GAO-09-338 Defense Acquisitions: Production and Fielding of Missile

Total Page:16

File Type:pdf, Size:1020Kb

GAO-09-338 Defense Acquisitions: Production and Fielding of Missile United States Government Accountability Office Report to Congressional Committees GAO March 2009 DEFENSE ACQUISITIONS Production and Fielding of Missile Defense Components Continue with Less Testing and Validation Than Planned GAO-09-338 March 2009 DEFENSE ACQUISITIONS Accountability Integrity Reliability Production and Fielding of Missile Defense Highlights Components Continue with Less Testing and Highlights of GAO-09-338, a report to Validation Than Planned Congressional Committees Why GAO Did This Study What GAO Found The Missile Defense Agency (MDA) Cost has spent about $56 billion and will MDA has not yet established baselines for total costs or unit costs, both spend about $50 billion more fundamental markers most programs use to measure progress. Consequently, through 2013 to develop a Ballistic for the sixth year, GAO has not been able to assess MDA’s actual costs against Missile Defense System (BMDS). a baseline of either total costs or unit costs. MDA planned to establish such GAO was directed to assess the baselines in 2008 in response to past GAO recommendations, but has delayed annual progress MDA made in developing the BMDS as well as this until 2009. GAO was able to assess the cost performance on individual improvements in accountability contracts, and project an overrun at completion of between $2 billion and $3 and transparency in agency billion. However, because in some cases the budgeted costs at completion— operations, management processes, the basis for our projection—has changed significantly over time as and the new block strategy. To adjustments were made, this projection does not capture as cost growth the accomplish this, GAO reviewed difference between the original and current budgeted costs at completion. In contractor cost, schedule, and one case, these costs increased by approximately five times its original value. performance; tests completed; and the assets fielded during 2008. GAO Performance and Testing also reviewed pertinent sections of While MDA completed several key tests that demonstrated enhanced the U.S. Code, acquisition policy, performance of the BMDS, all elements of the system had test delays and and the activities of the new Missile Defense Executive Board (MDEB). shortfalls. Overall, testing achieved less than planned. For example, none of An appendix on the effect the the six Director’s test knowledge points established by MDA for 2008 were cancellation of a Ground-based achieved. Poor performing target missiles have been a persistent problem. Midcourse Defense flight test Testing shortfalls have slowed the validation of models and simulations, (FTG-04) had on BMDS which are needed to assess the system’s overall performance. Consequently, development is also included. the performance of the BMDS as a whole can not yet be determined. What GAO Recommends Schedule Although fewer tests have been conducted than planned, the production and GAO recommends that the MDEB fielding of assets has proceeded closer to schedule. Except for no ground- assess how the transparency and accountability of MDA acquisitions based interceptors being delivered, all other radars, standard missiles, and can be strengthened without losing software were delivered as planned. However, some deliveries, such as the benefits of MDA’s existing enhanced Exoatmospheric Kill Vehicles, will now precede test results. In flexibilities. Meanwhile, MDA most cases, MDA has also reduced the bases it planned to use to declare when should improve its cost and test capabilities are operational in the field. Thus, fielding decisions are being baselines; tie modeling and made with a reduced understanding of system effectiveness. simulation needs into test objectives; provide more time to Transparency, Accountability, and Oversight analyze tests; better coordinate Improvement in this area has been limited. The Missile Defense Executive with independent testers; Board (MDEB) has acted with increased authority in providing oversight of synchronize development, MDA and the BMDS. However, transparency and accountability into MDA’s manufacturing, and fielding with testing and validation; complete a work is limited by the management fluidity afforded through the lack of cost key developmental test; and baselines, an unstable test baseline, continued use of development funds to strengthen the basis for capability produce assets for fielding, and renewed potential for transferring work from