 1.1 On 13.1.2017, the draft Kowloon Tong Outline Zoning Plan No. S/K18/20 (the Plan) (Annex I) was exhibited for public inspection under section 5 of the Town Planning Ordinance (the Ordinance). The amendments are set out in the Schedule of Amendments at Annex II.
    [Show full text]