Rail Dividers PTW - Infrastructure Company Management System 01

KEEP THIS PERMIT TOGETHER

RO ______Applicant ______Activity______

APPROVED: ______EXPIRY: ______RENEWAL: 3 months valid

2 WEEKS BEFORE EXPIRY WITH VALID RO

BRING THIS PERMIT TO WORK.

PUT THE NEW PERMIT ON TOP + RO + SUPPORTING INFORMATION

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 2 of 14

Qatar Rail Dividers PTW - Infrastructure Guide Company Management System

01 Filled out by .

02 Insert QR Check list / Register

03 Write RO # & DR #

04 Insert Interface Drawing

05 Insert QR Assessment

06 Insert Applicant Drawings

07 Insert Traffic Management

08 Insert

Monitoring

Regime

09 Insert Support Docs

10 Insert MS / RA 11 Insert QR General Conditions

12 Insert QR Contacts

13 Insert previous PTW

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 1 of 14

QR-PERMIT Ref. # Qatar Rail Permit to Work ______for Infrastructure/Utility Works in Rail-Protection-Zone (Filled out by Qatar Rail) Company Management System

First Submittal Renewal Previous QR Permit Ref. # ______Contractor / Applicant:

Contractor Contract No Building No. Street No. Street Name: Full address Zone No.

Stamp/signature Telephone/Fax

Email The Contractor/Applicant certifies that: Print name:  He/she fully understands the documentation associated with this work activity, the hazards, the precautions required, his/her obligations, and the procedures to carry out the work in relation to the rail interface,  He/she will provide access/egress for Qatar Rail to their land & work sites at all times and during all phases of the work. Date:  The workforce undertaking the work activities are fully briefed and equipped and understand the safety and emergency procedures to be followed and are competent. Others. Also refer to terms & conditions. Name Person in Charge Email

Title Mobile No PERMIT DURATION (maximum 3 months) WORK LOCATION (area, zone, street/no.) FROM DATE / TIME:

TO DATE / TIME:

DR No. RO No.

Project / Scheme: Work Description TRIAL HOLE/BORE HOLE EXCAVATION LAYING CABLE(S) ELECTRICITY OHL LAYING PIPELINES PRESSURISED PIPE DRILLING WORKS FOUNDATIONS TUNNELING / PIPE JACKING PERMANENT CIVIL CONSTRUCTION BUILDING DEMOLITION TEMPORARY INSTALLATIONS (LESS THAN 6 MONTH) DEWATERING OTHERS Type and Description of Work:

Applicant’s Client Applicant’s Consultant

Stamp/signature Stamp/signature Name Name

Title Title

LEADING EXCELLENCE │CMS Ref.: TM-215-F06, 04/02/19, Rev. 3.0 Page 1 of 3

QR-PERMIT Ref. # Qatar Rail Permit to Work ______for Infrastructure/Utility Works in Rail-Protection-Zone (Filled out by Qatar Rail) Company Management System

QATAR RAILWAYS (QR) COMPANY (APPROVING ENTITY) North EAG Red Line North UG Red Line South UG Red Line South EAG EAG Green Line UG UG Gold Line EAG Blue Line UG Black Line UG Long Distance Commuter Line LRT

Phase ______LOT / CORRIDOR ______

QR CONTRACTOR RKH QITARAT - SERVICE PROVIDER ENDORSEMENT (1) I have reviewed, assessed and considered the intended work and my comments on the submission are shown below. Provided these comments are adequately addressed I hereby endorse the acceptance of the intended third party work. Comments / conditions: (use separate page, if required)

Stamp/signature

Name

Title

QR PMC PROGRAM MANANGEMENT CONSULTANT SERVICE DELIVERY DEPT. (RAILWAY OPERATOR) ENDORSEMENT (2) I have reviewed, assessed and considered the intended work and my comments on the submission are shown below. Provided these comments are adequately addressed I hereby endorse the acceptance of the intended third work. Comments / conditions: (use separate page, if required)

Stamp/signature

Name

Title

QR GOVENMENTAL INTERFACES & PERMITS DEPARTMENT (3) I accept that, so far as can reasonably be ascertained from the information submitted, the relevant comments and conditions stated herein including the associated documents have been complied with properly. QR GENERNAL CONDITIONS DETAILED DESIGN DRAWING(S) COMPLIANCE CERTIFICATE DR – DESIGN REVIEW TRAFFIC DIVERSION & ACCESS PLAN LETTER OF AUTHORISATION (CONTR./CR/ID) RO – ROAD OPENING PERMIT METHOD STATEMENT / RISK ASSESSEMENT UNDERTAKING&LIABILITY LETTER/ INSURANCE INTERFACE DRAWING EMERGENCY/MONITORING/DEWATERING PLAN INTERFACE CONTROL FORM / OTHERS Comments / conditions: (use separate page, if required)

Stamp/signature

Name

Title

VALID FOR MAXIMUM 3 MONTH

LEADING EXCELLENCE │CMS Ref.: TM-215-F06, 04/02/19, Rev. 3.0 Page 2 of 3

QR-PERMIT Ref. # Qatar Rail Permit to Work ______for Infrastructure/Utility Works in Rail-Protection-Zone (Filled out by Qatar Rail) Company Management System

Terms & Conditions: 1. A Qatar Rail (QR) Permit to Work (PTW) to be filled out and submitted for every Railway Party (i.e. QR contractors, service provider, etc.) interfacing with the Third Party Intended Work. refer to QR contact list: QR Departments, QR Contractors, QR Operator & Service Provider 2. (1) If no Qatar Rail contractor is awarded, then the Qatar Rail Civil Department to sign. 3. (2) If no Qatar Rail PMC contract is awarded, then the Qatar Rail Alignment Department to sign. 4. The QR Governmental Interfaces & Permits Department can replace/overrule Endorsement (1) & (2). 5. The applicant must submit all relevant documents. Additional comments / conditions can be attached separately. 6. All work is at the applicants risk and responsibility. 7. Qatar Rail representatives have the right to STOP WORK if any violation of the submitted documents occurs of safe working practices are compromised. 8. Contractor must apply for the Qatar Rail Permit to Work 10 working days before starting the work. 9. Contractor must submit a QR approved & valid RO permit (construction NOC). 10. Contractor must submit all associated documents, proof of coordination with the contractors of active rail projects, Qatar Rail, the PMC or any other related department of Qatar Rail. Assessment and monitoring reports for (movements/settlements, vibration, noise/dust, etc.) as required by Qatar Rail. 11. The Rail Operator/Service Provider access- and operational requirements to be complied with. 12. All submitted documents must reflect the Qatar Rail interface and must match previous submissions. 13. The applicant must reflect the Qatar Rail interface in the method statement and risk assessment specifically for the intended works and the site specific conditions. 14. Any damage, partially or totally, to Qatar Rail assets shall be reported to Qatar Rail immediately. All costs will be at the applicants account. 15. All costs to carry out the intended works (design & construction) are at the applicants account. 16. The Qatar Rail approval of the intended works is for the duration of the works as specified in this permit but not longer than 3 month. 17. If the intended work of the applicant requires more than 3 month or the RO permit has expired, a new Permit to Work shall be submitted. 18. Any change to the reviewed documents or design or method of work is required to be notified to Qatar Rail immediately and renders this document as invalid. A new application has to be submitted. 19. The applicant shall comply with the law, rules and regulations of the State of Qatar as well as Qatar Rail & Operational rules & regulations & guidelines. 20. Any attachments and related documents to this PTW-document are part of the Permit to Work. 21. The QR General Conditions apply.

Access & movement around metro stations (assets) 1. The applicant shall implement active measures for any proposed activities that all access/egress to the Metro station is and Emergency access is safeguarded and protected including unrestricted pedestrian traffic 2. This includes obtaining approval from Qatar Rail for temporary traffic- & pedestrian management schemes.

QR Inspections (QR appointed representatives) 1. Qatar Rail reserves the right to carry out site inspections announced and unannounced. Access shall be granted to Qatar Rail representatives. 2. For works with direct physical interfaces with Qatar Rail assets or land an inspection/hand-over to be arranged and fully conducted. 3. The approved permit shall be available on site at all time and readily available to Qatar Rail on request.

Work Completion 1. As built drawings and relevant quality documentation to be submitted to Qatar Rail. 2. On completion of work Qatar Rail must be notified and respective Qatar Rail assets to be formally handed over.

The applicant certifies that the information contained in this application is true and complete. The applicant confirms to undertake as follows: 1. Not to commence the proposed construction works prior to obtaining: (a) All relevant Authority and Government consents, permissions and approvals for the works. (b) The issuance of a Permit by Qatar Railways Company. 2. To perform the works strictly in accordance with: (a) The Permit issued by Qatar Railways Company; Law 10 of 2014 (also Ministerial Circular-6-2018 Circular no. (6) of 2018). (b) All conditions stipulated in this document and related documents by Qatar Railways Company and their representatives. (c) All authority and government consents, permissions or approvals. 3. Not to vary the works without obtaining a Permit from Qatar Railways Company. 4. To implement the construction works in accordance with all approved specifications and to take responsibility for all construction safety matters.

