3.1 Design Principles 3.2 Operations Plan

Total Page:16

File Type:pdf, Size:1020Kb

3.1 Design Principles 3.2 Operations Plan Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report 3. PROJECT DESCRIPTION 3.2 Operations Plan The development of the project was based on a number of inputs: 3.2.1 LRT Service The studies described in Chapter 2; The service objective is to provide a peak-hour maximum capacity of 8000 pphpd (person per hour per Design Criteria developed by the Toronto Transit Commission; direction) with at least 40% of passengers being able to be seated at the peak-hour demand. The service is proposed to operate at least every 6 minutes at peak times regardless of demand. It is expected that these The assessment of Existing and Future Conditions described in Chapter 4; and requirements will result in all facilities being designed to accommodate ultimate train lengths of approximately 90 metres (consisting of three 30 metres long LRT vehicles). The Consultation Process described in Chapter 6. The following chapters describe the proposed project. Initially the LRT Is not planned to operate 24 hours a day. During LRT operations, existing bus services along Eglinton Avenue will no longer exist. Some north-south buses that have a portion of their route 3.1 Design Principles travelling along Eglinton Avenue will continue to operate in short sections of the LRT corridor where necessary. In general, customers travelling east-west along Eglinton Avenue will be served by the LRT During preliminary planning for the Eglinton Crosstown LRT, the following design principles were during normal operation hours as opposed to buses. established: LRT operating headways will likely vary throughout the corridor. The tunnel portion of the LRT corridor will Must provide fast, reliable, frequent and comfortable transit service from a passenger have turn back capability at both ends of the tunnel section to allow the LRT to operate with short turn perspective; service and provide shorter headways than on the surface sections. Headways on the surface section of the LRT also may vary depending on ridership demand. Fully accessible to persons with mobility difficulties; Fare collection will be operated as proof of payment. This system will be implemented to avoid delays Must achieve highest level possible of safety and security for both passengers and employees; associated with traditional fare collection. Station and stop platforms will include ticket vending machines, Must be achieved with minimum environmental impacts; and which will also be used to facilitate transit transfers to subways and buses. Must incorporate excellence in urban design – pedestrian realm, facilities, amenities, and 3.2.2 Bus Service landscaping. Excellent passenger transfer facilities between LRT and subway stations, and between LRT Parallel Bus Service lines - typically grade-separated from other vehicular traffic -- minimizing vertical and horizontal movement required by passengers when transferring between lines; Members of the public have requested that parallel bus service be provide on Eglinton Avenue, in particular through the underground section of the Eglinton Crosstown LRT. The TTC determines bus routings based Transfer stations to be fully accessible between inter-connecting lines; on customer needs and observed travel demands, which, in some cases, includes operating buses in Surface passenger stops to be located and designed for easy passenger transfer to intersecting parallel to a rapid transit line. bus routes, and to provide safe, signal-protected access between the stops and surrounding land uses; The average station spacing on the Eglinton Crosstown LRT between Keele Station and Laird Station is approximately 850 metres. This spacing is comparable to the station spacing of the Bloor-Danforth Fare transactions to be done through proof-of-payment fare media and random-check Subway, where parallel bus service is not provided today. Parallel bus service is provided on the Yonge enforcement; and Street at all times between Davisville and Finch Station (where some stations are 1600 metres apart), and Vehicles, stations, and infrastructure must allow for: at peak times south of Davisville (where the stations are approximately 650 metres apart on average) . o the highest possible level of, and ease of, maintenance; The need for parallel bus service will be determined through the TTC Service Standards process based on observed ridership patterns and specific community needs, relative to the additional cost of providing the o the highest possible level of customer and employee security; service. o must be fully accessible for people of differing levels of mobility. Feeder Bus Service The bus operating plan for the Eglinton Crosstown LRT includes the following changes to the bus network: MARCH 2010 Page 59 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report The 32C Eglinton West – Trethewey route will be shortened from its current terminating point at To develop a conceptual plan for the Transit Project