declarations. DOD agreed with 10 one predefined block to another. A better balance must still be struck of the 11 recommendations and between the information Congress and the Department of Defense need to partially agreed with one. conduct oversight of the BMDS and the flexibility MDA needs to manage To view the full product, including the scope across the portfolio of assets that collectively constitute the system’s and methodology, click on GAO-09-338. capability. At this point, the balance does not provide sufficient information For more information, contact Paul Francis at for effective oversight. (202) 512-4841 or [email protected]. United States Government Accountability Office Contents Letter 1 Background 3 Cost Tracking Deficiencies Hinder Assessment of Cost Performance 9 While Some Tests Succeeded, Others Were Deferred; Overall System Performance Cannot Yet Be Assessed 25 Production, Fielding, and Declaration of Capabilities Proceed despite Delays in Testing and Assessments 40 Production and Fielding of BMDS Systems Getting Ahead of Testing 42 Limited Progress Made in Improving Transparency and Accountability 52 Conclusions 59 Recommendations for Executive Action 60 Agency Comments and Our Evaluation 62 Appendix I Comments from the Department of Defense 65 Appendix II BMDS Prime Contractors Exceed Budgeted Cost and Schedule Performance during Fiscal Year 2008 69 Aegis BMD Contractors Experienced Mixed Performance during the Fiscal Year 70 ABL Contractor Overran Budgeted Fiscal Year Cost 73 C2BMC Program Incurred Negative Cumulative and Fiscal Year Variances 74 GMD Contractor Maintained Negative Cumulative Cost and Schedule Variances throughout the Fiscal Year 76 KEI Cost and Schedule Performance Continued to Decline after Replan 78 Limited Contractor Data Prevented Analysis of All MKV Task Orders 79 Sensors’ Radar Experienced Fiscal Year Cost and Schedule Growth 83 Technical Issues Drove STSS Cost Growth during the Fiscal Year 84 Targets and Countermeasures Program’s Rebaseline Positively Affected Fiscal Year Schedule Variances 86 THAAD Contractor Spent More Money and Time Than Budgeted 87 Page i GAO-09-338 Defense Acquisitions Appendix III FTG-04 Flight Test Cancellation 90 Faulty Telemetry Component Caused Delay and Subsequent Cancellation of FTG-04 90 Most FTG-04 Test Objectives Will Be Allocated to Follow-on Tests 93 Cancellation Eliminates One of Few Opportunities to Demonstrate GMD Capabilities 94 Conclusions 96 Appendix IV Reduced Basis for Capability Declarations 97 Appendix V Scope and Methodology 101 Appendix VI GAO Contact and Staff Acknowledgments 104 Tables Table 1: MDA BMDS Elements 4 Table 2: MDA Block Construct 6 Table 3: Fiscal Year 2008 Capability Goals for Blocks 1.0, 2.0, and 3.1/3.2 9 Table 4: Analysis of Contractor Realignments from Contract Start through Fiscal Year 2008 18 Table 5: Prime Contractor Fiscal Year 2008 and Cumulative Cost and Schedule Performance 22 Table 6: Test and Targets Issues 26 Table 7: Status of Fiscal Year 2008 Director’s Test Knowledge Points 33 Table 8: BMDS Deliveries and Total Fielded Assets as of September 30, 2008 41 Table 9: MDA BMDS Test Baseline Revisions 58 Table 10: Timeline of Events 91 Table 11: Engagement Sequence Groups with Revised Basis for Fiscal Year 2008 Capability Declarations 97 Table 12: Block 1.0 Engagement Sequence Groups with Revised Basis for Completion at End of Fiscal Year 2009 99 Page ii GAO-09-338 Defense Acquisitions Figures Figure 1: Estimated Percentage of Total BMDS Block and Capability Development Funds through Fiscal Year 2013 Expected to Be Baselined in 2009 12 Figure 2: Difference in Traditional Unit Cost Reporting and MDA’s Unit Cost Reporting 14 Figure 3: GMD Reduction in Flight Tests from January 2006 to March 2010 29 Figure 4: GMD Flight Test and Fielding Plan for Interceptors Comparison—September 2006 versus January 2009 43 Figure 5: Timeline Showing Declaration of Capabilities in Fiscal Year 2008 47 Figure 6: Timeline Showing Deferred Declaration of Capabilities from Fiscal Year 2008 to 2009 50 Figure 7: Aegis BMD Weapon System Fiscal Year 2008 Cost and Schedule Performance 71 Figure 8: Aegis BMD SM-3 CLIN 1 Fiscal Year 2008 Cost and Schedule Performance 72 Figure 9: ABL Fiscal Year 2008 Cost and Schedule Performance 73 Figure 10: C2BMC Fiscal Year 2008 Cost and Schedule Performance 75 Figure 11: GMD Fiscal Year 2008 Cost and Schedule Performance 77 Figure 12: KEI Fiscal Year 2008 Cost and Schedule Performance 78 Figure 13: MKV Task Order 6 Fiscal Year 2008 Cost and Schedule Performance 80 Figure 14: MKV Task Order 7 Fiscal Year 2008 Cost and Schedule Performance 81 Figure 15: MKV Task Order 8 Fiscal Year 2008 Cost and Schedule Performance 82 Figure 16: Sensors Fiscal Year 2008 Cost and Schedule Performance 83 Figure 17: STSS Fiscal Year 2008 Cost and Schedule Performance 85 Figure 18: Targets and Countermeasures Fiscal Year 2008 Cost and Schedule Performance 87 Figure 19: THAAD Fiscal Year 2008 Cost and Schedule Performance 88 Page iii GAO-09-338 Defense Acquisitions Abbreviations ABL Airborne Laser Aegis BMD Aegis Ballistic Missile Defense
