भारत सरकार Government of विद् युत मंत्रालय Ministry of Power केन्द्रीय विद् युत प्राविकरण Central Electricity Authority

Report of under construction Renewable Energy Projects

Table of Contents

S.No Title Page No A. Solar Power Projects 1. Summary 2 2. Physical Attributes 3 3. Physical Progress 10 4. Commercial Details 17 5. LTA Connectivity 22 6. Others 27 B. Wind Power Projects 1. Summary 39 2. Physical Attributes 40 3. Physical Progress 44 4. Commercial Details 48 5. LTA Connectivity 52 6. Others 57 C. Details of Associated Transmission Projects 1. Transmission system-Wind power Projects 64 2. Transmission System-Solar Power Projects 66

Details of Underconstruction Solar Power Projects

Page 1 Central Electricity Authority / के न्द्रीय वि饍युत प्राधिकरण Renewable Energy Project Monitoring Division/निीकरणीय ऊ셍ा ा पररयो셍ना प्रबोिन प्रभाग

Summary of Underconstruction Solar Power Projects (SECI) S.No Scheme Total Capacity Tendered (MW) Total Capacity Awarded (MW) Under Construction Capacity (MW) 2000 MW ISTS Connected Solar PV 1 2000.00 2000.00 2000.00 Projects (ISTS-I) 3000 MW ISTS Connected Solar PV 2 3000.00 600.00 600.00 Projects (ISTS-II) 1200 MW ISTS Connected Projects 3 1200.00 1200.00 1200.00 (ISTS-III) 1200 MW ISTS Connected Projects 4 1200.00 1150.00 1150.00 (ISTS-IV) 1200 MW ISTS Connected Projects (ISTS- 5 1200.00 480.00 480.00 V) 1200 MW ISTS Connected Projects (ISTS- 6 1200.00 900.00 900.00 VI) 1200 MW ISTS Connected Projects (ISTS- 7 1200.00 1200.00 1200.00 VIII) 2000 MW ISTS Connected Projects (ISTS- 8 2000.00 2000.00 2000.00 IX) 9 750 MW (Tranche-I) 750.00 750.00 750.00

10 750 MW Rajasthan (Tranche-II) 750.00 680.00 610.00 150 MW Grid Connected Floating Solar 11 150.00 150.00 150.00 PV Plants 750 MW Kadapa Solar Park (5000 MW 12 750.00 750.00 750.00 VGF Scheme) 13 CPSU Scheme (Tranche-I, 2000 MW) 2000.00 922.00 922.00

14 CPSU Scheme (Tranche-II, 1500 MW) 1500.00 1104.00 1104.00

Total 18900.00 13886.00 13816.00

Page 2 Status of Underconstruction Solar Power Projects Physical attributes S-NO SPV/ Parent/ Holding Company Capacity (MW) Type Bidding Scheme State Project Location (Name of Project Company/ SPD)

2000 MW ISTS Mahindra Renewables Private Vill-Bhiv Ji ka Gaon, Tehsil- 1 250.00 Solar Connected Solar PV Rajasthan Limited Bap, Dist.- Projects (ISTS-I)

2000 MW ISTS Vill:, Nure Ki Bhurj/Sihra, Dist: 2 Kilaj Solar (Maharashtra) Pvt. Ltd 50.00 Solar Connected Solar PV Rajasthan Jodhpur Projects (ISTS-I)

2000 MW ISTS Village-Sanwara, Tehsil- ACME Raisar Solar Energy Private 3 300.00 Solar Connected Solar PV Rajasthan Pokhran, Dist.-Jaisalmer, Limited Projects (ISTS-I) Rajasthan

2000 MW ISTS Village-Sanwara, Tehsil- ACME Phalodi Solar Energy Private 4 300.00 Solar Connected Solar PV Rajasthan Pokhran, Dist.-Jaisalmer, Limited Projects (ISTS-I) Rajasthan

2000 MW ISTS Village Jagdev wala and Azure Power Forty Three Private 5 300.00 Solar Connected Solar PV Rajasthan Daudsar, Tehsil , Limited Projects (ISTS-I) District Bikaner

2000 MW ISTS Village Jagdev wala and Azure Power Forty Three Private 6 300.00 Solar Connected Solar PV Rajasthan Daudsar, Tehsil Bikaner, Limited Projects (ISTS-I) District Bikaner

2000 MW ISTS Clean Solar Power (Jodhpur) Pvt. Vill-Noore Bhurj, Tehsil-Bap- 7 250.00 Solar Connected Solar PV Rajasthan Ltd Dist.-Jodhpur Projects (ISTS-I)

2000 MW ISTS Vill-Ettayapuram, Dist.- 8 Arina Solar Private Limited 250.00 Solar Connected Solar PV Tamil Nadu Thoothukudi, Tamilnadu Projects (ISTS-I)

3000 MW ISTS Village-Sanwara, Tehsil- 9 ACME Deoghar Solar Power Pvt. Ltd. 300.00 Solar Connected Solar PV Rajasthan Pokhran, Dist.-Jaisalmer, Projects (ISTS-II) Rajasthan

3 Status of Underconstruction Solar Power Projects Physical attributes S-NO SPV/ Parent/ Holding Company Capacity (MW) Type Bidding Scheme State Project Location (Name of Project Company/ SPD)

3000 MW ISTS Village-Sanwara, Tehsil- 10 ACME Dhaulpur Powertech Pvt. Ltd. 300.00 Solar Connected Solar PV Rajasthan Pokhran, Dist.-Jaisalmer, Projects (ISTS-II) Rajasthan

1200 MW ISTS Vill: Lalsar & Hapasar, Tehsil: SBSR Power Cleantech Eleven Pvt. 11 300.00 Solar Connected Projects Rajasthan Bikaner, Dist: Bikaner, State Ltd. (ISTS-III) Rajasthan

1200 MW ISTS Vill: Mandhopura, Tehsil: ReNew Sun Waves Pvt. 12 300.00 Solar Connected Projects Rajasthan Fatehgarh, Dist: Jaisalmer, Ltd. (ISTS-III) State Rajasthan

1200 MW ISTS Vill: Sanawara/Sunawara, Eden Renewable Cite Pvt. 13 300.00 Solar Connected Projects Rajasthan Tehsil: Pokhran, Dist: Ltd. (ISTS-III) Jaisalmer, State Rajasthan

1200 MW ISTS Vill: Noore Ki Bhurj, Tehsil: 14 Azure Power Forty One Pvt. Ltd. 300.00 Solar Connected Projects Rajasthan Bap, Dist:Jodhpur Rajasthan (ISTS-III)

1200 MW ISTS Ayana Renewable Power One Pvt. Vill: Khichiya, Bikaner Dist., 15 300.00 Solar Connected Projects Rajasthan Ltd. Rajasthan (ISTS-IV)

Renew Solar Energy (Jharkhand 1200 MW ISTS Vil: Mandhopura, Tehsil: 16 Three) Pvt. 300.00 Solar Connected Projects Rajasthan Fatehgarh, Dist Jaisalmer, Ltd. (ISTS-IV) Rajasthan

Vill: Sonanda, Shekhar, 1200 MW ISTS Azure Power Maple Pvt. Bandhari & Kesarapura 17 300.00 Solar Connected Projects Rajasthan Ltd. Teshsil: Bap, Dist. Jodhpur, (ISTS-IV) Rajasthan

1200 MW ISTS Connected 18 Mega SuryaUrja Pvt. Ltd. 250.00 Solar Rajasthan Jodhpur Dist., Rajasthan Projects (ISTS-IV)

4 Status of Underconstruction Solar Power Projects Physical attributes S-NO SPV/ Parent/ Holding Company Capacity (MW) Type Bidding Scheme State Project Location (Name of Project Company/ SPD)

Taluka: Ettayapuram, 1200 MW ISTS Connected 19 GRT Jewellers (India) Pvt. Ltd. 150.00 Solar Tamil Nadu Kayathar, District: Projects (ISTS-V) Thoothukkudi, Tamil Nadu

Village: Ugraas, Nagnechi 1200 MW ISTS Connected nagar and Dadhu, Tehsil: 20 SBE Renewables Sixteen Pvt. Ltd. 150.00 Solar Rajasthan Projects (ISTS-V) Phalodi, District: Jodhpur, State: Rajasthan

Village: Lakhasar, Tehsil: 1200 MW ISTS Connected 21 SBE Renewables Sixteen Pvt. Ltd. 180.00 Solar Rajasthan Pokhran, District: Jaisalmer, Projects (ISTS-V) State: Rajasthan

1200 MW ISTS Village: Noorsar, Tehsil: Avaada Sustainable RJProject 22 300.00 Solar Connected Projects Rajasthan Bikaner in Bikaner, Private Limited (ISTS-VI) Rajasthan

1200 MW ISTS Masaya Solar Energy 23 300.00 Solar Connected Projects Madhya Pradesh Khandwa, Madhya Pradesh Private Limited (ISTS-VI)

1200 MW ISTS Village Mandhopura, Tehsil 24 ReNew Solar Urja Private Limited 300.00 Solar Connected Projects Rajasthan Fatehgarh, District Jaisalmer, (ISTS-VI) State Rajasthan

1200 MW ISTS Vill: Mandali, Tehsil: Bap, Dist: 25 SBE Renewables Fifteen Pvt. Ltd. 300.00 Solar Connected Projects Rajasthan Jodhpur, Rajasthan (ISTS-VIII)

1200 MW ISTS Vill: Badi Sid, Tehsil:Bap, 26 SBE Renewables Fifteen Pvt. Ltd. 300.00 Solar Connected Projects Rajasthan Dist: Jpdhpur, Rajasthan (ISTS-VIII)

1200 MW ISTS Vill: Ekalpar, Tehsil: Sam, Dist: 27 AMP Energy Green Pvt. Ltd. 100.00 Solar Connected Projects Rajasthan Jaisalmer, Rajasthan (ISTS-VIII)

5 Status of Underconstruction Solar Power Projects Physical attributes S-NO SPV/ Parent/ Holding Company Capacity (MW) Type Bidding Scheme State Project Location (Name of Project Company/ SPD)

1200 MW ISTS Kansingh ki Sir (Sid), Tehsil: 28 Eden Renewable Alma Pvt. Ltd. 300.00 Solar Connected Projects Rajasthan Bap, Dist: Jodhpur, (ISTS-VIII) Rajasthan

1200 MW ISTS Vill: Mandhopura, Tehsil: 29 ReNew Solar Power Pvt. Ltd. 200.00 Solar Connected Projects Rajasthan Fatehgarh, Dist: Jaisalmer, (ISTS-VIII) State Rajasthan

Village: Badi Seed & Ranjeet 2000 MW ISTS Connected Nagar, 30 AMP Energy Green Pvt. Ltd. 100.00 Solar Rajasthan Projects (ISTS-IX) Tehsil: Bap, Distt: Jodhpur State: Rajasthan

2000 MW ISTS Connected Vill: Dholera 1, Jamsar, Dist: 31 Avikiran Surya India Pvt. Ltd. 300.00 Solar Rajasthan Projects (ISTS-IX) Bikaner, Rajasthan

2000 MW ISTS Connected 32 Ayana Renewable Power Pvt Ltd 300.00 Solar Rajasthan Bikaner District, Rajasthan Projects (ISTS-IX)

2000 MW ISTS Vill: Pusar/Pushad, Tehsil: 33 Eden Renewable Bercy Pvt. Ltd. 300.00 Solar Connected Projects Rajasthan Sheo, Barmer, Rajasthan (ISTS-IX)

Jaisalmer (near villages 2000 MW ISTS Connected Neemba, Deora), Tehsil: 34 IB Vogt Singapore Pte Ltd 300.00 Solar Rajasthan Projects (ISTS-IX) Fatehgarh, Distt: Jaisalmer, State: Rajasthan

Village - Neebma, Tehsil - 2000 MW ISTS Connected 35 ReNew Solar Power Pvt. Ltd. 300.00 Solar Rajasthan Fatehgarh, Dist. - Jaisalmer, Projects (ISTS-IX) State - Rajasthan

Village - Neebma, Tehsil - 2000 MW ISTS Connected 36 ReNew Solar Power Pvt. Ltd. 100.00 Solar Rajasthan Fatehgarh, Dist. - Jaisalmer, Projects (ISTS-IX) State - Rajasthan

6 Status of Underconstruction Solar Power Projects Physical attributes S-NO SPV/ Parent/ Holding Company Capacity (MW) Type Bidding Scheme State Project Location (Name of Project Company/ SPD)

Solarpack Corporacion Technologica 2000 MW ISTS Connected Vill: Bari Seer, Tehsil: Baap, 37 300.00 Solar Rajasthan S.A Projects (ISTS-IX) Dist: Jodhpur, Rajasthan

Vill: Bhainsara, Tehsil: ACME Aklera Power Technology Pvt. 750 MW Rajasthan 38 250.00 Solar Rajasthan Bhaniyana, Dist: Jaisalmer, Ltd (Tranche-I) State Rajasthan

Vill: Bainsada , Tehsil: Fortum Solar Plus Pvt. 750 MW Rajasthan 39 250.00 Solar Rajasthan Pokhran, Dist: Jaisalmer, State Ltd. (Tranche-I) Rajasthan

Vill: Bhainsara, Tehsil: ReNew Solar Energy (Jharkhand 750 MW Rajasthan 40 110.00 Solar Rajasthan Fatehgarh, Dist: Jaisalmer, Five) Pvt. Ltd (Tranche-I) State Rajasthan

Sitara Solar Energy Pvt. 750 MW Rajasthan Vill: Kanasar, Tehsil: Bap, Dist: 41 100.00 Solar Rajasthan Ltd. (Tranche-I) Jodhpur, State Rajasthan

Vill: Hariyasar, Tehsil: 750 MW Rajasthan 42 Palimarwar Solar House Pvt. Ltd. 20.00 Solar Rajasthan Pokhran, Dist: Jaisalmer, State (Tranche-I) Rajasthan

Vill: Hariyasar, Tehsil: 750 MW Rajasthan 43 Palimarwar Solar House Pvt. Ltd. 20.00 Solar Rajasthan Pokhran, Dist: Jaisalmer, State (Tranche-I) Rajasthan

750 MW Rajasthan Vill: Jetsar, Dist. Sri Ganga 44 NTPC Limited 160.00 Solar Rajasthan (Tranche-II) Nagar, Rajasthan

750 MW Rajasthan 45 - 200.00 Solar Rajasthan Bikaner Dist. Rajasthan (Tranche-II)

7 Status of Underconstruction Solar Power Projects Physical attributes S-NO SPV/ Parent/ Holding Company Capacity (MW) Type Bidding Scheme State Project Location (Name of Project Company/ SPD)

Vill: Bhainsada, Clean Solar Power (BHAINSADA) 750 MW Rajasthan Amarsar/Balwantgarh, Tehsil: 46 250.00 Solar Rajasthan Pvt. Ltd. (Tranche-II) Bhaniyana, Dist: Jaisalmer, Rajasthan

150 MW Grid Rihand Dam, Sonbhadra Dist. 47 Auxo Sunlight Pvt. Ltd. 50.00 Solar Connected Floating Uttar Pradesh UP Solar PV Plants

150 MW Grid ReNew Sun Power Pvt. Rihand Dam, Sonbhadra Dist. 48 50.00 Solar Connected Floating Uttar Pradesh Ltd. UP Solar PV Plants

150 MW Grid Rihan Floating Solar Pvt. Rihand Dam, Sonbhadra Dist. 49 50.00 Solar Connected Floating Uttar Pradesh Ltd. UP Solar PV Plants