The applicant to comply with the following: 1. Show the Permit to any Qatar Rail Inspector/ staff upon request. 2. Work only within the site boundaries as stipulated 3. Carry out all works in compliance with the instructions from Traffic Department; do not block traffic/pedestrian routes without providing save & secure alternatives. 4. Create protective barriers around the site to guarantee the safety of the public & adjacent properties. 5. Not store any building materials or equipment outside the site boundaries. 6. Not excavate sewage utilities outside the site boundaries. 7. Not to mix building materials on the sidewalks or the public roads. 8. Clean the site, sorting remnants outside city boundaries and then transfer them to sites assigned by MMUP. 9. In case of demolition, obtain the approval from authorities to coordinate cutting utilities services (if required). 10. Not allow storage of any hazardous materials on the site, unless approved. 11. Ensure that all groundwater is pumped in accordance with PWA & MME guidelines and requirements. 12. Excavate any trial pits and carry out any surveys required to ascertain the extent of existing utilities. Use Cable Avoidance Tool CAT & Signal Generator GENNY. 13. Be responsible for any violations. Any violation of one or more of these conditions shall invalidate the Permit. 14. It is mandatory to present detailed drawings/methods/and monitoring reports to obtain demolishing permits.

LEADING EXCELLENCE │CMS Ref.: TM-215-F06, 04/02/19, Rev. 3.0 Page 3 of 3

Qatar Rail – Surveying Engineers / Inspectors

Eng. Trinadha Rao Boddeti [email protected] Mobil: +974 7022 6846

Eng. Qaisar Imtiaz [email protected] Mobil: +974 7727 1342

Mr. Darcelon Ryes Mr. Frederick D. Fernandez [email protected] [email protected] Mobil: +974 3316 6437 Mobil: +974 5045 2539 Qatar Rail Dividers PTW - Infrastructure Company Management System 02

QATAR RAIL PERMIT TO WORK SUBMISSION CHECK LIST

(Content List)

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 3 of 14

Qatar Rail Permit to Work Content List / Index Company Management System

INFRA- CONTENT LIST / INDEX PIN REMARKS STRUCTURE CONTENT LIST 1 Content List / Index   APPROVALS 2 Permit to Work   3 DR (approved & valid) 4 RO (approved & valid)  5 Previous Permit to Work   CONDITIONS AND CONTACTS 6 QR General Conditions  7 QR contact list  8 Site specific point of contact Qatar Rail Contractor’s or PMC’s / 9 PMCS’s conditions (specific)  Contractor’s and PMC’s assessment and 10 recommendation METHOD OF WORK, RISK & PROGRAM 11 Method Statement  12 Risk Assessment  13 Program of works INTERFACE IDENTIFICATION – DRAWINGS QATAR RAIL TID Interface drawing(s) 14 (superimposed proposal)  QATAR RAIL Designer’s / Contractor’s 15 Interface drawing(s) 16 Contractor’s mark-up drawings 17 Approval in Principle AIP 18 Interface control form 19 Location plan   Site set-up / site installation / laydown- 20 and storage areas, etc. Design drawings (plan, sections, levels, 21 dimensions, etc.)   Protection details, material data sheets, 22 etc. Structural drawings, reports, 23 calculations, etc. 24 Geotechnical report (as required) Design and method departures, 25 relaxations, waivers, etc. 26 As built drawings SURVEY & & TAKING-OVER & HANDOVER 27 Survey report 28 Pre-condition survey 29 Handover documentation

LEADING EXCELLENCE │CMS Ref.: TM-215-F08, 15/08/17, Rev. 1.0 Page 1 of 2 Qatar Rail Permit to Work Content List / Index Company Management System

INFRA- CONTENT LIST / INDEX PIN REMARKS STRUCTURE Temporary Land Occupation agreement 30 / letter (as applicable) CORRESPONDENCE 31 Email correspondence 32 Minutes of meeting 33 Letters (and NOC letters) Memorandum of Understanding (any 34 other agreement) MONITORING & EMERGENCY Monitoring regime – vibration – settlements - movements (base line 35 data and ongoing data collection, thresholds, etc.) 36 Drainage / Dewatering Plan & Reports

37 Noise & Vibration report (as applicable) 38 Emergency Response Plan LOGISTICS & TEMPORARY TRAFFIC MANAGEMENT (TDP) Traffic Diversion Plan (access 39 agreement/arrangement drawings) 40 Logistics Plan COMPLIANCE & LIABILITY 41 Compliance certificate 42 Undertaking letter 43 Letter of Authorization 44 Letter of Award 45 Liability Letter 46 Insurance Policy OTHER SUPPORTING DOCUMENTATION 47 Others

48

49

50

51

This list has to be attached to all Third Party PTWs. INFRASTRUCTURE = related to all infrastructure schemes (DR/RO) PIN = related to all building developments and developments on land parcels (PIN=Parcel Identification Number) = as required  = mandatory = not required

LEADING EXCELLENCE │CMS Ref.: TM-215-F08, 15/08/17, Rev. 1.0 Page 2 of 2

Qatar Rail Dividers PTW - Infrastructure Company Management System 03

CURRENT RO #

______

ASSOCIATED DR #

_ _ _ _ _

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 4 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 04

QATAR RAIL

CURRENT RO INTERFACE DRAWING (s)

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 5 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 05

ASSESSMENT/CONDITIONS

QR-CIVIL QR-PMC QR-CONTRACTOR QR-OPERATOR RKH QITARAT OTHER ______

• Site specific conditions • Interface Control Form ICF • Access Requirements • Operational Requirements • Any other

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 6 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 06

APPLICANT’S

RELEVANT DRAWING (S)

• LOCATION PLAN • SITE SET-UP PLAN • LOGISTIC PLAN • DESIGN (LAYOUT, SECTIONS, PROFIL) • PROTECTION MEASURES • ANY OTHER

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 7 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 07

TEMPORARY

TRAFFIC DIVERSION PLAN (TDP)

&

PEDESTRIAN MANAGEMENT PLAN

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 8 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 08

MONITORING PLAN

• STRUCTURAL MONITORING • SETTLEMENT / MOVEMENT • NOISE & VIBRATION • DUST / WASTE • EMERGENCY RESPONSE

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 9 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 09

OTHER DOCUMENTS

• EMAIL • MINUTES OF MEETING • LETTER OF AUTHORISATION • LIABILITY LETTER / UNDERTAKING / INSURANCE • TEMPORARY LAND OCCUPATION • QATAR ID • COMMERCIAL REGISTRATION • PROGRAM OF WORKS • ANY OTHER

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 10 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 10

APPLICANT’S

METHOD STATEMENT & RISK ASSESSMENT

SITE SPECIFIC & ADDRESS THE RAILWAY - INTERFACE

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 11 of 14

Qatar Rail Dividers PTW - Infrastructure Company Management System 11

QATAR RAIL

GENERAL CONDITIONS

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 12 of 14

Qatar Rail General Conditions (Infrastructure) Company Management System

Metro & Long Distance & Lusail LRT (trams) network short, medium and long term. Any concerns have to be raised to Qatar Rail and fully coordinated.

GENERAL CONDITIONS The applicant remains fully liable for any of the proposed work & scope as per the application. Any subletting and subcontracting does not exempt the applicant from this responsibility. THE WORKS REQUIRE A SEPARATE APPILCATION: 7. Coordination Drilling & Boring & Piling & Bolting & Anchoring & Diaphragm & Blasting Fully liaise, cooperate, coordinate and interface with Qatar Rail and our D&B contractor(s) and the Rail Operator (and any related works) & Service Provider RKH Qitarat prior and during works commencement. You are requested to share design & construction information; working program/timing & sequence of work;

1. Expiry commencement and finish date; preparatory works; access & egress arrangements; temporary traffic This NOC is VALID for 6 months from the issuing date. Design approvals are valid for 6 months and management (TDPs). In all cases the applicant (i.e. contractor) is first in the sequence of the construction program. construction to start (including associated RO) within this 6 month otherwise the applicant to apply for re-approval / re-validation. Qatar Rail Permit to Work (PTW) is valid 3 months from the issuing date. The applicant shall carry out, in coordination with above mentioned parties, impact & structural

2. Validity analysis/assessment, Finite Element Modeling (FEM) to estimate potential ground movements and assess the stress redistribution from TBM tunneling operations (rail), settlements, etc. This consent is VALID for the interface with Qatar Rail Scheme(s) ONLY, and is not considered as approval / acceptance of the technical design content. Valid as per Qatar Rail general conditions, special conditions and Pipelines: consider pipe settlements caused through TBM drive of the rail tunnel and a minimum 1% volume overview drawing. loss for their settlement calculations, etc.), if not agreed otherwise.

3. Applicability Rail piers are designed to withstand the vehicular collision. For protection of the public traffic Road/Highway All activities within the Railway Protection Zone require Qatar Rail’s NOC. The Qatar Rail Safeguarding Safety barriers as per Ashghal’s design standards) can be used. document and Restricted Activities document, and related documents apply. Also as per local construction the impact on the railway from the applicant’s scheme shall be fully regulations the applicant is, in any case, required to coordinate their works with authorities, infrastructure owners Flooding & Drainage & Dewatering: and neighboring / adjacent schemes and projects. assessed and included in the design. Rail assets shall be maintained in a fully functional, safe and secure condition. The third party design has to ensure that the station area cannot be flooded at any time. Refer to QCS 2014 and in particular section 01 part 17, part 18, and part 19. All standards, codes, regulations, For critical interfaces we highly recommend the use of a 2-Party NOC agreement (joint NOC). guidance documents and laws apply as applicable in the State of Qatar. The latest document revision applies.

