Flat Run Solar, LLC Kentucky State Board on Electric Generation and Transmission Application

Total Page:16

File Type:pdf, Size:1020Kb

Flat Run Solar, LLC Kentucky State Board on Electric Generation and Transmission Application Flat Run Solar, LLC Kentucky State Board on Electric Generation and Transmission Application Site Assessment Report Case No. 2020-00272 April 2021 Contents 1. Description of Proposed Facility 2. Compatibility with Scenic Surroundings 3. Property Value Impacts 4. Anticipated Noise Levels at Property Boundary 5. Effect on Road, Railways, and Fugitive Dust 6. Mitigation Measures Attachments A. Preliminary Project Layout B. Property Value Impact Report C. Map of Nearest Neighbors D. Surrounding Area Images E. Boundary Survey and Legal Descriptions F. Noise and Traffic Study G. Phase 1 Environmental Site Assessment Flat Run Solar Site Assessment Report Page 1 1. Description of Proposed Facility REQUIREMENT: per KRS 278.708(3)(a); A description of the proposed facility that shall include a proposed site development plan that describes: 1. Surrounding land uses for residential, commercial, agricultural, and recreational purposes; 2. The legal boundaries of the proposed site; 3. Proposed access control to the site; 4. The location of facility buildings, transmission lines, and other structures; 5. Location and use of access ways, internal roads, and railways; 6. Existing or proposed utilities to service the facility; 7. Compliance with applicable setback requirements as provided under KRS 278.704(2), (3), (4), or (5); and 8. Evaluation of the noise levels expected to be produced by the facility COMPLIANCE: The proposed facility is described in detail in Section 2 of the Application. The proposed site development plan is attached hereto as Attachment A, and is described in detail at numbers 3-7 below. 1. A detailed description of the surrounding land uses is identified in the Impact Study conducted by Kirkland Appraisals, LLC, and attached as Attachment B. A summary of the surrounding land use is contained in the chart below: Acreage Parcels Residential 11.11% 55.56% Agricultural 55.72% 33.33% Agri/Res 18.44% 7.41% Industrial 14.73% 3.70% Page 6 of the Kirkland Impact Study lists the adjoining parcels, states whether each parcel has a residential home, and states the number of feet between each adjoining residential home and the solar facility. Flat Run Solar Site Assessment Report Page 2 To provide more detailed information on the closest residential homes to the Project, a map showing a 300’ radius around the exterior of the Project is attached as Attachment C. There are three non-participating residential homes within 300’ of the Project, which are marked on the map. Two of these homes have at least one existing vegetative buffer between the home and the Project. Aerial images of each of these three closest homes, and information on the efforts Flat Run has made to additionally screen the view of the Project from each home, are included in Attachment C. Referring to the map in Attachment C, one of the homes (Residence A) has two rows of existing vegetation and a building that will block the view of the solar facility. The Project is also adding a planted vegetative buffer as shown on the site layout map in Attachment A. Residence B is located across Hobson Road from the Project, and will be screened by a home owned by a participating landowner, as well as a planted vegetative buffer. Residence C has existing vegetation that will screen the Project from the home. Attachment C also shows the location of four residential homes (marked with yellow dots on Attachment C) that are owned by landowners that are leasing land from their parcels to the Project, and approve of the Project’s location on their properties. In order to provide the Siting Board with a visualization of the surrounding area, Applicant took a number of photos from the roadways surrounding the proposed facility. These photos, along with a map index showing the location where each image was taken, are attached as Attachment D. 2. Attachment E contains the boundary survey, as well as the legal descriptions of the properties that are leasing land to the proposed facility. 3. The proposed site entrances are marked with orange dots on the site development plan attached hereto as Attachment A. In order to comply with the National Electric Safety Code, the entire site (all areas where equipment is located) will be fenced prior to the start of construction and all entrances to the site will be gated, and locked at all times when workers are not active on site. 4. The preliminary site development plan is located in Attachment A. The applicant will provide a final site plan to the Siting Board prior to construction. The preliminary plan shows the following items that will not materially change during final design: a. Potential Project Footprint (described in detail below, and depicted on the site plan in Attachment A) b. utility easement c. Project setbacks from property lines and roads d. Project setbacks from non-participating residential homes Flat Run Solar Site Assessment Report Page 3 e. vegetative buffer locations and specification1 