750 MW Kadapa 50 SB Energy Seven Pvt Ltd. 250.00 Solar Solar Park (5000 MW Andhra Pradesh Kadapa Solar Park VGF Scheme)

750 MW Kadapa 51 Sprng Soura Kiran Vidyut Pvt Ltd. 250.00 Solar Solar Park (5000 MW Andhra Pradesh Kadapa Solar Park VGF Scheme)

750 MW Kadapa 52 Ayana Renewable Power Pvt. Ltd. 250.00 Solar Solar Park (5000 MW Andhra Pradesh Kadapa Solar Park VGF Scheme)

CPSU Scheme 53 NTPC Limited 769.00 Solar (Tranche-I, 2000 Any where in India MW)

CPSU Scheme 54 NHDC LTD 25.00 Solar (Tranche-I, 2000 Madhya Pradesh Madhya pradesh MW)

8 Status of Underconstruction Solar Power Projects Physical attributes S-NO SPV/ Parent/ Holding Company Capacity (MW) Type Bidding Scheme State Project Location (Name of Project Company/ SPD)

CPSU Scheme The singareni Collieries Company 55 90.00 Solar (Tranche-I, 2000 Various of Areas of SCCL limited MW)

CPSU Scheme Lower Assam zone, 2. Central Assam power Distribution Company 56 30.00 Solar (Tranche-I, 2000 Assam Assam Zone,3 cachar,karimga Limited MW) nj, Hailakandi Assam

CPSU Scheme Metro Station Depots etc.of 57 Delhi Metro Rail Corporation Limited 3.00 Solar (Tranche-I, 2000 Delhi DMRC, Delhi MW)

CPSU Scheme 58 Nalanda University 5.00 Solar (Tranche-I, 2000 Bihar Nalanda University, Rajgir MW)

CPSU Scheme 59 NTPC Limited 923.00 Solar (Tranche-II, 1500 Any where in India MW)

CPSU Scheme The Singareni Collieries Company 60 81.00 Solar (Tranche-II, 1500 Various of Areas of SCCL Limited MW)

Yaswnath Sagar Dam CPSU Scheme Reservoir,Hatod Village, 61 Indore Municipal Corporation 100.00 Solar (Tranche-II, 1500 Madhya Pradesh Indore District,madhya MW) pradesh

9 Status of Underconstruction Solar Power Projects Physical Progress S- SPV/ Parent/ Holding Bidding Scheme Original Revised Scheduled/E Financial Land Plant material Plant NO Company (Name of Scheduled Scheduled xtended FC Closure Acquisition order Erection Project Company/ Commissioning Commisioning Date status SPD) Date Date

2000 MW ISTS Mahindra Renewables Under 1 Connected Solar PV 25-Oct-20 31-Jan-21 25-May-19 Achieved completed completed Private Limited Progress Projects (ISTS-I)

Kilaj Solar 2000 MW ISTS 2 (Maharashtra) Pvt. Connected Solar PV 25-Oct-20 25-Jul-20 25-May-19 Achieved Ltd Projects (ISTS-I)

ACME Raisar Solar 2000 MW ISTS 3 Energy Private Connected Solar PV 25-Oct-20 24-Dec-21 25-May-19 Achieved Limited Projects (ISTS-I)

ACME Phalodi Solar 2000 MW ISTS 4 Energy Private Connected Solar PV 25-Oct-20 24-Dec-21 25-May-19 Achieved Limited Projects (ISTS-I)

2000 MW ISTS Azure Power Forty 5 Connected Solar PV 25-Oct-20 31-Jan-21 25-May-19 Achieved Three Private Limited Projects (ISTS-I)

2000 MW ISTS Azure Power Forty 6 Connected Solar PV 25-Oct-20 31-Jan-21 25-May-19 Achieved Three Private Limited Projects (ISTS-I)

2000 MW ISTS Clean Solar Power 7 Connected Solar PV 25-Oct-20 31-Jan-21 25-May-19 Achieved (Jodhpur) Pvt. Ltd Projects (ISTS-I)

2000 MW ISTS Arina Solar Private 8 Connected Solar PV 25-Oct-20 31-Jan-21 25-May-19 Achieved Limited Projects (ISTS-I)

3000 MW ISTS ACME Deoghar Solar 9 Connected Solar PV 8-Nov-20 07-Jan-22 06-Jan-21 Power Pvt. Ltd. Projects (ISTS-II)

10 Status of Underconstruction Solar Power Projects Physical Progress S- SPV/ Parent/ Holding Bidding Scheme Original Revised Scheduled/E Financial Land Plant material Plant NO Company (Name of Scheduled Scheduled xtended FC Closure Acquisition order Erection Project Company/ Commissioning Commisioning Date status SPD) Date Date

3000 MW ISTS ACME Dhaulpur 10 Connected Solar PV 8-Nov-20 07-Jan-22 06-Jan-21 Powertech Pvt. Ltd. Projects (ISTS-II)

SBSR Power 1200 MW ISTS Under Under Under 11 Cleantech Eleven Pvt. Connected Projects 3-Dec-20 11-Apr-21 09-Oct-20 Under Progress Progress Progress Progress Ltd. (ISTS-III)

ReNew Sun Waves 1200 MW ISTS 12 Pvt. Connected Projects 3-Dec-20 28-Mar-21 26-Sep-20 Ltd. (ISTS-III)

Eden Renewable Cite 1200 MW ISTS 13 Pvt. Connected Projects 3-Dec-20 01-Apr-21 30-Sep-20 Ltd. (ISTS-III)

1200 MW ISTS Azure Power Forty 14 Connected Projects 3-Dec-20 07-Jun-21 09-Dec-20 One Pvt. Ltd. (ISTS-III)

1200 MW ISTS Ayana Renewable Under Under Not 15 Connected Projects 23-Apr-21 30-Jul-21 29-Jan-21 completed Power One Pvt. Ltd. Progress Progress started (ISTS-IV)

Renew Solar Energy 1200 MW ISTS (Jharkhand Three) Under Under Not 16 Connected Projects 23-Apr-21 30-Jul-21 29-Jan-21 Under Progress Pvt. Progress Progress started (ISTS-IV) Ltd.

Azure Power Maple 1200 MW ISTS 17 Pvt. Connected Projects 23-Apr-21 30-Jul-21 29-Jan-21 Ltd. (ISTS-IV)

1200 MW ISTS Mega SuryaUrja Pvt. Under Under 18 Connected Projects 23-Apr-21 01-Jan-22 01-Jul-21 Under Progress NA Ltd. Progress Progress (ISTS-IV)

11 Status of Underconstruction Solar Power Projects Physical Progress S- SPV/ Parent/ Holding Bidding Scheme Original Revised Scheduled/E Financial Land Plant material Plant NO Company (Name of Scheduled Scheduled xtended FC Closure Acquisition order Erection Project Company/ Commissioning Commisioning Date status SPD) Date Date

1200 MW ISTS GRT Jewellers (India) 19 Connected Projects 27-Jun-21 17-Nov-21 20-May-21 Pvt. Ltd. (ISTS-V)

1200 MW ISTS SBE Renewables Under Under Under 20 Connected Projects 27-Jun-21 17-Nov-21 20-May-21 Under Progress Sixteen Pvt. Ltd. Progress Progress Progress (ISTS-V)

1200 MW ISTS SBE Renewables Under Under Under 21 Connected Projects 27-Jun-21 17-Nov-21 20-May-21 Under Progress Sixteen Pvt. Ltd. Progress Progress Progress (ISTS-V)

Avaada Sustainable 1200 MW ISTS 22 RJProject Private Connected Projects 11-Nov-21 11-May-21 Limited (ISTS-VI)

1200 MW ISTS Masaya Solar Energy 23 Connected Projects 11-Nov-21 11-May-21 Private Limited (ISTS-VI)

1200 MW ISTS ReNew Solar Urja 24 Connected Projects 11-Nov-21 11-May-21 Private Limited (ISTS-VI)

1200 MW ISTS SBE Renewables Under Under Not 25 Connected Projects 6-Jan-22 6-Jan-22 NA Not Started Fifteen Pvt. Ltd. Process Process Started (ISTS-VIII)

1200 MW ISTS SBE Renewables Under Under Not 26 Connected Projects 6-Jan-22 6-Jan-22 NA Not Started Fifteen Pvt. Ltd. Process Process Started (ISTS-VIII)

12 Status of Underconstruction Solar Power Projects Physical Progress S- SPV/ Parent/ Holding Bidding Scheme Original Revised Scheduled/E Financial Land Plant material Plant NO Company (Name of Scheduled Scheduled xtended FC Closure Acquisition order Erection Project Company/ Commissioning Commisioning Date status SPD) Date Date

1200 MW ISTS AMP Energy Green 27 Connected Projects Pvt. Ltd. (ISTS-VIII) PPA & PSA yet to be executed 1200 MW ISTS Eden Renewable Alma 28 Connected Projects Pvt. Ltd. (ISTS-VIII)

1200 MW ISTS ReNew Solar Power 29 Connected Projects Pvt. Ltd. (ISTS-VIII)

2000 MW ISTS AMP Energy Green 30 Connected Projects Pvt. Ltd. (ISTS-IX) PPA & PSA yet to be executed 2000 MW ISTS Avikiran Surya India 31 Connected Projects Pvt. Ltd. (ISTS-IX)

2000 MW ISTS Ayana Renewable 32 Connected Projects Power Pvt Ltd (ISTS-IX) PPA & PSA yet to be executed 2000 MW ISTS Eden Renewable 33 Connected Projects Bercy Pvt. Ltd. (ISTS-IX)

2000 MW ISTS IB Vogt Singapore Pte 34 Connected Projects PPA & PSA yet to be executed Ltd (ISTS-IX)

13 Status of Underconstruction Solar Power Projects Physical Progress S- SPV/ Parent/ Holding Bidding Scheme Original Revised Scheduled/E Financial Land Plant material Plant NO Company (Name of Scheduled Scheduled xtended FC Closure Acquisition order Erection Project Company/ Commissioning Commisioning Date status SPD) Date Date

2000 MW ISTS ReNew Solar Power 35 Connected Projects Pvt. Ltd. (ISTS-IX)

2000 MW ISTS ReNew Solar Power 36 Connected Projects PPA & PSA yet to be executed Pvt. Ltd. (ISTS-IX)

Solarpack 2000 MW ISTS 37 Corporacion Connected Projects Technologica S.A (ISTS-IX)

ACME Aklera Power 750 MW Rajasthan 38 2-Dec-20 10-Mar-21 08-Sep-20 8-Sep-20 Technology Pvt. Ltd (Tranche-I)

Fortum Solar Plus Pvt. 750 MW Rajasthan 39 2-Dec-20 10-Mar-21 08-Sep-20 8-Sep-20 Ltd. (Tranche-I)

ReNew Solar Energy 750 MW Rajasthan 40 (Jharkhand Five) Pvt. 2-Dec-20 10-Mar-21 08-Sep-20 8-Sep-20 (Tranche-I) Ltd

Sitara Solar Energy 750 MW Rajasthan 41 Pvt. 2-Dec-20 10-Mar-21 08-Sep-20 8-Sep-20 (Tranche-I) Ltd.

Palimarwar Solar 750 MW Rajasthan 42 2-Dec-20 10-Mar-21 08-Sep-20 8-Sep-20 House Pvt. Ltd. (Tranche-I)

Palimarwar Solar 750 MW Rajasthan 43 2-Dec-20 10-Mar-21 08-Sep-20 8-Sep-20 House Pvt. Ltd. (Tranche-I)

14 Status of Underconstruction Solar Power Projects Physical Progress S- SPV/ Parent/ Holding Bidding Scheme Original Revised Scheduled/E Financial Land Plant material Plant NO Company (Name of Scheduled Scheduled xtended FC Closure Acquisition order Erection Project Company/ Commissioning Commisioning Date status SPD) Date Date

750 MW Rajasthan 44 NTPC Limited 16-Apr-21 23-Jul-21 22-Jan-21 22-Jan-21 (Tranche-II)

750 MW Rajasthan 45 - 16-Apr-21 23-Jul-21 22-Jan-21 22-Jan-21 (Tranche-II)

Clean Solar Power 750 MW Rajasthan 46 (BHAINSADA) Pvt. 16-Apr-21 23-Jul-21 22-Jan-21 22-Jan-21 (Tranche-II) Ltd.

150 MW Grid Auxo Sunlight Pvt. 47 Connected Floating 3-Sep-21 10-Dec-21 11-Mar-20 11-Mar-20 Ltd. Solar PV Plants

ReNew Sun Power 150 MW Grid 48 Pvt. Connected Floating 3-Sep-21 10-Dec-21 11-Mar-20 11-Mar-20 Ltd. Solar PV Plants

Rihan Floating Solar 150 MW Grid 49 Pvt. Connected Floating 3-Sep-21 10-Dec-21 11-Mar-20 11-Mar-20 Ltd. Solar PV Plants

750 MW Kadapa Not handed SB Energy Seven Pvt Not 50 Solar Park (5000 29-Jun-20 29-Jun-20 29-Sep-19 over by NA NA Ltd. Complied MW VGF Scheme) ASPCL

750 MW Kadapa Not handed Sprng Soura Kiran Not 51 Solar Park (5000 29-Jun-20 29-Jun-20 29-Sep-19 over by NA NA Vidyut Pvt Ltd. Complied MW VGF Scheme) ASPCL

750 MW Kadapa Not handed Ayana Renewable Not 52 Solar Park (5000 29-Jun-20 29-Jun-20 29-Sep-19 over by NA NA Power Pvt. Ltd. Complied MW VGF Scheme) ASPCL

15 Status of Underconstruction Solar Power Projects Physical Progress S- SPV/ Parent/ Holding Bidding Scheme Original Revised Scheduled/E Financial Land Plant material Plant NO Company (Name of Scheduled Scheduled xtended FC Closure Acquisition order Erection Project Company/ Commissioning Commisioning Date status SPD) Date Date

CPSU Scheme Not 53 NTPC Limited (Tranche-I, 2000 28-Sep-21 04-Jan-22 Not Started started MW)

CPSU Scheme Not 54 NHDC LTD (Tranche-I, 2000 28-Sep-21 04-Jan-22 Not Started started MW)

The singareni CPSU Scheme Not 55 Collieries Company (Tranche-I, 2000 28-Sep-21 04-Jan-22 Not Started started limited MW)

Assam power CPSU Scheme Not 56 Distribution Company (Tranche-I, 2000 28-Sep-21 04-Jan-22 Not Started started Limited MW)

CPSU Scheme Delhi Metro Rail Not 57 (Tranche-I, 2000 28-Sep-21 04-Jan-22 Not Started Corporation Limited started MW)

CPSU Scheme Not 58 Nalanda University (Tranche-I, 2000 28-Sep-21 04-Jan-22 Not Started started MW)

CPSU Scheme Not 59 NTPC Limited (Tranche-II, 1500 25-Nov-21 03-Mar-22 Not Started started MW)

The Singareni CPSU Scheme Not 60 Collieries Company (Tranche-II, 1500 25-Nov-21 03-Mar-22 Not Started started Limited MW)

CPSU Scheme Indore Municipal Not 61 (Tranche-II, 1500 25-Nov-21 03-Mar-22 Not Started Corporation started MW)