Recommended publications
  • Vice Admiral Jon A. Hill, USN Director, Missile Defense Agency Before the House Armed Services Committee Subcommittee on Strategic Forces March 12, 2020
    Vice Admiral Jon A. Hill, USN Director, Missile Defense Agency Before the House Armed Services Committee Subcommittee on Strategic Forces March 12, 2020 Good morning, Chairman Cooper, Ranking Member Turner, distinguished Members of the subcommittee. I appreciate this opportunity to testify before you today. The Missile Defense Agency budget request of $9.187 billion for Fiscal Year (FY) 2021 will enable the continued execution of the MDA mission to design, develop and deploy a layered Missile Defense System to defend the United States, deployed forces, allies, and friends from missile attacks in all phases of flight. Working together with the Services, international partners, and industry, the highly skilled and dedicated MDA government and contractor workforce stands ready to develop and deliver ready, reliable, and effective defenses the Nation needs to counter the proliferating and increasingly sophisticated missile threat. Missile Threat – A Significant Inflection Point for Missile Defense Potential adversaries continue to increase the number and capabilities of existing missile systems while adding new types of missile capabilities to their arsenals, creating an inflection point in the missile defense program that will complicate U.S. missile defense operations. Ballistic, hypersonic, and cruise missiles are becoming more capable of carrying conventional and mass destruction payloads farther, faster, and with greater accuracy. New ballistic missile systems feature multiple independently targetable reentry vehicles and maneuverable reentry vehicles, along with decoys and jamming countermeasures. Russia and 1 China are developing advanced cruise missiles and hypersonic missiles. Hypersonic missiles can be launched from ground ballistic missile launchers, released from aircraft, or launched from the sea. These missiles travel along unpredictable flight paths and at low altitudes, making them especially difficult to track and intercept.
    [Show full text]
  • Navy Aegis Ballistic Missile Defense (BMD) Program: Background and Issues for Congress
    Navy Aegis Ballistic Missile Defense (BMD) Program: Background and Issues for Congress Updated September 30, 2021 Congressional Research Service https://crsreports.congress.gov RL33745 SUMMARY RL33745 Navy Aegis Ballistic Missile Defense (BMD) September 30, 2021 Program: Background and Issues for Congress Ronald O'Rourke The Aegis ballistic missile defense (BMD) program, which is carried out by the Missile Defense Specialist in Naval Affairs Agency (MDA) and the Navy, gives Navy Aegis cruisers and destroyers a capability for conducting BMD operations. BMD-capable Aegis ships operate in European waters to defend Europe from potential ballistic missile attacks from countries such as Iran, and in in the Western Pacific and the Persian Gulf to provide regional defense against potential ballistic missile attacks from countries such as North Korea and Iran. MDA’s FY2022 budget submission states that “by the end of FY 2022 there will be 48 total BMDS [BMD system] capable ships requiring maintenance support.” The Aegis BMD program is funded mostly through MDA’s budget. The Navy’s budget provides additional funding for BMD-related efforts. MDA’s proposed FY2021 budget requested a total of $1,647.9 million (i.e., about $1.6 billion) in procurement and research and development funding for Aegis BMD efforts, including funding for two Aegis Ashore sites in Poland and Romania. MDA’s budget also includes operations and maintenance (O&M) and military construction (MilCon) funding for the Aegis BMD program. Issues for Congress regarding the Aegis BMD program include the following: whether to approve, reject, or modify MDA’s annual procurement and research and development funding requests for the program; the impact of the COVID-19 pandemic on the execution of Aegis BMD program efforts; what role, if any, the Aegis BMD program should play in defending the U.S.