f. substation and interconnection equipment location g. parcel boundaries The Applicant proposes that any material changes to the locations of the above items would require approval from the Siting Board. The preliminary site development plan also shows the preliminary locations of the following equipment that will change during the detailed design process. Until detailed civil engineering and equipment manufacturing sourcing selections are made prior to construction, Applicant is not able to provide the exact location of these items. The Applicant proposes that changes to the location of these items will not require approval from the Siting Board, as these modifications will not materially change the off-site visual or auditory perception of the facilities: h. interior access roads i. construction entrances j. solar panel, racking, inverter, energy storage, and transformer equipment areas (indicative locations for this equipment are shown on the preliminary facility layout, but actual locations will change within the Potential Project Footprint) k. security fence (the security fence will enclose all Project equipment, but its location may change from the specific locations shown on the preliminary facility layout based on changes in the location of the equipment within the Potential Project Footprint) All equipment related to the Project will be placed within the Potential Project Footprint, with the exception of the fencing, vegetative buffers and pollinator plantings. The fencing, vegetative buffers and pollinator plantings may be placed outside the Potential Project Footprint2, so that the Potential Project Footprint setbacks are measured to the nearest solar panel or other equipment. The Potential Project Footprint in the site development plan conforms with the following proposed setbacks: 50 feet from adjacent roadways 25 feet from non-participating adjoining parcels 150 feet from non-participating residences 1 As described in Section 2 of the Application, the proposed vegetative buffer will consist of two staggered rows of evergreen shrubs. The buffer is designed to be approximately 15 feet wide, and the shrubs will be at least three feet in height at time of planting. 2 Excluding fencing and vegetative buffers from solar project setbacks is fairly standard practice in jurisdictions that have planning and zoning and enact a solar ordinance. Fencing and vegetation are both typically found in residential neighborhoods, and are not typically regulated by setback restrictions. Flat Run Solar Site Assessment Report Page 4 Applicant proposes the following additional setbacks for central inverters, if used, and energy storage systems within the Potential Project Footprint3: 150 feet from property boundaries 300 feet from non-participating residences The purpose of the Potential Project Footprint and associated setbacks is to provide the neighbors of the project and surrounding community with certainty as to the nearest locations they can expect to see solar panels and equipment. In proposing the setbacks for this Project, the Applicant considered the Project’s location along 2 rural county roads, and the fact that the Project area is relatively close to only three non-participating residences as described in Attachment C. Due to the constrained amount of land available for the Project, Applicant requires these proposed setbacks in order to build the Project at the proposed size. 5. The location and use of construction access points and internal roads are described in items 3 and 4 above. There are no railways that intersect with the Project site. 6. The Green County – Saloma 161kv transmission line will serve the facility and carry electricity generated by the Project. At this time, it is not anticipated that the Project will need to receive external utility services during typical plant operation. If electricity service is required during construction or operation of the Project, it will be contracted with the local utility, Taylor County RECC. There will not be any water or sewer servicing the Project site. There is likely to be no permanent project office building on site (there will not be permanent workers at the Project site after construction.) If there is a permanent building on site, it will likely be a trailer or container to store operations and maintenance equipment and parts. This trailer or container will not require water or sewer service. Communications fiber will be contracted with local service providers. During construction, water may be required initially for irrigating the vegetative buffer until it is established. This water would be trucked onto site. During operation solar sites 3 In the Applicant’s experience, most zoning jurisdictions in the US that have a solar ordinance do not include a specific setback for inverters or energy storage systems, in addition to the general property line setbacks that apply to all equipment within the solar project. Applicant is proposing the additional setback for central inverters and energy storage systems in order to provide the Siting Board and neighbors of the project with certainty about the nearest potential locations of this equipment.