16 Status of Underconstruction Solar Power Projects Commercial Details S- SPV/ Parent/ Holding Bidding Scheme Date of Letter Bidder's Name Bidding PPA PSA (End Tariff / NO Company (Name of of Award (LOA) Agency Consumer) Original PPA Project Company/ (Center/ Tariff SPD) State/ (INR/kWh) Others) 2000 MW ISTS Mahindra Renewables Mahindra Sustem Pvt. Chattisgarh 1 Connected Solar PV 27-Jul-18 SECI 25-Oct-18 2.53 Private Limited Ltd. (250MW) Projects (ISTS-I) 2000 MW ISTS Kilaj Solar Mahoba Solar (UP) Pvt. Delhi BYPL 2 Connected Solar PV 27-Jul-18 SECI 25-Oct-18 2.54 (Maharashtra) Pvt. Ltd Ltd. (50MW) Projects (ISTS-I) 2000 MW ISTS ACME Raisar Solar ACME Solar Holdings 3 Connected Solar PV 27-Jul-18 SECI 25-Oct-18 Delhi (300 MW) 2.44 Energy Private Limited Limited Projects (ISTS-I) 2000 MW ISTS ACME Phalodi Solar ACME Solar Holdings 4 Connected Solar PV 27-Jul-18 SECI 25-Oct-18 Delhi (300 MW) 2.44 Energy Private Limited Limited Projects (ISTS-I) 2000 MW ISTS Jharkhand, Azure Power Forty Azure Power India 5 Connected Solar PV 27-Jul-18 SECI 25-Oct-18 Odisha , 2.53 Three Private Limited Private Limited Projects (ISTS-I) Haryana 2000 MW ISTS Jharkhand, Azure Power Forty Azure Power India 6 Connected Solar PV 27-Jul-18 SECI 25-Oct-18 Odisha , 2.53 Three Private Limited Private Limited Projects (ISTS-I) Haryana 2000 MW ISTS Clean Solar Power Hero Solar Energy jharkhand 7 Connected Solar PV 27-Jul-18 SECI 25-Oct-18 2.53 (Jodhpur) Pvt. Ltd Private Limited (250MW) Projects (ISTS-I) 2000 MW ISTS Shapoorji Pallonji Arina Solar Private Jharkhand 8 Connected Solar PV 27-Jul-18 Infrastructure Capital SECI 25-Oct-18 2.52 Limited (250MW) Projects (ISTS-I) Company Private 3000 MW ISTS Bihar , ACME Deoghar Solar ACME Solar Holdings 9 Connected Solar PV 10-Aug-18 SECI 8-Nov-18 Haryana , 2.44 Power Pvt. Ltd. Limited Projects (ISTS-II) Puducherry 3000 MW ISTS Bihar , ACME Dhaulpur ACME Solar Holdings 10 Connected Solar PV 10-Aug-18 SECI 8-Nov-18 Haryana , 2.44 Powertech Pvt. Ltd. Limited Projects (ISTS-II) Puducherry 1200 MW ISTS Delhi SBSR Power Cleantech SBSR Power Cleantech 11 Connected Projects 5-Mar-19 SECI 3-Jun-19 BYPL(100MW), 2.61 Eleven Pvt. Ltd. Eleven Pvt. Ltd. (ISTS-III) TPDDL(200MW) 1200 MW ISTS ReNew Solar Energy ReNew Sun Waves Pvt. 12 Connected Projects 5-Mar-19 (Jharkhand Four) Pvt. SECI 3-Jun-19 Bihar(300MW) 2.55 Ltd. (ISTS-III) Ltd. Eden Renewable Cite 1200 MW ISTS Delhi Eden Renewable Cite 13 Pvt. Connected Projects 5-Mar-19 SECI 3-Jun-19 BRPL(250MW), 2.60 Pvt. Ltd. Ltd. (ISTS-III) BYPL(50MW) 1200 MW ISTS Azure Power Forty One Azure Power India Pvt. 14 Connected Projects 5-Mar-19 SECI 3-Jun-19 Odisha(200MW) 2.58 Pvt. Ltd. Ltd. (ISTS-III)

17 Status of Underconstruction Solar Power Projects Commercial Details S- SPV/ Parent/ Holding Bidding Scheme Date of Letter Bidder's Name Bidding PPA PSA (End Tariff / NO Company (Name of of Award (LOA) Agency Consumer) Original PPA Project Company/ (Center/ Tariff SPD) State/ (INR/kWh) Others) 1200 MW ISTS Ayana Renewable Ayana Renewable 15 Connected Projects 25-Jul-19 SECI 23-Oct-19 Not Executed 2.54 Power One Pvt. Ltd. Power Pvt Ltd (ISTS-IV) Renew Solar Energy 1200 MW ISTS ReNew Solar Power Pvt. 16 (Jharkhand Three) Pvt. Connected Projects 25-Jul-19 SECI 23-Oct-19 Not Executed 2.54 Ltd. Ltd. (ISTS-IV) 1200 MW ISTS Azure Power Maple Pvt. Azure Power Maple Pvt. 17 Connected Projects 25-Jul-19 SECI 23-Oct-19 Not Executed 2.54 Ltd. Ltd. (ISTS-IV) 1200 MW ISTS Mega SuryaUrja Pvt. Mahindra Susten Pvt. 18 Connected Projects 25-Jul-19 SECI 23-Oct-19 Not Executed 2.54 Ltd. Ltd. (ISTS-IV) 1200 MW ISTS GRT Jewellers (India) GRT Jewellers (India) 19 Connected Projects 28-Sep-19 SECI 2.53 Pvt. Ltd. Pvt. Ltd. (ISTS-V) 1200 MW ISTS SBE Renewables SBE Renewables Sixteen 20 Connected Projects 28-Sep-19 SECI 2.65 Sixteen Pvt. Ltd. Pvt. Ltd. (ISTS-V) 1200 MW ISTS SBE Renewables SBE Renewables Sixteen 21 Connected Projects 28-Sep-19 SECI 2.65 Sixteen Pvt. Ltd. Pvt. Ltd. (ISTS-V) Avaada Sustainable 1200 MW ISTS 22 RJProject Private Connected Projects 25-Nov-19 Avaada Energy Pvt. Ltd. SECI 2.71 Limited (ISTS-VI) 1200 MW ISTS Masaya Solar Energy Masaya Solar Energy 23 Connected Projects 25-Nov-19 SECI 2.71 Private Limited Pvt. Ltd. (ISTS-VI) 1200 MW ISTS ReNew Solar Urja ReNew Solar Power Pvt. 24 Connected Projects 25-Nov-19 SECI Not Executed Not Executed 2.71 Private Limited Ltd. (ISTS-VI) 1200 MW ISTS SBE Renewables SBE Renewables Fifteen 25 Connected Projects 6-Apr-20 SECI Not Executed Not Executed 2.50 Fifteen Pvt. Ltd. Pvt. Ltd. (ISTS-VIII) 1200 MW ISTS SBE Renewables SBE Renewables Fifteen 26 Connected Projects 6-Apr-20 SECI Not Executed Not Executed 2.50 Fifteen Pvt. Ltd. Pvt. Ltd. (ISTS-VIII) 1200 MW ISTS AMP Energy Green Pvt. AMP Energy Green Pvt. 27 Connected Projects 6-Apr-20 SECI Not Executed Not Executed 2.50 Ltd. Ltd. (ISTS-VIII) 1200 MW ISTS Eden Renewable Alma Eden Renewable Alma 28 Connected Projects 6-Apr-20 SECI Not Executed Not Executed 2.50 Pvt. Ltd. Pvt. Ltd. (ISTS-VIII)

18 Status of Underconstruction Solar Power Projects Commercial Details S- SPV/ Parent/ Holding Bidding Scheme Date of Letter Bidder's Name Bidding PPA PSA (End Tariff / NO Company (Name of of Award (LOA) Agency Consumer) Original PPA Project Company/ (Center/ Tariff SPD) State/ (INR/kWh) Others) 1200 MW ISTS ReNew Solar Power ReNew Solar Power Pvt. 29 Connected Projects 6-Apr-20 SECI Not Executed Not Executed 2.51 Pvt. Ltd. Ltd. (ISTS-VIII) 2000 MW ISTS AMP Energy Green Pvt. AMP Energy Green Pvt. 30 Connected Projects 15-Jul-20 SECI Not Executed Not Executed 2.37 Ltd. Ltd. (ISTS-IX) 2000 MW ISTS Avikiran Surya India Avikiran Surya India 31 Connected Projects 15-Jul-20 SECI Not Executed Not Executed 2.37 Pvt. Ltd. Pvt. Ltd. (ISTS-IX) 2000 MW ISTS Ayana Renewable Ayana Renewable 32 Connected Projects 15-Jul-20 SECI Not Executed Not Executed 2.38 Power Pvt Ltd Power Pvt Ltd (ISTS-IX) 2000 MW ISTS Eden Renewable Bercy Eden Renewable Bercy 33 Connected Projects 15-Jul-20 SECI Not Executed Not Executed 2.37 Pvt. Ltd. Pvt. Ltd. (ISTS-IX) 2000 MW ISTS IB Vogt Singapore Pte IB Vogt Singapore Pte 34 Connected Projects 15-Jul-20 SECI Not Executed Not Executed 2.37 Ltd Ltd (ISTS-IX) 2000 MW ISTS ReNew Solar Power ReNew Solar Power Pvt. 35 Connected Projects SECI Not Executed Not Executed 2.38 Pvt. Ltd. Ltd. (ISTS-IX) 2000 MW ISTS ReNew Solar Power ReNew Solar Power Pvt. 36 Connected Projects 15-Jul-20 SECI Not Executed Not Executed 2.38 Pvt. Ltd. Ltd. (ISTS-IX) 2000 MW ISTS Solarpack Corporacion Solarpack Corporacion 37 Connected Projects 15-Jul-20 SECI Not Executed Not Executed 2.36 Technologica S.A Technologica S.A (ISTS-IX) ACME Aklera Power 750 MW Rajasthan ACME Solar Holdings 38 2-Mar-19 SECI RUVNL 2.48 Technology Pvt. Ltd (Tranche-I) Limited

Fortum Solar Plus Pvt. 750 MW Rajasthan Fortum Solar Plus Pvt. 39 2-Mar-19 SECI RUVNL 2.48 Ltd. (Tranche-I) Ltd. ReNew Solar Energy 750 MW Rajasthan Renew Solar Power Pvt. 40 (Jharkhand Five) Pvt. 2-Mar-19 SECI RUVNL 2.49 (Tranche-I) Ltd. Ltd Sitara Solar Energy Pvt. 750 MW Rajasthan Sitara Solar Energy Pvt. 41 2-Mar-19 SECI RUVNL 2.48 Ltd. (Tranche-I) Ltd.

Palimarwar Solar 750 MW Rajasthan Palimarwar Solar House 42 2-Mar-19 SECI RUVNL 2.48 House Pvt. Ltd. (Tranche-I) Pvt. Ltd.

19 Status of Underconstruction Solar Power Projects Commercial Details S- SPV/ Parent/ Holding Bidding Scheme Date of Letter Bidder's Name Bidding PPA PSA (End Tariff / NO Company (Name of of Award (LOA) Agency Consumer) Original PPA Project Company/ (Center/ Tariff SPD) State/ (INR/kWh) Others)

Palimarwar Solar 750 MW Rajasthan Palimarwar Solar House 43 2-Mar-19 SECI RUVNL 2.48 House Pvt. Ltd. (Tranche-I) Pvt. Ltd.

750 MW Rajasthan 44 NTPC Limited 16-Sep-19 NTPC Limited SECI 2.50 (Tranche-II)

750 MW Rajasthan Mahindra Susten Pvt. 45 - 16-Sep-19 SECI 2.50 (Tranche-II) Ltd.

Clean Solar Power 750 MW Rajasthan Hero Solar Energy Pvt. 46 16-Sep-19 SECI 2.50 (BHAINSADA) Pvt. Ltd. (Tranche-II) Ltd. 150 MW Grid ReNew Solar Power Pvt. 47 Auxo Sunlight Pvt. Ltd. Connected Floating 5-Sep-19 SECI 3.29 Ltd. Solar PV Plants 150 MW Grid ReNew Sun Power Pvt. ReNew Solar Power Pvt. 48 Connected Floating 5-Sep-19 SECI 3.29 Ltd. Ltd. Solar PV Plants Rihan Floating Solar 150 MW Grid Shapoorji Pallonji 49 Pvt. Connected Floating 5-Sep-19 Infrastructure Capital SECI 3.29 Ltd. Solar PV Plants Company Pvt. Ltd. 750 MW Kadapa Andhra Pradesh SB Energy Seven Pvt SB Energy Seven Pvt 50 Solar Park (5000 30-Aug-18 SECI Not Executed APDISCOM (SECI 2.70 Ltd. Ltd. MW VGF Scheme) has written to 750 MW Kadapa Andhra Pradesh Sprng Soura Kiran Sprng Soura Kiran 51 Solar Park (5000 30-Aug-18 SECI Not Executed APDISCOM (SECI 2.70 Vidyut Pvt Ltd. Vidyut Pvt Ltd. MW VGF Scheme) has written to 750 MW Kadapa Andhra Pradesh Ayana Renewable Ayana Renewable 52 Solar Park (5000 30-Aug-18 SECI Not Executed APDISCOM (SECI 2.71 Power Pvt. Ltd. Power Pvt. Ltd. MW VGF Scheme) has written to CPSU Scheme 53 NTPC Limited (Tranche-I, 2000 28-Sep-19 NTPC Limited SECI MW) CPSU Scheme 54 NHDC LTD (Tranche-I, 2000 28-Sep-19 NHDC LTD SECI MW) CPSU Scheme The singareni Collieries The singareni Collieries 55 (Tranche-I, 2000 28-Sep-19 SECI Company limited Company limited MW) Assam power CPSU Scheme Assam power 56 Distribution Company (Tranche-I, 2000 28-Sep-19 Distribution Company SECI Limited MW) Limited

20 Status of Underconstruction Solar Power Projects Commercial Details S- SPV/ Parent/ Holding Bidding Scheme Date of Letter Bidder's Name Bidding PPA PSA (End Tariff / NO Company (Name of of Award (LOA) Agency Consumer) Original PPA Project Company/ (Center/ Tariff SPD) State/ (INR/kWh) Others) CPSU Scheme Delhi Metro Rail Delhi Metro Rail 57 (Tranche-I, 2000 28-Sep-19 SECI Corporation Limited Corporation Limited MW) CPSU Scheme 58 Nalanda University (Tranche-I, 2000 28-Sep-19 Nalanda University SECI MW) CPSU Scheme 59 NTPC Limited (Tranche-II, 1500 25-Nov-19 SECI MW) CPSU Scheme The Singareni Collieries 60 (Tranche-II, 1500 25-Nov-19 SECI Company Limited MW) CPSU Scheme Indore Municipal 61 (Tranche-II, 1500 25-Nov-19 SECI Corporation MW)

21 Status of Underconstruction Solar Power Projects LTA Connectivity

SPV/ Parent/ Holding S- Owner of Company (Name of Project Bidding Scheme Sub-Station Transmission line NO Substation Company/ SPD)

Dedicated connectivity Line:- Mahindra Renewables 2000 MW ISTS Connected 220-kV Bhadla-1 1 PGCIL 220 kV S/C Line (250 MW Private Limited Solar PV Projects (ISTS-I) Substation Solar Power Project Bhadla) Kilaj Solar (Maharashtra) 2000 MW ISTS Connected 220-kV Bhadla-1 2 PGCIL Pvt. Ltd Solar PV Projects (ISTS-I) Substation

ACME Raisar Solar Energy 2000 MW ISTS Connected Fatehgarh-1 PGCIL S/S 3 PGCIL Private Limited Solar PV Projects (ISTS-I) @ 400 kV