4. Pre-Submission Meeting 8. Agreement with Qatar Rail and/or D&B Contractor and/or Rail Operator Department requires the applicant for ‘live’ rail schemes where Before the actual submission of the application the applicant shall conduct initial review- and feedback meetings Qatar Rail Governmental Interfaces & Permits (GIP) or workshops with Qatar Rail. Such meetings should be scheduled with sufficient time prior to the formal a consultant designer, contractor or both (D&B) and/or a rail operator is awarded, to fully agree the solution to the interface(s) between the applicants design and / or work. submission and construction start date. Once the interfaces/conflicts are fully coordinated and agreed the formal submission (package) can be The applicant has to provide evidence of coordination and agreement in form of signed & stamped Interface processed. Splitting the submission in multiple parts is advised. Control Form ICF, letter, minutes of meeting with unambiguous clear statements, sketches and drawings or

5. Submission particular rail permits. The submitted information has to be complete, consistent with previous correspondence, Design Consultant: concept / preliminary / detailed design (DC1 & DC2) clear and easy to follow & understand packaged. Refer also to the compliance template in document Third Party Utility Crossing Spec and similar Qatar Rail guidelines. Contractor: construction (for all activities) Traffic Management: every TDP submission 9. Method / Risk [It is recommended to submit major schemes in smaller parts.] a) All railway schemes: QDRS (DR): Design Consultant / Design & Build Contractor The designer is required to show the railway interface, risks and measures associated on the drawings. QPRO2 (RO): Contractor / Design & Build Contractor [every RO requires a valid DR The contractor is required to provide method statement and site specific risk assessment reflecting and approval] addressing the rail interface. For bigger schemes submissions shall be packaged and submitted following consultation, coordination, and b) Awarded, on-going and live operated railway schemes: agreement with Qatar Rail and the QR representatives. The contractor shall carry out their scope and works at interface locations with caution and assigned Submissions and additional or revised information which is issued in multiple iterations via different channels and approved control measures by Qatar Rail. The applicant’s health & safety and quality process shall have are not clearly addressed to Qatar Rail GIP (Governmental Interfaces & Permits) will be rejected. documents, checks and briefings containing the rail interface and requirements. This includes physical on-site Final submissions to be packaged, complete, technically conclusive, and consistent with signatures and stamps. marking and segregation / protection of rail assets and regular briefings for all involved staff, workers and 6. Responsibility operators. It remains the full responsibility of the applicant to ensure and demonstrate that there is no adverse impact on the

1 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

c) Future planned railway schemes: Refer to 9a. The contractor shall carry out their scope and works at interface locations with caution. The applicant’s quality process shall have documents, checks and briefings containing the rail interface and Station Area (SAP) Example Station requirements. The contractor shall follow the approved drawings as agreed with Qatar Rail and conduct regular briefings for all involved staff, workers and operators. d) The Tunnel critical zone to be marked on site with pole and flags highlighting Qatar Rail Tunnels beneath – this is to be clearly maintained at all time. Pedestrian & Bike Paths 10. Program of Works The Contractor shall coordinate the construction program with Qatar Rail and/or the rail D&B Contractor and/or Walking Assumption: 400m Rail Operator in order to identify timing interfaces (i.e. at crossings, overlapping work zones and where works are likely to be carried out at the same location at the same time) to avoid conflicts and include the findings in their program of works (schedule) when preparing the Baseline Schedule. Bike Paths

This program of works shall be updated and mitigated jointly with Qatar Rail prior and during to your works Cycling Assumption: 2km commencement. In the event of the schemes taking place at the same time a coordinated/mitigated program of works shall be provided prior commencement.

11. Traffic & Pedestrian Management The contractor is required (must) to provide an approved Traffic Diversion Plan for any temporary traffic diversion scheme (TDP) and temporary traffic management in line with the latest WZTMG. The applicant is required to comply with the QDRS and QPRO2 requirement within the Right-of-Way and the NOC requirement within the Rail Protection Zone.

Meeting at MOTC TDP: Temporary Traffic Management – Keep Moving (to coordinate) For coordination initiation contact: Mr. Markus Leppert, Sr. Interface Manager, Qatar Rail, [email protected]

12. Pedestrian Management & Pedestrian/Cycle Connectivity - all proposed works within 400 meters of any rail asset. All developments / construction works will be required to demonstrate that provisions are provided and implemented, to make sure that all access routes to and from x metro station(s), x emergency exit(s) x metro utility building(s) is safeguarded and protected with an approved ‘design and access’ statement to make sure the pedestrian traffic is continuous during any 3rd party activity within the RPZ/ Public RoW and from private land developments.

The main requirements for Pedestrian / Cycle Connectivity to the Catchment Area of the Stations are:

 All pedestrian routes to and from the station up to 400m is to be maintained and kept clear at all times.  No illegal car parking on footpaths and places not designated for car parking.  Routes shall be safe, secure and unobstructed for all members of public.

The minimum requirements are as follows:

1. Unobstructed width of Pedestrian Walkways 2. Maximum cross slope 2.5% 1.8 meter. 3. Local obstructions (street lighting, sign 4. Road signage and markings at road crossings. posts) up to an absolute minimum width of 0.9 meter. 5. Lowered curbs for equal access. 6. Prevention against vehicle intrusion / illegal parking. 7. No tripping hazards.

2 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

13. Access & Egress to be fully operational prior to the opening of the rail scheme(s) (tentative, unless otherwise announced by Qatar Access and egress to Qatar Rail allocated land has to be maintained at all times and throughout all project Rail); stages of the applicant. This includes handing over and operation of the applicant’s project, especially when the  Metro Phase 1 stations operational 2019 (Phase O / Operational) rail scheme continuous on.  Metro Phase 1a (Green Line UG/EAG), commencement to be confirmed with Qatar Rail Any changes to established temporary traffic management schemes have to be coordinated and agreed with  Long Distance, Phase 1 – commencement to be confirmed with Qatar Rail. Qatar Rail. The access strategy and/or arrangement has to be clearly documented (ICF with drawings, start/end  Lusail LRT phase 1 – operational 2019/2020 date, etc.) between the parties and attached to the QR THIRD PARTY PERMIT TO WORK.  For interfacing utility schemes programs and work sequence has to reflect this constraint in order not

to jeopardize key and opening dates of the Metro and Long Distance railway. 14. Emergency Access& Egress (Fire & Life Safety) Any Qatar Rail access related to health & safety (ambulance, Civil Defense) shall be kept clear / cannot not be The above dates require reconfirmation from Qatar Rail via formal request from the applicant. For cases blocked at all times and no changes to this access road can be made without Qatar Rail approval. Amendments where clarification or further coordination is required contact Qatar Rail. or changes to such emergency access routes require the prior agreement about alternate routes. This is applicable for temporary and permanent road arrangements. 20. Third Party Hazards & Analysis (required by MoTC) The applicant shall together with Qatar Rail identify rail hazards, risks (i.e. to the road traffic) and assess and 15. Qatar Rail allocated Land / Station Area develop joint mitigation measures to be implemented. No work to be carried out on Qatar Rail allocated land without Qatar Railways Company and their PMC / D&B contractor (construction) and RKH Qitarat (railway operation) approval. 21. Alterations & Changes There are to be no alterations from the reviewed application, design (drawings), method of work and coordinated 16. Damage to Qatar Rail Assets agreements. This consent/approval is invalid if the proposed work or part of it is getting carried out by any other Any damage to a Qatar Rail assets (i.e. property, resources, plant & equipment, possessions, goods and authority / designer / contractor than the authority / designer / contractor as mentioned in the application. materials, fencing, buildings, etc.) either (temporary) during design & construction or (permanently) during If there are any changes, Qatar Rail and its contractor must be notified immediately and a new application must operation, caused by a third party and associated subcontracts will result into holding the third party accountable be made for NOC and coordination has to take place, this includes any deviation from the original submissions and liable. All associated costs are at the originator’s account. and agreement as this approval will become invalid/ void.

17. Updated Information Construction must start within 6 month from the date the QR design NOC was provided; otherwise a new application (DR, design re-validation) has to be done. It is the applicant's responsibility to officially (per letter, RFI) request the latest Metro/Long Distance Network Plans in order to identify any potential interface, clash or any other design or construction relevant issue. Your 22. Temporary Works client is receiving a monthly update on the Qatar Rail scheme alignment. The applicant has to accommodate (responsible for) all temporary/ permanent measures and associated works

which may arise from any interface with Qatar Rail related to their own work. 18. Urban Integration & Station Area Planning & Transit Orientated Developments TODs and Park & Ride Facilities (Bus Stops) 23. Costs  Comply with Urban/Utility Integration Plans & Drawings UIPs and Station Area Plans (SAPs). The applicant to All the associated costs and expenses resulting from the applicants proposed design, intended work activities confirm their coordination agreement with the SAP designer containing with a drawing showing the road and compliance with these conditions and incidental to the preparation and completion of the applicant’s works layout and levels and utilities tying into the station area realm. are at the applicants account.  On top of specific metro stations and within stations areas (refer to SAP) TOD (building developments) will be 24. As-Build Records designed and constructed. The applicant to confirm their coordination agreement with the TOD designer / Qatar Rail will require ‘As Built’ AutoCAD record drawings for your project including depth, location and contractor with a drawing showing the building- and road layout / levels and utilities tying into the station area coordinates QND (95) in PDF- and AutoCAD format. Any associated records related to HSEQ shall be provided realm.  on request. Discrepancies between the Qatar Rail interface drawing(s) and associated documents approved by There are Park & Ride Facilities with main bus stops planned at designated locations within the metro Qatar Rail and the provided ‘As Build’ records, identified at any time, will result in the applicant’s client to carry network (stations Al Qassar, Qqba Ibn Nafie, Al Sudan, Msheireb, Lusail, Al Wakra; subject to any costs which may arise from rectifying such differences in order to allow the railway being constructed and update/change). The applicant to confirm their coordination agreement with the P&R designer operated. (MoTC/AECOM and the contractor containing a drawing showing the building- and road layout / levels and utilities tying into the station area realm. 25. Qatar Rail Works at Interface Location Should permits be required to carry out Qatar Rail work, to divert or work around your works, utilities, associated 19. Integration & Connectivity apparatus, and structures then these require issuance within 2 weeks (10 working days) in line with the QDRS The designer/contractor shall ensure and demonstrate full connectivity with the Qatar Rail stations as per the and QPRO requirements. UIP and/or SAP (higher priority) drawings for either the permanent or any intermediate road scheme required to provide an integrated fully functional transportation system (i.e. access strategy, etc.). 26. Future required Qatar Rail works This means connectivity of the interfacing station(s), emergency exits and utility pop-ups has to be ensured and Any future railway/metro works which are required to be carried out in relation to the applicants works due to maintained under all possible scenarios available now and in the foreseeable future at the time of station interface and/or conflict with our alignment (including all structures, technical/utility pop-ups, pedestrian access) completion (interim and/or final solution). Completion of any road scheme / connecting roads to the station has and associated assets are considered as ‘approved in principle’, since already identified and known at the time