Recommended publications
  • Environmental and Economic Benefits of Building Solar in California Quality Careers — Cleaner Lives
    Environmental and Economic Benefits of Building Solar in California Quality Careers — Cleaner Lives DONALD VIAL CENTER ON EMPLOYMENT IN THE GREEN ECONOMY Institute for Research on Labor and Employment University of California, Berkeley November 10, 2014 By Peter Philips, Ph.D. Professor of Economics, University of Utah Visiting Scholar, University of California, Berkeley, Institute for Research on Labor and Employment Peter Philips | Donald Vial Center on Employment in the Green Economy | November 2014 1 2 Environmental and Economic Benefits of Building Solar in California: Quality Careers—Cleaner Lives Environmental and Economic Benefits of Building Solar in California Quality Careers — Cleaner Lives DONALD VIAL CENTER ON EMPLOYMENT IN THE GREEN ECONOMY Institute for Research on Labor and Employment University of California, Berkeley November 10, 2014 By Peter Philips, Ph.D. Professor of Economics, University of Utah Visiting Scholar, University of California, Berkeley, Institute for Research on Labor and Employment Peter Philips | Donald Vial Center on Employment in the Green Economy | November 2014 3 About the Author Peter Philips (B.A. Pomona College, M.A., Ph.D. Stanford University) is a Professor of Economics and former Chair of the Economics Department at the University of Utah. Philips is a leading economic expert on the U.S. construction labor market. He has published widely on the topic and has testified as an expert in the U.S. Court of Federal Claims, served as an expert for the U.S. Justice Department in litigation concerning the Davis-Bacon Act (the federal prevailing wage law), and presented testimony to state legislative committees in Ohio, Indiana, Kansas, Oklahoma, New Mexico, Utah, Kentucky, Connecticut, and California regarding the regulations of construction labor markets.
    [Show full text]
  • CSPV Solar Cells and Modules from China
    Crystalline Silicon Photovoltaic Cells and Modules from China Investigation Nos. 701-TA-481 and 731-TA-1190 (Preliminary) Publication 4295 December 2011 U.S. International Trade Commission Washington, DC 20436 U.S. International Trade Commission COMMISSIONERS Deanna Tanner Okun, Chairman Irving A. Williamson, Vice Chairman Charlotte R. Lane Daniel R. Pearson Shara L. Aranoff Dean A. Pinkert Robert B. Koopman Acting Director of Operations Staff assigned Christopher Cassise, Senior Investigator Andrew David, Industry Analyst Nannette Christ, Economist Samantha Warrington, Economist Charles Yost, Accountant Gracemary Roth-Roffy, Attorney Lemuel Shields, Statistician Jim McClure, Supervisory Investigator Address all communications to Secretary to the Commission United States International Trade Commission Washington, DC 20436 U.S. International Trade Commission Washington, DC 20436 www.usitc.gov Crystalline Silicon Photovoltaic Cells and Modules from China Investigation Nos. 701-TA-481 and 731-TA-1190 (Preliminary) Publication 4295 December 2011 C O N T E N T S Page Determinations.................................................................. 1 Views of the Commission ......................................................... 3 Separate Views of Commission Charlotte R. Lane ...................................... 31 Part I: Introduction ............................................................ I-1 Background .................................................................. I-1 Organization of report.........................................................