ACME Phalodi Solar Energy 2000 MW ISTS Connected Fatehgarh-1 PGCIL S/S 4 PGCIL Private Limited Solar PV Projects (ISTS-I) @ 400 kV

Azure Power Forty Three 2000 MW ISTS Connected 400 kV Bikaner-1 PGCIL 5 PGCIL Private Limited Solar PV Projects (ISTS-I) SS

Azure Power Forty Three 2000 MW ISTS Connected 400 kV Bikaner-1 PGCIL 6 PGCIL Private Limited Solar PV Projects (ISTS-I) SS

Clean Solar Power 2000 MW ISTS Connected Bhadla-1 PGCIL SS @ 7 PGCIL (Jodhpur) Pvt. Ltd Solar PV Projects (ISTS-I) 220 kV 400/220 kV GIS 2000 MW ISTS Connected 8 Arina Solar Private Limited (New) vandanam Village PGCIL Solar PV Projects (ISTS-I) TuticorinTamilnadu 3000 MW ISTS Connected ACME Deoghar Solar Power Fatehgarh-1 PGCIL S/S 9 Solar PV Projects (ISTS- PGCIL Pvt. Ltd. @ 400 kV II) 3000 MW ISTS Connected ACME Dhaulpur Powertech Fatehgarh-1 PGCIL S/S 10 Solar PV Projects (ISTS- PGCIL Pvt. Ltd. @ 400 kV II) SBSR Power Cleantech 1200 MW ISTS Connected 765/400 kV PGCIL 11 PGCIL Eleven Pvt. Ltd. Projects (ISTS-III) S/S Bikaner-1 @ 220 kV

ReNew Sun Waves Pvt. 1200 MW ISTS Connected Fatehgarh-2 PGCIL S/S 12 PGCIL Ltd. Projects (ISTS-III) @ 220 kV

Eden Renewable Cite Pvt. 1200 MW ISTS Connected 13 Fatehgarh-2 PGCIL S/S PGCIL Ltd. Projects (ISTS-III)

Azure Power Forty One Pvt. 1200 MW ISTS Connected 14 Bikaner-1 @ 220 kV PGCIL Ltd. Projects (ISTS-III)

22 Status of Underconstruction Solar Power Projects LTA Connectivity

SPV/ Parent/ Holding S- Owner of Company (Name of Project Bidding Scheme Sub-Station Transmission line NO Substation Company/ SPD)

Ayana Renewable Power 1200 MW ISTS Connected 400 kV Bikaner PGCIL 15 PGCIL Under Construction One Pvt. Ltd. Projects (ISTS-IV) substation Renew Solar Energy Fatehgarh II PGCIL 220 1200 MW ISTS Connected 16 (Jharkhand Three) Pvt. kV Substation, Jaisalmer PGCIL Projects (ISTS-IV) Ltd. Dist., Rajasthan Azure Power Maple Pvt. 1200 MW ISTS Connected 220-kV Bhadla-1 17 PGCIL Ltd. Projects (ISTS-IV) Substation

1200 MW ISTS Connected Bhadla-II PGCIL 18 Mega SuryaUrja Pvt. Ltd. PGCIL Projects (ISTS-IV) Substation at 220 kV

GRT Jewellers (India) Pvt. 1200 MW ISTS Connected 400/220 kV 19 Ltd. Projects (ISTS-V) Tirunelveli S/S

SBE Renewables Sixteen 1200 MW ISTS Connected 765/400/220 kV 20 PGCIL Pvt. Ltd. Projects (ISTS-V) Fatehgarh-II S/S

SBE Renewables Sixteen 1200 MW ISTS Connected 765/400/220 kV 21 PGCIL Pvt. Ltd. Projects (ISTS-V) Fatehgarh-II S/S

Avaada Sustainable 1200 MW ISTS Connected 765/400 kV Bikaner 22 PGCIL Under Progress RJProject Private Limited Projects (ISTS-VI) PGCIL Substation

Masaya Solar Energy 1200 MW ISTS Connected PGCIL 400 kV, 23 PGCIL Private Limited Projects (ISTS-VI) Khandwa, MP Fatehgarh II PGCIL ReNew Solar Urja Private 1200 MW ISTS Connected 24 400kV or 220kV PGCIL Limited Projects (ISTS-VI) Substation, Dist.

23 Status of Underconstruction Solar Power Projects LTA Connectivity

SPV/ Parent/ Holding S- Owner of Company (Name of Project Bidding Scheme Sub-Station Transmission line NO Substation Company/ SPD)

Bhadla-II, 765/400/220 SBE Renewables Fifteen 1200 MW ISTS Connected 25 kV PGCIL NA Pvt. Ltd. Projects (ISTS-VIII) PGCIL GSS SBE Renewables Fifteen 1200 MW ISTS Connected Bhadla-II, 26 PGCIL NA Pvt. Ltd. Projects (ISTS-VIII) 765/400/220 kV 220 kV end of 1200 MW ISTS Connected 27 AMP Energy Green Pvt. Ltd. 220/400/765 kV PGCIL NA Projects (ISTS-VIII) Ramgarh PGCIL Eden Renewable Alma Pvt. 1200 MW ISTS Connected 28 Bhadla-II PGCIL NA Ltd. Projects (ISTS-VIII) Fatehgarh II PGCIL ReNew Solar Power Pvt. 1200 MW ISTS Connected 29 400kV or 220kV PGCIL NA Ltd. Projects (ISTS-VIII) Substation, Dist. 220 kV end of 2000 MW ISTS Connected 30 AMP Energy Green Pvt. Ltd. 220/400/765 kV PGCIL NA Projects (ISTS-IX) Bhadla-II PGCIL Avikiran Surya India Pvt. 2000 MW ISTS Connected 765/400/220 kV SS 31 PGCIL NA Ltd. Projects (ISTS-IX) Bikaner (PGCIL)

Ayana Renewable Power 2000 MW ISTS Connected Bikaner PGCIL 32 PGCIL NA Pvt Ltd Projects (ISTS-IX) substation

Eden Renewable Bercy Pvt. 2000 MW ISTS Connected Fatehgarh-III 33 PGCIL NA Ltd. Projects (ISTS-IX) (Ramgarh) At 220KV 2000 MW ISTS Connected 34 IB Vogt Singapore Pte Ltd Fatehgarh-III PS PGCIL NA Projects (ISTS-IX) (shifted location of 220 kV/400 KV at ReNew Solar Power Pvt. 2000 MW ISTS Connected 35 Fatehgarh III (Changed PGCIL NA Ltd. Projects (ISTS-IX) location 220 kV/400 KV at ReNew Solar Power Pvt. 2000 MW ISTS Connected 36 Fatehgarh III (Changed PGCIL NA Ltd. Projects (ISTS-IX) location Solarpack Corporacion 2000 MW ISTS Connected PGCIL 765/400 kV 37 PGCIL NA Technologica S.A Projects (ISTS-IX) Bhadla II

ACME Aklera Power 750 MW Rajasthan 400/220 kV 38 RVPN Technology Pvt. Ltd (Tranche-I) Jaisalmer II SS RVPN

24 Status of Underconstruction Solar Power Projects LTA Connectivity

SPV/ Parent/ Holding S- Owner of Company (Name of Project Bidding Scheme Sub-Station Transmission line NO Substation Company/ SPD)

Fortum Solar Plus Pvt. 750 MW Rajasthan RVPNL Bainsda 400 KV 39 RVPN Ltd. (Tranche-I) S/S

ReNew Solar Energy 750 MW Rajasthan RVPN Jaisalmer II 400 40 RVPN (Jharkhand Five) Pvt. Ltd (Tranche-I) KV GSS

Sitara Solar Energy Pvt. 750 MW Rajasthan 220/132/33 KV 41 RVPN Ltd. (Tranche-I) Kanasar S/S

Palimarwar Solar House 750 MW Rajasthan 132/33 kv Rajmathai 42 RVPN Pvt. Ltd. (Tranche-I) GSS

Palimarwar Solar House 750 MW Rajasthan 132/33 kv Rajmathai 43 RVPN Pvt. Ltd. (Tranche-I) GSS 132 kV SS at Sri 750 MW Rajasthan 44 NTPC Limited Vijaynagar & RVPN (Tranche-II) Raisingnagar 750 MW Rajasthan 45 - Gajner SS 220 kV RVPN (Tranche-II)

Clean Solar Power 750 MW Rajasthan Jaisalmer-II, 400 kV 46 RVPN (BHAINSADA) Pvt. Ltd. (Tranche-II) GSS

150 MW Grid Connected 47 Auxo Sunlight Pvt. Ltd. - Floating Solar PV Plants

ReNew Sun Power Pvt. 150 MW Grid Connected 48 - Ltd. Floating Solar PV Plants

Rihan Floating Solar Pvt. 150 MW Grid Connected 49 - Ltd. Floating Solar PV Plants 750 MW Kadapa Solar Kadapa Solar Park, 50 SB Energy Seven Pvt Ltd. Park (5000 MW VGF APSPCL Contract not Awarded 220/33 kV pooling s/s Scheme) 750 MW Kadapa Solar Sprng Soura Kiran Vidyut Kadapa Solar Park, 51 Park (5000 MW VGF APSPCL Contract not Awarded Pvt Ltd. 220/33 kV pooling s/s Scheme) 750 MW Kadapa Solar Ayana Renewable Power Kadapa Solar Park, 52 Park (5000 MW VGF APSPCL Contract not Awarded Pvt. Ltd. 220/33 kV pooling s/s Scheme)

25 Status of Underconstruction Solar Power Projects LTA Connectivity

SPV/ Parent/ Holding S- Owner of Company (Name of Project Bidding Scheme Sub-Station Transmission line NO Substation Company/ SPD)

CPSU Scheme (Tranche-I, 53 NTPC Limited 2000 MW)

CPSU Scheme (Tranche-I, 54 NHDC LTD 2000 MW)

The singareni Collieries CPSU Scheme (Tranche-I, 55 Company limited 2000 MW)

Assam power Distribution CPSU Scheme (Tranche-I, 56 Company Limited 2000 MW)

Delhi Metro Rail CPSU Scheme (Tranche-I, 57 Corporation Limited 2000 MW)

CPSU Scheme (Tranche-I, 58 Nalanda University 2000 MW)

CPSU Scheme (Tranche- 59 NTPC Limited II, 1500 MW)

The Singareni Collieries CPSU Scheme (Tranche- 60 Company Limited II, 1500 MW)

Indore Municipal CPSU Scheme (Tranche- 61 Corporation II, 1500 MW)

26 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project EU n d Suitable extension has been 2000 MW ISTS Project timeline has been extended due to delay in Mahindra Renewables e granted in all timeline due to 1 Connected Solar PV readiness of power evacuation infrastructure, LTA RJJOB01 Private Limited r Covid- 19 in line with MNRE OM Projects (ISTS-I) operationalization P dated 30.06.2020 r o

Suitable extension has been 2000 MW ISTS Kilaj Solar granted in all timeline due to 2 Connected Solar PV RJJOB01 (Maharashtra) Pvt. Ltd Covid- 19 in line with MNRE OM Projects (ISTS-I) dated 30.06.2020

Suitable extension has been 2000 MW ISTS Extension of 327 days granted in all timelines of PPA ACME Raisar Solar granted in all timeline due to 3 Connected Solar PV due to due to delay in finalization of ISTS substation RJJAF01 Energy Private Limited Covid- 19 in line with MNRE OM Projects (ISTS-I) location due to stay order by Jodhpur high court. dated 30.06.2020

Suitable extension has been 2000 MW ISTS Extension of 327 days granted in all timelines of PPA ACME Phalodi Solar granted in all timeline due to 4 Connected Solar PV due to due to delay in finalization of ISTS substation RJJAF01 Energy Private Limited Covid- 19 in line with MNRE OM Projects (ISTS-I) location due to stay order by Jodhpur high court. dated 30.06.2020

Suitable extension has been 2000 MW ISTS Project timeline has been extended due to delay in Azure Power Forty granted in all timeline due to 5 Connected Solar PV readiness of power evacuation infrastructure, LTA RJBIB01 Three Private Limited Covid- 19 in line with MNRE OM Projects (ISTS-I) operationalization. dated 30.06.2020 Suitable extension has been 2000 MW ISTS Project timeline has been extended due to delay in Azure Power Forty granted in all timeline due to 6 Connected Solar PV readiness of power evacuation infrastructure, LTA RJBIB01 Three Private Limited Covid- 19 in line with MNRE OM Projects (ISTS-I) operationalization. dated 30.06.2020

Suitable extension has been 2000 MW ISTS Project timeline has been extended due to delay in Clean Solar Power granted in all timeline due to 7 Connected Solar PV readiness of power evacuation infrastructure, LTA RJJOB01 (Jodhpur) Pvt. Ltd Covid- 19 in line with MNRE OM Projects (ISTS-I) operationalization. dated 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 27 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E 2000 MW ISTS Extension in all timeline has been Arina Solar Private 8 Connected Solar PV granted due to Covid-19 in line TNTUV01 Limited Projects (ISTS-I) with MNRE OM dated 30.06.2020

3000 MW ISTS Extension of 327 days granted in all timelines of PPA Extension in all timeline has been ACME Deoghar Solar 9 Connected Solar PV due to due to delay in finalization of ISTS substation granted due to Covid-19 in line RJJAF01 Power Pvt. Ltd. Projects (ISTS-II) location due to stay order by Jodhpur high court. with MNRE OM dated 30.06.2020

3000 MW ISTS Extension of 327 days granted in all timelines of PPA Extension in all timeline has been ACME Dhaulpur 10 Connected Solar PV due to due to delay in finalization of ISTS substation granted due to Covid-19 in line RJJAF01 Powertech Pvt. Ltd. Projects (ISTS-II) location due to stay order by Jodhpur high court. with MNRE OM dated 30.06.2020

U n1200 MW ISTS Extension in all timeline has been SBSR Power Cleantech 11 dConnected Projects granted due to Covid-19 in line RJBIB01 Eleven Pvt. Ltd. e(ISTS-III) with MNRE OM dated 30.06.2020 r 1200 MW ISTS Extension in all timeline has been ReNew Sun Waves Pvt. 12 Connected Projects granted due to Covid-19 in line RJJAF02 Ltd. (ISTS-III) with MNRE OM dated 30.06.2020

Eden Renewable Cite 1200 MW ISTS Extension in all timeline has been 13 Pvt. Connected Projects granted due to Covid-19 in line RJJAF02 Ltd. (ISTS-III) with MNRE OM dated 30.06.2020

1200 MW ISTS Extension in all timeline has been Azure Power Forty One 14 Connected Projects granted due to Covid-19 in line RJBIB01 Pvt. Ltd. (ISTS-III) with MNRE OM dated 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 28 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project EN o t s 1200 MW ISTS Extension in all timeline has been Ayana Renewable t 15 Connected Projects granted due to Covid-19 in line RJBIB02 Power One Pvt. Ltd. a (ISTS-IV) with MNRE OM dated 30.06.2020 r t e d N Renew Solar Energy o1200 MW ISTS Extension in all timeline has been 16 (Jharkhand Three) Pvt. tConnected Projects granted due to Covid-19 in line RJJAF02 Ltd. s(ISTS-IV) with MNRE OM dated 30.06.2020 t

1200 MW ISTS Extension in all timeline has been Azure Power Maple Pvt. 17 Connected Projects granted due to Covid-19 in line RJJOB01 Ltd. (ISTS-IV) with MNRE OM dated 30.06.2020

