Federal PSDP 2018-19 Releases As on 31-August-2018 (Million Rupees)

Total Page:16

File Type:pdf, Size:1020Kb

Federal PSDP 2018-19 Releases As on 31-August-2018 (Million Rupees) Federal PSDP 2018-19 Releases as on 31-August-2018 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2018-19 Releases Upto June forward (Rupee Total Foreign Rupees Foreign Total 2018 Component) Aid Aid AVIATION DIVISION 1 Acquisition of Land for Construction/ 1,600.0 0.0 450.4 1,149.6 250.000 0.000 250.000 Establishment of Airport at Mansehra, KPK 2Airport Security Force (ASF) 2,586.9 0.0 1,726.3 860.6 859.690 0.000 859.690 171.940 Accommodation at New Islamabad International Airport (Revised) 3Construction of Rain Water 2,228.0 0.0 1,920.7 307.3 307.260 0.000 307.260 20.000 Harvesting Kasana Dam, Islamabad 4Construction of Single Barrack at 38.5 0.0 21.4 17.1 17.120 0.000 17.120 3.424 DG Khan Airport 5Construction of Single Barrack for 17.1 0.0 17.0 0.1 0.100 0.000 0.100 0.020 36 ASF Personnel alongwith OC Residence at Moen-jo-Daro Airport 6 Establishment of Flood Forecasting 230.0 0.0 180.0 50.0 50.000 0.000 50.000 & Warning System for Kalpani Nullah Basin, Mardan (KPK) 7Establishment of Specialized 2,502.5 2,441.0 2,487.0 15.5 3.532 81.000 84.532 0.700 Medium Range Weather Forecasting Centre (SMRFC) and Strengthening of Weather Forecasting System 8Installation of Weather Surveillance 1,580.0 1,542.0 108.0 1,472.0 15.000 446.000 461.000 3.000 Radar at Karachi in the Islamic Republic of Pakistan 9 New Gwadar International Airport, 22,247.5 2,751.1 1,053.7 21,193.8 800.000 1,000.000 1800.000 Gwadar 10Reverse Linkage Project Between 101.0 30.0 8.2 92.8 31.830 10.975 42.805 6.366 Pakistan Meteorological Department and Marmara Research Centre(MRC), Turkey 11Extension/Up-Gradation of Bannu 676.0 0.0 0.0 676.0 675.980 0.000 675.980 5.000 Airport for A-320/B-737 or Equivalent Aircraft Operation Phase- 1 (Land Acquisition Bannu) 12 Installation of Weather Surveillance 1,842.0 1,720.0 0.0 1,842.0 9.000 20.000 29.000 Radar at Multan 13 Strengthening of Early Warning 12,942.0 0.0 0.0 12,942.0 50.000 50.000 100.000 System of Pakistan Meteorological Department Total: 48591.4 8484.1 7972.6 40618.8 3069.512 1607.975 4677.487 210.450 BOARD OF INVESTMENT 14 Establishment of Project 339.3 0.0 0.0 339.3 125.000 0.000 125.000 Management Unit (PMU) on China Pakistan Economic Corridor Industrial Cooperation Development Project (CPEC-ICDP) Total: 339.3 0.0 0.0 339.3 125.000 0.000 125.000 CABINET DIVISION 15Digitization of Archival Holdings of 39.4 0.0 35.1 4.3 7.300 0.000 7.300 1.460 the National Archives of Pakistan Page 1 of 70 Federal PSDP 2018-19 Releases as on 31-August-2018 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2018-19 Releases Upto June forward (Rupee Total Foreign Rupees Foreign Total 2018 Component) Aid Aid 16Establishment of 200 Bed Center of 5,301.4 0.0 983.3 4,318.2 1,000.000 0.000 1000.000 200.000 Excellence for Obstetrics & Gynecology at Rawalpindi (Revised) 17 Infrastructure Development & 59.1 0.0 0.0 59.1 59.138 0.000 59.138 Provision of Security Lights at Newly Purchased Eight (08) Acres of Land at 6 Aviation Squadron, Islamabad Heliport 18 Tourism Master Plan AJK, GB and 50.0 0.0 0.0 50.0 50.000 0.000 50.000 Swat (Technical Study) Total: 5449.9 0.0 1018.3 4431.6 1116.438 0.000 1116.438 201.460 CAPITAL ADMINISTRATION & DEVELOPMENT DIVISION 19Construction / Upgradation of 439.7 0.0 239.7 200.0 199.992 0.000 199.992 39.998 Mosque at Pak- Secretariat, Islamabad 20 Construction of Additional Family 2,908.4 0.0 1,265.0 1,643.4 200.000 0.000 200.000 Suits for the Members of Parliament including 500 Servant Quarters at G- 5/2, Islamabad 21 Security Arrangements at 98.1 0.0 74.5 23.7 23.663 0.000 23.663 Parliament House Building, G-5, Islamabad 22 Signal Free Islamabad Expressway 10,750.0 0.0 1,000.0 9,750.0 7,000.000 0.000 7000.000 (Phase-III) 23 Conduction of Water from Indus 75,929.9 7,862.4 0.0 75,929.9 500.000 0.000 500.000 River System of Tarbella Dam for Islamabad and Rawalpindi 24 Providing / Replacement of HVAC 295.8 0.0 0.0 295.8 295.760 0.000 295.760 System Installed at Aiwan-e-Sadr, Islamabad 25 Providing / Replacement of 10 Nos. 158.0 0.0 0.0 158.0 158.009 0.000 158.009 Lifts Installed at Aiwan-e-Sadr, Islamabad 26Construction / Establishment of 59.8 0.0 29.9 29.9 29.885 0.000 29.885 5.954 OPD Block of Federal General Hospital, Chak Shahzad, Islamabad 27 Establishment of Centre for 588.1 0.0 0.8 587.3 400.000 0.000 400.000 Hematology Disorder at PIMS, Islamabad 28Establishment of Safe Blood 683.0 475.0 128.3 554.8 120.000 100.000 220.000 4.000 Transfusion Services Project 29Establishment of Orthopedic 20.3 0.0 11.0 9.3 9.258 0.000 9.258 1.852 Workshop at National Special Education Centre for Physically Handicapped Children, G-8/4, Islamabad 30Up-Gradation of Non-Radiation / 198.1 0.0 100.0 98.1 98.130 0.000 98.130 19.626 Modern Endoscopy Diagnostic Services in PIMS, Islamabad 31 Cancer Hospital, Islamabad 1,998.0 0.0 0.0 1,998.0 265.000 0.000 265.000 32 Construction of Federal Medical 8,206.8 0.0 0.0 8,206.8 200.000 0.000 200.000 College, Islamabad Page 2 of 70 Federal PSDP 2018-19 Releases as on 31-August-2018 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2018-19 Releases Upto June forward (Rupee Total Foreign Rupees Foreign Total 2018 Component) Aid Aid 33 Construction of Female Doctor 222.1 0.0 0.0 222.1 50.000 0.000 50.000 Hostel at PIMS, Islamabad 34 Construction of Nursing Hostel at 59.4 0.0 0.0 59.4 50.000 0.000 50.000 PIMS, Islamabad 35 Establishment of Centre for 7,439.0 0.0 0.0 7,439.0 300.000 0.000 300.000 Neurosciences at PIMS, Islamabad 36 Extension of Organ Transplant 2,000.0 0.0 0.0 2,000.0 500.000 0.000 500.000 Centre 37 Establishment of Unit for Shredding, 295.3 0.0 0.0 295.3 295.316 0.000 295.316 Sterilization and Disposal of Medical Waste at Shaheed Zulfiqar Ali Bhutto Medical University / Pakistan Institute of Medical Sciences, Islamabad 38 Extension of Cardiac Centre 100.0 0.0 0.0 100.0 25.000 0.000 25.000 Extension Block at PIMS, Islamabad (Feasibility) 39 Replacement/ Up-gradation HVAC 725.0 0.0 0.0 725.0 725.000 0.000 725.000 Plant Room Equipment & Allied Works at PIMS, Islamabad 40 Strengthening of Intensive Care Unit 152.9 0.0 0.0 152.9 46.000 0.000 46.000 at FGPC, Islamabad 41 Strengthening of Maternal and Child 35.0 0.0 0.0 35.0 35.000 0.000 35.000 Health Care Services at FGPC (PGMI), Islamabad 42 Up-Gradation of Department of 50.0 0.0 0.0 50.0 49.950 0.000 49.950 Nephrology at PIMS, Islamabad 43 Up-gradation of Existing Liver 500.0 0.0 0.0 500.0 500.000 0.000 500.000 Transplant Centre at PIMS 44 Up-Gradation of Gastroenterology 386.0 0.0 0.0 386.0 100.000 0.000 100.000 Department/Replacement of Equipment for Advance Liver and GI Diseases PIMS, Islamabad 45 Up-gradation of Other Facilities at 200.0 0.0 0.0 200.0 200.000 0.000 200.000 PIMS 46 Up-Gradation of Radiology 364.5 0.0 0.0 364.5 110.000 0.000 110.000 Department at FGPC (PGMI), Islamabad 47 Construction of New Building of 30.8 0.0 17.8 13.0 13.000 0.000 13.000 Islamabad Model School for Boys (I- V), Mangial (F.A), Islamabad. 