Assessment, design criteria for both LRT alignment Eglinton West Station to the new terminal at Keele Station. This route will operate on Eglinton and roadway geometry were assumed. The criteria were developed based on the “TTC - Design and Avenue from Emmett Avenue to Keele Street. Supply of the Low Floor Light Rail Vehicle – Technical Specification” and the “Transportation Association of Canada (TAC) – Geometric Design Guidelines”. Additionally, in January 2008, TTC developed a set of The 32D Eglinton West – Emmett route will be shortened from its current terminating point at technical specifications named “Design and Supply of the Low Floor Light Rail Vehicle – Technical Eglinton West Station to the new terminal at Keele Station. This route will no longer operate on Specification” to replace the existing streetcars and to support the proposed Transit City network. This Eglinton Avenue. technical specification provides the vision for the future Toronto LRT network and the basic design criteria The 47 Landsdowne will be rerouted along Eglinton Avenue from Caledonia Road to Croham for the vehicles to be used. The design criteria are listed in Exhibit 80. Road to a new bus loop located adjacent to the Caledonia Station. The 51 Leslie and 56 Leaside routes will be combined and will operate on Eglinton Avenue Design Parameters Proposed Standards between Laird Drive and Leslie Street. The portions of these routes that serve Eglinton Avenue from Laird Drive to Eglinton Station at Yonge Street will be eliminated. Maximum Operating Speed 60 km / h The 100 Flemingdon Park route will be shortened from its current terminating point at Eglinton LRT Right-of-way Width 7.4 m – Midblock Station to the new terminal at Don Mills Station. This route will no longer operate on Eglinton Avenue. Median Width TBD The 54 Lawrence East route will be shortened from its current terminating point at Eglinton Minimum Grade 0.5 % Station to the new terminal at Don Mills Station. This route will no longer operate on Eglinton Maximum Grade (LRT) 5.0 % Avenue. Minimum Curve Radius 25.0 metres 3.3 Design Criteria Side platform – 3.0 metres Platform Width Centre Platform – 6.0 / 5.0 metres 3.3.1 Transit Elements (desirable / minimum) LRT vehicles will be of modern European-style design with a length of approximately 30 metres. Trainsets Platform Length 90 metres will consist of two cars initially, with opportunity to expand to three cars when ridership levels warrant. The Desired – 0.0% (provided that capacity of the LRT for planning purposes is 260 passengers for two car trainsets and 390 passengers for adequate drainage can be provided) three car trainsets. Maximum operating speed is 60 km/hr; though vehicles will not be permitted to operate Platform Area Grade above the posted speed limit along Eglinton Avenue. The vehicle’s average speed including stops is Maximum – 3.0% projected to be 28-31 km/hr in the west surface section, 22-25 km/hr in the east surface section and 32 Maximum – 6.7 metres from Top of km/hr underground. Rail (TOR) Nominal – 5.5 metres from Top of Rail Trains will be powered by electricity from overhead catenary wires. Train operations on the surface Operating Height sections of the LRT corridor, both train control and opening/closing of doors, will be controlled by on-board (TOR) staff. In the underground section of the LRT corridor, vehicles may be controlled by automatic train Minimum – 4.0 metres from Top of operation (ATO). Rail (TOR) The LRT vehicles will be fully accessible to all riders, with low floor vehicles with level boarding from platforms. Boarding will occur on all doors to reduce time spent serving stops/stations. Doors will be 3.3.2 Road Elements located on both sides of the vehicle to accommodate centre and parallel platforms. Operator cabs will be located on both ends of the trainsets to permit operation in either direction without the requirement for turn Due to the implementation of the LRT, existing roads along the Eglinton Crosstown LRT corridor will around loops. require modifications. Exhibit 81 summarizes the road design criteria that were used during this study. The track technology to be used is a combination of a continuously welded rail with a rubber sleeve that isolates the rail from the concrete. This elimination of rail joints combined with the isolating sleeve provides a smooth operation with limited noise and vibration that is no different than the noise levels of a busy street. MARCH 2010 Page 60 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report Stray currents. Design Parameters Proposed Standards Trackbed has been primarily assumed as a conventional reinforced concrete slab. Posted Speed 60 km/h Attachment to the bridge deck will be considered during design. Any local strengthening to assure load distribution would be addressed at that time. 2 x 3.3 metres through lanes Pavement Width The LRT loading is comparable to current highway loadings and as such, causes only a 2 x 1.6 m for delineated bicyle lane marginal change to the loadings at underpass footings.