1200 MW ISTS Extension in all timeline has been Mega SuryaUrja Pvt. N 18 Connected Projects granted due to Covid-19 in line RJJOB02 Ltd. A (ISTS-IV) with MNRE OM dated 30.06.2020

1200 MW ISTS Extension in all timeline has been GRT Jewellers (India) 19 Connected Projects granted due to Covid-19 in line TNTI01 Pvt. Ltd. (ISTS-V) with MNRE OM dated 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 29 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project EU n d e r P1200 MW ISTS Extension in all timeline has been SBE Renewables 20 rConnected Projects granted due to Covid-19 in line RJJAF02 Sixteen Pvt. Ltd. o(ISTS-V) with MNRE OM dated 30.06.2020 g r e s s U n d e r P1200 MW ISTS Extension in all timeline has been SBE Renewables 21 rConnected Projects granted due to Covid-19 in line RJJAF02 Sixteen Pvt. Ltd. o(ISTS-V) with MNRE OM dated 30.06.2020 g r e s s

Avaada Sustainable 1200 MW ISTS 22 RJProject Private Connected Projects PPA Yet to be executed NA RJBIB02 Limited (ISTS-VI)

1200 MW ISTS Masaya Solar Energy 23 Connected Projects PPA Yet to be executed NA MPKHK01 Private Limited (ISTS-VI)

* Details available at C. Detailes of Associated Transmission Network 30 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E

1200 MW ISTS ReNew Solar Urja 24 Connected Projects PPA Yet to be executed NA RJJAF02 Private Limited (ISTS-VI)

N o t S 1200 MW ISTS SBE Renewables t 25 Connected Projects PPA & PSA yet to be executed NA RJJOB02 Fifteen Pvt. Ltd. a (ISTS-VIII) r t e d N o t S 1200 MW ISTS SBE Renewables t 26 Connected Projects PPA & PSA yet to be executed NA RJJOB02 Fifteen Pvt. Ltd. a (ISTS-VIII) r t e d

1200 MW ISTS AMP Energy Green Pvt. 27 Connected Projects PPA & PSA yet to be executed NA RJJAR01 Ltd. (ISTS-VIII)

1200 MW ISTS Eden Renewable Alma 28 Connected Projects PPA & PSA yet to be executed NA RJJOB02 Pvt. Ltd. (ISTS-VIII)

* Details available at C. Detailes of Associated Transmission Network 31 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E

1200 MW ISTS ReNew Solar Power 29 Connected Projects PPA & PSA yet to be executed NA RJJAF02 Pvt. Ltd. (ISTS-VIII)

2000 MW ISTS AMP Energy Green Pvt. 30 Connected Projects PPA & PSA yet to be executed NA RJJOB02 Ltd. (ISTS-IX)

2000 MW ISTS Avikiran Surya India 31 Connected Projects PPA & PSA yet to be executed NA RJBIB02 Pvt. Ltd. (ISTS-IX)

2000 MW ISTS Ayana Renewable 32 Connected Projects PPA & PSA yet to be executed NA RJBIB02 Power Pvt Ltd (ISTS-IX)

2000 MW ISTS Eden Renewable Bercy 33 Connected Projects PPA & PSA yet to be executed NA RJJAF03 Pvt. Ltd. (ISTS-IX)

2000 MW ISTS IB Vogt Singapore Pte 34 Connected Projects PPA & PSA yet to be executed NA RJJAF03 Ltd (ISTS-IX)

* Details available at C. Detailes of Associated Transmission Network 32 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E

2000 MW ISTS ReNew Solar Power 35 Connected Projects PPA & PSA yet to be executed NA RJJAF03 Pvt. Ltd. (ISTS-IX)

2000 MW ISTS ReNew Solar Power 36 Connected Projects PPA & PSA yet to be executed NA RJJAF03 Pvt. Ltd. (ISTS-IX)

2000 MW ISTS Solarpack Corporacion 37 Connected Projects PPA & PSA yet to be executed NA RJJOB02 Technologica S.A (ISTS-IX)

Extension in all timeline has been ACME Aklera Power 750 MW Rajasthan 38 granted due to Covid-19 in line RJJAJ02 Technology Pvt. Ltd (Tranche-I) with MNRE OM dated 30.06.2020

Extension in all timeline has been Fortum Solar Plus Pvt. 750 MW Rajasthan 39 granted due to Covid-19 in line RJJAB01 Ltd. (Tranche-I) with MNRE OM dated 30.06.2020

ReNew Solar Energy Extension in all timeline has been 750 MW Rajasthan 40 (Jharkhand Five) Pvt. granted due to Covid-19 in line RJJAJ02 (Tranche-I) Ltd with MNRE OM dated 30.06.2020

Extension in all timeline has been Sitara Solar Energy Pvt. 750 MW Rajasthan 41 granted due to Covid-19 in line RJJOK01 Ltd. (Tranche-I) with MNRE OM dated 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 33 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E Extension in all timeline has been Palimarwar Solar 750 MW Rajasthan 42 granted due to Covid-19 in line RJJAR01 House Pvt. Ltd. (Tranche-I) with MNRE OM dated 30.06.2020

Extension in all timeline has been Palimarwar Solar 750 MW Rajasthan 43 granted due to Covid-19 in line RJJAR01 House Pvt. Ltd. (Tranche-I) with MNRE OM dated 30.06.2020

Extension in all timeline has been 750 MW Rajasthan granted due 44 NTPC Limited RJGNV01 (Tranche-II) to Covid-19 in line with MNRE OM dated 30.06.2020

Extension in all timeline has been 750 MW Rajasthan granted due to Covid-19 in line with 45 - RJBIG01 (Tranche-II) MNRE OM dated 30.06.2020

Extension in all timeline has been Clean Solar Power 750 MW Rajasthan 46 granted due to Covid-19 in line with RJJAJ02 (BHAINSADA) Pvt. Ltd. (Tranche-II) MNRE OM dated 30.06.2020

Extension in all timeline has been 150 MW Grid granted due to Covid-19 in line 47 Auxo Sunlight Pvt. Ltd. Connected Floating with MNRE OM dated Solar PV Plants 30.06.2020

Extension in all timeline has been 150 MW Grid ReNew Sun Power Pvt. granted due to Covid-19 in line 48 Connected Floating Ltd. with MNRE OM dated Solar PV Plants 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 34 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E Extension in all timeline has been Rihan Floating Solar 150 MW Grid granted due to Covid-19 in line 49 Pvt. Connected Floating with MNRE OM dated Ltd. Solar PV Plants 30.06.2020

750 MW Kadapa Solar SB Energy Seven Pvt 1. Land not given. Project is unlikely to come. 50 NAPark (5000 MW VGF NA APKAK01 Ltd. 2. APSPCL yet to award contract for construction of Scheme) Grid S/S and realted Transmission line. . SPPD has not handed over the land. As most of the Land earmarked for thgis purpose is government Land, 750 MW Kadapa Solar state Sprng Soura Kiran 51 NAPark (5000 MW VGF government's NOC is required for subleasing of land to NA APKAK01 Vidyut Pvt Ltd. Scheme) the SPDs, no NOC/subleasing permission has been received to SPPD yet 2. Initialy the tariff adoption for the Projects got delayed due state government's stand of renogiating all the tariff and thereafter public hearing in APERC. Subsequently, APTEL overruled APERC decision and considered the adoption of Traiff at discovered Tariff only. During this Process more than one year time got lost and accordingly SPDs have sought extension of timeline of PPA. Since there is 750 MW Kadapa Solar Ayana Renewable a back to back PSA with APDISCOMs for trhese 52 NAPark (5000 MW VGF NA APKAK01 Power Pvt. Ltd. Projects and unilateral extension of PPA would not have Scheme) served any purpose, SECI has written to APDISCOM for extension of PSA timelines 3. Despite of several reminders to the state over these issues, no positive response or tangible progress is seen in these issues

* Details available at C. Detailes of Associated Transmission Network 35 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E

Extension in all timeline has been CPSU Scheme granted due to Covid-19 in line 53 NTPC Limited Not started (Tranche-I, 2000 MW) with MNRE OM dated 30.06.2020

Extension in all timeline has been CPSU Scheme granted due to Covid-19 in line 54 NHDC LTD Not started (Tranche-I, 2000 MW) with MNRE OM dated 30.06.2020

Extension in all timeline has been The singareni Collieries CPSU Scheme granted due to Covid-19 in line 55 Not started Company limited (Tranche-I, 2000 MW) with MNRE OM dated 30.06.2020

Extension in all timeline has been Assam power CPSU Scheme granted due to Covid-19 in line 56 Distribution Company Not started (Tranche-I, 2000 MW) with MNRE OM dated Limited 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 36 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E

Extension in all timeline has been Delhi Metro Rail CPSU Scheme granted due to Covid-19 in line 57 Not started Corporation Limited (Tranche-I, 2000 MW) with MNRE OM dated 30.06.2020

Extension in all timeline has been CPSU Scheme granted due to Covid-19 in line 58 Nalanda University Not started (Tranche-I, 2000 MW) with MNRE OM dated 30.06.2020

Extension in all timeline has been CPSU Scheme granted due to Covid-19 in line 59 NTPC Limited Not(Tranche-II, started 1500 with MNRE OM dated MW) 30.06.2020

Extension in all timeline has been CPSU Scheme The Singareni Collieries granted due to Covid-19 in line 60 Not(Tranche-II, started 1500 Company Limited with MNRE OM dated MW) 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 37 Status of Underconstruction Solar Power Projects Others S- SPV/ Parent/ Holding P Bidding Scheme *Transmission NO Company (Name of l Lines Project Company/ SPD) a Remarks Covid Extension Associated n with RE t Project E

Extension in all timeline has been CPSU Scheme Indore Municipal granted due to Covid-19 in line 61 Not(Tranche-II, started 1500 Corporation with MNRE OM dated MW) 30.06.2020

* Details available at C. Detailes of Associated Transmission Network 38 Details of Underconstruction Wind Power Projects

Page 39 Central Electricity Authority / के न्द्रीय वि饍युत प्राधिकरण Renewable Energy Project Monitoring Division/निीकरणीय ऊ셍ा ा पररयो셍ना प्रबोिन प्रभाग

Summary of Underconstruction Wind Power Projects S.No Scheme Total Capacity Tendered (MW) Total Capacity Awarded (MW) Under construction Capacity (MW)

1 Trenche I 1000.00 1049.90 50.00

2 Trenche II 1000.00 1000.00 315.50

3 Trenche III 2000.00 2000.00 1649.80

4 Trenche IV 2000.00 2000.00 2000.00

5 Trenche V 1200.00 1190.00 1190.00

6 Trenche VI 1200.00 1200.00 1200.00

7 Trenche VII 1200.00 480.00 480.00

8 Trenche VIII 1800.00 440.64 440.80

9 Trenche IX 1200.00

Total 12600.00 9360.54 7326.10

40 Status of Underconstruction wind Power Projects Physical attributes

SPV/ Parent/ Holding S- Capacity (MW) Balance Capacity Bidding Company (Name of Type State Project Location NO (Awarded) (MW) Scheme Project Company/ SPD)

1 Inox Wind Infrastructure 250.00 50.00 Tranche I Wind Gujarat Kutch Services Limited 2 ReNew Power Ventures 250.00 65.50 Tranche II Wind Gujarat Kutch Private Limited 3 Inox Wind Infrastructure 50.00 50.00 Tranche II Wind Gujarat Kutch Services Limited 4 Inox Wind Infrastructure 50.00 50.00 Tranche II Wind Gujarat Kutch Services Limited 5 Inox Wind Infrastructure 50.00 50.00 Tranche II Wind Gujarat Kutch Services Limited 6 Inox Wind Infrastructure 50.00 50.00 Tranche II Wind Gujarat Kutch Services Limited 7 Inox Wind Infrastructure 50.00 50.00 Tranche II Wind Gujarat Kutch Services Limited 8 ReNew Wind Energy 100.00 100.00 Tranche III Wind Gujarat Kutch (AP2) Private Limited 9 ReNew Wind Energy 300.00 300.00 Tranche III Wind Gujarat Kutch (AP2) Private Limited 10 Inox Wind Infrastructure 50.00 50.00 Tranche III Wind Gujarat Kutch Services Limited 11 Inox Wind Infrastructure 50.00 50.00 Tranche III Wind Gujarat Kutch Services Limited 12 Inox Wind Infrastructure 50.00 50.00 Tranche III Wind Gujarat Kutch Services Limited 13 Inox Wind Infrastructure 50.00 50.00 Tranche III Wind Gujarat Kutch Services Limited 14 Torrent Power Limited 300.30 300.30 Tranche III Wind Gujarat Kutch

41 Status of Underconstruction wind Power Projects Physical attributes

SPV/ Parent/ Holding S- Capacity (MW) Balance Capacity Bidding Company (Name of Type State Project Location NO (Awarded) (MW) Scheme Project Company/ SPD)

15 Torrent Power Limited 199.50 199.50 Tranche III Wind Gujarat Kutch

16 Alfanar Energy Private 300.00 300.00 Tranche III Wind Gujarat Limited Kutch 17 Adani Green Energy (MP) 250.00 250.00 Tranche III Wind Gujarat Kutch Limited 18 Srijan Energy Systems 250.00 250.00 Tranche IV Wind Gujarat Kutch Private Limited 19 Sprng Renewable Energy 300.00 300.00 Tranche IV Wind Tamil Nadu Karur Dist Private Limited 20 Avikiran Solar India Pvt 285.00 285.00 Tranche IV Wind Gujarat Kutch Ltd. 21 Vivid Solaire Energy Pvt. 200.00 200.00 Tranche IV Wind Tamil Nadu Thirunelveli Ltd. 22 Inox Wind Infrastructure 50.00 50.00 Tranche IV Wind Gujarat Kutch Services Limited 23 Inox Wind Infrastructure 50.00 50.00 Tranche IV Wind Gujarat Kutch Services Limited 24 Adani Renewable Energy 50.00 50.00 Tranche IV Wind Gujarat Kutch (TN) Limited 25 Adani Renewable Energy 50.00 50.00 Tranche IV Wind Gujarat Kutch (TN) Limited 26 Adani Renewable Energy 50.00 50.00 Tranche IV Wind Gujarat Kutch (TN) Limited 27 Adani Renewable Energy 50.00 50.00 Tranche IV Wind Gujarat Kutch (TN) Limited 28 Adani Renewable Energy 50.00 50.00 Tranche IV Wind Gujarat Kutch (TN) Limited

42 Status of Underconstruction wind Power Projects Physical attributes

SPV/ Parent/ Holding S- Capacity (MW) Balance Capacity Bidding Company (Name of Type State Project Location NO (Awarded) (MW) Scheme Project Company/ SPD)

29 Adani Renewable Energy 50.00 50.00 Tranche IV Wind Gujarat Kutch (TN) Limited 30 Mytrah Vayu (Brahmaput 300.00 300.00 Tranche IV Wind Kerela Palakkad ra) Pvt Ltd 31 ReNew Wind Energy (TN) 265.00 265.00 Tranche IV Wind Gujarat Kutch Private Limited 32 Torrent Power Limited 115.00 115.00 Tranche V Wind

33 Adani Wind Energy (GJ) 300.00 300.00 Tranche V Wind Gujarat Kutch Limited 34 Kotda Madh village, Alfanar Energy Pvt. Ltd. 300.00 300.00 Tranche V Wind Gujarat Lakhpat Taluk, Kutch district. 35 Sitac Kabini Renewables 300.00 300.00 Tranche V Wind Gujarat Kutch Private Limited 36 Ecoren Energy India 175.00 175.00 Tranche V Wind Karnataka Chittaradurga Private Limited 37 Adani Renewable Energy 250.00 250.00 Tranche VI Wind Gujarat Kutch Park (Gujarat) Limited 38 ReNew Wind Energy (TN) Madhya 300.00 300.00 Tranche VI Wind Rajgarh Private Limited Pradesh 39 Powerica Limited 50.60 50.60 Tranche VI Wind Gujarat Dwarka

40 SBESS Services Projectco 274.40 274.40 Tranche VI Wind Maharastra Beed Two Private Limited 41 SBESS Services Projectco 50.00 50.00 Tranche VI Wind Maharastra Beed Two Private Limited 42 Morjar Windfarm 150.00 150.00 Tranche VI Wind Gujarat Development Pvt. Ltd.