48Construction of New Building of 46.3 0.0 39.3 7.0 7.000 0.000 7.000 1.400 Islamabad Model School for Girls (I- VIII) Khana Dak, Islamabad 49Establishment of Federal 1,543.1 607.5 650.6 892.5 350.000 150.000 500.000 30.000 Government College of Home Economics, Management Sciences & Specialized Disciplines, F-11/1, Islamabad 50 Establishment of Islamabad Model 59.4 0.0 47.6 11.8 11.831 0.000 11.831 School for Girls (I-X), PAF Complex, E-9, Islamabad Page 3 of 70 Federal PSDP 2018-19 Releases as on 31-August-2018 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2018-19 Releases Upto June forward (Rupee Total Foreign Rupees Foreign Total 2018 Component) Aid Aid 51Establishment of Resource Unit for 54.3 0.0 10.3 44.1 22.000 0.000 22.000 4.000 Autistic Children at National Special Education Centre for Mentally Retarded Children, H-8/4, Islamabad.
Recommended publications
  • Students' Perception of the Learning Environment in Private-Sector
    Pharmacy Education (2020) 20(1) 191 - 197 https://doi.org/10.46542/pe.2020.201.191197 RESEARCH ARTICLE Students’ perception of the learning environment in private-sector pharmacy institutes of Pakistan 1 iiii 2 2 1 3 4 Samra Bashir , Arif-ullah Khan , Maryam Mahmood , Mateen Abbas , Samar Akhtar , Abdul Waheed Khan , Muhammad Tahir Aqeel5, Muhammad Akhlaq6 & Hamaad Ahmad3 1Capital University of Science and Technology, Islamabad, Pakistan 2Riphah Institute of Pharmaceutical Sciences, Riphah International University, Islamabad, Pakistan 3Yusra Institute of Pharmaceutical Sciences, Islamabad, Pakistan 4Department of Pharmacy, University of Lahore, Islamabad, Pakistan 5Margalla College of Pharmacy, Margalla Institute of Health Sciences, Rawalpindi, Pakistan 6Department of Pharmacy, Abasyn Univeristy Islamabad Campus, Islamabad, Pakistan Keywords Abstract Pharmacy Institutes Student’s Perception Introduction: A conducive learning environment is crucial to the effective delivery of Learning Environment curriculum and professional and social development of the students. This cross-sectional DREEM study was conducted to investigate students’ perception of the learning environment in private-sector pharmacy institutes of Pakistan. Methods: The overall learning environment and its various aspects were compared between different pharmacy institutes, year of study Correspondence and gender. Questionnaires, based on the Dundee Ready Education Environment Measure Dr Samra Bashir (DREEM) and demographic information, were completed by 527 undergraduate pharmacy Department of Pharmacy students enrolled at six private-sector pharmacy institutes in Pakistan. Participants were Capital University of Science & selected by convenience sampling and the scores were compared across grouping variables Technology identified via demographic information. Results: The total DREEM score across the sample Islamabad EXpressway was 116.10±25.39 (mean ± S.D), indicating an overall positive perception of the learning Kahuta Road environment among students of the private-sector pharmacy institutes.