    [Show full text]
  • Background Report Prepared by Arizona State University NINETY-NINTH ARIZONA TOWN HALL
    Arizona’s Energy Future 99th Arizona Town Hall November 6 - 9, 2011 Background Report Prepared by Arizona State University NINETY-NINTH ARIZONA TOWN HALL PREMIER PARTNER CONTRIBUTING PARTNER COLLABORATING PARTNERS SUPPORTING PARTNERS CIVIC PARTNERS CORE Construction Kennedy Partners Ryley, Carlock & Applewhite Sundt Construction One East Camelback, Suite 530, Phoenix, Arizona 85012 Phone: 602.252.9600 Fax: 602.252.6189 Website: www.aztownhall.org Email: [email protected] ARIZONA’S ENERGY FUTURE September 2011 We thank you for making the commitment to participate in the 99th Arizona Town Hall to be held at the Grand Canyon on November 6-9, 2011. You will be discussing and developing consensus with fellow Arizonans on the future of energy in Arizona. An essential element to the success of these consensus-driven discussions is this background report that is provided to all participants before the Town Hall convenes. As they have so often done for past Arizona Town Halls, Arizona State University has prepared a detailed and informative report that will provide a unique and unparalleled resource for your Town Hall panel sessions. Special thanks go to editors Clark Miller and Sharlissa Moore of the Consortium for Science, Policy, and Outcomes at ASU for spearheading this effort and marshaling many talented professionals to write individual chapters. For sharing their wealth of knowledge and professional talents, our thanks go to the many authors who contributed to the report. Our deepest gratitude also goes to University Vice President and Dean of the College of Public Programs for ASU, Debra Friedman, and Director of the School of Public Affairs for ASU, Jonathan Koppell, who made great efforts to ensure that ASU could provide this type of resource to Arizona.
    [Show full text]
  • Concentrating Solar Power and Water Issues in the U.S. Southwest
    Concentrating Solar Power and Water Issues in the U.S. Southwest Nathan Bracken Western States Water Council Jordan Macknick and Angelica Tovar-Hastings National Renewable Energy Laboratory Paul Komor University of Colorado-Boulder Margot Gerritsen and Shweta Mehta Stanford University The Joint Institute for Strategic Energy Analysis is operated by the Alliance for Sustainable Energy, LLC, on behalf of the U.S. Department of Energy’s National Renewable Energy Laboratory, the University of Colorado-Boulder, the Colorado School of Mines, the Colorado State University, the Massachusetts Institute of Technology, and Stanford University. Technical Report NREL/TP-6A50-61376 March 2015 Contract No. DE-AC36-08GO28308 Concentrating Solar Power and Water Issues in the U.S. Southwest Nathan Bracken Western States Water Council Jordan Macknick and Angelica Tovar-Hastings National Renewable Energy Laboratory Paul Komor University of Colorado-Boulder Margot Gerritsen and Shweta Mehta Stanford University Prepared under Task No. 6A50.1010 The Joint Institute for Strategic Energy Analysis is operated by the Alliance for Sustainable Energy, LLC, on behalf of the U.S. Department of Energy’s National Renewable Energy Laboratory, the University of Colorado-Boulder, the Colorado School of Mines, the Colorado State University, the Massachusetts Institute of Technology, and Stanford University. JISEA® and all JISEA-based marks are trademarks or registered trademarks of the Alliance for Sustainable Energy, LLC. The Joint Institute for Technical Report Strategic Energy Analysis NREL/TP-6A50-61376 15013 Denver West Parkway March 2015 Golden, CO 80401 303-275-3000 • www.jisea.org Contract No. DE-AC36-08GO28308 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.