Recommended publications
  • Transit City Etobicoke - Finch West LRT
    Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices Transit City Etobicoke - Finch West LRT APPENDIX M – Consultation Record March 2010 March 2010 Appendix M Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices 3.0 List of Interested Persons Participating in the Consultations 1.0 Introduction This appendix documents in detail the consultations carried out with the technical agencies, the public, Consultation was carried out to encourage technical agencies to provide input during the course of the and the First Nations communities. study. The following agencies were invited to be involved and provide comment on the TPAP study for the EFWLRT: 2.0 Description of Consultations and Follow-up Efforts The general public, government agencies and various interest groups were provided opportunities to Government Review Agencies Technical Agencies Canadian Environmental Assessment All Stream review and comment on this project during the course of the study. The City of Toronto Public Agency Consultation Team was involved in the overall public consultation process. They offered a wide range Environmental Canada MTA All Stream Inc. of communication methods to the public, including project web site, dedicated telephone number, fax, Department of Fisheries and Oceans Telus and email address for contacting the project team. Indian and Northern Affairs Canada Enwave Energy Corporation (INAC) Transportation Canada-Ontario Region Group Telecom/360 Network Technical agencies, including federal, provincial, municipal agencies, utilities, and potential interested Ministry of Aboriginal Affairs Hydro One Network Inc.
    [Show full text]
  • Routing Changes - Junction Area Study Update
    For Action Routing Changes - Junction Area Study Update Date: July 10, 2018 To: TTC Board From: Chief Customer Officer Summary The TTC bus network is very mature. In order to ensure that the network continues to reflect the way our customers travel across the city, staff has developed a program to review different segments of the city over time. This report provides an update on the status of the Junction Area Study. The objective of the study is to improve transit travel for customers by restructuring the bus route network in the Junction Area. In spring 2017, the TTC began the study with a customer survey to better understand customer travel patterns in the Junction Area. Feedback was also collected on existing services to identify key concerns for customers. Three key issues were identified: • No continuous transit service along Dundas Street West between Dundas West Station and Kipling Station; • No continuous transit service along St Clair Avenue West between Gunn's Loop (Weston Road) and Scarlett Road; and, • Need to extend the 80 Queensway from its current eastern terminus at Humber Loop to Keele Station via Parkside Drive in the late evening and on Sundays and holidays. Based on this feedback, staff prepared and proposed a preliminary transit network to reflect the data collected and address concerns raised by customers. The new transit network includes a number of service proposals that include restructuring and rationalizing existing services and improving periods of service on routes. In May 2018, the TTC held public information sessions at Runnymede, High Park, and Dundas West stations, and Gunn’s Loop to share the proposed transit network with customers and to collect feedback on the proposals.