3 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

of this review process and in such case where the need for the anticipated work/development/requirements was design & construction coordination monetary and program related. foreseen in time (for example: related correspondence from QR, Qatar Rail’s UIP Stakeholder submissions, The site specific drawings and document (method statement & risk assessment, permits, etc.) shall reflect the coordination with QR PMC / D&B Contractors, etc.). This includes: rail interface, constraints and other important information.  Construction of the railway, related structures, utility works, utility connections, access, land requirements. 33. Control & Monitoring (Protection of Railway Assets)  Diversion, relocation, protection, shifting of or modifications to or dismantling of the utility service (i.e. The applicant shall ensure that robust control & monitoring schemes are implemented to control and monitor the crossing), either temporary or permanent, as required for the proper construction and/or functioning of the third party works and their effect on the railway asset (track, tunnel, station, viaduct, etc.). The monitoring scheme Railway/Metro/Trams. (track, structural, etc.) shall be reviewed and approved by Qatar Rail. Such measures and procedures have to  In the event of it being necessary in the opinion of Qatar Rail to support or protect the railway tracks, land, cover operations of instrumentation information, installation of instruments, measurement methods, manual and works or assets, currently or in future, during or after the execution of any of the applicants works thereof the automated collection of monitoring data, automated data streaming, data management, the use of monitoring work of supporting or protecting the railway by installing, removing or restoring of any works as deemed database and related system components, as well as the contingency action plan when monitoring trigger values required and fit by Qatar Rail. are exceeded.

rd – 27. 3 Party Access during Railway Operations IMPORTANT 34. Revoking / Cancellation of NOC The Metro and Long Distance Railway Corridor will be non-accessible during operations over the width of the A violation of any of the conditions prescribed in the provided NOC will render the Qatar Rail NOC and permit void Critical Zone, as a minimum. Other access restrictions may apply. Only authorized personal will be permitted and withdrawn, with immediate effect. and allowed inside the designated corridor. Refer to RKH Qitarat and QR-SDD. 35. Compliance Certification & Liability Letter & Undertaking Letter/Indemnification 28. Utility Crossing Guidance Document The applicant is required to provide compliance certification with the conditions stipulated within the NOC Comply with the latest approved manuals from Qatar Rail. The “Third Party Utility Crossing Guidance” document. document and guideline for Third Party Utility Interfaces with Metro, Long Distance and Light Rail shall be The applicant is required to provide a Liability/Undertaking Letter prior to the commencement of the works for adhered to including any associated documents. interfaces with existing railway assets.  You are required to install suitable protection for your utility scheme over the entire length of the Critical Zone + 5 meter. The protection measure shall be continuous across the rail corridor, but at least extend 36. Non-Compliance across the Critical Zone of the railway. Non-compliance with Qatar Rail conditions will result in the applicant / company being notified of the non-  Installation of spares shall be considered. This is to highlight that future works and access within the Critical compliance and the revocation / cancellation of the NOC takes immediate effect for this particular case. Railway Zone of the Railway will be highly restricted due to operational and safety concerns. Continuous non-compliance will result in the NOC applications and/or DRs/ROs by this designer/contractor, ‘approved’ or ‘under review’ for this particular scheme, will be ‘on hold’  Underground and above ground utility apparatus such as poles, manholes, chambers, pull-boxes, etc. is not . Continuous non-compliance will result in permitted within the Critical Zone and any fenced off railway zone. the designer/ contractor being blacklisted. all NOC requests from the authority will be ‘on hold’  For light rail (i.e. Lusail Tram) the above is applicable and to be read in conjunction with the relevant QR Continuous non-compliance will result into . At the scretion of Qatar Rail a “Stop Notice” will be issued. guidelines. di Until compliance has been demonstrated by the applicant and verified by Qatar Rail above actions will remain in 29. Verification prior Construction Start place. The designer / contractor is required to familiarize themselves with the Rail Permitting Requirements and verify with Qatar Rail the location and design of the proposed works in relation to the rail/metro alignment and 37. Back Charge of Costs structures (underground & at-grade & elevated) prior commencement of their works. Qatar Rail reserves the right to back charge all the associated costs and expenses resulting from non-compliance with Qatar Rail’s conditions and incidental to the preparation and completion of the applicant’s work are at the The Qatar Rail –Technical Interface Department (TID) representative shall be invited to site before applicants account. construction / implementation of the respective protection to assure compliance with Qatar Rail requirements.

At a time determined by Qatar Rail, Qatar Rail will design & build all necessary works to protect the Metro/Railway 30. Law & Directive rd Comply with Law 10 of 2014. The designer of the scheme has to obtain a NOC from Qatar Rail for all design and the utility service following the non-compliance. The non-compliant agency/authority/ 3 party will carry all stages within the Rail Protection Zone. The designer and contractor of the works have to obtain a NOC from future costs related to the protection measures as required and deemed suitable by Qatar Rail. Qatar Rail for all activities within the Rail Protection Zone. Refer also to Administrative Circular 8 of 2017 from This contains all associated activities/tasks to deliver a fully functional & safe system and includes any charges arising from shut down, maintenance, start-up, penalties, 3rd party claims, loss of profit, etc. MME under letter 75178/2017 dated 22 March 2017 and Ministerial Circular-6-2018 Circular no. (6) of 2018. Qatar Rail’s Third Party PERMIT TO WORK 31. Policy Plan 38. Prior to starting your work (activity) on site the applicant is required to obtain a permit to work from Qatar Rail. Railway corridor as per approved Rail Protection Zone (RPZ) within the CGIS policy plan. Comply with MMUP Policy Plan. 39. Dilapidation Survey (condition survey) 32. Inclusion of known Interface with Qatar Rail schemes The third party contractor shall carry out a pre-condition survey prior to starting your work (activity) on site in The rail interface including all related information and data shall be included in all of your drawings, programs, presence of Qatar Rail representative and RKH Qitarat. Same applies for the post-condition survey. tenders and relevant documents (i.e. as-built, etc.). Sufficient allowances shall be included to accommodate for

4 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

40. Site visit / inspection Qatar Rail (or appointed inspectors on behalf of Qatar Rail) will conduct site inspections verifying the conditions and requirements stipulated in the provided NOC (DR, RO) and permit to work. Drilling & Boring & Piling & Bolting & Anchoring & Diaphragm & (and related works) 41. Permit Close-Out Blasting Works* i. The third party contractor shall carry out ii. Pre-Dilapidation Survey ALL WORKS AS NOTED ABOVE (*) REQUIRE A SEPARATE APPILCATION AND APPROVAL FROM QR iii. Joint Inspections during works commencement DRILLING IN THE CRITICAL / EXLCUSION ZONE IS NOT PERMITTED.

iv. Snagging; Non-compliances must be closed for partial acceptance. 1. Method Statement / Risk Assessment v. Post-Dilapidation survey and Drilling & work method - The contractor to provide Method Statement / Risk Assessment and Program of vi. Closing of the Qatar Rail Permit to Work to start the liability period of 365 days (partial acceptance). Non- Works to Qatar Rail prior to the works commencement. In the event of the schemes taking place at the same compliances must be closed for partial acceptance. time with QR works, a coordinated/mitigated program of works shall be provided. Where drilling support fluid vii. At the end of the liability period final inspection/snagging shall be carried out to obtain final completion & is proposed, the fluid shall be selected to avoid potential ingress of fluid into the nearby tunnels, for instance acceptance from Qatar Rail. from transmission of the fluid through fissures in the ground. 42. Insurance Policy by Third Party 2. Location The third party shall include Qatar Rail as the named company co-insured in their insurance policy. In particular Provide location plan, detailed drawings with diameter, depth, inclination and coordinates (and AutoCAD). cases Qatar Rail reserves the right to request a bond insurance; as deemed required. The third party (contractor) Your temporary trial pits / bore holes / trenches can be located on top of our metro / long distance alignment. shall have adequate insurance coverage. Depth restriction for your works can be applied maximum depth in meter QND(95) 3. Reinstatement Relegated QR Documents (latest versions apply): All trial pits/bore holes/disturbed surfaces by trench excavations or similar shall be reinstated by the contractor 1. Qatar Rail Safeguarding Document to match existing and adjacent ground. Boreholes shall be grouted, unless otherwise agreed with Qatar Rail. 2. Guidance for Third Party Restricted Activities ( 3. Third Party Utility Crossing Guideline / Spec (TM-208-SR01_Utility_Crossing (manual)) rev 2 Evidential information to be provided to QRC. 4. Typical plan_COMB (typical drawings) 4. Monitoring and Reporting 5. OHL-DwgTyp_QRC_11Oct2016 (Overhead power line crossing railway) Monitoring of drilling/excavation activities is mandatory. Monitoring scheme to be agreed with Qatar Rail. 6. Guidelines for Utilities Interface with Light Rail Transit 7. Guidance Document for Third Party Grade Separated Structures 8. Guidance Document for Third Party Structural Interventions on Existing Qatar Rail Assets 9. H&S: QR_Metro Safety Awareness Event_Leaflet 10. H&S: QR_AWARENESS (Poster) 11. H&S: QR_METRO_SAFETY_AWARENESS_NOTE QR Permit to Work: 1. TM-215-F06-Permit_to_Work 2. TM-215-F08-Permit_to_Work_Contents_List_Index 3. TM-215-F11-Dividers_PTW_Infrastructure 4. TM-215-F04-Location_Verification_Validation 5. TM-226-F01-Confirmation_of_Inclusion_of_Station_Area_Plan_Design 6. TM-215-F16_Bridge_Headroom_Check_Sheet 7. TM-215-F17_Certificate_of_Design_and_Checking 8. TM-215-F15_Dilapidation_Condition_Survey 9. TM-215-F14 Closing of Permit to Work (Liability Period) (QR documents will be constantly added and updated)

INCIDENTS & ACCIDENTS TO BE REPORTED TO QATAR RAIL IMMEDIATELY (AS SOON AS REASONABLY POSSIBLE).