    [Show full text]
  • Operation Construction Development
    Major Solar Projects in the United States Operating, Under Construction, or Under Development Updated March 7, 2016 Overview This list is for informational purposes only, reflecting projects and completed milestones in the public domain. The information in this list was gathered from public announcements of solar projects in the form of company press releases, news releases, and, in some cases, conversations with individual developers. It is not a comprehensive list of all major solar projects under development. This list may be missing smaller projects that are not publicly announced. Particularly, many smaller projects located outside of California that are built on a short time-scale may be underrepresented on this list. Also, SEIA does not guarantee that every identified project will be built. Like any other industry, market conditions may impact project economics and timelines. SEIA will remove a project if it is publicly announced that it has been cancelled. SEIA actively promotes public policy that minimizes regulatory uncertainty and encourages the accelerated deployment of utility-scale solar power. This list includes ground-mounted solar power plants 1 MW and larger. Example Projects Nevada Solar One Sierra SunTower Nellis Air Force Base DeSoto Next Generation Solar Energy Center Developer: Acciona Developer: eSolar Developer: MMA Renewable Ventures Developer: Florida Power & Light Co. Electricity Purchaser: NV Energy Electricity Purchaser: Southern Electricity Purchaser: Nellis AFB Electricity Purchaser: Florida Power & California
    [Show full text]
  • State of Utah Mail - Solar Customers Potential Penalty
    11/1912016 State of Utah Mail - Solar Customers potential penalty PublicService Commission <[email protected]> Solar Customers potential penalty 1 message Benjamin Baker <bbaker@vivintsolarcom> Thu, Nov 17, 2016 at 5:34 PM To: "[email protected]" <[email protected]> To Whom it may concern, So My name is Ben Baker and I am Building a that will be done during the summer of 2017 next to my father in law and plan to put solar on my home like he has, but if this Solar Tax get passed I will be one of MANY un happy customer who feel helping the environment and choosing our power source should be a consumer choice, not to mention solar has provided thousands of jobs for Utahans and give us, the consumers, an option to our power Normally, if you live in a specific area, you have NO CHOICE, but you have to use RMP and are at their dictates... this is called a MONOPOLY. Name me one other product or service in your life that this where your Forced to use only 1 company .. Also, having been born and raised in Utah, the air quality is horrific and isn't getting better ... solar is helping out beautiful state. Please stop this big monopoly from hurting the consumer. Thanks you for your time. Ben Baker 801-647-2277 B. Taylor Baker 801-647-2277BBaker@vivintsolarcom Vivint Solar Developer , LLC (EIN: 80-0756438) is a licensed contractor in each state in which we operate, for information about our licenses please visit our contractor licenses page.
    [Show full text]
  • Utility-Scale Solar: Empirical Trends in Project Technology, Cost
    Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition Authors: Mark Bolinger, Joachim Seel Lawrence Berkeley National Laboratory September 2018 Table of Contents List of Acronyms ................................................................................................................................. i Executive Summary........................................................................................................................... ii 1. Introduction .................................................................................................................................... 1 2. Utility-Scale Photovoltaics (PV) ................................................................................................. 5 2.1 Installation and Technology Trends Among the PV Project Population (590 projects, 20.5 GWAC) 6 The Southeast became the new national leader in solar growth 6 Tracking c-Si projects continued to dominate 2017 additions 8 More projects at lower insolation sites, fixed-tilt mounts crowded out of sunny areas 10 Developers continued to favor larger module arrays relative to inverter capacity 12 2.2 Installed Project Prices (506 projects, 18.7 GWAC) 14 Median prices fell to $2.0/WAC ($1.6/WDC) in 2017 15 The price premium for tracking over fixed-tilt installations seemingly disappeared 16 Faint evidence of economies of scale among our 2017 sample 17 System prices varied by region 18 2.3 Operation and Maintenance Costs (39 projects, 0.8 GWAC) 21 2.4 Capacity Factors (392 projects, 16.1 GWAC) 23 Wide range in capacity factors reflects differences in insolation, tracking, and ILR 23 More recent project vintages exhibited higher capacity factors 26 Performance degradation is evident, but is difficult to assess and attribute at the project level 27 2.5 Power Purchase Agreement (PPA) Prices (232 contracts, 14.5 GWAC) 30 PPA prices have fallen dramatically, in all regions of the country 32 Solar’s largely non-escalating and stable pricing can hedge against fuel price risk 39 3.