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 SIMC OE L A K E SIMC OE L A K E SIMC OE Allandale Waterfront Newmarket Hwy 404 Yonge-Davis Lincolnville Bloomington Y ORK Unionville Vaughan University of Ontario Metropolitan Institute of Technology Helen Centre Richmond Hill Centre (Langstaff GO) Hwy 407 Finch West Conestoga Downsview Park DURHAM Don Sheppard Leslie Mills W A TERL OO Humber -Yonge McCowan College Oriole Bramalea Kitchener Yorkdale Scarborough Centre Weston TORONT O Pickering Oshawa Bowmanville Science Gateway Terminal Toronto Region of Waterloo Caledonia Cedarvale Eglinton Centre International Airport Pearson International Kennedy Airport Mount Renforth Dennis Fairway Dundas West Lansdowne St. George Bloor-Yonge Pape Main Kipling Bloor Spadina Square WELLING T ON One Danforth Cooksville Gerrard- Osgoode Queen Carlaw Milton PEEL Winston LEGEND Churchill East Harbour Port Credit UNION Subway Ontario Place /Exhibition Billy Bishop Toronto Light Rail Transit (LRT) City Airport HA LT ON Bus Rapid Transit (BRT)/ LAKE ONTARIO Regional Express Bus Aldershot GO Rail - 15-min Two-Way All-Day GORail - Two-Way All-Day HAMI LT ON West Harbour Niagara Falls GO Rail - Peak Only McMaster Hamilton GO Centre UP Express John C.
    [Show full text]
  • Route Period / Service Old New Old New Old New Old
    Service Changes Effective Sunday, March 29, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled recovery/layover usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train Keele Station Bus Roadway Reconstruction 30 High Park / 80 Queensway Interlined due to construction at Keele Station AM Peak 80 Sherway to Keele Station 30' 68+22 3B 30' 56+4 2B 80 Sherway to High Park Stn via Parkside 20' 70+10 4B 20' 58+2 3B 30 High Park Stn to Runnymede 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 14+6 1B 1B M-F Midday 80 Sherway to Keele Station 30' 68+22 3B 24' 70+2 3B 24' 70+2 3B 80 Sherway to High Park Stn via Parkside 20' 70+10 4B 20' 72+8 4B 20' 72+8 4B 30 High Park Stn to Runnymede 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 16+4 1B 1B 20' 20' 14+6 16+4 1B 1B PM Peak 80 Sherway to Keele Station 30' 75+15 3B 24' 70+2 3B 24' 70+2 3B 80 Sherway to High Park Stn via Parkside 20' 77+3 4B 20' 72+8 4B 20' 72+8 4B 30 High Park Stn to Runnymede 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B Early Evening 80 Sherway to Keele Station 24' 56+16 3B 30' 56+4 2B 30' 56+4 2B 80 Sherway to High Park Stn via Parkside 20' 58+2 3B 20' 58+2 3B 20' 58+2 3B 30 High Park Stn to Runnymede 20' 20' 13+7 13+7 1B 1B 20' 20' 14+6 14+6 1B
    [Show full text]
  • Connecting the Region
    EGLINTON CROSSTOWN CONSTRUCTION UPDATE EASTERN WORKS OPEN HOUSE | APRIL 9, 2020 WELCOME Our Eastern Works Open House will feature the following stations and stops: • Science Centre • Aga Khan Park & Museum, Wynford, Sloane, O’Connor • Pharmacy , Hakimi Lebovic, Golden Mile, Birchmount, Ionview • and Kennedy. 2 COVID-19 MANAGEMENT • Crosslinx Transit Solutions (CTS) has been exercising all safety protocols on-site including social distancing. • For more information on CTS’ COVID-19 Management, please visit their website: http://www.crosslinxtransit.ca/wp-content/uploads/CTS_COVID- 19_mobile_v2.png EGLINTON CROSSTOWN LRT PROJECT • A 19-kilometre route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface in east • 15 underground stations and 10 surface stops • A maintenance and storage facility • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station PROJECT PROGRESS Maintenance and Storage Facility complete 12 vehicles received 50% of track installed Mining complete at Laird and Oakwood stations Deep excavation underway or complete at all stations 2019 PROJECT HIGHLIGHTS FIRST LIGHT RAIL VEHICLE ON MAINLINE 8 9 10 SCIENCE CENTRE STATION RENDERINGS AERIAL VIEW MAIN ENTRANCE WEST PORTAL LOBBY BUS TERMINAL SCIENCE CENTRE STATION: WHAT TO EXPECT Year What to Expect • Completion of all structural concrete works 2019 Milestones • Completion of support of excavation • Completion of excavation • Interior works at Station Box • Interior and exterior finishes as Main Entrance • Track work and rail installation Remaining Work • Waterproofing and backfill for 2020 • Permanent road restoration • Substantial completion late 2020 SCIENCE CENTRE STATION PROGRESS PHOTOS WALL TILING AT THE MAIN ENTRANCE GLAZING AT THE BUS TERMINAL Aga Khan & Museum Stop to O’Connor Stop (Don Valley Parkway to Victoria Park Ave) Brentcliffe Portal AGA KHAN PARK & MUSEUM STOP RENDERINGS SIDEWALK PLATFORM AERIAL VIEW WYNFORD STOP RENDERINGS SIDEWALK PLATFORM .