    [Show full text]
  • DEPARTMENT of DEFENSE Office of the Secretary, the Pentagon, Washington, DC 20301–1155 Phone, 703–545–6700
    DEPARTMENT OF DEFENSE Office of the Secretary, The Pentagon, Washington, DC 20301–1155 Phone, 703–545–6700. Internet, www.defenselink.mil. SECRETARY OF DEFENSE ROBERT M. GATES DEPUTY SECRETARY OF DEFENSE WILLIAM LYNN III Under Secretary of Defense for Acquisition, ASHTON B. CARTER Technology, and Logistics Deputy Under Secretary of Defense (Business PAUL A. BRINKLEY Transformation) Deputy Under Secretary of Defense LOUIS W. ARNY III (Installations and Environment) Under Secretary of Defense for Policy MICHELE FLOURNOY Principal Deputy Under Secretary of Defense JAMES N. MILLER, JR. for Policy Assistant Secretary of Defense (International ALEXANDER R. VERSHBOW Security Affairs) Assistant Secretary of Defense (Special MICHAEL VICKERS Operations and Low-Intensity Conflict) Assistant Secretary of Defense (Homeland (VACANCY) Defense and America’s Security) Assistant Secretary of Defense (Global Strategic JOSEPH BENKERT Affairs Assistant Secretary of Defense (Asian and (VACANCY) Pacific Security Affairs) Deputy Assistant Secretary of Defense (Plans) JANINE DAVIDSON Deputy Under Secretary of Defense (VACANCY) (Technology Security Policy/Counter Proliferation) Deputy Under Secretary of Defense (Strategy, KATHLEEN HICKS Plans and Forces) Deputy Under Secretary of Defense (Policy PETER VERGA Integration and Chief of Staff) Principal Deputy Under Secretary of Defense WILLIAM J. CARR, Acting for Personnel and Readiness Assistant Secretary of Defense (Reserve Affairs) DAVID L. MCGINNIS, Acting Deputy Assistant Secretary of Defense (Reserve JENNIFER C. BUCK Affairs) Deputy Under Secretary of Defense (Program JEANNE FITES Integration) Deputy Under Secretary of Defense (Readiness) SAMUEL D. KLEINMAN Deputy Under Secretary of Defense (Military WILLIAM J. CARR Personnel Policy) Deputy Under Secretary of Defense (Military ARTHUR J. MYERS, Acting Community and Family Policy) Deputy Under Secretary of Defense (Plans) GAIL H.
    [Show full text]
  • Report to the Under Secretary of Defense
    Wind Turbine Analysis for Cape Cod Air Force Station Early Warning Radar and Beale Air Force Base Upgraded Early Warning Radar Spring 2007 EXECUTIVE SUMMARY The Missile Defense Agency (MDA) analyzed the potential impact of utility class wind farms on radars. • Utility class wind farms could have a significant impact on radars, including the missile defense early warning radars (EWRs), the PAVE PAWS radar at Cape Cod AFS, MA, and the Upgraded Early Warning Radar (UEWR) at Beale AFB, CA. • To mitigate this impact, establish and enforce a wind farm offset zone within the effective “line-of-sight” of the radars, taking into account the direct, refracted, and diffracted signals from the radar. This effectively establishes a zone around the radar of approximately twenty-five kilometers, assuming relatively level terrain. • Within twenty-five kilometers, further study would be required to assess the impact accounting for location within the radar’s field of view and the relative height of the wind turbine. • After establishing this offset zone, eliminate any remaining impacts on the radar by using gain control and range gating techniques. 1 History Studies on the effects of windmill farms on military readiness were documented in a 2006 Report to Congressional Defense Committees. That report focused on the effects of wind farms on radars and the resulting potential impact on military readiness. The primary historical data and research efforts were focused on air defense radars, characterized as “Primary Surveillance Radars” (PSR) and Air Traffic Control (ATC) radars. Two fixed-site missile Early Warning Radars (EWR) were mentioned in the report but not examined in detail.