    [Show full text]
  • Annexures for Annual Report 2020
    List of Annexures Annex A Minutes of the Annual General Meeting held on March 08, 2019 Annex B Detailed Expenditures on Purchase and Establishment of PCATP Head Office Islamabad Annex C Policy guidelines for Online Teaching-Learning and Assessment Implementation Annex D Thesis guidelines for graduating batch during COVID-19 pandemic Annex E Inclusion of PCATP in NAPDHA Annex F Inclusion of role of Architects and Town Planners in the CIDB Bill 2020 Annex G Circulation List for Compliance of PCATP Ordinance IX of 1983 Annex H Status of Institutions Offering Architecture and Town Planning Undergraduate Degree Programs in Pakistan Annex I List of Registered Members and Firms who have contributed towards COVID- 19 fund in PCATP Account Annex J List of Registered Members and Firms who have contributed towards COVID- 19 fund in IAP Account Audited Accounts and Balance Sheet of PCATP General Fund and RHS Annex K Account for the Year 2018-2019 Page | 1 ANNEX A MINUTES OF THE ANNUAL GENERAL MEETING OF THE PAKISTAN COUNCIL OF ARCHITECTS AND TOWN PLANNERS ON FRIDAY, 8th MARCH, 2019, AT RAMADA CREEK HOTEL, KARACHI. In accordance with the notice, the Annual General Meeting of the Pakistan Council of Architects and Town Planners was held at 1700 hrs on Friday, 8th March, 2019 at Crystal Hall, Ramada Creek Hotel, Karachi, under the Chairmanship of Ar. Asad I. A. Khan. 1.0 AGENDA ITEM NO.1 RECITATION FROM THE HOLY QURAN 1.1 The meeting started with the recitation of Holy Quran, followed by playing of National Anthem. 1.2 Ar. FarhatUllahQureshi proposed that the house should offer Fateha for PCATP members who have left us for their heavenly abode.
    [Show full text]
  • Project/Programme Proposal to the Adaptation Fund
    PROJEC T/PROGRAMME PROPOSAL TO THE ADAPTATION FUND PART I: PROJECT/PROGRAMME INFORMATION Title of Project/Programme: Enhance community, local and national-level urban climate change resilience to water scarcity, caused by floods and droughts in Rawalpindi and Nowshera, Pakistan Country: Pakistan Type of Implementing Entity: Multilateral Implementing Entity: United Nations Human Settlements Programme Executing Entities: National level: - Ministry of Climate Change – through establish- ment of PMU; NDMA - Ministry of Water Resources Local level: - Concerned provincial and district departments in- cluding Provincial and district disaster management authorities - Municipal Corporation Rawalpindi and Municipal Committee/Tehsil Municipal Administration Now- shera Community level: - Shehersaaz NGO - Elected representatives and officials of target Union and Neighbourhood Councils - Community based organizations and citizen/women groups in target communities Amount of Financing Requested: USD 6,094,000 1 1. Project Background and Context Problem Statement, Need for the Project and Proposed Approach Reducing the impact of flooding and droughts is becoming one of the top priorities of the government of Pakistan1. The government has requested UN-Habitat, through its Adaptation Fund designated authority to develop a project that addresses these adaptation challenges in line with the National Water Policy 2018, the National Flood Pro- tection Plan 20162 and the National Disaster Management Plan 2012. Even though flood impacts are often severe in urban areas3, a national approach to address this situation in cities doesn’t exist in Pakistan. This is critical, considering that 36.4% of Pakistan’s population lives in urban areas4. Existing approaches to deal with flood and drought impacts are not comprehensive and rainwater harvesting techniques are rarely used.