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central Open House will feature the following stations: • Forest Hill • Chaplin • Avenue (Eglinton Connects) • Eglinton • Mount Pleasant Station • Leaside PROJECT QUANTITIES 273.5 km 111 escalators 15.2 million job hours medium voltage/ 38 two-vehicle trains direct current cable 208 overhead 60 elevators 6000 tons of rail 5 new bridges catenary system poles 60 KM/H street level MODEL: Bombardier Flexity Freedom POWER SUPPLY: Overhead Catenary Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now over 75% complete • Three stations – Mount Dennis, Keelesdale and Science Centre – are largely complete • Over 85% of track has been installed • 45 LRVs have arrived at the EMSF to date • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to
    [Show full text]
  • Yonge Subway Extension Transit Project Assessment
    Yonge Subway Extension Transit Project Assessment Councillors Briefing January 22, 2009 inter-regional connectivity is the key to success 2 metrolinx: 15 top priorities ● On November 28, 2008 Regional Transportation Plan approved by Metrolinx Board ● Top 15 priorities for early implementation include: ¾ Viva Highway 7 and Yonge Street through York Region ¾ Spadina Subway extension to Vaughan Corporate Centre ¾ Yonge Subway extension to Richmond Hill Centre ¾ Sheppard/Finch LRT ¾ Scarborough RT replacement ¾ Eglinton Crosstown LRT 3 …transit city LRT plan 4 yonge subway – next steps TODAY 5 what’s important when planning this subway extension? You told us your top three priorities were: 1. Connections to other transit 2. Careful planning of existing neighbourhoods and future growth 3. Destinations, places to go and sensitivity to the local environment were tied for the third priority In addition, we need to address all the technical and operational requirements and costs 6 yonge subway at a crossroads ● The Yonge Subway is TTC’s most important asset ● Must preserve and protect existing Yonge line ridership ● Capacity of Yonge line to accommodate ridership growth a growing issue ● Extension of Yonge/Spadina lines matched by downstream capacity ● Three major issues: 1. Capacity of Yonge Subway line 2. Capacity of Yonge-Bloor Station 3. Sequence of events for expansion 7 yonge-university-spadina subway – peak hour volumes 8 yonge subway capacity: history ● Capacity of Yonge line an issue since early 1980s ● RTES study conclusions (2001) ¾
    [Show full text]
  • Traffic and Transportation Report
    Appendix A5 Ontario Line Project Exhibition Station Early Works – Final Traffic and Transportation Early Works Report Metrolinx Traffic and Transportation Early Works Report Ontario Line Exhibition Station Early Works Prepared by: AECOM Canada Ltd. 105 Commerce Valley Drive West, 7th Floor Markham, ON L3T 7W3 Canada T: 905.886.7022 F: 905.886.9494 www.aecom.com Date: February 2021 Project #: 60611173 Metrolinx Ontario Line Exhibition Station Early Works – Traffic and Transportation Early Works Report Statement of Qualifications and Limitations The attached Report (the “Report”) has been prepared by AECOM Canada Ltd. (“AECOM”) for the benefit of the Client (“Client”) in accordance with the agreement between AECOM and Client, including the scope of work detailed therein (the “Agreement”). The information, data, recommendations and conclusions contained in the Report (collectively, the “Information”): § is subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the “Limitations”); § represents AECOM’s professional judgement in light of the Limitations and industry standards for the preparation of similar reports; § may be based on information provided to AECOM which has not been independently verified; § has not been updated since the date of issuance of the Report and its accuracy is limited to the time period and circumstances in which it was collected, processed, made or issued; § must be read as a whole and sections thereof should not be read out of such context; § was prepared for the specific purposes described in the Report and the Agreement; and § in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time.