    [Show full text]
  • Foreign Press Center Briefing with Ms. Kathleen Hicks, Deputy Under Secretary of Defense for Strategy, Plans, and Forces, Dr
    FOREIGN PRESS CENTER BRIEFING WITH MS. KATHLEEN HICKS, DEPUTY UNDER SECRETARY OF DEFENSE FOR STRATEGY, PLANS, AND FORCES, DR. PEPPINO DEBIASO, THE DIRECTOR OF THE OFFICE OF MISSILE DEFENSE POLICY, AND MS. JANINE DAVIDSON, DEPUTY ASSISTANT SECRETARY OF DEFENSE FOR PLANS. THE WASHINGTON FOREIGN PRESS CENTER, WASHINGTON, D.C. TOPIC: "DEFENSE DEPARTMENT QUADRENNIAL DEFENSE REVIEW (QDR) ROLLOUT BRIEFING" THURSDAY, FEBRUARY 4, 2010 AT 1:00 P.M. EST MS. HICKS: Thank you and good afternoon. I’m going to speak to you a little bit about the Quadrennial Defense Review and then I’ll turn it over to Dr. DeBiaso to speak a little bit about the Ballistic Missile Defense Review, and then we’ll be open to your questions. As you may know, on Monday, the Secretary of Defense provided the reports of both of these important documents to Congress. They help to institutionalize the shift that the Secretary of Defense called for last year to rebalance our forces for the urgent demands of today and for the complex and lethal threats of the future. Both reports emphasize international cooperation to ensure the United States and our allies, partners, and friends are able to meet the demands of a broad spectrum of threats, concerns, and issues that impact every nation. The QDR report delivered to Congress conveys a defense strategy centered on two key themes. The first is the need to rebalance capabilities to prevail in today’s wars while building capability to address future threats. We owe our people in harm’s way nothing less than focusing on the operations in which we are engaged today.
    [Show full text]
  • MISSILE DEFENSE Further Collaboration with the Intelligence Community Would Help MDA Keep Pace With
    United States Government Accountability Office Report to Congressional Committees December 2019 MISSILE DEFENSE Further Collaboration with the Intelligence Community Would Help MDA Keep Pace with Emerging Threats GAO-20-177 December 2019 MISSILE DEFENSE Further Collaboration with the Intelligence Community Would Help MDA Keep Pace with Highlights of GAO-20-177, a report to Emerging Threats congressional committees Why GAO Did This Study What GAO Found MDA is developing missile defense The Missile Defense Agency (MDA) is experiencing delays getting the threat capabilities to defend the United assessments needed to inform its acquisition decisions. Officials from the States, deployed forces, and regional defense intelligence community—intelligence organizations within the allies from missile attacks. However, Department of Defense (DOD)—told GAO this is because they are currently missile threats continue to emerge, as overextended due to an increased demand for threat assessments from a adversaries continue to improve and recent upsurge in threat missile activity, as well as uncertainties related to their expand their missile capabilities. transition to new threat processes and products. The delays are exacerbated The National Defense Authorization because MDA does not collectively prioritize the various types of threat Act for Fiscal Year 2012 included a assessment requests submitted to the defense intelligence community or provision that GAO annually assess provide resources for unique requests, as other major defense acquisition and report on the extent to which MDA programs are generally required to do. Without timely threat assessments, has achieved its acquisition goals and MDA risks making acquisition decisions for weapon systems using irrelevant objectives, and include any other or outdated threat information, which could result in performance shortfalls.
    [Show full text]
  • Afghanistan Security Forces Fund, the Navy’S Hypersonic Weapons Program Known As Conventional Prompt Strike, and Upgrades to the M-2 Bradley Infantry Fighting Vehicle
    FY2021 Defense Appropriations Act: Context and Selected Issues for Congress June 7, 2021 Congressional Research Service https://crsreports.congress.gov R46812 SUMMARY R46812 FY2021 Defense Appropriations Act: June 7, 2021 Context and Selected Issues for Congress Brendan W. McGarry The Department of Defense Appropriations Act is one of 12 annual appropriations measures Analyst in U.S. Defense typically reported by the House and Senate Committees on Appropriations and the largest in Budget terms of discretionary funding. The act funds activities of the U.S. Department of Defense (DOD) except for military construction and family housing programs. The legislation also funds certain activities of the intelligence community. On February 10, 2020, President Donald J. Trump submitted a budget request for FY2021 that included $753.5 billion for national defense-related activities, including discretionary and mandatory programs. The request aligned with the statutory spending limit, or cap, for national defense-related activities in the Budget Control Act (BCA; P.L. 112-25), as amended by the Bipartisan Budget Act of 2019 (BBA; P.L. 116-37). The request included $69 billion in defense funding designated for Overseas Contingency Operations, or OCO, which is effectively exempt from the cap. The portion of the request falling within the scope of the Department of Defense Appropriations Act, 2021, totaled $690.17 billion. That figure included $688.99 billion for defense activities and $1.18 billion for intelligence activities. The request was $8.17 billion (1.2%) less than the FY2020 enacted amount, which included emergency funding provided for hurricane relief and the Coronavirus Disease 2019 (COVID-19) response.