43 Status of Underconstruction wind Power Projects Physical attributes

SPV/ Parent/ Holding S- Capacity (MW) Balance Capacity Bidding Company (Name of Type State Project Location NO (Awarded) (MW) Scheme Project Company/ SPD)

43 Ecoren Energy India 125.00 125.00 Tranche VI Wind Karnataka Chittaradurga Private Limited 44 Betam Wind Energy 200.00 200.00 Tranche VII Wind Gujarat Dwarka Private Limited 45 ReNew Wind Energy (TN) 50.00 50.00 Tranche VII Wind Gujarat Kutch Private Limited 46 Sprng Vaayu Urja Private Madhya 100.00 100.00 Tranche VII Wind Rajgarh Limited Pradesh 47 Adani Renewable Energy Park 130.00 130.00 Tranche VII Wind Gujarat Kutch (Gujarat) Limited 48 Sidhpur, Dwarka CLP India Private Limited 250.80 250.80 Tranche VIII Wind Gujarat Gujarat 49 Avikiran Energy India Sidhpur, Dwarka 190.00 190.00 Tranche VIII Wind Gujarat Private Limited Gujarat

44 Status of Underconstruction wind Power Projects Physical Progress

SPV/ Parent/ Original Revised Plant Plant S- Holding Company Bidding Scheduled Scheduled Financial Land material Erection NO (Name of Project Scheme Commissioning Commisioning Closure Acquisition order status Company/ SPD) Date Date

1 Inox Wind Infrastructure Tranche I 13.06.19 Acheived Acquired completed Services Limited 2 ReNew Power Ventures Tranche II 03.05.19 Acheived Private Limited 3 Inox Wind Infrastructure Under Not Tranche II 03.05.19 Acheived Not Started Services Limited progress Started 4 Inox Wind Infrastructure Under Not Tranche II 03.05.19 Acheived Not Started Services Limited progress Started 5 Inox Wind Infrastructure Under Not Tranche II 03.05.19 Acheived Not Started Services Limited progress Started 6 Inox Wind Infrastructure Under Not Tranche II 03.05.19 Acheived Not Started Services Limited progress Started 7 Inox Wind Infrastructure Under Not Tranche II 03.05.19 Acheived Not Started Services Limited progress Started 8 ReNew Wind Energy (AP2) Tranche III 31.03.21 Not Achieved Private Limited 9 ReNew Wind Energy (AP2) Tranche III 31.03.21 Not Achieved Private Limited 10 Inox Wind Infrastructure Not Tranche III 24.11.19 08.04.21 Not Achieved Not Started Not Started Services Limited Started 11 Inox Wind Infrastructure Not Tranche III 24.11.19 08.04.21 Not Achieved Not Started Not Started Services Limited Started 12 Inox Wind Infrastructure Not Tranche III 24.11.19 08.04.21 Not Achieved Not Started Not Started Services Limited Started 13 Inox Wind Infrastructure Not Tranche III 24.11.19 08.04.21 Not Achieved Not Started Not Started Services Limited Started 14 Not Torrent Power Limited Tranche III 24.11.19 Not Achieved Not Started Not Started Started

45 Status of Underconstruction wind Power Projects Physical Progress

SPV/ Parent/ Original Revised Plant Plant S- Holding Company Bidding Scheduled Scheduled Financial Land material Erection NO (Name of Project Scheme Commissioning Commisioning Closure Acquisition order status Company/ SPD) Date Date

15 Not Torrent Power Limited Tranche III 24.11.19 Not Achieved Not Started Not Started Started 16 Alfanar Energy Private Under Under Tranche III 29.12.20 06.04.21 Achieved Completed Limited progress progress 17 Adani Green Energy (MP) Under Tranche III 24.11.19 24-09-20 Achieved Acquired Completed Limited Progress 18 Srijan Energy Systems Tranche IV 30.11.20 Not Achieved Started Private Limited 19 Sprng Renewable Energy Under Under Tranche IV 28.08.20 04.12.20 Achieved Completed Private Limited progress Progess 20 Avikiran Solar India Pvt Under Under Tranche IV 14.03.20 05.06.20 Not Achieved Under Progress Ltd. progress Progess 21 Vivid Solaire Energy Pvt. Tranche IV 28.08.20 04.12.20 Not Aceived Ltd. 22 Inox Wind Infrastructure Not Tranche IV 28.02.20 08.04.21 Not Aceived Not Acquired Not Placed Services Limited Started 23 Inox Wind Infrastructure Not Tranche IV 28.02.20 08.04.21 Not Aceived Not acquired Not Placed Services Limited Started 24 Adani Renewable Energy Under Under Tranche IV 28.02.20 Not Aceived Under progress (TN) Limited progress progress 25 Adani Renewable Energy Under Under Tranche IV 28.02.20 Not Aceived Under progress (TN) Limited progress progress 26 Adani Renewable Energy Under Under Tranche IV 28.02.20 Not Aceived Under progress (TN) Limited progress progress 27 Adani Renewable Energy Under Under Tranche IV 28.02.20 Not Aceived Under progress (TN) Limited progress progress 28 Adani Renewable Energy Under Under Tranche IV 28.02.20 Not Aceived Under progress (TN) Limited progress progress

46 Status of Underconstruction wind Power Projects Physical Progress

SPV/ Parent/ Original Revised Plant Plant S- Holding Company Bidding Scheduled Scheduled Financial Land material Erection NO (Name of Project Scheme Commissioning Commisioning Closure Acquisition order status Company/ SPD) Date Date

29 Adani Renewable Energy Under Under Tranche IV 28.02.20 Not Aceived Under progress (TN) Limited progress progress 30 Mytrah Vayu (Brahmaputr Tranche IV 28.08.20 Not Aceived Not Acquired a) Pvt Ltd 31 ReNew Wind Energy (TN) Tranche IV 28.02.20 Not Aceived Not Acquired Private Limited 32 Torrent Power Limited Tranche V 22.07.20 28.10.20 Not Achieved Not Acquired

33 Adani Wind Energy (GJ) Under under Tranche V 22.07.20 08.04.21 Not Achieved Under Progress Limited progress progress 34 Under Not Alfanar Energy Pvt. Ltd. Tranche V 28.02.21 06.06.21 Not Achieved Placed Progress Started 35 Sitac Kabini Renewables Under Not Tranche V 31.12.20 08.04.2020 Achieved Placed Private Limited Progress Started 36 Ecoren Energy India Tranche V 22.07.20 28.10.20 Not Achieved Not Acquired Not Placed NA Private Limited 37 Adani Renewable Energy Under Under Tranche VI 15.03.21 15.09.21 Not Achieved Under Progress Park (Gujarat) Limited progress Progress 38 ReNew Wind Energy (TN) Under Tranche VI 15.03.21 Not Aceived Private Limited progress 39 Powerica Limited Tranche VI 15.03.21 Not Achieved Acquired Placed

40 SBESS Services Projectco Under Under Tranche VI 15.03.21 Not Achieved Placed Two Private Limited progress Progress 41 SBESS Services Projectco Under Under Tranche VI 15.03.21 Not Achieved Placed Two Private Limited progress Progress 42 Morjar Windfarm Tranche VI 15.03.21 Not Achieved Acquired Development Pvt. Ltd.

47 Status of Underconstruction wind Power Projects Physical Progress

SPV/ Parent/ Original Revised Plant Plant S- Holding Company Bidding Scheduled Scheduled Financial Land material Erection NO (Name of Project Scheme Commissioning Commisioning Closure Acquisition order status Company/ SPD) Date Date

43 Ecoren Energy India Tranche VI 15.03.21 Not Aceived Private Limited 44 Betam Wind Energy Tranche VII 18.04.21 Not Achieved Not Acquired NA NA Private Limited 45 ReNew Wind Energy (TN) Tranche VII 18.04.21 Not Aceived Private Limited 46 Sprng Vaayu Urja Private Not Tranche VII 18.04.21 Not Achieved Not Acquired Not Placed Limited Started 47 Adani Renewable Energy Under Under Park Tranche VII 18.04.21 18.04.21 Not Achieved Under Progress progress progress (Gujarat) Limited 48 Under Not CLP India Private Limited Tranche VIII 27.06.21 Not Aceived Under Progress progress Started 49 Avikiran Energy India Tranche VIII 27.06.21 Not Aceived Private Limited

48 Status of Underconstruction wind Power Projects Commercial Details Bidding SPV/ Parent/ Holding Tariff / Agency S- Company (Name of Bidding Date of Letter of PSA (End Original Bidder's Name (Center/ PPA NO Project Company/ Scheme Award (LOA) Consumer) PPA Tariff State/ SPD) (INR/kWh) Others) 1 UTTAR PRADESH(100) Inox Wind Infrastructure DELHI(50MW) Tranche I 05-04-17 Wind Four Energy Pvt. Ltd. SECI 21-Jul-17 3.46 Services Limited BIHAR(50MW) Jharkhand:(50MW)

2 UP100(MW), ReNew Power Ventures ReNew Power Ventures Private Tranche II 11-03-17 SECI 3-Jan-18 Punjab(100MW), Private Limited Limited Goa(50MW 3 Inox Wind Infrastructure Haroda Wind Energy Private Haryana(150MW), Tranche II 11-03-17 SECI 3-Jan-18 2.65 Services Limited Limited UP(100MW) 4 Inox Wind Infrastructure Khatiyu Wind Energy Private Haryana(150MW), Tranche II 11-03-17 SECI 3-Jan-18 2.65 Services Limited Limited UP(100MW) 5 Inox Wind Infrastructure Vigodi Wind Energy Private Haryana(150MW), Tranche II 11-03-17 SECI 3-Jan-18 2.65 Services Limited Limited UP(100MW) 6 Inox Wind Infrastructure Nani Virani Wind Energy Haryana(150MW), Tranche II 11-03-17 SECI 3-Jan-18 2.65 Services Limited Private Limited UP(100MW) 7 Inox Wind Infrastructure Ravapar Wind Energy Private Haryana(150MW), Tranche II 11-03-17 SECI 3-Jan-18 2.65 Services Limited Limited UP(100MW) 8 ReNew Wind Energy (AP2) ReNew Wind Energy (AP2) Haryana(350MW), Tranche III 23-02-18 SECI 24-May-18 Private Limited Private Limited Odisha(50MW) 9 ReNew Wind Energy (AP2) ReNew Wind Energy (AP2) Haryana(350MW), Tranche III 23-02-18 SECI 24-May-18 Private Limited Private Limited Odisha(50MW) 10 Inox Wind Infrastructure ALIENTO WIND ENERGY Tranche III 23-02-18 SECI 24-May-18 Jharkhand(200MW) 2.44 Services Limited PRIVATE LIMITED 11 Inox Wind Infrastructure FLURRY WIND ENERGY Tranche III 23-02-18 SECI 24-May-18 Jharkhand(200MW) 2.44 Services Limited PRIVATE LIMITED 12 Inox Wind Infrastructure TEMPEST WIND ENERGY Tranche III 23-02-18 SECI 24-May-18 Jharkhand(200MW) 2.44 Services Limited PRIVATE LIMITED

49 Status of Underconstruction wind Power Projects Commercial Details Bidding SPV/ Parent/ Holding Tariff / Agency S- Company (Name of Bidding Date of Letter of PSA (End Original Bidder's Name (Center/ PPA NO Project Company/ Scheme Award (LOA) Consumer) PPA Tariff State/ SPD) (INR/kWh) Others) 13 Inox Wind Infrastructure VUELTA ENERGY PRIVATE Tranche III 23-02-18 SECI 24-May-18 Jharkhand(200MW) 2.44 Services Limited LIMITED 14 MP(450MW), Torrent Power Limited Tranche III 23-02-18 Torrent Power Limited SECI Terminated Bihar(49.8MW) 15 MP(450MW), Torrent Power Limited Tranche III 23-02-18 Torrent Power Limited SECI Terminated Bihar(49.8MW) 16 Alfanar Energy Private Delhi(250MW) Tranche III 23-02-18 Alfanar Company SECI 24-May-18 2.45 Limited Bihar(50MW) 17 Goa(50MW), Adani Green Energy (MP) Adani Green Energy (MP) Tranche III 23-02-18 SECI 24-May-18 Chhattsihgarh(150M 2.45 Limited Limited W), Bihar(50MW) 18 Srijan Energy Systems Srijan Energy Systems Private Tranche IV 01-06-18 SECI 30-Aug-18 MP(250MW) Private Limited Limited 19 Sprng Renewable Energy Tranche IV 01-06-18 Sprng Energy Private Limited SECI 30-Aug-18 UP(300MW) 2.51 Private Limited 20 Maharashtra Avikiran Solar India Pvt Ltd. Tranche IV 01-06-18 BLP Energy Private Limited SECI 30-Aug-18 (100MW) 2.51 MP(185MW) 21 Vivid Solaire Energy Pvt. Betam Wind Energy Private Odisha100(MW), Tranche IV SECI 30-Aug-18 Ltd. Limited UP(100MW) 22 Inox Wind Infrastructure Maharashtra Tranche IV 01-06-18 Suswind Power Private Limited SECI 30-Aug-18 2.51 Services Limited (100MW) 23 Inox Wind Infrastructure Flutter Wind Energy Private Maharashtra Tranche IV 01-06-18 SECI 30-Aug-18 2.51 Services Limited Limited (100MW) 24 Adani Renewable Energy Adani Green Energy (MP) Maharashtra Tranche IV 01-06-18 SECI 30-Aug-18 2.51 (TN) Limited Limited (300MW) 25 Adani Renewable Energy Adani Green Energy (MP) Maharashtra Tranche IV 01-06-18 SECI 30-Aug-18 2.51 (TN) Limited Limited (300MW) 26 Adani Renewable Energy Adani Green Energy (MP) Maharashtra Tranche IV 01-06-18 SECI 30-Aug-18 2.51 (TN) Limited Limited (300MW)

50 Status of Underconstruction wind Power Projects Commercial Details Bidding SPV/ Parent/ Holding Tariff / Agency S- Company (Name of Bidding Date of Letter of PSA (End Original Bidder's Name (Center/ PPA NO Project Company/ Scheme Award (LOA) Consumer) PPA Tariff State/ SPD) (INR/kWh) Others) 27 Adani Renewable Energy Adani Green Energy (MP) Maharashtra Tranche IV 01-06-18 SECI 30-Aug-18 2.51 (TN) Limited Limited (300MW) 28 Adani Renewable Energy Adani Green Energy (MP) Maharashtra Tranche IV 01-06-18 SECI 30-Aug-18 2.51 (TN) Limited Limited (300MW) 29 Adani Renewable Energy Adani Green Energy (MP) Maharashtra Tranche IV 01-06-18 SECI 30-Aug-18 2.51 (TN) Limited Limited (300MW) 30 UP(150MW),BYPL, Mytrah Vayu (Brahmaputra) Mytrah Energy (India) Private Tranche IV 01-06-18 SECI Terminated Delhi(100MW), Pvt Ltd Limited TPDDL, Delhi(50 31 UP(150MW),Dadra ReNew Wind Energy (TN) ReNew Wind Energy (TN) Tranche IV 01-06-18 SECI Terminated &NagarHaveli(50MW Private Limited Private Limited ), MP(65MW) 32 Torrent Power Limited Tranche V 24-10-18 Torrent Power Limited SECI 22-Jan-19 Haryana(115MW)