5 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

consultants & contractors for their Projects shall consider and incorporate in any interface and amendment to the DESIGN - STATION AREA PLANNING SAP existing SAP approved by Ashghal, in addition to all temporary and permanent works proposals:

Surface Level Works at Stations / Emergency Exits a) Qatar Civil Defense (QCD) Requirements Uninterrupted (24/7) access/exit from and through the service road to the Roads/ Emergency Vehicle routes, Compliance with latest approved SAP design is mandatory. noting that fulfilling QCD requirements for minimum road width must be maintained. This applies to all remote Approved SAP Design emergency exits also.

Metro Phase 0 (Constructed/Existing Metro) - Qatar Rail states that as per the agreement between Qatar Rail and b) Operational Readiness Requirements Ashghal, the Station Area Planning (SAP) has been designed by Ashghal’s Consultant Gannett Fleming, and has i. Uninterrupted safe and functional accessibility must be maintained by the third party at all times for been approved by Ashghal and issued to Qatar Rail for construction as per the SAP drawings stamped by Ashghal. pedestrians, cyclist and drop off facilities (equal access parking, bus and taxi drop offs) during all phases of METRO Stations & EE (Emergency Exits) TTM with proper signage as per temporary works Qatar Highway Standards and traffic regulations WZTMG. Full integration of Station design including access/egress roads to be carried out and complied with. ii. TTM plans for all phases must be submitted to Qatar Rail‘s consent as per usual process prior to its Provide signed (filled out) “SAP Inclusion Form”. implementation. TTM plans and Traffic Control Plans must demonstrate the safe access to pedestrians/cyclist and drop off facilities. SAP Condition (1) - COMPLIANCE iii. The third party must maintain and incorporate all the elements of Ashghal designed and approved SAP a) Full compliance with and integration of the PWA approved Station Area Planning SAP design. including feeder & network (commuter/city) bus bays, equal access parking, private car and taxi pick-up and b) Any changes / amendments to the approved design have to be re-approved via the SAP Approval Process. drop-off bays in the new design. c) Present to the meeting: Qatar Rail Tower, C-Ring, every Tuesday, 8:30am, 12 floor. iv. The above facilities must be maintained for each metro entrance shelter. d) Contact: Shripad Korantak, Qatar Rail ([email protected]) or Slawomir Mieczyslaw Kaszewski, Ashghal v. The walking distances from drop off facilities to metro entrances must be in line with approved SAP (walking CFO ([email protected]) distances from bus bays in SAP are within 20m -30m). Always shortest possible route. e) MOTC approval is required. Contact : Mr. Durga Mahesh Kasani ([email protected]); Mr. Vinod vi. The road design must follow traffic calming measures and pedestrian crossing facilities as per SAP. Ayyappa ([email protected])

SAP Condition (2) – TEMPORARY TRAFFIC MANAGEMENT Temporary Traffic Management (diversions, tie-ins, etc.) at Metro Stations, Emergency Exits and metro neuralgic CONSTRUCTION – STATION AREA PLANNING locations (i.e. emergency routes, etc.) must be fully coordinated with Qatar Rail and approved by Qatar Rail. The area around Stations like Entrances, Emergency Exits or SAP Condition (3) – OPERATIONAL METRO Utility pop-ups and related Assets. Metro Operations scenario with the third party proposal shall be coordinated and agreed with the Qatar Rail Service QATAR RAIL STATION AREA & EMERGENCY EXITS Delivery Team and RKH-Qitarat. For any of the above mentioned activities, if within Qatar Rail Protection Zone (RPZ), the owner of the utility has to SAP Condition (4) – KEEP PEDESTRIANS MOVING apply for a permit from Qatar Railways Company.

Pedestrian routes around the station to be constructed to the minimum requirements, see QR General Conditions. QATAR RAIL PERMIT TO WORK Obtain information & requirements from Eng. Rami Jandali, Qatar Rail ([email protected]). For any of the above mentioned activities, if within Qatar Rail Protection Zone (RPZ) and particularly at Station Areas & Emergency Exits & Railway Assets, the owner of the third party asset (proposed, planned, to be under construction) TEMPORARY TRAFFIC MANAGEMENT has to apply for a permit from Qatar Railways Company. Statutory requirements apply.

STATION AREA PLANNING Requirements OPERATIONAL & LUSAIL LIGHT RAIL TRANSIT (TRAM) Construction of SAP Design The OPERATOR (Qatar Rail) in conjunction with the SERVICE PROVIDER (RKH Qitarat) is maintaining and operating Qatar Rail’s Metro Civil Contractor and REDCO International constructing/implementing the SAP Design. the railway networks within the Rail Protection Zones.

Third Party SAP Coordination SPECIAL PERMITS & APPROVAL (RKH Qitarat) might be required in order to ensure OPERATIONAL SAFETY of Qatar Rail as part of their General Condition requires the third party to coordinate their design with Gannett Fleming the railway system. Potential Impact on the railway system/operations: or the respective person within Ashghal in order to avoid any abortive works related to Ashghal’s SAP design. 1. Station Area (dust, noise, vibration, damage) 2. QR structure & utilities (vibration, damage) Third Party Introduced Changes to SAP Design 3. Visual nuisance In order to avoid unnecessary costs and abortive works, we hereby request the third party contractor to inform 4. Wayfinding Ashghal to inform Qatar Rail immediately about any intended changes in the SAP design. 5. Segregation Third Party Minimum Requirements 6. Waste management (flying debris) Below is the list of the minimum requirements which the third party authority (i.e. Ashghal, Kahramaa, etc.) and its 7. Metro related movements due to plant & machinery movement, deliveries

6 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

8. Pedestrian & cycle connectivity (walking routes) 9. Public traffic flow for public transport (bus, etc.), cars, etc. 10. Emergency & maintenance traffic 11. Qatar Rail’s feeder bus services around the entrance. THIRD PARTY WORKS It is the road-, asset-, utility owner’s sole responsibility for his utilities to carry out routine maintenance, renewal, changes, adjustment, revitalization, replacement, repairs and emergency actions unless otherwise coordinated and agreed with Qatar Rail.

INPSECTION & MAINTENACE WORKS For the inspection and maintenance of utilities located within the Rail Protection Zone the Utility Owner shall submit an Inspection and Testing Plan to Qatar Railways Company.

Every owner of a utility installed under a railway or within the RPZ shall at all times maintain their assets in good working order and condition, so that:

• the safety of railway operations is not jeopardized, put at risk, interrupted or threatened in any manner; • the safety of the public, including the lives, well-being and health of people is safeguarded; and • the environment is protected

EXAMPLE IMPACT TYPES

TYPE DESCRIPTION REQUIREMENT 1 CHANGE TO 1. Railway Operational requirements apply for the metro and LLRT. Once the metro SAP (including is operational, works might only be possible during engineering hours (i.e. night Emergency Exit time or particular time slots); subject to RKH approval / subject to change. arrangements / 2. Install your works prior (physical works where an impact on the Station Area access road) including access roads is expected from your works. 2 CROSSING THE 3. You are also kindly requested to coordinate/bundle amongst OTHER SAP& AUTHORITIES and your efforts as much as possible, to minimize the impact. LOCALIZED 4. Access to the metro stations cannot be blocked. WORK 5. Emergency related elements, routes and assembly areas must be maintained. 6. The site shall be tidy, clean, controlled & organized.