    [Show full text]
  • Population According to Religion, Tables-6, Pakistan
    -No. 32A 11 I I ! I , 1 --.. ".._" I l <t I If _:ENSUS OF RAKISTAN, 1951 ( 1 - - I O .PUlA'TION ACC<!>R'DING TO RELIGIO ~ (TA~LE; 6)/ \ 1 \ \ ,I tin N~.2 1 • t ~ ~ I, . : - f I ~ (bFICE OF THE ~ENSU) ' COMMISSIO ~ ER; .1 :VERNMENT OF PAKISTAN, l .. October 1951 - ~........-.~ .1',l 1 RY OF THE INTERIOR, PI'ice Rs. 2 ~f 5. it '7 J . CH I. ~ CE.N TABLE 6.-RELIGION SECTION 6·1.-PAKISTAN Thousand personc:. ,Prorinces and States Total Muslim Caste Sch~duled Christian Others (Note 1) Hindu Caste Hindu ~ --- (l b c d e f g _-'--- --- ---- KISTAN 7,56,36 6,49,59 43,49 54,21 5,41 3,66 ;:histan and States 11,54 11,37 12 ] 4 listricts 6,02 5,94 3 1 4 States 5,52 5,43 9 ,: Bengal 4,19,32 3,22,27 41,87 50,52 1,07 3,59 aeral Capital Area, 11,23 10,78 5 13 21 6 Karachi. ·W. F. P. and Tribal 58,65 58,58 1 2 4 Areas. Districts 32,23 32,17 " 4 Agencies (Tribal Areas) 26,42 26,41 aIIjab and BahawaJpur 2,06,37 2,02,01 3 30 4,03 State. Districts 1,88,15 1,83,93 2 19 4,01 Bahawa1pur State 18,22 18,08 11 2 ';ind and Kbairpur State 49,25 44,58 1,41 3,23 2 1 Districts 46,06 41,49 1,34 3,20 2 Khairpur State 3,19 3,09 7 3 I.-Excluding 207 thousand persons claiming Nationalities other than Pakistani.
    [Show full text]
  • Margallah Hills National Park.Pdf
    i Cover page design: Irfan Ashraf, GIS Laboratory, WWF – Pakistan Photo Credits: Kaif Gill and Naeem Shahzad, GIS Laboratory, WWF - Pakistan ii Contents Contents.............................................................................................................................iii List of Figures ...................................................................................................................iv List of Tables.....................................................................................................................iv List of Abbreviations .........................................................................................................v Acknowledgments .............................................................................................................1 Summary ............................................................................................................................2 1 INTRODUCTION.......................................................................................................3 1.1 Background..........................................................................................................3 1.2 Study Area ...........................................................................................................4 2 MATERIALS AND METHODS ................................................................................6 2.1 Satellite Data Procurement ...............................................................................6 2.2 Software Used.....................................................................................................7
    [Show full text]
  • Federal PSDP 2018-19 Releases As on 21-12-2018 (Million Rupees)
    Federal PSDP 2018-19 Releases as on 21-12-2018 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2018-19 Releases Upto June forward (Rupee Total Foreign Rupees Foreign Total 2018 Component) Aid Aid AVIATION DIVISION 1Airport Security Force (ASF) 2,586.9 0.0 1,726.3 860.6 859.690 0.000 859.690 343.880 Accommodation at New Islamabad International Airport (Revised) 2Construction of Rain Water 2,228.0 0.0 1,920.7 307.3 307.260 0.000 307.260 70.000 Harvesting Kasana Dam, Islamabad 3Construction of Single Barrack at 38.5 0.0 21.4 17.1 17.120 0.000 17.120 6.848 DG Khan Airport 4Construction of Single Barrack for 17.1 0.0 17.0 0.1 0.100 0.000 0.100 0.040 36 ASF Personnel alongwith OC Residence at Moen-jo-Daro Airport 5Establishment of Flood Forecasting 230.0 0.0 180.0 50.0 50.000 0.000 50.000 0.000 & Warning System for Kalpani Nullah Basin, Mardan (KPK) 6Establishment of Specialized 2,502.5 2,441.0 2,487.0 15.5 3.532 81.000 84.532 1.400 Medium Range Weather Forecasting Centre (SMRFC) and Strengthening of Weather Forecasting System 7Installation of Weather Surveillance 1,580.0 1,542.0 108.0 1,472.0 15.000 446.000 461.000 5.000 Radar at Karachi in the Islamic Republic of Pakistan 8 New Gwadar International Airport, 22,247.5 2,751.1 1,053.7 21,193.8 800.000 1,000.000 1800.000 Gwadar 9Reverse Linkage Project Between 101.0 30.0 8.2 92.8 31.830 10.975 42.805 12.732 Pakistan Meteorological Department and Marmara Research Centre(MRC), Turkey 10Installation of Weather Surveillance 1,842.0 1,720.0 0.0 1,842.0 9.000 20.000 29.000 3.600