33 Adani Wind Energy (GJ) Bihar(125MW), Tranche V 24-10-18 Adani Green Energy Limited SECI 22-Jan-19 2.76 Limited Haryana(175MW) 34 Alfanar Energy Pvt. Ltd. Tranche V 24-10-18 Netra Wind Private Limited SECI 22-Jan-19 Haryana(300MW) 2.77

35 Sitac Kabini Renewables Sitac Kabini Renewables Private Delhi(200MW), Tranche V 24-10-18 SECI 22-Jan-19 2.77 Private Limited Limited Puducherry(100MW) 36 Ecoren Energy India Private Boreas Renewable Energy Tranche V 24-10-18 SECI 22-Jan-19 Bihar175(MW) Limited Private Limited 37 Kerala(75MW), Adani Renewable Energy Adani Green Energy Three Tranche VI 17-06-19 SECI 15-Sep-19 Odisha(50MW), 2.82 Park (Gujarat) Limited Limited UP(85MW), 38 ReNew Wind Energy (TN) Tranche VI 17-06-19 Ostro Energy Private Limited SECI 15-Sep-19 Bihar(300MW) Private Limited 39 Powerica Limited Tranche VI 17-06-19 Powerica Limited SECI 15-Sep-19 UP(50.6MW)

40 SBESS Services Projectco SBESS Services Projectco Two Tranche VI 17-06-19 SECI 15-Sep-19 UP (324.4MW) Two Private Limited Private Limited

51 Status of Underconstruction wind Power Projects Commercial Details Bidding SPV/ Parent/ Holding Tariff / Agency S- Company (Name of Bidding Date of Letter of PSA (End Original Bidder's Name (Center/ PPA NO Project Company/ Scheme Award (LOA) Consumer) PPA Tariff State/ SPD) (INR/kWh) Others) 41 SBESS Services Projectco SBESS Services Projectco Two Tranche VI 17-06-19 SECI 15-Sep-19 UP (324.4MW) Two Private Limited Private Limited 42 Bihar(50MW), Morjar Windfarm Srijan Energy Systems Private Tranche VI 17-06-19 SECI 15-Sep-19 Goa(50MW), Development Pvt. Ltd. Limited Delhi(50MW) 43 Ecoren Energy India Private Zenataris Renewable Energy Tranche VI 17-06-19 SECI 15-Sep-19 Kerala(125MW) Limited Private Limited 44 Betam Wind Energy Private Betam Wind Energy Private Tranche VII SECI 17-Sep-19 Limited Limited 45 ReNew Wind Energy (TN) Tranche VII Ostro Energy Private Limited SECI 17-Sep-19 Private Limited 46 Sprng Vaayu Urja Private Tranche VII 19-06-19 Sprng Energy Private Limited SECI 17-Sep-19 Kerela (100 MW) 2.82 Limited 47 Adani Renewable Energy Adani Renewable Energy Park Park Tranche VII 19-11-2019 SECI 17-Sep-19 2.83 (Gujarat) Limited (Gujarat) Limited 48 CLP India Private Limited Tranche VIII 28-09-19 CLP India Private Limited SECI Executed 2.83

49 Avikiran Energy India Avikiran Energy India Private Tranche VIII 28-09-19 SECI Not signed Private Limited Limited

52 Status of Underconstruction wind Power Projects LTA Connectivity S-NO SPV/ Parent/ Holding Company Bidding Scheme Sub-Station Owner of Substation Transmission line Status (Name of Project Company/ SPD)

1

Inox Wind Infrastructure Services Limited Tranche I 765/400/220 kV Bhuj S/S PGCIL

2 ReNew Power Ventures Private Limited Tranche II 400/220 KV Bachau S/S PGCIL

3 Inox Wind Infrastructure Services Limited Tranche II 765/400/220 kV Bhuj S/S PGCIL

4 Inox Wind Infrastructure Services Limited Tranche II 765/400/220 kV Bhuj S/S PGCIL

5 Inox Wind Infrastructure Services Limited Tranche II 765/400/220 kV Bhuj S/S PGCIL

6 Inox Wind Infrastructure Services Limited Tranche II 765/400/220 kV Bhuj S/S PGCIL

7 Inox Wind Infrastructure Services Limited Tranche II 765/400/220 kV Bhuj S/S PGCIL

8 ReNew Wind Energy (AP2) Private Limited Tranche III 220/400 KV Bachau S/S PGCIL

9 ReNew Wind Energy (AP2) Private Limited Tranche III 220/400 KV Bhuj S/S PGCIL

10 Inox Wind Infrastructure Services Limited Tranche III 765/400/220 kV Bhuj-II S/S PGCIL

11 Inox Wind Infrastructure Services Limited Tranche III 765/400/220 kV Bhuj-II S/S PGCIL

12 Inox Wind Infrastructure Services Limited Tranche III 765/400/220 kV Bhuj-II S/S PGCIL

13 Inox Wind Infrastructure Services Limited Tranche III 765/400/220 kV Bhuj-II S/S PGCIL

14 Torrent Power Limited Tranche III 765/400/220 kV Bhuj S/S PGCIL

15 Torrent Power Limited Tranche III 765/400/220 kV Bhuj S/S PGCIL

53 Status of Underconstruction wind Power Projects LTA Connectivity S-NO SPV/ Parent/ Holding Company Bidding Scheme Sub-Station Owner of Substation Transmission line Status (Name of Project Company/ SPD)

16

96% Completed Foundation: 210/210 Alfanar Energy Private Limited Tranche III 765/400/220 kV Bhuj S/S PGCIL Erection: 210/210. Stringing: 58.50/66 KM

17

Adani Green Energy (MP) Limited Tranche III 765/400/220 kV Bhuj S/S PGCIL

18 765/400/220 kV Bhuj S/S Srijan Energy Systems Private Limited Tranche IV PGCIL (220 kV level)

19

EHV Tower 33.8 km S/C Line on D/C Foundation casted : Tower from wind farm 400/230 kV Pugalur S/S 118/127, EHV Sprng Renewable Energy Private Limited Tranche IV PGCIL pooling Substation to (230 kV level) Tower Stringing : PGCIL Pugalur Grid 76/127 towers Substation. completed

20 Achieved Connectivity approval . Current status: Foundations:172 220kV EHV line / 283 765/400/220 kV Bhuj S/S Avikiran Solar India Pvt Ltd. Tranche IV PGCIL between Wind pooling Erection: (220 kV level) station and Grid 123/283 Substation stringing: 28.072/82.2km Total length 82.2km;

21 400/230 kV Thirunelveli S/S Vivid Solaire Energy Pvt. Ltd. Tranche IV (230 kV level)

22 765/400/220 kV Bhuj-II S/S Inox Wind Infrastructure Services Limited Tranche IV PGCIL (220 kV level)

54 Status of Underconstruction wind Power Projects LTA Connectivity S-NO SPV/ Parent/ Holding Company Bidding Scheme Sub-Station Owner of Substation Transmission line Status (Name of Project Company/ SPD)

23 765/400/220 kV Bhuj-II S/S Inox Wind Infrastructure Services Limited Tranche IV PGCIL (220 kV level)

24 765/400/220 kV Bhuj S/S Adani Renewable Energy (TN) Limited Tranche IV PGCIL Under Progess (220 kV level)

25 765/400/220 kV Bhuj S/S Adani Renewable Energy (TN) Limited Tranche IV PGCIL Under Progess (220 kV level)

26 765/400/220 kV Bhuj S/S Adani Renewable Energy (TN) Limited Tranche IV PGCIL Under Progess (220 kV level)

27 765/400/220 kV Bhuj S/S Adani Renewable Energy (TN) Limited Tranche IV PGCIL Under Progess (220 kV level)

28 765/400/220 kV Bhuj S/S Adani Renewable Energy (TN) Limited Tranche IV PGCIL Under Progess (220 kV level)

29 765/400/220 kV Bhuj S/S Adani Renewable Energy (TN) Limited Tranche IV PGCIL Under Progess (220 kV level)

30

400/230 kV Palakkad S/S Mytrah Vayu (Brahmaputra) Pvt Ltd Tranche IV KSEB (230 kV level)

31

765/400/220 kV Bhuj S/S ReNew Wind Energy (TN) Private Limited Tranche IV PGCIL (220 kV level)

32 765/400/220 kV Bhuj S/S Torrent Power Limited Tranche V PGCIL (220 kV level)

33 Bhuj-II PS will 765/400/220 kV Bhuj -II S/S Adani Wind Energy (GJ) Limited Tranche V PGCIL Under Progress be commissioned (220 kV level) by 31-Dec-20

55 Status of Underconstruction wind Power Projects LTA Connectivity S-NO SPV/ Parent/ Holding Company Bidding Scheme Sub-Station Owner of Substation Transmission line Status (Name of Project Company/ SPD)

34

Route survey completed and 765/400/220 kV Bhuj -II S/S Alfanar Energy Pvt. Ltd. Tranche V PGCIL order placed to Vendor but (220 kV level) Work not started

35

765/400/220 kV Bhuj -II S/S Sitac Kabini Renewables Private Limited Tranche V PGCIL (220 kV level)

36 Ecoren Energy India Private Limited Tranche V Hiryur 400/220 kV PGCIL

37

Bhuj-II PS will Adani Renewable Energy Park (Gujarat) 765/400/220 kV Bhuj-II S/S Tranche VI PGCIL Under Progrss be commissioned Limited (220 kV level) by 31-Dec-20

38 220 kV Rajgarh S/S ReNew Wind Energy (TN) Private Limited Tranche VI PGCIL (220 kV level) 39 400/220 kV Jam Powerica Limited Tranche VI Khambaliya S/S (220 kV level) 40 SBESS Services Projectco Two Private 400/220 kV Parli S/S Tranche VI PGCIL Limited (220 kV level) 41 SBESS Services Projectco Two Private 400/220 kV Parli S/S Tranche VI PGCIL Limited (220 kV level) 42 765/400/220 kV Bhuj S/S Morjar Windfarm Development Pvt. Ltd. Tranche VI PGCIL (220 kV level)

43 400/220 kV Ecoren Energy India Private Limited Tranche VI PGCIL Hiryur S/S (220 kV level)

56 Status of Underconstruction wind Power Projects LTA Connectivity S-NO SPV/ Parent/ Holding Company Bidding Scheme Sub-Station Owner of Substation Transmission line Status (Name of Project Company/ SPD)

44 400/220 kV Jamkhambaliya Betam Wind Energy Private Limited Tranche VII S/S GETCO (220 kV level) 45 220 kV Bachhau S/S ReNew Wind Energy (TN) Private Limited Tranche VII PGCIL (220 kV level) 46

~26 km Single Circuit Line on Single/Double Circuit Tower from wind farm pooling 400/220 kV Rajgarh S/S Substation to PGCIL Rajgarh Construction not Sprng Vaayu Urja Private Limited Tranche VII PGCIL (220 kV level) Grid Substation & ~3 km commenced underground cable in sanctuary area towards PGCIL rajgarh end

47 Bhuj-II PS will Adani Renewable Energy Park 765/400/220 kV Bhuj-II S/S Tranche VII Under Progress be commissioned (Gujarat) Limited (220 kV level) by 31-Dec-20 48

220 kV S/C transmission line of ~40km length is proposed with following bifurcation: 400/220 kV Jamkhambaliya 1. Approximate length of S/C CLP India Private Limited Tranche VIII S/S GETCO transmission line on Multi- (220 kV level) circuit towers: 2 km 2. Approximate length of S/C transmission line on Double- circuit towers: 38 km

49 400/220 kV Jamkhambaliya Avikiran Energy India Private Limited Tranche VIII S/S GETCO (220 kV level)

57 Status of Underconstruction wind Power Projects Others SPV/ Parent/ Holding Bidding Remarks Covid Extension *Transmission Lines Company (Name of Scheme Associated with RE S-NO Project Company/ SPD) Project

1 Inox Wind Infrastructure 50 MW Project Cancelled as WPD had failed to Services Limited Tranche I to commission within extended period GJKUB01

2 ReNew Power Ventures Private 1. 27.6 MW is ready for commissioning. Limited Tranche II Balance 37.9 MW might not come due to GJKUB03 contractual issues 3 Inox Wind Infrastructure 1. Developer requested time extension as land Services Limited Tranche II acquisition is not complete. However, since GJKUB01 Nov 2019 failed to submit required document 4 Inox Wind Infrastructure to SECI Services Limited Tranche II GJKUB01

5 Inox Wind Infrastructure Services Limited Tranche II GJKUB01

6 Inox Wind Infrastructure Services Limited Tranche II GJKUB01

7 Inox Wind Infrastructure Services Limited Tranche II GJKUB01

8 ReNew Wind Energy (AP2) 1. WPD informed that this project is not Private Limited Tranche III commercially viable GJKUB03

9 ReNew Wind Energy (AP2) 1.WPD has given prior intimation of Private Limited Tranche III commissioning GJKUB01

10 Inox Wind Infrastructure 1. Land is not available with WPD. SECI has Services Limited Tranche III granted extension till 08.04.2021 for 100 MW GJKUB02 project only. 11 Inox Wind Infrastructure Services Limited Tranche III GJKUB02

12 Inox Wind Infrastructure Services Limited Tranche III GJKUB02

*Details available at C. Details of Associated Transmission Networks 58 Status of Underconstruction wind Power Projects Others SPV/ Parent/ Holding Bidding Remarks Covid Extension *Transmission Lines Company (Name of Scheme Associated with RE S-NO Project Company/ SPD) Project

13 Inox Wind Infrastructure 1. Land is not available with WPD. SECI has Services Limited granted extension till 08.04.2021 for 100 MW Tranche III project only. GJKUB02

14 Torrent Power Limited 1. WPD unilaterally terminated the PPA and Tranche III filed cse in CERC GJKUB01

15 Torrent Power Limited Tranche III GJKUB01

16 Alfanar Energy Private Limited 1. WPD has given notice to commission 150 Extension in all MW by 22.07.2020 timeline has been granted due to Covid- Tranche III GJKUB01 19 in line with MNRE OM dated 30.06.2020

17 Adani Green Energy (MP) Limited Tranche III GJKUB01

18 Srijan Energy Systems Private 1. EHV Line work completed Limited Tranche IV GJKUB01

19 Sprng Renewable Energy Private 1. FC extended til revised SCD Limited Tranche IV TNKA02

20 Avikiran Solar India Pvt Ltd. 1. FC extended till revised SCD Tranche IV GJKUB01

21 Vivid Solaire Energy Pvt. Ltd. 1. FC extended til revised SCD Tranche IV 2. Prior intimation of commissioning of 1st TNTI01 part by Aug 2020. 22 Inox Wind Infrastructure No progess Services Limited Tranche IV GJKUB02

23 Inox Wind Infrastructure No progess Services Limited Tranche IV GJKUB02

*Details available at C. Details of Associated Transmission Networks 59 Status of Underconstruction wind Power Projects Others SPV/ Parent/ Holding Bidding Remarks Covid Extension *Transmission Lines Company (Name of Scheme Associated with RE S-NO Project Company/ SPD) Project