Qatar Rail Quality & WORKS UNDER 7. In any case, full reinstatement will be with the originator to 3 RAIL VIADUCT Material Standard. 8. The disturbed area shall be handed over / dilapidation survey and handed back. 4 WORKS UNDER There will be partial and final completion after liability period. RAIL VIADUCT – 9. The usual requirement of “making the site safe” applies. Refer to QR General with access Conditions & Manuals. obstruction

7 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

INTENDED WORKS AFFECTING SAP OR QR ASSETS # CONTROLLING (Traffic) TYPE 1 TYPE 3 TYPE 4 As-Build drawings: 1 Site Set-up: Site office, storage & lay-down areas CANNOT be located on SAP area. Applicant to obtain IFC or ‘as-built’ information from Qatar Rail 2 Only small machinery and hand tools permitted. a) Metro JV (SAP, structures, related utilities) 3 Protect existing assets, surfaces and furniture and maintain proper housekeeping, waste b) REDCO-SAW (SAP, related utilities) management, and management of fire risks, flooding, noise, dust, smell and vibration. Superimpose & clash detection & solution

a) Applicant to overlay the IFC or ‘as-built’ information from QR with the proposed scheme. 4 Keep vehicles and people apart. Provide hoarding and barriers. (Separation) The best way to protect pedestrians is to make sure people and vehicles cannot interact. Where powered b) Conduct clash analysis & Conduct impact analysis mobile plant is used at our workplace, we must ensure it does not collide with pedestrians or other powered c) Propose solution(s) mobile plant. Design Submission (QDRS Design Review for Approval) This can be achieved by not allowing vehicles on site into pedestrian spaces or not allowing pedestrians in a) Design must reflect fully functional SAP. Demonstrating SAP compliance. vehicle operating areas (segregation). b) The road curb lines must be in line with the SAP design (and not affecting utilities & SAP furniture). However this may not be always be reasonably practicable at our workplace. Where people and vehicles c) The SAP provisions for the lay-bys areas/ parking in addition to the EV access shall be considered in cannot be separated we should consider using: the design. • Hoarding d) Emergency routes/facilities (Fire & Life Safety) & Assembly Points (access) to be maintained. • barriers or guardrails at building entrances and exits to stop pedestrians e) The architectural (materials) design shall be the same as the SAP. walking in front of vehicles QPRO2 (Road Opening Application before starting construction) • high impact traffic control barriers a) RO information must contain (DR) design reflecting fully functional SAP. • temporary physical barriers, or b) Method Statement & Risk Assessment & HAZOP Analysis • separate, clearly marked footpaths or walkways c) Pedestrian Connectivity 5 Provide clear public vehicular, pedestrian routes & QR emergency / maintenance routes. d) General Accessibility to the Station (bus, Metro Link, emergency & maintenance, etc.) Provide work access strategy, public access strategy, traffic / pedestrian management, phasing / shift work, QR-Permit to Work (last stage before starting construction) working hours. a) Do not request PTW unless points in DR and RO are & satisfied (approved). 6 Limit vehicle movements or speed. b) Provide Untertaking Letter. c) Complete PTW for construction and implementation. 7 Avoid the need for vehicles to reverse. d) Carry out Handover & Handback and start of liability (365 days). 8 Provide dedicated loading, unloading and parking areas for worker. 9 Provide a safe area for the driver and worker. 10 Provide clear signage road/area markings. Pedestrian routes and intersections shall be clearly marked with wayfinding signage, unobstructed, well maintained and well lit (illumination). 11 Ensure effective workplace communication. 12 Comply with QCS 2014 Section 1 Part 10 Occupational Health and Safety (related pages)  Safety and security procedure, warning signs, lighting, adequate barricades, railing, reduced & control speed  Access to properties shall be maintained.  Watchman, banksman to be assigned.  Designated pedestrian routes to be provided.  Method statement and job hazard analysis for all activities.

8 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

# INTERFACE REQUIREMENTS TYPE 3 - WORKS UNDER VIADUCT INTERFACE REQUIREMENTS TYPE 3 - WORKS UNDER VIADUCT 1 Elevated & At- Access for QR maintenance & inspection: OPERATIONAL The OPERATOR (Qatar Rail) in conjunction with the SERVICE PROVIDER (RKH Qitarat) is Grade a) For inspections and regular cleaning (during day and night) by foot (only walking) DOHA METRO & maintaining and operating the railway networks within the Rail Protection Zones. and with MEWP mobile elevated platforms. LUSAIL LIGHT SPECIAL PERMITS & APPROVAL & AGREEMENTS (RKH Qitarat) are required in order to b) Dedicated, suitable access point and route. Special measures to gain access to RAIL TRANSIT ensure OPERATIONAL SAFETY of the railway system. be avoided. (TRAM) c) Level, solid and suitably stable ground able to withstand maintenance vehicles Third Party to maintain at all times: and works in general a) the safety of railway operations is not jeopardized (risk assessment) and d) No major obstruction (bollards, planters, lighting column, manholes, hills, interrupted or threatened in any manner; barriers, fencing); if possible. b) the safety of the public, including the lives, well-being and health of people is e) If third party buildings are in the vicinity (i.e. substations), working above and safeguarded; and around such buildings must be permitted for the purpose of metro maintenance. c) protection of the environment in accordance with MME regulations f) Maintenance / inspection must be permitted: Structure (sub- and superstructure), waterproofing, drainage system, bearings, cover plates at bearings, corrosion monitoring, expansion joints, earthing & lighting protection, protective coating, handrail, fencing, Third Party to provide prior to starting the intended works: retaining walls, access gates & stairs, remote entrance, glass facade and associated a) Method statement / risk assessment with all necessary drawings elements, CCTV cameras, equipment, MEP & HVAC system equipment, Lighting and b) Traffic Diversion Plan / drawing illumination, signaling and systems equipment, utility supply (electrical, portable water, TSE, c) Pedestrian management plan / drawing Storm, Foul Sewer, Chilled Water, Irrigation, etc.), septic tanks, holding tanks, ponds, rail d) Access strategy plantation, etc. e) Monitoring plan (vibration, dust, noise, etc.) 2 QR Emergency Unobstructed & unrestricted, safe access must be maintained at all times. Diverting Access emergency routes must be agreed with Qatar Rail. f) Structural monitoring, depending on type of works, severity of impact and potential Emergency assembly areas and parking areas must be maintained. adverse effects on rail infrastructure 3 QR drainage / Must be maintained or adequate replacement to be agreed with Qatar Rail. ponds 4 QR Utilities QR utilities to be maintained (electrical, portable water, TSE, Storm, Foul Sewer, Chilled Water, Irrigation, etc.), septic tanks, holding tanks QR utilities cannot be altered, changed, removed, and blocked without Qatar Rail approval. 5 Flooding & The impact on the railway from the applicant’s scheme shall be fully assessed and Drainage & included in the applicant’s design. Rail assets shall be maintained in a fully functional, Dewatering safe and secure condition. The third party design has to ensure that the station area cannot be flooded at any time. 6 QR substructure Station structure / Footings / Pier / Drainage / Earthing / etc. Assessment required by third party. Adequate measures by third party, as required and agreed with QR. Related pipes, ducts, cables and other railway elements/furniture must be maintained and/or protected as agreed with Qatar Rail. 7 QR Structure Third Party structural works require provision of impact assessment. Adequate measures by third party, as required and agreed with QR. Soft / hard Non-invasive, conduct hazard analysis and risks and assess and develop joint landscaping mitigation measures to be implemented in relation to railways. 8 Manual & QR Restricted Works Manual and associated guidelines apply. Requirements QR assets shall be protected from any impact, damage, etc. 9 Maintanenance Third party maintenance works to be carried out not to affect the railway. Works must be agreed with QR Service Delivery Department (Operator). QR maintenance works cannot be obstructed.

9 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

CHECK AND COMPLY WITH “QR RESTRICTED WORKS” MANUAL RAIL PROTECTION ZONE – Emergency Exits & Access Roads HEALTH & SAFETY AT OPERATIONAL RAIL INTERFACES 1. Prioritize Areas of Risk at our Workplace. 2. Identify appropriate Design & Construction Controls. 3. Site specific coordinated drawings, plans, and sequence/stage schematics 4. Method Statement & Risk Assessment 5. Monitoring Regime 6. Review, Revise, Prepare traffic management procedures and Plans. 7. Provide Emergency Procedures & Contacts (information). 8. Allocate Responsibility and clear line of Communication.

MINIMUM CHECK-POINTS BEFORE APPROVAL Work access strategy, public access strategy, major events, site segregation/fencing, site traffic crossing-points, traffic / pedestrian management, phasing / shift work, working hours, housekeeping, waste management, noise / dust, vibration, etc.

NOISE / DUST / VIBRATION generated on the existing tunnel structure during any of Works must not exceed the local/international value for the peak particle velocity.

PLANT (MACHINERY) & CRANE MOVEMENTS All work carried out on or near railway lines related to machinery and equipment used which can potentially put the railway at risk requires special measures to be implemented to prevent damage to the rail assets.

METHOD STATEMENT / RISK ASSESSMENT - Refer to page 2, point 9 PROTECTION OF RAIL INFRASTRUCTURE All work carried out on or near railway lines shall require special protective measures to be implemented to prevent EMGERGENCY RESPONSE PROCEDURES / PLAN damage to the rail assets. Emergency response procedures shall be developed by the applicant for all project phases and submitted to Qatar Rail

These measures shall be considered at an early stage of the work proposals and submitted with method statement/risk for approval. Construction / operation: assessment at the time of NOC application. Where required by Qatar Rail, protective measures shall be designed,  For all risks which could arise in a Health & Safety concern; i.e. to handle a situation in which a constructed, maintained and removed on completion as directed by Qatar Rail. pipeline leak or railroad derailment or any incident may jeopardize the integrity of the pipeline/cable and/or railway line. Excavation in the vicinity of structure footings are therefore not permitted unless documented engineering advice and  all applications shall include a section for ‘Fire Safety’. Any utility and device, apparatus, building, approval are obtained from Qatar Rail. stations or similar related is required to fully comply with the latest fire safety standards, codes and No excavation shall be made below the base of the footings of any structure (for example bridges, retaining walls regulations for the State of Qatar. and station platforms) without prior analysis of structure stability with respect to the effects of the excavation.