    [Show full text]
  • Operation Technology of Solar Photovoltaic Power Station Roof and Policy Framework
    Operation Technology of Solar Photovoltaic Power Station Roof and Policy Framework Expert Group on New and Renewable Energy Technologies (EGNRET) Of Energy Working Group (EWG) (May 2014) Operation Technology of Solar Photovoltaic Power Station Roof and Policy Framework APEC Project: EWG 24 2012A -- Operation Technology of Solar Photovoltaic Power Station Roof and Policy Framework Produced by Beijing QunLing Energy Resources Technology Co., Ltd For Asia Pacific Economic Cooperation Secretariat 35 Heng Mui Keng Terrace Singapore 119616 Tel: (65) 68919 600 Fax: (65) 68919 690 Email: [email protected] Website: www.apec.org © 2014 APEC Secretariat APEC Publication number : APEC#214-RE-01.8 Page 2 of 170 Operation Technology of Solar Photovoltaic Power Station Roof and Policy Framework Operation Technology of Solar Photovoltaic Power Station Roof and Policy Framework Content 1 Introduction.............................................................................................8 1.1 Background ..................................................................................................... 8 1.2 Project Goal................................................................................................... 12 1.2.1 Solar Resources Analysis.......................................................................... 12 1.2.2 PV Technology Development .................................................................... 12 1.2.3 Policy Review ............................................................................................ 12 1.2.4 PV
    [Show full text]
  • RECORD of DECISION Gemini Solar Project
    RECORD OF DECISION Gemini Solar Project Case File Number: N-84631 DOI-BLM-NV-S010-2018-0051-EIS May 2020 Prepared by United States Department of the Interior Bureau of Land Management Las Vegas Field Office 4701 N. Torrey Pines Drive Las Vegas, NV 89130 GEMIN1 SOLAR PROJECT RECORD OF DECISION Executive Summary This document constitutes the Record of Decision (ROD) of the United States Department of the Interior (DOI), regarding the Solar Partners XI, LLC's (Applicant) application fora right-of-way (ROW) grant for the Gemini Solar Project (Project) and the associated amendment to the Las Vegas Resource Management Plan of 1998, as amended (1998 Las Vegas RMP). This decision is supportedby the analysis included in the Proposed Resource Management Plan Amendment (RM.PA) andFinal Environmental lmpact Statement (FBlS) for Ulis project that was published on December 27, 2019. This ROD makes two decisions: • First, it approves the issuance of a Federal Land Policy and Management Act (FLPMA) Title V ROW grant to the Applicant to construct, operate, maintain, and decommission a solar facility analyzed in the Proposed RMPA/Final EIS as the Hybrid Alternative. • Second, it amends the Visual Resource Management (VRM) Class 111 objective in the 1998 Las Vegas RMP to a VRM Class TV objective, to allow for management activities that require major modifications of existing landscape character. This decision reflects careful consideration of the Proposed Action, the various alternatives, and the issues identified in the Propo$ed RMPA/Final EIS. This decision best fulfillsthe BLM' s and DOJ's stallllory mission and responsibilities. Introduction The Applicant amended an existing ROW grant application with the BLM to construct, operate, maintain, and decommission the Project on July 21, 2017.
    [Show full text]
  • Major Solar Projects.Xlsx
    Utility‐Scale Solar Projects in the United States Operating, Under Construction, or Under Development Updated January 17, 2012 Overview This list is for informational purposes only, reflecting projects and completed milestones in the public domain. The information in this list was gathered from public announcements of solar projects in the form of company press releases, news releases, and, in some cases, conversations with individual developers. It is not a comprehensive list of all utility‐scale solar projects under development. This list may be missing smaller projects that are not publicly announced. Particularly, many smaller projects located outside of California that are built on a short time‐scale may be underrepresented on this list. Also, SEIA does not guarantee that every identified project will be built. Like any other industry, market conditions may impact project economics and timelines. SEIA will remove a project if it is publicly announced that it has been cancelled. SEIA actively promotes public policy that minimizes regulatory uncertainty and encourages the accelerated deployment of utility‐scale solar power. This list includes ground‐mounted utility‐scale solar power plants larger than 1 MW that directly feed into the transmission grid. This list does not include large "behind the meter" projects that only serve on‐site load. One exception to this is large projects on military bases that only serve the base (see, for example, Nellis Air Force Base). While utility‐scale solar is a large and growing segment of the U.S. solar industry, cumulative installations for residential and non‐residential (commercial, non‐profit and government) solar total 841 MW and 1,634 MW, respectively.