24 Adani Renewable Energy (TN) Limited Tranche IV GJKUB01

25 Adani Renewable Energy (TN) Limited Tranche IV GJKUB01

26 Adani Renewable Energy (TN) Limited Tranche IV GJKUB01

27 Adani Renewable Energy (TN) Limited Tranche IV GJKUB01

28 Adani Renewable Energy (TN) Limited Tranche IV GJKUB01

29 Adani Renewable Energy (TN) Limited Tranche IV GJKUB01

30 Mytrah Vayu (Brahmaputra) Pvt 1. WPD unilaterally terminated the PPA and Ltd Tranche IV filed cse in CERC KEPA01

31 ReNew Wind Energy (TN) 1. WPD unilaterally terminated the PPA and Private Limited Tranche IV filed cse in CERC GJKUB01

32 Torrent Power Limited 1. LTA was revokeed Tranche V GJKUB01

33 Adani Wind Energy (GJ) Limited 1. FC date extended to revised SCD Tranche V GJKUB02

34 Alfanar Energy Pvt. Ltd. 1. FC date extended to revised SCD Extension in all timeline has been granted due to Covid- Tranche V GJKUB02 19 in line with MNRE OM dated 30.06.2020

*Details available at C. Details of Associated Transmission Networks 60 Status of Underconstruction wind Power Projects Others SPV/ Parent/ Holding Bidding Remarks Covid Extension *Transmission Lines Company (Name of Scheme Associated with RE S-NO Project Company/ SPD) Project

35 Sitac Kabini Renewables Private 1. FC date extended to revised SCD Extension in all Limited timeline has been granted due to Covid- Tranche V GJKUB02 19 in line with MNRE OM dated 30.06.2021

36 Ecoren Energy India Private 1. FC date extended to revised SCD Limited 2. Developer is not able to provide documents Tranche V KNCH01 to SECI required for. SCD extension

37 Adani Renewable Energy Park (Gujarat) Limited Tranche VI GJKUB02

38 ReNew Wind Energy (TN) Private Limited Tranche VI MPRA01

39 Powerica Limited Tranche VI GJDWJ01

40 SBESS Services Projectco Two Private Limited Tranche VI MHBE01

41 SBESS Services Projectco Two Private Limited Tranche VI MHBE01

42 Morjar Windfarm Development Pvt. Ltd. Tranche VI GJKUB01

43 Ecoren Energy India Private Limited Tranche VI KNCH01

44 Betam Wind Energy Private 1. WPD refusing to sign PPA Limited Tranche VII GJDWJ01

45 ReNew Wind Energy (TN) Private Limited Tranche VII GJKUB03

*Details available at C. Details of Associated Transmission Networks 61 Status of Underconstruction wind Power Projects Others SPV/ Parent/ Holding Bidding Remarks Covid Extension *Transmission Lines Company (Name of Scheme Associated with RE S-NO Project Company/ SPD) Project

46 Sprng Vaayu Urja Private Limited Tranche VII MPRA01

47 Adani Renewable Energy Park (Gujarat) Limited Tranche VII GJKUB02

48 CLP India Private Limited Tranche VIII GJDWJ01

49 Avikiran Energy India Private Limited Tranche VIII GJDWJ01

*Details available at C. Details of Associated Transmission Networks 62 Details of Associated Transmission Network

Page 63 Status of Under-Construction Transmission Line associated with U/C Renewable Energy Projects As on 30.06.20 Progress Status of Transmission Target Date Ckts Name of Voltage Total Total Owner of the (S/C) Foundation Tower Stringing Substation Transmission Level Length Locations Remarks State Line & completed Erected complete Schedule Revised Substation Lines (kV) (cKm) (Nos) Code (D/C) (Nos) (Nos) d (CKm)

Transmission network related to Solar Power Projects Length of the line: 100 Ckm. Work progress hampered due Bhadla-II PS-Bhadla (PG) (Twin HTLS) PGCIL D/C 400 0 130 33 22 MAR-21 to lockdown of the entire country due to Corona Pandemic (PGCIL-RTM) from 22.03.2020. Work restarted. PGCIL 765 KV Bhadla-I S/S - Bikaner-I S/S D/C 765 340 455 455 455 340 Jan-19 Oct-19 Commissioned Fatehgarh-II PS - Bhadla section (PGCIL- D/C 765 0 497 251 79 MAR-21 Length of the line: 370 Ckm. RTM)

RVPN Ramgarh -Bhadla D/C 400 320 446 446 446 314 OCT-20 AUG-20 W/O awarded to M/S SEW Hydrabad.

RJJOB01 Bhadla-I S/S Rajasthan Fatehgarh PS/S - Bhadla (PG) (initially to be a) Project hampered due to COVID-19. b) Severe RoW. c) TBCB D/C 765 292 405 369 320 200 JAN-21 DEC-20 operated at 400 kV) (F-BTL-TBCB) Delay in receipt of forest clearance.

Bhadla IV SP - Bhadla Pooling station line D/C 220 0 (GEC-II) SPP - Bhadla (PS) (GEC-II) D/C 220 0 a) Project hampered due to COVID-19. b) Severe RoW. c) TBCB 765 kV Bhadla-I S/S - Fatehgarh-I S/S D/C 765 292 405 369 320 200 JAN-21 DEC-20 Delay in receipt of forest clearance.

PGCIL 400kV Bhadla-I S/S - Bhadla (STU) S/S

Length of the line: 100 Ckm. Work progress hampered due PGCIL 400 kV Bhadla-I S/S - Bhadla-II S/S D/C 400 0 130 31 11 MAR-21 to lockdown of the entire country due to Corona Pandemic from 22.03.2020. Work restarted. TBCB 765 kV Bhadla-II S/S - Fatehgarh-II S/S Bhadla-II RJJOB02 Rajasthan 5000 MW HVDC line from Bhadla-II S/S - S/S PGCIL M'Puram VSC S/S Work has also been affected due to lockdown of the entire LILO of both Ckts. of Ajmer - Bikaner line at PGCIL D/C 765 0 722 659 437 29 MAR-21 country because of Corona Pandemic. Work has now Bhadla-II PS (PGCIL-RTM) restarted.

Fatehgarh-I a) Project hampered due to COVID-19. b) Severe RoW. c) RJJAF01 Rajasthan TBCB 765 kV Bhadla-I S/S - Fatehgarh-I S/S D/C 765 292 405 369 320 200 JAN-21 DEC-20 S/S Delay in receipt of forest clearance. TBCB 400 kV Fathergarh-II - Jaisalmer S/S

TBCB 765 kV Bhadla-II S/S - Fatehgarh-II S/S D/C 765 0 497 251 79 MAR-21 Length of the line: 370 Ckm.

Fatehgarh-II RJJAF02 Rajasthan S/S LILO of both Ckts. of Fatehgarh (TBCB) - Work has also been affected due to lockdown of the entire PGCIL Bhadla (PG) line at Fatehgarh-II PS (PGCIL- D/C 765 0 221 96 25 MAR-21 country because of Corona Pandemic. Work has now RTM) restarted. 400 kV LILO at Fategarh II of 765 kV Bhadla-I PGCIL S/S - Fatehgarh S/S Fatehgarh- RJJAF03 Rajasthan III S/S PGCIL 765 KV Bhadla-I S/S - Bikaner-I S/S D/C 765 340 455 455 455 340 Jan-19 Oct-19 Commissioned PGCIL 765 kV Bikaner-I S/S -Moga S/S D/C 765 734 988 988 988 734 Mar'20 Comissioned 03/2020 Bikaner-I TBCB 400 kV Bikaner-I S/S - Bikaner-II S/S RJBIB01 Rajasthan S/S TBCB 765 kV Bikaner-I S/S -Khetri S/S LILO of 400 KV Bhadla (STU) S/S -Bikaner RVPN D/C 400 18 26 26 26 18 Jul-19 Commissioned 07/2019. (STU) S/S at Bikaner-I Bikaner-II TBCB 400 kV Bikaner-II S/S -Khetri S/S RJBIB02 Rajasthan S/S TBCB 400 kV Bikaner-I S/S - Bikaner-II S/S Ramgarh RJJAR01 Rajasthan RVPN 400 kV Ramgarh -Bhadla line D/C 400 320 446 446 446 314 OCT-20 AUG-20 W/O awarded to M/S SEW Hydrabad. S/S RVPN 200 kV Akal- Jaisalmer-2 line (GEC-I) D/C 220 112 195 192 191 56 NOV-20 SEP-20 NOA issued in favor of M/s Skipper on dated 01.06.2018. Jaisalmer-II RVPN 400 kV Jaisalmer-II S/S - Bamer S/S D/C 400 234 332 332 332 234 Jan-19 Commissioned 01/2019 RJJAJ02 Rajasthan S/S

64 Status of Under-Construction Transmission Line associated with U/C Renewable Energy Projects As on 30.06.20 Progress Status of Transmission Target Date Ckts Name of Voltage Total Total Owner of the (S/C) Foundation Tower Stringing Substation Transmission Level Length Locations Remarks State Line & completed Erected complete Schedule Revised Substation Lines (kV) (cKm) (Nos) Code (D/C) (Nos) (Nos) d (CKm) Jaisalmer-II RJJAJ02 Rajasthan S/S LILO at Jaisalmer-II S/S of Jaisalmer-I to RVPN Kankani S/S

RJJAB01 Bainsda S/S Rajasthan

RJJOK01 Kanasar S/S Rajasthan RVPN

Rajmathai RJJAR01 Rajasthan RVPN S/S Sri RJGNV01 Vijaynagar Rajasthan RVPN S/S RJBIG01 Gajnar S/S Rajasthan RVPN Gajner - Chhatargarh line (GEC-I) D/C 220 167 297 294 281 121 JAN-21 AUG-20 NOA issued on dated 05.06.18 in favor of M/s Man structural. LILO of one ckt of Khandwa (PGCIL) - PGCIL DCDS 400 20 8 8 8 DEC-20 Rajgarh (PGCIL) at Chhegaon

1. Objection has been raised by D.C, Dhule for traversing of line through submergence area of proposed Jamphal Dam in Maharastra and diversion of line is requested. Work is stopped now and this force majeure event has been intimated to the concerned LTTC’s. 2. In the meeting held in Khandwa MPKHK01 Madhya Pradesh CEA dated 29-07-2019, it has been finaised that KTL has to S/S TBCB Khandwa Pool - Dhule (KTL - TBCB) D/C 765 379 492 476 474 350 MAY-20 DEC-20 re-route the line so as to divert the Dam area and the (Sterlite) construction work of KD line has to be completed by May’20 subject to the timely grant of Forest Clearance and Sec-164 approval 3. Forest clearance proposal for diverted route is pending with Nodal officer, MoEF 4. Delay due to occurrence of Force Majeure (FM) event i.e. outbreak of COVID-19 and this FM event has been intimated to all LTTCs

400 kV LILO of Hindupur - Kadapa PGCIL D/C 400 18 0 0 0 (Cuddapah) at NP Kunta PS (GEC-II) Kadapa 400 kV LILO of Kadapa (Cuddapah) - Kolar APKAK01 (Cuddapah) Andhra Pradesh PGCIL D/C 400 14 0 0 0 S/C line at NP Kunta PS (GEC-II) S/S 400 kV Kadapa (Cuddapah)- Anathpur (SEZ) TBCB S/S 400/220 kV GIS TNTUV01 Tamil Nadu (New) vandanam

65 Status of Under-Construction Transmission Line associated with U/C Renewable Energy Projects As on 30.06.20 Progress Status of Transmission Target Date

Name of Voltage Total Total Owner of the Ckts Foundation Tower Stringing Transmission Level Length Locations Line (S/C) completed Erected complete Schedule Revised Lines (kV) (cKm) (Nos) Substation & (Nos) (Nos) d (CKm) Code Substation State (D/C) Remarks

Transmission network related to wind Power Projects GJKUB01 Bhuj PS Gujarat Yet to be awarded GETCO 400 220 0 0 0 MAR-21 400 kV Bhachunda- Bhuj PS Line D/C PGCIL 765 kV D/C line Khavda PS - Bhuj PS D/C 400 PGCIL 765 kV D/C Bhuj PS- Bhuj II PS D/C 400 GJKUB02 Bhuj-II PS Gujarat PGCIL 765 kV D/C Bhuj-II - Lakadia D/C 765 120 PGCIL 765 kV D/C Bhuj PS- Bhuj II PS D/C 765 GJKUB03 Bachau S/S Gujarat PGCIL 400 kV Lakadia S/s - Bachau S/S D/C 400 Bhachau - Radhanpur Yet to award. GETCO 220 340 0 0 0 0 MAR-22 D/C Jam Gujarat Khambhaliy PGCIL 400 a PS (GIS) GJDWJ01 400 kV Lakadia S/S - Jam Khambalia S/S D/C MPRA01 Rajgarh Madhya PGCIL 400 kV Rajgarh S/S- Sujalpur S/S D/C 400 (PG) S/S Pradesh PGCIL 400 kV Rajgarh S/S- Bhopal S/S D/C 400 Rajgarh (B) - Nalkheda (GEC) MPTRANSCO 220 144 205 191 134 26 DEC-20 D/C MPTRANSCORajgarh - Susner (GEC-I) D/C 220 0 0 0 0 TNKA02 Pugalur S/s Tamil Nadu 400 kV Pugalur (Existing) S/s - Pugalur PGCIL 400 100 138 138 138 100 JUN-20 AUG-20 (New) (New) S/s (LILO at Karur) D/C

PGCIL 400 118 162 154 146 79 JUN-20 AUG-20 400 kV Pugalur (New) S/s - Arasur S/s D/C

PGCIL 400 114 150 91 33 12 FEB-20 NOV-20 400 kV Pugalur (New) S/s - Edayarpalam S/s D/C 400 kV HVDC Line Pugalur (New) S/s - N. PGCIL 320 364 404 378 327 122 APR-20 DEC-20 Trichur S/s BIPOLE

PGCIL 400 780 1109 944 807 167 FEB-20 DEC-20 400kV Pugalur (New) S/s - THiRUVALAM S/s D/C 400 kV HVDC Line Raigarh S/s- Pugalur PGCIL (New) S/s BIPOLE 800 3531 4773 4772 4771 3524 AUG-20 AUG-20 Thirunveli Tamil Nadu TNTI01 S/s Palakkad Kerela KEPA01 S/s Parli S/S Maharastra LILO of KPSHEP - Kundah PH-III at Parali The existing LILO of KPSHEP - Kundah PH-III, 230 kv D/C 230 0 0 0 0 MHBE01 (400/230 kV S/S) D/C line to Parali 400/230 kV S/S . And utilizing the existing KNCH01 Hiryur S/s Karnataka PGCIL 400 kV Hiriyur S/s - Mysore S/s D/C 400 206 565 565 565 206 DEC-19 MAY-20 Commissioned 04/20. Chitradurga - Hiriyur S/S D/C 220 78 152 142 103 56 MAR-19 DEC-19 ROW issues resloved and work is under progress. Hiriyur (PG) - Hiriyur S/S S/C 220 16 18 0 0 APR-19 DEC-19 work to be taken up.(Only stringing work to be done in the Hiriyur - Mysore (GEC-II) D/C 400 412 565 565 565 412 JAN-19 Apr’20 Tumkur PS - Hiriyur (GEC-II) D/C 400 218 302 302 302 218 Sep-18 Completed

66