    [Show full text]
  • Islamabad Testing Service Jobs Application Form
    Islamabad Testing Service Jobs Application Form Inevitable and parasynthetic Ethan conduct some mechanisation so electively! Veiny and Yugoslav Orton extemporized some Recife so arrantly! Public-spirited and intermediary Durand confab her juggernaut perjuring while Hari dallies some jumbo federally. The aaj newspaper jobs opportunity to operation division, islamabad testing service of the national testing service must reach this test center Minister for admissions is linked with your application form for your comment data thus purpose including govt jobs in nts recruitment on. Press Release Events Job Advertisements Downloads Judicial Forms. Candidates are required to define read all details about the test schedule, preparation, you can ask the network administrator to dump a scan across several network especially for misconfigured or infected devices. Go into doctoral degrees and more service. WELCOME TO CTSPAK Central Testing Services CTS is an employment and academic testing service dealing with university students and job applicants. This online here nat is basically a technologically based? GENERAL this NOTICE: DTS COMES TO KNOW though FEW SOCIAL MEDIA WEBSITES AND CHANNELS MISLEADINGLY LINKING THE DTS JOBS ANNOUNCEMENT WITH SECP HIRING. We can check below, do not be downloaded with us in conducting these organizations as in. Just a captcha proves you are helping us in daily latest jobs. Form Deposit slip to NTS Headquarter 1-E Street 46 Sector 1-2 Islamabad. How to hawk for Islamabad Testing Service Jobs Application forms can be downloaded from wall ITS Website at wwwitsbizpk A duly filled form. Prometric test center network. Vacancies are available find people from Islamabad Karachi Rawalpindi Multan Faisalabad Peshawar Lahore and across Pakistan.
    [Show full text]
  • Interim Report on the Review of Master Plan of Islamabad (2020-2040)
    REGISTERED No. M - 302 L.-7646 Ste ea,ette at adds'tatt EXTRAORDINARY • PUBLISHED BY AUTHORITY ISLAMABAD, FRIDAY, FEBRUARY 14, 2020 PART II Statutory Notifications (S. R. 0.) GOVERNMENT OF PAKISTAN CAPITAL DEVELOPMENT AUTHORITY (Master Planning Directorate) NOTIFICATION Islamabad, the I bh February, 2020 a. SuBJECTREVIEW OF MASTER PLAN OF ISLAMABAD (2020-2040) PREPARED BY FEDERAL COMMISSION (Interim Report) S,R.O. 110(1)(2020).—In exercise of powers conferred by Section 51 of the Capital Development Authority Ordinance, 1960 (No. XXIII of 1960), read with section 11 thereof, the Capital Development Authority has been pleased to notify with immediate'effeet till further orders following "Interim Report on the review of Master Plan of Islamabad (2020-2040)" prepared by the Commission constituted by the Federal Government of Pakistan and approved by the Federal Cabinet. ['No. CDA-30(15) (Noti)-SCB/2020/2751 SYED SAFDAR AU, Secretaly, CDA Board (273) Price: Rs. 15000 [5152(2020)/Ex. Gaz.] 274 THE GAZETTE OF PAKISTAN, EXTRA., FEBRUARY 14, 2020 [PART II REVIEW OF MASTER PLAN OF ISLAMABAD (2020-2040) Government of Pakistan 7 October 2019 PREP AREDL,BY Federal Commission IN COLLABORATION_ WITH Capital Development Authority, Islamabad PART IIJ THE GAZETTE OF PAKISTAN, EXTRA.. FEBRUARY 14, 2020 275 RAGE II NEED FOR REVIEW he Capital needs retwirrnt on cind regeneration The capital city has had only one master plan made by Doxiadis Associates in 1960. Afterwards tt was reviewed a couple of times but no substantial changes or reforms were made. The world has changed rapidly and the capital is facing numerous problems concerning the way it is growing.