    [Show full text]
  • Attachment 4 – Assessment of Ontario Line
    EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively.
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • TTC Typography History
    With the exception of Eglinton Station, 11 of the 12 stations of The intention of using Helvetica and Univers is unknown, however The Toronto Subway Font (Designer Unknown) the original Yonge Subway line have been renovated extensively. with the usage of the latter on the design of the Spadina Subway in Based on Futura by Paul Renner (1928) Some stations retained the original typefaces but with tighter 1978, it may have been an internal decision to try and assimilate tracking and subtle differences in weight, while other stations subsequent renovations of existing stations in the aging Yonge and were renovated so poorly there no longer is a sense of simplicity University lines. The TTC avoided the usage of the Toronto Subway seen with the 1954 designs in terms of typographical harmony. font on new subway stations for over two decades. ABCabc RQKS Queen Station, for example, used Helvetica (LT Std 75 Bold) in such The Sheppard Subway in 2002 saw the return of the Toronto Subway an irresponsible manner; it is repulsively inconsistent with all the typeface as it is used for the names of the stations posted on ABCabc RQKS other stations, and due to the renovators preserving the original platfrom level. Helvetica became the primary typeface for all TTC There are subtle differences between the two typefaces, notably the glass tile trim, the font weight itself looks botched and unsuitable. wayfinding signages and informational material system-wide. R, Q, K, and S; most have different terminals, spines, and junctions. ST CLAIR SUMMERHILL BLOOR DANGER DA N GER Danger DO NOT ENTER Do Not Enter Do Not Enter DAVISVILLE ST CL AIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR The specially-designed Toronto Subway that embodied the spirit of modernism and replaced with a brutal mix of Helvetica and YONGE SUBWAY typeface graced the walls of the 12 stations, progress.
    [Show full text]
  • Eglinton Crosstown LRT Interchange Stations – Final Designs
    Report for Action Eglinton Crosstown LRT Interchange Stations – Final Designs Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary Metrolinx is currently constructing the Eglinton Crosstown LRT between Weston Road and Kennedy subway station, scheduled to open in 2021. This new LRT line will be operated by TTC and be identified as TTC Line 5. Approximately half of the 19 km LRT line will run underground, and connect to three existing subway stations. These interchange stations are currently under construction and will connect to Line 1 at Eglinton West Station (to be renamed Cedarvale Station) and Eglinton Station, and Line 2 at Kennedy Station. As the owner and operator of the subway system in Toronto, the TTC has a responsibility to ensure that the structural integrity of the existing subway infrastructure is maintained during construction, and that safe and efficient operation of the system is maintained. This report presents the final Metrolinx/Crosslinx Transit Solutions designs of the 3 interchange stations at Eglinton West (Cedarvale), Eglinton and Kennedy. Recommendations It is recommended that the Board: 1. Approve the final designs for Cedarvale, Eglinton and Kennedy interchange stations, as presented in this report. Financial Summary The Master Agreement between Metrolinx, the City of Toronto and the TTC, states that Metrolinx, as owner and developer, is responsible for expenditures related to the delivery of the Eglinton Crosstown Light Rail Transit Project. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Eglinton Crosstown LRT Interchange Stations – Final Designs Page 1 of 5 Equity/Accessibility Matters The new interchange stations are designed to be accessible, with barrier free paths from street to platform levels.
    [Show full text]