10 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

Particular attention shall be given to underground services as follows;  substances and surroundings with a high risk and likelihood by its nature  highly flammable contents; substances with risk of explosions; areas with explosive substances GENERAL PROCESS for ROW / PIN / QR-SAP Area  areas and substances with risk of external sabotage and attacks

OPERATION & MAINTENANCE PLAN (A) Public Right-of-Way (ROW) The Operation and Maintenance Plan shall be provided and the regime shall be clearly defined in coordination and The station area planning is public realm and utility corridors are (or will be) located within the ROW without agreement with Qatar Railways Company. exception. As such, a process already exists (QDRS/QPRO2) to manage and control access and installations. Qatar Rail is reviewing authority in the PWA online approval system and will respond to all applications. USE & OCCUPANCE PLAN i. Follow and comply with statutory requirements and the QDRS / QPRO process. This includes The applicant shall provide a statement regarding the extent to which facilities they are expecting to occupy, shall be emergency works. available, if at all, for the use of other stakeholders and include terms and conditions of such use to be agreed by Qatar ii. Inform bus-, taxi- and related companies at least 2 weeks before commencement of the intended works. Rail and other relevant stakeholders. This might be related to general maintenance in this area or emergency access iii. Once the Metro becomes operational specific conditions for access may apply, see point (C). Inform requirements. If facilities will or have be available for others a Use and Occupancy Plan shall be provided to Qatar Qatar Rail Operator and Service Provider at least 2 weeks before commencement of the intended Railways Company. works. PROGRAM OF WORKS iv. Coordinate all works within Rail Protection Zone with Qatar Rail. The Contractor shall coordinate the construction program with Qatar Rail and/or the rail D&B Contractor in order to identify timing interfaces (i.e. at crossings, overlapping work zones and where works are likely to be carried out at the (B) Public & Private Land – refer to MME Building Permit Complex BPC process and as above ii, iii, iv. Qatar same location at the same time) to avoid conflicts and include the findings in their program of works (schedule) when Rail is reviewing authority in the MME BPC online approval system. preparing the Baseline Schedule. (C) Qatar Rail Land (Station Area) – including areas around stations, station entrances, emergency- & This program of works shall be updated and mitigated jointly with Qatar Rail prior and during to your works maintenance access, utility buildings, service routes, fenced-off rail related areas. As the Metro relies on commencement. In the event of the schemes taking place at the same time a coordinated/mitigated program of works pedestrian accessibility for daily operations and requires uninterrupted access for emergency services / shall be provided prior commencement. maintenance to ensure safe operations it is likely the requirements for undertaking works adjacent to the Metro TRAFFIC & PEDESTRIAN MANAGEMENT will be more specific, better regulated, inspected to ensure compliance and punitive in the event of specific The contractor is required to provide an approved Traffic Diversion Plan for any temporary traffic diversion scheme non-compliances. (TDP) and temporary traffic management in line with the latest WZTMG and MME requirements. The applicant is i. Follow and comply with Qatar Rail requirements. Refer also to QR document TM-208-SR01 Rev 2, required to comply with the QDRS and QPRO2 requirement within the Right-of-Way and the NOC requirement within chapter 4.16 Maintenance of Utilities, 7.2 Emergency Response Procedures / Plans, 7.3 Operation and the Rail Protection Zone. Maintenance Plan, 7.4 Use and Occupancy Plan

ii. Follow and comply with QR Service Delivery / Operator RKH Qitarat requirements, i.e.: a) Particular access & operational requirements will be communicated via the Service Delivery Team to all Stakeholders that have potential works within the ROW at the appropriate time. b) Emergency vehicle access (ambulance, fire engine, maintenance) as well as safe exiting for people from the area to be maintained at all times. c) Provision of Method Statement & Risk Assessment, drawings, program of works. d) Work areas, access routes for workers, members of the public and rail staff have to be clear, safe and secure (access strategy). e) Work program to be clear and mitigated to ensure minimum impact on rail operations. f) Reinstated to be done to the existing conditions. g) RKH will provide access control to the Qatar Rail Network under their Permit to Work. h) RKH will provide an operational and maintenance impact advice on the 3rd party proposal in order to put protection and monitoring in place for the operational railway, as and if required (to ensure safe rail operations). i) Utility maintenance & Emergency - It is advised to establish a standard process with the Operator/Service Provider RKH Qitarat.

11 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

0 1 Third parties to follow the statutory approval process via Ashghal’s PROCEEDING WITHOUT QATAR RAIL APPROVAL. QDRS /QPRO2 (in ROW) and MME Building Permit applications

Three (3) Typical Cases (plots/PIN). PTW process and comply with the requirements under Law 10 of 2014. Qatar Rail Dept.’s (design/construction /structural 1. The Applicant’s proceeding with the proposed / intended work activities (disciplines) without complying impact); Service Delivery / RKH to review and identify / operational with the: impact; necessary measures i. Statutory requirement to obtain DR approval… New Construction including replacement, Standard ii. Statutory requirement to obtain RO approval... revitalization; use of MME corridors iii. Obtaining approvals for works within parcel boundaries via MME Building Permit Complex BPC online Maintenance Works within specified area approval process… Standard (reoccurring, regular) iv. Qatar Rail requirement to obtain Permit to Work approval AND obtain signatures from concerned parties… Emergency Works within specified area Standard (Emergency Notification to RKH Qitarat/QR-SDD) v. Obtaining / complying with the requirements of the operational / live railway (Doha Metro, Lusail LRT, etc.)… 0 2 …is on the Applicant’s OWN RISK & full LIABILITY. Rail Operated Area: 2. The Qatar Rail Approval is valid only for activities (disciplines) provided and attached to the applications • Work zone handover to applicant with access permission; operational requirements (AutoCAD / PDF format) and can be (electronically) superimposed on the Qatar Rail Network Scheme for Three (3) Typical Cases • Excavation, pipe/cable installation, testing & commissioning, detailed review & assessment. Mismatching information and descriptions may be rejected. backfilling, reinstatement 3. Work description in “writing” only is deemed as not acceptable for a detailed review. • Inspections by QR or appointed person • Work zone hand-back to Operator / RKH (closing of permit) New Construction including replacement, Standard revitalization; use of MME corridors Maintenance Works within specified area ELECTRICTRICITY (POWER) SUBSTATIONS Standard (reoccurring, regular) KAHRAMAA ELECTRICITY APPROVAL Emergency Works within specified area Standard Qatar Rail requires sight of the KM-E approval for the substation design and construction.

0 3 (maintenance) On Parcels (PIN) Locations Standard Maintenance: 1. All substations which are within parcel (land) boundaries are required to go via MME Building Permit Complex BPC online approval process. • Third party to provide Maintenance Plan and requirements in line with QR requirements 2. All substations require Parcel Identification Number (PIN) allocation by MME. Three (3) Typical Cases • Method Statement + Health & Safety + risk assessments WITHIN Public Right-of-Way ROW • Access for public traffic, pedestrians, and Rail maintenance & Qatar Rail’s conditional approval is only related to works within the Rail Protection Zone & ROW for substation(s) emergency to be maintained at all times. (safe & secure) within the ROW, subject to (on the basis of):

New Construction including replacement, Beneficial; 1. Obtaining valid approved DR/RO. revitalization; use of MME corridors A standard process can be agreed 2. Obtaining QR PTW Maintenance Works within specified area Beneficial; 3. Final IFADA, DC1 / DC2 approval by PIN allocation from MME (reoccurring, regular) A standard process can be agreed 4. Qatar Rail’s final approval via MME BPC online process (QR is part of the system) Emergency Works within specified area Beneficial; OUTSIDE Public Right-of-Way ROW (within land parcels) A standard process can be agreed Substations which are allocated outside the Public Right-of-Way ROW are excluded from any QDRS/QPRO2

approval since the MME BPC online process is applicable.

12 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

OPERATIONAL RAILWAY – METRO – LIGHT RAIL Road, Directional Signage & Totem Marker

1. Supply The full responsibility of the applicant to procure, ship, store and deliver to the location of installation. This includes all approvals, permits and other regulatory or state requirements (customs, etc.). 2. Installation ENERGIZED RAILWAY The full responsibility of the applicant to procure, ship, store and deliver to the location of installation. This includes all approvals, permits in accordance with state and authorities’ requirements. Position signage not to HIGH VOLTAGE obstruct safe walking routes. 3. Relocation of Signage Signage and associated shall be protected and stored safely. Inventory list to be provided to Qatar Rail with location and photographs.

HEIGHT CLEARANCE (MIN. 6.50 METER)

Sign Face / Board Sign Post

Footing

13 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail General Conditions (Infrastructure) Company Management System

NOTES: Compaction & Vibration 1. Duty of Care The applicant is fully responsibility (duty of care) during backfilling over Qatar Rail structures, but also for demolition activities to provide fulltime supervision during the entire backfilling operation. The contractors supervisor shall at all times be in contact with the relevant Metro/LRT Operator in order to notify each other in case of irregular occurrences related to either structural behavior, vibrations, noise or any other adverse situation arising from the 3rd party work and affecting the metro/LRT. 2. Impact assessment (vibration, etc.) The applicant shall conduct an impact and risk assessment based on the method of construction and the interfacing Qatar Rail asset. Adjustments to methods and/or monitoring systems must be installed based on the risk assessment and Qatar Rail’s review, regulations and risk categorization. 3. Installation The full responsibility to comply with accordance with state-, authorities’ requirements and Qatar Rails conditions is with the applicant This includes all approvals, permits.