    [Show full text]
  • Press Release Anf Seized 232.245 Kg Drugs in 26
    PRESS RELEASE ANF SEIZED 232.245 KG DRUGS IN 26 OPERATIONS ARRESTED 40 PERSONS INCLUDING 4 LADIES AND INTERCEPTED 11 VEHICLES INVOLVED IN DRUG SMUGGLING THE SEIZED DRUGS WORTH RS 1.127 BILLION INTERNATIONALLY Determined to uproot drug menace from the country and the world, Anti Narcotics Force Pakistan seized 232.245 Kg Narcotics valuing Rs. 1.127 Billion internationally, arrested 40 culprits including 4 Ladies and impounded 11 vehicles while conducting 26 counter-narcotic strikes. The seized drugs comprised of 104.29 Kg Hashish, 75.2 Kg Opium, 51.025 Kg Heroin, 970 gram Amphetamine (Ice) and 0.760 gram Methamphetamine (Ice). ANF Rawalpindi recovered 500 Gram Hashish from personal possession of the arrested accused namely Ashraf Khan resident of Rawalpindi. He was arrested near Chakwal Morr, Main GT Road, Jehlum. In another operation, ANF Rawalpindi arrested three accused namely Akif Shah and two lady accomplice namely Jasmin and Yasmeen all residents of Charsada and recovered 4.8 Kg Hashish and 1.2 Kg Opium from their personal possession. They were arrested near Chakwal Morr, main GT Road, Jehlum. In third operation, ANF Rawalpindi intercepted a Hino Truck near Koral Chowk, Islamabad Expressway and recovered 6.000 Kg Hashish & 6.000 Kg Opium which was concealed in secret cavities of the seized Truck. Resultantly three accused namely Abdul Wakeel, Minar Khan and Ameen Khan all resident of Khyber agency were arrested during the operation. In fourth operation, ANF Rawalpindi arrested an accused namely Suleman resident of Charsadda and recovered 2 Kg Hashish form his personal possession. He was arrested near Chungi No 26 Bus Stop, Islamabad.
    [Show full text]
  • IEE: Pakistan: Power Distribution Enhancement Investment Program
    Initial Environmental Examination August 2012 MFF 0021-PAK: Power Distribution Enhancement Investment Program – Proposed Tranche 3 Prepared by the Islamabad Electric Supply Company for the Asian Development Bank. ISLAMABAD ELECTRIC SUPPLY COMAPNY INITIAL ENVIRONMENTAL EXAMINATION REPORT (IEE) FOR In and Out Construction at 132 KV Chakri Grid Station Transmission Line (Stringing of Second Circuit on Existing Line) POWER DISTRIBUTION ENHANCEMENT PROJECT (TRANCHE – III) UNDER ASIAN DEVELOPMENT BANK MULTI TRANCHE FINANCING FACILITY (MFF) AUGUST 2012 (DRAFT) Prepared & Submitted By ENVIRONMENTAL & SOCIAL SAFEGUARD UNIT OFFICE OF G.M (DEVELOPMENT) MANAGEMENT UNIT ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO) ISLAMABAD – PAKISTAN. In / Out Construction at 132 KV Chakri GS Transmission Line Subproject (IESCO) Initial Environmental Examination (IEE) Report Table of Contents 1. INTRODUCTION 1 1.1 Overview 1 1.2 Scope of the IEE Study and Personnel 4 1.3 Structure of Report 5 2. POLICY AND STATUARY REQUIREMENTS IN PAKISTAN 7 2.1 Statutory Framework 7 2.1.1 Pakistan Environmental Protection Act, 1997 7 2.1.2 Pakistan Environmental Protection Agency Review of IEE and EIA Regulations, 2000 8 2.1.3 National Environmental Quality Standards 9 2.1.4 Other Relevant Laws 9 3. DESCRIPTION OF THE PROJECT 11 3.1 Type of the Project 11 3.2 Categorization of the Project 11 3.3 Need for the Project 11 3.4 Location and Scale of Project 12 3.5 Decommissioning and Disposal of Materials 14 3.6 Proposed Schedule for Implementation 15 4. DESCRIPTION OF THE ENVIRONMENT 17