    [Show full text]
  • Ballistic Missile Defense Patty-Jane Geller
    Ballistic Missile Defense Patty-Jane Geller issile defense is a critical component of either has or is developing the know-how to Mthe national security architecture that advance to the ICBM-level of capability.2 Ac- enables U.S. military efforts and can protect cording to Dr. Robert Soofer, Deputy Assistant national critical infrastructure, from popula- Secretary of Defense for Nuclear and Missile tion and industrial centers to politically and Defense Policy: historically important sites. It can strength- en U.S. diplomatic and deterrence efforts As adversary missile technology matures and provide both time and options to senior and proliferates, the threat to the U.S. decision-makers amid crises involving mis- homeland, allies, partners, and our forces siles flying on both ballistic and non-ballistic in the field becomes increasingly dynamic trajectories (e.g., cruise missiles and hyper- and difficult to predict. While traditional sonic weapons). fixed and mobile ballistic missile threats continue to grow, adversaries are also in- The Growing Missile Threat vesting in ground-, air-, and sea-launched Missiles remain a weapon of choice for cruise missiles with diverse ranges. China many U.S. adversaries because they possess and Russia are also developing and test- important attributes like extraordinarily high ing hypersonic missile technology, with speed (against which the U.S. has a limited abil- Russia recently deploying the world’s first ity to defend) and relative cost-effectiveness operational intercontinental-range hyper- compared to other types of conventional attack sonic glide vehicle (HGV). These missile weapons.1 The number of states that possess technologies are being incorporated into missiles will continue to increase, as will the adversary strategies meant to coerce sophistication of these weapons, as modern and intimidate the United States and its technologies become cheaper and more wide- allies by threatening critical targets in ly available.
    [Show full text]
  • Defense Intelligence Agency (DIA)
    Description of document: Defense Intelligence Agency (DIA) Department of Defense (DoD) Orders/Charter Establishing the National MASINT (Measurement And Signature Intelligence) Management Office (NMMO), 2008-2009 Requested date: 17-July-2017 Release date: 07-January-2021 Posted date: 15-March-2021 Source of document: Defense Intelligence Agency ATTN: FAC2A1 (FOIA) 7400 Pentagon Washington, DC 20301-7400 Fax: (301) 394-5356 Email: [email protected] The governmentattic.org web site (“the site”) is a First Amendment free speech web site and is noncommercial and free to the public. The site and materials made available on the site, such as this file, are for reference only. The governmentattic.org web site and its principals have made every effort to make this information as complete and as accurate as possible, however, there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the governmentattic.org web site or in this file. The public records published on the site were obtained from government agencies using proper legal channels. Each document is identified as to the source. Any concerns about the contents of the site should be directed to the agency originating the document in question. GovernmentAttic.org is not responsible for the contents of documents published on the website. DEFENSE INTELLIGENCE AGENCY WASHINGTON, D.C. 20340-5100 FAC-2C January 07, 2021 This responds to your Freedom oflnformation Act (FOIA) request, dated July 11, 2017 that you submitted to the Defense Intelligence Agency (DIA) for information concerning Requesting a copy of the DoD Order or Charter that established the NMMO (National MASINT Management Office).