LOAD

Noise

Vibration

Railway Load Impact Underground

Structure

14 | P a g e Printed copy is uncontrolled and only valid at the time of printing. Document: PMTG-QRC-TIF-00023, Rev 21, 22 July 2019

Qatar Rail Dividers PTW - Infrastructure Company Management System 12

QATAR RAIL

CONTACT LIST

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 13 of 14

Qatar Rail Contact List Company Management System

# QIRP Line PH Contact Company Email 0 Technical Interface ‐ Mr. Markus Leppert, Senior Interface Manager Qatar Rail [email protected] 1 Permitting ‐ NOC ‐ DR/RO Mr. Mohammad Abdelaaty, Sr. Infrastructure Engineer Qatar Rail [email protected] – Traffic Management Mr. Selvaraj Andiyappan, Infrastructure Engineer Qatar Rail [email protected] Mr. Abdelrahman Mohamed, Infrastructure Engineer Qatar Rail [email protected]

All phases Mr. Ahmed Abdulrazaq A A Al Muslih, Civil Engineer Qatar Rail [email protected] (77471375)

Mr. Praveen Krishna Dev, Infrastructure Engineer Qatar Rail [email protected] (3044 8795)

0 Technical Interface ‐ Mr. Ashwin Rabadia, Technical Interface Manager Qatar Rail [email protected] 2 Permitting ‐ NOC ‐ PIN – Mr. Mohamed Ali Eissa, Technical Interface Engineer Qatar Rail [email protected]

Building Development Mrs. Fadia Amro, Technical Interface Engineer Qatar Rail [email protected] Mrs. Dana Nabil Enaya, Technical Interface Engineer Qatar Rail [email protected] Mr. Fahad Al‐Muftah, Interface Manager Qatar Rail falmuftah @qr.com.qa

All phases Email for land parcels (developments) Qatar Rail [email protected] Email for DR & RO & PTW Qatar Rail [email protected] Third Party Permit to Work (PINs) Qatar Rail [email protected]

0 QR‐Rail Inspector ALL Mr. Trinadha Rao Bodetti, Surveying Eng. (7022 6846) Qatar Rail [email protected] 3 Mr. Qaisar Imtiaz, Surveying Eng. (7727 1342) Qatar Rail [email protected] Mr. Darcelon Aquino Reyes, Inspector (3316 6437) Qatar Rail [email protected] Mr. Frederick D. Fernandez, Inspector (50452539) Qatar Rail [email protected]

OPERATIONAL (O&M) DOHA METRO & LUSAIL LRT (TRAMS) Building 14 in Ras Bu Fontas Depot O Service Provider Mr. Amit CHAKRABORTY, Civil Interface Mgr (30018117) RKH‐Qitarat [email protected] & (Operation & Mr. Ashutosh BARANWAL, Civils & Tracks Mgr (31568073) RKH‐Qitarat [email protected] M Maintenance O&M) Mrs. Susan JEOJU, Civil Engineer (33403384) RKH‐Qitarat [email protected] Mr. Mohammad ZAMAN, Systems Eng (3041 6817) RKH‐Qitarat [email protected] Mr. Samir Husein, Project Manager (5001 2189) EGIS Red Line Samer.HUSEIN‐[email protected] Mr.Chadi Saliba, Project Manager (33100924) APAVE [email protected] Green & Gold Protection Zone Application ‐ This share mailbox is RKH‐Qitarat [email protected] dedicated to any mail exchange related to RKH PTW

Metro & LLRT Phase 1 application request This share mailbox is dedicated to any mail exchange RKH‐Qitarat [email protected] related to RPZ information. Qatar Rail Operator Mr. Nitish Singh, Operational Readiness Manager Qatar Rail [email protected] (4433 1426) (Service Delivery Mr. James Bromley, Senior Metro Manager (44331917) Metro [email protected] Department SDD) Mr. Miguel Martins, O&M Manager (44331762) LLRT‐O&M [email protected] Mr. Michiel Smuts Lombard, Senior Emergency, Security Qatar Rail [email protected] & Crisis Management Manager

STATION – CONNECTIVITY & ACCESS S STATION AREA WORKS & Mr. JAZIB MINHAS, Interface & Technical Manager REDCO [email protected] (74787819) A Pedestrian Connectivity Mr. Tasleem Abbas, Interface Coordinator REDCO [email protected] (66690716) W Works (managed by Qatar Mr. Wasim Abbas, Interface Engineer REDCO [email protected] (50381943)

Rail site teams/ PMC) Mr. Derek Clucas, Senior Project Manager Qatar Rail [email protected] METRO PHASE 1 Mr. Lee Robert Graves, Senior Project Manger Qatar Rail [email protected]

S STATION AREA Mr. Shripad Korantak, SAP Coordination Manager Qatar Rail [email protected] (44331707)

A PLANNING (Design) Mr. Phil Hadley, Sr. Third Party Coordination Manager Qatar Rail [email protected] (44331196) P (SAP) Mr. Amr Fangary, Architect Station Manager (44331705) Qatar Rail [email protected] Mr. Meerza Baig, Transport Integration Manager Qatar Rail [email protected] Mr. Benjamin Vardon, Transport Planning Mgr (Cycling) Qatar Rail [email protected] S Station Pedestrian/Cycle Mr. Rami Jandali, Interface Manager (44331857) Qatar Rail [email protected] P Connectivity

1 | Page Printed copy is uncontrolled and only valid at the time of printing, QR Contact List ‐ Rev 26, 15 January 2020

Qatar Rail Contact List Company Management System

QR CIVIL DEPARTMENT C QR Civil Department Mr. Marin Griguta, Director Qatar Rail [email protected] 1 Red Line North UG & Mr. Mohammed Mbaye, Civil Work Interface Manager Qatar Rail [email protected] Lusail LRT Mr. Sotirios Tsournakis, Structural Engineer [email protected] 2 Red Line South UG & HIA1 Mr. Christian Frank, Technical Manager Qatar Rail [email protected] Red Line North EAG Mr. Georgios Nikolis, Tunnel Expert [email protected] 3 Red Line South EAG Mr. Stefan Bender, Senior Project Manager (4032 7604) Qatar Rail [email protected] Green Line EAG 4 Green Line UG Mr. Arvid Boehnke, Technical Manager (4457 0598) Qatar Rail [email protected] 5 Gold Line UG Mr. Spyridon Konstantis, Technical Manager Qatar Rail [email protected] Mr. Petros Chronopoulos, Structural Engineer [email protected] 6 Major Stations Mr. George Alexiadis, Structural Expert (Msheireb /Edu City) Qatar Rail [email protected]

LAND & LOGISTICS LL Logistics / Land All Mr. Chamakh Mohamed Chamakh, Techn. Interf Eng. Qatar Rail cchamakh @qr.com.qa

Mr. Ashwin Rabadia, Technical Interface Manager Qatar Rail [email protected]

METRO – LIGHT RAIL – TRANSIT ORIENTED DEVELOPMENTS 1 Major Stations 1 Mr. Jerry Garland; Utility Lead (3341 4026) Qatar Rail [email protected] (Msheireb/Education City) Mr. Phil Slaven, Sr. Project Manager Qatar Rail [email protected] 2 Red Line North UG 1 Mr. Derek Clucas, Sr. Project Manager Qatar Rail [email protected] 3 Red Line North Extension 1 Mr. Christian Frank, Technical Manager Qatar Rail [email protected] Elevated / At Grade Ext Mr. Mohamed Ghadi, Depot & Trackwork Director Qatar Rail [email protected] 4 Red Line South 1 Mr. Christian Frank, Technical Manager (6604 6005) Qatar Rail [email protected] Underground Mr. Firas Ezudin, Stakeholder Manager (5555 8375) D&B Contr. firas.ezudin@rls‐jv.com 5 Red Line South 1 Mr. Jaco Botha, Construction & Engineering Manager PMC [email protected] Elevated/At Grade Mr. Stefan Bender, Senior Project Manager (4032 7604) Qatar Rail [email protected] 6 Green Line Underground 1 Mr. Arvid Boehnke, Technical Manager (4457 0598) Qatar Rail [email protected] Mr. Thomas Warncke, Sr. Project Manager (4457 0593) Qatar Rail [email protected] 7 Green Line Elevated/At 1 Mr. Jaco Botha, Construction & Engineering Manager PMC [email protected] Grade Mr. Stefan Bender, Senior Project Manager (4032 7604) Qatar Rail [email protected] 8 Gold Line Underground 1 Mr. Spyridon Konstantis, Technical Manager Qatar Rail [email protected]

9 MSI (Systems / Depot) 1 Mr. Ender Nabghali, Stakeholder Manager (5540 2236) MMHKT [email protected]

10 Lusail Light Rail Transit 1 Mr. Ahmad Al Daradkeh, Permitting Specialist (4459 3205) PMC [email protected] (LLRT; Trams) Mr. Carlos Cesar Galli, Sr. Construction Specialist PMC [email protected] Mr. Saif Al‐Hilal, Interface Manager (5581 8472) Qatar Rail [email protected] Mr. Robin LABAUNE, Coordination Engineer (7048 5094) QDVC robin.labaune@lrt‐i.com

11 Green Line (Extension) 1A Mr. Daniel Metzger, Concept Design & Approvals Manager Qatar Rail [email protected] (4433 1810) Phase 2 Metro Mr. Bruno Gilbert, Alignment Manager Qatar Rail [email protected] Long Distance Mr. Bashir Ahmed Siddiqi, Utility Manager Qatar Rail [email protected] 12 Transit Orientated All Mr. Roch Wery, Sr. Project Mgr Real Estate (4433 1814) Qatar Rail [email protected] (7059 9176) Developments TODs Dr. Saleh Ragab, Sr. Real Estate Development Manager Qatar Rail [email protected]

OPERATIONAL

ENERGIZED RAILWAY

METRO HIGH VOLTAGE

DO NOT DRILL WITHOUT QR – PERMIT

2 | Page Printed copy is uncontrolled and only valid at the time of printing, QR Contact List ‐ Rev 26, 15 January 2020

Qatar Rail Dividers PTW - Infrastructure Company Management System 13

PREVIOUS PTW #

______

DATE APPROVED

______

Expired on: ______

LEADING EXCELLENCE │CMS Ref.: TM-215-F11, 30/10/18, Rev. 2.0 Page 14 of 14