    [Show full text]
  • Utility-Scale Solar Projects in The
    APL000043 10/21/2011 UtilityScaleSolarProjectsintheUnitedStates Operating,UnderConstruction,orUnderDevelopment UpdatedOctober14,2011 Overview Thislistisforinformationalpurposesonly,reflectingprojectsandcompletedmilestonesinthepublicdomain.Theinformationinthislistwasgathered frompublicannouncementsofsolarprojectsintheformofcompanypressreleases,newsreleases,and,insomecases,conversationswithindividual developers.Itisnotacomprehensivelistofallutilityscalesolarprojectsunderdevelopment.Thislistmaybemissingsmallerprojectsthatarenot publiclyannounced.Particularly,manysmallerprojectslocatedoutsideofCaliforniathatarebuiltonashorttimescalemaybeunderrepresentedon thislist.Also,SEIAdoesnotguaranteethateveryidentifiedprojectwillbebuilt.Likeanyotherindustry,marketconditionsmayimpactproject economicsandtimelines.SEIAwillremoveaprojectifitispubliclyannouncedthatithasbeencancelled.SEIAactivelypromotespublicpolicythat minimizesregulatoryuncertaintyandencouragestheaccelerateddeploymentofutilityscalesolarpower. Thislistincludesgroundmountedutilityscalesolarpowerplantslargerthan1MWthatdirectlyfeedintothetransmissiongrid.Thislistdoesnot includelarge"behindthemeter"projectsthatonlyserveonsiteload.Oneexceptiontothisislargeprojectsonmilitarybasesthatonlyservethebase (see,forexample,NellisAirForceBase). WhileutilityscalesolarisalargeandgrowingsegmentoftheU.S.solarindustry,cumulativeinstallationsforresidentialandnonresidential (commercial,nonprofitandgovernment)solartotal712MWand1,233MW,respectively.FormoreinformationontheU.S.solarmarket,visit www.seia.org/cs/research/solarinsight.
    [Show full text]
  • Market Trends 2 013
    U.S. Solar MARKET TRENDS 2 013 JULY 2014 Larry Sherwood U.S. Solar MARKET TRENDS 2 013 EXECUTIVE SUMMARY Solar energy markets are booming in the United Important CURRENT TRENDS States due to falling photovoltaic (PV) prices, strong consumer demand, available financing, Photovoltaic JULY 2014 Larry Sherwood renewable portfolio standards (RPSs), and • California was the most important market financial incentives from the federal government, in 2013. Fifty-seven percent of U.S. capacity states and utilities. Thirty-four percent more PV installed in 2013 occurred in the Golden State, capacity was installed in 2013 than the year and the capacity installed during 2013 was 161 before. Developers completed three large percent greater than what was installed concentrating solar power (CSP) plants with a in 2012. combined capacity of nearly 0.8 GWAC at the • Residential capacity installed in 2013 grew by end of 2013. Solar installations accounted for 68 percent in the U.S., fueled by the increasing 31 percent of all electric power installations use of leases and third-party ownership of these completed in 2013. systems. Over 145,000 residential PV systems were installed during the year. The federal Investment Tax Credit (ITC) of 30 percent of the installed cost is an important • Utility sector capacity installed grew by 47 foundational incentive for most installations. percent. Ten PV installations, each larger than 100 MW , were completed in 2013. Installed prices for distributed PV installations fell DC by at least 11 percent in 2013 and have fallen by • Hawaii had the highest per capita installed 44 percent since 2009.
    [Show full text]