    [Show full text]
  • Punjab Tourism for Economic Growth Final Report Consortium for Development Policy Research
    Punjab Tourism for Economic Growth Final Report Consortium for Development Policy Research ABSTRACT This report documents the technical support provided by the Design Team, deployed by CDPR, and covers the recommendations for institutional and regulatory reforms as well as a proposed private sector participation framework for tourism sector in Punjab, in the context of religious tourism, to stimulate investment and economic growth. Pakistan: Cultural and Heritage Tourism Project ---------------------- (Back of the title page) ---------------------- This page is intentionally left blank. 2 Consortium for Development Policy Research Pakistan: Cultural and Heritage Tourism Project TABLE OF CONTENTS LIST OF ACRONYMS & ABBREVIATIONS 56 LIST OF FIGURES 78 LIST OF TABLES 89 LIST OF BOXES 910 ACKNOWLEDGMENTS 1011 EXECUTIVE SUMMARY 1112 1 BACKGROUND AND CONTEXT 1819 1.1 INTRODUCTION 1819 1.2 PAKISTAN’S TOURISM SECTOR 1819 1.3 TRAVEL AND TOURISM COMPETITIVENESS 2324 1.4 ECONOMIC POTENTIAL OF TOURISM SECTOR 2526 1.4.1 INTERNATIONAL TOURISM 2526 1.4.2 DOMESTIC TOURISM 2627 1.5 ECONOMIC POTENTIAL HERITAGE / RELIGIOUS TOURISM 2728 1.5.1 SIKH TOURISM - A CASE STUDY 2930 1.5.2 BUDDHIST TOURISM - A CASE STUDY 3536 1.6 DEVELOPING TOURISM - KEY ISSUES & CHALLENGES 3738 1.6.1 CHALLENGES FACED BY TOURISM SECTOR IN PUNJAB 3738 1.6.2 CHALLENGES SPECIFIC TO HERITAGE TOURISM 3940 2 EXISTING INSTITUTIONAL ARRANGEMENTS & REGULATORY FRAMEWORK FOR TOURISM SECTOR 4344 2.1 CURRENT INSTITUTIONAL ARRANGEMENTS 4344 2.1.1 YOUTH AFFAIRS, SPORTS, ARCHAEOLOGY AND TOURISM
    [Show full text]
  • Islamabad, Page 1 of 2
    Things to Do in Islamabad, page 1 of 2 Things to Do in Islamabad Islamabad is a charming city where lush green hill backdrops and mild warm weather set it apart from other big cities in the region. It is a city, not for the night owls and party animals, but for the aesthetically inclined and to those drawn to the glory of nature. Islamabad’s relative infancy as a major metropolis is reflected in the city’s architecture, which is modern – the influence of its first urban planner Constantinos A. Doxiadis is pretty evident – yet distinctly Islamic in appearance. Faisal Mosque E-7, Islamabad, ICT, Pakistan The Faisal Mosque (also known as Shah Faisal Masjid) is the largest mosque in Pakistan, located in the national capital city of Islamabad. Completed in 1986, it was designed by Turkish architect Vedat Dalokay to be shaped like a desert Bedouin’s tent. It functions as the national mosque of Pakistan. Height: 295' (90 m) Architect: Vedat Dalokay Margalla Hills The Margalla Hills—also called Margalla Mountain Range are also a part of lesser Himalayas located north of Islamabad. Margalla Range has an area of 12,605 hectares.The hills are a part of Murree hills. It is a range with many valleys as well as high mountains. The hill range nestles between an elevation of 685 meters at the western end and 1,604 meters on its east with average height of 1000 meters. Its highest peak is Tilla Charouni.The range gets snowfall in winters. Instituted in 1980, the Margalla Hills National Park comprises the Margalla Range (12605 hectares) the Rawal Lake, and Shakarparian Sports and Cultural complex.
    [Show full text]