    [Show full text]
  • Unclassified Unclassified
    UNCLASSIFIED Exhibit P-40, Budget Line Item Justification: PB 2020 Air Force Date: February 2019 Appropriation / Budget Activity / Budget Sub Activity: P-1 Line Item Number / Title: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 838010 / Comm Elect Mods Equip / BSA 8: Modifications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0305111F, 0305909F, Other Related Program Elements: 0305111F, 0305114F, 0305912F, 1203699F 0305137F, 0305909F Line Item MDAP/MAIS Code: None Prior FY 2020 FY 2020 FY 2020 To Resource Summary Years FY 2018 FY 2019 Base OCO Total FY 2021 FY 2022 FY 2023 FY 2024 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 192.086 68.248 10.654 14.500 - 14.500 13.500 12.329 4.468 4.550 - 320.335 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) 192.086 68.248 10.654 14.500 - 14.500 13.500 12.329 4.468 4.550 - 320.335 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) 192.086 68.248 10.654 14.500 - 14.500 13.500 12.329 4.468 4.550 - 320.335 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 1.786 1.013 - - - - - - - - 2.799 Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0604281F Tactical Data Networks Enterprise - P-40A Tactical Data Links (TDL), as a subset of the broader airborne network, are used in a combat environment to exchange information such as messages, data, radar tracks, target information, platform status, imagery, and command assignments.
    [Show full text]
  • Alternatives for Boost-Phase Missile Defense
    CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE A CBO STUDY JULY 2004 Alternatives for Boost-Phase Missile Defense A CBO STUDY Alternatives for Boost-Phase Missile Defense July 2004 The Congress of the United States O Congressional Budget Office Notes Numbers in the text and tables of this report may not add up to totals because of rounding. Unless otherwise indicated, all dollar figures are in 2004 dollars. The cover shows an intercontinental ballistic missile (a U.S. Minuteman III being test launched from Vandenberg Air Force Base in California) in the first seconds of the boost phase of its flight. (Photo by the U.S. Air Force) Preface A prominent part of the Bush Administration’s strategy for national defense is devel- oping and fielding defenses against ballistic missiles. To that end, the Department of De- fense’s Missile Defense Agency (MDA) is pursuing a layered defense composed of various systems capable of intercepting ballistic missiles at different points in their flight. For the past several years, work has primarily focused on intercepting long-range missiles during their mid- course phase (after their booster rockets have burned out but before their warheads have re- entered the atmosphere). MDA plans to field initial elements of a midcourse system this year. Recently, the agency also began an effort to develop interceptors capable of hitting interconti- nental ballistic missiles during their boost phase (the first few minutes after launch, before their booster rockets burn out). This Congressional Budget Office (CBO) study—prepared at the request of the Subcommit- tee on Emerging Threats and Capabilities of the Senate Armed Services Committee—looks at technical, operational, and cost issues related to using a boost-phase intercept (BPI) system to defend the United States against intercontinental ballistic missiles.
    [Show full text]
  • RAO BULLETIN 15 July 2017
    RAO BULLETIN 15 July 2017 PDF Edition All Hands: I anticipate moving 29 & 30 JUL and it is likely I will not have time to publish the 1 AUG Bulletin or at best a delayed one. Hopefully, now that I have reached age 77, this will be my last move FOREVER! Lt. James "EMO" Tichacek, USN (Ret) Editor/Publisher RAO Bulletin THIS RETIREE ACTIVITIES OFFICE BULLETIN CONTAINS THE FOLLOWING ARTICLES Pg Article Subject . * DOD * . 04 == NDAA 2018 ------------------------------------- (House $631B | Senate $700B) 05 == NDAA 2018 [01] -------------------------------------------- (Civilian Workforce) 06 == NDAA 2018 [02] ------------------------------------- (Valor Awards Retention) 06 == NDAA 2018 [03] ------------------------------------- (TRICARE Fee Increases) 07 == NDAA 2018 [04] ----- (Transgender-Related Medical Treatment Funding) 1 07 == NDAA 2018 [05] ------------------------------------------------------ (BRAC Ban) 08 == Transgender Troops [06] ------------ (Enlistment Plan Opposed by House) 09 == Recruiting Non-citizens [02] ------ (Opposition to Contract Cancellations) 09 == Exchange Online Shopping [11] -------------------------- (Beta Test Results) 11 == DoD Budget 2018 [05] ----------------- (Congress Divided on Pay & BAH) 12 == Project 112 & SHAD [09] ----------------- (What Happened - Who Suffered?) 13 == DoD Fraud, Waste, & Abuse ------------------ (Reported 1 thru 15 JUL 2017) 15 == Pentagon Spending ------------------------- ( $33.6 Billion In Missed Savings) 15 == POW/MIA Recoveries ------------- (Reported 1 thru 15 JUL 2017 | Eighteen)
    [Show full text]